36E77618R0062-007.pdf

PDF 14 MB Posted

Attached to
Research Addition JP, Construction Federal contract opportunity
Solicitation number
36E77618R0062
Issued by
Department of Veterans Affairs Headquarters

About this file

36E77618R0062 S02 Attachment 6 523-307 Research Addition JP - Bid Docs - Plans Vol 2.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Research Addition JP, Construction, newest first.
File Type Posted
36E77619C0005_1.docx DOCX document
36E77618R0062-0002000.docx DOCX document
36E77618R0062-0001000.docx DOCX document
36E77618R0062-012.docx DOCX document
36E77618R0062-004.pdf PDF
36E77618R0062-009.pdf PDF
36E77618R0062-006.pdf PDF
36E77618R0062-011.docx DOCX document
36E77618R0062-001.docx DOCX document
36E77618R0062-003.pdf PDF
36E77618R0062-005.pdf PDF
36E77618R0062-010.pdf PDF
36E77618R0062-002.pdf PDF
36E77618R0062-008.pdf PDF
36E77618R0062-000.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING 1

BUILDING 1F

ACA ADDITION

AREA OF WORK

SITE LOCATION MAP

49 DARTMOUTH STREET

PORTLAND, ME 04101

207-775-1059 www.pdtarchs.com

ARCHITECTURE

INTERIOR DESIGN

PLANNING

Project Number

Building Number

Drawing NumberLocation

Project Title

Date Checked Drawn

Drawing Title

Approved: Project Director

Dwg:

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

1 2 3 4 5 6 7 8

A

B

C

D

E

A

B

C

D

E

F

VA FORM 08-6231, OCT 1978

on e e ig ht h in ch o ne fo ot on e q ua rte r i nc on e h al f th re e e ig hs th re e q ua rte rs i

6" on e i

6" on e a nd on e h a lf i nc he s f oo t 6"

M.E.P.:

Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376

Denis McLaughlin Telephone: 857-364-5149

1 2 3 4 5 6 7 8

SITE LOCATION MAP

JAMAICA PLAIN CAMPUS

VA JAMAICA PLAIN CAMPUS

SPECIFICATIONS:

Lowell Specifications, Inc.

34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001

STRUCTURAL:

Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822

CIVIL/LANDSCAPE:

Stantec Consulting 141 Portland St.

Boston, MA 02114 T: (617) 523-8103

AE Research Addition 523-307

0%

S

UB

MI

TT

AL

- B

ID

D

OC

UM

EN

TS

3-31-2016

Title Sheet Volume 2

+T002

PNDW

523-307 AE Research Addition

DEPARTMENT OF VETERANS AFFAIRS

BOSTON HEALTHCARE SYSTEM

JAMAICA PLAIN CAMPUS

100% SUBMITTAL - BID DOCUMENTS (VOLUME 2)

SHEET INDEX - VOLUME 1

SHEET

NUMBER Sheet Name

SHEET INDEX - VOLUME 1

SHEET

NUMBER Sheet Name

SF-103 Third Floor Framing Plan SF-104 Roof Framing Plan SF-200 Column Schedules & Details SF-500 Framing Sections & Details SF-501 Framing Sections & Details SF-502 Framing Sections & Details SF-503 Framing Sections & Details SF-504 Framing Sections & Details SF-505 Framing Sections & Details

SHEET INDEX - VOLUME 1

SHEET

NUMBER Sheet Name

+T001 Title Sheet Volume 1 General -G-001 VA Project General Notes -G-002 Project General Notes & Material Legend Civil VF101 Survey-Plan-Field CD101 Civil-Plan-Demo CS101 Civil-Plan-Site CS102 Civil-Site-Enlargements CG101 Civil-Plan-Grading CU101 Civil-Plan-Utilities CS501 Civil-Details-Site CS502 Civil-Details-Site CS503 Civil-Details-Site Architectural AD100 Ground Floor & First Floor Demolition Plan AD101 Second Floor & Third Floor Demolition Plan AD201 Demolition Elevations AS001 Assembly Types AS002 Typical Mounting Heights and Layouts AS003 Ground and First Floor Code Plans AS004 Second and Third Floor Code Plans AS005 Deduct Alternates AS100A Ground Floor Plan A AS100B Ground Floor Plan B AS101A First Floor Plan A AS101B First Floor Plan B AS102A Second Floor Plan A AS102B Second Floor Plan B AS103A Third Floor Plan A AS103B Third Floor Plan B AS104 Roof Plan AS105 Ground & 1st Floor Furniture, Equipment, and Floor Finish Plan AS106 2nd & 3rd Floor Furniture, Equipment, and Floor Finish Plan AS107 Ground Floor& First Floor Reflected Ceiling Plan AS108 Second Floor, Third Floor, Fourth Floor Reflected Ceiling Plan AS109 Ceiling Systems and Details AS201 Exterior Elevations AS202 Exterior Elevations AS203 Exterior Elevations AS204 Interior Elevations - Ground Floor AS205 Interior Elevations - Ground & 1st Floor Circulation AS206 Interior Elevations - 1st Floor AS207 Interior Elevations - 2nd & 3rd Floor AS208 Interior Elevations - Toilet Rooms AS301 Building Sections AS302 Building Sections AS303 Wall Sections AS304 Wall Sections AS305 Wall Sections AS306 Wall Sections AS307 Not Used AS401 Enlarged Plans AS402 Stair and Elevator Plans, 4th Floor Plan AS403 Stair and Elevator Sections AS404 Stair Plans & Sections AS405 Stair and Mech Shaft Plans and Details AS406 Stair Details AS407 Stair And Elevator Shaft Details AS501 Exterior Details AS502 Exterior Details AS503 Exterior Details AS504 Exterior Details AS505 Exterior Details AS506 Interior Details AS507 Typical Interior Details AS508 Typical Interior Firestopping, Sealing, And Shaftwall Details AS509 Typical Casework Details & Misc Details AS601 Door and Frame Schedule, Notes, and Details AS602 Curtain Walll Types AS603 Curtain Wall Types And Details AS604 Curtain Wall Details AS605 Curtain Walll Details AS606 Curtain Wall Details AS607 Curtain Wall Details AS608 Curtain Walll Details AS609 Curtain Wall Details AS610 Room Finish Schedule AS611 Finishes By Division Shielding RF0.0 Cover RF1.0 Foundation Plan RF1.1 Ceiling Support Layout RF1.2 Floor Plan RF1.3 Silicone Steel Ceiling RF1.4 Silicone Steel Floor RF2.0 Elevations RF2.1 Silicone Steel Elevations RF3.0 Details RF3.1 Details RF4.0 Autoseal 2 Door Structural SS-001 General Notes SB-100 Foundation Plan SB-300 Typical Foundation Sections & Details SB-301 Foundation Sections & Details SB-302 Foundation Sections & Details SB-303 Foundation Sections & Details SB-304 Foundation Sections & Details SF-101 First Floor Framing Plan SF-102 Second Floor Framing Plan

SHEET INDEX - VOLUME 2

SHEET

NUMBER Sheet Name

10-E600 Electrical Ground Floor Panel Schedules & Lighting Fixture Schedule 10-E601 Electrical Ground Floor Panel Schedules 10-E602 Electrical First & Second Floor Panel Schedules 10-E603 Electrical Third Floor Panel Schedules Plumbing 10-PL001 Plumbing Legend & General Notes 10-PD100 Plumbing Domestic Water Ground Floor Demo Plan 10-PD101 Plumbing Sanitary and Vent Ground Floor Demo Plan 10-PL100A Plumbing Domestic Water Ground Floor Plan A 10-PL100B Plumbing Domestic Water Ground Floor Plan B 10-PL101A Plumbing Sanitary and Vent Ground Floor Plan A 10-PL101B Plumbing Sanitary and Vent Ground Floor Plan B 10-PL102A Plumbing Domestic Water First Floor Plan A 10-PL102B Plumbing Domestic Water First Floor Plan B 10-PL103A Plumbing Sanitary and Vent First Floor Plan A 10-PL103B Plumbing Sanitary and Vent First Floor Plan B 10-PL104A Plumbing Domestic Water Second Floor Plan A 10-PL104B Plumbing Domestic Water Second Floor Plan B 10-PL105A Plumbing Sanitary and Vent Second Floor Plan A 10-PL105B Plumbing Sanitary and Vent Second Floor Plan B 10-PL106A Plumbing Domestic Water Third Floor Plan A 10-PL106B Plumbing Domestic Water Third Floor Plan B 10-PL107A Plumbing Sanitary and Vent Third Floor Plan A 10-PL107B Plumbing Sanitary and Vent Third Floor Plan B 10-PL108 Plumbing Sanitary and Vent Roof Plan 10-PL501 Plumbing Details & Schedules Fire Protection

FP-001 FIRE PROTECTION-TITLE SHEET

FP-100 FIRE PROTECTION-GROUND FLOOR PLAN

FP-101 FIRE PROTECTION-FIRST FLOOR PLAN

FP-102 FIRE PROTECTION-SECOND FLOOR PLAN

SHEET INDEX - VOLUME 2

SHEET

NUMBER Sheet Name

+T002 Title Sheet Volume 2 Mechanical 10-MH001 HVAC Legend & General Notes 10-MD101 HVAC Ductwork Ground Floor Demo 10-MD102 HVAC Piping Ground Floor Demo 10-MD103 HVAC Piping First Floor Demo 10-MH100A HVAC Ductwork Ground Floor Plan A 10-MH100B HVAC Ductwork Ground Floor Plan B 10-MH101A HVAC Piping Ground Floor Plan A 10-MH101B HVAC Piping Ground Floor Plan A 10-MH101C HVAC Piping Ground Floor Plan C 10-MH102A HVAC Ductwork First Floor Plan A 10-MH102B HVAC Ductwork First Floor Plan B 10-MH103A HVAC Piping First Floor Plan A 10-MH103B HVAC Piping First Floor Plan B 10-MH104A HVAC Ductwork Second Floor Plan A 10-MH104B HVAC Ductwork Second Floor Plan B 10-MH105A HVAC Piping Second Floor Plan A 10-MH105B HVAC Piping Second Floor Plan B 10-MH106A HVAC Ductwork Third Floor Plan A 10-MH106B HVAC Ductwork Third Floor Plan B 10-MH107A HVAC Piping Third Floor Plan A 10-MH107B HVAC Piping Third Floor Plan A 10-MH108 HVAC Ductwork Roof Plan 10-MH109 HVAC Piping Roof Plan 10-MH501 HVAC Details 10-MH502 HVAC Details 10-MH503 HVAC Details 10-MH601 HVAC Schedules 10-MH602 HVAC Schedules 10-MH603 HVAC Schedules 10-MH604 HVAC Schematic Diagrams 10-MH801 HVAC Controls 10-MH802 HVAC Controls 10-MH803 HVAC Controls Electrical 10-E000 Electrical Legend & General Notes 10-ED100 Electrical Site Plan Demo 10-ED101 Electrical Ground and Second Floor Demo 10-ES100 Electrical Site Plan New 10-ES500 Electrical Site Details 10-E001 Electrical One-Line Normal System Riser 10-E002 Electrical One-Line Emergency System Riser 10-E003 Data/Tel System One-Line Diagrams & Risers 10-E004 Misc. System One-Line Diagrams & Risers 10-EL100A Electrical Lighting Ground Floor Plan A 10-EL100B Electrical Lighting Ground Floor Plan B 10-EL101A Electrical Lighting First Floor Plan A 10-EL101B Electrical Lighting First Floor Plan B 10-EL102A Electrical Lighting Second Floor Plan A 10-EL102B Electrical Lighting Second Floor Plan B 10-EL103A Electrical Lighting Third Floor Plan A 10-EL103B Electrical Lighting Third Floor Plan B 10-EP100A Electrical Power Ground Floor Plan A 10-EP100B Electrical Power Ground Floor Plan B 10-EP100C Electrical Power Ground Floor Plan C 10-EP101A Electrical Power First Floor Plan A 10-EP101B Electrical Power First Floor Plan B 10-EP102A Electrical Power Second Floor Plan A 10-EP102B Electrical Power Second Floor Plan B 10-EP103A Electrical Power Third Floor Plan A 10-EP103B Electrical Power Third Floor Plan B 10-EP104 Electrical Power Roof New 10-ET001 Electrical Systems Ground Floor Routing Plan A 10-ET002 Electrical Systems Ground Floor Routing Plan B 10-ET003 Electrical Systems First Floor Routing Plan 10-ET004 Electrical Systems Third Floor Routing Plan 10-ET100A Electrical Systems Ground Floor Plan A 10-ET100B Electrical Systems Ground Floor Plan B 10-ET101A Electrical Systems First Floor Plan A 10-ET101B Electrical Systems First Floor Plan B 10-ET102A Electrical Systems Second Floor Plan A 10-ET102B Electrical Systems Second Floor Plan B 10-ET103A Electrical Systems Third Floor Plan A 10-ET103B Electrical Systems Third Floor Plan B 10-ET400 Electrical Enlarged ACA Tel/Comm Rooms 10-ET401 Electrical Enlarged Research Tel/Comm Data Room 10-E400 Electrical Enlarged Ground Floor MRI New 10-E500 Electrical MRI Details 10-E501 Electrical Details 10-E502 Electrical Lighting Details 10-E503 Electrical Details - LIghtning Protection 10-E504 Electrical Details

V

MPV

T

PS

F

P

P

P C

S

FD

FSD

PP

GAS PIPING

FLOW SWITCH

ISOLATION ROOM PRESSURIZATION CONTROLLER

EQUIPMENT, GRILLE, REGISTER OR DIFFUSER TAG

AUTOMATIC AIR VENT

VENT PIPING

MULTIPURPOSE VALVE

PRESSURE SWITCH

THERMOMETER

HOT WATER PIPING

POINT OF CONNECTION TO EXISTING

DUCT STATIC PRESSURE SENSOR

VARIABLE AIR VOLUME BOX

COLD WATER PIPING

PRESSURE REGULATING VALVE

UNION

CIRCUIT BALANCE VALVE

SWING CHECK VALVE

BALL VALVE

BUTTERFLY VALVE

PRESSURE GAUGE W/PETCOCK

THERMOSTAT

GATE VALVE

MANUAL AIR VENT

MEDIUM PRESSURE CONDENSATE RETURN

MEDIUM PRESSURE STEAM

LOW PRESSURE CONDENSATE RETURN

HOT WATER RETURN PIPING

CHILLED WATER SUPPLY PIPING

HOT WATER SUPPLY PIPING

CHILLED WATER RETURN PIPING

LOW PRESSURE STEAM

MPC

MPS

HWS

HWR

CHWS

CHWR

LPC

LPS

CONDENSER WATER RETURN

CONDENSER WATER SUPPLY

CWR

CWS

PIPE DROP

PIPE RISER

PIPE TEE - DOWN

PIPE TEE - UP

PIPE CONNECTION

PIPE BREAK - TO CONTINUE

DIRECTION OF FLOW

EXISTING RECTANGULAR DUCT RUN W/ SIZE

DESIGNATION

EXISTING CIRCULAR DUCT RUN W/ SIZE DESIGNATION

DEMOLITION RECTANGULAR DUCT RUN W/ SIZE

DESIGNATION

DEMOLITION CIRCULAR DUCT RUN W/ SIZE

DESIGNATION

NEW RECTANGULAR DUCT RUN W/ SIZE DESIGNATION

NEW CIRCULAR DUCT RUN W/ SIZE DESIGNATION

NEW RECTANGULAR DUCT - UP

NEW CIRCULAR DUCT RUN - UP

NEW RECTANGULAR DUCT - DOWN

NEW CIRCULAR DUCT RUN - DOWN

EXISTING FLEX DUCT RUN W/ SIZE DESIGNATION

DEMOLITION FLEX DUCT RUN W/ SIZE DESIGNATION

NEW FLEX DUCT RUN W/ SIZE DESIGNATION

ACOUSTICALLY LINED DUCT RUN

ELEVATION CHANGE IN DUCTWORK - UP

RECTANGULAR TO RECTANGULAR DUCTWORK TRANSITION

RECTANGULAR TO CIRCULAR DUCTWORK TRANSITION

RECTANGULAR TO RECTANGULAR DUCTWORK TRANSITION

ELEVATION CHANGE IN DUCTWORK - DOWN

DUCTWORK BREAK - TO CONTINUE

RG, RR

EG, ER

SD, SR, SG

SD, SR, SG

SD, SR, SG

SD, SR, SG

SD, SR, SG

DIFFUSER, REGISTER OR GRILLE TAG, WITH CFM

AIRFLOW

NOTE CALL OUT1

COMBINATION FIRE SMOKE DAMPER

FIRE DAMPER

MANUAL VOLUME DAMPER

HUMIDIFIER

PIPE CAP

PIPE GUIDE

PIPE ANCHOR

CW

HW

V

G

REHEAT HOT WATER RETURN PIPING

REHEAT HOT WATER SUPPLY PIPINGRHWS

RHWR

REVISION TAG

REVISION CLOUD

DUCT SIZE12�, 12x12

AD

AFF

AFG

AP

AS

ATC

BFP

BOD

BTU

BTUH

C

C&HW

CAP

CC

CD

CFM

COL

CONN

CV

DB

DDC

DIA

DN

DO

DWG OR DWGS

E, EX OR (E)

EA

EAT

EC

ECU

EF

EG

EL

EMS

ER

ERV

ESP

ET

ETO

ETR

EWT

EXH

FA

FC

FD

FLA

FLR

FPI

FPM

FSD

FT

FTR

GAL

GC

GE

GPM

GV

HC

HP

HVAC

HW

ID

IH

IN

KW

L

LAT

LWT

MBH

MD

MECH

MTD

N.C. OR NC

N.O. OR NO

NIC

NOM

NTS

O.A. OR OA

OAT

OBD

OD

OED

PC

PD

PSI

PRV

RA

REF

RF

RG

RHWR

RHWS

RM

RR

RV

SA

SAT

SF

SP

SPD

SPEC

SR

SS

TG

TOD

TSTAT

TYP

U.G.

U.S.

UC

V

VAV

VB

VFD

VTR

W W/

WB

WMS

DUCT ACCESS DOOR

ABOVE FINISHED FLOOR

ABOVE FINISH GRADE

ACCESS PANEL

AIR SEPARATOR

AUTOMATIC TEMPERATURE CONTROL

BACK FLOW PREVENTER

BOTTOM OF DUCT

BRITISH THERMAL UNIT

BRITISH THERMAL UNIT PER HOUR

CONVECTOR

COLD & HOT WATER

CAPACITY

COOLING COIL

CEILING DIFFUSER

CUBIC FEET PER MINUTE

COLUMN

CONNECT

CONTROL VALVE

DRY BULB TEMPERATURE

DIRECT DIGITAL CONTROL

DIAMETER

DOWN

DIGITAL OUTPUT

DRAWINGS

EXISTING

EXHAUST AIR

ENTERING AIR TEMPERATURE

ELECTRICAL CONTRACTOR

EVAPORATIVE CONDENSING UNIT

EXHAUST FAN

EXHAUST AIR GRILLE

EXPANSION LOOP

ENERGY MANAGEMENT SYSTEM

EXHAUST AIR REGISTER

EXHAUST ON ROOF

EXTERNAL STATIC PRESSURE

EXPANSION TANK

EXISTING TO BE REMOVED

ETHYLENE OXIDE

ENTERING WATER TEMPERATURE

EXHAUST

FREE AREA

FLEXIBLE CONNECTION

FIRE DAMPER

FULL LOAD AMPS

FLOOR

FINS PER INCH

FEET PER MINUTE

COMBINATION FIRE AND SMOKE DAMPER

FEET

FIN TUBE RADIATION

GALLONS

GENERAL CONTRACTOR

GENERAL EXHAUST

GALLONS PER MINUTE

GATE VALVE

HEATING COIL

HORSE POWER

HEATING, VENTILATION AND AIR COND.

HOT WATER

INSIDE DIAMETER

INTAKE HOOD

INCHES

KILOWATTS

LOUVER

LEAVING AIR TEMPERATURE

LEAVING WATER TEMPERATURE

THOUSANDS OF B.T.U.'S PER HOUR

MOTORIZED DAMPER

MECHANICAL

MOUNTED

NORMALLY CLOSED

NORMALLY OPEN

NOT IN CONTRACT

NOMINAL

NOT TO SCALE

OUTSIDE AIR

OUTSIDE AIR TEMPERATURE

OPPOSED BLADE DAMPER

OUTSIDE DIAMETER

OPEN ENDED DUCT

PLUMBING CONTRACTOR

PRESSURE DROP

POUNDS PER SQUARE INCH

PRESSURE REDUCING VALVE

RETURN AIR

RETURN EXHAUST FAN

RETURN FAN

RETURN AIR GRILLE

REHEAT WATER RETURN

REHEAT WATER SUPPLY

ROOM

RETURN AIR REGISTER

RELIEF VALVE

SUPPLY AIR

SUPPLY AIR TEMPERATURE

SQUARE FEET

STATIC PRESSURE

SPEED

SPECIFICATION

SUPPLY AIR REGISTER

STAINLESS STEEL

TRANSFER AIR GRILLE

TOP OF DUCT

THERMOSTAT

TYPICAL

UNDER GRADE

UNDER SLAB

UNDERCUT DOOR

VENT

VARIABLE AIR VOLUME

VACUUM BREAKER

VARIABLE FREQUENCY DRIVE

VENT THROUGH ROOF

WASTE

WITH

WET BULB TEMPERATURE (°F)

WIRE MESH SCREEN

HOT WATER RETURN PIPINGHWR

GLOBE VALVE

FLANGE

STRAINER W/DRAIN VALVE AND CAP

PRESSURE PORT ("PETE'S PLUG")

HIGH PRESSURE STEAMHPS

CHEMICAL SUPPLY PIPESCHEM

SANITARY DRAIN ABOVE FLOOR OR GRADESAN

HIGH-TEMPERATURE HOT WATER RETURNHTWR

MEDIUM-TEMPERATURE HOT WATER RETURNMTWR

FUEL OIL TANK VENTFOV

HIGH-TEMPERATURE HOT WATER SUPPLYHTWS

MEDIUM-TEMPERATURE HOT WATER SUPPLYMTWS

FUEL OIL RETURNFOR

FUEL OIL SUCTIONFOS

FUEL OIL GAGEFOG

FUEL OIL DISCHARGEFOD

BOILER BLOWDOWNBBD

HIGH-PRESSURE CONDENSATEHPC

PUMPED CONDENSATEPC

MAKE UP WATERMUW

A.C. CONDENSATE DRAIND

REFRIGERANT HOT GASRHG

RL

RS

GLYCOL RETURNGR

REFRIGERANT LIQUID

REFRIGERANT SUCTION

GLYCOL SUPPLYGS

MPC

MPS

HWS

HWR

CHWS

CHWR

LPC

LPS

CWR

CWS

RHWS

RHWR

HPS

CHEM

SAN

HTWR

MTWR

FOV

HTWS

MTWS

FOR

FOS

FOG

FOD

BBD

HPC

PC

MUW

D

RHG

RL

RS

GR

GS

BLV

BFV

SCV

CBV

ACV

ACV

GV

GLV

MPV

PRV

T

FLG

RSV

PGV

RPBP

RELIEF OR SAFETY VALVE

PLUG VALVE

REDUCED PRESSURE BACKFLOW PREVENTOR

S-1

VAV

RETURN AIR GRILLE, REGISTER

EXHAUST AIR GRILLE, REGISTER

SUPPLY AIR 4 WAY DIFFUSER, REGISTER, GRILLE

SUPPLY AIR 3 WAY DIFFUSER, REGISTER, GRILLE

SUPPLY AIR 2 WAY DIFFUSER, REGISTER, GRILLE

SUPPLY AIR 2 WAY DIFFUSER, REGISTER, GRILLE

SUPPLY AIR 1 WAY DIFFUSER, REGISTER, GRILLE

ANCHOR

GUIDE

U

1. ALL HVAC GENERAL NOTES, SYMBOLS LISTS & DETAILS ARE TO BE

CONSIDERED AS APPLICABLE TO ALL HVAC DRAWINGS FOR THIS

PROJECT.

2. THE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND EXACT LOCATIONS

AND ARRANGEMENTS OF EXIST./NEW EQUIPMENT, DUCTWORK, PIPING

AND OTHER COMPONENTS SHALL BE DETERMINED IN THE FIELD WITH DUE

CONSIDERATION OF STRUCTURAL, ELECTRICAL AND ARCHITECTURAL

SYSTEMS. EXISTING STRUCTURAL SYSTEMS SHALL NOT BE MODIFIED

WITHOUT THE EXPRESS PERMISSION OF THE ENGINEER.

3. THE PROJECT SHALL BE PHASED IN ACCORDANCE WITH THE APPROVED

PHASING PLAN. THE CONTRACTOR SHALL OBTAIN APPROVAL FOR THE

SEQUENCING AND TIMING OF OPERATIONS PRIOR TO COMMENCING

WORK. SEE SPECIFICATIONS.

4. CONTRACTOR IS TO MAINTAIN SERVICE TO ROOMS OUTSIDE THE PROJECT

SCOPE OF WORK AND PHASING SCHEDULE. IF INTERRUPTION OF

SERVICE IS REQUIRED COORDINATE SHUTDOWN.

5. CARE SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT EXISTING

SYSTEMS AND SURFACES TO REMAIN. RESTORE DAMAGED AREAS THAT

ARE BEYOND THE SCOPE OF THIS CONTRACT TO THEIR ORIGINAL

CONDITION.

6. WHERE INDICATED ON THE DRAWINGS, REMOVE OR RELOCATE EXISTING

COMPONENTS AS REQUIRED TO ACCOMMODATE THE NEW WORK.

REMOVALS SHALL INCLUDE ALL ASSOCIATED OFF-SITE DISPOSAL COSTS.

7. COORDINATE REMOVALS AND RELOCATION'S INCLUDING SELECTIVE

CUTTING AND PENETRATIONS WITH ARCHITECTURAL, MECHANICAL,

STRUCTURAL AND ELECTRICAL CONTRACTORS.

8. MOST PARTITIONS ARE FULL HEIGHT AND REQUIRE UTILITIES

PENETRATIONS TO BE SEALED, SEE ARCHITECTURAL DWGS FOR

PARTITION HEIGHTS. UTILITIES SHOWN FOR CLARITY THAT MAY RUN

PARALLEL TO WALL PARTITIONS WILL REQUIRE LOCATING IN THE FIELD TO

MINIMIZE CONFLICT WITH PARTITIONS.

9. COORDINATE THE LOCATIONS OF ALL WALL MOUNTED TEMPERATURE

SENSORS WITH FINAL EQUIPMENT/FURNITURE LAYOUT.

10. MANUFACTURERS NAME & MODEL NUMBER ARE USED FOR DESCRIPTIVE

PURPOSES ONLY & ARE INTENDED TO INDICATE THE STANDARD OF

MATERIAL OR ARTICLES REQUIRED.

11. INSTALL EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S

RECOMMENDATIONS AND GOOD PRACTICE NORMAL TO THE TRADE.

INSTALLATION SHALL INCLUDE PROVISIONS FOR ACCESS TO NORMAL

MAINTENANCE ITEMS SUCH AS BELTS, BEARINGS, FILTERS AND MOTORS.

PROVIDE ADEQUATE STRUCTURAL SUPPORTS AND SECURE MOUNTING

METHODS WITH PROVISIONS FOR VIBRATION ISOLATION AND EXPANSION

WHERE REQUIRED.

12. PROVIDE VOLUME DAMPERS DOWN STREAM OF VAV BOXES AT EACH

BRANCH FROM MAIN DUCTWORK AND DUCT RUNNOUTS. PROVIDE

OPPOSED BLADE DAMPERS AT EACH NECK TO AN INDIVIDUAL REGISTER

OR DIFFUSER IN SUPPLY, RETURN AND EXHAUST DUCTS IRRESPECTIVE

OF WHETHER OR NOT A DAMPER IS INDICATED ON THE PLANS.

13. DIFFUSER SIZES INDICATED ARE NECK SIZES. REGISTERS & GRILLES ARE

INDICATED AS NOMINAL SIZES.

14. PERFORM ALL TESTS BEFORE INSULATING.

15. PIPING AND DUCTWORK SHALL BE CONCEALED UNLESS OTHERWISE

NOTED.

16. INSTALLATION SHALL PERMIT ACCESSIBILITY FOR SERVICE AND/OR

REPLACEMENT OF EQUIPMENT PROVIDED. PROVIDE ACCESS PANELS TO

GAIN ACCESS TO SYSTEMS COMPONENTS THAT REQUIRE MAINTENANCE

ACCORDING TO MANUFACTURER'S LITERATURE.

17. PROVIDE DUCTWORK WITH OFFSETS AND TRANSITIONS AS REQUIRED TO

FIT UNDER STRUCTURAL STEEL OR OTHER OBSTRUCTIONS. FLAT OVAL OR

ROUND SIZES MAY BE USED INTERCHANGEABLY BY THE CONTRACTOR.

MAINTAIN DUCT CROSS SECTIONAL AREA. CHANGES SHALL BE ONLY IN

ACCORDANCE WITH APPROVED SHOP DRAWINS OR WRITTEN PERMISSION

OF THE VA PROJECT ENGINEER.

18. PROVIDE CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS & GUIDES

AS NECESSARY TO PREVENT UNDUE STRAIN ON PIPING.

19. SEE DETAILS & PIPING DIAGRAMS FOR ADDITIONAL VALVES & FITTINGS

NECESSARY FOR COMPLETE PIPING SYSTEM.

20. MECHANICAL CONTRACTOR TO COORDINATE ALL WORK WITH OTHER

BUILDING TRADES. SOME RELOCATION OF EXISTING UTILITIES MAY BE

NECESSARY TO ACCOMMODATE INSTALLATION OF NEW EQUIPMENT OR

DUCTWORK.

21. PROVIDE FIRE OR FIRE/SMOKE DAMPERS WHERE INDICATED ON PLANS &

WHERE REQUIRED BY APPLICABLE CODES FOR DUCTS & OPENINGS

THROUGH FLOORS, FIRE WALLS & FIRE PARTITIONS. DAMPERS SHALL BE

ENCLOSED IN #14 GAUGE STEEL SLEEVE. PROVIDE ACCESS DOORS

LOCATED SO THAT FUSIBLE LINK & OTHER DAMPER COMPONENTS MAY BE

INSPECTED REPLACED AND/OR SERVICED.

22. SEE SPECIFICATIONS FOR OTHER REQUIREMENTS.

23. AT THE END OF EACH WORKING DAY, THE CONSTRUCTION SITE SHALL BE

LEFT IN A CLEAN AND NEAT CONDITION.

24. FIELD VERIFY EXISTING EQUIPMENT, DUCTWORK AND PIPING PRIOR TO

REMOVAL OR REUSE. CONFIRM WITH HOSPITAL THAT ALL EQUIPMENT,

DUCTWORK AND PIPING DESIGNATED TO BE REMOVED IS NO LONGER IN

SERVICE PRIOR TO ITS REMOVAL.

25. EXISTING EQUIPMENT, DUCTWORK AND PIPING TO REMAIN IN SERVICE

SHALL BE INSPECTED. ANY EQUIPMENT FOUND TO BE INOPERABLE SHALL

BE REPORTED TO THE PROJECT ENGINEER.

26. INFILL ALL NEW OR EXISTING ABANDONED FLOOR SLAB PENETRATIONS

WITH GROUT, FULL THICKNESS OF SLAB. MAINTAIN 2 HR FIRE RATING. ALL

EXISTING CONCRETE FLOORS AND CHASES ARE 2 HOUR FIRE RATED.

27. FILL AND PATCH ALL OPENINGS IN WALLS WHERE CONDUITS, PIPES,

DUCTS ETC. ARE OR HAVE BEEN REMOVED WITH UL LISTED FIRE

ASSEMBLY APPROVED BY THE ARCHITECT. MAINTAIN 2 HR FIRE RATING

WHERE APPLICABLE.

28. ALL UNUSED (ABANDONED) DUCTWORK, PIPING AND EQUIPMENT

INDICATED TO BE REMOVED SHALL BE REMOVED AND CAPPED.

29. TIE-IN POINT LOCATIONS ARE APPROXIMATE. CONTRACTOR SHALL

DETERMINE EXACT LOCATIONS IN THE FIELD BASED ON EXISTING

CONDITIONS.

SMOKE DAMPERSD

3-WAY AUTOMATIC CONTROL

VALVE (MIXING PATTERN)

2-WAY AUTOMATIC CONTROL VALVE

SHADED DUCTWORK SHALL BE 16 GAUGE SHEETMETAL10x16

ROOF EXHAUST - EXISTING

ROOF EXHAUST - REMOVED

ROOF EXHAUST - NEW

EXPANSION JOINT

PIPE SIZE12"

G

PIPE SLOPE

PIPE SIZE, GANG

12"S UP

14"DN

1-1/2"

F&T

FLOAT & THERMOSTATIC TRAP

SYMBOLS DESCRIPTIONSABBREVIATIONS DESCRIPTIONSSYMBOLSSYMBOLS DESCRIPTIONSDESCRIPTIONSDESCRIPTIONS ABBREVIATIONS SYMBOLS DESCRIPTIONS

SYMBOLS DESCRIPTIONSABBREVIATIONS

DUCT MOUNTED SMOKE DETECTOR, MTD BY HVAC

CONTR. SUPPLIED AND WIRED BY ELECTRICAL CONTR.

TITLENUMBER

NOTE:

REFER TO ARCHITECTURAL DOCUMENTS FOR DEDUCT ALTERNATE ITEMS.

DIFFUSER SYMBOLS

MECHANICAL ALTERNATE LIST

DUCTWORK SYMBOLSGENERAL SYMBOLSPIPING SYMBOLSGENERAL ABBREVIATIONSHVAC GENERAL NOTES

LIMIT OF DEMOLITION

49 DARTMOUTH STREET

PORTLAND, ME 04101

207-775-1059 www.pdtarchs.com

ARCHITECTURE

INTERIOR DESIGN

PLANNING

Project Number

Building Number

Drawing NumberLocation

Project Title

Date Checked Drawn

Drawing Title

Approved: Project Director

Dwg:

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

1 2 3 4 5 6 7 8

A

B

C

D

E

A

B

C

D

E

F

VA FORM 08-6231, OCT 1978

on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua rte rs i

6" on e i

6" on e h a lf i nc f oo t 6"

Denis McLaughlin Telephone: 857-364-5149

1 2 3 4 5 6 7 8

Jamaica Plain, MA

Dwg: of 217

M.E.P.:

Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376

SPECIFICATIONS:

Lowell Specifications, Inc.

34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001

STRUCTURAL:

Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822

CIVIL/LANDSCAPE:

Stantec Consulting 141 Portland St.

Boston, MA 02114 T: (617) 523-8103

198801108

AE Research Addition 523-307

0%

S

UB

MI

TT

AL

- B

ID

D

OC

UM

EN

TS

03-31-2016

HVAC Legend & General Notes

10-MH001

ERDCMP 107

LC

-000

UTILITY

AL

ENGINEERINGUTILITY

OFFICE

BB-21

CLERICAL

OFFICE

OFFICE

UP

FD

FD

A1- 2

CORRIDOR

CLOSET

FIRE PROTECT.

ROOM

STORAGE

STORAGE

STORAGE

CORR

CORR

CORR

ROOM

WET MECH

8'-0"

8'-6"

8'-6"

8'-6"

1A1A

8F6

8F6

8F6

8F6

1A1

1A1

1A1

8F6

FB-05

FB-04

FB-03

FB-02

FCB-03

FC0-02

FC0-04

FB-01

AB-12A

AB-

MAIN ELECT.ROOM WET MECH.ROOM

STORAGE

ROOM

ENGIN. DEPT.

FIL

EX

M

M

E-2

E-E E-F

EF

(E)

RE-LOCATE EXISTING

DIFFUSER TO ALLOW

FOR NEW WORK.

24"x18" EA

36"x16" EA

1.9

EXISTING DUCTWORK TO BE REMOVED

(TYPICAL)

EXISTING LOUVER TO BE REMOVEDEXISTING LOUVER TO BE REMOVED

EXISTING DUCTWORK TO REMAIN (TYPICAL)

EXISTING FAN TO REMAIN

2 3 3.3 4 E-A E-B E-C

E-3

E-4

A

B

B.5

C

E-5D

D.6

EE-6

E-AA

49 DARTMOUTH STREET

PORTLAND, ME 04101

207-775-1059 www.pdtarchs.com

ARCHITECTURE

INTERIOR DESIGN

PLANNING

Project Number

Building Number

Drawing NumberLocation

Project Title

Date Checked Drawn

Drawing Title

Approved: Project Director

Dwg: of 217

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

1 2 3 4 5 6 7 8

A

B

C

D

E

A

B

C

D

E

F

VA FORM 08-6231, OCT 1978

on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua rte rs i

6" on e i

6" on e h a lf i nc f oo t 6"

Denis McLaughlin Telephone: 857-364-5149

1 2 3 4 5 6 7 8

Jamaica Plain, MA

198801108

M.E.P.:

Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376

SPECIFICATIONS:

Lowell Specifications, Inc.

34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001

STRUCTURAL:

Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822

CIVIL/LANDSCAPE:

Stantec Consulting 141 Portland St.

Boston, MA 02114 T: (617) 523-8103

AE Research Addition 523-307

0%

S

UB

MI

TT

AL

- B

ID

D

OC

UM

EN

TS

03-31-2016

HVAC Ductwork Ground Floor Demo

10-MD101

ERDCMP 108

1/8" = 1'-0"1 HVAC Ductwork Ground Floor Demo

LC

000UTILITY

ICAL

ENGINEERINGUTILITY

OFFICE

BB-21

CLERICAL

OFFICE

OFFICE

FD

FD

A1- 2

CORRIDOR

CLOSET

FIRE PROTECT.

ROOM

STORAGE

STORAGE

STORAGE

CORR

CORR

CORR

ROOM

WET MECH

8'-0"

8'-6"

8'-6"

8'-6"

1A1A

8F6

8F6

8F6

8F6

1A1

1A1

1A1

8F6

FB-05

FB-04

FB-03

FB-02

FCB-03

FC0-02

FC0-04

FB-01

AB-12A

MAIN ELECT.ROOM WET MECH.ROOM

STORAGE

ROOM

ENGIN. DEPT.

E-2

E-E E-F

6"ø MPS

2"ø MPS

2"ø MPS

2" ø

MP

S

6"ø MPS

8"ø MPS

CONCRETE

PLATFORM TO BE

REMOVED (TYP 2)

3/4"ø MPC

2"ø MPC

4"ø LPC

8"ø LPC

3"ø LPC

4"ø MPC

EXISTING

CONDENSATE

PUMP TO REMAIN.

EXISTING FLASH

TANK TO REMAIN.

EXISTING 1-1/2"

MPC CAPPED

TEES.

EXISTING

DOMESTIC

WATER HEATERS

TO REMAIN

1.9

EXISTING PIPING TO REMAIN (TYPICAL)

2 3 3.3 4 E-A E-B E-C

E-3

E-4

A

B

B.5

C

E-5D

D.6

EE-6

E-AA

49 DARTMOUTH STREET

PORTLAND, ME 04101

207-775-1059 www.pdtarchs.com

ARCHITECTURE

INTERIOR DESIGN

PLANNING

Project Number

Building Number

Drawing NumberLocation

Project Title

Date Checked Drawn

Drawing Title

Approved: Project Director

Dwg: of 217

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

1 2 3 4 5 6 7 8

A

B

C

D

E

A

B

C

D

E

F

VA FORM 08-6231, OCT 1978

on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua rte rs i

6" on e i

6" on e h a lf i nc f oo t 6"

Denis McLaughlin Telephone: 857-364-5149

1 2 3 4 5 6 7 8

Jamaica Plain, MA

198801108

M.E.P.:

Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376

SPECIFICATIONS:

Lowell Specifications, Inc.

34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001

STRUCTURAL:

Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822

CIVIL/LANDSCAPE:

Stantec Consulting 141 Portland St.

Boston, MA 02114 T: (617) 523-8103

AE Research Addition 523-307

0%

S

UB

MI

TT

AL

- B

ID

D

OC

UM

EN

TS

03-31-2016

HVAC Piping Ground Floor Demo

10-MD102

ERDCMP 109

1/8" = 1'-0"1 HVAC Piping Ground Floor Demo

1.91.31.50

EXISTING PIPING TO REMAIN

EXISTING FIN TUBE BASEBOARD HEATERS

TO BE REMOVED TO ACCOMMODATE NEW

CONNECTOR CORRIDOR

EXISTING FIN TUBE

BASEBOARD HEATERS TO

REMAIN

1 2 3 3.3 4 E-A E-B E-C

E-3

E-4

A

B

B.5

C

E-5D

D.6

EE-6

E.8

G

E-7

E-AA

ADJACENT BUILDING

(EXISTING)

49 DARTMOUTH STREET

PORTLAND, ME 04101

207-775-1059 www.pdtarchs.com

ARCHITECTURE

INTERIOR DESIGN

PLANNING

Project Number

Building Number

Drawing NumberLocation

Project Title

Date Checked Drawn

Drawing Title

Approved: Project Director

Dwg: of 217

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

1 2 3 4 5 6 7 8

A

B

C

D

E

A

B

C

D

E

F

VA FORM 08-6231, OCT 1978

on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua rte rs i

6" on e i

6" on e h a lf i nc f oo t 6"

Denis McLaughlin Telephone: 857-364-5149

1 2 3 4 5 6 7 8

Jamaica Plain, MA

198801108

M.E.P.:

Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376

SPECIFICATIONS:

Lowell Specifications, Inc.

34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001

STRUCTURAL:

Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822

CIVIL/LANDSCAPE:

Stantec Consulting 141 Portland St.

Boston, MA 02114 T: (617) 523-8103

AE Research Addition 523-307

0%

S

UB

MI

TT

AL

- B

ID

D

OC

UM

EN

TS

03-31-2016

HVAC Piping First Floor Demo

10-MD103

ERDCMP 110

1/8" = 1'-0"1 HVAC Piping First Floor Demo

FEC

V t

V atc atc

PATIENT TLT

G-01

ELEV.

G-30

STAIR 1

GS-11

OFFICE

G-07

OFFICE

G-08

OFFICE

G-09

TMS

G-12

MRI WAIT

G-13

MRI PREP

G-18

MRI TOILET

G-15

GOWN 1

G-16

GOWN 2

G-17

READING

ROOM

G-29

OPEN BENCH

LAB

G-06

EEG

CONTROL RM

G-05

CORRIDOR

CORRIDOR

CR-G-02

CORRIDOR

CR-G-10

0" x1

" S A

72"x26" SA UP 60"x30" EA UP

EF

(E)

/1 10-MH100B /1 10-MH100B

30"x18" RA

16"x14" RA

"x1

6" R

A

18"x12" SA 18"x16" SA

"x1

8" S

A

"x2

6" S

A

S-2

S-3

(TYP 2)

R-5

S-3

E-4

EEG TEST

G-03

EXERCISE

ROOM

G-04

S-2

S-2

R-2

R-2

E-1

R-5

S-2

R-2

R-2

S-2

S-2

R-2

R-2

S-2

R-2

R-1

R-1

AC

S-2

S-2

S-2

E-1 100 S-3

S-3

RHC

G1

E-2

R-4

VVR

VVR

VVR

VVR

004 VVR

VVR

VVR

VVR

VVR

18"x18" SA18"x16" SA

30"x16" RA

8"ø RA10"x10" RA

"x1

0" R

A

"x1 2"

R A

"x1

2" R

A

16"x12" RA

8"ø SA

10"x10" SA

8"ø SA

8"ø SA

"x1

0" S

A

8"ø RA

8"ø RA

"x1

0" S

A

9"ø SA

12"x12" SA

8" ø

SA

"ø S

A

7" ø

SA

7"ø RA

8"ø RA

6"ø RA

6" ø

RA

8" ø

SA

8" ø

RA

"x8

" R A

"x1

4" R

A

8"ø SA

"x1

2" R

A

10"ø SA

10"ø SA

"ø

S A

8"ø SA

8"ø RA

"x8

" R A

"x1

0" S

A

14"x12" RA

16"x10" EA

"x1

4" E

A

"x1

6" R

A

"x8

" E A

8" ø

EA

6"ø EA

6" ø

EA

F

F

F

F

1.91.31.50

BALANCE TO

640 CFM

"x1

0" E

A

14"x14" EA UP

"x1

0" E

A

FCU

E-3

FIRE DAMPER IN

VERTICAL DUCTWORK

F

ACCESS DOOR

48"x48" EA

FIRE DAMPER IN

VERTICAL DUCTWORK

F

1 2 3 3.3 4 E-A E-B E-C

E-4

A

B

B

C

E-5 D

30"x60" EA

"x1

8" S

A

T

AC-2 TEMPERATURE

SENSOR LOCATED IN

RETURN DUCTWORK14

"x1 4"

S A

"x1

4" R

A

"x1 2"

R A

14"x14" EA

"x1

0" S

A

8"ø SA

8" ø

SA

S-2

277V277V4X4 JUNCTION BOX, 277V, 1PH,

EMERGENCY POWER, DEDICATED

15 AMP CIRCUIT, ABOVE CEILING BY

E.C. FOR CONTINUATION BY ATC

CONTRACTOR FOR CONTROLS.

49 DARTMOUTH STREET

PORTLAND, ME 04101

207-775-1059 www.pdtarchs.com

ARCHITECTURE

INTERIOR DESIGN

PLANNING

Project Number

Building Number

Drawing NumberLocation

Project Title

Date Checked Drawn

Drawing Title

Approved: Project Director

Dwg: of 217

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

1 2 3 4 5 6 7 8

A

B

C

D

E

A

B

C

D

E

F

VA FORM 08-6231, OCT 1978

on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua rte rs i

6" on e i

6" on e h a lf i nc f oo t 6"

Denis McLaughlin Telephone: 857-364-5149

1 2 3 4 5 6 7 8

Jamaica Plain, MA

198801108

M.E.P.:

Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376

SPECIFICATIONS:

Lowell Specifications, Inc.

34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001

STRUCTURAL:

Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822

CIVIL/LANDSCAPE:

Stantec Consulting 141 Portland St.

Boston, MA 02114 T: (617) 523-8103

AE Research Addition 523-307

0%

S

UB

MI

TT

AL

- B

ID

D

OC

UM

EN

TS

03-31-2016

HVAC Ductwork Ground Floor Plan A

10-MH100A

ERDCMP 111

1/4" = 1'-0"1 HVAC Ductwork Ground Floor Plan A

M

V M

V atc

V atc atc

MRI PREP

G-18

MRI TOILET

G-15

GOWN 1

G-16

GOWN 2

G-17

CONTROL

ROOM

G-19

MRI EXAM

ROOM

G-20

SIEMENS

EQUIPMENT

ROOM

G-21

STAIR 2

GS-22

ELEC.

CLOSET

G-23

STAFF TLT

G-24

HKP

G-25

READING

ROOM

G-29

IT-DATA

ROOM

G-26

OPEN BENCH

LAB

G-06

EEG

CONTROL RM

G-05

CORRIDOR

CORRIDOR

CR-G-27

0" x1

" S A

EF

(E)

12"x12" SA

10"ø SA

10"ø SA

"x1

2" S

A

12"x12" SA

"ø

S A

"ø

S A

AL AL

AL

AL

AL

AL

/1 10-MH100A/1 10-MH100A

18"x30" RA UP

30"x18" RA

16"x14" RA

"x1

6" R

A

S-2

S-2

S-3

S-3

"x2

6" S

A

S-2

R-3

E-1

E-1

R-3

S-2

S-3

(TYP 2)

R-5

S-3

E-4

EXERCISE

ROOM

G-04

R-1

AC

S-2

S-3

S-3

RHC

G1

S-2

R-3

R-4

S-3

VVR

VVR

VVR

VVR

VVR

VV

VVR

"x1

4" S

A

12"x12" SA

18"x18" SA18"x16" SA

"x1

6" S

A

30"x16" RA

"x1

2" R

A

16"x12" RA

"x1

0" S

A

6"ø RA

6" ø

RA

"x1

2" R

A

10"ø SA

10"ø SA

"ø

S A

"x8

" S A

SG-2

10"ø SA

9"ø SA

8"ø SA

"x8

" R A

"x1

0" S

A

8"ø RA

14"x12" RA

8"ø RA

14"x12" EA

"x8

" E A

12"x10" EA

"x1 0"

E A

16"x10" EA

"x1

4" E

A

"x1

6" R

A E-3

6" ø

EA

6"ø EA

"x8 " E

A

F

F

F

F

1.91.31.50

14"x12" EA UP

BALANCE TO

640 CFM

R-8

(TYP 2)

T

"x1

0" E

A

14"x14" EA UP

"x1

0" E

A

FCU

W-3

F

48"x48" EA

1 2 3 3.3 4 E-A E-B E-C

E-5 D

D.6

E E-6

E.8

G

E-7

E-AA

30"x60" EA

ALL DUCTWORK,

DIFFUSERS, GRILLES

AND OTHER

EQUIPMENT WITHIN

THE MRI EXAM ROOM

MUST BE

CONSTRUCTED OF

NON-FERROUS

MATERIALS

12"x12" RA

"x1

8" S

A

"x8

" S A

T

AC-2 TEMPERATURE

SENSOR LOCATED IN

RETURN DUCTWORK

RF WAVEGUIDE MUST BE

INSTALLED WHEREVER DUCT

ENTERS THE RF SHIELD.

REFER TO ETS LINDGREN DWGS

RF WAVEGUIDE MUST BE

INSTALLED WHEREVER DUCT

ENTERS THE RF SHIELD. REFER

TO ETS LINDGREN DWGS.

"x1

4" S

A

"x1

4" R

A

"x1 2"

R A

"x1

2" R

A

24"x12" RA

14"x14" EA

8"ø SA

8" ø

SA

S-2

AL

AL

PROVIDE DIELECTRIC

CONNECTOR TO SEPARATE

ALUMINUM DUCT INSIDE MRI

EXAM ROOM FROM

GALVANIZED STEEL

(TYPICAL)

277V277V4X4 JUNCTION BOX, 277V, 1PH,

EMERGENCY POWER, DEDICATED

15 AMP CIRCUIT, ABOVE CEILING BY

E.C. FOR CONTINUATION BY ATC

CONTRACTOR FOR CONTROLS.

4X4 JUNCTION BOX, 120V, 1PH, ABOVE

CEILING BY E.C. FOR CONTINUATION BY

ATC CONTRACTOR FOR CONTROLS.

(TYPICAL UNLESS NOTED OTHERWISE)

S-5

(TYP 3)

R-9

(TYP 3)

"x2

0" S

A

24"x24" SA DN

TO DIFFUSER

(TYP 3)

NOTE: CEILING

PLENUM RETURN. ALL

CABLE MUST BE

PLENUM-RATED.

AC

49 DARTMOUTH STREET

PORTLAND, ME 04101

207-775-1059 www.pdtarchs.com

ARCHITECTURE

INTERIOR DESIGN

PLANNING

Project Number

Building Number

Drawing NumberLocation

Project Title

Date Checked Drawn

Drawing Title

Approved: Project Director

Dwg: of 217

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

1 2 3 4 5 6 7 8

A

B

C

D

E

A

B

C

D

E

F

VA FORM 08-6231, OCT 1978

on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua rte rs i

6" on e i

6" on e h a lf i nc f oo t 6"

Denis McLaughlin Telephone: 857-364-5149

1 2 3 4 5 6 7 8

Jamaica Plain, MA

198801108

M.E.P.:

Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376

SPECIFICATIONS:

Lowell Specifications, Inc.

34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001

STRUCTURAL:

Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822

CIVIL/LANDSCAPE:

Stantec Consulting 141 Portland St.

Boston, MA 02114 T: (617) 523-8103

AE Research Addition 523-307

0%

S

UB

MI

TT

AL

- B

ID

D

OC

UM

EN

TS

03-31-2016

HVAC Ductwork Ground Floor Plan B

10-MH100B

ERDCMP 112

1/4" = 1'-0"1 HVAC Ductwork Ground Floor Plan B

FECFEC

PATIENT TLT

G-01

ELEV.

G-30

STAIR 1

GS-11

OFFICE

G-07

OFFICE

G-08

OFFICE

G-09

TMS

G-12

MRI WAIT

G-13

MRI PREP

G-18

MRI TOILET

G-15

GOWN 1

G-16

GOWN 2

G-17

CONTROL

ROOM

G-19

READING

ROOM

G-29

OPEN BENCH

LAB

G-06

EEG

CONTROL RM

G-05

CORRIDOR

CORRIDOR

CR-G-02

CORRIDOR

CR-G-10

AC

/1 10-MH101B /1 10-MH101B

VVR

VVR

VVR

VVR

VVR

006VVR

VVR

VVR

VVR

EEG TEST

G-03

1.91.31.50

FCU

E-3

3/4"ø HWS 3/4"ø HWR

1 1 /2" ø

HW

R 1 1

/2" ø

HW

S

1 1 /4" ø

HW

R 1 1

/4" ø

HW

S

1 1/4"ø HWS 1 1/4"ø HWR

3/4"ø HWS 3/4"ø HWR

3/4 "ø

H W

R 3/4

"ø H

W S

3/4 "ø

H W

S 3/4

"ø H

W R

1 1 /4" ø

HW

S 1 1

/4" ø

HW

R

1"ø HWS 1"ø HWR

T

T

T

T

T T

T

T

T

1 2 3 3.3 4 E-A E-B E-C

E-4

A

B

B

C

E-5 D

1"ø CHWR 1"ø CHWS

3/4"ø HWR 3/4"ø HWS

1 /

-M H1

C

3-WAY CONTROL VALVE

RHC-G1

T

T

AC-2 TEMPERATURE

SENSOR LOCATED IN

RETURN DUCTWORK

NOTE: PUMP

CONDENSATE TO

HOUSEKEEPING

SINK.

PROVIDE BASE OF

RISER DRIP TRAP.

4.8 KW ELECTRIC WALL

HEATER. QMARK CWH3000

OR EQUAL. 277V/1PH

49 DARTMOUTH STREET

PORTLAND, ME 04101

207-775-1059 www.pdtarchs.com

ARCHITECTURE

INTERIOR DESIGN

PLANNING

Project Number

Building Number

Drawing NumberLocation

Project Title

Date Checked Drawn

Drawing Title

Approved: Project Director

Dwg: of 217

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

1 2 3 4 5 6 7 8

A

B

C

D

E

A

B

C

D

E

F

VA FORM 08-6231, OCT 1978

on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua rte rs i

6" on e i

6" on e h a lf i nc f oo t 6"

Denis McLaughlin Telephone: 857-364-5149

1 2 3 4 5 6 7 8

Jamaica Plain, MA

198801108

M.E.P.:

Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376

SPECIFICATIONS:

Lowell Specifications, Inc.

34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001

STRUCTURAL:

Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822

CIVIL/LANDSCAPE:

Stantec Consulting 141 Portland St.

Boston, MA 02114 T: (617) 523-8103

AE Research Addition 523-307

0%

S

UB

MI

TT

AL

- B

ID

D

OC

UM

EN

TS

03-31-2016

HVAC Piping Ground Floor Plan A

10-MH101A

ERDCMP 113

1/4" = 1'-0"1 HVAC Piping Ground Floor Plan A

FEC FEC

MRI PREP

G-18

MRI TOILET

G-15

GOWN 1

G-16

GOWN 2

G-17

CONTROL

ROOM

G-19

MRI EXAM

ROOM

G-20

SIEMENS

EQUIPMENT

ROOM

G-21

STAIR 2

GS-22

ELEC.

CLOSET

G-23

STAFF TLT

G-24

HKP

G-25

READING

ROOM

G-29

IT-DATA

ROOM

G-26

OPEN BENCH

LAB

G-06

EEG

CONTROL RM

G-05

CORRIDOR

CORRIDOR

CR-G-27

4"ø HWS

1 1/2"ø MPC 1 1/2"ø MPS

4"ø HWR

AC

/1 10-MH101A

EXISTING MRI CHILLER SHALL

BE MOVED TO THIS LOCATION.

INSTALL ON CONCRETE PAD

2"ø CHWR

2"ø CHWS

VV

VVR

VVR

VVR

VVR

VVR

VVR

1.91.31.50

FCU

W-3

3/4"ø HWS 3/4"ø HWR

1 1 /2" ø

HW

R 1 1

/2" ø

HW

S

1 1 /2" ø

HW

S 1 1

/2" ø

HW

R

1 1/2"ø HWR 1 1/2"ø HWS

1 1 /4" ø

HW

S 1 1

/4" ø

HW

R

4"ø HWR 4"ø HWS

4"ø HWR 4"ø HWS

1"ø HWR 1"ø HWS

4" ø

CH

W

S 4" ø

CH

W R

T

T

T

T

T

T

T

T

4" CHWS RISER TO UPPER

FLOORS AND AHU-1

4" CHWR RISER FROM

UPPER FLOORS AND AHU-1

CH

CH

MRI

1 2 3 3.3 4 E-A

E-5 D

D.6

E E-6

E.8

G

E-7

E-AA

CH-1 CHILLED WATER SUPPLY &

RETURN PIPING SHALL GO DOWN

OUTSIDE OF BUILDING

UNDERGROUND FROM THIS POINT

TO CH-1.

4"ø CHWS

4"ø CHWR

1 1/4"ø CHWS 1 1/4"ø CHWR

1"ø HWR 1"ø HWS

UNDERGROUND

UNDERGROUND

1"ø CHWR 1"ø CHWS

3/4"ø HWR 3/4"ø HWS

1 /

-M H1

C

1 /

-M H1

C

CONNECT TO SIEMENS HEAT EXCHANGER

NO FERROUS MATERIALS ARE

PERMITTED WITHIN THE MRI EXAM

ROOM

3-WAY CONTROL VALVE

3/4"ø HWR 3/4"ø HWS

RHC-G1

T

Emergency

__EF-1

Emergency

__EF-1

EMERGENCY

SWITCH FOR

EF-1

T

AC-2 TEMPERATURE

SENSOR LOCATED IN

RETURN DUCTWORK

MRI SUITE NOTES:

(1) THE QUENCH VENT SHALL BE FABRICATED OF NON-MAGNETIC WELDED STAINLESS STEEL OR ALUMINUM.

REFER TO SPECIFICATION 232113. QUENCH VENT PIPE MUST BE ROUTED IN THE MOST DIRECT ROUTE TO ROOF AS SHOWN. RE-LOCATE ANY EXISTING UTILITIES THAT ARE IN THE WAY. DO NOT ADD ELBOWS OR OFFSETS THAT ARE NOT SHOWN ON DRAWINGS. ALL OTHER TRADES SHALL COORDINATE THEIR WORK TO ACCOMODATE QUENCH VENT ROUTE. INSULATE QUENCH VENT ALONG ITS ENTIRE LENGTH IN ACCORDANCE WITH MRI MANUFACTURER'S RECOMMENDATIONS. QUENCH VENT MUST WITHSTAND MAXIMUM PRESSURE OF

6.5 PSI. PROVIDE RIGID SUPPORTS TO BUILDING STRUCTURE AS FOR PIPE, NOT DUCT, BASED ON WEIGHT OF VENT.

ALL ELBOWS SHALL BE SMOOTH WALLED AND HAVE A CENTERLINE TO INTERNAL PIPE DIAMETER RATIO OF 1.5 TO 5.0.

(2) INSTALL QUENCH VENT WAVEGUIDE (PROVIDED BY ETS LINDGREN) AT RF SHIELD PENETRATION. INSTALL DIALECTRIC ISOLATION, ONE INSIDE RF SHIELD AND ONE OUTSIDE, PER MRI MANUFACTURER'S RECOMMENDATIONS.

(3) CONNECTION TO MAGNET MUST BE MADE BY BOLTING VENT ADAPTER TUBE SECTION (SUPPLIED BY SIEMENS)

DIRECTLY TO FLANGE.

(4) INSTALL STAINLESS STEEL BELLOWS RATED TO 6.5 PSI AND -451 DEG F WHERE NOTED ON DRAWINGS.

BELLOWS SHALL BE DESIGNED PER SPECIFICATION 232113.

(5) AT 3RD FLOOR OFFSET, PROVIDE 3/4" DRAIN PIPE CONNECTION WITH VALVE AND HOSE CONECTION AND CAP

AT BASE OF ELBOW TO ROOF.

(6) PROVIDE HVAC WAVEGUIDE AIR VENT AT EVERY DUCT PENETRATION OF THE RF SHIELDING. REFER TO ETS LINDGREN DRAWINGS FOR PENETRATION DETAILS. PROVIDE DIELECTRIC UNION/CONNECTOR IN DUCT OUTSIDE

OF RF SHIELDING PENETRATIONS.

COORIDINATE

BURRIED DEPTH

WITH CIVIL

SEE CRYOGEN VENT DETAIL.

INSTALL FLEXIBLE BELLOWS

PER SPEC 232113 BETWEEN

EACH RIGID SUPPORT

TO BUILDING STRUCTURE.

SEE ALSO SIEMENS DRAWINGS.

MSI

G

NOTE: PUMP

CONDENSATE TO

HOUSEKEEPING

SINK.

NOTE: PUMP

CONDENSATE TO

HOUSEKEEPING

SINK.

1 1/2" MPC UP

1 1/2" MPS UP

PROVIDE BASE OF

RISER DRIP TRAP.

PROVIDE BASE OF

RISER DRIP TRAP.

AC

NOTE: CEILING

PLENUM RETURN. ALL

CABLE MUST BE

PLENUM-RATED.

49 DARTMOUTH STREET

PORTLAND, ME 04101

207-775-1059 www.pdtarchs.com

ARCHITECTURE

INTERIOR DESIGN

PLANNING

Project Number

Building Number

Drawing NumberLocation

Project Title

Date Checked Drawn

Drawing Title

Approved: Project Director

Dwg: of 217

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

1 2 3 4 5 6 7 8

A

B

C

D

E

A

B

C

D

E

F

VA FORM 08-6231, OCT 1978

on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua rte rs i

6" on e i

6" on e h a lf i nc f oo t 6"

Denis McLaughlin Telephone: 857-364-5149

1 2 3 4 5 6 7 8

Jamaica Plain, MA

198801108

M.E.P.:

Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376

SPECIFICATIONS:

Lowell Specifications, Inc.

34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001

STRUCTURAL:

Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822

CIVIL/LANDSCAPE:

Stantec Consulting 141 Portland St.

Boston, MA 02114 T: (617) 523-8103

AE Research Addition 523-307

0%

S

UB

MI

TT

AL

- B

ID

D

OC

UM

EN

TS

03-31-2016

HVAC Piping Ground Floor Plan B

10-MH101B

ERDCMP 114

1/4" = 1'-0"1 HVAC Piping Ground Floor Plan B

-000

D2

UTILITY

BIOMEDICAL

ENGINEERINGUTILITY

OFFICE

BB-21

CLERICAL

OFFICE

OFFICE

S U

FD

FD

A1- 2

CORRIDOR

LOBBY

ELEVATOR

CLOSET

FIRE PROTECT.

ROOM

STORAGE

STORAGE

STORAGE

CORR

CORR

CORR

ROOM

WET MECH

REAWAY 1

AREAWAY 2

8'-0"

8'-6"

8'-6"

8'-6"

1A1A

8F6

8F6

8F6

8F6

1A1

1A1

1A1

8F6

8F6

8F6

FB-05

FB-04

FB-03

FB-02

FCB-03

FC0-02

FC0-04

FB-01

AB-12A

AB-12B

MAIN ELECT.ROOM WET MECH.ROOM

STORAGE

ROOM

ENGIN. DEPT.

EXIST.

FILES

EXIST.

-000

D2

UTILITY

BIOMEDICAL

ENGINEERINGUTILITY

OFFICE

BB-21

CLERICAL

OFFICE

OFFICE

S U

FD

FD

A1- 2

CORRIDOR

LOBBY

ELEVATOR

CLOSET

FIRE PROTECT.

ROOM

STORAGE

STORAGE

STORAGE

CORR

CORR

CORR

ROOM

WET MECH

REAWAY 1

AREAWAY 2

8'-0"

8'-6"

8'-6"

8'-6"

1A1A

8F6

8F6

8F6

8F6

1A1

1A1

1A1

8F6

8F6

8F6

FB-05

FB-04

FB-03

FB-02

FCB-03

FC0-02

FC0-04

FB-01

AB-12A

AB-12B

MAIN ELECT.ROOM WET MECH.ROOM

STORAGE

ROOM

ENGIN. DEPT.

EXIST.

FILES

EXIST.

E-2

E-E E-F

E-B E-C

E-3

E-4

A

B.5

C

E-5D

D.6

EE-6

4"ø HWR 4"ø HWS 1 1/2"ø MPS

1 1/2"ø MPC

CONTRACTOR IS

RESPONSIBLE FOR PROVIDING

EXPANSION LOOPS AND

ANCHORS WHERE NEEDED.

INSTALL PIPES WITHIN

LARGER PIPES, OR

PROVIDE SIMILAR MEANS

OF POSITIVE LEAK

PROTECTION WHERE

PIPES CROSS DATA

ROOM.

HX

P 1P

HX

REFER TO STEAM AND HOT

WATER GENERATION

SCHEMATIC AND RELATED

DETAILS FOR WORK IN THIS

AREA.

1 /

-M H1

B

1 /

-M H1

B

4"ø HWR 4"ø HWS 1 1/2"ø MPS 1 1/2"ø MPC

EXPOSED:

MOUNT HIGH AS POSSIBLE.

FLASH TANK (E)

COND PUMP (E)

6" MPS (E)

NEW HEATING HOT WATER SYSTEM

MAKEUP WATER SHALL BE FROM

EXISTING MAKEUP WATER TO

EXISTING HEATING HOT WATER

SYSTEM.

49 DARTMOUTH STREET

PORTLAND, ME 04101

207-775-1059 www.pdtarchs.com

ARCHITECTURE

INTERIOR DESIGN

PLANNING

Project Number

Building Number

Drawing NumberLocation

Project Title

Date Checked Drawn

Drawing Title

Approved: Project Director

Dwg: of 217

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

1 2 3 4 5 6 7 8

A

B

C

D

E

A

B

C

D

E

F

VA FORM 08-6231, OCT 1978

on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua rte rs i

6" on e i

6" on e h a lf i nc f oo t 6"

Denis McLaughlin Telephone: 857-364-5149

1 2 3 4 5 6 7 8

Jamaica Plain, MA

198801108

M.E.P.:

Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376

SPECIFICATIONS:

Lowell Specifications, Inc.

34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001

STRUCTURAL:

Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822

CIVIL/LANDSCAPE:

Stantec Consulting 141 Portland St.

Boston, MA 02114 T: (617) 523-8103

AE Research Addition 523-307

0%

S

UB

MI

TT

AL

- B

ID

D

OC

UM

EN

TS

03-31-2016

HVAC Piping Ground Floor Plan C

10-MH101C

ERDCMP 115

1/8" = 1'-0"1 HVAC Piping Ground Floor Plan C

F F FF

atc atc

TEAM

LEADER

OFFICE

1-14

TEAM

LEADER

OFFICE

1-13

STAIR 1

1S-11

ELEVATOR

G-30

PATIENT

TOILET

1-10

CONFERENCE

ROOM

1-16

EXAM ROOM

1-09

BLOOD

DRAW

1-08

PATIENT

TOILET

1-07

CONSULT

1-05

CONSULT

1-04

NOURISH

1-06

WAITING

1-02

CORRIDOR

CR-1-23

CORRIDOR

CR-1-15

LAB MODULE

1-17

CONSULT

1-38

CONSULT

1-39

60"x30" EA UP

72"x26" SA UP

10"x8" SA

10"x8" RA

6" ø

RA

10"x8" SA7"ø SA

7" ø

SA

8"ø SA

VVR

R-1

S-1

R-1

S-1

VVR

VVR

116 S-1

/1 10-MH102B /1 10-MH102B

CORRIDOR

CR-1-33

"x2

6" R

A

26"x48" RA UP

48"x26" SA UP

"x8

" S A

"x1

2" S

A

"x1 6"

S A

26"x26" RA

7"ø SA S-1

R-2

28"x12" RA

R-2

(TYP 2)

R-4

(TYP 2)

R-4

(TYP 2)

R-2

7"ø RA

"x1

8" R

A

6"ø RA

E-2

S-1

8" ø

SA

VVR

VVR

VVR

10"x10" SA

R-4

8" ø

SA

8" ø

SA

SL-2

(TYP 2)

SL-2

(TYP 2)

8" ø

SA

8" ø

SA

10"x10" SA

R-4

VVR

VVR

VVR

SL-2

(TYP 3)

SL-2

(TYP 3)

R-2

S-2

12"x12" RA

"x1

2" R

A

7"ø RA

R-2

S-1

"x1

4" S

A

"x1 4"

S A

10"x10" SA

9"ø SA

9"ø SA

9"ø SA

9"ø SA

9" ø

SA

12"x12" RA

9" ø

SA 20"x12" RA 28"x12" RA

"x8

" R A

"x1

0" E

A

12"x12" RA

12"x6" RA

"x6

" R A

"x6

" R A

"x6

" R A

14"x12" RA 20"x12" RA

12"x10" RA

8"x8" RA

LINEN

SUPPLY

1-36

SL-2

(TYP 2)

12"x10" SA

14"x10" SA

7" ø

SA

S-1

7" ø

SA

8" ø

SA

S-2

7" ø

SA

VVR

S-2

8"x8" SA

8" ø

SA

20"x12" RA

8" ø

EA

8"ø SA

"x1

0" E

A

E-1

CORRIDOR

CR-1-01

1.91.31.50

R-2

6"ø EA

14"x18" EA UP

8" ø

SA

8" ø

SA

8" ø

SA

8" ø

SA

8" ø

SA

SL-2

(TYP 5)R-5

(TYP 2)

"x1

6" R

A

7"ø SA

S-1

R-1

6" ø

RA

8"x8" RA 6"ø RA

10"x8" SA

18"x12" SA

FCU

2E

SURFACE MOUNT AND

RECESS UNIT FCU-2E

1 2 3 3.3 4 E-A E-B E-C

E-4

A

B

B

C

E-5 D

49 DARTMOUTH STREET

PORTLAND, ME 04101

207-775-1059 www.pdtarchs.com

ARCHITECTURE

INTERIOR DESIGN

PLANNING

Project Number

Building Number

Drawing NumberLocation

Project Title

Date Checked Drawn

Drawing Title

Approved: Project Director

Dwg: of 217

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

1 2 3 4 5 6 7 8

A

B

C

D

E

A

B

C

D

E

F

VA FORM 08-6231, OCT 1978

on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua rte rs i

6" on e i

6" on e h a lf i nc f oo t 6"

Denis McLaughlin Telephone: 857-364-5149

1 2 3 4 5 6 7 8

Jamaica Plain, MA

198801108

M.E.P.:

Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376

SPECIFICATIONS:

Lowell Specifications, Inc.

34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001

STRUCTURAL:

Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822

CIVIL/LANDSCAPE:

Stantec Consulting 141 Portland St.

Boston, MA 02114 T: (617) 523-8103

AE Research Addition 523-307

0%

S

UB

MI

TT

AL

- B

ID

D

OC

UM

EN

TS

03-31-2016

HVAC Ductwork First Floor Plan A

10-MH102A

ERDCMP 116

1/4" = 1'-0"1 HVAC Ductwork First Floor Plan A

F

F

F FF

F atc atc

EXAM ROOM

1-09

BLOOD

DRAW

1-08

CORRIDOR

CR-1-24

CORRIDOR

CR-1-25

CORRIDOR

CR-1-23

LAB MODULE

1-17

LAB MODULE

1-18

CONSULT

1-19

CONSULT

1-20

HKP

1-26

CLOSET

1-21

OFFICE

1-27 OFFICE

1-28

STAIR 2

1S-22

ELEC.

CLOSET

1-30

MENS STAFF

TOILET

1-31

WOMENS

STAFF

TOILET

1-32

CONSULT

1-38

CONSULT

1-39

16" MRI QUENCH

VENT

VVR

/1 10-MH102A/1 10-MH102A

CORRIDOR

CR-1-33

"x2

6" S

A

42"x18" SA

"x2

6" R

A

26"x48" RA UP

48"x26" SA UP

"x8

" S A

"x1

6" S

A

SG-2

26"x26" RA

VVR

VVR

"x8

" S A

VVR

S-1

7"ø SA S-1

R-2

E-3

28"x12" RA

R-4

(TYP 2)

R-4

(TYP 2)

"x1

8" R

A

6"ø RA

VVR

VVR

SL-2

(TYP 3)

SL-2

(TYP 3)

R-2

12"x12" RA

S-1

40"x18" SA

"x1 6"

S A

"x1

6" S

A

"x1 4"

S A

9"ø SA

9"ø SA

9" ø

SA

12"x12" RA

12"x12" SA

9" ø

SA

9"ø SA

9"ø SA

"x1

2" R

A

20"x12" RA 28"x12" RA

"x8

" R A

"x8

" R A

12"x12" SA

6" ø

EA

14"x8" EA

10"x8" SA

6" ø

EA

"x1

0" E

A

12"x12" RA

12"x6" RA

"x6

" R A

S-2

E-1

E-1

42"x18" SA

12"x10" SA

8"ø SA

"x1

0" S

A 8" ø

SA

SL-2

SL-2

VVR

VVR

118VVR

VVR

SL-2

OFFICE

1-29

LINEN

SUPPLY

1-36

8"ø SA

10"x10" SA

8" ø

SA

SL-2

S-1

8" ø

SA

R-2

R-2

10"x10" RA8"ø RA

8" ø

RA

R-2

R-2

R-2

8"ø RA

"x1

2" R

A

8"ø RA

8"ø RA

6" ø

EA

6" ø

EA

E-1

R-2

7"ø RA

7" ø

SA

7"ø SA

"x1

0" S

A

VVR

S-2

8"x8" SA

8" ø

SA

"x1

0" E

A

VV

119 S-1

E-2

1.91.31.50

R-2

8"ø EA

14"x12" EA UP

14"x18" EA UP

12"x12" EA UP

FCU

2W

"x1

2" E

A

1 2 3 3.3 4 E-A E-B E-C

E-5 D

D.6

E E-6

E.8

G

E-7

E-AA

"x8

" E A

12"x8" SA

10"ø SA

S-2

49 DARTMOUTH STREET

PORTLAND, ME 04101

207-775-1059 www.pdtarchs.com

ARCHITECTURE

INTERIOR DESIGN

PLANNING

Project Number

Building Number

Drawing NumberLocation

Project Title

Date Checked Drawn

Drawing Title

Approved: Project Director

Dwg: of 217

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

1 2 3 4 5 6 7 8

A

B

C

D

E

A

B

C

D

E

F

VA FORM 08-6231, OCT 1978

on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua rte rs i

6" on e i

6" on e h a lf i nc f oo t 6"

Denis McLaughlin Telephone: 857-364-5149

1 2 3 4 5 6 7 8

Jamaica Plain, MA

198801108

M.E.P.:

Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376

SPECIFICATIONS:

Lowell Specifications, Inc.

34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001

STRUCTURAL:

Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822

CIVIL/LANDSCAPE:

Stantec Consulting 141 Portland St.

Boston, MA 02114 T: (617) 523-8103

AE Research Addition 523-307

0%

S

UB

MI

TT

AL

- B

ID

D

OC

UM

EN

TS

03-31-2016

HVAC Ductwork First Floor Plan B

10-MH102B

ERDCMP 117

1/4" = 1'-0"1 HVAC Ductwork First Floor Plan B

TEAM

LEADER

OFFICE

1-14

STAIR 1

1S-11

ELEVATOR

G-30

EXAM ROOM

1-09

PATIENT

TOILET

1-07

WAITING

1-02

CORRIDOR

CR-1-23

LAB MODULE

1-17

LAB MODULE

1-18

CONSULT

1-38

CONSULT

1-39

1"ø HWS 1"ø HWR

1"ø HWS 1"ø HWR

RADIANT SLAB HEATING

SYSTEM, 16 MBH:

CIRCULATING PUMP, 3-WAY

MIXING VALVE, AND

MANIFOLD IN CABINET.

/1 10-MH103B /1 10-MH103B

EXTENT OF

RADIANT SLAB

HEATING SYSTEMVVR

VVR

VVR

VVR

VVR

VVR

VVR

VVR

CONSULT

1-03

LINEN

SUPPLY

1-36

CORRIDOR

CR-1-01

TEAM

LEADER

OFFICE

1-13

PATIENT

TOILET

1-10

CONFERENCE

ROOM

1-16

BLOOD

DRAW

1-08

PATIENT

TOILET

1-07

CONSULT

1-05

CONSULT

1-04

NOURISH

1-06

CORRIDOR

CR-1-23

CORRIDOR

CR-1-15

CONSULT

1-03

LINEN

SUPPLY

1-36

CORRIDOR

CR-1-01

1.91.31.50

1" HWS & HWR UP TO

SECOND FLOOR CEILING

1" HWS & HWR UP TO

SECOND FLOOR CEILING

COPY/RECORDS

STORAGE

1-40

KITCHEN

1-34

FCU

2E

1 1/4"ø HWR 1 1/4"ø HWS

1" ø

HW

S

1" ø

HW

R

1 1 /2" ø

HW

R 1 1

/2" ø

HW

S

1" ø

HW

R

1" ø

HW

S

VVR

VVR

3/4 "ø

H W

S 3/4

"ø H

W R

1"ø HWR 1"ø HWS

1 1 /2" ø

HW

R 1 1

/2" ø

HW

S

1"ø HWR 1"ø HWS

1" ø

HW

S

1" ø

HW

S

1" ø

CH

W

S 1" ø

CH

W R

1" ø

CH

W

S 1" ø

CH

W R

1" ø

CH

W

S 1" ø

CH

W R

T

T

T

T

T

T T

T

T T

T T

1 1 /2" ø

HW

R 1 1

/2" ø

HW

S 1 1/4"ø HWR

1 1/4"ø HWS

4" DOWN

FLUSH MOUNT

VERTICAL RECESS

1 2 3 3.3 4 E-A E-B E-C

E-4

A

B

B.5

C

E-5 D

DRAIN TO INDIRECT WASTE

(TYPICAL)

3-WAY

CONTROL

VALVE

3-WAY

CONTROL

VALVE

RP

RP

RP

T

49 DARTMOUTH STREET

PORTLAND, ME 04101

207-775-1059 www.pdtarchs.com

ARCHITECTURE

INTERIOR DESIGN

PLANNING

Project Number

Building Number

Drawing NumberLocation

Project Title

Date Checked Drawn

Drawing Title

Approved: Project Director

Dwg: of 217

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

1 2 3 4 5 6 7 8

A

B

C

D

E

A

B

C

D

E

F

VA FORM 08-6231, OCT 1978

on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua rte rs i

6" on e i

6" on e h a lf i nc f oo t 6"

Denis McLaughlin Telephone: 857-364-5149

1 2 3 4 5 6 7 8

Jamaica Plain, MA

198801108

M.E.P.:

Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376

SPECIFICATIONS:

Lowell Specifications, Inc.

34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001

STRUCTURAL:

Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822

CIVIL/LANDSCAPE:

Stantec Consulting 141 Portland St.

Boston, MA 02114 T: (617) 523-8103

AE Research Addition 523-307

0%

S

UB

MI

TT

AL

- B

ID

D

OC

UM

EN

TS

03-31-2016

HVAC Piping First Floor Plan A

10-MH103A

ERDCMP 118

1/4" = 1'-0"1 HVAC Piping First Floor Plan A

FEC FEC

EXAM ROOM

1-09

CORRIDOR

CR-1-25

CORRIDOR

CR-1-23

LAB MODULE

1-17

LAB MODULE

1-18

CONSULT

1-20

HKP

1-26

CLOSET

1-21

STAIR 2

1S-22

ELEC.

CLOSET

1-30

MENS STAFF

TOILET

1-31

WOMENS

STAFF

TOILET

1-32

CONSULT

1-38

CONSULT

1-39

/1 10-MH103A/1 10-MH103A

4" HWR UP

4" HWS UP

VVR

VVR

VVR

VVR

VVR

VVR

VVR

VVR

VVR

VVR

VV

VVR

LINEN

SUPPLY

1-36

OFFICE

1-29

CORRIDOR

CR-1-24

CORRIDOR

CR-1-23

CONSULT

1-19

CONSULT

1-20

CLOSET

1-21

OFFICE

1-27

OFFICE

1-28

ELEC.

CLOSET

1-30

LINEN

SUPPLY

1-36

OFFICE

1-29

CORRIDOR

CR-1-33

1.91.31.50

COPY/RECORDS

STORAGE

1-40

KITCHEN

1-34

IT-DATA

ROOM

1-41

1 1 /2" ø

HW

R 1 1

/2" ø

HW

S

1" ø

HW

R

1" ø

HW

S

FCU

2W

1 1 /2" ø

HW

R 1 1

/2" ø

HW

S

2"ø HWR 2"ø HWS

3/4"ø HWS 1"ø HWS 3/4"ø HWR 1"ø HWR

1" ø

HW

S

1" ø

HW

R

1" ø

HW

S

1" ø

HW

S

1 1/4"ø HWR 1 1/4"ø HWS1 1/4"ø HWS

1 1/4"ø HWR

1 1 /2" ø

HW

R 1 1

/2" ø

HW

S

1" ø

HW

S

1" ø

HW

R

1"ø HWR 1"ø HWS

1" ø

CH

W

S 1" ø

CH

W R

1"ø CHWS 1"ø CHWR

1" ø

CH

W

S 1" ø

CH

W R

1" ø

CH

W

S 1" ø

CH

W R

1"ø HWS 1"ø HWR

T

T

T T

T

T

T

T

T

T

T

4" DOWN

4" DOWN

FLUSH MOUNT

VERTICAL RECESS

1 2 3 3.3 4 E-A E-B E-C

E-5 D

D.6

E E-6

E.8

G

E-7

E-AA

DRAIN TO

INDIRECT WASTE

3-WAY

CONTROL

VALVE

RP

RP

T

SEE CRYOGEN VENT DETAIL.

INSTALL FLEXIBLE BELLOWS

PER SPEC 232113 BETWEEN

EACH RIGID SUPPORT

TO BUILDING STRUCTURE.

SEE ALSO SIEMENS DRAWINGS.

MSI

49 DARTMOUTH STREET

PORTLAND, ME 04101

207-775-1059 www.pdtarchs.com

ARCHITECTURE

INTERIOR DESIGN

PLANNING

Project Number

Building Number

Drawing NumberLocation

Project Title

Date Checked Drawn

Drawing Title

Approved: Project Director

Dwg: of 217

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

1 2 3 4 5 6 7 8

A

B

C

D

E

A

B

C

D

E

F

VA FORM 08-6231, OCT 1978

on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua rte rs i

6" on e i

6" on e h a lf i nc f oo t 6"

Denis McLaughlin Telephone: 857-364-5149

1 2 3 4 5 6 7 8

Jamaica Plain, MA

198801108

M.E.P.:

Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376

SPECIFICATIONS:

Lowell Specifications, Inc.

34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001

STRUCTURAL:

Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822

CIVIL/LANDSCAPE:

Stantec Consulting 141 Portland St.

Boston, MA 02114 T: (617) 523-8103

AE Research Addition 523-307

0%

S

UB

MI

TT

AL

- B

ID

D

OC

UM

EN

TS

03-31-2016

HVAC Piping First Floor Plan B

10-MH103B

ERDCMP 119

1/4" = 1'-0"1 HVAC Piping First Floor Plan B

FF

atc atc

PATIENT

TOILET

2-02

ELEVATOR

G-30

STAIR 1

2S-11

TEAM

LEADER

OFFICE

2-06

TEAM

LEADER

OFFICE

2-07

LAB MODULE

2-08

LAB MODULE

2-09

LAB MODULE

2-11

CONSULT

2-04

CORRIDOR

CR-2-05

CORRIDOR

CR-2-10

CORRIDOR

CR-2-01

72"x26" SA DN

SUPPLY AIR LOUVER. 17'-

0"x7'-0" ACTIVE AREA.

EXHAUST AIR LOUVER.

17'-0"x7'-0" ACTIVE AREA.

BLANK OFF UNUSED

PORTION OF LOUVER

/1 10-MH104B /1 10-MH104B

IT-DATA

ROOM

2-23

CONSULT

2-24

LAB

2-25

CONSULT

2-26

OPEN

OFFICE

2-03

"x2

6" R

A

26"x26" RA

8" ø

RA

6"ø RA

"x8

" S A S-1

"x6

" S A

8"ø SA

8"ø SA

S-1

S-1

VVR

12"x10" SA

9" ø

SA

9" ø

SA

R-5

28"x12" RA

R-4

(TYP 2)

R-4

(TYP 2)

R-4

(TYP 2)

R-2

7"ø RA

"x1

8" R

A

6"ø RA

E-2

S-2

8" ø

SA

VVR

VVR

VVR

12"x10" SA

R-4

8" ø

SA

8" ø

SA

SL-2

(TYP 2)

SL-2

(TYP 2)

8" ø

SA

8" ø

SA

12"x10" SA

R-4

VVR

VVR

VVR

SL-2

(TYP 3)

SL-2

(TYP 3)

SL-2

(TYP 3)

R-1

R-1

S-2

12"x12" RA 14"x8" RA

"x1

2" R

A

6"ø RA

R-1

S-1

7"ø SA

S-2

(TYP 2)

"x1

4" S

A

"x1 4"

S A

14"x12" SA

9"ø SA

9"ø SA

9"ø SA

9"ø SA

9"ø SA

9" ø

SA

14"x12" RA

9" ø

SA 20"x12" RA 28"x12" RA

"x8

"…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.