36E77618R0062-005.pdf
PDF 11 MB Posted
- Attached to
- Research Addition JP, Construction Federal contract opportunity
- Solicitation number
- 36E77618R0062
About this file
36E77618R0062 S02 Attachment 4 523-307 Research Addition JP - Bid Docs - Plans Vol 1- 1 of 2.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36E77619C0005_1.docx | DOCX document | |
| 36E77618R0062-0002000.docx | DOCX document | |
| 36E77618R0062-0001000.docx | DOCX document | |
| 36E77618R0062-012.docx | DOCX document | |
| 36E77618R0062-004.pdf | ||
| 36E77618R0062-009.pdf | ||
| 36E77618R0062-011.docx | DOCX document | |
| 36E77618R0062-001.docx | DOCX document | |
| 36E77618R0062-003.pdf | ||
| 36E77618R0062-010.pdf | ||
| 36E77618R0062-007.pdf | ||
| 36E77618R0062-006.pdf | ||
| 36E77618R0062-002.pdf | ||
| 36E77618R0062-008.pdf | ||
| 36E77618R0062-000.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 1
BUILDING 1F
ACA ADDITION
AREA OF WORK
SITE LOCATION MAP
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
Dwg:
ARCHITECT/ENGINEERS:CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
A
B
C
D
E
F
VA FORM 08-6231, OCT 1978
on e e ig ht h in ch o ne fo ot on e q ua rte r i nc on e h al f th re e e ig hs th re e q ua rte rs i
6" on e i
6" on e a nd on e h a lf i nc he s f oo t 6"
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
Denis McLaughlin Telephone: 857-364-5149
1 2 3 4 5 6 7 8
SITE LOCATION MAP
JAMAICA PLAIN CAMPUS
VA JAMAICA PLAIN CAMPUS
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
CIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103
AE Research Addition 523-307
0%
S
UB
MI
TT
AL
- B
ID
D
OC
UM
EN
TS
3-31-2016
Title Sheet Volume 1
+T001
PNDW
523-307 AE Research Addition
DEPARTMENT OF VETERANS AFFAIRS
BOSTON HEALTHCARE SYSTEM
JAMAICA PLAIN CAMPUS
SHEET INDEX - VOLUME 1
SHEET
NUMBER Sheet Name
SHEET INDEX - VOLUME 1
SHEET
NUMBER Sheet Name
SF-103 Third Floor Framing Plan SF-104 Roof Framing Plan SF-200 Column Schedules & Details SF-500 Framing Sections & Details SF-501 Framing Sections & Details SF-502 Framing Sections & Details SF-503 Framing Sections & Details SF-504 Framing Sections & Details SF-505 Framing Sections & Details
SHEET INDEX - VOLUME 1
SHEET
NUMBER Sheet Name
+T001 Title Sheet Volume 1 General -G-001 VA Project General Notes -G-002 Project General Notes & Material Legend Civil VF101 Survey-Plan-Field CD101 Civil-Plan-Demo CS101 Civil-Plan-Site CS102 Civil-Site-Enlargements CG101 Civil-Plan-Grading CU101 Civil-Plan-Utilities CS501 Civil-Details-Site CS502 Civil-Details-Site CS503 Civil-Details-Site Architectural AD100 Ground Floor & First Floor Demolition Plan AD101 Second Floor & Third Floor Demolition Plan AD201 Demolition Elevations AS001 Assembly Types AS002 Typical Mounting Heights and Layouts AS003 Ground and First Floor Code Plans AS004 Second and Third Floor Code Plans AS005 Deduct Alternates AS100A Ground Floor Plan A AS100B Ground Floor Plan B AS101A First Floor Plan A AS101B First Floor Plan B AS102A Second Floor Plan A AS102B Second Floor Plan B AS103A Third Floor Plan A AS103B Third Floor Plan B AS104 Roof Plan AS105 Ground & 1st Floor Furniture, Equipment, and Floor Finish Plan AS106 2nd & 3rd Floor Furniture, Equipment, and Floor Finish Plan AS107 Ground Floor& First Floor Reflected Ceiling Plan AS108 Second Floor, Third Floor, Fourth Floor Reflected Ceiling Plan AS109 Ceiling Systems and Details AS201 Exterior Elevations AS202 Exterior Elevations AS203 Exterior Elevations AS204 Interior Elevations - Ground Floor AS205 Interior Elevations - Ground & 1st Floor Circulation AS206 Interior Elevations - 1st Floor AS207 Interior Elevations - 2nd & 3rd Floor AS208 Interior Elevations - Toilet Rooms AS301 Building Sections AS302 Building Sections AS303 Wall Sections AS304 Wall Sections AS305 Wall Sections AS306 Wall Sections AS307 Not Used AS401 Enlarged Plans AS402 Stair and Elevator Plans, 4th Floor Plan AS403 Stair and Elevator Sections AS404 Stair Plans & Sections AS405 Stair and Mech Shaft Plans and Details AS406 Stair Details AS407 Stair And Elevator Shaft Details AS501 Exterior Details AS502 Exterior Details AS503 Exterior Details AS504 Exterior Details AS505 Exterior Details AS506 Interior Details AS507 Typical Interior Details AS508 Typical Interior Firestopping, Sealing, And Shaftwall Details AS509 Typical Casework Details & Misc Details AS601 Door and Frame Schedule, Notes, and Details AS602 Curtain Walll Types AS603 Curtain Wall Types And Details AS604 Curtain Wall Details AS605 Curtain Walll Details AS606 Curtain Wall Details AS607 Curtain Wall Details AS608 Curtain Walll Details AS609 Curtain Wall Details AS610 Room Finish Schedule AS611 Finishes By Division Shielding RF0.0 Cover RF1.0 Foundation Plan RF1.1 Ceiling Support Layout RF1.2 Floor Plan RF1.3 Silicone Steel Ceiling RF1.4 Silicone Steel Floor RF2.0 Elevations RF2.1 Silicone Steel Elevations RF3.0 Details RF3.1 Details RF4.0 Autoseal 2 Door Structural SS-001 General Notes SB-100 Foundation Plan SB-300 Typical Foundation Sections & Details SB-301 Foundation Sections & Details SB-302 Foundation Sections & Details SB-303 Foundation Sections & Details SB-304 Foundation Sections & Details SF-101 First Floor Framing Plan SF-102 Second Floor Framing Plan
S. HUNTINGTON AVE.
HE
AT
H
ST
SHEET INDEX - VOLUME 2
SHEET
NUMBER Sheet Name
10-E600 Electrical Ground Floor Panel Schedules & Lighting Fixture Schedule 10-E601 Electrical Ground Floor Panel Schedules 10-E602 Electrical First & Second Floor Panel Schedules 10-E603 Electrical Third Floor Panel Schedules Plumbing 10-PL001 Plumbing Legend & General Notes 10-PD100 Plumbing Domestic Water Ground Floor Demo Plan 10-PD101 Plumbing Sanitary and Vent Ground Floor Demo Plan 10-PL100A Plumbing Domestic Water Ground Floor Plan A 10-PL100B Plumbing Domestic Water Ground Floor Plan B 10-PL101A Plumbing Sanitary and Vent Ground Floor Plan A 10-PL101B Plumbing Sanitary and Vent Ground Floor Plan B 10-PL102A Plumbing Domestic Water First Floor Plan A 10-PL102B Plumbing Domestic Water First Floor Plan B 10-PL103A Plumbing Sanitary and Vent First Floor Plan A 10-PL103B Plumbing Sanitary and Vent First Floor Plan B 10-PL104A Plumbing Domestic Water Second Floor Plan A 10-PL104B Plumbing Domestic Water Second Floor Plan B 10-PL105A Plumbing Sanitary and Vent Second Floor Plan A 10-PL105B Plumbing Sanitary and Vent Second Floor Plan B 10-PL106A Plumbing Domestic Water Third Floor Plan A 10-PL106B Plumbing Domestic Water Third Floor Plan B 10-PL107A Plumbing Sanitary and Vent Third Floor Plan A 10-PL107B Plumbing Sanitary and Vent Third Floor Plan B 10-PL108 Plumbing Sanitary and Vent Roof Plan 10-PL501 Plumbing Details & Schedules Fire Protection
FP-001 FIRE PROTECTION-TITLE SHEET
FP-100 FIRE PROTECTION-GROUND FLOOR PLAN
FP-101 FIRE PROTECTION-FIRST FLOOR PLAN
FP-102 FIRE PROTECTION-SECOND FLOOR PLAN
SHEET INDEX - VOLUME 2
SHEET
NUMBER Sheet Name
+T002 Title Sheet Volume 2 Mechanical 10-MH001 HVAC Legend & General Notes 10-MD101 HVAC Ductwork Ground Floor Demo 10-MD102 HVAC Piping Ground Floor Demo 10-MD103 HVAC Piping First Floor Demo 10-MH100A HVAC Ductwork Ground Floor Plan A 10-MH100B HVAC Ductwork Ground Floor Plan B 10-MH101A HVAC Piping Ground Floor Plan A 10-MH101B HVAC Piping Ground Floor Plan A 10-MH101C HVAC Piping Ground Floor Plan C 10-MH102A HVAC Ductwork First Floor Plan A 10-MH102B HVAC Ductwork First Floor Plan B 10-MH103A HVAC Piping First Floor Plan A 10-MH103B HVAC Piping First Floor Plan B 10-MH104A HVAC Ductwork Second Floor Plan A 10-MH104B HVAC Ductwork Second Floor Plan B 10-MH105A HVAC Piping Second Floor Plan A 10-MH105B HVAC Piping Second Floor Plan B 10-MH106A HVAC Ductwork Third Floor Plan A 10-MH106B HVAC Ductwork Third Floor Plan B 10-MH107A HVAC Piping Third Floor Plan A 10-MH107B HVAC Piping Third Floor Plan A 10-MH108 HVAC Ductwork Roof Plan 10-MH109 HVAC Piping Roof Plan 10-MH501 HVAC Details 10-MH502 HVAC Details 10-MH503 HVAC Details 10-MH601 HVAC Schedules 10-MH602 HVAC Schedules 10-MH603 HVAC Schedules 10-MH604 HVAC Schematic Diagrams 10-MH801 HVAC Controls 10-MH802 HVAC Controls 10-MH803 HVAC Controls Electrical 10-E000 Electrical Legend & General Notes 10-ED100 Electrical Site Plan Demo 10-ED101 Electrical Ground and Second Floor Demo 10-ES100 Electrical Site Plan New 10-ES500 Electrical Site Details 10-E001 Electrical One-Line Normal System Riser 10-E002 Electrical One-Line Emergency System Riser 10-E003 Data/Tel System One-Line Diagrams & Risers 10-E004 Misc. System One-Line Diagrams & Risers 10-EL100A Electrical Lighting Ground Floor Plan A 10-EL100B Electrical Lighting Ground Floor Plan B 10-EL101A Electrical Lighting First Floor Plan A 10-EL101B Electrical Lighting First Floor Plan B 10-EL102A Electrical Lighting Second Floor Plan A 10-EL102B Electrical Lighting Second Floor Plan B 10-EL103A Electrical Lighting Third Floor Plan A 10-EL103B Electrical Lighting Third Floor Plan B 10-EP100A Electrical Power Ground Floor Plan A 10-EP100B Electrical Power Ground Floor Plan B 10-EP100C Electrical Power Ground Floor Plan C 10-EP101A Electrical Power First Floor Plan A 10-EP101B Electrical Power First Floor Plan B 10-EP102A Electrical Power Second Floor Plan A 10-EP102B Electrical Power Second Floor Plan B 10-EP103A Electrical Power Third Floor Plan A 10-EP103B Electrical Power Third Floor Plan B 10-EP104 Electrical Power Roof New 10-ET001 Electrical Systems Ground Floor Routing Plan A 10-ET002 Electrical Systems Ground Floor Routing Plan B 10-ET003 Electrical Systems First Floor Routing Plan 10-ET004 Electrical Systems Third Floor Routing Plan 10-ET100A Electrical Systems Ground Floor Plan A 10-ET100B Electrical Systems Ground Floor Plan B 10-ET101A Electrical Systems First Floor Plan A 10-ET101B Electrical Systems First Floor Plan B 10-ET102A Electrical Systems Second Floor Plan A 10-ET102B Electrical Systems Second Floor Plan B 10-ET103A Electrical Systems Third Floor Plan A 10-ET103B Electrical Systems Third Floor Plan B 10-ET400 Electrical Enlarged ACA Tel/Comm Rooms 10-ET401 Electrical Enlarged Research Tel/Comm Data Room 10-E400 Electrical Enlarged Ground Floor MRI New 10-E500 Electrical MRI Details 10-E501 Electrical Details 10-E502 Electrical Lighting Details 10-E503 Electrical Details - LIghtning Protection 10-E504 Electrical Details
100% SUBMITTAL - BID DOCUMENTS (VOLUME 1)
1. GENERAL CONTRACTOR SHALL ASSURE THAT ALL TRADES ARE
AWARE OF THEIR RESPECTIVE FULL SCOPE OF WORK.
CONTRACTOR SHALL PROCURE ALL NECESSARY PERMITS AND
INSPECTIONS. REFER TO ALL CONTRACT DRAWINGS,
SPECIFICATIONS AND NOTES FOR ADDITIONAL RESPONSIBILITIES,
DETAILS AND SCOPE OF WORK. ALL WORK SHALL BE PERFORMED
BY PERSONNEL PROPERLY SKILLED IN THE TASK THEY ARE
PERFORMING AND AWARE OF THEIR PROJECT RESPONSIBILITIES.
WORKMANSHIP SHALL BE THE BEST OF THEIR RESPECTIVE KIND
USING THE MOST MODERN APPROVED METHODS AND MATERIALS.
GENERAL CONTRACTOR SHALL DIRECTLY SUPERVISE ALL PHASES
OF CONSTRUCTION, AND THE SUPERVISOR SHALL HAVE FULL
AUTHORITY TO ACT ON FIELD CONDITIONS ASSOCIATED WITH ALL
TRADES TO PREVENT CONSTRUCTION DELAYS. DAILY WORK LOGS
SHALL BE ISSUED TO THE VA PROJECT ENGINEER DESCRIBING IN
DETAIL THE MANPOWER, MAN-HOURS, WORK PERFORMED BY
EACH TRADE.
2. INFORMATION ON EXISTING CONDITIONS AND PROPOSED
DESIGN SOLUTIONS DESCRIBED IN THE CONTRACT DOCUMENTS
ARE BASED ON NON-DESTRUCTIVE TESTING AND VISUAL SITE
INVESTIGATION OBSERVATIONS ACCESSIBLE IN AN OCCUPIED
STRUCTURE. LOCATIONS OF COMPONENTS ARE APPROXIMATE
AND INFORMATION PROVIDED IS DIAGRAMMATIC. IN SOME
INSTANCES, IT MAY HAVE BEEN IMPRACTICABLE TO DETAIL ALL THE
ITEMS IN THE SPECIFICATIONS OR ON THE DRAWINGS BECAUSE OF
VARIANCES IN THE METHODS OF ACHIEVING THE NECESSARY
RESULTS. IN SUCH INSTANCES, THE CONTRACTOR SHALL FURNISH
ALL LABOR, MATERIALS, DRAWINGS, SERVICES AND CONNECTIONS
NECESSARY NOT LIMITED TO THE INFORMATION PROVIDED TO
PRODUCE SYSTEMS, APPURTENANCES AND EQUIPMENT WHICH
ARE COMPLETE, FUNCTIONAL AND READY FOR PROPER
OPERATION BY FACILITY PERSONNEL FOR THE PURPOSE
INTENDED IN ACCORDANCE WITH THEIR NEEDS AND THE
REQUIREMENTS OF THE MANUFACTURERS AT NO ADDITIONAL
COST/TIME TO THE GOVERNMENT. ALL WORK SHALL BE
PERFORMED WITHIN THE REQUIREMENTS OF THE GENERAL
CONDITIONS, GENERAL REQUIREMENTS, DRAWINGS,
SPECIFICATIONS AND NOTES. PRIOR TO THE BID OPENING DATE
THE CONTRACTOR IS HIGHLY ADVISED TO VISIT THE FACILITY AND
CAREFULLY EXAMINE THE CONDITIONS/DIFFICULTIES THAT WILL
AFFECT CONSTRUCTION TO AVOID PROBLEMS THAT MAY BE
CAUSED BY UNFAMILIARITY WITH CONDITIONS/DIFFICULTIES THAT
ARE EITHER VISIBLE OR READILY CONSTRUED BY AN EXPERIENCED
OBSERVER.
3. GENERAL CONTRACTOR SHALL COORDINATE ALL WORK WITH
ALL TRADES, AND EQUIPMENT INSTALLERS IN ORDER TO MAINTAIN
PROPER USE AND ACCESS TO ALL ITEMS AND SPACES. REFER TO
THE "COORDINATION DRAWING CHECKLIST" FOR FURTHER
DETAILS. GENERAL CONTRACTOR IS RESPONSIBLE FOR
COORDINATING ALL EQUIPMENT AND COMPONENTS BEING
INSTALLED WITH THE PLACEMENT LOCATION AND DIMENSION
REQUIREMENTS. PRIOR TO JOB EXECUTION EACH TRADE SHALL
SUBMIT "COMPLETE" COORDINATED SHOP DRAWINGS INDICATING
ALL EQUIPMENT AND MATERIAL LAYOUTS INDICATING LOCATIONS
FROM WALLS/COLUMNS, BOTTOM/TOP ELEVATIONS, VIBRATION
ISOLATORS, SUPPORTS, DIMENSIONS, UTILITY REQUIREMENTS AND
EQUIPMENT SUBMITTAL NUMBERS. EACH TRADE SHALL MAINTAIN A
SET OF WORKING DRAWINGS TO DOCUMENT AS-BUILT
INFORMATION AS THE WORK PROGRESSES AND SUBMIT TO THE VA
PROJECT ENGINEER MONTHLY FOR REVIEW.
4. THE CONTRACT DOCUMENTS SHOW OR DESCRIBE THE
GENERAL ARRANGEMENT OF PIPES, EQUIPMENT, COMPONENTS,
APPURTENANCES BUT DO NOT IDENTIFY ALL REQUIRED FITTINGS
AND OFFSETS THAT ARE NECESSARY TO PROPERLY COMPLETE
THE INSTALLATION. CONTRACTOR SHALL ALTER LOCATION OF
ITEMS ON THE DRAWINGS WHERE NECESSARY TO AVOID
INTERFERENCE AND CLEARANCE DIFFICULTIES. IT IS THE INTENT
OF THE DRAWINGS/SPECIFICATIONS THAT THE CONTRACTOR
SHALL PROVIDE ALL MATERIALS AND LABOR NECESSARY TO
COMPLETE THE WORK DESCRIBED OR IMPLIED BY THE
DOCUMENTS AT NO ADDITIONAL COST/TIME TO THE GOVERNMENT.
SHOULD THE CONTRACT DOCUMENTS NOT AGREE WITH
THEMSELVES THE GREATER QUANTITY OF SUPERIOR WORK AND
MATERIALS SHALL BE PERFORMED. NO STATEMENTS HERE IN
SHALL RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY AS
DESCRIBED ELSEWHERE IN THE CONTRACT DOCUMENTS.
VA PROJECT GENERAL NOTES
5. CONTRACTOR SHALL VERIFY ALL DIMENSIONS, CLEARANCES,
INFORMATION AND ASSUMPTIONS ON EXISTING CONDITIONS. ALL
WORK SHALL BE PERFORMED WITHIN APPROVED TOLERANCES,
MEET THE REQUIREMENTS OF THE MANUFACTURER AND BE NEAT,
STRAIGHT, PLUMB, LEVEL, SMOOTH. CONTRACTOR IS
RESPONSIBLE FOR REVIEWING ALL CONTRACT DOCUMENTS FOR
DISCREPANCIES PRIOR TO COMMENCING ANY AND ALL WORK.
CONTRACTOR SHALL NOTIFY THE VA PROJECT ENGINEER OF ANY
VARIANCES WITH ADEQUATE TIME SO THAT ALTERNATE
SOLUTIONS CAN BE ESTABLISHED WITHOUT DISRUPTING THE
ESTABLISHED CONSTRUCTION SCHEDULE. DATA AND
INFORMATION FURNISHED OR REFERRED TO IN THE
CONSTRUCTION DOCUMENTS IS FOR THE CONTRACTOR'S USE.
THE GOVERNMENT ASSUMES NO RESPONSIBILITY FOR ANY
INTERPRETATION OF OR CONCLUSION DRAWN FROM THE DATA
OR INFORMATION MADE BY THE CONTRACTOR BASED ON THE
INFORMATION MADE AVAILABLE BY THE GOVERNMENT. NOR
DOES THE GOVERNMENT ASSUME RESPONSIBILITY FOR ANY
UNDERSTANDING REACHED OR REPRESENTATION MADE
CONCERNING CONDITIONS THAT CAN AFFECT THE WORK BY ANY
OF ITS OFFICERS OR AGENTS BEFORE THE EXECUTION OF THIS
CONTRACT, UNLESS THAT UNDERSTANDING OR REPRESENTATION
IS EXPRESSLY STATED IN THE CONTRACT.
6. SUBMITTALS AND SCHEDULES REQUIRED BY THE
CONSTRUCTION DOCUMENTS SHALL BE CHECKED BEFORE
SUBMISSION BY TECHNICALLY QUALIFIED EMPLOYEES OF THE
CONTRACTOR FOR ACCURACY, COMPLETENESS AND
COMPLIANCE WITH THE CONTRACT REQUIREMENTS. THESE
DOCUMENTS SHALL BE SIGNED/STAMPED BY THE CONTRACTOR
CERTIFYING TO THIS REVIEW. SHOP AND COORDINATION
DRAWINGS FOR ALL EQUIPMENT AND COMPONENT INSTALLATION
ARE REQUIRED. THE CONTRACTOR SHALL SUBMIT FOR REVIEW A
MINIMUM OF 5 SETS OF INDIVIDUAL SUBMITTALS/SCHEDULES FOR
REVIEW. THE CONTRACTOR SHALL ISSUE ONE SUBMITTAL
PACKAGE ONLY FOR EACH SPECIFICATION SECTION. THE
SUBMITTAL PACKAGE SHALL CONTAIN A "CHECKLIST TABLE"
PREPARED BY THE CONTRACTOR ITEMIZING ALL REQUIRED
SUBMITTAL ITEMS IDENTIFIED IN THE CONTRACT DOCUMENTS. IT
IS THE RESPONSIBILITY OF THE CONTRACTOR TO ASSURE THE
TIMELY SUBMISSION/REVIEW OF ALL NECESSARY SUBMITTALS
AND SCHEDULES. SUCH REVIEW BY THE GOVERNMENT OR
DESIGNEE SHALL NOT ALLEVIATE THE CONTRACTOR OF
COMPLYING WITH THE TERMS AND CONDITIONS SPECIFIED IN THE
CONTRACT DOCUMENTS.
7. CONTRACTOR SHALL PROCURE ALL NECESSARY PERMITS AND
INSPECTIONS. VERIFY IN ADVANCE OF PERFORMING ANY WORK
THE AVAILABILITY, TYPE, CAPACITY, LOCATION OF ENERGY
SYSTEMS (EG, MECHANICAL, ELECTRICAL, PLUMBING)
NECESSARY TO PERFORM THE WORK. PROVIDE ALL NECESSARY
LABOR, MATERIAL AND COORDINATION TO COMPLETE THE WORK
DESCRIBED OR IMPLIED BY THE CONSTRUCTION DOCUMENTS FOR
EQUIPMENT TO OPERATE IN THE MANNER INTENDED AT NO
ADDITIONAL COST OR TIME TO THE GOVERNMENT. IN THE EVENT
THAT THE CHARACTERISTICS OF ANY EQUIPMENT DO NOT AGREE
WITH THE CHARACTERISTICS OF THE AVAILABLE SYSTEM, MAKE
THE NECESSARY MODIFICATIONS. ALL APPURTENANCES,
ASSEMBLIES, ARTICLES, EQUIPMENT, COMPONENTS, AND
MATERIALS FURNISHED SHALL BE NEW AND FREE FROM DEFECTS,
AND BE OF THE MOST SUITABLE GRADE, SIZE AND CAPACITY FOR
THE PURPOSE INTENDED, UNLESS OTHERWISE SPECIFIED OR
APPROVED BY THE VA PROJECT ENGINEER. SHOULD THE
CONTRACT DOCUMENTS NOT AGREE WITH THEMSELVES THE
GREATER QUANTITY OF SUPERIOR QUALITY OF MATERIALS AND
WORK SHALL BE USED.
8. NEW WORK SHALL BE INSTALLED AND CONNECTED TO
EXISTING WORK NEATLY AND CAREFULLY. DISTURBED OR
DAMAGED WORK SHALL BE REPLACED OR REPAIRED TO
ORIGINAL CONDITION. CARE SHALL BE USED DURING REMOVAL
AND INSTALLATION TO AVOID DAMAGING THE SURROUNDING
SURFACES. DAMAGED SURFACES AND ITEMS WITHIN THE
CONTRACT LIMITS SHALL BE PATCHED, REPAIRED, REFINISHED,
PAINTED AND/OR REPLACED AS NECESSARY WITH MATERIALS
COMPARABLE TO THE SURROUNDING MATERIAL AND SURFACE
EQUAL TO NEW CONDITIONS UNLESS OTHERWISE NOTED OR
DIRECTED BY THE VA PROJECT ENGINEER. FINISHED SURFACES
SHALL BE INDISTINGUISHABLE FROM THE SURROUNDING AREA.
9. ALL APPURTENANCES, ASSEMBLIES, ARTICLES, EQUIPMENT,
COMPONENTS, AND MATERIALS INSTALLED SHALL BE COMPLETE
FOR OPERATION, SERVICE AND MAINTENANCE FOR THE PURPOSE
INTENDED NOT LIMITED TO THE DETAILS AND INFORMATION
PROVIDED. ALL APPURTENANCES, ASSEMBLIES, ARTICLES,
EQUIPMENT, COMPONENTS, MATERIALS AND EXECUTION SHALL
BE IN CONFORMANCE WITH THE CONTRACT DOCUMENTS,
MANUFACTURER'S WRITTEN PROCEDURES AND
RECOMMENDATIONS, LATEST EDITIONS OF ALL APPLICABLE
FEDERAL/STATE/CITY CODES, REGULATIONS, ORDINANCES, AND
THE JURISDICTION HAVING AUTHORITY (JHA) AS APPLICABLE.
EXCEPT WHERE SPECIFIC DATES ARE GIVEN, THE ISSUE
(INCLUDING AMENDMENTS, ADDENDA, REVISIONS, SUPPLEMENTS,
AND ERRATA) IN EFFECT ON THE DATE OF INVITATION FOR BIDS
SHALL BE APPLICABLE. IN THE EVENT THAT CRITERIA
REQUIREMENTS CONFLICT, THE MOST STRINGENT REQUIREMENT
(THE GREATER QUANTITY OF SUPERIOR WORK AND MATERIALS)
SHALL BE MET.
10. CONTRACTOR SHALL COORDINATE ALL UTILITY AND HVAC
SHUTDOWNS 3 WEEKS IN ADVANCE WITH THE VA PROJECT
ENGINEER. DUE TO HOSPITAL SCHEDULING SOME
SHUTDOWNS WILL NEED TO BE PERFORMED DURING PRIME-
TIME BY THE CONTRACTOR.
11. ALL CONSTRUCTION DEBRIS IS TO BE REMOVED OFF-SITE
AND DISPOSED OF PROPERLY BY THE CONTRACTOR. ALL
DEBRIS SHALL BE REMOVED ON A DAILY BASIS. ALL
SALVAGEABLE ITEMS ARE THE PROPERTY OF THE VA.
CONTRACTOR SHALL REMOVE FROM THE SITE ALL ITEMS
WHICH THE VA DOES NOT INTEND TO REUSE.
12. AREAS WITHIN THE CONSTRUCTION WORKSITE MAY BE
OCCUPIED DURING THE EXECUTION OF WORK. PROPER
PRECAUTIONS SHALL BE TAKEN SO THAT ADJACENT OCCUPIED
AREAS SHALL NOT BE DISTURBED DURING CONSTRUCTION.
CONTRACTOR SHALL COORDINATE THE PERFORMANCE OF
WORK AND SPACE ACCESS 3 WEEKS IN ADVANCE WITH THE VA
STAFF AND PROJECT ENGINEER. DUE TO HOSPITAL
SCHEDULING AND ACCESS DIFFICULTIES (EG, EXAM ROOMS,
TREATMENT ROOMS, PROCEDURE ROOMS, ET AL) THE
PERFORMANCE OF CERTAIN WORK WILL NEED TO BE
PERFORMED DURING PRIME-TIME BY THE CONTRACTOR.
PRE-BID SITE VISIT RECOMMENDATION: BEFORE SUBMITTING
BID, VISIT THE SITE AND CAREFULLY EXAMINE THE AREAS TO
IDENTIFY COMPLEXITY, EXISTING CONDITIONS AND
DIFFICULTIES THAT WILL AFFECT WORK. BID SUBMISSION
SHALL BE CONSTRUED AS ACCEPTANCE OF THE EXISTING
CONDITIONS AND DIFFICULTIES. NO CHANGE TO THE
CONTRACT PRICE OR SCHEDULE SHALL BE ALLOWED FOR
WORK CAUSED BY UNFAMILIARITY WITH THE SITE CONDITIONS
THAT ARE VISIBLE OR READILY CONSTRUED BY AN
EXPERIENCED OBSERVER. DUE TO ONGOING FACILITY
ALTERATIONS VARIATIONS IN THE EXISTING CONDITIONS
SHALL BE ANTICIPATED.
PRE-WORKSITE RE-VISIT REQUIREMENT: BEFORE STARTING
WORK IN A PARTICULAR AREA, VISIT THE WORKSITE AND
CAREFULLY EXAMINE THE AREAS TO VERIFY COMPLEXITY,
EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT
WORK INCLUDING ALL WORK DONE UNDER VARIOUS
SPECIFICATION SECTIONS AND THE VA. COMMENCEMENT OF
WORK SHALL BE CONSTRUED AS ACCEPTANCE OF THE
EXISTING CONDITIONS AND DIFFICULTIES. NO CHANGE TO THE
CONTRACT PRICE OR SCHEDULE SHALL BE ALLOWED FOR
WORK CAUSED BY UNFAMILIARITY WITH THE SITE CONDITIONS
THAT ARE VISIBLE OR READILY CONSTRUED BY AN
EXPERIENCED OBSERVER. DUE TO ONGOING FACILITY
ALTERATIONS VARIATIONS IN THE EXISTING CONDITIONS
SHALL BE ANTICIPATED.
13. LOCATION/COMPLEXITY VARIATIONS WITHIN THE PROJECT
LIMITS ARE CONSIDERED TO HAVE NO CHANGE ON THE
CONTRACT PRICE OR SCHEDULE. TO PERFORM AND
COMPLETE ALL NECESSARY WORK, CONTRACTOR WITH
EXPERIENCED/TRAINED PERSONNEL SHALL BE RESPONSIBLE
FOR THE PROPER PROTECTION AND
RELOCATION/RESTORATION OF OBSTRUCTIONS WITHIN THE
CONSTRUCTION BOUNDARIES CONSIDERED INTERFERING
WITH THE INSTALLATION OR PERFORMANCE OF
CONSTRUCTION AFTER CONFIRMING PLANS WITH THE VA
STAFF AND PROJECT ENGINEER.
14. NOT USED
15. NOT USED
16. CONTRACTOR SHALL REMOVE ALL ABANDONED
COMPONENTS WITHIN THE CONSTRUCTION AREA. WHEN
WIRING FEEDS OTHER ACTIVE DEVICES, WIRING SHALL BE
REMOVED BACK TO THE NEAREST JUNCTION BOX. OTHER
EXISTING ITEMS NOT COMPATIBLE WITH THE NEW
CONSTRUCTION SHALL BE REMOVED UNLESS OTHERWISE
DIRECTED BY THE VA PROJECT ENGINEER. WHERE EXISTING
ITEMS ARE REMOVED, WALL/FLOOR AREAS SHALL BE PATCHED
TO MATCH SURROUNDING MATERIAL AND SURFACE. ALL
REMOVED COMPONENTS SHALL BE TERMINATED PROPERLY.
17. CONTRACTOR SHALL PROPERLY RELOCATE ANY EXISTING
SYSTEMS (INCLUDING BUT NOT LIMITED TO PLUMBING/STEAM
LINES, DUCTS, PIPES, CONDUITS, HANGERS, FIXTURES, SURFACE
MOUNTED DEVICES, SUSPENSION SYSTEMS) CONSIDERED
INTERFERING WITH THE INSTALLATION OF NEW CONSTRUCTION AT
NO ADDITIONAL EXPENSE TO THE GOVERNMENT, AND AFTER
CONFIRMING PLANS WITH THE VA PROJECT ENGINEER. THIS WILL
INCLUDE THE RELOCATION AND/OR REINSTALLATION OF ITEMS
WITHIN THE CONSTRUCTION BOUNDARIES TO PERFORM AND
COMPLETE ALL NECESSARY WORK AS REQUIRED.
18. CONTRACTOR SHALL MAINTAIN AND RESTORE ALL UTILITIES
SERVICING UNDISTURBED REGIONS WHICH PASS THROUGH THE
RENOVATED AREAS.
19. THE MEP DRAWINGS AND SPECIFICATIONS INCLUDE WORK
REQUIRED TO MAKE CONNECTIONS TO EXISTING
INFRASTRUCTURE IN BUILDINGS 1 AND 1F. SOME OF THIS WORK
INVOLVES REMOVAL AND REINSTALLATION OF EXISTING HUNG
CEILINGS. THE SCOPE OF THIS WORK IS CONVEYED ENTIRELY IN
THE MEP DOCUMENTS. REPLACE ANY BUILDING COMPONENTS
DAMAGED BY THE WORK WITH MATCHING MATERIALS.
20. WHERE NEW PLUMBING/HVAC CONNECTIONS AREA MADE TO
EXISTING SYSTEMS, SHUT-OFF BALL VALVES ARE TO BE
INSTALLED. UNIONS SHALL BE INSTALLED TO ACCOMMODATE
FUTURE SERVICE AND MAINTENANCE OF ALL EQUIPMENT.
21. NOT USED.
22. NOT USED.
23. NOT USED.
24. CONTRACTOR SHALL PROPERLY SANITIZE/CLEAN THE EACH
AREA TO ASSURE CLEAN, HEALTHY, PROPER AND EFFICIENT
OPERATION OF ALL SYSTEMS. AT A MINIMUM, USE OF HEPA
VACUUM CLEANERS AND APPROVED SANITIZING CLEANERS ARE
REQUIRED. AT THE COMPLETION OF CONSTRUCTION IN EACH
AREA, ALL AFFECTED SURFACES SHALL BE LEFT CLEAN,
POLISHED AND SANITARY INCLUDING BUT NOT LIMITED TO ACCESS
COVERS, FLOORS, WALLS, SILLS, EQUIPMENT, FURNITURE, OFFICE
APPURTENANCES.
25. EXISTING SURFACES WITHIN THE CONTRACT LIMITS ARE TO BE
PATCHED, REFINISHED AND PAINTED WITH MATERIALS
COMPARABLE TO THE EXISTING SURFACE UNLESS OTHERWISE
NOTED OR DIRECTED BY THE VA PROJECT ENGINEER. DAMAGED
SURFACES AND ITEMS SHALL BE PATCHED, REFINISHED,
REPLACED AND PAINTED WITH MATERIALS MATCHING THE
EXISTING SURROUNDING MATERIAL AND SURFACE UNLESS
OTHERWISE NOTED OR DIRECTED BY THE VA PROJECT ENGINEER.
FINISHED SURFACES SHALL BE INDISTINGUISHABLE FROM THE
SURROUNDING AREA AT THE COMPLETION OF WORK IN EACH
AREA.
26. CONTRACTOR IS RESPONSIBLE FOR CLEANING BOTH NEW
AND EXISTING DUCTWORK WITHIN THE CONSTRUCTION
BOUNDARY. CLEANING AND TESTING COMPANIES SHALL BE A
MEMBER OF AIAQC, ASCR, IAQA, MSHI AND NADC, AND BE
CERTIFIED TO MEET OSHA 1926 STANDARDS.
27. NOT USED.
28. CONSTRUCTION SHALL NOT BLOCK ACCESS TO NEW/EXISTING
COMPONENTS AND PIPE VALVES. PROVIDE PROPER ACCESS TO
ALL EQUIPMENT AND COMPONENTS REQUIRING OPERATION,
SERVICE AND MAINTENANCE WHETHER DETAILED ON THE
DRAWINGS OR NOT. ACCESS MUST BE CONVENIENTLY PLACED
AS DETERMINED BY THE VA PROJECT ENGINEER.
29. CONTRACTOR TO MAINTAIN BUILDING FIRE PROTECTION DURING
CONSTRUCTION. CONTRACTOR TO REMOVE FIRE ALARM SYSTEM
SMOKE DETECTORS THAT CAN BE AFFECTED BY CONSTRUCTION WORK
AND TEMPORARILY REPLACE DEVICES WITH HEAT DETECTORS
(CHEMETRONICS SERIES 600 MODEL 601 RATE-OF-RISE & 135 F FIXED
TEMPERATURE). PRIOR TO REMOVAL, TEST DETECTORS TO ASSURE
CORRECT OPERATION. AFTER INSTALLATION, TEST SYSTEM FOR
PROPER OPERATION, AND REPORT RESULTS TO VA SAFETY OFFICER.
AFTER CONSTRUCTION DUST HAS BEEN ELIMINATED, REMOVE HEAT
DETECTORS, CLEAN EXISTING SMOKE DETECTORS, REINSTALL, AND
TEST FOR PROPER SYSTEM OPERATION. ALL WORK ASSOCIATED WITH
THE FIRE ALARM SYSTEM MUST BE SCHEDULED 3 WEEKS IN ADVANCE
WITH THE VA SAFETY OFFICER.
30. ALL TEMPORARY, CONCEALED, FRAMING LUMBER SHALL COMPLY
WITH MIL-L-19140 FOR FIRE RETARDENT TREATMENT, AND SHALL BEAR
THE TESTING AGENCY IDENTIFICATION MARK AND PERFORMANCE
RATING.
31. ALL PENETRATIONS THROUGH FIRE/SMOKE WALLS ARE TO BE
SLEEVED UNLESS OTHERWISE NOTED OR DIRECTED BY THE VA
PROJECT ENGINEER. INSTALL FIRE SEAL MATERIAL AT ALL
PENETRATIONS, AND TROUGHS PENETRATING FIRE/SMOKE WALLS. ALL
PENETRATIONS THROUGH FIRE/SMOKE WALLS
(COMPARTMENTALIZATION) WILL BE SEALED WITH APPROPRIATE FIRE
RETARDANT MATERIAL ON A DAILY BASIS, AND SHALL MAINTAIN THE
SAME INTEGRITY AS THE FIRE BARRIER BEING SEALED. THE VA WILL BE
COMPENSATED THROUGH CONTRACTOR CONTRACT REDUCTION PER
DAY FOR EACH FIRE WALL PENETRATION NOT SEALED WITH
ACCEPTABLE FIRE RETARDANT MATERIAL TESTED IN ACCORDANCE
WITH ASTM E814 (F RATING) BY THE CLOSE OF BUSINESS THE DAY THAT
PENETRATION IS MADE.
32. ALL INSTALLED EQUIPMENT AND ARTICLES SHALL BE COMPLETE
FOR OPERATION, SERVICE AND MAINTENANCE FOR THE PURPOSE
INTENDED NOT LIMITED TO THE DETAILS AND INFORMATION PROVIDED
ON THE DRAWINGS IN ACCORDANCE WITH THE MANUFACTURES
PROCEDURES AND RECOMMENDATIONS. ALL INSTALLED EQUIPMENT
SHALL BE LABELED WITH ENGRAVED BLACK PHENOLIC NAME PLATES
UTILIZING THE HOSPITAL NOMENCLATURE AS DIRECTED BY THE VA
PROJECT ENGINEER.
33. CONTRACTOR SHALL ENGAGE INDEPENDENT TESTING COMPANIES
SPECIALIZED AND CERTIFIED IN THE REQUIRED TESTING OF ALL
INSTALLED EQUIPMENT AND COMPONENTS. CALIBRATED TESTING
INSTRUMENTS, MATERIALS, LABOR TO BE SUPPLIED BY THE
INDEPENDENT CERTIFIED TESTING COMPANY FURNISHED BY THE
CONTRACTOR. TAB REPORTS SHALL BE CO-CERTIFIED BY A
REGISTERED PROFESSIONAL MECHANICAL ENGINEER AND THE TESTING
COMPANY REPRESENTATIVE.
34. TWO WEEKS PRIOR TO EACH TESTING PHASE, SUBMIT TO THE VA
PROJECT ENGINEER 3 COPIES OF THE "STATUS REPORT", AND
SUPPORTING DOCUMENTATION THAT ALL MATERIALS AND
WORKMANSHIP HAS BEEN ACCOMPLISHED IN ACCORDANCE WITH THE
CONSTRUCTION DOCUMENTS, IS PROPERLY INSTALLED, IS READY FOR
FULL OPERATION IN ACCORDANCE WITH ALL APPLICABLE CODES AND
THE CONTRACT REQUIREMENTS
35. TWO WEEKS PRIOR TO THE FINAL INSPECTION, CONTRACTOR SHALL
PROVIDE THE VA PROJECT ENGINEER 2 COMPLETE SETS OF
REPRODUCIBLE CLEAN & LEGIBLE CAD QUALITY DRAWINGS, DISKS AND
MARKED-UP SPECIFICATIONS IDENTIFYING ALL DEVIATIONS FROM THE
ORIGINAL CONSTRUCTION DOCUMENTS. THE DRAFTSMANSHIP SHALL BE
COMPARABLE IN ALL WAYS TO THE ORIGINAL DOCUMENTS, AND SHALL
BE DATED AND NOTED "AS-BUILT".
36. TWO WEEKS PRIOR TO THE FINAL INSPECTION, CONTRACTOR SHALL
PROVIDE THE VA PROJECT ENGINEER WITH 3 COPIES OF THE
COMPLETED "STATUS REPORT", AND EITHER CERTIFICATION WITH
SUPPORTING DOCUMENTATION THAT ALL MATERIALS AND
WORKMANSHIP HAS BEEN ACCOMPLISHED IN ACCORDANCE WITH THE
CONSTRUCTION DOCUMENTS, IS PROPERLY INSTALLED, IS READY FOR
FACILITY USE IN ACCORDANCE WITH ALL APPLICABLE CODES AND THE
CONTRACT REQUIREMENTS, OR LIST INCOMPLETE ITEMS, VALUE OF
UNCOMPLETED WORK, AND REASONS FOR BEING INCOMPLETE WITH
SUPPORTING DOCUMENTATION.
37. PROVIDE VA PROJECT ENGINEER WITH REFERENCE DOCUMENTS
ITEMIZED IN SECTION 01 42 19.
38. BID DEDUCT ALTERNATES AND UNIT PRICES SHALL BE PROVIDED AT
THE TIME OF BID FOR THE SPECIFIED ITEMS.
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
Dwg:
ARCHITECT/ENGINEERS:CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua rte rs i
6" on e i
6" on e h a lf i nc f oo t 6"
Denis McLaughlin Telephone: 857-364-5149
1 2 3 4 5 6 7 8
Jamaica Plain, MA
A
B
C
D
E
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
CIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103
AE Research Addition 523-307
0%
S
UB
MI
TT
AL
- B
ID
D
OC
UM
EN
TS
3-31-2016
VA Project General Notes
-G-001 PNDW 3 of 217
GENERAL PROJECT NOTES
1. These notes are intended for general reference and information and to augment the Contract and Specification information provided under separate cover. Refer to the Contact and Specifications for detailed information and requirements.
2. All Work included in this Contract shall conform to all national, state, and local laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authority. Promptly report to the Architect any nonconformity discovered.
3. The intent of the drawings and specifications is to include all items necessary for the proper execution and completion of Work by the Contractor. Provide a complete, fully operational building. Provide all labor, materials and incidentals necessary to achieve this intent. Failure of the Drawings or Specifications to indicate each incidental shall not relieve the Contractor from providing the necessary items as part of this Contract. The Drawings show the design and layout, describe the quality level and construction techniques in a general sense only. All details are typical. What is shown in one condition applies to all other similar conditions, unless noted otherwise.
4. Verify the following items and report any discrepancies to the Architect prior to proceeding with Work, and proceed with the Work only after such discrepancies are resolved:
• Existing conditions
• Walls, floors, roofs, and substrates where products and systems are to be installed.
• Size and condition of window, door, louver, and other openings where products and systems are to be installed.
• The existence, size, and location of all existing utilities, mechanical and electrical systems.
• Discrepancies between or within the Contract Documents.
• Unsuitable soils: report the location of all unsuitable soil materials below anticipated levels of footings or slabs prior to setting forms.
• Mechanical, electrical and plumbing coordination having potential impact on ceiling heights or building appearance.
• Dimensional discrepancies.
5. Coordinate the Work of all Subcontractors.
6. Do not penetrate structural beams, columns, or shear walls unless specifically detailed otherwise.
7. Provide bond-outs, blocking, sleeves and pipes as required for all wall, floor, roof, and ceiling penetrations.
• Maintain continuity of fire rated assemblies and smoke assemblies. Seal all penetrations to conform to U.L.
rated assemblies and all NFPA and IBC requirements. Refer to the Code Plans for additional Code references.
• All penetrations shall comply with the acoustical assembly rating required for each wall or floor assembly.
8. Mechanical, electrical and plumbing coordination: Ceiling heights and duct sizes are given.
Coordinate the Work to achieve the given visual and performance requirements, and the requirements of mechanical, electrical and plumbing systems within the indicated space.
9. Provide work holes or adequate access to install new systems in concealed spaces, as required or indicated.
10. All new openings into existing masonry walls for mechanical or electrical penetrations shall receive a lintel. Refer to the structural plans for lintel type. Refer to Mechanical and Electrical plans for number, location, and size of all penetrations.
11. Products shall bear UL classification where required by design. Do not remove or paint UL classifications.
12. Definitions:
• New: May be used to indicate items which shall be furnished and installed by this Contract. Typically used to ensure clarity between various components of the drawings. Not all items are labeled as "new" when it is obvious by other indication.
• Existing: Existing building or site components which are in place at the start of Construction. Not all items are labeled as "existing" when it is obvious by other indication. Consult the Architect for clarification.
• Repair: Restore to proper operating and aesthetic condition.
• Restore: Bring back to former condition, by repairing or patching as required.
• Patch: Restore to condition matching existing adjacent construction, surface texture and finish.
• N.I.C. (Not in Contract): Work which is not included in this Contract, but which may require Contractor coordination.
• Remove: Dismantle and/or extract from the premises entirely. Dispose of off of the site unless noted otherwise.
• Replace: Dismantle and/or extract from the premises entirely. Dispose of off of the site unless noted otherwise. Provide new material as indicated.
• Damages: Existing building or site components, not scheduled for work, which are damaged. Such elements and components shall be replaced or restored to original condition by methods approved by the Architect.
• Demolish: Dismantle and/or extract from the premises entirely. Dispose of off of the site unless noted otherwise.
• Salvage: Remove and reinstall or remove and deliver to the Owner, as indicated. Salvaged components may be for limited reuse, to match existing conditions or to patch and repair as indicated
GENERAL ARCHITECTURAL NOTES
1. The Drawings use a system of keyed notes on plans, elevations and details. Instructions for specific components of the Work are keyed to the Drawings. Building systems (partitions, roof & foundation) are keyed to floor plans, wall sections, roof plan and other details as appropriate.
2. Maintain other clear dimensions in accordance with the latest version of the ADA Accessibility Guidelines (ADAAG).
3. Maintain minimum maneuvering clearances at doors in compliance with the ADA Accessibility Guidelines (ADAAG), including but not limited to the following excerpt from 2010 ADA Standards for Accessible Design:
4. All mounting heights and clearances at Toilet Rooms and elsewhere shall comply with the latest version of the ADA Accessibility Guidelines (ADAAG).
• Barrier-Free clearances are given. These clear dimensions shall be maintained in cases of discrepancy.
• All dimensions given for fixture and accessory locations are clear dimensions from finished surfaces, unless noted otherwise. Coordinate actual dimensions with wall construction and finishes.
• Locate all controls, flush valves, shutoffs and similar items in accordance with the latest version of the ADA
Accessibility Guidelines (ADAAG).
• Some items may indicate a range in mounting height. Maintain a consistent mounting height, within the given range, throughout the Project, unless noted otherwise.
5. All grab bar components shall be able to withstand a horizontal load of 250lbs at any point.
6. Install blocking behind all surface-applied fixtures, trim, grab bars, shelves, chair rails, picture rails, base moldings, tack or marker boards, window treatment, wall or base cabinets or counters, and miscellaneous accessories mounted on stud walls.
7. Install 2 coat hooks centered on the inside of each toilet room door, mounted at 48”AFF and 60”
AFF.
8. All wood not indicated to be painted shall be natural finish (clear).
9. Flooring and floor finishes shall be installed to a maximum differential of 1/16" between dissimilar materials. Provide transition strips or thresholds (1/2" maximum) of same material as flooring and/or as noted on the drawings, between dissimilar flooring materials
10. Patch and level existing floors to receive new finishes as indicated in the room finish schedule.
11. Pipes below sinks shall be insulated or configured to protect against contact.
GENERAL PATCHING AND REPAIRING NOTES
1. Where new construction either infills or abuts existing construction, the finished faces shall align, and the surfaces shall be finished to match.
2. After cutting, fitting, or removal of building components, any resulting holes shall be patched. Such patches shall be flush with adjacent surfaces and finished to match.
3. Maintain fire and smoke ratings.
4. Provide metal cover plates at all abandoned electrical devices, finished to match wall.
GENERAL DEMOLITION AND REMOVAL NOTES
1. The demolition drawings provide general coordination information only, and are schematic in nature. They do not identify all individual items to be removed. Remove any existing construction which logically is in the way of new construction or prohibits the new construction shown on the Architectural floor plans.
2. Verify existing structural conditions prior to demolition or removals
3. Protect from damage and weather any existing building components, which are exposed as a result of demolition or removals.
4. Coordinate and schedule all work in existing occupied portions of the building with the Owner.
5. Notify the Architect and Owner immediately upon discovery of potentially hazardous material or substance not addressed in the contract documents, including but not limited to asbestos, PCB, lead, mercury, and mold. Do not disturb hazardous materials. Hazardous material shall be legally disposed of.
6. Concrete slab removals may be required throughout the existing building and may not be shown on the demolition drawings. Coordinate the extent of slab removals with Structural, Mechanical and Electrical plans. Cut trenches in existing concrete floors with no more than a 1:2 slope. Patch concrete to match adjacent thickness and finish prior to the installation of underlayment or new finishes.
7. Removal of the materials as indicated shall be done without disturbing adjacent surfaces to remain or the current condition of the building elements.
8. The Owner shall remove furniture and other movable and/or fixed equipment prior to new work in any area, except for mechanical, electrical or minor work not requiring the Owner to completely vacate the premises. Notify the Owner of the schedule for new work and extent of Owner removals necessary.
9. Remove all damaged and/or discarded building construction material from concealed spaces. Prior to closing- or sealing-off concealed spaces, the Contractor shall allow for an inspection of components which will not be visible when the spaces have been sealed.
10. All demolition/removal debris is the property of the Contractor, unless noted otherwise, and shall be legally disposed of.
MATERIALS LEGEND
GRAVEL
CONCRETE MASONRY UNIT
BRICK
CONCRETE
SOIL
STEEL
WOOD FRAMING
WOOD BLOCKING
GYPSUM BOARD
PLYWOOD
BATT INSULATION
RIGID INSULATION
ABBREVIATIONS
AB ANCHOR BOLT
AB AIR BARRIER
AC AIR CONDITIONING
ADDL ADDITIONAL
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AH AIR HANDLER
AIB AIR INFILTRATION BARRIER
ALT ALTERNATE
ALUM ALUMINUM
AOR AREA OF REFUGE
APPROX APPROXIMATE
ARCH ARCHITECT(URAL)
ARND AROUND
AWP ACOUSTICAL WALL PANEL
BD BOARD
BF BARRIER FREE
BIT BITUMINOUS
BLDG BUILDING
BLKG BLOCKING
BM BENCHMARK
BOT BOTTOM
BO BOTTOM OF
BRK BRICK
BRG BEARING
B/S BACKER ROD AND SEALANT
BSMT BASEMENT
C, CRS COURSE
CAB CABINET
CB CATCH BASIN
CC CENTER TO CENTER
CF CUBIC FOOT
CFMF COLD FORMED METAL
FRAMING
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLR CLEAR
CMT CERAMIC MOSAIC TILE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CONC/C COLORED CONCRETE
CONT CONTINUOUS OR CONTINUE
CONTR CONTRACTOR
CPT CARPET
CS COUNTERSINK
CSMT CASEMENT
CT CERAMIC TILE
CWT CERAMIC WALL TILE
CUH CABINET UNIT HEATER
CY CUBIC YARD
DBL DOUBLE
DC DISPLAY CASE
DEMO DEMOLISH, DEMOLITION
DF DRINKING FOUNTAIN
DIA, DIAM DIAMETER
DIM DIMENSION
DIV DIVISION
DMP DEMOUNTABLE PARTITION
DN DOWN
DR DOOR
DTL DETAIL
DWG DRAWING
DWR DRAWER
E EAST
EA EACH
EF EXHAUST FAN
EMHO ELECTRO MAGNETIC HOLD
OPEN
EIFS EXTERIOR INSULATION FINISH
SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
EP EPOXY PAINT
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSED/ENCLOSURE
EO EDGE OF
EQ EQUAL
EQUIP EQUIPMENT
EXH EXHAUST
EXIST EXISTING
EXT EXTERIOR
EW EYEWASH
EWC ELECTRIC WATER COOLER
FB FIRE BLANKET
FBO FURNISHED BY OWNER
FCS FLOOR COATING SYSTEM
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER AND
CABINET
FFE FINISHED FLOOR ELEVATION
FG FIBERGLASS
FHVC FIRE HOSE AND VALVE
CABINET
FIN FINISH(ED)
FIN GR FINISH GRADE
FLR FLOOR(ING)
FNDN FOUNDATION
FP FIREPROOFING
FO FACE OF
FRMG FRAME(ING)
FRP FIBER REINFORCED PLASTIC
FRT FIRE RETARDANT TREATED
FSR FLEXIBLE SHEET ROOFING
FT FOOT(FEET)
FTG FOOTING
FTR FIN TUBE RADIATION
FUR FURRED(ING)
FV FIELD VERIFY
FWC FABRIC WALL COVERING
GA GAUGE
GALV GALVINIZED
GB GRAB BAR
GFB GROUND FACE CMU
GL GLASS, GLAZING
GWB GYPSUM WALLBOARD
HARD HARDENER
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDO HIGH DENSITY OVERLAY
HDWD HARDWOOD
HDWR HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HAND RAIL
HT HEIGHT
HTG HEATING
HVAC HEATING/VENTILATION/AIR CONDITIONING
IBC INSTALLED BY CONTRACTOR
ID INSIDE DIAMETER
IN INCH (ES)
INCL INCLUDE (D), (ING)
INFO INFORMATION
INSUL INSULATED/INSULATION
INT INTERIOR
INV INVERT
JT JOINT
KIT KITCHEN
LAB LABORATORY
LAM LAMINATE (D)
LAV LAVATORY
LB POUND (S)
LCC LEAD COATED COPPER
LF LINEAR FOOT
LH LEFT HAND
LOC’N LOCATION
LW LIGHTWEIGHT (CMU)
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MC MEDICINE CABINET
MCWF MULTI COLOR WALL FINISH
MDO MEDIUM DENSITY OVERLAY
MECH MECHANICAL
MED MEDIUM
MF MEMBRANE FLASHING
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MLDG MOULDING, MOULDING
MO MASONRY OPENING
MR MOISTURE RESISTANT
MRGB MOISTURE RESISTANT
GYPSUM BOARD
MS MOP SINK
MSF METAL STUD FRAMING
MTL METAL
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
O/ OVER
OC ON CENTER
OD OUTSIDE DIAMETER
OFS OVERFLOW SCUPPER
OP OPAQUE
OH OVERHEAD
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPS OPERABLE PANEL SYSTEM
P, PTD PAINT
PC PRECAST CONC.
PERF PERFORATED
PERIM PERIMETER
PRKG PARKING
PL PLATE
PLAM PLASTIC LAMINATE
PLYWD PLYWOOD
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
QR QUARTER ROUND
QT QUARRY TILE
RD ROOF DRAIN
RE: REFERENCE
REF REFRIGERATOR
REQ’D REQUIRED
REV REVISION (S), REVISED
RL RAIN LEADER
RF RUBBER FLOOR
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
S SOUTH
SAT SUSPENDED ACOUSTICAL TILE
SC SOLID CORE
SCHED SCHEDULE
SD STORM DRAIN, SOAP DISPENSER
SECT SECTION
SF SQUARE FOOT
SGL SAFETY GLASS
SH SHOWER
SHT SHEET
SHTHG SHEATHING
SIM SIMILAR
SLNT SEALANT
SNR SANITARY NAPKIN RECEPTOR
SOF SPRAYED-ON FIREPROOFING
SP SPECIAL PAINT
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
SS STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STOR STORAGE
STRL STRUCTURAL
STRUCT STRUCTURE/STRUCTURAL
SUPT SUPPORT
SUSP SUSPENDED
SV SHEET VINYL
T TOILET
TB TOWEL BAR
TB TACKBOARD
T&G TONGUE AND GROOVE
TGL TEMPERED GLASS
THK THICK(NESS)
TO TOP OF
TP TOILET PARTITION
TPD TOILET PAPER DISPENSER
TV TELEVISION
TYP TYPICAL
UCR UNDER COUNTER REFRIGERATOR
UNO UNLESS NOTED OTHERWISE
VB VAPOR BARRIER/VINY BASE
VC VALVE CABINET
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VPW VENEER PLYWOOD
VWC VINYL WALL COVERING
W WEST
W/ WITH
WC WATER CLOSET
WD WOOD
WGL WIRE GLASS
WH WATER HEATER
W/O WITHOUT
WS WATERSTOP
WP WATERPROOF
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
YD YARD
ZCC ZINC-COATED COPPER
SYMBOLS
ROOM TAG
DOOR TAG
1t WINDOW/GLAZING TAG
0.0
S4
A41.1
FIRE RATINGS
SMOKE
1 HOUR FIRE RATED PARTITION
2 HOUR FIRE RATED PARTITION
WALL TAG
A101
SIM
BUILDING SECTION
WALL SECTION
PLAN OR SECTION DETAIL
INTERIOR ELEVATION
EXTERIOR ELEVATION
A101
SIM
FLOOR LEVEL\VERTICAL ELEVATION
COLUMN CENTERLINE
Room name
150 SF
SPECIALTY EQUIPMENT\
TOILET ACCESSORY TAG
1i
A101
SIM
A101
SIM
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
Dwg:
ARCHITECT/ENGINEERS:CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua rte rs i
6" on e i
6" on e h a lf i nc f oo t 6"
Denis McLaughlin Telephone: 857-364-5149
1 2 3 4 5 6 7 8
Jamaica Plain, MA
A
B
C
D
E
M.E.P.:
Stantec 482 Payne Road Scarborough, ME 04074 T: (207) 883-3355 F: (207) 883-3376
SPECIFICATIONS:
Lowell Specifications, Inc.
34 Marc Avenue Topsham, ME 04086 T: (207) 406-4001
STRUCTURAL:
Becker Structural Engineers 75 York St Portland, ME 04101 T: (207) 879-1838 F: (207) 879-1822
CIVIL/LANDSCAPE:
Stantec Consulting 141 Portland St.
Boston, MA 02114 T: (617) 523-8103
AE Research Addition 523-307
0%
S
UB
MI
TT
AL
- B
ID
D
OC
UM
EN
TS
3-31-2016
Project General Notes & Material Legend
-G-002
PNDW
1/8" = 1'-0" _Symbols Legend
SL
P 32 Turnpike Road
Precision Land Surveying, Inc.
Southborough, Massachusetts 01772
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
Dwg: of 217
ARCHITECT/ENGINEERS:CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua rte rs
6" on e i
6" on e h al f in es
6"
SPECIFICATIONS:
Lowell Specifications 50 Fernald Road Freeport, ME 04032 Tel: (207)865-4518 Fax: (207) 865-1136
Stantec 482 Payne Road Scarborough, ME 04074 Tel: (207) 883-3355 Fax: (207) 883-3376
Denis McLaughlin Telephone: 857-364-5149
1 2 3 4 5 6 7 8
Jamaica Plain, MA
Becker Structural Engineers 75 York Street Portland, ME 04101 Tel: (207) 879-1838
A
B
C
D
E
03/31/2016
523-307AE Research Addition
100% DOCUMENTS
VF 101
SURVEY - PLAN -FIELD
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
Dwg: of 217
ARCHITECT/ENGINEERS:CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua
6" on e i
6" on e h al f in
6"
SPECIFICATIONS:
Lowell Specifications 50 Fernald Road Freeport, ME 04032 Tel: (207)865-4518 Fax: (207) 865-1136
Stantec 482 Payne Road Scarborough, ME 04074 Tel: (207) 883-3355 Fax: (207) 883-3376
Denis McLaughlin Telephone: 857-364-5149
1 2 3 4 5 6 7 8
Jamaica Plain, MA
Becker Structural Engineers 75 York Street Portland, ME 04101 Tel: (207) 879-1838
A
B
C
D
E
03/31/2016
523-307AE Research Addition
100% DOCUMENTS
CD101
JMTM
CIVIL - PLAN - DEMO
STOP
DO NOT ENTER
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
Dwg: of 217
ARCHITECT/ENGINEERS:CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua
6" on e i
6" on e h al f in
6"
SPECIFICATIONS:
Lowell Specifications 50 Fernald Road Freeport, ME 04032 Tel: (207)865-4518 Fax: (207) 865-1136
Stantec 482 Payne Road Scarborough, ME 04074 Tel: (207) 883-3355 Fax: (207) 883-3376
Denis McLaughlin Telephone: 857-364-5149
1 2 3 4 5 6 7 8
Jamaica Plain, MA
Becker Structural Engineers 75 York Street Portland, ME 04101 Tel: (207) 879-1838
A
B
C
D
E
03/31/2016
523-307AE Research Addition
100% DOCUMENTS
CS101
JMTM
CIVIL - PLAN - SITE
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
Dwg: of 217
ARCHITECT/ENGINEERS:CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua
6" on e i
6" on e h al f in
6"
SPECIFICATIONS:
Lowell Specifications 50 Fernald Road Freeport, ME 04032 Tel: (207)865-4518 Fax: (207) 865-1136
Stantec 482 Payne Road Scarborough, ME 04074 Tel: (207) 883-3355 Fax: (207) 883-3376
Denis McLaughlin Telephone: 857-364-5149
1 2 3 4 5 6 7 8
Jamaica Plain, MA
Becker Structural Engineers 75 York Street Portland, ME 04101 Tel: (207) 879-1838
A
B
C
D
E
03/31/2016
523-307AE Research Addition
100% DOCUMENTS
CS102
JMTM
CIVIL - PLAN - SITE
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
Dwg: of 217
ARCHITECT/ENGINEERS:CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua
6" on e i
6" on e h al f in
6"
SPECIFICATIONS:
Lowell Specifications 50 Fernald Road Freeport, ME 04032 Tel: (207)865-4518 Fax: (207) 865-1136
Stantec 482 Payne Road Scarborough, ME 04074 Tel: (207) 883-3355 Fax: (207) 883-3376
Denis McLaughlin Telephone: 857-364-5149
1 2 3 4 5 6 7 8
Jamaica Plain, MA
Becker Structural Engineers 75 York Street Portland, ME 04101 Tel: (207) 879-1838
A
B
C
D
E
03/31/2016
523-307AE Research Addition
100% DOCUMENTS
CG101
JMTM
CIVIL - PLAN - GRADING
GAS
G A
S G
A S
G A
S G
AS
GAS GAS
E
E
E E
E E
E E
E E E
E E
E E
E E
E E
E
E
E
E
C C
C
C C
C
E E
E
M
D
S
M
E C
49 DARTMOUTH STREET
PORTLAND, ME 04101
207-775-1059 www.pdtarchs.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
Project Number
Building Number
Drawing NumberLocation
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
Dwg: of 217
ARCHITECT/ENGINEERS:CONSULTANTS:
DateRevisions:
1 2 3 4 5 6 7 8
A
B
C
D
E
VA FORM 08-6231, OCT 1978
on e e ig on e q ua rte r i on e h al f th re e e ig th re e q ua
6" on e i
6" on e h al f in
6"
SPECIFICATIONS:
Lowell Specifications 50 Fernald Road Freeport, ME 04032 Tel: (207)865-4518 Fax: (207) 865-1136
Stantec 482 Payne Road Scarborough, ME 04074 Tel: (207) 883-3355 Fax: (207) 883-3376
Denis McLaughlin Telephone: 857-364-5149
1 2 3 4 5 6 7 8
Jamaica Plain, MA
Becker Structural Engineers 75 York Street Portland, ME 04101 Tel: (207) 879-1838
A
B
C
D
E
03/31/2016
523-307AE Research Addition
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.