36C78618R0287-0005000.docx

DOCX document 31 KB Posted

Attached to
Fort Scott NC Design-Build Services for Sections 18 & 19 Crypt Conversion 893CM3015 Federal contract opportunity
Solicitation number
36C78618R0287
Issued by
Department of Veterans Affairs National Cemetery Administration

About this file

36C78618R0287 0005 36C78618R0287 0005.docx

View the file

Other files for this federal contract opportunity

Other files attached to Fort Scott NC Design-Build Services for Sections 18 & 19 Crypt Conversion 893CM3015, newest first.
File Type Posted
36C78618R0287-0006000.docx DOCX document
36C78618R0287-0005003.pdf PDF
36C78618R0287-0005002.pdf PDF
36C78618R0287-0005001.pdf PDF
36C78618R0287-00004000.docx DOCX document
36C78618R0287-00003000.docx DOCX document
36C78618R0287-00003001.pdf PDF
36C78618R0287-00002002.docx DOCX document
36C78618R0287-00002000.docx DOCX document
36C78618R0287-00002001.docx DOCX document
36C78618R0287-00002003.docx DOCX document
36C78618R0287-00001000.docx DOCX document
36C78618R0287-072.docx DOCX document
36C78618R0287-055.pdf PDF
36C78618R0287-060.docx DOCX document
36C78618R0287-076.docx DOCX document
36C78618R0287-059.doc DOC document
36C78618R0287-054.docx DOCX document
36C78618R0287-062.docx DOCX document
36C78618R0287-056.docx DOCX document
36C78618R0287-073.docx DOCX document
36C78618R0287-064.docx DOCX document
36C78618R0287-058.doc DOC document
36C78618R0287-057.docx DOCX document
36C78618R0287-075.docx DOCX document
36C78618R0287-069.docx DOCX document
36C78618R0287-065.docx DOCX document
36C78618R0287-068.docx DOCX document
36C78618R0287-061.docx DOCX document
36C78618R0287-070.docx DOCX document
36C78618R0287-074.docx DOCX document
36C78618R0287-071.docx DOCX document
36C78618R0287-067.docx DOCX document
36C78618R0287-063.docx DOCX document
36C78618R0287-066.docx DOCX document
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2.

AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF

CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV.

11/2016) is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITE

M 10A.

15C. DATE

SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR

43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE

SIGNED

14.

DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME

AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS

OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 06-13 -2018

893CM3015

43C2 Department of Veterans Affairs National Cemetery Administration 425 I Street NW Washington DC 20001

To all Offerors/Bidders

36C78618R0287 05-02-2018

X x x x The Request for Information period for Phase II is closed. This Amendment provides responses to Requests for Information received for Phase II.

The Phase II Technical and Price proposal due date remains unchanged and is June 25, 2018 by 4:00 PM ET.

See continuation page.

ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.

Elizabeth Monohan Contracting Officer

CONTINUATION PAGE

AMENDMENT 00005 TO SOLICITATION 36C786-18-R-0287

RESPONSES TO RESQUESTS FOR INFORMATION FOR FORT SCOTT DB SECTIONS 18 & 19, PHASE II

QUESTION 1:Have there been any hydrologic studies completed for the site or the adjacent area. If so, can the studies be made available to the prospective bidders?
RESPONSE 1:No.
QUESTION 2:It is understood from the site visit, that cemetery staff has encountered ground water when excavating for interments. Has the volume of ground water encountered ever been sufficient to cause an open grave to collapse prior to or after placement of the casket?
RESPONSE 2:This information is not available.

QUESTION 3: Based upon responses to previously asked questions, it is understood that the contractor should "plan for site dewatering" during construction. Also based upon previously asked questions it is understood that "the design should eliminate the possibility of standing water within the pre-placed crypts", and the NCA has "no knowledge of any locations on or off site that would meet the requirements" necessary to "be used as a gravity fed groundwater discharge site for the subsurface drainage from the proposed crypt field". Given these three previous responses to questions, it is understood that some type of groundwater discharge system such as a lift station will be required to pump groundwater from the crypt field under drain system into the shallow storm water manhole located outside of the stone wall west of the pump station. Does the NCA have standard specifications for an appropriate lift station? In lieu of a standard specification, is an example detail of a lift station from a previous NCA project available?

RESPONSE 3: NCA standard specifications are located on the Technical Information Library (TIL) website, https://www.cfm.va.gov/til/ncaSpec.asp.

QUESTION 4: Is there a City, County or State regulatory agency responsible for environmental / groundwater issues which has jurisdiction over the site and will require permits to be issued in order to pump groundwater for construction dewatering; and on the long term to pump groundwater from the crypt field under drain system?

RESPONSE 4:It is the contractor’s responsibility to investigate this requirement.
QUESTION 5:What is the average depth from the surface to the groundwater?
RESPONSE 5:It is the contractor’s responsibility to investigate and determine this information.
QUESTION 6:What is the anticipated flow rate of the groundwater discharge system?
RESPONSE 6:It is the contractor’s responsibility to investigate and determine this information.

QUESTION 7: Will the groundwater discharge system need to be designed with a redundant "backup" pump?

RESPONSE 7: Any design solution will need to be designed and constructed to industry standards and perform as required.

QUESTION 8: Is electrical power for the groundwater discharge system available on site? If so, where on site is the power source?

RESPONSE 8: A potential source of electrical power is located on the south corner of Section 19; see the attached record drawing 893CM3011_E-1_RD.

See attached document: 893CM3011_I-7_RD.

See attached document: 893CM3011_E-1_RD.

See attached document: 893CM3011_I-1_RD.

END OF AMENDMENT 00005