36C78618Q9495-022.pdf

PDF 209 KB Posted

Attached to
MPS: TASK ORDER BASE PERIOD F1 FLAT MARBLE MARKERS:POP JANUARY 1, 2019-DECEMBER 31, 2019
Solicitation number
36C78618Q9495
Issued by

About this file

36C78618Q9495 A-EM-1 (2017-12-23).pdf

View the file

Other files

File Type Posted
36C78619D0068-000.docx DOCX document
36C78619D0068_1.docx DOCX document
36C78618Q9495-041.pdf PDF
36C78618Q9495-048.pdf PDF
36C78618Q9495-042.pdf PDF
36C78618Q9495-037.xlsx XLSX spreadsheet
36C78618Q9495-034.docx DOCX document
36C78618Q9495-043.pdf PDF
36C78618Q9495-032.xlsx XLSX spreadsheet
36C78618Q9495-044.pdf PDF
36C78618Q9495-040.pdf PDF
36C78618Q9495-038.xlsx XLSX spreadsheet
36C78618Q9495-045.pdf PDF
36C78618Q9495-033.docx DOCX document
36C78618Q9495-031.docx DOCX document
36C78618Q9495-046.pdf PDF
36C78618Q9495-036.docx DOCX document
36C78618Q9495-035.docx DOCX document
36C78618Q9495-039.pdf PDF
36C78618Q9495-047.pdf PDF
36C78618Q9495-030.docx DOCX document
36C78618Q9495-028.pdf PDF
36C78618Q9495-018.docx DOCX document
36C78618Q9495-026.pdf PDF
36C78618Q9495-016.docx DOCX document
36C78618Q9495-017.docx DOCX document
36C78618Q9495-019.docx DOCX document
36C78618Q9495-027.pdf PDF
36C78618Q9495-023.pdf PDF
36C78618Q9495-021.pdf PDF
36C78618Q9495-029.pdf PDF
36C78618Q9495-024.pdf PDF
36C78618Q9495-025.pdf PDF
36C78618Q9495-015.docx DOCX document
36C78618Q9495-020.pdf PDF
36C78618Q9495-001.docx DOCX document
36C78618Q9495-012.pdf PDF
36C78618Q9495-004.docx DOCX document
36C78618Q9495-003.docx DOCX document
36C78618Q9495-013.pdf PDF
36C78618Q9495-009.pdf PDF
36C78618Q9495-014.pdf PDF
36C78618Q9495-002.docx DOCX document
36C78618Q9495-000.docx DOCX document
36C78618Q9495-005.pdf PDF
36C78618Q9495-007.pdf PDF
36C78618Q9495-011.pdf PDF
36C78618Q9495-010.pdf PDF
36C78618Q9495-006.pdf PDF
36C78618Q9495-008.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RAISED BRONZE

SCALE:1"=1"

INCISED STONE

SCALE:1"=1"

E

E

JUDAISM

(3)

SECTION E-E

SEE INSCRIPTION

TABLE

F

F

G

G

H

H

SEE INSCRIPTION

TABLE

SEE INSCRIPTION

TABLE

SEE INSCRIPTION

TABLE

CHRISTIAN SECTION F-F BUDDHIST

(2)

SECTION G-G CONFEDERATE (SOUTHERN CROSS OF HONOR)

(50)

SECTION H-H

HEBREW

(3)

BUDDHIST

(2)

SECTION A-A SECTION C-CCHRISTIAN

(1)

CONFEDERATE

(SOUTHERN CROSS OF HONOR)SECTION B-B SECTION D-D

(50)

A

A B

B C

C

D

D

1 3/8"

3/32"

1/64"

1/8" (4/32")

3/64"

1/8" (4/32") 1/8" (4/32")

Date

Project No.

DrawnCheckedMarker Type

Project TitleDrawing Title

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

DRAWING NO.

Sheet Of

A B

C D

E F

Approved: Director, Memorial Programs Service

Approved: Chief of Operations, Memorial Programs Service

A-EM-1

1 5

Signed

Signed

G

G

DO NOT SCALE THIS DRAWING

Location

Digital File

A-EM-1.DWG 24" x 36" SHEET

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY

GOVERNMENT HEADSTONES

AND MARKERS

EMBLEMS

KEE/KS

MLT

SYSTEMS

DECEMBER 23, 2017

ALL

GENERAL NOTES:

1. ALL EMBLEMS WHEN USED ON STONE NICHE COVERS SHALL BE 2" AT THEIR LARGEST POINT TO POINT MEASUREMENT AND ALL OTHER

AREAS IN EQUAL PROPORTION. ALL EMBLEMS ON FLAT MARKERS AND UPRIGHT HEADSTONES SHALL BE 3" AT THEIR LARGEST POINT TO

POINT MEASUREMENT AND ALL OTHER AREAS SHALL BE IN EQUAL PROPORTION.

2. INSCRIPTION DEPTHS ARE SHOWN IN THE TABLE AT THE UPPER LEFT CORNER OF DRAWING A-LFN&OC.

3. ALL EMBLEMS ARE TO BE INCISED AS INDICATED BY SOLID LINE OR SOLID AREA. CLEAR AREAS TO REMAIN AS FINISHED SURFACE.

4. THE CONTRACTOR MAY REDUCE THE EMBLEM'S DEPTH WHERE ELEMENTS OF THE DESIGN ARE SO DETAILED AS TO MAKE IT IMPRACTICAL

TO ACHIEVE DEPTHS SHOWN IN THE TABLE OF DRAWING A-LFN&OC.

DateRevisions DateRevisions

ApprovedCheckedDrawn

AE Contractor

IRN CSJJP/JN/IRN

06-05-03

SUPERSEDES DRAWING ID-4

SHEET 2 OF 2 DATED 12-2-99

03-01-07

A

MOVED INCISED STONE DETAIL FROM SHT 1,

REARRANGED EMBLEMS FROM SHEET 1 OF 3

07-01-13

B

REARRANGED ALL EMBLEMS TO FIT FULL SCALE

SHEET LAYOUT. REVISED GENERAL NOTES,

ADDED INDEX CHARTS

01-23-17

F

INSERTED AE CONTRACTOR LOGO AND DETAILS.

MOVE EMBLEM TABLE AND REVISION BLOCK INTO

COVER PAGE.

42 310

1" = 1" GRAPHIC SCALE

12-09-17H

ADD NOTES TO GENERAL NOTES NUMBER 1.

REPLACED NOTES TO GENERAL NOTES NUMBERS

2 AND 4. REVISED AE CONTRACTOR DETAILS.

PLANATE MANAGEMENT GROUP

3631 Ransom Place, Alexandria, VA 22306

12-23-17I

REVISED DIMENSION ON RAISED BRONZE AND

INCISED STONE ON SHEET 1.

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text

ATIONAL

AutoCAD SHX Text

EMETERY

AutoCAD SHX Text

DMINISTRATION

Sheets and Views
A-EM-1

File details come from the government source that posted it.