36C78618B0210-00001000.docx
DOCX document 19 KB Posted
- Solicitation number
- 36C78618B0210
About this file
36C78618B0210 00001 36C78618B0210 00001.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78618C0175-000.docx | DOCX document | |
| 36C78618B0210-00002000.docx | DOCX document | |
| 36C78618B0210-00001001.pdf | ||
| 36C78618B0210-00001002.pdf | ||
| 36C78618B0210-006.pdf | ||
| 36C78618B0210-005.pdf | ||
| 36C78618B0210-003.pdf | ||
| 36C78618B0210-002.pdf | ||
| 36C78618B0210-001.docx | DOCX document | |
| 36C78618B0210-004.pdf | ||
| 36C78618B0210-008.pdf | ||
| 36C78618B0210-007.pdf | ||
| 36C78618B0210-000.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00001 04-16-2018 8528-000023
852-NRM18-101
43C2 Department of Veterans Affairs National Cemetery Administration 425 I Street NW, 5th Floor Washington, D.C. 20001
43C2 Department of Veterans Affairs National Cemetery Administration 425 I Street NW, 5th Floor Washington, D.C. 20001
To all Offerors/Bidders
36C78618B0210 03-21-2018
X X X X The purpose of this amendment is to provide clarifications and answers to questions submitted by prospective offerors.
1. All questions and responses are on page two (2) of this amendment document.
2. All other terms, conditions and specifications of this solicitation remain unchanged.
Dr. Harry Parker, Ph.D.
Supervisory Contracting Officer Can an existing contour maps of the area be provided? Please see attached 2 drawings from back in 2002.
Is existing survey information of the area available and can it be provided? No existing survey information provided.
Will coordination with the Metropolitan St. Louis Sewer district known as (MSD) be a part required in this project? If so to what extent? No MSD coordination required.
Should there be extra clay material will it be deposited at the maintenance yard for future use or hauled off site? Hauled off site.
How deep are the two manholes? It will be the contractor’s responsibility to determine the depth of the manholes.
Are you sure a 48” diameter pre-cast manhole is large enough to have 2-24” holes and a 12” hole at the manhole where the 12” ties into this line? It will be the contractor’s responsibility to determine the elevation location of the pipe inverts to allow them to fit into the manhole.
Can we use a nearby water spigot to water the grass for the 30-day maintenance period? If not, do we have to haul the water from off the property? Is there a charge for the water? Yes, contractors can use the water and there is no charge.
Is it allowable to place sod instead of hauling in topsoil, seed, fertilizer, and straw matting? Yes, sod can be used, it will need to be watered.
As part of the scope of work the contractor is to fill in the Large Sinkhole located on the slope:
Does Jefferson Barracks have any dirt we can access? If so, is there a charge for dirt? Will this dirt have to be Benched into slope to prevent future slides? Yes, the cemetery does have dirt to use/access at no charge. Contractor to determine the means and methods for the dirt.
If benching is required, there is a very good chance a good portion of hillside will need to be redone in order to stabilize slope. How will this be paid for? Incidental to the project, it is the contractor’s responsibility to determine the means and methods.
Typically a Storm Sewer project has Plan & Profile sheet that gives Elevations, Percentage Slope of Pipe, MH inverts top and bottom etc. Can the Dept. provide these sheets? It is the contractor’s responsibility to set the grades based on the conditions of the site.
If not what is the % slope on pipe needed to insure the pipe is buried deep enough or that the pipe is not coming out of ground? It is the contractor’s responsibility to ensure the pipe is buried deep enough and is not coming out of the ground.
What is flowline elevation of the manholes, especially the downstream Manhole? It is the contractor’s responsibility to determine the flow line. Per the SOW “The invert elevation of the new 24-inch PVC storm at the new manhole, shall be the same elevation or lower than the 12-inch ADS storm pipe.”
If we are not given MH elevations, how much of the manhole do you want sticking out of the ground? Manhole rim shall be flush with the existing ground.
The existing Rip Rap located at the very end of the existing pipe run. Can this Rip rap be buried onsite or placed into the side slope of the existing ditch? Existing Rip-Rap can be placed into the side slope of the existing ditch.
Are there any existing utilities other than the what appears to be an existing sprinkler pipe located running through large sinkhole? No
See attached document: Sht B-6.
See attached document: Sht B-2.
End of Document