This federal contract opportunity notice seeks proposals from general contractors for an infrastructure upgrade project at the Hot Springs VAMC in South Dakota. Key requirements of the project include demolishing outdated phone lines and IT closets, upgrading electrical panels and emergency generators, renovating HVAC, fire safety, and IT systems, installing new data cabling and fiber optic infrastructure, migrating telecommunications rooms, and abating hazardous materials like asbestos and lead paint. Proposers must minimize downtime for hospital operations during phasing of work and maintain clean work areas in accordance with infection control regulations. The project involves high technical complexity due to replacing the majority of telecommunications rooms while preserving existing building management systems, upgrading outdated phone lines while maintaining the mass notification system, and reintegrating security and fire safety systems.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment
Amendment Number: 1 Date Issued: 7/19/2022
Project Name: Hot Springs VA EHRM Upgrade Project Number: 21089.00
Pages in Addendum: 2 pages of narrative, Appendix page count list independently.
Prepared By: Andrew Hall (A&E)
Issued To: All bidders thru the VA
Addendum to Contract Documents:
General Bid Items:
1. The project door schedule and elevations can be found on sheet 00-GI-006.
2. The new generator in building 10 shall have an insulated exhaust pipe.
3. The existing generator in building 10 is to be salvaged and relocated to a storage location to be determined by the COR on the Hot Springs VA campus.
4. The general contractor is responsible for hiring the commissioning agent (CxA) also known as a commissioning provider (CxP).
Project Manual (Specifications): (See attached Appendix A for specification changes, 16 pages)
1. Section 10 14 00 “Signage” has been updated. See attached Signage specification.
2. Section 23 08 00 “Commissioning of HVAC Systems” 1.1D has had …“appointed and provided by the VA”… stricken. See attached Commissioning of HVAC System specification.
3. Section 28 08 00 “Commissioning of Electrical Safety and Security Systems” 1.1B has had …“appointed by the
VA”… stricken. See attached Commissioning of Electrical Safety and Security Systems specification.
Drawings: (See attached Appendix B for the following drawing changes, 17 pages) Sheet 00-GI-003
1. A Room Signage Notes and section has been added to support the signage specification section 10 44 13.
Sheet 00-GI-006
1. Doors 01-113B.0, 01-217C.0, 01-315C.0, 02-222.0, 03-103.1, 05-211.1, 06-102.1, 08-107.0, 11-001.0, 12-B001A.0, 12-B303.0, 18-002.0, and 65-100B.0 have been changed or additional information has been provided to the door schedule.
Sheet CJ0001
1. Vault Foundation Detail 4 note has been changed from “vault by others” to “vault designed & provided by GC.
HS 20 Rated.”
Sheet 10-AD-201
1. Demolition note has been added indicating demo required for the removal and salvage of the existing generator.
Sheet 01-AE-402
1. Glass Type GL-1 has been changed to have low-e coating only on the #2 surface.
Sheet 11-AE-301
1. Building 11 Enlarged Roof Plan had its visibility setting adjusted to display the roof drawing.
Sheet 53-AE-301
1. Building 53 Enlarged Ground Floor Plan has been updated to show how to finish the new South TR wall as it intersects with the existing West window. The West TR wall has been flushed out with the existing wall bump out. The north arrow in the title block of the plan has been corrected.
2. Interior elevation 102B TR North has been updated to reflect the new flushed out wall.
3. Key Notes 09-34 and 09-35 have been added per the plan and elevation updates above.
Sheet MK-001
1. Addition of drain pan & condensate pump requirements for certain TR spaces in buildings 4, 8, & 11, as well as general requirements for all project areas.
Sheet MK-005
1. Note added require that the existing emergency shutoff buttons are to be reused, and that the CRAC units as well as the air handler serving the data center be shut off in the event one of them is pushed.
Sheet 004-MH-0B2
1. Addition of drain pan & condensate pump requirements for certain TR spaces in buildings 4, 8, & 11, as well as
Sheet 008-MH-011
1. Addition of drain pan & condensate pump requirements for certain TR spaces in buildings 4, 8, & 11, as well as
Sheet 010-MH-0B1
1. Noted has been added indicating a new roof exhaust penetration.
Sheet 065-MH-011
1. Note added require that the existing emergency shutoff buttons are to be reused, and that the CRAC units as well as the air handler serving the data center be shut off in the event one of them is pushed.
Sheet 011-MH-001
1. Addition of drain pan & condensate pump requirements for certain TR spaces in buildings 4, 8, & 11, as well as
Sheet 004-EP-0B2
1. Addition of condensate pump requirements for certain TR spaces in buildings 4, 8, & 11.
Sheet 008-EP-011
1. Addition of condensate pump requirements for certain TR spaces in buildings 4, 8, & 11.
Sheet 011-EP-0B1
1. Addition of condensate pump requirements for certain TR spaces in buildings 4, 8, & 11.
Technical Question Responses: (See attached Appendix C, 33 pages)
As Built Drawings for Reference
1. Telephone System 1987 As-Builts (See attached Appendix D, 30 pages)
2. Building 65 Main Floor Switch Plans 1990 (See attached Appendix E, 2 pages)
3. Partial Fiber Plans 2012 (See attached Appendix F, 6 pages)
4. Power One-line Diagrams (See attached Appendix G, 6 pages)
Technical Question Drawing Responses: (See attached Appendix H, 17 pages)
Prior Approvals:
1. None submitted.
End of Amendment 01.
HOT SPRINGS VA MEDICAL CENTER 100% DOCUMENTS
HOT SPRINGS, SD 01/07/2022
Electronic Health Records Modernization
(EHRM) Infrastructure Upgrades
Hot Springs VA Medical Center
Project No. 568A4-21-702
10 14 00 - 1 of 6
SIGNAGE
SECTION 10 14 00
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies interior signage for room numbers, and names.
B. The signage shall match the existing signage system with the inclusion of braille tactile text line.
1.2 RELATED WORK
A. Sustainable Design Requirements: Section 01 81 13, SUSTAINABLE
CONSTRUCTION REQUIREMENTS.
B. Color and Finish of Interior Signs: Section 09 06 00, SCHEDULE FOR
FINISHES.
1.3 QUALITY ASSURANCE
A. Manufacturer’s Qualifications: Provide signage that is the product of one manufacturer, who has provided signage as specified for a minimum of three (3) years. Submit manufacturer’s qualifications.
B. Installer’s Qualifications: Minimum three (3) years’ experience in the installation of signage of the type as specified in this Section.
Submit installer’s qualifications.
C. Basis of Design: Signage manufacturer
2/90 Sign Systems
ATTN: Valerie Dye
Email: valeriedye@290signs.com
5350 Corporate Grove Blvd. SE
Grand Rapids, MI 49512
Tel: 800-777-4310 Ext. 3323
Fax: 616-656-4300
Or approved equal.
D. New signs to match the existing signage system. See photograph included with the specification section.
1.4 SUBMITTALS
A. Submit in accordance with Section 01 33 00, SHOP DRAWINGS, PRODUCT DATA
AND SAMPLES.
B. Sustainable Design Submittals, as described below:
1. Volatile organic compounds per volume as specified in PART 2 -
PRODUCTS.
Hot Springs VA Medical Center
Project No. 568A4-21-702
10 14 00 - 2 of 6
C. Interior Sign Sample: Sign panel and frame, with letters and room number and braille tactile text line.
1. Sign Panel, 203 x 254 mm (8 x 10 inches) full size, with letters.
2. Color sample of matching existing signage color, 152 x 152 mm (6 x 6 inches) full size.
D. Manufacturer's Data:
1. Showing the methods and procedures proposed for the anchorage of the signage system to each surface type.
2. Manufacturer’s printed specifications and maintenance instructions.
E. Shop Drawings: Scaled for manufacture and fabrication of sign. Identify materials, anchorage, accessory items, mounting and finishes.
F. Full size layout patterns for dimensional letters.
G. Manufacturer’s qualifications.
H. Installer’s qualifications.
1.5 DELIVERY AND STORAGE
A. Deliver materials to job in manufacturer's original sealed containers with brand name marked thereon. Protect materials from damage.
B. Package to prevent damage or deterioration during shipment, handling, storage and installation. Maintain protective covering in place and in good repair until removal is necessary.
C. Deliver signs only when the site and mounting services are ready for installation work to proceed.
D. Store products in dry condition inside enclosed facilities.
1.6 WARRANTY
A. Construction Warranty: Comply with FAR clause 52.246-21, “Warranty of
Construction”.
1.7 APPLICABLE PUBLICATIONS
A. VA Signage Design Guide, December 2021
B. VA Barrier Free Design Standard
C. Federal Architectural Barriers Act Accessibility Standard (ABAAS)
D. Code of Federal Regulation (CFR):
40 CFR 59...............Determination of Volatile Matter Content, Water
Content, Density Volume Solids, and Weight
Solids of Surface Coating
E. Federal Specifications (Fed Spec):
MIL-PRF-8184F...........Plastic Sheet, Acrylic, Modified.
MIL-P-46144C............Plastic Sheet, Polycarbonate ahall Text Box ahall Polygon ahall Cloud
Hot Springs VA Medical Center
Project No. 568A4-21-702
10 14 00 - 3 of 6
F. National Fire Protection Association (NFPA):
101-2021................Life Safety Code
PART 2 - PRODUCTS
2.1 SIGNAGE GENERAL
A. Provide signs of type, size and design shown on the construction documents.
B. Provide signs complete with lettering, framing and related components for a complete installation.
C. Provide graphics items as completed units produced by a single manufacturer, including necessary mounting accessories, fittings and fastenings.
D. Do not scale construction documents for dimensions. Verify dimensions and coordinate with field conditions. Notify Contracting Officer
Representative (COR) of discrepancies or changes needed to satisfy the requirements of the construction documents.
2.2 INTERIOR SIGN MATERIALS
A. Door signage shall match room door signage provided as part of project
585-16-112 568A4-21-702 install server room.
B. Provide component system signs with quarry blue finish.
C. Signage
1. Sign shall be made from a matching material that provides for letters, numbers and Braille to be integral with sign. Do not apply letters, numbers and Braille with adhesive.
2. Numbers, letters and Braillie to be raised 0.8 mm (1/32 inches) from the background surface. The draft of the letters, numbers and Braille to be tapered, vertical and clean.
3. Braille Dots: Conform with ANSI A117.1 for Braille position and layout; (a) Dot base diameter: 1.5 mm (0.59 inches)(b)Inter-dot spacing: 2.3 mm (0.090 inches) (c) Horizontal separation between cells:
6.0 mm (.241 inches) (d) Vertical separation between cells: 10.0 mm
(.395 inches)
D. Fire Extinguisher Signs
1. Three dimensional sign equal to Manufacture Prinzing Model No.
V1FE15A, Fire Extinguisher sign, 6”x9”, Red background with White ahall Text Box ahall Polygon ahall Cloud ahall Text Box ahall Polygon
Hot Springs VA Medical Center
Project No. 568A4-21-702
10 14 00 - 4 of 6
Letters and Graphics. Mount above fire extinguisher cabinet per fire department direction.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Locate signs on the handle side of adjacent wall match the mounting dimensions of existing signage. of as shown on the construction documents at each telecommunications room or other new or renovated spaces included in this project.
B. Mount signs in proper alignment, level and plumb according to the construction documents and the dimensions given on elevation and Sign
Location Plans. When exact position, angle, height or location is not clear, contact COR for resolution.
C. At completion of sign installation, clean exposed sign surfaces. Clean and repair adjoining or adjacent surfaces that became soiled or damaged as a result of installation of signs.
- - - END - - -
Text Box ahall Polygon
Hot Springs VA Medical Center
Project No. 568A4-21-702
10 14 00 - 5 of 6
See drawing sheet 00-GI-003 for a photo of existing room signage to be matched from
Hot Springs VA building 12.
ahall Text Box ahall Polygon
Hot Springs VA Medical Center
Project No. 568A4-21-702
10 14 00 - 6 of 6
----THIS PAGE INTENTIONALLY LEFT BLANK---
HOT SPRINGS, SD 1/19/2022
Electronic Health Records
Management (EHRM) Infrastructure
Upgrades
Project No. 568A4-21-702
23 08 00 - 1 of 6
COMMISSIONING OF HVAC SYSTEMS
SECTION 23 08 00
PART 1 - GENERAL
1.1 DESCRIPTION
A. The requirements of this Section apply to all sections of
Division 23.
B. This project will have selected building systems commissioned.
See Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.
C. The commissioning process, which the Contractor is responsible to execute, is defined in Section 01 91 00, GENERAL
COMMISSIONING REQUIRMENTS.
D. A Commissioning Agent (CxA) appointed and provided by the VA will manage the commissioning process.
1.2 RELATED WORK
A. The requirements of this Section apply to all sections of
Division 23.
B. Section 01 00 00, GENERAL REQUIREMENTS.
C. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
D. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.
E. Section 13 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING
AND EQUIPMENT.
F. Section 23 05 93, TESTING, ADJUSTING, AND BALANCING FOR HVAC.
G. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC.
1.3 SUMMARY
A. This Section includes requirements for commissioning the HVAC systems, related subsystems, and related equipment. This
Section supplements the general requirements specified in
Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.
B. Refer to Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS for more details regarding processes and procedures as well as roles and responsibilities for all Commissioning Team members.
1.4 DEFINITIONS
A. Refer to Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS for definitions.
ahall Text Box ahall Polygon
Upgrades
Project No. 568A4-21-702
23 08 00 - 2 of 6
1.5 COMMISSIONED SYSTEMS
A. Commissioning of a system or systems specified in Division 23 is part of the construction process. Documentation and testing of these systems, as well as training of the VA’s Operation and
Maintenance personnel in accordance with the requirements of
Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS, and of
Division 23, is required in cooperation with the VA and the VA's
Commissioning Agent.
B. The HVAC systems commissioning will include the systems listed in Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.
1.6 SUBMITTALS
A. The commissioning process requires review of selected Submittals that pertain to the systems to be commissioned. The
Commissioning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the
Contractor. Refer to Section 01 33 23, SHOP DRAWINGSS, PRODUCT
DATA, AND SAMPLES for further details.
B. The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.
1.7 APPLICABLE PUBLICATIONS
A. The following publications form a part of this specification to the extent indicated by the reference thereto. In text the publications are referenced to by the acronym of the organization.
B. Department of Veterans Affairs (VA):
1. PG 18-10 2007 Mission Critical Facilities - DRAFT
2. PG 18-10 2007 Life-Safety Protected Facilities - DRAFT
C. American Society of Heating, Refrigerating and Air Conditioning
Engineers, Inc. (ASHRAE):
1. HANDBOOK 2019 HVAC Applications ASHRAE Handbook, Chapter 39, Testing, Adjusting, and Balancing, Chapter 44, HVAC
Commissioning and Chapter 49, Sound and Vibration Control
2. HANDBOOK 2017 HVAC Fundamentals ASHRAE Handbook, Chapter 8, Sound and Vibration
D. Associated Air Balance Council (AABC):
1. 7th Edition 2016 AABC National Standards for Total System
Balance
Upgrades
Project No. 568A4-21-702
23 08 00 - 3 of 6
E. National Environmental Balancing Bureau (NEBB):
1. 9th Edition 2019 Procedural Standards for Testing, Adjusting, Balancing of Environmental Systems
2. 3rd Edition 2015 Procedural Standards for the Measurement of
Sound and Vibration
3. 2rd Edition 2019 Standard for Whole Building Technical
Commissioning of New Construction
F. Sheet Metal and Air Conditioning Contractors National
Association (SMACNA):
1. 006-2006 HVAC Duct Construction Standard – Metal and
Flexible Duct
2. 3rd Edition-2005 HVAC Systems Testing, Adjusting and
Balancing
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 CONSTRUCTION INSPECTIONS
A. Commissioning of HVAC systems will require inspection of individual elements of the HVAC systems construction throughout the construction period. The Contractor shall coordinate with the Commissioning Agent in accordance with Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS and the Commissioning plan to schedule HVAC systems inspections as required to support the
Commissioning Process.
3.2 PRE-FUNCTIONAL CHECKLISTS
A. The Contractor shall complete Pre-Functional Checklists to verify systems, subsystems, and equipment installation is complete and systems are ready for Systems Functional
Performance Testing. The Commissioning Agent will prepare Pre-
Functional Checklists to be used to document equipment installation. Refer to Section 13 05 41, NOISE AND VIBRATION
CONTROL FOR HVAC PIPING AND EQUIPMENT, Section 23 05 93, TESTING, ADJUSTING, AND BALANCING FOR HVAC, and Section 23 09
23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC. The Contractor shall complete the checklists. Completed checklists shall be submitted to the VA and to the Commissioning Agent for review.
The Commissioning Agent may spot check a sample of completed checklists. If the Commissioning Agent determines that the information provided on the checklist is not accurate, the
Commissioning Agent will return the marked-up checklist to the
Contractor for correction and resubmission. If the
Commissioning Agent determines that a significant number of completed checklists for similar equipment are not accurate, the
Commissioning Agent will select a broader sample of checklists
Upgrades
Project No. 568A4-21-702
23 08 00 - 4 of 6 for review. If the Commissioning Agent determines that a significant number of the broader sample of checklists is also inaccurate, all the checklists for the type of equipment will be returned to the Contractor for correction and resubmission.
Refer to Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS for submittal requirements for Pre-Functional Checklists, Equipment Startup Reports, and other commissioning documents.
3.3 CONTRACTORS TESTS
A. Contractor tests as required by other sections of Division 23 shall be scheduled and documented in accordance with Section 01
00 00, GENERAL REQUIREMENTS. All testing shall be incorporated into the project schedule. Contractor shall provide no less than seven calendar days’ notice of testing. The Commissioning
Agent will witness selected Contractor tests at the sole discretion of the Commissioning Agent. Contractor tests shall be completed prior to scheduling Systems Functional Performance
Testing.
3.4 SYSTEMS FUNCTIONAL PERFORMANCE TESTING
A. The Commissioning Process includes Systems Functional
Performance Testing that is intended to test systems functional performance under steady state conditions, to test system reaction to changes in operating conditions, and system performance under emergency conditions. The Commissioning Agent will prepare detailed Systems Functional Performance Test procedures for review and approval by the VA's COR. The
Contractor shall review and comment on the tests prior to approval. The Contractor shall provide the required labor, materials, and test equipment identified in the test procedure to perform the tests. The Commissioning Agent will witness and document the testing. The Contractor shall sign the test reports to verify tests were performed.
1. See Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS for additional requirements.
3.5 TRAINING OF VA PERSONNEL
A. Training of the VA operation and maintenance personnel is required in cooperation with the VA's COR and Commissioning
Agent. Provide competent, factory authorized personnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. Contractor shall submit training agendas and trainer resumes in accordance with the requirements of Section
01 91 00. The instruction shall be scheduled in coordination with the VA COR after submission and approval of formal training plans.
Upgrades
Project No. 568A4-21-702
23 08 00 - 5 of 6
1. Refer to Section 01 91 00, GENERAL COMMISSIONING
REQUIREMENTS and Division 23 Sections for additional
Contractor training requirements.
- - - END - - -
Upgrades
Project No. 568A4-21-702
23 08 00 - 6 of 6
- - - THIS PAGE LEFT INTENTIONALLY BLANK - - -
HOT SPRINGS VA MEDICAL CENTER 100% FINAL DOCUMENTS
HOT SPRINGS, SD 02/23/2022
Electronic Health Records Modernization 28 08 00 - 1 of 4
(EHRM)Infrastructure Upgrades COMMISSIONING OF ELECTRONIC
Hot Springs VA Medical Center SAFETY AND SECURITY SYSTEMS
VA Project No. 568A4-21-702
SECTION 28 08 00
COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
A. The requirements of this Section apply to all sections of Division 28.
B. This project will have selected building systems commissioned. The complete list of equipment and systems to be commissioned is specified in
Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. The commissioning process, which the Contractor is responsible to execute, is defined in
Section 01 91 00 GENERAL COMMISSIONING REQUIRMENTS. A Commissioning Agent
(CxA) appointed by the VA will manage the commissioning process.
1.2 RELATED WORK
A. Section 01 00 00 GENERAL REQUIREMENTS.
B. Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.
C. Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
1.3 SUMMARY
A. This Section includes requirements for commissioning the Facility electronic safety and security systems, related subsystems and related equipment. This Section supplements the general requirements specified in Section 01 91 00 General Commissioning Requirements.
B. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for more details regarding processes and procedures as well as roles and responsibilities for all Commissioning Team members.
1.4 DEFINITIONS
A. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for definitions.
1.5 COMMISSIONED SYSTEMS
A. Commissioning of a system or systems specified in Division 28 is part of the construction process. Documentation and testing of these systems, as well as training of the VA’s Operation and Maintenance personnel in accordance with the requirements of Section 01 91 00 and of Division 28, is required in cooperation with the VA and the Commissioning Agent.
B. The Facility exterior closure systems commissioning will include the systems listed in Section 01 91 00 General Commissioning Requirements:
1.6 SUBMITTALS
ahall Text Box ahall Polygon
Electronic Health Records Modernization 28 08 00 - 2 of 4
A. The commissioning process requires review of selected Submittals that pertain to the systems to be commissioned. The Commissioning Agent will provide a list of submittals that will be reviewed by the Commissioning
Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details.
B. The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL
COMMISSIONING REQUIREMENTS.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 CONSTRUCTION INSPECTIONS
A. Commissioning of Electronic Safety and Security systems will require inspection of individual elements of the electronic safety and security systems throughout the construction period. The Contractor shall coordinate with the Commissioning Agent in accordance with Section 01 91
00 and the Commissioning plan to schedule electronic safety and security systems inspections as required to support the Commissioning Process.
3.2 PRE-FUNCTIONAL CHECKLISTS
A. The Contractor shall complete Pre-Functional Checklists to verify systems, subsystems, and equipment installation is complete and systems are ready for Systems Functional Performance Testing. The Commissioning
Agent will prepare Pre-Functional Checklists to be used to document equipment installation. The Contractor shall complete the checklists.
Completed checklists shall be submitted to the VA and to the Commissioning
Agent for review. The Commissioning Agent may spot check a sample of completed checklists. If the Commissioning Agent determines that the information provided on the checklist is not accurate, the Commissioning
Agent will return the marked-up checklist to the Contractor for correction and resubmission. If the Commissioning Agent determines that a significant number of completed checklists for similar equipment are not accurate, the Commissioning Agent will select a broader sample of checklists for review. If the Commissioning Agent determines that a significant number of the broader sample of checklists is also inaccurate, all the checklists for the type of equipment will be returned to the
Contractor for correction and resubmission. Refer to SECTION 01 91 00
Electronic Health Records Modernization 28 08 00 - 3 of 4
GENERAL COMMISSIONING REQUIREMENTS for submittal requirements for Pre-
Functional Checklists, Equipment Startup Reports, and other commissioning documents.
3.3 CONTRACTORS TESTS
A. Contractor tests as required by other sections of Division 28 shall be scheduled and documented in accordance with Section 01 00 00 GENERAL
REQUIREMENTS. All testing shall be incorporated into the project schedule. Contractor shall provide no less than 7 calendar days’ notice of testing. The Commissioning Agent will witness selected Contractor tests at the sole discretion of the Commissioning Agent. Contractor tests shall be completed prior to scheduling Systems Functional Performance
Testing.
3.4 SYSTEMS FUNCTIONAL PERFORMANCE TESTING
A. The Commissioning Process includes Systems Functional Performance Testing that is intended to test systems functional performance under steady state conditions, to test system reaction to changes in operating conditions, and system performance under emergency conditions. The Commissioning
Agent will prepare detailed Systems Functional Performance Test procedures for review and approval by the Resident Engineer. The
Contractor shall review and comment on the tests prior to approval. The
Contractor shall provide the required labor, materials, and test equipment identified in the test procedure to perform the tests. The Commissioning
Agent will witness and document the testing. The Contractor shall sign the test reports to verify tests were performed. See Section 01 91 00
GENERAL COMMISSIONING REQUIREMENTS, for additional details.
3.5 TRAINING OF VA PERSONNEL
A. Training of the VA operation and maintenance personnel is required in cooperation with the Resident Engineer and Commissioning Agent. Provide competent, factory authorized personnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. Contractor shall submit training agendas and trainer resumes in accordance with the requirements of Section 01 91 00. The instruction shall be scheduled in coordination with the VA Resident Engineer after submission and approval of formal training plans. Refer to Section 01 91 00 GENERAL COMMISSIONING
REQUIREMENTS and Division 28 Sections for additional Contractor training requirements.
Electronic Health Records Modernization 28 08 00 - 4 of 4
----- END -----
1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FAMILIARIZE HIMSELF/ HERSELF WITH THE
SCOPE OF WORK.
2. THE DEMOLITION NOTES PROVIDE A GENERAL DESCRIPTION OF THE ITEMS AND AREAS
REQUIRING REMOVAL. THE CONTRACTOR SHALL FIELD VERIFY ACTUAL QUANTITIES
AND LOCATIONS OF ALL INDICATED ITEMS AS NECESSARY TO COMPLETE THE SCOPE OF
WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
3. COORDINATE WITH OWNER FOR ANY EQUIPMENT TO BE SALVAGED. UNLESS
SPECIFICALLY SCHEDULED FOR REUSE, DEMOLISHED MATERIALS SHALL BECOME THE
POSSESSION OF THE CONTRACTOR AND SHALL BE IMMEDIATELY REMOVED FROM THE
SITE.
4. REMOVE MATERIALS FROM SITE AND DISPOSE OF IN A LEGAL MANNER AT NO
ADDITIONAL EXPENSE TO OWNER
5. DEBRIS FROM THE DEMOLITION SHALL NOT BE ALLOWED TO ACCUMULATE WITHIN THE
BUILDING OR ON THE SITE.
6. REMOVE FROM SITE ANY CONTAMINATED, VERMIN INFESTED, OR DANGEROUS
MATERIALS ENCOUNTERED AND DISPOSE OF BY SAFE MEANS SO AS NOT TO ENDANGER
HEALTH OF WORKERS AND PUBLIC.
7. BURNING OF MATERIALS ON SITE IS NOT PERMITTED.
8. CLEAN-UP: MUST MEET GOVERNING DUST CONTROL CODES.
9. NOTIFY AFFECTED UTILITY COMPANIES BEFORE STARTING WORK AND COMPLY WITH
THEIR REQUIREMENTS.
10. PREVENT MOVEMENT OR SETTLEMENT OF ADJACENT STRUCTURES. PROVIDE BRACING
AND SHORING.
11. CARRY OUT DEMOLITION WORK TO CAUSE AS LITTLE INCONVENIENCE TO ANY
ADJACENT OCCUPIED BUILDING OR SITE AS POSSIBLE AND WITH MINIMUM
INTERFERENCE TO PUBLIC OR PRIVATE ACCESSES. MAINTAIN PROTECTED EGRESS AND
ACCESS AT ALL TIMES.
12. CONTRACTOR SHALL PROVIDE TEMPORARY DUST AND CONSTRUCTION SEPARATION
WALLS AS REQUIRED TO SHIELD THE PUBLIC FROM NOISE, DUST, WEATHER, AND OTHER
HAZARDS THAT MAY BE EXPOSED AS A RESULT OF THE DEMOLITION WORK.
SEE SPECIFICATION SECTION 01 35 26 FOR DETAILS AND DEMOLITION DRAWINGS FOR
LOCATIONS.
13. PERFORM CUTTING OF EXISTING CONCRETE AND MASONRY WITH SAWS AND CORE
DRILLS. DO NOT USE JACK-HAMMERS EXCEPT WHERE PERMITTED BY OWNER.
14. BREAK CONCRETE AND MASONRY INTO SECTIONS LESS THAN 3 FEET IN ANY
DIMENSION.
15. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO INSURE EXISTING
STRUCTURAL ELEMENTS REMAIN UNDAMAGED THROUGHOUT CONSTRUCTION, UNLESS
SPECIFICALLY NOTED ON DEMOLITION PLAN. IT IS THE SOLE RESPONSIBILITY OF THE
CONTRACTOR TO IDENTIFY AND PROVIDE ANY SHORING, BRACING, OR TEMPORARY
STRUCTURE, AND TO COORDINATE WITH STRUCTURAL ENGINEER AS REQUIRED.
16. ALL PUBLIC UTILITIES TO REMAIN IN OPERATION THROUGHOUT CONSTRUCTION.
CONTRACTOR TO COORDINATE ANY TEMPORARY SERVICES REQUIRED TO MAINTAIN
BUSINESS OPERATIONS.
17. SEE ENGINEERING DRAWINGS FOR DUCTWORK, DIFFUSER, PLENUM BOX, ETC.
DEMOLITION AND/OR PROTECTION. COORDINATE WITH MECHANICAL ENGINEER.
18. FIRE SAFETY MUST BE MAINTAINED FOR ALL PERSONNEL WORKING ON THE FLOOR. ALL
FIRE STAIRS, ALARMS, SPEAKERS, ETC. MUST REMAIN ACCESSIBLE AND OPERABLE AT
ALL TIMES. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT THIS
EQUIPMENT. IMMEDIATELY NOTIFY BUILDING SECURITY AND BUILDING MANAGER OF
DAMAGED OR DISABLED SYSTEMS AND REPAIR OR REPLACE DAMAGED SYSTEMS
IMMEDIATELY. RELOCATION OF SMOKE DETECTORS, PUBLIC ADDRESS SPEAKERS AND
FIRE ALARM EQUIPMENT, NECESSITATED BY NEW CONSTRUCTION, SHALL BE
ACCOMPLISHED AS A FIRST PRIORITY, AND PER THE PLANS.
19. IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY THE POINT IN
QUESTION WITH THE OWNER BEFORE PROCEEDING. IMMEDIATELY STOP WORK IF
HAZARDOUS MATERIALS ARE FOUND AND CONTACT THE OWNER'S REPRESENTATIVE.
20. SEE TELECOMMUNICATION DRAWINGS FOR REMOVAL OF ANY EQUIPMENT, CABLING
SWITCHES, AND CONDUIT PERTAINING TO DATA/COMMUNICATIONS AND TELEPHONE.
VERIFY WITH TELEPHONE COMPANIES, SERVICE OWNER OR TENANT
DATA/COMMUNICATIONS REPRESENTATIVE AS REQUIRED TO PREVENT NEW
CONSTRUCTION DELAYS.
21. PROVIDE FOR FIRE PROOFING REPAIR AS REQUIRED AT STRUCTURAL STEEL, TO THE
ORIGINAL RATING WHERE CONSTRUCTION TRADES REMOVE EXISTING FIRE PROOFING.
REPAIR ANY DAMAGE OR PENETRATIONS IN RATED ASSEMBLIES TO CONFORM TO THEIR
ORIGINAL LISTING REQUIREMENTS AND TO MAINTAIN FIRE PROTECTION AND
SEPARATION AS ORIGINALLY DESIGNED.
22. AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION AREA(S) SHALL BE LEFT IN
"BROOM CLEAN" CONDITION. ALL DEBRIS AND MISCELLANEOUS MATERIAL SHALL BE
REMOVED.
23. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING ANY DAMAGE
CAUSED BY HIM OR HIS SUBCONTRACTORS. REFINISH TO MATCH EXISTING ADJACENT
FINISH, OR AS NOTED HEREIN.
24. FOR AREAS NOT IN DEMOLITION SCOPE OF WORK, PROTECT AS REQUIRED, ALL
SURFACES, EQUIPMENT, FIXTURES AND HARDWARE DURING DEMOLITION AND/OR
CONSTRUCTION.
25. PRIOR TO DEMOLITION, INVESTIGATE WALLS FOR CONCEALED PIPING AND INFORM
OWNER/ARCHITECT OF ANY CONDITION NOT DOCUMENTED IN CONTRACT DRAWINGS.
DEMO DESIGNATED WALL BASES, WALL FRAMING, BATT INSULATION AND GYPSUM
BOARD. DEMO CONDUITS AND RECEPTACLES, REFERENCE ELECTRICAL DEMO PLAN
FOR ADDITIONAL INFORMATION.
26. ALL EXISTING DIRECTIONAL SIGNAGE TO BE REMOVED UNLESS NOTED OTHERWISE.
27. WHERE NOTED, REMOVE FLOORING DOWN TO TOP OF CONC. SLAB, INCLUDING
ADHESIVES, TRANSITION STRIPS, AND OTHER ASSOCIATED ELEMENTS, TYP., UNLESS
NOTED OTHERWISE. PREPARE REMAINING SURFACES TO RECEIVE NEW FINISHES.
DEMOLITION NOTES
HAZARDOUS MATERIALS NOTES
± 36" PATH
ASSUMED ROUTE FOR CABLE,
CONDUIT, AND/OR CABLE TRAY
1. REFER TO STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION. ALL INFORMATION REGARDING EXISTING CONDITIONS IS BASED UPON
OWNER-SUPPLIED DOCUMENTS AND MAY NOT PRECISELY REFLECT FIELD
CONDITIONS.
2. PROVIDE ALL BACKING FOR MILLWORK, GRAB BARS, AND ANY AND ALL WALL MOUNTED
EQUIPMENT OR ACCESSORIES; COORDINATE LOCATIONS.
3. ALL DIMENSIONS ARE FROM STRUCTURAL OR UNFINISHED FACE OF STUD, UNLESS
OTHERWISE NOTED.
4. PROVIDE A SMOOTH AND LEVEL FINISH FLOOR, TYP. PATCH AND REPAIR ALL
INCONSISTENCIES IN FLOOR ELEVATIONS.
5. PATCH AND REPAIR ANY / ALL WALL SURFACES AS REQUIRED TO PROVIDE SUITABLE
SUBSTRATE FOR FINISHES.
6. REFER TO DOOR AND FRAME SCHEDULE FOR DOORS REQUIRING ADA ACCESS
CONTROL.
7. PROVIDE ACOUSTICAL SEALANT AROUND WALL EDGES, TOP AND BOTTOM, AND
PENETRATIONS, AND INSTALL PUTTY PADS AROUND ELECTRICAL BOXES WHERE
PARTITION CONTAINS ACOUSTICAL INSULATION.
8. ALL TELECOMMUNICATION ROOMS ARE TO HAVE EXPOSED STRUCTURE UNLESS
NOTED OTHERWISE, NO CEILINGS SPECIFIED.
FLOOR PLAN NOTES
REFLECTED CEILING PLAN NOTES
1. REFER TO ELECTRICAL SHEETS FOR FIXTURE TYPES, SWITCHING, AND SPECIAL
SYSTEMS.
2. REFER TO MECHANICAL SHEETS FOR DIFFUSER AND DUCTING LAYOUTS.
3. REFERENCE EXTERIOR FINISH LEGEND FOR EXTERIOR PAINT COLORS; REFERENCE
FINISH SCHEDULE FOR INTERIOR PAINT COLORS AND FINISH.
1. REMOVAL OF HAZARDOUS MATERIALS FROM THE BUILDING MUST FOLLOW STATE AND
FEDERAL REGULATIONS, AS WELL AS LOCAL LAWS WHEN APPLICABLE. DRAWINGS
DIAGRAM THE KNOWN ACM MATERIALS AFFECTED BY THE “WORK” AND THESE
QUANTITIES FORM THE BASE BID OF THE CONTRACT. REFER TO MECHANICAL,
ELECTRICAL, AND TELECOMM DRAWINGS FOR SPECIFIC ROUTING, PENETRATIONS,
ETC. COORDINATE ALL HAZMAT CONDITIONS WITH ARCHITECTURAL PLANS.
2. ASBESTOS TESTING OF ALL MATERIALS AFFECTED WITHIN PROJECT SCOPE PRIOR TO
DEMOLITION UNLESS OTHERWISE NOTED IS REQUIRED. REFER TO SPECIFICATION
SECTION 02 82 11 FOR MATERIAL PRE-TESTED, UANTITIES, AND MECHANICAL DRAWINGS
FOR SPECIFIC PENETRATIONS AND CABLE ROUTING TO DATA PORTS IN EACH ROOM.
3. AT COMPLETION OF TESTING CONTRACTOR WILL PROVIDE A REPORT WHIC WILL
INCLDUDE MATERIAL LOCATION, DESCRIPTION, AND QUANTITY.
4. REFER TO ACM REPORT TO BE PROVIDED BY THE VA
1. PRESSURE INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE PRESSURE (VERIFY
TWICE A DAY IN WRITTING) - IF NOT, VERIFY ALL OPENINGS (SUCH AS DOORS) ARE
CLOSED AND/OR CHANGE OUT NEGATIVE AIR PRE-FILTER. METER MUST READ
CONTINOUSLY.
2. CONTRACTOR SHALL DEVELOPE A DAILY CHECK LIST FOR CONSTRUCTION
OVERSIGHT TUNED TO THE QUALITY ASSURANCE PLAN WHICH CAPTURED MOST
ERRORS. THIS MAY EVOLVE TO A LIVING DOCUMENT PENDING ISSUES
ENCOUNTERED.
3. REFER TO SPEC SECTION 01 35 26 AND DEMOLITION DRAWINGS FOR ICRA
REQUIREMENTS BASED ON DURATION / EXTENT OF WORK AND RISK FACTOR
INFECTION CONTROL NOTES
1. REFER TO SPEC SECTION 10 44 13 "SIGNAGE" FOR PRODUCT DETAILS. INTENT IS TO
MATCH THE EXISTING ROOM SIGNS (UPPER PORTION WITH ROOM NUMBER ONLY) IN
BUILDING 12 AS SHOWN BELOW
2. REMOVE AND TURN OVER TO OWNER, ALL SIGNAGE THAT IS TO BE REPLACED PER THE
SIGNAGE SCHEDULE BELOW
BUILDING ROOM No & SIGNAGE TEXT QUANTITY (EACH SIGN) 01 B003A, 113C, 217C, 315C, 204A, 206A, 305A, 306A 1
01 EXIT STAIR 4
01 EXIT (INSIDE BUILDING TO EXIT CORRIDOR) 2
02 B1B, 222 1 03 103 1 04 04, 103, 203 1 05 211 1 06 115 1 07 110 1 08 107 1 10 B007A 2 11 001 1
12 A038, TB13 (SALAVAGE AND REINSTALL ROOM SIGN AT NEW ENTRANCE)
12 C004, D003, C106, C208, B03, 404C 1 14 105 1 53 102B 1
65 109A (REINSTALL EXISTING SIGN AT DOOR 109.3) 1
66 132 1
EXTRA PROVIDE 10 ADDITIONAL SIGNS WITH ROOM NUMBERS TBD 10
(GC TO VERIFY) TOTAL 47
3. INSTALLATION
ROOM SIGNAGE NOTES
MATCH ROOM NUMBER &
BRAILE PORTION ONLY
LOWER PORTION NOT USED
IN THIS PROJECT
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V A
M e d ic a l C e n te r
H o t S p ri n g s S
D /2
G
E N
E R
A L
I N
F O r2
.r v t
/6
/2
:5
:3
A M
00-GI-003
GENERAL NOTES
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
HOT SPRINGS, SOUTH DAKOTA
568A4-21-702
Project Director
LMTMP02/23/2022
100% CD FINAL
SOLUTION
ARCHITECTA/E:
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V A
M e d ic a l C e n te r
H o t S p ri n g s S
D /2
G
E N
E R
A L
I N
F O r2
.r v t
/6
/2
:5
:3
A M
00-GI-003
GENERAL NOTES
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
HOT SPRINGS, SOUTH DAKOTA
568A4-21-702
Project Director
LMTMP02/23/2022
100% CD FINAL
SOLUTION
ARCHITECTA/E:
FULLY SPRINKLERED
Revisions: Date:
Revision 1 06/30/22
Revisions: Date:
Revision 1 06/30/22
A - FLUSH
A B - MASONRY C D - MASONRY
METAL STUD WALL
ANCHOR LOCATION
H.M. FRAME, PAINT
FINISH FLOOR
CEILING TRACK
3/4" CHANNEL - WELD OR
SADDLE TIE TO EACH STUD
DOUBLE STUDS AT DOOR JAMBS (ADD
THIRD STUD ABOVE DOOR HEAD FOR
G.B. CONTROL JT. PER ARCHT'S DESIGN
RQMTS)
WOOD STUDS AT 16" O.C.
FLOOR TRACK
DOOR FRAME ANCHORS
NOTE: LOCATE JAMB ANCHORS ABOVE
HINGE REINFORCEMENT AND JUST
BELOW TOP REINFORCEMENT - CLIPS ON
STRIKE SIDE OCCUR DIRECTLY OPPOSITE
OF THOSE ON THE HINGE SIDE
METAL STUD ANCHOR SECTIONHOLLOW METAL FRAME ELEVATION
/2
2'
2'
2'
8"
3'
3'
3'
3'
1"
CENTERLINE OF DEADLOCK
CENTERLINE OF HOSPITAL
PUSH-PULL PLATE
CENTERLINE OF PUSH-PULL
BAR AND PULL
CENTERLINE OF LEVER
HANDLE ON LOCK OR LATCH
AND CROSS BAR ON FIRE
EXIT DEVICE
FINISHED FLOOR
GYPSUM WALLBOARD
ON METAL STUDS - SEE
PARTITION TYPES
P.LAM DOOR
HOLLOW METAL FRAME
JAMB, PROFILE AS
SCHEDULED
1/ 2"
T H
IC
K
N E
S S
P A
R T
IT
IO
N 1/
2"
CONTINUOUS SEALANT
AT PERIMETER OF
FRAME
SEAL PERIMETER OF
FRAME
JAMB ANCHOR
2"
FINISHED FACE OF
INTERSECTING
PARTITION
NOTE: SEE DETAIL FOR ANCHORING LOCATIONS/11 00-GI-006
1/2"1/2"
THICKNESS
PARTITION
SEALAN AT PERIMETER
OF JAMB, BOTH SIDES
DOOR SLAB
TYPICAL HEAD FRAMING STEEL
TRACK
FRAME HEAD AS SCHEDULED
PROFILE
SEE PARTITION TYPES
DOUBLE STUDS NESTED IN STEEL
TRACK TOP AND BOTTOM AT
OPENINGS OVER 3'-6" WIDE
1/8" MIN. + CLEAR WIDTH DIMENSION
SEALANT AT PERIMETER
OF JAMB, BOTH SIDES
DOOR SLAB
SHIM
DOUBLE METAL STUDS
FRAME JAMB AS SCHEDULED PROFILE
SEE PARTITION TYPESTHICKNESS
PARTITION
HOLLOW METAL FRAME
GYPSUM WALLBOARD ON METAL
STUDS - SEE PARTITION TYPES
P.LAM DOOR
HOLLOW METAL FRAME JAMB,
PROFILE AS SCHEDULED
1/ 2"
T H
IC
K
N E
S S
P A
R T
IT
IO
N 1/
2"
SEALANT
SEAL PERIMETER OF FRAME
NON-RATED CORNER
JAMB ANCHOR
P.LAM DOOR
HOLLOW METAL FRAME JAMB,
PROFILE AS SCHEDULED
1/ 2"
T H
IC
K
N E
S S
P A
R T
IT
IO
N 1/
2"
SEALANT
SEAL PERIMETER OF FRAME
JAMB ANCHOR
RATED CORNER
CONTINUOUS GYPSUM BOARD TO
MAINTAIN INTEGRITY OF RATED
ASSEMBLY
2"
TAPERED VINYL
EDGE STRIP
NOTE: CENTER SEAMS AND/OR VINYL EDGE STRIPS UNDER DOOR UNLESS OTHERWISE NOTED.
LC
VCT/SHT.V.
DOOR
CARP. TYPE 1
DOOR
DOOR
VCT/SHT.V.
VCT
CARP.
SEAM UNDER
DOOR
CARP. TYPE 2
CONC. FL.
SHT.V.
SEAM UNDER
DOOR
CONC.
DOORVINYL EDGE
STRIP
FEATHER LEVELING
COMPOUND TO PROVIDE
OF FLUSH TRANSITION
DOOR
MTL.TRANS.
STRIP
CER. TILE
DOOR
VCT
VINYL EDGE
STRIP
CARP.
20"
DOOR
CER. TILE
TRANS.STRIP
MTL. TRANS. STRIP
FEATHER LEVELING
COMPOUND TO PROVIDE
OF FLUSH TRANSITION
CARPET
LC
20"
JAMB / HEAD DETAIL
2" 5/8"
1/ 2"
T H
IC
K
N E
S S
P A
R T
IT
IO
N 1/
2"
/1 6"
9/
ALL WELDED
CLOSURE PLATE A
EXPOSED ENDS
APPLIED GLAZING
STOP WHERE
REQUIRED
3/4" EXPANDED STAINLESS STEEL MESH
WELD EXPANDED STAINLESS STEEL MESH TO
2" TUBE STEEL STAINLESS STEEL FRAME
MECHANICAL UNIT
4" X 4" 1/4" STAINLESS STEEL PLATE
WELDED TO 2" STAINLESS STEEL TUBE
FRAME ANCHORED TO CONCRETE SLAB
VERIFY WITH MANUFACTURE THE SIZE OF MECHANICAL UNIT BEFORE
STAINLESS STEEL TUBE FRAMES ARE CONSTRUCTED AND ALSO VERIFY SIZE OF
THE CONCRETE PAD BEFORE IT IS POURED
3/4" EXPANDED STAINLESS STEEL MESH
WELD EXPANDED STAINLESS STEEL MESH TO
2" TUBE STEEL STAINLESS STEEL FRAMESLOPE TUBE STEEL 2" PER
FOOT AWAY FROM BUILDING
SEE DETAIL FOR ROOF
MOUNTED LOCATIONS
MECHANICAL UNIT
EXISTING BUILDING WALL
INSULATED PROTECTIVE
PENETRATION OUTLET
EXTERIOR WALL SEAL
PENETRATION OUTLET
3" C
LE
A
R M
IN
EXISTING BUILDING WALL
CONCRETE SLAB REFER CIVIL DRAWINGS
/4 00-GI-006
FIELD VERIFY
MATCH EXISTING ROOF ASSEMBLY,
FOLLOW MANUFACTURER'S PATCHING
DETAILS
WRAP ROOF MEMBRANE
OVER SUPPORT
EXISTING DECK
CONTINUOUS BEAD OF
EPDM FLASHING EDGE
SEALANT. ALL AROUND
LEG OR BASE.
MECHANICAL UNIT SUPPORT
FRAME OR LEG
CARLISLE OR FIRESTONE
RUBBER WALKWAY PADS
EXISTING ROOF INSULATION
NEW SPRAY FOAM INSULATION
NOTE: 2X BLOCKING (DEPT TO BE EQUAL TO ROOF INSULATION THICKNESS, DETERMINED IN FIELD.)
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V A
M e d ic a l C e n te r
H o t S p ri n g s S
D /2
G
E N
E R
A L
I N
F O r2
.r v t
/1
/2
:3
:0
P M
00-GI-006
DOOR SCHEDULE AND DETAILS
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
HOT SPRINGS, SOUTH DAKOTA
568A4-21-702
Project Director
PGTMP02/23/2022
100% CD FINAL
SOLUTION
ARCHITECTA/E:
FULLY SPRINKLERED
DOOR SCHEDULE
DOOR
NUMBER
DIMENSIONS DOOR FRAME
HARDWARE
FIRE
RATING COMMENTSWIDTH HEIGHT
THICKNE
SS
DOOR
TYPE
DOOR
PANEL TYPE
DOOR
MATERIAL
DOOR
FINISH
DOOR
PAIR
FRAME
TYPE
FRAME
MATERIAL
FRAME
FINISH
01-113B.0 3' - 0" 8' - 0" 1 3/4" A FLUSH HM PAINT A HM PAINT 001 90 MIN.
01-217B.0 3' - 0" 7' - 6" 1 3/4" A FLUSH HM PAINT A HM PAINT 007 90 MIN.
01-217C.0 3' - 0" 8' - 0" 1 3/4" A FLUSH HM PAINT A HM PAINT 001
01-315B.0 3' - 0" 7' - 6" 1 3/4" A FLUSH HM PAINT A HM PAINT 007 90 MIN.
01-315C.0 3' - 0" 8' - 0" 1 3/4" A FLUSH HM PAINT A HM PAINT 001
01-B003A.0 3' - 0" 7' - 10" 1 3/4" A FLUSH HM PAINT A HM PAINT 004
01-B003B.0 3' - 0" 7' - 10" 1 3/4" A FLUSH HM PAINT A HM PAINT 005
02-222.0 3' - 0" 8' - 0" 1 3/4" A FLUSH HM PAINT A HM PAINT 001
02-B1A.0 5' - 6" 7' - 0" 1 3/4" A FLUSH Yes A HM EXISTING RELOCATED DOOR, FRAME, AND HARDWARE
02-B1B.0 3' - 0" 7' - 6" 1 3/4" A FLUSH HM PAINT A HM PAINT 001 45 MIN
03-103.1 3' - 0" 8' - 0" 1 3/4" A FLUSH HM PAINT A HM PAINT 001
05-211.1 3' - 0" 8' - 0" 1 3/4" A FLUSH HM PAINT A HM PAINT 001
06-102.1 3' - 0" 8' - 0" 1 3/4" A FLUSH HM PAINT A HM PAINT 001
07-110.0 3' - 0" 8' - 0" 1 3/4" A FLUSH HM PAINT A HM PAINT 001 PROVIDE HARDWARE FOR IN-SWING DOOR
08-107.0 3' - 0" 8' - 0" 1 3/4" A FLUSH HM PAINT A HM PAINT 001 NEW DOOR IN EXISTING OPENING
10-B007.1 3' - 0" 7' - 0" 1 3/4" A FLUSH HM PAINT A HM PAINT 007 45 MIN.
10-B007.2 2' - 6" 7' - 0" 1 3/4" A FLUSH HM PAINT A PAINT PAINT 007 45 MIN. NEW DOOR IN EXISTING OPENING
11-001.0 3' - 0" 8' - 0" 1 3/4" A FLUSH HM PAINT A HM PAINT 001
12-404C.0 3' - 0" 7' - 6" 1 3/4" A FLUSH HM PAINT A HM PAINT 001
12-A038.0 6' - 0" 7' - 6" 1 3/4" A FLUSH HM PAINT Yes C HM PAINT 002
12-A119.1 3' - 0" 7' - 6" 1 3/4" A FLUSH HM PAINT C HM PAINT 001
12-B001A.0 2' - 4" 7' - 0" 1 3/4" A FLUSH HM PAINT A HM PAINT 001 CARD READER
12-B303.0 3' - 0" 8' - 0" 1 3/4" A FLUSH HM PAINT A HM PAINT 001
12-C004.0 3' - 0" 7' - 6" 1 3/4" A FLUSH HM PAINT A HM PAINT 001
12-C106D.0 3' - 0" 7' - 6" 1 3/4" A FLUSH HM PAINT A HM PAINT 001
12-C208.0 3' - 0" 7' - 6" 1 3/4" A FLUSH HM PAINT A HM PAINT 001
12-D003.0 3' - 0" 7' - 6" 1 3/4" A FLUSH HM PAINT A HM PAINT 001 INSTALL IN EXISTING GYPSUM BOARD OPENING
14-105.0 3' - 0" 7' - 6" 1 3/4" A FLUSH HM PAINT A HM PAINT 001 45 MIN.
18-002.0 3' - 0" 7' - 0" 1 3/4" A FLUSH HM PAINT A HM PAINT 007
53-102B.0 3' - 0" 7' - 6" 1 3/4" A FLUSH HM PAINT A HM PAINT 001
53-104.0 3' - 0" 7' - 6" 1 3/4" A FLUSH HM PAINT A HM PAINT EXISTING RELOCATED DOOR, FRAME, AND HARDWARE
65-100B.0 3' - 0" 7' - 0" 1 3/4" A FLUSH HM PAINT A HM PAINT 004 NEW DOOR IN EXISTING OPENING
65-109.3 6' - 0" 8' - 0" 1 3/4" A FLUSH HM PAINT Yes C HM PAINT 002 45 MIN.
65-109A.0 3' - 0" 7' - 0" 1 3/4" A FLUSH HM PAINT A HM PAINT 006 90 MIN.
66-132.0 3' - 0" 8' - 0" 1 3/4" A FLUSH HM PAINT A HM PAINT 004
DOOR FRAME TYPE ELEVATIONS
DOOR PANEL TYPE ELEVATIONS
1/2" = 1'-0"11
DOOR ANCHORS
1/2" = 1'-0"12
TYPICAL HARDWARE MOUNTING
3" = 1'-0"8
TYPICAL JAMB DETAIL AT GYPSUM BOARD
3" = 1'-0"9
TYPICAL HEAD DETAIL
3" = 1'-0"10
TYPICAL DETAIL FLUSH JAMB
3" = 1'-0"5
TYPICAL FLUSH JAMB AT CORNER
3/16" = 1'-0"1
FLOOR TRANSITION DETAILS
3" = 1'-0"13
FRAME PROFILE - TYPICAL FRAME
1/2" = 1'-0"3
OUTDOOR UNIT PROTECTION DETAIL
1" = 1'-0"4
MECH EQUIPMENT ROOF MOUNT DETAIL
Revisions: Date:
Revision 1 06/30/22
1 1 1
1 1 1
1 1 1 1
1 1 1
1 1 1
CJ0001
CIVIL - DETAILS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% DOCUMENTSPROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
FLS
AJG RDR
EHRM INFRASTRUCTURE
UPGRADES
HOT SPRINGS, SOUTH DAKOTA
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST, UNIT 3
BINDGE, WA 98605
P: 541.436.4723
ADAM GOODIN, PE
01-19-2022
A/E:
568A4-21-702
DETECTABLE LOCATOR WARNING TAPE
NFS MATERIAL COMPACTED TO 95%
3000 PSI CONCRETE DYED ORANGE
CONDUIT/CONDUCTORS
NEW SOD TO MATCH EXISTING LAWNS
(NEW 4" CONCRETE TO MATCH
SIDEWALK CROSSINGS)
6"
4" MINIMUM CONCRETE ABOVE CONDUIT
TRENCH WIDTH AS REQUIRED
MINIMUM OF 24"
6" MINIMUM
M
IN
IM
U
M C
O
VE
R
SCALE: NTS
TRENCH DETAIL
6" 2"
2"
COMPACTED
ROCK BASE
COMPACTED,
APPROVED
SUBGRADE
CLASS "B" BASE COURSE
CLASS "C" WEARING COURSE
SCALE: NTS
ASPHALT PAVEMENT DETAILS
6" 4"
COMPACTED,
APPROVED
SUBGRADE
COMPACTED
ROCK
BASE
PCC CONCRETE
PAVEMENT SECTION AS
SPECIFIED
3300 PSI @ 28 DAYS
SCALE: NTS
CONCRETE PAVEMENT DETAILS
6" 2"
2"
COMPACTED
ROCK BASE
COMPACTED,
APPROVED
SUBGRADE
CLASS "B" BASE COURSE
CLASS "C" WEARING COURSE
SCALE: NTS
ASPHALT PAVEMENT DETAILS
6" 4"
COMPACTED,
APPROVED
SUBGRADE
COMPACTED
ROCK
BASE
PCC CONCRETE
PAVEMENT SECTION AS
SPECIFIED
3300 PSI @ 28 DAYS
SCALE: NTS
CONCRETE PAVEMENT DETAILS
2 3
FINISHED GRADE
DUCTILE IRON,
SCHEDULE 40, OR C900
PVC PIPE AND FITTINGS
4"
MIN
4"
MIN
6" M
IN
NOTES
1. TRACER WIRE SHALL
ENTER STRUCTURE AT
PIPE INLET OR OUTLET.
PROVIDE ADEQUATE FREE
WIRE TO EXTEND 24"
ABOVE TOP OF GRATE TO
FACILITATE TESTING. COIL
WIRE AND SECURE WITH
NON-CORROSIVE
FASTENER 2" UNDER
FRAME.
2. LOCATION SPECIFIED ON
PLAN INDICATES CENTER
OF GRATED SECTION OF
BASIN, FACE OF CURB AT
CENTER OF GRATED
SECTION, OR
INTERSECTION BETWEEN
FACE OF CURBS.
3. ALL STRUCTURES SHALL
BE PROVIDED WITH HEAVY
DUTY GRATE WITH
BICYCLE BARS
RIM SET TO
FINISHED
GRADE
STRUCTURE GRATE
SEE NOTE 3
FLEX-TRANSITION
COUPLER
FLEX-TRANSITION
COUPLER
PROJECTED
FLOWLINE AS
INDICATED
ON PLAN
24"
SQUARE
CHAMBER
WITH
SUMP
SET BASIN ON
COMPACTED
CRUSHED ROCK
BASE
HINGED
ACCESS
COVER
PE X PE
EXTENSION
LENGTH
AS
REQUIRED
45° BEND
45° BEND
NOTE: SMALLER AREA DRAINS (AD)
SHOWN IN PEDESTRIAN AREAS ARE
12" SQUARE CHAMBERS WITH SUMP
WHEREAS PAVEMENT AREA CATCH
BASINS (CB) ARE 24" SQUARE
SCALE: NTS
STANDARD CATCH BASIN (CB)
SCALE: NTS
VAULT FOUNDATION DETAILS
6" COMPACTED
ROCK BASE
COMPACTED TRENCH
BACKFILL MATERIAL
FINISHED GRADE
NOTES:
1. DRAIN ROCK - 12" SQUARE BY MINIMUM 12" DEPTH
CENTERED UNDER THE VAULT SUMP DISCHARGE.
VAULT DESIGNED
BY G.C. HS20 RATED
M
IN
ADDENDA ONE
ADDENDA ONE- 06/29/2022
AutoCAD SHX Text
FINISHED GRADE
Adam Polygon
WAP
WAP
WAP
DEMOLITION LEGEND
INDICATES BUILT ITEM TO BE REMOVED
INDICATES LIGHT FIXTURE TO BE REMOVED
INDICATES EXTENT OF ICRA CLASS SCOPE
1. SEE G SERIES SHEETS FOR ALL DEMOLITION NOTES &
HAZARDOUS MATERIAL NOTES
DEMOLITION GENERAL NOTES
CABLE INSTALLATION ROUTE, FIELD VERIFY
CONDITIONS PRIOR TO COMMENCEMENT OF
WORK, SEE TELECOMM DRAWINGS FOR
EXTENT OF WORK
02-26
13-01
DEMO EXISTING GENERATOR
FLUE, PATCH OPENING AND
PREPARE TO RECEIVE NEW
ROOFING
EXISTING ROOFING
Room
Room
Room
Room
108 Room
Room
Room
Room
01-02
TO
B
U
IL
D
IN
G
03-02
02-27
02-31
02-40
02-03
DEMO WALL INFIL, PREPARE TO
RECEIVE NEW LOUVER, COORDINATE
SIZE REQUIRED WITH MECHANICAL
DRAWINGS
GENERATOR
ROOM
B007A
ELECTRICAL
B007
13-01
Room
B003
Room
B006
Room
B001
Room
B002
Room
B004
Room
B005
DEMO EXISTING HOUSEKEEPING PADS, SEE
MECH. DRAWINGS FOR GENERATOR NOTES
02-24
01-02
02-24
02-53
SEE ELECTRICAL DRAWINGS FOR
TRANSFER SWITCH EQUIPMENT
DEMOLITION
DEMO INFILLED WALL SURROUNDING
LOUVER AS NECESSARY TO
REMOVE/SALVAGE THE GENERATOR
AND TURN IT OVER TO THE VA
NORTH
SITE LEGEND
PLAN
NORTH
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V
A M e d ic a l C e n te r
H o t S p ri n g s S
D /2
B
L D
G r2
.r v t
/6
/2
:3
:1
A M
10-AD-201
DEMOLITION FLOOR PLANS
GDM
1000 W STEUBEN STR, UNIT 3
BINGEN,WA 98605
541.436.4723
ADAM GOODIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
HOT SPRINGS, SOUTH DAKOTA
568A4-21-702
Project Director
AHTMP02/23/2022
100% CD FINAL
SOLUTION
ARCHITECTA/E:
FULLY SPRINKLERED
01-02 EXPOSED CABLE TRAY BELOW PLASTER CEILING
02-03 CAREFULLY REMOVE EXISTING DOOR, FRAME AND HARDWARE, RETURN TO
OWNER
02-24 CORE DRILL THROUGH MASONRY WALL AS REQUIRED, PROVIDE OPENING
1/2" LARGER THAN CONDUIT SIZE, SEE TELECOM DRAWINGS FOR CONDUIT
SIZE AND QUANTITES. PATCH AND ACOUSTICALLY SEAL ALL NEW
PENETRATIONS. APPLY APPROPRIATE HILTI FIRE RATED SEAL FOR TYPE OF
PENETRATION AT RATED WALL CONDITION.
02-26 PATCH AND SEAL ALL NEW PENETRATIONS THROUGH PLASTER WALLS,
TYP. LOCATE PENETRATIONS ABOVE ACOUSTIC CEILING TILES WHERE
OCCURS, COORDINATE DATA DROP LOCATIONS WITH TELECOM DRAWINGS
02-27 DEMO EXISTING FLOORING, FLOORING ADHESIVE, AND BASE, PREPARE TO
RECEIVE NEW FINISHES.
02-31 SEE TELECOM PLANS FOR PATH LOCATION, SHOWN HATCHED. CAREFULLY
REMOVE CEILING TILES DURING WORK AND RE-INSTALL AT COMPLETION OF
SHIFT. ALL WORK IN CORRIDORS TO BE CONDUCTED WITHIN CONSTUCTION
CUBE MAINATINING NEGATIVE PRESSURE AND MINIMIZING DIRUPTION OF
CORIDOR CIRCULATION. SEE HAZARDOUS MATERIAL NOTES SHEET
00-GI-003 PREP…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .