36C77621R0040_3.docx
DOCX document 15 KB Posted
- Solicitation number
- 36C77621R0040
About this file
This document provides details for a federal contract opportunity to provide architect-engineering services for infrastructure upgrades at the Hot Springs VA Medical Center in South Dakota. The Department of Veterans Affairs Technology Acquisition Center Austin is seeking a firm to complete design work, including site visits, studies, drawings, specifications, and cost estimates. The project scope involves upgrading electrical and IT infrastructure to support a new electronic health records system, including replacing IT closets and cable trays, installing new data and power outlets, and renovating IT and server rooms. The contract value is estimated at $20.4 million. Interested firms must submit an SF-330 by March 15, 2021 to be evaluated. A minimum of three firms will be shortlisted to provide written responses on project management, challenges, and design approach. The highest rated respondent based on the written responses will be selected for negotiations. The opportunity is fully set aside for Service-Disabled Veteran Owned Small Businesses. The selected firm must complete design work within 147 calendar days of award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW - EHRM Infrastructure Upgrades Hot Springs - Final 2-26-21.pdf | ||
| 36C77621R0040_2.docx | DOCX document | |
| PPQ Hot Springs EHRM - Due 3-15-2021.docx | DOCX document | |
| SOW - EHRM Infrastructure Upgrades Hot Springs - Final 1-28-21.docx | DOCX document | |
| 36C77621R0040.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Opportunity Modification to a Previous Notice
PRODUCT SERVICE CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
BASE NOTICE TYPE
RESPONSE DATE/TIME/ZONE
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field Contract Opportunity Modification to a Previous Notice
C1DA
EHRM Infrastructure Upgrades Design Hot Springs, SD - 568A4-21-702 44131 36C77621R0040 P 03-15-2021
2PM
EASTERN TIME, NEW YORK, USA
N
SDVOSBC
541330 Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence OH 44131 Contract Specialist Jason Phillip jason.phillip@va.gov 216-447-8300 x3498 Hot Springs VAMC 500 North 5th Street Hot Springs SD
57747
USA
http://www.va.gov/2 Department of Veterans Affairs Homepage2 jason.phillip@va.gov Contract Specialist Please provide more direction on the Professional Qualifications for the Discipline of Construction Manager.
Will this person be required to be onsite full-time during construction? No, (note the once per month visit, and Final.)
What proof of Licensure is required for this Discipline? A Professional Construction Manager shall have a CMAA or 15+ years construction management/project management with a four-year degree.
It appears the Fort Meade EHRM Solicitation does not list this requirement but has a similar scope. Hot Springs VA has determined we will need more support than Fort Meade. Budget accordingly.
Per SOW for reference only:
A/E Part Two Services of this design project (also known as Construction Period Services (CPS)) includes responding to construction contractor Requests For Information (RFIs) during the solicitation and construction phases of the construction project, attendance at pre-bid, kick off construction project (on site not required), one (1) site visit per month during construction, and Final to ensure compliance with the design drawings and specifications, preparation of site visit reports, coordination with project commissioning requirements, review of any construction project modifications for cost and technical acceptability, provide independent government cost estimate (IGCE), attendance in the final acceptance inspection, preparation of the punch list and preparation of record drawings of the completed construction project based on the construction contractor’s as-built redlined drawings. The A/E shall prepare a submittal log to be utilized by the VA during construction period services, maintain RFI log, review general contractor meeting minutes for weekly construction meetings throughout the duration of construction. All Part Two Services are optional line items and will not be exercised at the time of award.
8. CHARRETTE KICK-OFF MEETING
The design must begin with meetings with key VA Health Care System (VAHCS), Hot Springs staff and a thorough physical site survey. The A/E firm shall be responsible for site review of the existing facility to field verify the owner’s existing conditions, documents and as-built drawings to complete the design. The A/E shall confirm existing measurements, capacities, elevations, surface and subsurface conditions impacting their design. As Built documents are not to be relied upon. Any modifications that are required to be made as a result of the site review to the As Built shall be communicated to the VA and if determined to be corrected by the A/E firm, shall be completed via a modification. The Design submittals will be developed with VA involvement to assure they are reasonable. Once a SD approach has been selected, the design development (DD) stage begins. All large-scale decisions, i.e. layouts, materials and systems selections, etc., shall be made by the completion of design development. Design shall be complete enough to do a detailed estimate and predict the final bid price with 90% certainty.
The A/E shall present a charrette at Hot Springs VA:
1. A/E Design Team
1. NFPA Life Safety Category for project.
1. The VA Design Guides to be used
1. A general overview and timeline of the process to the stakeholders.
End of Document
File details come from the government source that posted it. Updated .