Puck Dimensions.pdf
PDF 467 KB Posted
- Attached to
- 3650--Automated System Conveyance Integration Federal contract opportunity
- Solicitation number
- 36C77023Q0179
About this file
This performance work statement describes an opportunity for a federal contractor to integrate an automated capping machine into an existing conveyance system at a Department of Veterans Affairs pharmacy facility. Key requirements include connecting a TeDelta rotary capping machine to the existing 100mm conveyor belt system ensuring a footprint of no more than 5 feet by 13 feet 10 inches; integrating inspection, rejection, and notification capabilities; providing electrical and software integration; and ensuring performance of at least 2,000 bottles per hour. The contractor must also deliver engineering drawings, provide on-site installation and training, and warrant all equipment. The performance period is to be determined, with the contractor responsible for quality control and safety compliance throughout.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Capper Exit with Cap Veriification.pdf | ||
| Bridge to Capper- Main Conveyor- Puck Infeed Ramp-Downview.pdf | ||
| Capper Outfeed Line to Main Conveyor.pdf | ||
| Update Puck Dimension.pdf | ||
| Capper Back Side.pdf | ||
| Capper Layout.pdf | ||
| 36C77023Q0179 0002.docx | DOCX document | |
| TEDelta-CAR-103-Redacted-Capper-Drawing-20230306.pdf | ||
| Hines Pucks 2.pdf | ||
| 36C77023Q0179 0001.docx | DOCX document | |
| Hines Pucks.pdf | ||
| 36C77023Q0179.docx | DOCX document | |
| FINAL-Capper integration Install PWS-20230216.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .