36C77023Q0179 0002.docx

DOCX document 27 KB Posted

Attached to
3650--Automated System Conveyance Integration Federal contract opportunity
Solicitation number
36C77023Q0179
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

This document outlines a solicitation for conveyor system integration services at a Department of Veterans Affairs consolidated mail outpatient pharmacy facility. The scope of work involves connecting and integrating a rotary capping machine into the existing conveyor belt system to automate bottle capping. Key requirements include designing and installing a new conveyor section within a specified footprint to interface the capper, integrating inspection and rejection of incorrectly capped bottles, and ensuring a minimum capping rate of 2,000 bottles per hour. The contractor must also integrate safety controls, lighting systems, and software communications. The period of performance is to be determined based on delivery date of the capping machine. The solicitation specifies performance standards, quality control program requirements, deliverables, and general terms such as liability, security protocols, and conduct policies for contractor personnel.

View the file

Other files for this federal contract opportunity

Other files attached to 3650--Automated System Conveyance Integration, newest first.
File Type Posted
Capper Exit with Cap Veriification.pdf PDF
Bridge to Capper- Main Conveyor- Puck Infeed Ramp-Downview.pdf PDF
Capper Outfeed Line to Main Conveyor.pdf PDF
Capper Back Side.pdf PDF
Capper Layout.pdf PDF
Update Puck Dimension.pdf PDF
TEDelta-CAR-103-Redacted-Capper-Drawing-20230306.pdf PDF
Hines Pucks 2.pdf PDF
Hines Pucks.pdf PDF
Puck Dimensions.pdf PDF
36C77023Q0179 0001.docx DOCX document
36C77023Q0179.docx DOCX document
FINAL-Capper integration Install PWS-20230216.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) NCO 15 Contracting Ofc - CMOP 765-23-2-060-0073 36C770 Department of Veterans Affairs NCO 15 Contracting Ofc - CMOP 3450 S. 4th St. Trafficway Leavenworth KS 66048-5012 36C770 Department of Veterans Affairs

NCO

15 Contracting Ofc - CMOP 3450 S. 4th St.

Trafficway Leavenworth KS 66048-5012 To all Offerors/Bidders

36C77023Q0179 03-09-2023

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:

X One( 1) The purpose of this modification is to post additional Q&A and drawing.

Zaritz, Larry Contracting Officer

A.1 QUESTIONS AND ANSWERS:

· The Puck dimensions pdf seems to show the bottle dimension versus the puck dimensions.

Please advise.

· See attached drawing

· Please advise if 3/17/23 is the date the complete bid/proposal is due.

· Yes, extended to March 17th 2023 @ 10:00 am cdt.

A.2 ATTACHED DRAWING:

1) Capper Layout

2) Capper Outfeed Line to Main conveyor

3) Bridge to Capper – Main Conveyor – Puck Infeed Ramp-Downview

4) Back-Side of Capper

5) Capper – exit with Cap Verification

6) Update Puck Dimension

File details come from the government source that posted it. Updated .