This performance work statement outlines requirements for integrating a rotary capper machine into an existing conveyance system at a Department of Veterans Affairs outpatient pharmacy facility. Key requirements include connecting the capper to a 100mm belt conveyor no less than 37 inches or higher than 42 inches above floor level, integrating inspection and rejection capabilities to divert incorrectly capped bottles, and ensuring the integrated footprint does not exceed 5 feet by 13 feet 10 inches. The contractor must provide project management, engineering, installation, configuration, testing, training, and warranty services. Performance standards require handling at least 2,000 bottles per hour, maintaining conveyor operations, and complying with quality control and safety procedures. The contractor must qualify for the work and obtain security credentials to access the facility, following all applicable laws and protocols.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Capper Layout.pdf | ||
| 36C77023Q0179 0002.docx | DOCX document | |
| Update Puck Dimension.pdf | ||
| Capper Exit with Cap Veriification.pdf | ||
| Bridge to Capper- Main Conveyor- Puck Infeed Ramp-Downview.pdf | ||
| Capper Outfeed Line to Main Conveyor.pdf | ||
| Puck Dimensions.pdf | ||
| 36C77023Q0179 0001.docx | DOCX document | |
| Hines Pucks.pdf | ||
| TEDelta-CAR-103-Redacted-Capper-Drawing-20230306.pdf | ||
| Hines Pucks 2.pdf | ||
| FINAL-Capper integration Install PWS-20230216.docx | DOCX document | |
| 36C77023Q0179.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .