This document contains an amendment to a solicitation for fire damper inspection and testing services. Key details include that the solicitation number is 36C26324Q0211 and is seeking quotes from SDVOSB contractors to provide inspection and testing of fire dampers at the Minneapolis VA Health Care System facility located at 1 Veterans Dr., Minneapolis, MN 55417. The period of performance is from January 1, 2024 to June 30, 2024. Technical questions are due by December 20, 2023 and quotes are due by December 22, 2023 and must be emailed to cameron.rick@va.gov. The site visit location has changed and interested vendors must RSVP to attend. Life safety drawings and confined space entry requirements are attached.

View the file

Other files for this federal contract opportunity

Other files attached to Inspect/Test Fire Dampers, newest first.
File Type Posted
36C26324Q0211 0003.pdf PDF
36C26324Q0211 0003.docx DOCX document
70 SOC B Facility (1).pdf PDF
70 SOC 3 Facility (1).pdf PDF
70 SOC 1 Facility (1).pdf PDF
70 SOC 4 Facility (1).pdf PDF
Confined Space Entry.docx DOCX document
70 SOC 2 Facility (1).pdf PDF
36C26324Q0211 0001.pdf PDF
36C26324Q0211.pdf PDF
Fire Damper Testing Checklist.docx DOCX document
Wage Determination - Mpls.pdf PDF
VA Damper Testing 2024 Master Spreadsheet.xls XLS spreadsheet
36C26324Q0211.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 3

36C618

Department of Veterans Affairs Minneapolis VAMC

1 Veterans Dr.

Minneapolis MN 55417 Cameron Rick cameron.rick@va.gov

36C263

Department of Veterans Affairs

NETWORK 23 CONTRACTING OFFICE

316 Robert Street N. STE. 506 St. Paul MN 55101

To all Offerors/Bidders

36C26324Q0211

01-08-2024

X

X X

X 1

The purpose of this amendment is to change the location of the site visit meet-up location and to answer questions asked by interested vendors.

The site visit meet up location is changed to BQ-105. Vendors interested in attending must inform the COR, Tobe Okoro, via email at tobechukwu.okoro@va.gov prior to the site visit of their intent to attend.

Refer to the following pages and attachments for question and answers to questions asked.

There are no other changes to this solicitation. Bids must be submitted by 11:59pm on January 16, 2024.

Michael Casper Contracting Officer

Vendor Questions

1. In Section 2: A-1-o Do you have an outline of a previous plan to build out for the safety plan?

We do not have a previous plan. The contractor is responsible for creating the project-specific safety plan.

o How high are the ceilings that temporary Scaffolding may need to be utilized?

Please attend the site visit as ceiling heights vary. The Contractor shall coordinate with the local COR where required.

2. In Section 2: A-2- Is OSHA 10 or 30 required?

o To work in the VA, Superintendents/Competent Person/Supervisor must have OSHA 30 and Contract Personnel must have OSHA 10.

3. Section 2: A-3- Do you have the confined space policy that is able to be sent for review?

o Yes, see attached.

4. Section 2: B-1 Are the timelines negotiable?

o Contract requirement is that work must be completed within 180 calendar days from date of contract award. Contractor is more than welcome to finish early if possible.

5. Our software can capture all the information on the damper inspections sheet. If all the information on the sheet is provided in the report is the damper sheet also needed to be filled out?

o Yes, for uniformity of reports we must file the damper sheet must also be provided.

6. Can you provide photos of the different types of access categories?

o Easy; Moderate; and Difficult

No, photos cannot be provided currently. Please attend the site visit to determine ease of access.

7. Do you have current Life Safety Plans that can provide the location of each damper?

o Only the life safety drawings can be provided. See attached.

8. Are the dampers labeled on the grids on ceilings?

o Yes

9. Will HEPA cart be required in the facility? Yes o If yes, will the facility be providing the HEPA cart?

The vendor needs to provide their own HEPA cart to use.

o If yes, what percentage of the facility is HEPA cart use required?

Any place that’s in a patient care area.

10. Do you have a copy of your previous damper reports you can provide us?

o No, not at this time.

11. Will our technicians need to be escorted by maintenance personnel at all times?

o The COR will assist with escorts as needed.

12. Will we have the ability to work nights and weekends?

o Yes, with proper coordination with the COR. Majority of work is to be conducted during normal business hours. Overtime work must first be coordinated.

13. What on boarding requirements can we complete prior to arrival to fast track our team and get your project started?

o Have OSHA requirements complete.

See attached document: Confined Space Entry.

See attached document: 70 SOC 1 Facility (1).

See attached document: 70 SOC 2 Facility (1).

See attached document: 70 SOC 3 Facility (1).

See attached document: 70 SOC 4 Facility (1).

See attached document: 70 SOC B Facility (1).

File details come from the government source that posted it. Updated .