This document provides answers to questions regarding a solicitation for fire sprinkler head cleaning services at the VA Loma Linda Health Care System in California. The solicitation seeks semi-annual cleaning of approximately 9,900 sprinkler heads and includes requirements such as the use of HEPA vacuums for cleaning, with some heads potentially requiring off-hour or weekend access. The question and answer period clarifies that containment units will be needed for 20% of heads, compressed air cannot be used, lifts may be needed for some high locations, advanced notice and coordination will be required, and a report documenting cleaning and any non-compliant heads is expected. Licensing requirements apply to the contractor performing the work. Restricted access areas include nine operating rooms, and patient rooms and clinical areas.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02 36C26223Q0495.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
36C262
Department of Veterans Affairs NCO22 Network Contracting New Mexico VA Health Care System 1501 San Pedro Drive SE Albuquerque NM 87108
36C262
Department of Veterans Affairs NCO22 Network Contracting New Mexico VA Health Care System 1501 San Pedro Drive SE Albuquerque NM 87108
To all Offerors/Bidders
36C26223Q0495
02-06-2023
X
The purpose of this amendment is to provide answers to questions.
QUESTIONS AND ANSWERS
Question 1: Does VA Loma Linda require containment units to be used during the scheduled cleaning for all or any for the heads? Please identify counts if yes.
Answer 1: Yes, 20%.
Question 2: If yes, does VA Loma Linda provide containment units for our technicians to use?
Do they assist with setup/ takedown?
Answer 2: No.
Question 3: What percentage of the 9,900 heads will require off hours cleaning? What percentage require weekend cleaning?
Answer 3: 25%. Either off hours or weekend.
Question 4: Can the off hours required for cleaning be billed against the over and above maintenance repair contract once hours are realized?
Answer 4: No.
Question 5: Per NFPA 25 – “it is permitted to clean sprinklers with compressed air or by a vacuum provided that the equipment does not touch the sprinkler.” The RFP suggests using a whip brush to clean the heads – is this something VA Loma Linda is insistent on using despite the code?
Answer 5: At a minimum a hepa vacuum, no compressed air.
Question 6: Can compressed air be used for heads not able to be cleaned by a vacuum?
Answer 6: No.
Question 7: Are there any sprinkler head locations that require a lift or ladder taller than 12ft? If yes, how many?
Answer 7: Yes, auditorium.
Question 8: Can the VA Loma Linda confirm there is no above ceiling work required?
Answer 8: No interstitial work.
Question 9: Are there any special permits required by the hospital or AHJ to if necessary to go above ceiling?
Answer 9: No above ceiling work.
Question 10: Can we get plans showing specifically which areas need to be done after hours?
Answer 10: Yes.
Question 11: Are we only cleaning heads at the ceilings, or will we include sprinklers in areas where there is exposed pipe?
Answer 11: Just sprinkler heads.
Question 12: Is there a limit to the size of the crew we can have working at any one time?
Answer 12: No.
Question 13: What can we expect as far as accessibility to all areas and all rooms as we move through the building?
Answer 13: There will be times when a crew will have to leave and return to an area. Patient Care is priority.
Question 14: What will be the procedure for gaining access through locked doors?
Answer 14: VA escort.
Question 15: Will we need to provide advanced notice to occupants of various offices, work spaces, etc.?
Answer 15: Yes.
Question 16: Can you provide a copy of the site visit sign in sheet please?
Answer 16: No.
Question 17: Can all of the work be performed after hours to minimize intrusion/obstructions to patients or staff?
Answer 17: No.
Question 18: The solicitation states under Vl. Licensing Requirements that the "OFFEROR" must have the following:
• 30-hour Occupational Safety and Health Administration (OSHA) safety card.
• C-36 Plumbing Contractor License
• C-16 Fire Protection Contractor License Can you clarify if this pertains to the GC or the Sub Contractors doing the work?
Answer 18: The contractor performing the work.
Question 19: How many buildings are on the campus that will need to be cleaned? Do you have a campus map?
Answer 19: Main Hospital only.
Question 20: What is the accessibility to each building? I assume we can get into most of the buildings during business hours—but the hospital may have areas that need to be done before/after business hours. Can you give me an idea of ‘restricted’ rooms, such as OR’s (how many are there)—patient rooms, clinical areas etc.
Answer 20: Nine (9) OR’s.
Question 21: Are there buildings that will require a man-lift in order to reach the heads to be cleaned?
Answer 21: Yes.
Question 22: Can you be more specific as to what your ‘report documenting the cleaning of the sprinkler heads and fire sprinklers not in compliance’ should look like? Are we only stating that each building had all sprinkler heads cleaned and found XYZ heads to be out of compliance, therefore need to be replaced? How granular does the report need to be? You will provide the report by area, i.e., 2SW, 2NE Answer 22: To be determined by COR.
Question 23: Can you explain CLN 0002 Emergency/over & above maintenance/repairs? a.III.
Objectives states: i. Contractor shall prepare an estimate for the fire sprinklers heads/escutcheons needing to be repaired, added, adjusted, or replaced. If we are preparing a quote for repairs, then what is CLN 0002 asking for?
Answer 23: This line items is as needed basis; nothing is required at this time.