Drawing_UG Emergency Potable Water Tanks.pdf

PDF 6 MB Posted

Attached to
N045 - Water Monitoring System Installation
Solicitation number
36C26222Q0043
Issued by

About this file

This document is a solicitation for a commercial services contract issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22. The solicitation seeks a contractor to perform installation of water monitoring sensors at the VA Loma Linda Healthcare System located in Loma Linda, California. Services required include installing new water auto-monitoring systems, sensors, adjustments, testing and validation in five buildings. The contractor must also install two water monitoring sensors on the underground storage tank, replace an existing monitoring system, install related networking and programming, and provide a one-year warranty on labor and parts. The period of performance is 90 days. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses and quotes are due by November 18, 2021. Award will be made based on price to the responsible offeror submitting the most advantageous quote meeting requirements.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

262-15-B-1061

19 FEBRUARY 2016

2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.com

2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

REPAIR UNDERGROUND

POTABLE WATER TANKS

Office of Construction and Facilities Management

GLHN Project # 15107.00

LOMA LINDA, CA

100% SUBMITTAL DOCUMENTS

FULLY SPRINKLED

COVER SHEET

G001

AMMMH 01

LOCATION MAPF2 NTS

AREA OF WORK

CIVIL GENERAL NOTES

CI001

MJEJCM 2

FIRE PROTECTION:

PROTECTION OF EXISTING FACILITIES:

SURFACING REPAIRS:TRAFFIC CONTROL NOTES:PROTECTION OF EXISTING TREES AND SHRUBS:GENERAL NOTES:

PROTECTION OF EXISTING UTILITIES:

ADJUSTMENT OF VALVE BOXES, FRAMES, AND COVERS:

CIVIL PLAN ABBREVIATIONS

AND SYMBOLS

CI002

MJEJCM 3

LIST OF ABBREVIATIONS PLAN SYMBOLS

G

F.F.E.

T P

25'

IR

C

BOOSTER PUMP

ROOM

BLDG. S-1

MECHANICAL

ROOM

BL

D

G . S

-1

SH

IP

PI

N G

A N

D R

EC

IE

V

IN

G

LO

A

D

IN

G D

O C

K

EMERGENCY

GENERATOR

BUILDING

BLDG. S-45

SOUTH PARKING

STRUCTURE

BLDG. S-31

COOLING

BUILDING

EXISTING SITE AND DEMOLITION PLAN

CS101

MJEJCM 4

EXISTING SITE AND DEMOLITION PLAN1

DEMOLITION KEYNOTES

SOUTHEAST

PARKING LOT

SHIPPING AND RECEIVING

ACCESS DRIVE

EXISTING SURVEY NOTE:

1. THE DESIGN FOR THIS PROJECT WAS BASED ON THE SURVEY PROVIDED BY THE CONTRACTOR

(D-SQUARE CONSTRUCTION, LLC) ON NOVEMBER 5, 2015. ALL DISCREPANCIES FOUND

DURING CONSTRUCTION SHALL BE BROUGHT TO THE ATTENTION OF THE COTR AND ENGINEER.

2. THE ABOVE NOTED SURVEY WAS MODIFIED BY THE CONTRACTOR ON DECEMBER 17, 2015.

CONTRACTOR VERIFIED BOOSTER PUMP SUMP DEPTH, SURVEY SUMP DEPTH MODIFIED FROM

ELEVATION 1132.34, TO VERIFIED ELEVATION 1136.38. THIS MODIFICATION ALSO INCLUDES THE

ADDITION OF BOOSTER SUMP MANHOLE RIM ELEVATION 1152.03.

BLDG. S-1

MECHANICAL

ROOM

BL

D

G . S

-1

SH

IP

PI

N G

A N

D R

EC

IE

V

IN

G

LO

A

D

IN

G D

O C

K

EMERGENCY

GENERATOR

BUILDING

BLDG. S-45

SOUTH PARKING

STRUCTURE

SURFACE RESTORATION SITE PLAN

CS201

MJEJCM 5

SURFACE RESTORATION SITE PLAN1

SURFACE RESTORATION KEYNOTES

SURFACE RESTORATION DETAILS

CS301

MJEJCM 6

C1 CONCRETE SIDEWALK DETAIL

N.T.S. C3 NOT USED

N.T.S. C6 CONCRETE PAVEMENT REPAIR DETAIL

N.T.S. C8 NEW A.C. AND PCC PAVEMENT SECTIONS

N.T.S.

F1 CONCRETE CURB DETAIL

N.T.S. F6 LANDSCAPE REPAIR DETAIL

N.T.S. F8 TREE PROTECTION DETAIL

N.T.S.

CONTRACTOR SHALL REMOVE EXISTING SIDEWALK

TO THE NEAREST JOINT THAT WILL PROVIDE FOR A

SMOOTH TRANSITION FROM NEW SIDEWALK TO

EXISTING SIDEWALK. IF THIS JOINT IS A SCORED

JOINT, THE CONTRACTOR SHALL SAWCUT TO THE

FULL DEPTH OF CONCRETE.

1. EXPANSION JOINTS SHALL BE SPACED AT 60' MAXIMUM IN NEW SIDEWALKS.

2. EXPANSION JOINTS SHALL BE LOCATED WHERE SIDEWALK ABUTS CONCRETE

DRIVEWAYS, CURBS, OR OTHER ADJACENT STRUCTURES.

3. 1" DEEP CONTRACTION JOINTS SHALL BE PLACED AT INTERVALS OF

APPROXIMATELY 15' OR AT A SPACING THAT MATCHES THE ADJACENT CURB,

AS APPLICABLE.

4. SCORED JOINTS SHALL BE 1/4" DEEP AND PLACED AT THE SPACING

INDICATED FOR THE WIDTH OF SIDEWALK OR MATCH SCORED JOINT PATTERN

OF ADJACENT CURB, AS APPLICABLE.

5. CONCRETE SHALL BE FINISHED BY MEANS OF A FLOAT, STEEL TROWEL, AND

BROOM WITH A FINE BRUSH IN A TRANSVERSE DIRECTION.

4"

EXISTING CONCRETE

SIDEWALK3000 PSI

CONCRETE

EXPANSION JOINT WITH 1

2 "

BITUMINOUS JOINT FILLER,

FULL DEPTH OF CONCRETE

M

IN

1" SCORED OR SAWCUT

CONTRACTION JOINT

4"

3 16

4"R @ FORMED

JOINTS, (TYP.) 1

4" R SCORED

JOINT

3000 PSI

CONCRETE EXPANSION JOINT WITH 1

2"

BITUMINOUS JOINT FILLER

M

IN

NEW CONCRETE

SIDEWALK

SECTION

MATCH NEW TO EXISTING

SECTION

NEW CONCRETE SIDEWALK

EXPANSION/SCORED JOINTS

NOTES:

SAW CUT EXISTING

CONCRETE FULL DEPTH,

BOTH SIDES

NEW ABC, 4" MIN. THICKNESS OR

MATCH THICKNESS OF EXISTING

GRANULAR BASE COURSE MATERIALS

(EXISTING ABC & SELECT THICKNESS)

EXISTING CONCRETE

PAVEMENT

EXISTING GRANULAR

MATERIAL (ABC)TRENCH

BACKFILL

1/2" BITUMINOUS

EXPANSION JOINT,

TYP, BOTH SIDES

NEW CONCRETE PAVEMENT, 6" (MIN.)

THICKNESS PER DETAIL C8, THIS SHEET,

OR MATCH THICKNESS OF EXISTING

PAVEMENT, WHICHEVER IS GREATER

NEW DOWELS,

AS NECESSARY,

TYP, SEE NOTES.

REFER TO DETAIL C1,

SHEET CU501

6" M

IN

1. BACKFILL COMPACTION REQUIREMENTS SHALL BE PER SPECIFICATIONS.

2. ABC SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS.

3. PORTLAND CEMENT CONC. (PCC) SHALL BE IN ACCORDANCE WITH SPEC'S.

4. LOAD TRANSFER DOWELS FOR JOINTS TRANSVERSE TO THE

ROADWAY/DRIVEWAY CENTERLINE SHALL BE SMOOTH STEEL DOWELS IN

ACCORDANCE WITH THE SPECIFICATIONS. DOWELS SHALL BE SIZED AND

SPACED AS FOLLOWS:

5. DEFORMED TIE BARS SHALL BE USED IN TRENCH PATCHES LONGITUDINAL TO

THE ROADWAY/DRIVEWAY CENTERLINE WHEN THE TRENCH LENGTH IS

GREATER THAN 50 FEET. TIE BARS SHALL BE 2'-0" LONG. DEFORMED #5 BARS

FOR PCC LESS THAN 8" THICK AND #6 BARS IF 8" THICK OR MORE. TIE BARS

SHALL BE PLACED 30" CENTER-TO-CENTER.

6. HOLES SHALL BE DRILLED 12" INTO THE EXISTING SLAB FOR TIE BARS AND

DOWELS. HOLES SHALL BE OF A DIAMETER SUFFICIENT TO ACCOMMODATE

THE TIE BAR ANCHORAGE OR DOWEL CAP. TIE BARS SHALL BE ANCHORED

WITH AN APPROVED HIGH VISCOSITY EPOXY.

7. IF THE CONCRETE SLAB REMAINING NEXT TO A LONGITUDINAL OR

TRANSVERSE JOINT IS LESS THAN 6'-0" AT ITS NARROWEST WIDTH, REMOVE

AND REPLACE THE EXISTING CONCRETE TO THE JOINT.

PCC

THICKNESS

6"

DOWEL

SIZE

#6

DOWEL

LENGTH

18"

DOWEL

SPACING

12"

NOTES:

SECTION

6" THICK PCC,

3000 PSI (MIN.)

SUBGRADE COMPACTED

TO A MIN. 95% OF ASTM

D-698

6"

4" 4" ABC,

COMPACT TO 100%

PER ASTM D-698

PCC SECTION

CONTRACTOR SHALL REMOVE EXISTING CURB

PER PLAN, THE CONTRACTOR SHALL SAWCUT TO

THE FULL DEPTH OF CONCRETE CURB SECTION

EXISTING CONCRETE

TOP OF CURB

3000 PSI

CONCRETE

1/2" BITUMINOUS

JOINT FILLER

NEW CONCRETE

TOP OF CURB

SECTION

MATCH NEW TO EXISTING

1. IF AN EXISTING EXPANSION JOINT IS 1' OR LESS FROM THE

DIMENSIONED JOINT, REMOVE EXISTING CURB TO THE

EXISTING EXPANSION JOINT IN LIEU OF THE SAW CUT.

NOTES:

EXISTING CONCRETE

CURB GUTTER LINE

NEW CONCRETE

CURB GUTTER LINE

B8 MATCH NEW TO EXISTING CURB DETAIL

N.T.S.

SEE NOTE 2.

TREES AND SHRUBS SCHEDULED FOR

REMOVAL SHALL BE PLACED IN SUITABLE

CONTAINERS AND MAINTAINED IN A

HEALTHY CONDITION.

INORGANIC SURFACING:

REMOVE, SALVAGE, AND REINSTALL,

MATCH EXISTING COLOR AND

GRADATION OF ROCK.

FOR TREES AND SHRUBS TO BE

REMOVED AND REPLANTED,

PREPARE TREE WELL AS SPECIFIED.

RAKED EARTH AREAS SHALL BE GRADED

AND RAKED SMOOTH, FREE OF STONES

AND DEBRIS, MATCHING EXISTING

CONDITIONS AND CONTOURS.

SALVAGE AND REINSTALL 8" MINIMUM

OF TOP SOIL/SOD IN TURF AREAS.

FIELD LOCATE ALL IRRIGATION SYSTEMS,

PROTECT IN PLACE. REPLACE ALL

PORTIONS OF THE SYSTEM DAMAGED

BY CONSTRUCTION. READJUST HEADS

AS REQUIRED BY THE OWNER.

REINSTATE ALL LAND FORMS, BERMS, ETC.,

TO MATCH EXISTING CONDITIONS.

PROTECT TREE CANOPY, IF A TREE

REQUIRES PRUNING, IT SHALL ONLY

BE PRUNED BY THE OWNER.

COORDINATE WITH THE OWNER'S

CONSTRUCTION PROJECT MANAGER.

NOTES:

1. TREES WITHIN 2' OF THE TRENCH SHALL BE REMOVED AND REPLANTED. TREES

WITHIN 6' OF THE TRENCH SHALL BE BRACED ON THREE SIDES AT ALL TIMES

THAT THE TRENCH IS OPEN.

2. IN TURF AREAS, CUT EXISTING TURF WITHIN THE CONSTRUCTION AREAS,

MAINTAIN IN A HEALTHY CONDITION AND RE-SOD. ADDITIONAL SOD MAY

BE OBTAINED FROM AN OUTSIDE SOURCE, IF APPROVED BY THE OWNER.

3. DAMAGED IRRIGATION FACILITIES SHALL BE REPLACED OR REPAIRED AS

DIRECTED BY THE OWNER'S REPRESENTATIVES. VARIABLE SIZE

TO DRIP LINE

ALTERNATE FENCE

LOCATION BENEATH TREE

CANOPY ONLY IN LIMITED

CONSTRUCTION AREAS

WHERE DRIP LINE EXTENDS BEYOND

CURB LINE OR SIDEWALK, INSTALL

FENCE 1' BEHIND CURB LINE/SIDEWALK

A

PLAN VIEW

A

CURB LINE OR SIDEWALK,

WHERE APPLICABLE

TEMPORARY CHAIN

LINK FENCE

SECTION A-A

FENCE POSTS AT

10' O.C. MAX.

TEMPORARY 7' HIGH

CHAIN LINK FENCE

PANELS

TREE TRUNK

TREE TRUNK

CENTERLINE

66% MIN.

OF CANOPY

RADIUS

1. ALL CONCRETE CURBS AND TRANSITIONS SHALL HAVE A MIN. COMPRESSIVE STRENGTH OF 3000 PSI.

2. MAXIMUM SPACING ON SCORED JOINTS SHALL BE 15'.

3. ONE HALF INCH THICK EXPANSION JOINTS SHALL BE LOCATED AT TANGENT POINTS IN CURB RETURNS, TRANSITIONS, AND AT A MAXIMUM OF 60 FT. INTERVALS. EXPANSION MATERIAL SHALL ALSO BE

PLACED BETWEEN CURBS AND ADJACENT STRUCTURES, SIDEWALKS, DRIVEWAYS AND HANDICAP

RAMPS. THE 1/2" JOINT FILLER SHALL EXTEND THE FULL DEPTH OF THE CONCRETE.

4. CONCRETE SHALL BE FINISHED WITH A STEEL TROWEL FOLLOWED BY BRUSHING WITH A FINE BRUSH

ALONG THE LENGTH OF THE CURB.

5. CURB MAY BE CONSTRUCTED BY THE USE OF FORMS OR THE CONCRETE MAY BE EXTRUDED.

6. ALL EXPOSED EDGES AND HAND TOOLED JOINTS SHALL BE FINISHED WITH A TOOL HAVING A 1/4 -

INCH RADIUS UNLESS A LARGER RADIUS IS INDICATED.

NEW/EXISTING PAVEMENT,

REFER TO DETAILS C8, THIS SHEET,

AND SPECIFICATIONS

"H" = DESIGN REVEAL

(6" MIN.)

FOR REVEALS OF

8" TO 10"

FOR REVEALS OF

6" TO LESS THAN 8"

1"R

6"

CURB FACE

8 "

NOTES:

VERTICAL CURB VERTICAL CURB AND GUTTER

NEW/EXISTING PAVEMENT,

REFER TO DETAILS C8, THIS SHEET,

AND SPECIFICATIONS

"H" = DESIGN REVEAL

(6" MIN.)

1" CURB BATTER OR

MATCH EXISITNG

FOR REVEALS OF

8" TO 10"

FOR REVEALS OF

6" TO LESS THAN 8"

1"R

6"

"H

CURB FACE

2" THICK ASPHALTIC

CONCRETE OR MATCH

EXISTING THICKNESS,

WHICHEVER IS GREATER

SUBGRADE COMPACTED

TO A MIN. 95% OF ASTM

D-698

2" 6"

M

IN

A.C. SECTION

6" MINIMUM ABC OR

MATCH EXISTING,

WHICHEVER IS GREATER,

COMPACT TO 100% PER

ASTM D-698

M

IN

BITUMINOUS SURFACE TREATMENT

(CHIPSEAL) REQUIRED ONLY FOR

LONGITUDINAL TRENCHES WIDTH

WIDTHS GREATER THAN 6'.

18" MIN.

MATCH EXISTING

GUTTER

1"R

MIN.

1" CURB BATTER OR

MATCH EXISITNG

"H

INSTALL 6" x 6" #10

WELDED WIRE MESH

#6 REBAR PER CALTRANS

STANDARD PLAN RSP P4

BLDG. S-1

MECHANICAL

ROOM

BL

D G

. S -1

SH

IP

PI

N

G A

N D

R

EC

IE

V

IN

G

LO

A

D

IN

G D

O C

K

EMERGENCY

GENERATOR

BUILDING

BLDG. S-45

SOUTH PARKING

STRUCTURE

UTILITY SITE PLAN

CU101

MJEJCM 7

UTILITY SITE PLAN1

NEW CONSTRUCTION KEYNOTES

2 222

15 15

UTILITY DETAILS

CU501

MJEJCM 8

C1 NEW BLADDER TANK PAD DETAIL

N.T.S.

F1 BRINE TRANSFER PUMP STATION

DEMOLITION DETAIL N.T.S.

C4 12" BUTTERFLY TANK VALVE

REMOVAL DETAIL N.T.S.

H.W.L.

8.

.0

0'

6"

24"

REMOVE EXISTING

12" BUTTERFLY VALVE

EXISTING

12" PIPE

REMOVE EXISTING OPERATOR

EXTENSION AND MOUNTING

HARDWARE

REMOVE EXISTING

OPERATOR AND

MOUNTING HARDWARE

EXISTING CONCRETE

WATER STORAGE TANKS

H.W.L.

8.

'10 .0

0'

EXISTING

12" PIPE

EXISTING

CONCRETE WATER

STORAGE TANKS

EXISTING CONCRETE

TANK PIT

EXISTING 12" PIPE TO

BOOSTER SUMP TANK

NEW VALVE NUT AND

VALVE BOX EXTENSION,

REFER TO DETAIL C6,

SHEET CU502.

NEW VALVE BOX AND COVER, CHRISTY,

"G5 BOX" TRAFFIC VALVE BOX, OR

APPROVED EQUAL, REFER TO DETAIL C3

AND C8, SHEET CU502.

STORAGE TANK SECTION

SECTION

C8 NEW 12" GATE VALVE DETAIL

N.T.S.

EXISTING CONCRETE

PAVEMENT

EXISTING CONCRETE

PAVEMENT

EXISTING SECTION

3' -6

EXISTING

GRADE

RIM 1157.27

EXISTING CURB

AND GUTTER

EXISTING CONCRETE

BASE

NEW 12" BLIND FLANGE

ON STUB-OUT

NEW 12" x 12" TEE

DEMOLISH AND REMOVE

EXISTING CONCRETE PAD

REMOVE AND SALVAGE PUMPS

AND EXISTING STEEL PUMP BASE,

CUT AND REMOVE EXISTING PVC

PIPING.

REMOVE AND SALVAGE

EXISTING STEEL COVER

AND VERTICAL SUPPORTS

REMOVE AND SALVAGE

EXISTING ELECTRICAL STEEL

RACK AND EQUIPMENT

1. POST BARRICADES SHALL BE PRIMED AND PAINTED COLOR SELECTED BY

THE COTR.

2. STRIPES CONSISTING OF 4" BANDS OF YELLOW REFLECTORIZED TAPE SHALL

BE USED UNLESS OTHERWISE DIRECTED BY COTR.

BARRICADE CONCRETE FILLED

4" REFLECTORIZED TAPE

BANDS, 5 EACH

3,000 PSI

CONCRETE

F8 POST BARRICADE DETAIL

N.T.S.

NOTES:

EXISTING TOP OF VERTICAL

CURB AND GUTTER

EXISTING CURB

GUTTER

SECTION

RIM 1157.27

NEW 1" UGE CONDUITS (2-EACH),

INSTALL PRIOR TO PLACING NEW

CONCRETE PAD

RE-INSTALL SALVAGED STEEL COVER,

PROVIDE CONCRETE BASE FOR

SOUTH VERTICAL SUPPORTS

NEW POST BARRICADES (2 EACH)

REFER TO DETAIL F8, THIS SHEET.

DISCONNECT AND REMOVE

EXISTING ELECTRICAL SERVICE

AND CONDUIT

DISCONNECT AND REMOVE

EXISTING BRINE PUMP PVC PIPING

TOP EXISTING WATER

STORAGE TANK

TOP EXISTING WATER

STORAGE TANK,

12"4'-0"

6" 6"

4"

EXISTING

MANHOLE

EXISTING

MANHOLE

2"

6"

RE-INSTALL SALVAGED ELECTRICAL

RACK AND EQUIPMENT

RE-INSTALL SALVAGED STEEL PUMP

BASE , NEW PUMPS, AND PIPING,

REFER TO MECHANICAL PLANS

MATCH EXISTING TOP OF PAD ELEVATION,

CONSTRUCT NEW, 3000 PSI, CAST-IN-PLACE

CONCRETE PAD.

5'-0"

5'-10"

5"5"

4" 4"

3' -4

12"

MIN.

7' -0

TOP OF NEW CAST-IN-PLACE

CONCRETE PUMP PAD

3"

4'-0"

6"

2' -0

4"

1' -8

10"

MIN.

10"

MIN.

10"

MIN.

10"

MIN.

6"

5'-10"

6"

#4 BARS @ 12" O.C.

MAX., EACH WAY

#4 BARS @ 12" O.C.

MAX., EACH WAY

3" 3"

4" ABC,

COMPACT TO 100%

PER ASTM D-698

3,000 PSI

CONCRETE

PAD CROSS SECTION

(NORTH-SOUTH)

PAD CROSS SECTION

(EAST-WEST)

F4 BRINE TRANSFER PUMP STATION

NEW CONCRETE PAD DETAIL N.T.S.

PLAN

SECTION A-A

#5 TOP BARS AND

#4 BOTTOM BARS

@ 12" O.C. MAX.,

EACH WAY

DRILL 3" EMBED,

EPOXY AND GROUT #4 BENT

BAR DOWELS @ 12" O.C. MAX.,

EACH WAY, INTO EXISTING

FLOOR SLAB

2 1

2" CLEAR,

TYPICAL

TOOLED EDGE,

WHERE EXPOSED

6'- 0"

6'

- 0

EXISTING BOOSTER

PUMP ROOM WEST

WALL

EXISTING BOOSTER

TANK BELOW

EXIST. BOOSTER PUMP

ROOM SOUTH WALL

PROVIDE SEISMIC LEGS,

3-EACH, PER TANK SUPPLIER

2 1

2" CLEAR,

TYPICAL

2" EXPANSION JOINT

AGAINST EXIST. WALLS

SECTION B-B

TOP OF EXISTING

BOOSTER TANK,

EL. 1152.03

DRILL 3" EMBED,

EPOXY AND GROUT #4 BENT

BAR DOWELS @ 12" O.C. MAX.,

EACH WAY, INTO TOP OF

EXISTING FLOOR SLAB

2 1

2" CLEAR,

TYPICAL

TOOLED EDGE,

WHERE EXPOSED

2 1

2" CLEAR,

TYPICAL

2" EXPANSION JOINT

AGAINST EXIST. WALLS

6'- 0"

WEST

WALL

SOUTH

WALL

6'- 0"

8"

TOP OF EXISTING

FLOOR SLAB,

#5 TOP BARS

@ 12" O.C. MAX.,

EACH WAY

#4 BOTTOM BARS

@ 12" O.C. MAX.,

EACH WAY

HT

TANK: 60" DIA.

STAND: 54" DIA.

TOP OF EXISTING

FLOOR SLAB,

EXIST. BOOSTER TANK

ACCESS MANHOLE

RE-ESTABLISH MANHOLE

COVER WATERTIGHT SEAL

RE-ESTABLISH MANHOLE

COVER WATERTIGHT SEAL

RE-ESTABLISH MANHOLE

COVER WATERTIGHT SEAL

RE-ESTABLISH MANHOLE

COVER WATERTIGHT SEAL

REMOVE EXISTING LADDER RUNGS AND

REPLACE IN KIND, REFER TO COATING

MANUFACTURER'S RECOMMENDATIONS

TO COAT RUNG PENETRATIONSEXISTING

CONCRETE WATER

STORAGE TANKS

(P

ER

A S-

BU

IL

TS

(P

ER

A S-

BU

IL

TS

EXISTING WALL PENETRATION COATING,

REFER TO DETAIL F7, SHEET CU503

EXISTING MANHOLE COATING,

REFER TO DETAIL F7, SHEET CU503

NEW TANK COATING,

REFER TO DETAILS,

SHEET CU503

NEW TANK COATING,

REFER TO DETAILS,

SHEET CU503

EXISTING WALL PENETRATION COATING,

REFER TO DETAIL F7, SHEET CU503

TOP 1155.51

EXISTING

CONCRETE

BOOSTER SUMP PIT

FF 1151.50 MH RIM

1152.03

FLOOR

EL. 1136.38

RE-ESTABLISH MH

COVER WATERTIGHT

SEAL

NEW TANK COATING,

REFER TO DETAILS,

SHEET CU503

NEW 12" RESILIENT WEDGE GATE VALVE,

FL.x FL., MUELLER CO., CAT. No. A-2361-6, OR APPROVED EQUAL.

REFER TO DETAIL C1, CU502.

NEW 12" FLANGED COUPLING ADAPTER,

ROMAC, STYLE "FCA501", OR APPROVED

EQUAL, TYPICAL BOTH SIDES OF

CONNECTION TO EXISTING PIPE.

EXISTING

12" PIPE

EXISTING WALL PENETRATION COATING,

REFER TO DETAIL F7, SHEET CU503

EXISTING MANHOLE COATING,

REFER TO DETAIL F7, SHEET CU503

BOOSTER SUMP PIT SECTION

UTILITY DETAILS

CU502

MJEJCM 9

C1 GATE VALVE INSTALLATION DETAIL

N.T.S.

PVC VALVE BOX RISER,

REFER TO DETAIL C3, THIS SHEET

1. WRAP VALVE, ACTUATOR, AND MECHANICAL CONNECTION

IN POLYETHYLENE PRIOR TO PLACING CONCRETE.

2. NO CONCRETE SHALL BE IN DIRECT CONTACT WITH THE

MECHANICAL JOINTS IN PIPING AND APPURTENANCES.

BEDDING

MATERIAL

MJ STYLE JOINT EXCEPT AT

TAPPING SLEEVES AND TEES

GATE VALVE

VALVE NUT EXTENSION,

REFER TO DETAIL C6, THIS SHEET

PLAN VIEW

CONCRETE VALVE SEAT,

3000 PSI CONCRETE

4" M

IN

.6" MIN.

"X"

"X" + 4"

MIN.

ELEVATION

NOTES:

TR

EN

C H

6" M

IN

6" M

IN

4" M

IN

4" M

IN

NEW

PIPE

VALVE NUT EXTENSION,

REFER TO DETAIL C6, THIS

SHEET, IF REQUIRED

1. ATTACH DETECTOR WIRE TO OUTSIDE OF RISER, AND RUN BETWEEN

RISER AND C.I. FRAME, COIL 36" OF WIRE BELOW COVER, OUTSIDE OF

ALIGNMENT OF ACTUATOR NUT. INSURE INSULATION IS NOT DAMAGED

WHEN INSTALLING WIRE BETWEEN FRAME AND RISER.

2. OMIT CONCRETE COLLAR IF NEW VALVE BOX IS LOCATED IN

CONCRETE PAVEMENT. CONCRETE PAVEMENT SHALL BE PLACED

AGAINST VALVE BOX.

TOP OF RISER PIPE SHALL BE 3" ABOVE

BOTTOM OF C.I. VALVE BOX FRAME

REFER TO VALVE INSTALLATION

DETAIL C1, THIS SHEET

NEW PIPE

6" PVC (C900)RISER PIPE,

BACKFILL AND COMPACT AROUND RISER

WITH BEDDING AND SHADING MATERIALS

CAST IRON VALVE BOX FRAME

AND COVER, REFER TO DETAIL C8,

THIS SHEET

CONCRETE COLLAR,

3000 PSI CONCRETE,

REFER TO NOTE 2.

DETECTOR WIRE , STUB UP

AT ALL VALVES, REFER TO

NOTE 1, BELOW

WATER TIGHT WIRE

CONNECTION

FINISH GRADE,

UNPAVED

1"

FINISH GRADE,

PAVED

8" M

IN

2% 2%

3"

4"

NOTES:

24" SQUARE

GATE VALVE

2" COMPRESSIBLE FILLER,

DO NOT PLACE RISER DIRECTLY

ON VALVE

DETECTOR WIRE , BANDED

TO TOP OF PIPE PER

SPECIFICATIONS

NEW

PIPE

NEW

PIPE

C3 VALVE BOX DETAIL

N.T.S. C6 VALVE NUT EXTENSION DETAIL

N.T.S. C8 WATER VALVE BOX AND COVER DETAIL

N.T.S.

2" SQUARE

OPERATOR NUT

STABILIZING

DISC & COLLAR

CAST IRON VALVE BOX FRAME AND COVER,

REFER TO DETAIL C8, THIS SHEET

6" PVC (C900) RISER PIPE,

REFER TO DETAIL C3, THIS SHEET

VALVE NUT EXTENSION REQUIRED

ON ALL INSTALLATIONS WHERE THE

TOP OF THE VALVE OPERATING NUT

IS 4' OR MORE BELOW FINISH GRADE.

" M

A X.

1. VALVE NUT EXTENSION (DISC, COLLAR, AND 2" SQUARE NUT) SHALL ALL

BE CENTERED VERTICALLY OVER THE VALVE OPERATOR NUT.

2. INSTALL VALVE NUT EXTENSION AT ALL LOCATIONS WHERE THE TOP OF

THE VALVE NUT IS 4' OR GREATER BELOW FINISH GRADE.

3. ASSEMBLY SHALL BE FULLY WELDED CONSTRUCTION.

VALVE OPERATOR

NUT

GATE VALVE

VALVE ACTUATOR

SQUARE SOCKET,

SIZED TO FIT VALVE OPERATOR NUT

NOTES:

" M

IN

6" V

A

RI

ES

3"

1"

7" DIA.

V

A L

V

E 4"

1. ALL MATERIAL SHALL BE CAST IRON PER ASTM A-48, CLASS 30B.

2. WATER VALVE BOX SHALL BE INSTALLED PER DETAIL C3, THIS SHEET.

3. THE SURFACES OF THE COVER AND BOX WHICH COME IN CONTACT

WITH EACH OTHER MUST BE SMOOTH AND FREE OF ALL CASTING

RIDGES AND BURRS TO PROVIDE A SNUG FIT.

4. •• • •• • • • • •• • • •• • • •• • • • • •• • •• • •• • •• • • • • • •• • •• • • • • • •••••••••••••••••••••••••••••••••••••••••••••••••••

5. •• • •• • • • • •• • • •• • • • • •• • • • • •• • •• •• •• • • •••• ••• • •• • • •• • • ••• • • • • • • • • • • • • • • • • • • • • • • • •

WITHOUT BINDING.

R

E T

A

W

NOTES:

COVER PLAN VIEW

4" LETTERS,

RAISED 1

8" (TYP.)

PICK HOLE

4"

1 1 2"

7 1 4"

BOX SECTION

8 3

4" DIA.

7 3 8"1

2" 1 2"

16" MAX.

8" 5

8"

7 1 8"

SECTION A-A SECTION B-B

8" 1 2"1 8"

7 1

4" DIA.

8" 2

8"

7 3 8"

9 7

8" DIA.

1 1 4 " 1 1

4 "

4 "

8"

8"

PICK HOLE

8"

8"

4 "

4 "

2"

1 2"

4" M

IN

6" PVC RISER,

REFER TO DETAIL C3,

THIS SHEET

VALVE COVERS SHALL BE PAINTED

PER VA REQUIREMENTS.MIN.

"B

M A

X.

M

IN

"C"

BEDDING

MATERIAL

"D"

"E"

"E

12"

"B

"A"

1. PORTLAND CEMENT CONCRETE THRUST BLOCKS SHALL BE PLACED

AGAINST UNDISTURBED EARTH. WHERE IT IS NOT PRACTICAL TO

PLACE THE CONCRETE THRUST BLOCK AGAINST UNDISTURBED

EARTH, THE FILL MATERIAL PLACED BETWEEN THE PIPE'S BEARING

SURFACE AND THE UNDISTURBED SOIL SHALL BE COMPACTED TO

A MINIMUM OF 95% OF THE MAXIMUM DENSITY AS DETERMINED IN

ACCORDANCE WITH THE REQUIREMENTS OF THE APPLICABLE

ASTM TEST METHODS.

2. THE TABLES SHOWN HEREON ARE BASED ON THE FOLLOWING:

A) 200 PSI INTERNAL PRESSURE.

B) 1500 PSF SOIL BEARING PRESSURE.

C) 3000 PSI PORTLAND CEMENT CONCRETE, PER

SPECIFICATIONS.

D) THE CORRESPONDING WEIGHT OF THE CONCRETE IS EQUAL

TO, OR GREATER THAN, THE VERTICAL COMPONENT OF

THRUST ON THE VERTICAL BEND.

3. DIMENSIONS MAY BE VARIED AS REQUIRED BY FIELD CONDITIONS

AND AS DIRECTED BY THE OWNER. THE VOLUMES OF CONCRETE

THRUST BLOCKING SHALL NOT BE LESS THAN SHOWN.

4. EARTH TRENCH CONDITIONS: THE "C" DIMENSION SHALL BE AS

SHOWN. THE CONCRETE BLOCKING MUST BE POURED AGAINST

FIRM SOIL.

5. UNSTABLE SOIL: THE OWNER SHALL DETERMINE IF ADDITIONAL

THRUST BLOCKING IS REQUIRED. THE "C" DIMENSION SHALL BE

INCREASED AS DIRECTED BY THE ENGINEER, BASED ON

GEOTECHNICAL EVALUATIONS OF THE SITE SOILS.

6. FULLY RESTRAIN ALL JOINTS UNDER ANY STRUCTURE USING A

MECHANICAL RESTRAINT SYSTEM APPROVED BY

OWNER/ENGINEER.

7. A QUICK SETTING ADDITIVE SHALL BE MIXED WITH CONCRETE IN

AREAS WHERE LIMITED SHUT DOWN TIMES ARE REQUIRED TO TIE-IN

TO EXISTING WATER LINES.

NOTES:

PLACE AGAINST

UNDISTURBED EARTH

USE POLYETHYLENE WRAP TO

FORM A BOND BREAKER BETWEEN

THE CONCRETE AND THE FITTING

A A

CONCRETE

THRUST BLOCK

"A

12"

MIN.

"C"

"E

PLAN VIEW

SECTION A-A

CONCRETE THRUST

BLOCK

"B

"D

NOMINAL

PIPE SIZE

3" & 4" 6" 8"

12"

12" 5" 7" 9"

12" 5" 7" 36"

10" 14"

A B C D E A B C D E

HORIZONTAL BENDS

12" 12" 18"

12" 18" 30" 30"

18" 18"

18" 18"

5" 5" 12"

18" 18"

18" 18" 30" 30"

18" 18"

18" 18"

5" 7" 9"

12"

10" 10"

PLAN VIEW

SECTION B-B

CONCRETE THRUST

BLOCK

"B

"D

BRANCH

PIPE

PLACE AGAINST

UNDISTURBED EARTH

RU

N

PI

PE

"C" 12"

MIN.

USE POLYETHYLENE WRAP

TO FORM A BOND BREAKER

BETWEEN THE CONCRETE

AND THE FITTING

BB

"A

CONCRETE

THRUST BLOCK

BRANCH

PIPE SIZE

3" & 4" 6" 8"

12"

30" 5" 7" 9"

12"

A B C D REMARKS:

TEE BRANCH AND DEAD ENDS

3'-6" 7'-6"

18" 18" 30" 30"

18" 18"

18" 18"

NOMINAL

PIPE SIZE

3" & 4" 6" 8"

12" 6'-0"

A B C D E 24" 30" 36"

18" 18" 30" 30"

18" 18"

18" 18"

5" 7" 9"

12" 5" 6"

5" 5"

10'-6"

A B C D E

3'-6" 5'-0" 7'-6"

18" 18" 18" 30"

18" 18"

30" 30"

5" 7" 9"

12" 5" 6"

5" 5"

3'-6"

FOR DEAD END THRUST BLOCKS,

USE THRUST BLOCK DIMENSIONS

FOR SAME SIZE BRANCH PIPE.

CONCRETE THRUST

BLOCK

C

C VERTICAL

BAR

ANGLED

BAR

RESTRAIN JOINTS

PER DETAIL C6, THIS SHEET

"D"

MIN.

12"

MIN.

ELEVATION VIEW

NOMINAL

PIPE SIZE

3" & 4" 6" 8"

12"

2'-0"

A B C BAR SIZE

3'-0" 4'-0"

#5 #4

#6 #7

3'-0"

D E

2'-6"

5'-6" 6'-6"

4'-0" 3'-0"

4'-0" 5'-0"

3'-0" 6"

10" 12"

8" 12"

15" 17"

12"

NOMINAL

PIPE SIZE

3" & 4" 6" 8"

12"

2'-0"

A B C BAR SIZE

2'-6" 3'-0"

#4 #4

#5 #6

2'-0"

D E 22 1

2••• • • ••• • • •• • • • • • • • • • • • • • • • • • •

2'-6"

4'-6" 6'-0"

3'-6" 2'-0"

3'-0" 4'-0"

3'-0" 6"

9" 10"

6" 12"

15" 17"

12"

NOMINAL

PIPE SIZE

3" & 4" 6" 8"

12"

1'-6"

A B C BAR SIZE

2'-0" 3'-0"

#4 #4

#4 #5

2'-0"

D E 11 1

4••• • • ••• • • •• • • • • • • • • • • • • • • • • • •

2'-0"

3'-0" 4'-0"

2'-0" 2'-0"

3'-0" 3'-0"

3'-0" 6"

6" 9"

6" 12"

15" 17"

12"

SECTION C-C

VERTICAL BARS SHALL

BE INSTALLED PLUMB

CONCRETE THRUST

BLOCK

ANGLED BARS SHALL BE

ROTATED TO CLEAR

VERTICAL BARS

SPACE BETWEEN BARS

SHALL BE 3-BAR

DIAMETERS, MIN.

NOTE: 3" MINIMUM COVER OVER ALL BARS

VERTICAL BENDS

TEE

F5 CONCRETE THRUST BLOCK DETAIL

N.T.S.

20" LONG, #4 BARS,

2 ON EACH SIDE

F1 UTILITY TRENCH DETAIL

N.T.S.

DETECTABLE WARNING TAPE:

INSTALL CONTINUOUS TAPE

ABOVE UTILITY CENTERLINE

NOTES:

1. REFER TO V.A. CONSTRUCTION GUIDELINES.

2. DIMENSION INDICATED ARE THE MINIMUM ALLOWABLE DIMENSIONS, THE

CONTRACTOR SHALL VERIFY THAT ADEQUATE SPACE IS PROVIDED TO

INSTALL AND COMPLETE ALL JOINTS.

3. CONTRACTOR SHALL VERIFY ALL EXISTING UTILITY CROSSINGS AND NOTIFY

ENGINEER OF ANY CONFLICTS PRIOR TO CONSTRUCTION.

4" M

IN

M

IN

" M

IN

MIN.

5"

MIN.

6" BEDDING AND SHADING MATERIAL

COMPACTED A MIN. OF 85%

(ASTM D698), REFER TO SPEC'S

SLOPE OR SHORE TRENCH

PER OSHA REQUIREMENTS

REFER TO PLANS AND DETAILS

FOR SURFACING REPLACEMENT

BACKFILL MATERIALS COMPACTED

TO A MINIMUM OF 95% OF THE MAX.

DENSITY AS DETERMINED BY ASTM

D698. IN LANDSCAPED AREAS

COMPACT TOP 8" OF TOPSOIL TO

BETWEEN 80% AND 83% OF THE

MAX. DENSITY AS DETERMINED BY

ASTM D698

FINISH GRADE

DETECTOR WIRE,

12 GAUGE PER SPEC'S.

NEW 1" BRINE

DISCHARGE LINE

TYPICAL TRENCH

MIN.

6"

NEW 1" UGE CONDUIT

(2-EACH)

TANK REPAIR AND COATING DETAILS

CU503

MJEJCM 10

F1 DEFECTIVE CONCRETE, ROCK POCKETS,

OR HONEYCOMB REPAIR DETAIL N.T.S.

1 1 2"

MIN.1 1

2"

MIN.

EXISTING

PIPE

KEYNOTES

EXTERIOR WALL PIPE PENETRATION INTERIOR WALL PIPE PENETRATION

F7 TANK PIPE PENETRATIONS AND

MANHOLE ACCESS COATING DETAILS N.T.S.

EXISTING PIPE

1. PREPARE CONCRETE SUBSTRATE AND REPAIR CRACKS WITH

XYPEX, "PATCH'N PLUG" PATCHING AND RESURFACING COMPOUND,

REFER TO DETAILS F1 AND F4, THIS SHEET, AND MANUFACTURER'S

PLUGGING AND PATCHING PROCEDURES.

2. NEW CEMENTITIOUS CRYSTALLINE WATERPROOFING COATING,

PRIME COAT: XYPEX "CONCENTRATE" COATING,

FINISH COAT: XYPEX "MODIFIED" COATING,

REFER TO MANUFACTURER'S APPLICATION PROCEDURES.

3. XYPEX CONCENTRATE "DRY-PAC" PIPE PENETRATION SEAL,

REFER TO DETAIL F4, THIS SHEET, AND MANUFACTURER'S APPLICATION

PROCEDURES.

4. NEW EPOXY PIPE COATING, TNEMEC "POTA-POX PLUS", SERIES L140,

REFER TO MANUFACTURER'S APPLICATION PROCEDURES.

3 3

EXISTING TANK

WALL

EXISTING WALL

PENETRATION

1" M

IN

1" M

IN

1" M

IN

1" M

IN

EXISTING WALL

PENETRATION

211 2

1 2

1 2

1 2

TANK ACCESS MANHOLE TANK ACCESS MANHOLE

(IN CONCRETE PAVEMENT)

EXISTING CONCRETE

PAVEMENTEXISTING MH FRAME AND

COVER IN CONCRETE

DRIVEWAY TOP EXISTING WATER

STORAGE TANK

EXISTING MH FRAME AND

COVER IN TANK TOP SLAB

TOP EXISTING

TANK

1 2

3 3

3 3

1 2

6" (1 m m

O R

LE

SS

REPAIR PROCEDURES (REFERENCE: XYPEX METHOD STATEMENT, 2015-11)

STEP 1: CHIP OUT DEFECTIVE, POORLY CONSOLIDATED OR DELAMINATED CONCRETE UNTIL SOUND CONCRETE

IS ENCOUNTERED.

STEP 2: IF CORRODED REINFORCING STEEL (REBAR) IS ENCOUNTERED, THE DEFECTIVE REBAR SHOULD BE FULLY EXPOSED BY CHIPPING AND REMOVING ANY CONCRETE COVER UNTIL CORROSION FREE REBAR IS REACHED. REMOVE ALL CORROSION FROM THE EXPOSED REBAR AND CHIP ALL THE WAY AROUND IT SUCH THAT MORTAR CAN BE PLACED ON ALL SIDES OF THE REBAR. IF DUE TO CORROSION, THE CROSS SECTION OF THE REBAR IS NOTICEABLY REDUCED, ADVICE FROM A STRUCTURAL ENGINEER ON REBAR

REPLACEMENT IS RECOMMENDED.

STEP 3: IF THERE ARE ACTIVE WATER LEAKS IN THE EXCAVATED AREA, CREATE A VOID OF APPROXIMATELY 1" DIAMETER (25 mm) BY ABOUT 1" (25 mm) DEEP AT EACH LEAK POINT.

STEP 4: DELINEATE THE CHIPPED AREA TO AS CLOSE TO A SIMPLE SQUARE SHAPE AS IS PRACTICAL BY SAW CUTTING TO 3/4" (19 mm) DEEP OR AS SPECIFIED. IF CUTTING TO THIS DEPTH WILL DAMAGE THE REBAR THE REDUCE THE DEPTH OF THE CUT SUCH THAT THE REINFORCEMENT STEEL IS NOT IMPACTED. REMOVE THE CONCRETE WITHIN THE DESIGNATED REPAIR AREA, AND TO THE SAWCUT IN REPAIR "B", TO CREATE

A STRAIGHT SIDED, EXCAVATED AREA.

STEP 5: REMOVE ALL THOSE MATERIALS IN THE EXCAVATED AREA USING A 3,500 - 5,000 PSI (250 - 350 BAR) PRESSURE WASH AND SATURATE THE AREA WITH WATER. ALLOW THE CONCRETE TO ABSORB THE WATER

UNTIL IT IS A "SATURATED, SURFACE DRY" CONDITION.

STEP 6: STOP ANY ACTIVE LEAKING BY FILLING THE 1" (25 mm) DIAMETER BY 1" (25 mm) DEEP VOIDS AT THE

LEAK POINTS WITH XYPEX "PATCH'N PLUG".

STEP 7: (REPAIR "A"): APPLY A SCRUB COAT OF THE SELECTED REPAIR MORTAR TO THE INSIDE SURFACE OF THE PATCH AREA AND, WHILE IT IS STILL WET OR "GREEN", FILL THE ENTIRE AREA TO THE SURFACE WITH THE SAME MORTAR. NOTE THAT "PATCH'N PLUG" IS A VERY RAPID SETTING MATERIAL SO IT MUST BE APPLIED

IMMEDIATELY AFTER THE SCRUB COAT.

(REPAIR "B"): APPLY A SCRUB COAT OF XYPEX "MEGAMIX II" MORTAR TO THE INSIDE SURFACE OF THE PATCH AREA AND, WHILE IT IS STILL WET OR "GREEN", FILL THE ENTIRE AREA TO THE SURFACE WITH

"MEGAMIX II".

STEP 8: (REPAIR "A"): IF THE VOID IS DEEPER THAN 2" (50 mm) IT SHOULD BE FILLED IN LAYERS (LIFTS) OF NOT MORE THAN 2" (50 mm).

(REPAIR "B"): IF THE VOID IS DEEPER THAN 2" (50 mm) ON A VERTICAL OR HORIZONTAL SURFACE, OR

2" (37 mm) ON AN OVERHEAD SURFACE, THE VOID SHOULD BE FILLED IN LAYERS (LIFTS) OF NOT MORE

THAN THE STATED THICKNESS.

(REPAIR "A" AND "B"): FOR MECHANICAL BOND OF THE NEXT LAYER, PROVIDE PROFILE BY SCORING THE SURFACE OF THE INSTALLED MORTAR WITH THE TIP OF THE TROWEL. IN SITUATIONS WHERE THE REPAIR AREA REQUIRES MULTIPLE LIFTS, REINFORCING SUCH AS WIRE MESH MECHANICALLY ATTACHED TO THE

SUBSTRATE SHOULD BE CONSIDERED.

STEP 9: • • • • • •• •• • • ••• • •• • • • • ••• • • • • • •• • •• ••• • • • • • •• ••• •• •• • •• • ••• • •••• •• •• • •• •••• • • • ••• • •• • • • •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • AREA EXTENDING TO 6" (150 mm) MINIMUM BEYOND THE EDGE OF THE PATCH.

STEP 10: (REPAIR "A"): CURE THE REPAIR AREA BY KEEPING MOIST BY FOG SPRAYING PERIODICALLY WITH WATER

FOR TWO TO THREE DAYS. OPEN TO WATER CONTACT PER XYPEX COATINGS GUIDELINES.

(REPAIR "B"): CURE THE REPAIR AREA BY KEEPING MOIST BY FOG SPRAYING PERIODICALLY WITH WATER

FOR TWO TO THREE DAYS. OPEN TO WATER CONTACT PER XYPEX COATINGS GUIDELINES.

REPAIR "A" REPAIR "B"

XYPEX, "CONCENTRATE",

SLURRY COAT

1" (25 mm)

1" (2 m m

ACTIVELY LEAKING

CRACK

XYPEX, "PATCH'N PLUG",

CHIP AND FILL TO STOP

WATER FLOW

SCRUB COAT:

XYPEX, "PATCH'N PLUG" OR

XYPEX, "MEGAMIX II"

XYPEX, "PATCH'N PLUG" OR

XYPEX, "MEGAMIX II",

FILL IN ONE OR TWO LIFTS

6" (1 m m

LA

RG

ER

T

HA

N

ACTIVELY LEAKING

CRACK

1" (25 mm)

1" (2 m m

XYPEX, "PATCH'N PLUG",

CHIP AND FILL TO STOP

WATER FLOWSCRUB COAT:

XYPEX, "MEGAMIX II"

XYPEX, "MEGAMIX II",

FILL IN ONE OR TWO LIFTS

XYPEX, "CONCENTRATE",

SLURRY COAT

REPAIR AREAS APPROXIMATELY

6" IN DIAMETER OR LESS

REPAIR AREAS APPROXIMATELY

6" IN DIAMETER OR MORE

NOTE: THE FOLLOWING INFORMATION GIVES GENERAL DIRECTIONS AND PROCEDURES FOR REPAIR OF STANDARD, SMALL OR MEDIUM-LARGE SIZED DEFICIENCIES. THESE PROCEDURES SHOULD NOT SUPERSEDE ACI, ICRI, OR OTHER RECOGNIZED

AUTHORITIES' RECOMMENDATIONS.

1" (2 m m

1.5"(37 mm)

EXISTING TANK

WALL

EXISTING WALL TO

FLOOR SLAB JOINT

XYPEX, "CONCENTRATE",

SLURRY COAT

XYPEX, "CONCENTRATE",

SLURRY COAT

XYPEX, "CONCENTRATE",

DRY-PAC

REPAIR "C"

REPAIR OF SLAB

INTERFACE JOINTS

1" (2 m m

1.5" (37 mm)

EXISTING TANK

EXISTING CRACK

OR FAULTY JOINT

XYPEX, "CONCENTRATE",

SLURRY COAT

XYPEX, "CONCENTRATE",

DRY-PAC

1"

(25 m m

1.5"

(37 mm)

EXISTING WALL TO

TOP SLAB JOINT

XYPEX, "CONCENTRATE",

SLURRY COAT

XYPEX, "CONCENTRATE",

DRY-PAC

XYPEX, "CONCENTRATE",

SLURRY COAT

XYPEX, "CONCENTRATE",

SLURRY COAT

REPAIR "D"

REPAIR OF CRACKS AND FAULTY

CONSTRUCTION JOINTS

REPAIR PROCEDURES (REFERENCE: XYPEX METHOD STATEMENT, 2016-01)

STEP 1: (REPAIR "C"): CHIP OUT A "U" SHAPED SLOT PER THE REPAIR "C" DETAIL ABOVE AND DEPENDING ON

THE WALL TO SLAB INTERFACE CONFIGURATION, SUCH THAT THE BOTTOM CORNER OF THE SLOT IS

CENTERED OVER THE CONSTRUCTION JOINT.

(REPAIR "D"): CHIP OUT CRACK/JOINT IN A "U" SHAPED SLOT AS PER THE REPAIR "D" DETAIL ABOVE.

(REPAIR "C" AND "D"): THE SLOT IS TO BE 1" (25 mm) WIDE BY AT LEAST 1.5" (35 mm) DEEP. A "V" SHAPED SLOT IS NOT ACCEPTABLE. THE SLOT MAY BE SAW CUT INSTEAD OF CHIPPED BUT ENSURE THAT THE SLOT IS DOVETAILED OR OTHERWISE SHAPED SUCH THAT THERE WILL BE MECHANICAL INTERLOCK OF

MATERIALS PLACED INTO THE SLOT AT A LATER STAGE.

STEP 2: REMOVE ALL LOOSE MATERIALS WITHIN THE SLOT AND TO 6" (150 mm) ON EITHER SIDE OF SLOT.

CLEAN, PROFILE (ICRI CSP-3) AND SATURATE THIS AREA WITH WATER. ALLOW WATER TO SOAK INTO

CONCRETE AND THEN REMOVE ALL SURFACE WATER.

STEP 3: • • • • • •• • • •• • • • • • •• • • ••• • •• • • • • ••• • • • • • •• • •• ••• ••• •• • • • • • • • •• • •• •• •• • •• • ••• • ••• •• •• • •• ••••• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • THE SLOT AND TO 6" (150 mm) UP/DOWN THE WALL AND ONTO THE SLAB AWAY FROM THE SLOT.

APPLICATION MAY BE PERFORMED BY BRUSH OR GLOVED HAND.

STEP 4: WHILE SLURRY COAT IS STILL TACKY, FILL SLOT TO SURFACE WITH XYPEX "CONCENTRATE" "DRY-PAC" MIXED IN THE FOLLOWING PRO-PORTIONS: ONE PART CLEAN WATER TO SIX PARTS "CONCENTRATE" BY VOLUME. BLEND "DRY-PAC" BY TROWEL FOR 10-15 SECONDS ONLY (LUMPS SHOULD BE PRESENT IN THE MIXTURE). APPLY "DRY-PAC" BY GLOVED HAND, AND THEN COMPRESS IT TIGHTLY USING A PNEUMATIC

PACKING DEVICE OR A HAMMER AND BLOCK.

STEP 5: WET "DRY-PAC" SURFACE LIGHTLY WITH WATER, THEN APPLY A SLURRY COAT OF XYPEX (REPAIR "C"): TO 6" (150 mm) UP/DOWN THE WALL AND ONTO THE SLAB AWAY FROM THE SLOT, (REPAIR "D"): TO 6" (150 mm) STRIP ON EITHER SIDE OF SLOT.

STEP 6: CURE THE REPAIR AREA BY KEEPING MOIST BY FOG SPRAYING PERIODICALLY WITH WATER FOR TWO TO

THREE DAYS. OPEN TO WATER CONTACT PER XYPEX COATINGS GUIDELINES.

F4 SLAB INTERFACE JOINTS, CRACKS, OR

FAULTY CONSTRUCTION JOINTS REPAIR DETAIL N.T.S.

EXISTING TANK

TOP SLAB

EXISTING TANK

FLOOR SLAB

EXISTING

CONCRETE WATER

STORAGE TANK

6" FILL PIPE

EXISTING

CONCRETE TANK

FILL VAULT

RE-ESTABLISH MH COVER

WATERTIGHT SEAL

EXISTING 6" PVC

FILL LINE

H.W.L.

(PER AS-BUILTS)

1 2

FILL PIPE PENETRATION

FILL PIPE SUPPORTS

REMOVE EXISTING FILL PIPE SUPPORTS,

REPLACE IN KIND, REFER TO COATING

MANUFACTURER'S RECOMMENDATIONS

TO COAT PIPE SUPPORT MOUNTING

PENETRATIONS

REMOVE EXISTING FLOAT VALVE SUPPORTS,

REPLACE PER MECHANICAL PLANS,

REFER TO COATING MANUFACTURER'S

RECOMMENDATIONS TO COAT FLOAT

VALVE SUPPORT MOUNTING PENETRATIONS

EXISTING FLOAT

VALVE

File details come from the government source that posted it. Updated .