VENDOR RFI001 with VA RESPONSE.pdf
PDF 106 KB Posted
- Solicitation number
- 36C26221Q0254
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26221Q0254 0002_1.docx | DOCX document | |
| AmeriCoat Brochure.pdf | ||
| 36C26221Q0254 0001_1.docx | DOCX document | |
| WAGE DETERMINATION RATES SCA WDN 2015-5614 REVISION 16.pdf | ||
| 36C26221Q0254_1.docx | DOCX document | |
| SF1449 RFQ 36C26221Q0254.pdf | ||
| Final STATEMENT OF WORK (SOW).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI FORM
Contractor Name:
Address:
Phone/Fax:
Send to: cecil.nichols@va.gov
RFI
(REQUEST FOR INFORMATION)
PROJECT NO.:
RFI NO.:
PROJECT NAME:
SERVICE to REPLACE Twelve (12) Condenser Coils, Bldg. 206 Chiller, VA Greater Los Angeles
DATE REQUESTED:
01/21/2021
SOLICITATION NO.:
36C26221Q0254
REFERENCE:
DRAWING:
SPECIFICATION
SECTION:
DESCRIPTION OF PROBLEM OR INFORMATION BEING REQUESTED
Please be specific as possible:
1. Will work be performed during weekends or regular hours?
2. Are shutdowns required individually or all at once?
3. Is the VA pulling permits or would vendor need to?
PROJECT MANAGER’S RESPONSE
1. Work hours are specified / stated in the solicitation RFQ. All work will be performed during normal working hours.
2. The unit is currently off-line, and work can commence at any time and all coils can be completed at one time. There may be residual refrigerant that must be captured according to EPA standards.
3. Vendor will need hot work and a crane permit if a crane and torches are used. VA will provide the hot work permit and provide the information to the vendor for crane permits which must be submitted at least one (1) week ahead of lift date.
AMENDMENT NO.:
VA PROJECT ENGINEER/MANAGER:
Alan Silver, PE / Facility Manager
DATE:
01/21/2021 mailto:cecil.nichols@va.gov