36C26220Q0649-0001003.pdf

PDF Posted

Attached to
Z2DA--Construction services to Install New Secondary Water Line
Solicitation number
36C26220Q0649
Issued by

About this file

36C26220Q0649 0001 Note 14 of Statement of Work -Attachment 1.pdf

View the file

Other files

File Type Posted
36C26220Q0649-0001001.pdf PDF
36C26220Q0649-0001002.png PNG image
36C26220Q0649-0001000.docx DOCX document
36C26220Q0649-006.txt TXT text file
36C26220Q0649-003.docx DOCX document
36C26220Q0649-004.pdf PDF
36C26220Q0649-005.pdf PDF
36C26220Q0649-002.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1

Note #14

Before beginning any demolition work, the Contractor shall survey the site and examine the drawings and specifications to determine the extent of the work. The contractor shall take necessary precautions to avoid damages to existing items to remain in place, to be reused, or to remain the property of the Loma Linda VA Medical Center Property; any damaged items shall be repaired or replaced as approved by the Resident

Engineer. The Contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports as required.