36C26118R0306-003.docx

DOCX document 16 KB Posted

Attached to
Activation Warehouse San Jose Federal contract opportunity
Solicitation number
36C26118R0306
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21

About this file

36C26118R0306 S02 SJ - QASP.docx

View the file

Other files for this federal contract opportunity

Other files attached to Activation Warehouse San Jose, newest first.
File Type Posted
36C26118R0306-0006000.docx DOCX document
36C26118R0306-0006001.pdf PDF
36C26118R0306-0005000.docx DOCX document
36C26118R0306-00004000.docx DOCX document
36C26118R0306-00004001.pdf PDF
36C26118R0306-00003006.pdf PDF
36C26118R0306-00003008.pdf PDF
36C26118R0306-00003013.pdf PDF
36C26118R0306-00003001.pdf PDF
36C26118R0306-00003000.docx DOCX document
36C26118R0306-00003005.pdf PDF
36C26118R0306-00003010.xlsx XLSX spreadsheet
36C26118R0306-00003011.xlsx XLSX spreadsheet
36C26118R0306-00003012.pdf PDF
36C26118R0306-00003003.pdf PDF
36C26118R0306-00003007.pdf PDF
36C26118R0306-00003009.pdf PDF
36C26118R0306-00003002.xlsx XLSX spreadsheet
36C26118R0306-00003004.pdf PDF
36C26118R0306-00002000.docx DOCX document
36C26118R0306-00001000.docx DOCX document
36C26118R0306-012.pdf PDF
36C26118R0306-007.pdf PDF
36C26118R0306-001.docx DOCX document
36C26118R0306-005.docx DOCX document
36C26118R0306-008.pdf PDF
36C26118R0306-010.pdf PDF
36C26118R0306-011.pdf PDF
36C26118R0306-009.pdf PDF
36C26118R0306-002.xlsx XLSX spreadsheet
36C26118R0306-004.docx DOCX document
36C26118R0306-006.pdf PDF
36C26118R0306-000.docx DOCX document
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Standards

Required Services
Performance Standards
Acceptable Quality Level (AQL)
Monitoring
Incentives/ Disincentives
Prepare and maintain the Project Management Plan (PMP)
PMP contains, at a minimum, the sections listed in section 5.a.1 of the PWS and is updated to include approved changes
PMP is complete and contains the level of detail commensurate with the size, scope and complexity of the activities to be performed under the contract, and is updated prior to executing the activities affected by the change.
100% review by the COR.
The Government will not pay for services that do not conform or do not meet performance standards, or have not been properly rendered.

The Contractor shall be given an opportunity to correct non-conforming services at no cost to the Government.

Present progress reports
Progress reports are consistent with project management plan
No deviation.
100% review by the COR.
The Government will not pay for services that do not conform or do not meet performance standards, or have not been properly rendered.

The Contractor shall be given an opportunity to correct non-conforming services at no cost to the Government.

Present meeting minutes
Complete meeting minutes are presented within three (3) days of each meeting
Meeting minutes are complete and contains the level of detail appropriate to accurate capture the meeting’s content, including, but not limited to, discussion points, action items, and issues. Meeting minutes are delivered within (3) business days of each meeting.
100% review by the COR.
The Government will not pay for services that do not conform or do not meet performance standards, or have not been properly rendered.

The Contractor shall be given an opportunity to correct non-conforming services at no cost to the Government.

Provide inventory management reporting capabilities
FF&E items are entered and managed using the contractor’s inventory management system. FF&E items can be tracked to the purchase order and the physical location in the warehouse facility.
100% accuracy and 100% completeness
Random inspection of inventory management report; VA Logistics personnel will reconcile report against the report generated from VA legacy system
The Government will not pay for services that do not conform or do not meet performance standards, or have not been properly rendered.

The Contractor shall be given an opportunity to correct non-conforming services at no cost to the Government.

Transportation and installation of FF&E items
FF&E items and building infrastructure is undamaged upon post-installation acceptance and installed meeting manufacturer instructions, drawings, and specifications
No deviation
100% inspection; VA will inspect all FF&E items during post-installation inspection; VA and contractor will perform a pre- and post- installation inspection of building infrastructure
The Contractor will develop a remediation plan for damaged FF&E and/or building infrastructure within three (3) business days of identification. The Contractor will present the remediation plan to the COR for approval. The contractor will begin implementing the approved remediation plan within one (1) week of approval.

Track building and FF&E damage in PlanGrid

Building and FF&E damage identified by the Contractor is logged in PlanGrid
100% accuracy and 100% completeness with identified damage entered into PlanGrid within one (1) business day
Random inspection
The Government will not pay for services that do not conform or do not meet performance standards, or have not been properly rendered.

The Contractor shall be given an opportunity to correct non-conforming services at no cost to the Government.

Place and install FF&E items
All FF&E is placed and installed per the door report
100% accuracy and 100% completeness
100% inspection
The Government will not pay for services that do not conform or do not meet performance standards, or have not been properly rendered.

The Contractor shall be given an opportunity to correct non-conforming services at no cost to the Government.

Provide user and operating manuals
All FF&E item user and operating manuals provided to the COR during FF&E post-installation acceptance
No deviation
100% inspection by COR
The Government will not pay for services that do not conform or do not meet performance standards, or have not been properly rendered.

The Contractor shall be given an opportunity to correct non-conforming services at no cost to the Government.

Provide excess parts/items
All FF&E excess parts/items delivered to the VAPAHCS facility within five (5) business days after the completion of the Delivery and Installation Phase
No deviation
100% inspection by COR
The Government will not pay for services that do not conform or do not meet performance standards, or have not been properly rendered.

The Contractor shall be given an opportunity to correct non-conforming services at no cost to the Government.

Adjust workstations to meet user ergonomics requirements
A maximum of 200 workstations will be assessed by a certified ergonomics specialist and adjusted to meet ergonomics requirements during the Delivery and Installation Phase
No deviation
Random corroboration of Contractor-provided and maintained assessment and adjustment sign-off sheet
The Government will not pay for services that do not conform or do not meet performance standards, or have not been properly rendered.

The Contractor shall be given an opportunity to correct non-conforming services at no cost to the Government.

File details come from the government source that posted it.