36C26118B0612-050.pdf
PDF 143 KB Posted
- Solicitation number
- 36C26118B0612
About this file
36C26118B0612 Bldg 650 E-Room Pull box 6.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26118B0612-0002000.docx | DOCX document | |
| 36C26118B0612-0002001.pdf | ||
| 36C26118B0612-0001000.docx | DOCX document | |
| 36C26118B0612-0001001.pdf | ||
| 36C26118B0612-043.pdf | ||
| 36C26118B0612-045.pdf | ||
| 36C26118B0612-041.pdf | ||
| 36C26118B0612-042.pdf | ||
| 36C26118B0612-040.pdf | ||
| 36C26118B0612-052.pdf | ||
| 36C26118B0612-033.docx | DOCX document | |
| 36C26118B0612-054.pdf | ||
| 36C26118B0612-037.pdf | ||
| 36C26118B0612-044.pdf | ||
| 36C26118B0612-035.pdf | ||
| 36C26118B0612-051.pdf | ||
| 36C26118B0612-047.pdf | ||
| 36C26118B0612-039.pdf | ||
| 36C26118B0612-032.docx | DOCX document | |
| 36C26118B0612-030.docx | DOCX document | |
| 36C26118B0612-029.docx | DOCX document | |
| 36C26118B0612-055.pdf | ||
| 36C26118B0612-034.pdf | ||
| 36C26118B0612-031.docx | DOCX document | |
| 36C26118B0612-048.pdf | ||
| 36C26118B0612-046.pdf | ||
| 36C26118B0612-038.pdf | ||
| 36C26118B0612-036.pdf | ||
| 36C26118B0612-049.pdf | ||
| 36C26118B0612-053.pdf | ||
| 36C26118B0612-001.docx | DOCX document |
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHAMACDiltsT Rectangle
VHAMACDiltsT Rectangle
VHAMACDiltsT Rectangle
VHAMACDiltsT Rectangle
VHAMACDiltsT Typewritten Text New Panel A-C
VHAMACDiltsT Typewritten Text New Pull box for Panel A-C
VHAMACDiltsT Typewritten Text New Panel A-CE Critical and pull box located above
VHAMACDiltsT Typewritten Text New Panel N and pull box located above
VHAMACDiltsT Line
VHAMACDiltsT Rectangle
VHAMACDiltsT Typewritten Text New MCC-1 Panel
VHAMACDiltsT Rectangle
VHAMACDiltsT Typewritten Text VFD Rack
VHAMACDiltsT Text Box
VHAMACDiltsT Typewritten Text New 600A Disconnect
VHAMACDiltsT Text Box Load:
DPC1: Contractor will intercept parallel 350MCMM at location 1, and route feed to new 600A disconnect. The contractor shall route feed from disconnect to existing 500KVA XFMR shown at location 3.
VHAMACDiltsT Text Box
Text Box
Text Box Bldg. 650 E-Room 6
File details come from the government source that posted it.