36C261-18-B-0612| Project 612A4-18-234| Correct ATS System at Mather, CA
Solicitation number
36C26118B0612
Issued by

About this file

36C26118B0612 Bldg 650 E-Room Pull box 6.pdf

View the file

Other files

File Type Posted
36C26118B0612-0002000.docx DOCX document
36C26118B0612-0002001.pdf PDF
36C26118B0612-0001000.docx DOCX document
36C26118B0612-0001001.pdf PDF
36C26118B0612-043.pdf PDF
36C26118B0612-045.pdf PDF
36C26118B0612-041.pdf PDF
36C26118B0612-042.pdf PDF
36C26118B0612-040.pdf PDF
36C26118B0612-052.pdf PDF
36C26118B0612-033.docx DOCX document
36C26118B0612-054.pdf PDF
36C26118B0612-037.pdf PDF
36C26118B0612-044.pdf PDF
36C26118B0612-035.pdf PDF
36C26118B0612-051.pdf PDF
36C26118B0612-047.pdf PDF
36C26118B0612-039.pdf PDF
36C26118B0612-032.docx DOCX document
36C26118B0612-030.docx DOCX document
36C26118B0612-029.docx DOCX document
36C26118B0612-055.pdf PDF
36C26118B0612-034.pdf PDF
36C26118B0612-031.docx DOCX document
36C26118B0612-048.pdf PDF
36C26118B0612-046.pdf PDF
36C26118B0612-038.pdf PDF
36C26118B0612-036.pdf PDF
36C26118B0612-049.pdf PDF
36C26118B0612-053.pdf PDF
36C26118B0612-001.docx DOCX document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAMACDiltsT Rectangle

VHAMACDiltsT Rectangle

VHAMACDiltsT Rectangle

VHAMACDiltsT Rectangle

VHAMACDiltsT Typewritten Text New Panel A-C

VHAMACDiltsT Typewritten Text New Pull box for Panel A-C

VHAMACDiltsT Typewritten Text New Panel A-CE Critical and pull box located above

VHAMACDiltsT Typewritten Text New Panel N and pull box located above

VHAMACDiltsT Line

VHAMACDiltsT Rectangle

VHAMACDiltsT Typewritten Text New MCC-1 Panel

VHAMACDiltsT Rectangle

VHAMACDiltsT Typewritten Text VFD Rack

VHAMACDiltsT Text Box

VHAMACDiltsT Typewritten Text New 600A Disconnect

VHAMACDiltsT Text Box Load:

DPC1: Contractor will intercept parallel 350MCMM at location 1, and route feed to new 600A disconnect. The contractor shall route feed from disconnect to existing 500KVA XFMR shown at location 3.