36C26024Q0476 0001.docx
DOCX document 18 KB Posted
- Attached to
- 7320--NFS SOILED TRAY CONVEYOR CS: Tracy Heath
- Solicitation number
- 36C26024Q0476
About this file
This document is an Amendment to Solicitation 36C26024Q0476 for a Soiled Tray Conveyor System. The amendment provides responses to questions received and extends the solicitation due date by one day to June 20, 2024 at 3:00 PM PT. The solicitation is issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 20. The key details are:
The solicitation is for a Soiled Tray Conveyor System. Items can be received prior to the installation date, with storage for up to one month. The equipment will be located on the main floor, with access through the loading dock. There is no need for a field joint or to ship the table side in two pieces. Interested offerors should acknowledge receipt of the amendment and can make changes to offers submitted prior to the due date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26024Q0476.docx | DOCX document | |
| Attachement EUCCW6 Specs.pdf | ||
| S02 52.225-2 BUY AMERICAN CERTIFICATE.docx | DOCX document | |
| NFS CONVEYOR-30X42.pdf | ||
| Attachment Spec Sheet Soiled Tray Scrapping System 11S A.pdf | ||
| P07 WD King 2015-5535 Rev 21 12.23.23.docx | DOCX document | |
| Attachment MD96996C - S419 Salvajor Standard Spec Sheets 11S.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 36C260 NCO 20 Network Contracting Office
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver
WA
98661 36C260 NCO 20 Network Contracting Office
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver
WA
98661 To all Offerors/Bidders
36C26024Q0476 06-12-2024
X X X
06/20/2024 15:00 PT
See CONTINUATION Page 663-3640160-9961-820100-2580 010070757 X The Purpose of this amendment is:
1. To provide responses to questions received (see questions & answers below)
2. To extend the solicitation due date by one (1) day to account for the Federal holiday Juneteenth. Receipt of quotes are due 06/20/2024 15:00 PT.
Charles Hartwick Contracting Officer
VA-VHA-RPOW-2024-0059
CONTINUATION PAGE
Amendment 0001 – NFS Soiled Tray Conveyor –
Questions:
1. Can the Facility receive items prior to installation date and if so, how long can items be stored prior to installation? Yes, I’d say probably a month.
2. What floor will this be located on and what is the access like? Main floor, same as loading dock & equipment should fit through the doorways.
3. What is the size of the freight elevator if located on a different floor than main floor? Main floor, same as loading dock & equipment should fit through the doorways.
4. Is there a need for field joint? Shouldn’t be a need – We’re on the same floor as the loading dock & the equipment should fit through the doorways. This would probably be best answered through a site visit.
5. Does the table side need to be shipped in two pieces? Shouldn’t be a need – We’re on the same floor as the loading dock & the equipment should fit through the doorways. This would probably be best answered through a site visit.