DWG.3 01 B1-5th-CEILINGS-B1-5th-CEILINGS-Rev.0.pdf
PDF 190 KB Posted
- Solicitation number
- 36C25923Q0101
About this file
This solicitation is for minor modifications to the 5th floor of Building 1 at the Grand Junction VA Medical Center in Colorado. Work includes installing infection control measures; selective demolition; plumbing repairs and bathroom renovations; replacing window blinds, door hardware, and medical gas headwall covers; adding security cameras, sinks, and plumbing isolation valves; and construction barriers. The period of performance is 180 days from notice to proceed. The contractor must schedule work to minimize disruptions, implement safety and infection control programs, and coordinate all work with the VA. Submissions such as a schedule, safety plans, and list of employees are required. Work hours are generally Monday through Friday from 7 AM to 5 PM, though evening and weekend work may be approved with ten days' notice. The selected contractor will manage various trades to complete the listed tasks on schedule and in compliance with all VA requirements.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R5419-CT-19-2
1'-N WALL
8'-E WALL
R5419-CT-18-2
6"-S WALL
3'-E WALL
R5003-CT-25-2
SW CORNER
R5419-CT-31-1
4'-E WALL
4'-N WALL
R5419-CT-30-1
W WALL
5'-N WALL
R5431-CT-27-2
SW CORNER
R5412-CT-31-2
3'-E WALL
2'-N WALL
R5412-CT-30-2
2'-E WALL
6'-N WALL
R5412-CT-32-2
N WALL
3'-E WALL
R5412-CT-34-2
SW CORNER
R5412-CT-34-1
2'-W WALL
4'-N WALL
R5005-CT-24-3
NW CORNER
R5200-CT-26-2
2'-N WALL
14'-E WALL
R5208-CT-20-2
6"-N OF SW CORNER
R5208-CT-16-3
S WALL
6"-E WALL
S CORR-CT-33-1
6'-W OF S SIDE 5201 DOOR FRAME
S CORR-CT-33-2
8'-N OF W SIDE 5202 DOOR FRAME
R5419-CT-32-1
N WALL
8'-E WALL
File details come from the government source that posted it. Updated .