07-01-14
09-01-21
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
| SECTION NO. |
| DIVISION AND SECTION TITLES |
| DATE |
DIVISION 00 SPECIAL SECTIONS
| 00 01 15 |
| List of Drawing Sheets |
| 05-20 |
| 00 11 21 |
| Request for Proposal to Design Build |
| 09-21 |
DIVISION 01 GENERAL REQUIREMENTS
| 01 00 00 |
| General Requirements |
| 05-21 |
| 01 32 16.01 |
| Architectural and Engineering CPM Schedules |
| 03-20 |
| 01 32 16.13 |
| Network Analysis Schedules – Major Construction Project Design-Bid-Build |
| 03-20 |
| 01 32 16.15 |
| Project Schedules (Small Projects – Design/Bid/Build |
| 03-20 |
| 01 32 16.16 |
| Network Analysis Schedules (Design-Build Only) |
| 03-20 |
| 01 32 16.17 |
| Network Analysis Schedules – Major Design/Build Projects |
| 06-19 |
| 01 33 23 |
| Shop Drawings, Product Data, and Samples |
| 06-21 |
| 01 35 26 |
| Safety Requirements |
| 07-20 |
| 01 42 19 |
| Reference Standards |
| 11-20 |
| 01 45 00 |
| Quality Control |
| 02-21 |
| 01 45 29 |
| Testing Laboratory Services |
| 11-18 |
| 01 45 35 |
| Special Inspections |
| 06-21 |
| 01 57 19 |
| Temporary Environmental Controls |
| 01-21 |
| 01 58 16 |
| Temporary Interior Signage |
| 07-15 |
| 01 74 19 |
| Construction Waste Management |
| 01-21 |
| 01 81 13 |
| Sustainable Construction Requirements |
| 10-17 |
| 01 81 13.02 |
| Sustainability Certification Requirements – LEED NC V4 |
| 01-21 |
| 01 81 13.21 |
| Sustainability Certification Requirements – GREEN GLOBES |
| 01-21 |
| 01 91 00 |
| General Commissioning Requirements |
| 10-15 |
| 01 91 00.01 |
| DVA/USACE Projects General Commissioning Requirements |
| 08-19 |
DIVISION 02 – EXISTING CONDITIONS
| 02 21 13 |
| Site Surveys |
| 01-21 |
| 02 41 00 |
| Demolition |
| 08-17 |
| 02 65 00 |
| Underground Storage Tank Removal |
| 01-21 |
| 02 82 11 |
| Traditional Asbestos Abatement |
| 01-21 |
| 02 82 13.13 |
| Glovebag Asbestos Abatement |
| 01-21 |
| 02 82 13.19 |
| Asbestos Floor Tile and Mastic Abatement |
| 01-21 |
| 02 82 13.21 |
| Asbestos Roofing Abatement |
| 01-21 |
| 02 82 13.31 |
| Asbestos Transite Abatement |
| 01-21 |
| 02 82 13.41 |
| Asbestos Abatement for Total Demolition Project |
| 01-21 |
| 02 83 33.13 |
| Lead-Based Paint Removal and Disposal |
| 01-21 |
DIVISION 03 – CONCRETE
| 03 23 00 |
| Stressing Tendons |
| 01-21 |
| 03 30 00 |
| Cast-in-Place Concrete |
| 01-21 |
| 03 30 53 |
| (Short-Form) Cast-in-Place Concrete |
| 01-21 |
| 03 41 13 |
| Precast Concrete Hollow Core Planks |
| 01-21 |
| 03 41 33 |
| Precast Structural Pretensioned Concrete |
| 01-21 |
| 03 45 00 |
| Precast Architectural Concrete |
| 01-21 |
| 03 51 13 |
| Cementitious Wood Fiber Decks |
| 01-21 |
| 03 51 16 |
| Gypsum Concrete Roof Decks |
| 01-21 |
| 03 52 00 |
| Lightweight Concrete Roof Insulation |
| 01-21 |
| 03 55 11 |
| Gypsum Concrete Floor Decks |
| 01-21 |
DIVISION 04 – MASONRY
| 04 01 00 |
| Maintenance of Masonry |
| 01-21 |
| 04 05 13 |
| Masonry Mortaring |
| 10-17 |
| 04 05 16 |
| Masonry Grouting |
| 01-21 |
| 04 20 00 |
| Unit Masonry |
| 08-17 |
| 04 72 00 |
| Cast Stone Masonry |
| 01-21 |
DIVISION 05 – METALS
| 05 12 00 |
| Structural Steel Framing |
| 11-18 |
| 05 21 00 |
| Steel Joist Framing |
| 11-18 |
| 05 31 00 |
| Steel Decking |
| 01-21 |
| 05 36 00 |
| Composite Metal Decking |
| 01-21 |
| 05 40 00 |
| Cold-Formed Metal Framing |
| 01-21 |
| 05 50 00 |
| Metal Fabrications |
| 08-18 |
| 05 51 00 |
| Metal Stairs |
| 01-21 |
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
| 06 10 00 |
| Rough Carpentry |
| 10-17 |
| 06 16 63 |
| Cementitious Sheathing |
| 01-21 |
| 06 20 00 |
| Finish Carpentry |
| 01-21 |
DIVISION 07 THERMAL AND MOISTURE PROTECTION
| 07 01 50.19 |
| Preparation for Re-Roofing |
| 01-21 |
| 07 08 00 |
| Facility Exterior Closure Commissioning |
| 01-21 |
| 07 08 00.01 |
| DVA/USACE Projects Facility Exterior Closure Commissioning |
| 08-19 |
| 07 11 13 |
| Bituminous Dampproofing |
| 01-21 |
| 07 12 00 |
| Built-Up Bituminous Waterproofing |
| 01-21 |
| 07 13 00 |
| Sheet Waterproofing |
| 01-21 |
| 07 13 52 |
| Modified Bituminous Sheet Waterproofing |
| 01-21 |
| 07 14 21 |
| Latex Mastic Deck Covering |
| 01-21 |
| 07 18 13 |
| Pedestrian Traffic Coatings |
| 01-21 |
| 07 21 13 |
| Thermal Insulation |
| 01-21 |
| 07 21 23 |
| Loose-Fill Insulation |
| 01-21 |
| 07 22 00 |
| Roof and Deck Insulation |
| 01-21 |
| 07 24 00 |
| Exterior Insulation and Finish Systems |
| 01-21 |
| 07 27 26 |
| Fluid-Applied Membrane Air Barrier, Vapor Permeable |
| 01-21 |
| 07 27 27 |
| Fluid-Applied Membrane Air Barrier, Vapor Retarding |
| 01-21 |
| 07 31 13 |
| Asphalt Shingles |
| 02-21 |
| 07 31 26 |
| Slate Shingles |
| 01-21 |
| 07 31 29.13 |
| Wood Shingles |
| 01-21 |
| 07 32 13 |
| Clay Roof Tiles |
| 01-21 |
| 07 40 00 |
| Roofing and Siding Panels |
| 01-21 |
| 07 51 00 |
| Built-Up Bituminous Roofing |
| 08-18 |
| 07 51 13.11 |
| Hot-Applied Built-Up Asphalt Roofing |
| 01-21 |
| 07 51 13.13 |
| Cold-Applied Built-Up Asphalt Roofing |
| 01-21 |
| 07 52 16.11 |
| Cold Adhesive Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing |
| 01-21 |
| 07 52 16.12 |
| Hot-Mopped Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing |
| 01-21 |
| 07 53 23 |
| Ethylene-Propylene-Diene-Monomer Roofing |
| 01-21 |
| 07 54 16 |
| Ethylene Interpolymer (KEE) Roofing |
| 01-21 |
| 07 54 19 |
| Polyvinyl-Chloride (PVC) Roofing |
| 12-18 |
| 07 54 23 |
| Thermoplastic Polyolefin (TPO) Roofing |
| 01-21 |
| 07 56 00 |
| Fluid-Applied Roofing |
| 01-21 |
| 07 57 13 |
| Sprayed Polyurethane Foam Roofing |
| 01-21 |
| 07 60 00 |
| Flashing and Sheet Metal |
| 01-21 |
| 07 61 16 |
| Batten Seam Copper Roofing |
| 01-21 |
| 07 71 00 |
| Roof Specialties |
| 01-21 |
| 07 72 00 |
| Roof Accessories |
| 01-21 |
| 07 81 00 |
| Applied Fireproofing |
| 10-17 |
| 07 84 00 |
| Firestopping |
| 01-21 |
| 07 92 00 |
| Joint Sealants |
| 10-17 |
| 07 95 13 |
| Expansion Joint Cover Assemblies |
| 01-21 |
DIVISION 08 OPENINGS
| 08 11 13 |
| Hollow Metal Doors and Frames |
| 01-21 |
| 08 11 73 |
| Sliding Metal Fire Doors |
| 01-21 |
| 08 14 00 |
| Interior Wood Doors |
| 01-21 |
| 08 17 10 |
| Integrated Door Assemblies |
| 01-21 |
| 08 31 13 |
| Access Doors and Frames |
| 01-21 |
| 08 32 13 |
| ICU Sliding Glass Doors |
| 01-21 |
| 08 33 00 |
| Coiling Doors and Grilles |
| 01-21 |
| 08 33 13 |
| Coiling Counter Doors |
| 01-21 |
| 08 34 53 |
| Security Doors and Frames |
| 01-21 |
| 08 34 59 |
| Vault Doors and Day Gates |
| 01-21 |
| 08 35 13.13 |
| Accordion Folding Doors |
| 01-21 |
| 08 36 13 |
| Sectional Doors |
| 01-21 |
| 08 38 16 |
| Flexible Traffic Doors |
| 01-21 |
| 08 41 13 |
| Aluminum-Framed Entrances and Storefronts |
| 01-21 |
| 08 42 33 |
| Revolving Door Entrances |
| 01-21 |
| 08 44 13 |
| Glazed Aluminum Curtain Walls |
| 04-20 |
| 08 51 13 |
| Aluminum Windows |
| 01-21 |
| 08 51 13.11 |
| Side-Hinged Aluminum Windows |
| 01-21 |
| 08 51 23 |
| Steel Windows |
| 01-21 |
| 08 51 69.11 |
| Aluminum Storm Windows |
| 01-21 |
| 08 56 19 |
| Pass Windows |
| 01-21 |
| 08 56 53 |
| Blast Resistant Windows |
| 01-21 |
| 08 56 59 |
| Service and Teller Window Units |
| 01-21 |
| 08 56 66 |
| Detention Window Screens |
| 01-21 |
| 08 63 00 |
| Metal-Framed Skylights |
| 01-21 |
| 08 71 00 |
| Door Hardware |
| 01-21 |
| 08 71 13 |
| Automatic Door Operators |
| 01-21 |
| 08 71 13.11 |
| Low Energy Power Assist Door Operators |
| 01-21 |
| 08 90 00 |
| Louvers and Vents |
| 01-21 |
DIVISION 09 – FINISHES
| 09 05 16 |
| Subsurface Preparation for Floor Finishes |
| 01-21 |
| 09 06 00 |
| Schedule for Finishes |
| 01-21 |
| 09 22 16 |
| Non-Structural Metal Framing |
| 06-18 |
| 09 23 00 |
| Gypsum Plastering |
| 01-21 |
| 09 24 00 |
| Portland Cement Plastering |
| 01-21 |
| 09 26 00 |
| Veneer Plastering |
| 01-21 |
| 09 29 00 |
| Gypsum Board |
| 04-20 |
| 09 30 13 |
| Ceramic/Porcelain Tiling |
| 01-21 |
| 09 51 00 |
| Acoustical Ceilings |
| 12-18 |
| 09 54 23 |
| Linear Metal Ceilings |
| 01-21 |
| 09 63 13 |
| Brick Flooring |
| 01-21 |
| 09 63 40 |
| Stone Flooring |
| 01-21 |
| 09 65 13 |
| Resilient Base and Accessories |
| 01-21 |
| 09 65 16 |
| Resilient Sheet Flooring |
| 05-18 |
| 09 65 19 |
| Resilient Tile Flooring |
| 05-18 |
| 09 66 13 |
| Portland Cement Terrazzo Flooring |
| 01-21 |
| 09 66 16 |
| Terrazzo Floor Tile |
| 01-21 |
| 09 67 23.20 |
| Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2) |
| 01-21 |
| 09 67 23.30 |
| Resinous (Epoxy Resin Composition) Mortar Flooring (RES-3) |
| 01-21 |
| 09.67.23.40 |
| Resinous Poured In Place Resilient Flooring (RES-4) |
| 01-21 |
| 09 67 23.50 |
| Resinous Terrazzo Flooring (RES-5) |
| 01-21 |
| 09 67 23.60 |
| Resinous Urethane and Epoxy Mortar Flooring (RES-6A and RES 6B) |
| 01-21 |
| 09 68 21 |
| Athletic Carpeting |
| 01-21 |
| 09 69 00 |
| Access Flooring |
| 01-21 |
| 09 72 16 |
| Vinyl-Coated Fabric Wall Covering |
| 01-21 |
| 09 72 31 |
| Polypropylene Fabric Wall Covering |
| 01-21 |
| 09 78 23 |
| Phenolic Interior Wall Paneling |
| 01-21 |
| 09 84 33 |
| Sound-Absorbing Wall Units |
| 01-21 |
| 09 94 19 |
| Multicolor Interior Finishing |
| 01-21 |
| 09 96 59 |
| Resinous Specialty Glazed Coating Systems for Walls, Ceilings, Wallboard, and Block CMU (RES-W1, RES-W2) |
| 01-21 |
DIVISION 10 – SPECIALTIES
| 10 11 13 |
| Chalkboards and Markerboards |
| 01-21 |
| 10 11 23 |
| Tackboards |
| 01-21 |
| 10 11 33 |
| Glassboards (Magnetic & Non-Magnetic) |
| 01-21 |
| 10 13 00 |
| Directories |
| 01-21 |
| 10 21 13 |
| Toilet Compartments |
| 01-21 |
| 10 21 16 |
| Shower and Dressing Compartments |
| 01-21 |
| 10 21 23 |
| Cubicle Curtain Tracks |
| 01-21 |
| 10 22 13 |
| Wire Mesh Partitions |
| 01-21 |
| 10 22 19 |
| Demountable Partitions |
| 01-21 |
| 10 22 26.13 |
| Accordion Folding Partitions |
| 01-21 |
| 10 25 13 |
| Patient Bed Service Walls |
| 01-20 |
| 10 26 00 |
| Wall and Door Protection |
| 01-21 |
| 10 28 00 |
| Toilet, Bath, and Laundry Accessories |
| 01-21 |
| 10 44 13 |
| Fire Extinguisher Cabinets |
| 08-18 |
DIVISION 11 – EQUIPMENT
| 11 05 12 |
| General Motor Requirements for Equipment |
| 01-21 |
| 11 12 00 |
| Parking Control Equipment |
| 01-21 |
| 11 17 36 |
| Package Transfer Units |
| 01-21 |
| 11 26 00 |
| Unit Kitchens |
| 01-21 |
| 11 40 11 |
| Custom Fabricated Food Service Equipment |
| 01-21 |
| 11 40 21 |
| Food Service Equipment-Utility Distribution System |
| 01-21 |
| 11 41 00 |
| Food Storage Equipment |
| 11-11 |
| 11 41 21 |
| Walk-In Coolers and Freezers |
| 01-21 |
| 11 44 00 |
| Food Cooking Equipment |
| 01-21 |
| 11 48 00 |
| Cleaning and Disposal Equipment |
| 01-21 |
| 11 53 13 |
| Laboratory Fume Hoods |
| 01-21 |
| 11 53 23 |
| Laboratory Refrigerators |
| 01-21 |
| 11 53 53 |
| Biological Safety Cabinets Laminar Airflow Stations |
| 01-21 |
| 11 53 61 |
| Custom Fabricated Laboratory Equipment |
| 01-21 |
| 11 53 71 |
| Solution Warming Cabinets |
| 01-21 |
| 11 71 01 |
| Medical Washing and Sterilizing Equipment |
| 02-11 |
| 11 71 02 |
| Laboratory Washing and Sterilizing Equipment |
| 10-11 |
| 11 73 00 |
| Ceiling Mounted Patient Lift System |
| 08-20 |
| 11 78 00 |
| Mortuary Equipment |
| 11-11 |
| 11 78 13 |
| Mortuary Refrigerators |
| 11-11 |
| 11 79 13 |
| Hydrotherapy Equipment |
| 11-11 |
| 11 82 19 |
| Packaged Incinerators |
| 11-11 |
DIVISION 12 – FURNISHINGS
| 12 22 16 |
| Drapery Track and Accessories |
| 05-15 |
| 12 24 00 |
| Window Shades |
| 08-17 |
| 12 24 21 |
| Lightproof Shades |
| 05-15 |
| 12 31 00 |
| Manufactured Metal Casework |
| 05-15 |
| 12 32 00 |
| Manufactured Wood Casework |
| 09-15 |
| 12 34 00 |
| Manufactured Plastic Casework |
| 10-15 |
| 12 35 70.21 |
| Medication Cabinet |
| 02-16 |
| 12 36 00 |
| Countertops |
| 12-18 |
| 12 56 70.11 |
| Suspended Table |
| 02-16 |
DIVISION 13 - SPECIAL CONSTRUCTION
| 13 05 41 |
| Seismic Restraint Requirements for Non-Structural Components |
| 01-14 |
| 13 17 23 |
| Therapeutic Pools |
| 05-15 |
| 13 17 23.11 |
| Therapeutic Pool Accessories |
| 05-15 |
| 13 19 13 |
| Kennel Enclosures and Gates |
| 02-16 |
| 13 21 29 |
| Constant Temperature Rooms |
| 08-16 |
| 13 21 49 |
| Audiology Booth |
| 01-21 |
| 13 34 19 |
| Metal Building Systems |
| 08-16 |
| 13 49 00 |
| Radiation Protection |
| 02-16 |
DIVISION 14– CONVEYING EQUIPEMENT
| 14 12 11 |
| Traction and Winding Drum Dumbwaiter |
| 11-20 |
| 14 21 00 |
| New Traction Elevator |
| 08-20 |
| 14 21 10 |
| Modernization of Traction Elevator |
| 08-20 |
| 14 21 11 |
| Traction Cartlift |
| 03-20 |
| 14 24 00 |
| New Hydraulic Elevator |
| 08-20 |
| 14 24 10 |
| Modernization of Hydraulic Elevator |
| 08-20 |
| 14 24 11 |
| Hydraulic Cartlift |
| 03-20 |
| 14 24 24 |
| Renovation Hydraulic Elevator (Custom Written by VACO) |
| 14 26 26 |
| Renovation Traction Elevator (Custom Written by VACO) |
| 14 91 33 |
| Gravity Soiled Linen Chutes |
| 08-20 |
| 14 91 82 |
| Gravity Trash Chutes |
| 03-20 |
DIVISION 21- FIRE SUPPRESSION
| 21 08 00 |
| Commissioning of Fire Suppression System |
| 11-16 |
| 21 08 00.01 |
| DVA/USACE Projects Commissioning of Fire Suppression Systems |
| 08-19 |
| 21 12 00 |
| Manual Dry Standpipe Systems |
| 06-15 |
| 21 13 13 |
| Wet-Pipe Sprinkler Systems |
| 06-15 |
| 21 13 16 |
| Dry-Pipe Sprinkler Systems |
| 01-15 |
| 21-22-00 |
| Clean Agent Fire Suppression Systems |
| 05-15 |
| 21-30-13 |
| Electric-Driven, Fire Pumps |
| 05-15 |
| 21-30-16 |
| Diesel-Driven, Fire Pumps |
| 05-15 |
DIVISION 22 – PLUMBING
| 22 05 11 |
| Common Work Results for Plumbing |
| 09-20 |
| 22 05 12 |
| General Motor Requirements for Plumbing Equipment |
| 09-20 |
| 22 05 19 |
| Meters and Gages for Plumbing Piping |
| 09-20 |
| 22 05 23 |
| General-Duty Valves for Plumbing Piping |
| 09-20 |
| 22 05 33 |
| Heat Tracing for Plumbing Piping |
| 09-20 |
| 22 07 11 |
| Plumbing Insulation |
| 09-19 |
| 22 08 00 |
| Commissioning of Plumbing Systems |
| 11-16 |
| 22 08 00.01 |
| DVA/USACE Projects Commissioning of Plumbing Systems |
| 08-19 |
| 22 11 00 |
| Facility Water Distribution |
| 05-21 |
| 22 11 23 |
| Domestic Water Pumps |
| 09-15 |
| 22 12 16 |
| Facility Elevated, Potable-Water Storage Tanks |
| 09-15 |
| 22 13 00 |
| Facility Sanitary and Vent Piping |
| 09-20 |
| 22 13 23 |
| Sanitary Waste Interceptors |
| 09-20 |
| 22 13 29 |
| Sanitary Sewerage Pumps |
| 09-20 |
| 22 13 29.13 |
| Wet-Pit Mounted, Vertical Sewerage Pumps |
| 09-20 |
| 22 13 33 |
| Packaged, Submersible Sewerage Pump Units |
| 09-20 |
| 22 14 00 |
| Facility Storm Drainage |
| 09-15 |
| 22 14 29 |
| Sump Pumps |
| 09-15 |
| 22 14 33 |
| Packaged, Pedestal Drainage Pump Units |
| 09-15 |
| 22 14 36 |
| Packaged, Submersible, Drainage Pump Units |
| 09-15 |
| 22 15 00 |
| General Service Compressed-Air Systems |
| 09-20 |
| 22 31 11 |
| Water Softeners |
| 09-15 |
| 22 33 00 |
| Electric Domestic Water Heaters |
| 09-20 |
| 22 34 00 |
| Fuel-Fired Domestic Water Heaters |
| 09-20 |
| 22 35 00 |
| Domestic Water Heat Exchangers |
| 09-20 |
| 22 40 00 |
| Plumbing Fixtures |
| 09-15 |
| 22 42 26 |
| Commercial Disposers |
| 09-15 |
| 22 61 13.74 |
| Dental Compressed-Air Piping |
| 09-20 |
| 22 61 19.74 |
| Dental Compressed-Air Equipment |
| 09-20 |
| 22 62 00 |
| Vacuum Systems for Laboratory and Healthcare Facilities |
| 09-15 |
| 22 62 19.74 |
| Dental Vacuum and Evacuation Equipment |
| 09-15 |
| 22 63 00 |
| Gas Systems for Laboratory and Healthcare Facilities |
| 09-15 |
| 22 66 00 |
| Chemical-Waste Systems for Laboratory and Healthcare Facilities |
| 09-20 |
| 22 67 19.16 |
| Reverse-Osmosis Water Equipment |
| 09-15 |
| 22 67 21 |
| Water Dealkalizing System |
| 09-15 |
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
| 23 05 10 |
| Common Work Results for Boiler Plant and Steam Generation |
| 04-20 |
| 23 05 11 |
| Common Work Results for HVAC |
| 02-20 |
| 23 05 12 |
| General Motor Requirements for HVAC and Steam Generation Equipment |
| 02-20 |
| 23 05 41 |
| Noise and Vibration Control for HVAC Piping and Equipment |
| 02-20 |
| 23 05 51 |
| Noise and Vibration Control for Boiler Plant |
| 04-20 |
| 23 05 93 |
| Testing, Adjusting, and Balancing for HVAC |
| 02-20 |
| 23 05 93.01 |
| DVA/USACE Projects Testing, Adjusting, and Balancing for HVAC |
| 08-19 |
| 23 07 11 |
| HVAC and Boiler Plant Insulation |
| 02-20 |
| 23 08 00 |
| Commissioning of HVAC Systems |
| 02-20 |
| 23 08 00.01 |
| DVA/USACE Projects Commissioning of HVAC Systems |
| 08-19 |
| 23 08 11 |
| Demonstrations and Tests for Boiler Plant |
| 04-20 |
| 23 09 11 |
| Instrumentation and Control for Boiler Plant |
| 08-21 |
| 23 09 23 |
| Direct-Digital Control System for HVAC |
| 09-11 |
| 23 10 00 |
| Facility Fuel Systems |
| 04-20 |
| 23 11 23 |
| Facility Natural-Gas Piping |
| 04-20 |
| 23 21 11 |
| Boiler Plant Piping Systems |
| 09-21 |
| 23 21 13 |
| Hydronic Piping |
| 02-20 |
| 23 21 23 |
| Hydronic Pumps |
| 02-20 |
| 23 22 13 |
| Steam and Condensate Heating Piping |
| 02-20 |
| 23 22 23 |
| Steam Condensate Pumps |
| 04-20 |
| 23 23 00 |
| Refrigerant Piping |
| 02-20 |
| 23 25 00 |
| HVAC Water Treatment |
| 02-20 |
| 23 31 00 |
| HVAC Ducts and Casings |
| 02-20 |
| 23 36 00 |
| Air Terminal Units |
| 02-20 |
| 23 37 00 |
| Air Outlets and Inlets |
| 02-20 |
| 23 38 13 |
| Commercial-Kitchen Hoods |
| 02-20 |
| 23 40 00 |
| HVAC Air Cleaning Devices |
| 03-20 |
| 23 50 11 |
| Boiler Plant Mechanical Equipment |
| 11-17 |
| 23 51 00 |
| Breechings, Chimneys, and Stacks |
| 04-20 |
| 23 52 25 |
| Low-Pressure Water Heating Boilers |
| 08-21 |
| 23 52 28 |
| Low Pressure Steam Boilers |
| 08-21 |
| 23 52 33 |
| Water-Tube Boilers |
| 08-21 |
| 23 52 39 |
| Fire-Tube Boilers |
| 08-21 |
| 23 56 00 |
| Solar Energy Heating System |
| 03-20 |
| 23 57 33 |
| Geothermal Energy – Direct Use (Heating Applications) |
| 03-20 |
| 23 64 00 |
| Packaged Water Chillers |
| 03-20 |
| 23 65 00 |
| Cooling Towers |
| 03-20 |
| 23 72 00 |
| Air-to-Air Energy Recovery Equipment |
| 03-20 |
| 23 73 00 |
| Indoor Central-Station Air-Handling Units |
| 03-20 |
| 23 74 13 |
| Packaged, Outdoor, Central-Station Air-Handling Units |
| 03-20 |
| 23 81 00 |
| Decentralized Unitary HVAC Equipment |
| 03-20 |
| 23 81 23 |
| Computer-Room Air-Conditioners |
| 03-20 |
| 23 81 43 |
| Air-Source Unitary Heat Pumps |
| 03-20 |
| 23 81 46 |
| Water-Source Unitary Heat Pumps |
| 03-20 |
| 23 81 49 |
| Ground-Source Heat Pump |
| 03-20 |
| 23 82 00 |
| Convection Heating and Cooling Units |
| 03-20 |
| 23 84 00 |
| Humidity Control Equipment |
| 03-20 |
DIVISION 25 – INTEGRATED AUTOMATION
| 25 10 10 |
| Advanced Utility Metering System |
| 02-10 |
DIVISION 26 – ELECTRICAL
| 26 05 11 |
| Requirements for Electrical Installations |
| 01-16 |
| 26 05 13 |
| Medium-Voltage Cables |
| 01-17 |
| 26 05 19 |
| Low-Voltage Electrical Power Conductors and Cables |
| 01-17 |
| 26 05 26 |
| Grounding and Bonding for Electrical Systems |
| 01-17 |
| 26 05 33 |
| Raceway and Boxes for Electrical Systems |
| 01-18 |
| 26 05 36 |
| Wireways for Radiology Equipment |
| 01-18 |
| 26 05 39 |
| Underfloor Raceways for Electrical Systems |
| 01-18 |
| 26 05 41 |
| Underground Electrical Construction |
| 01-17 |
| 26 05 73 |
| Overcurrent Protective Device Coordination Study |
| 01-18 |
| 26 08 00 |
| Commissioning of Electrical Systems |
| 11-16 |
| 26 08 00.01 |
| DVA/USACE Projects Commissioning of Electrical Systems |
| 08-19 |
| 26 09 23 |
| Lighting Controls |
| 01-18 |
| 26 11 16 |
| Secondary Unit Substations |
| 01-18 |
| 26 12 19 |
| Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers |
| 01-18 |
| 26 13 13 |
| Medium-Voltage Circuit Breaker Switchgear |
| 01-17 |
| 26 13 16 |
| Medium-Voltage Fusible Interrupter Switches |
| 01-17 |
| 26 20 11 |
| Isolated Power Systems |
| 01-18 |
| 26 22 00 |
| Low-Voltage Transformers |
| 01-18 |
| 26 23 00 |
| Low-Voltage Switchgear |
| 01-17 |
| 26 23 13 |
| Generator Paralleling Controls |
| 01-17 |
| 26 24 13 |
| Distribution Switchboards |
| 01-18 |
| 26 24 16 |
| Panelboards |
| 01-18 |
| 26 24 19 |
| Motor Control Centers |
| 01-18 |
| 26 26 00 |
| Power Distribution Units for Static Uninterruptible Power Systems |
| 01-18 |
| 26 27 26 |
| Wiring Devices |
| 01-18 |
| 26 29 11 |
| Motor Controllers |
| 01-18 |
| 26 29 21 |
| Enclosed Switches and Circuit Breakers |
| 01-17 |
| 26 32 13 |
| Engine Generators |
| 01-18 |
| 26 33 53 |
| Static Uninterruptible Power Supply |
| 01-17 |
| 26 35 26 |
| Harmonic Filters |
| 01-18 |
| 26 36 23 |
| Automatic Transfer Switches |
| 01-17 |
| 26 41 00 |
| Facility Lightning Protection |
| 01-17 |
| 26 42 00 |
| Cathodic Protection |
| 01-17 |
| 26 43 13 |
| Surge Protective Devices |
| 01-17 |
| 26 51 00 |
| Interior Lighting |
| 01-18 |
| 26 55 71 |
| Medical and Surgical Lighting Fixtures |
| 01-18 |
| 26 56 00 |
| Exterior Lighting |
| 01-18 |
DIVISION 27 – COMMUNICATIONS
| 27 05 11 |
| Requirements for Communications Installations |
| 09-19 |
| 27 05 26 |
| Grounding and Bonding for Communications Systems |
| 06-15 |
| 27 05 33 |
| Raceways and Boxes for Communications Systems |
| 10-18 |
| 27 05 61 |
| Leased Space, Communication Equipment and Systems |
| 06-15 |
| 27 08 00 |
| Commissioning of Communications Systems |
| 11-16 |
| 27 08 00.01 |
| DVA/USACE Projects Commissioning of Communications Systems |
| 08-19 |
| 27 10 00 |
| Control, Communication and Signal Wiring |
| 06-15 |
| 27 11 00 |
| Communications Equipment Room Fittings |
| 06-15 |
| 27 15 00 |
| Communications Structured Cabling |
| 01-16 |
| 27 31 00 |
| Voice Communications Switching and Routing Equipment |
| 06-15 |
| 27 31 31 |
| Voice Communications Switching and Routing Equipment - Extension |
| 06-15 |
| 27 32 41 |
| Two-Way Radio Equipment and Systems |
| 10-18 |
| 27 41 31 |
| Master Antenna Television Equipment and Systems |
| 06-15 |
| 27 51 16 |
| Public Address and Mass Notification Systems |
| 10-18 |
| 27 51 23 |
| Intercommunications and Program Systems |
| 06-15 |
| 27 52 23 |
| Nurse Call and Code Blue Systems |
| 10-18 |
| 27 52 41 |
| Miscellaneous Medical Systems |
| 06-15 |
| 27 53 19 |
| Distributed Radio Antenna (Within Building) Equipment and System |
| 10-18 |
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
| 28 05 00 |
| Common Work Results for Electronic Safety and Security |
| 04-18 |
| 28 05 13 |
| Conductors and Cables for Electronic Safety and Security |
| 10-18 |
| 28 05 26 |
| Grounding and Bonding for Electronic Safety and Security |
| 09-11 |
| 28 05 28.33 |
| Conduits and Backboxes for Electronic Safety and Security |
| 09-11 |
| 28 08 00 |
| Commissioning of Electronic Safety and Security Systems |
| 11-16 |
| 28 08 00.01 |
| DVA/USACE Projects Commissioning of Electronic Safety and Security Systems |
| 08-19 |
| 28 13 00 |
| Physical Access Control System |
| 10-11 |
| 28 13 16 |
| Physical Access Control System and Database Management |
| 09-11 |
| 28 13 53 |
| Security Access Detection |
| 09-11 |
| 28 16 00 |
| Intrusion Detection System |
| 10-11 |
| 28 23 00 |
| Video Surveillance |
| 09-11 |
| 28 26 00 |
| Electronic Personal Protection System |
| 09-11 |
| 28 31 00 |
| Fire Detection and Alarm |
| 10-11 |
| 28 52 31 |
| Emergency Call System |
| 06-15 |
DIVISION 31 – EARTHWORK
| 31 20 11 |
| Earthwork (Short Form) |
| 10-12 |
| 31 23 19 |
| Dewatering |
| 10-12 |
| 31 23 23.33 |
| Flowable Fill |
| 10-12 |
| 31 32 23 |
| Pressure Grouting Soil Stabilization |
| 10-12 |
| 31 62 00 |
| Driven Piles |
| 10-12 |
| 31 63 16 |
| Auger Cast Grout Piles |
| 10-12 |
| 31 63 26 |
| Drilled Caissons |
| 10-12 |
DIVISION 32 – EXTERIOR IMPROVEMENTS
| 32 05 23 |
| Cement and Concrete for Exterior Improvements |
| 08-16 |
| 32 12 16 |
| Asphalt Paving |
| 09-15 |
| 32 14 16 |
| Brick Unit Paving |
| 08-16 |
| 32 17 23 |
| Pavement Markings |
| 08-16 |
| 32 31 13 |
| Chain Link Fences and Gates |
| 06-18 |
| 32 31 40 |
| High Security Fences and Gates |
| 08-16 |
| 32 84 00 |
| Planting Irrigation |
| 08-16 |
DIVISION 33 – UTILITIES
| 33 08 00 |
| Commissioning of Site Utility Systems |
| 11-16 |
| 33 08 00.01 |
| DVA/USACE Projects Commissioning of Site Utility Systems |
| 08-19 |
| 33 10 00 |
| Water Utilities |
| 03-17 |
| 33 30 00 |
| Sanitary Sewer Utilities |
| 06-13 |
| 33 40 00 |
| Storm Sewer Utilities |
| 12-17 |
| 33 46 13 |
| Foundation Drainage |
| 10-11 |
| 33 51 00 |
| Natural-Gas Distribution |
| 10-11 |
| 33 63 00 |
| Steam Energy Distribution |
| 09-17 |
DIVISION 34 – TRANSPORTATION
| 34 71 13 |
| Passive Vehicle Barriers |
| 04-18 |
| 34 75 13.13 |
| Active Vehicle Barriers |
| 08-16 |
DIVISION 48 – Electrical Power Generation
| 48 14 00 |
| Solar Energy Electrical Power Generation System |
| 10-17 |
| 48 15 00 |
| Wind Energy Electrical Power Generation System |
| 10-17 |
| 48 16 23 |
| Geothermal Energy Electrical Power Generation System |
| 10-17 |
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for 660-22-114 “Update Non-Sterile Compounding Room” as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer.
C. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.
D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, Room Renovation: The current casework, including the sinks and underlying plumbing system, needs to be updated for hygienic compliance and elements that are out of compliance need to be removed. In addition, the HVAC system must be reconfigured, and a fan coil unit installed with associated controls to better regulate temperatures and meet compliance. Current carpet flooring is also out of compliance and must be replaced with complete rubber sheet flooring. Additional finishes and repairs to walls are to be done to restore the appearance of the room.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including toolboxes and parked machines and take any emergency action.
D. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).
a) Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
b) “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of permits shall be issued for General Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA Medical Center Facility Manager.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as determined by the COR.
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two workdays. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
G. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to COR and Contractor.
H. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for preinspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.
I. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
J. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
K. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
1.7 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to reinstallation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.8 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.9 WARRANTY MANAGEMENT
A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction at least 30 days before the planned pre-warranty conference, submit one set of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:
1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.
2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.
3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.
4. A list for each warranted equipment item, feature of construction or system indicating:
a. Name of item.
b. Model and serial numbers.
c. Location where installed.
d. Name and phone numbers of manufacturers and suppliers.
e. Name and phone numbers of manufacturers or suppliers.
f. Names, addresses and phone numbers of sources of spare parts.
g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.
h. Starting point and duration of warranty period.
i. Summary of maintenance procedures required to continue the warranty in force.
j. Cross-reference to specific pertinent Operation and Maintenance manuals.
k. Organizations, names and phone numbers of persons to call for warranty service.
l. Typical response time and repair time expected for various warranted equipment.
5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.
6. Procedure and status of tagging of all equipment covered by extended warranties.
7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.
B. Performance & Payment Bonds: The Performance & Payment Bonds must remain effective throughout the construction period.
1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.
2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.
3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.
C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for Contractor response, and other details deemed necessary by the Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor. This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the Contractor of any of its responsibilities in conjunction with other portions of this provision.
D. Contractor’s Response to Construction Warranty Service Requirements:
E. Following oral or written notification by the Contracting Officer, the Contractor shall respond to construction warranty service requirements in accordance with the “Construction Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period. Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.
1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.
2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.
3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.
4. The “Construction Warranty Service Priority List” is as follows:
a) Code 1-Life Safety Systems
1. Fire suppression systems.
1. Fire alarm system(s).
b) Code 1-Air Conditioning Systems
1) Air conditioning leak in part of the building, if causing damage.
2) Air conditioning system not cooling properly.
c) Code 1 Doors
1. Overhead doors not operational, causing a security, fire or safety problem.
1) Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.
d) Code 3-Doors
1. Overhead doors not operational.
1. Interior/exterior personnel doors or hardware not functioning properly.
e) Code 1-Electrical
1. Power failure (entire area or any building operational after 1600 hours).
1. Security lights.
1. Smoke detectors.
f) Code 2-Electrical
1. Power failure (no power to a room or part of building). Receptacle and lights not operational (in a room or part of building).
g) Code 3-Electrical
1. Exterior lights not operational.
h) Code 1-Gas
1. Leaks and pipeline breaks.
i) Code 1-Heat
1. Power failure affecting heat.
j) Code 1-Plumbing
1. Hot water heater failure.
2) Leaking water supply pipes
k) Code 2-Plumbing
1. Flush valves not operating properly
1. Fixture drain, supply line or any water pipe leaking.
1. Toilet leaking at base.
l) Code 3- Plumbing
1. Leaky faucets.
m) Code 3-Interior
1. Floors damaged.
1. Paint chipping or peeling.
1. Casework damaged.
n) Code 1-Roof Leaks
1. Damage to property is occurring.
o) Code 2-Water (Exterior)
1. No water to facility.
p) Code 2-Water (Hot)
1. No hot water in portion of building listed.
q) Code 3
1. All work not listed above.
F. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the Contracting Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating. Also submit tworecord copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature must remain blank until the project is accepted for beneficial occupancy. Show the following information on the tag.
Warranty Tags
Type of product/material
Model number
Serial number
Contract number
Warranty period from/to
Inspector’s signature
Construction Contractor
Address
Telephone number
Warranty Contact
Address
Telephone number
Warranty response time priority code
1.10 TEMPORARY USE OF EXISTING ELEVATORS
A. Use of existing elevators for handling building materials and Contractor's personnel will be permitted subject to following provisions:
1. Contractor makes all arrangements with the COR for use of elevators. The COR will ascertain that elevators are in proper condition. Personnel for operating elevators will not be provided by the Department of Veterans Affairs.
2. Contractor covers and provides maximum protection of following elevator components:
r) Entrance jambs, heads soffits and threshold plates.
s) Entrance columns, canopy, return panels and inside surfaces of car enclosure walls.
t) Finish flooring.
1.11 AVAILABILITY AND USE OF UTILITY SERVICES
A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.
B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.
C. Contractor shall install meters at Contractor's expense and furnish the Medical Center a monthly record of the Contractor's usage of electricity as hereinafter specified.
D. Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials:
1. Obtain heat by connecting to Medical Center heating distribution system.
E. Electricity (for Construction and Testing): Furnish all temporary electric services.
1. Obtain electricity by connecting to the Medical Center electrical distribution system. The Contractor shall meter and pay for electricity required for electric cranes and hoisting devices, electrical welding devices and any electrical heating devices providing temporary heat. Electricity for all other uses is available at no cost to the Contractor.
F. Water (for Construction and Testing): Furnish temporary water service.
1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no cost to the Contractor.
2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation (at COR discretion) of use of water from Medical Center's system.
G. Fuel: Natural and LP gas and burner fuel oil required for boiler cleaning, normal initial boiler-burner setup and adjusting, and for performing the specified boiler tests will be furnished by the Government. Fuel required for prolonged boiler-burner setup, adjustments, or modifications due to improper design or operation of boiler, burner, or control devices shall be furnished and paid by the Contractor at Contractor's expense.
1.12 INSTRUCTIONS
A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.
B. Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and subassembly components. Manuals shall include an index covering all component parts clearly crossreferenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system being furnished. Manuals referencing equipment similar to but of a different model, style, and size than that furnished will not be accepted.
C. Instructions: Contractor shall provide qualified, factorytrained manufacturers' representatives to give detailed training to assigned Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. All such training will be at the job site. These requirements are more specifically detailed in the various technical sections. Instructions for different items of equipment that are component parts of a complete system, shall be given in an integrated, progressive manner. All instructors for every piece of component equipment in a system shall be available until instructions for all items included in the system have been completed. This is to assure proper instruction in the operation of inter-related systems. All instruction periods shall be at such times as scheduled by the COR and shall be considered concluded only when the COR is satisfied in regard to complete and thorough coverage. The contractor shall submit a course outline with associated material to the COR for review and approval prior to scheduling training to ensure the subject matter covers the expectations of the VA and the contractual requirements. The Department of Veterans Affairs reserves the right to request the removal of, and substitution for, any instructor who, in the opinion of the COR, does not demonstrate sufficient qualifications in accordance with requirements for instructors above.
SECTION 01 35 26
Safety REQUIREMENTS
TABLE OF CONTENTS
| 1.1 | APPLICABLE PUBLICATIONS | 3 | |
| 1.2 | DEFINITIONS | 5 | |
| 1.3 | REGULATORY REQUIREMENTS | 7 | |
| 1.4 | ACCIDENT PREVENTION PLAN (APP) | 7 | |
| 1.5 | ACTIVITY HAZARD ANALYSES (AHAs) | 13 | |
| 1.6 | PRECONSTRUCTION CONFERENCE | 15 | |
| 1.7 | “SITE SAFETY AND HEALTH OFFICER” (SSHO) and “COMPETENT PERSON” (CP) | | 16 |
| 1.8 | TRAINING | 17 | |
| 1.9 | INSPECTIONS | 18 | |
| 1.10 | ACCIDENTS, OSHA 300 LOGS, AND MAN-HOURS | 19 | |
| 1.11 | PERSONAL PROTECTIVE EQUIPMENT (PPE) | 20 | |
| 1.12 | INFECTION CONTROL | 22 | |
| 1.13 | TUBERCULOSIS SCREENING | 31 | |
| 1.14 | FIRE SAFETY | 32 | |
| 1.15 | ELECTRICAL | 36 | |
| 1.16 | FALL PROTECTION | 38 | |
| 1.17 | SCAFFOLDS AND OTHER WORK PLATFORMS | 38 | |
| 1.18 | EXCAVATION AND TRENCHES | 39 | |
| 1.19 | CRANES | 42 | |
| 1.20 | CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) | 42 | |
| 1.21 | CONFINED SPACE ENTRY | 43 | |
| 1.22 | WELDING AND CUTTING | 43 | |
| 1.23 | LADDERS | 43 | |
| 1.24 | FLOOR & WALL OPENINGS | 44 | |
SECTION 01 35 26
Safety REQUIREMENTS
1.1 APPLICABLE PUBLICATIONS:
A. Latest publications listed below form part of this Article to extent referenced. Publications are referenced in text by basic designations only.
B. American Society of Safety Engineers (ASSE):
| A10.1-2011 | Pre-Project & Pre-Task Safety and Health Planning |
| A10.34-2012 | Protection of the Public on or Adjacent to Construction Sites |
| A10.38-2013 | Basic Elements of an Employer’s Program to Provide a Safe and Healthful Work Environment American National Standard Construction and Demolition Operations |
C. American Society for Testing and Materials (ASTM):
E84-2013 Surface Burning Characteristics of Building Materials D. The Facilities Guidelines Institute (FGI):
FGI Guidelines-2010Guidelines for Design and Construction of Healthcare Facilities E. National Fire Protection Association (NFPA):
| 10-2018 | Standard for Portable Fire Extinguishers |
| 30-2018 | Flammable and Combustible Liquids Code |
| 51B-2019 | Standard for Fire Prevention During Welding, Cutting and Other Hot Work |
| 70-2020 | National Electrical Code |
| 70B-2019 | Recommended Practice for Electrical Equipment Maintenance |