Update Non Sterile Compounding Room Specs V2.docx

DOCX document 285 KB Posted

Attached to
Z2DA--660-22-114 Non-Sterile Compounding Room Update Federal contract opportunity
Solicitation number
36C25922Q0417
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--660-22-114 Non-Sterile Compounding Room Update, newest first.
File Type Posted
36C25922Q0417 RFI.docx DOCX document
36C25922Q0417 0002.docx DOCX document
S04 -Site Visit Meeting Doc.docx DOCX document
Past Performance Questionnaire.docx DOCX document
36C25922Q0417 0001.docx DOCX document
Walkthrough Attendance Sheet.pdf PDF
Specs.docx DOCX document
Solicitation_Instructions to Offerors - Under SAP.docx DOCX document
36C25922Q0417_1.docx DOCX document
Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07-01-14

09-01-21

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO.
DIVISION AND SECTION TITLES
DATE

DIVISION 00 SPECIAL SECTIONS

00 01 15
List of Drawing Sheets
05-20
00 11 21
Request for Proposal to Design Build
09-21

DIVISION 01 GENERAL REQUIREMENTS

01 00 00
General Requirements
05-21
01 32 16.01
Architectural and Engineering CPM Schedules
03-20
01 32 16.13
Network Analysis Schedules – Major Construction Project Design-Bid-Build
03-20
01 32 16.15
Project Schedules (Small Projects – Design/Bid/Build
03-20
01 32 16.16
Network Analysis Schedules (Design-Build Only)
03-20
01 32 16.17
Network Analysis Schedules – Major Design/Build Projects
06-19
01 33 23
Shop Drawings, Product Data, and Samples
06-21
01 35 26
Safety Requirements
07-20
01 42 19
Reference Standards
11-20
01 45 00
Quality Control
02-21
01 45 29
Testing Laboratory Services
11-18
01 45 35
Special Inspections
06-21
01 57 19
Temporary Environmental Controls
01-21
01 58 16
Temporary Interior Signage
07-15
01 74 19
Construction Waste Management
01-21
01 81 13
Sustainable Construction Requirements
10-17
01 81 13.02
Sustainability Certification Requirements – LEED NC V4
01-21
01 81 13.21
Sustainability Certification Requirements – GREEN GLOBES
01-21
01 91 00
General Commissioning Requirements
10-15
01 91 00.01
DVA/USACE Projects General Commissioning Requirements
08-19

DIVISION 02 – EXISTING CONDITIONS

02 21 13
Site Surveys
01-21
02 41 00
Demolition
08-17
02 65 00
Underground Storage Tank Removal
01-21
02 82 11
Traditional Asbestos Abatement
01-21
02 82 13.13
Glovebag Asbestos Abatement
01-21
02 82 13.19
Asbestos Floor Tile and Mastic Abatement
01-21
02 82 13.21
Asbestos Roofing Abatement
01-21
02 82 13.31
Asbestos Transite Abatement
01-21
02 82 13.41
Asbestos Abatement for Total Demolition Project
01-21
02 83 33.13
Lead-Based Paint Removal and Disposal
01-21

DIVISION 03 – CONCRETE

03 23 00
Stressing Tendons
01-21
03 30 00
Cast-in-Place Concrete
01-21
03 30 53
(Short-Form) Cast-in-Place Concrete
01-21
03 37 13
Shotcrete
01-21
03 41 13
Precast Concrete Hollow Core Planks
01-21
03 41 33
Precast Structural Pretensioned Concrete
01-21
03 45 00
Precast Architectural Concrete
01-21
03 51 13
Cementitious Wood Fiber Decks
01-21
03 51 16
Gypsum Concrete Roof Decks
01-21
03 52 00
Lightweight Concrete Roof Insulation
01-21
03 55 11
Gypsum Concrete Floor Decks
01-21

DIVISION 04 – MASONRY

04 01 00
Maintenance of Masonry
01-21
04 05 13
Masonry Mortaring
10-17
04 05 16
Masonry Grouting
01-21
04 20 00
Unit Masonry
08-17
04 72 00
Cast Stone Masonry
01-21

DIVISION 05 – METALS

05 12 00
Structural Steel Framing
11-18
05 21 00
Steel Joist Framing
11-18
05 31 00
Steel Decking
01-21
05 36 00
Composite Metal Decking
01-21
05 40 00
Cold-Formed Metal Framing
01-21
05 50 00
Metal Fabrications
08-18
05 51 00
Metal Stairs
01-21

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00
Rough Carpentry
10-17
06 16 63
Cementitious Sheathing
01-21
06 20 00
Finish Carpentry
01-21

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 01 50.19
Preparation for Re-Roofing
01-21
07 08 00
Facility Exterior Closure Commissioning
01-21
07 08 00.01
DVA/USACE Projects Facility Exterior Closure Commissioning
08-19
07 11 13
Bituminous Dampproofing
01-21
07 12 00
Built-Up Bituminous Waterproofing
01-21
07 13 00
Sheet Waterproofing
01-21
07 13 52
Modified Bituminous Sheet Waterproofing
01-21
07 14 21
Latex Mastic Deck Covering
01-21
07 18 13
Pedestrian Traffic Coatings
01-21
07 21 13
Thermal Insulation
01-21
07 21 23
Loose-Fill Insulation
01-21
07 22 00
Roof and Deck Insulation
01-21
07 24 00
Exterior Insulation and Finish Systems
01-21
07 27 26
Fluid-Applied Membrane Air Barrier, Vapor Permeable
01-21
07 27 27
Fluid-Applied Membrane Air Barrier, Vapor Retarding
01-21
07 31 13
Asphalt Shingles
02-21
07 31 26
Slate Shingles
01-21
07 31 29.13
Wood Shingles
01-21
07 32 13
Clay Roof Tiles
01-21
07 40 00
Roofing and Siding Panels
01-21
07 51 00
Built-Up Bituminous Roofing
08-18
07 51 13.11
Hot-Applied Built-Up Asphalt Roofing
01-21
07 51 13.13
Cold-Applied Built-Up Asphalt Roofing
01-21
07 52 16.11
Cold Adhesive Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing
01-21
07 52 16.12
Hot-Mopped Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing
01-21
07 53 23
Ethylene-Propylene-Diene-Monomer Roofing
01-21
07 54 16
Ethylene Interpolymer (KEE) Roofing
01-21
07 54 19
Polyvinyl-Chloride (PVC) Roofing
12-18
07 54 23
Thermoplastic Polyolefin (TPO) Roofing
01-21
07 56 00
Fluid-Applied Roofing
01-21
07 57 13
Sprayed Polyurethane Foam Roofing
01-21
07 60 00
Flashing and Sheet Metal
01-21
07 61 16
Batten Seam Copper Roofing
01-21
07 71 00
Roof Specialties
01-21
07 72 00
Roof Accessories
01-21
07 81 00
Applied Fireproofing
10-17
07 84 00
Firestopping
01-21
07 92 00
Joint Sealants
10-17
07 95 13
Expansion Joint Cover Assemblies
01-21

DIVISION 08 OPENINGS

08 11 13
Hollow Metal Doors and Frames
01-21
08 11 73
Sliding Metal Fire Doors
01-21
08 14 00
Interior Wood Doors
01-21
08 17 10
Integrated Door Assemblies
01-21
08 31 13
Access Doors and Frames
01-21
08 32 13
ICU Sliding Glass Doors
01-21
08 33 00
Coiling Doors and Grilles
01-21
08 33 13
Coiling Counter Doors
01-21
08 34 53
Security Doors and Frames
01-21
08 34 59
Vault Doors and Day Gates
01-21
08 35 13.13
Accordion Folding Doors
01-21
08 36 13
Sectional Doors
01-21
08 38 16
Flexible Traffic Doors
01-21
08 41 13
Aluminum-Framed Entrances and Storefronts
01-21
08 42 33
Revolving Door Entrances
01-21
08 44 13
Glazed Aluminum Curtain Walls
04-20
08 51 13
Aluminum Windows
01-21
08 51 13.11
Side-Hinged Aluminum Windows
01-21
08 51 23
Steel Windows
01-21
08 51 69.11
Aluminum Storm Windows
01-21
08 56 19
Pass Windows
01-21
08 56 53
Blast Resistant Windows
01-21
08 56 59
Service and Teller Window Units
01-21
08 56 66
Detention Window Screens
01-21
08 63 00
Metal-Framed Skylights
01-21
08 71 00
Door Hardware
01-21
08 71 13
Automatic Door Operators
01-21
08 71 13.11
Low Energy Power Assist Door Operators
01-21
08 80 00
Glazing
01-21
08 90 00
Louvers and Vents
01-21

DIVISION 09 – FINISHES

09 05 16
Subsurface Preparation for Floor Finishes
01-21
09 06 00
Schedule for Finishes
01-21
09 22 16
Non-Structural Metal Framing
06-18
09 23 00
Gypsum Plastering
01-21
09 24 00
Portland Cement Plastering
01-21
09 26 00
Veneer Plastering
01-21
09 29 00
Gypsum Board
04-20
09 30 13
Ceramic/Porcelain Tiling
01-21
09 51 00
Acoustical Ceilings
12-18
09 54 23
Linear Metal Ceilings
01-21
09 63 13
Brick Flooring
01-21
09 63 40
Stone Flooring
01-21
09 65 13
Resilient Base and Accessories
01-21
09 65 16
Resilient Sheet Flooring
05-18
09 65 19
Resilient Tile Flooring
05-18
09 66 13
Portland Cement Terrazzo Flooring
01-21
09 66 16
Terrazzo Floor Tile
01-21
09 67 23.20
Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2)
01-21
09 67 23.30
Resinous (Epoxy Resin Composition) Mortar Flooring (RES-3)
01-21
09.67.23.40
Resinous Poured In Place Resilient Flooring (RES-4)
01-21
09 67 23.50
Resinous Terrazzo Flooring (RES-5)
01-21
09 67 23.60
Resinous Urethane and Epoxy Mortar Flooring (RES-6A and RES 6B)
01-21
09 68 00
Carpeting
01-21
09 68 21
Athletic Carpeting
01-21
09 69 00
Access Flooring
01-21
09 72 16
Vinyl-Coated Fabric Wall Covering
01-21
09 72 31
Polypropylene Fabric Wall Covering
01-21
09 78 23
Phenolic Interior Wall Paneling
01-21
09 84 33
Sound-Absorbing Wall Units
01-21
09 91 00
Painting
01-21
09 94 19
Multicolor Interior Finishing
01-21
09 96 59
Resinous Specialty Glazed Coating Systems for Walls, Ceilings, Wallboard, and Block CMU (RES-W1, RES-W2)
01-21

DIVISION 10 – SPECIALTIES

10 11 13
Chalkboards and Markerboards
01-21
10 11 23
Tackboards
01-21
10 11 33
Glassboards (Magnetic & Non-Magnetic)
01-21
10 13 00
Directories
01-21
10 14 00
Signage
01-21
10 21 13
Toilet Compartments
01-21
10 21 16
Shower and Dressing Compartments
01-21
10 21 23
Cubicle Curtain Tracks
01-21
10 22 13
Wire Mesh Partitions
01-21
10 22 19
Demountable Partitions
01-21
10 22 26.13
Accordion Folding Partitions
01-21
10 25 13
Patient Bed Service Walls
01-20
10 26 00
Wall and Door Protection
01-21
10 28 00
Toilet, Bath, and Laundry Accessories
01-21
10 44 13
Fire Extinguisher Cabinets
08-18
10 75 00
Flagpoles
01-21

DIVISION 11 – EQUIPMENT

11 05 12
General Motor Requirements for Equipment
01-21
11 12 00
Parking Control Equipment
01-21
11 17 36
Package Transfer Units
01-21
11 26 00
Unit Kitchens
01-21
11 40 11
Custom Fabricated Food Service Equipment
01-21
11 40 21
Food Service Equipment-Utility Distribution System
01-21
11 41 00
Food Storage Equipment
11-11
11 41 21
Walk-In Coolers and Freezers
01-21
11 44 00
Food Cooking Equipment
01-21
11 48 00
Cleaning and Disposal Equipment
01-21
11 53 13
Laboratory Fume Hoods
01-21
11 53 23
Laboratory Refrigerators
01-21
11 53 53
Biological Safety Cabinets Laminar Airflow Stations
01-21
11 53 61
Custom Fabricated Laboratory Equipment
01-21
11 53 71
Solution Warming Cabinets
01-21
11 71 01
Medical Washing and Sterilizing Equipment
02-11
11 71 02
Laboratory Washing and Sterilizing Equipment
10-11
11 73 00
Ceiling Mounted Patient Lift System
08-20
11 78 00
Mortuary Equipment
11-11
11 78 13
Mortuary Refrigerators
11-11
11 79 13
Hydrotherapy Equipment
11-11
11 82 19
Packaged Incinerators
11-11

DIVISION 12 – FURNISHINGS

12 22 16
Drapery Track and Accessories
05-15
12 24 00
Window Shades
08-17
12 24 21
Lightproof Shades
05-15
12 31 00
Manufactured Metal Casework
05-15
12 32 00
Manufactured Wood Casework
09-15
12 34 00
Manufactured Plastic Casework
10-15
12 35 70.21
Medication Cabinet
02-16
12 36 00
Countertops
12-18
12 56 70.11
Suspended Table
02-16

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41
Seismic Restraint Requirements for Non-Structural Components
01-14
13 17 23
Therapeutic Pools
05-15
13 17 23.11
Therapeutic Pool Accessories
05-15
13 19 13
Kennel Enclosures and Gates
02-16
13 21 29
Constant Temperature Rooms
08-16
13 21 49
Audiology Booth
01-21
13 34 19
Metal Building Systems
08-16
13 49 00
Radiation Protection
02-16

DIVISION 14– CONVEYING EQUIPEMENT

14 12 11
Traction and Winding Drum Dumbwaiter
11-20
14 21 00
New Traction Elevator
08-20
14 21 10
Modernization of Traction Elevator
08-20
14 21 11
Traction Cartlift
03-20
14 24 00
New Hydraulic Elevator
08-20
14 24 10
Modernization of Hydraulic Elevator
08-20
14 24 11
Hydraulic Cartlift
03-20
14 24 24
Renovation Hydraulic Elevator (Custom Written by VACO)
14 26 26
Renovation Traction Elevator (Custom Written by VACO)
14 91 33
Gravity Soiled Linen Chutes
08-20
14 91 82
Gravity Trash Chutes
03-20

DIVISION 21- FIRE SUPPRESSION

21 08 00
Commissioning of Fire Suppression System
11-16
21 08 00.01
DVA/USACE Projects Commissioning of Fire Suppression Systems
08-19
21 12 00
Manual Dry Standpipe Systems
06-15
21 13 13
Wet-Pipe Sprinkler Systems
06-15
21 13 16
Dry-Pipe Sprinkler Systems
01-15
21-22-00
Clean Agent Fire Suppression Systems
05-15
21-30-13
Electric-Driven, Fire Pumps
05-15
21-30-16
Diesel-Driven, Fire Pumps
05-15

DIVISION 22 – PLUMBING

22 05 11
Common Work Results for Plumbing
09-20
22 05 12
General Motor Requirements for Plumbing Equipment
09-20
22 05 19
Meters and Gages for Plumbing Piping
09-20
22 05 23
General-Duty Valves for Plumbing Piping
09-20
22 05 33
Heat Tracing for Plumbing Piping
09-20
22 07 11
Plumbing Insulation
09-19
22 08 00
Commissioning of Plumbing Systems
11-16
22 08 00.01
DVA/USACE Projects Commissioning of Plumbing Systems
08-19
22 11 00
Facility Water Distribution
05-21
22 11 23
Domestic Water Pumps
09-15
22 12 16
Facility Elevated, Potable-Water Storage Tanks
09-15
22 13 00
Facility Sanitary and Vent Piping
09-20
22 13 23
Sanitary Waste Interceptors
09-20
22 13 29
Sanitary Sewerage Pumps
09-20
22 13 29.13
Wet-Pit Mounted, Vertical Sewerage Pumps
09-20
22 13 33
Packaged, Submersible Sewerage Pump Units
09-20
22 14 00
Facility Storm Drainage
09-15
22 14 29
Sump Pumps
09-15
22 14 33
Packaged, Pedestal Drainage Pump Units
09-15
22 14 36
Packaged, Submersible, Drainage Pump Units
09-15
22 15 00
General Service Compressed-Air Systems
09-20
22 31 11
Water Softeners
09-15
22 33 00
Electric Domestic Water Heaters
09-20
22 34 00
Fuel-Fired Domestic Water Heaters
09-20
22 35 00
Domestic Water Heat Exchangers
09-20
22 40 00
Plumbing Fixtures
09-15
22 42 26
Commercial Disposers
09-15
22 61 13.74
Dental Compressed-Air Piping
09-20
22 61 19.74
Dental Compressed-Air Equipment
09-20
22 62 00
Vacuum Systems for Laboratory and Healthcare Facilities
09-15
22 62 19.74
Dental Vacuum and Evacuation Equipment
09-15
22 63 00
Gas Systems for Laboratory and Healthcare Facilities
09-15
22 66 00
Chemical-Waste Systems for Laboratory and Healthcare Facilities
09-20
22 67 19.16
Reverse-Osmosis Water Equipment
09-15
22 67 21
Water Dealkalizing System
09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 10
Common Work Results for Boiler Plant and Steam Generation
04-20
23 05 11
Common Work Results for HVAC
02-20
23 05 12
General Motor Requirements for HVAC and Steam Generation Equipment
02-20
23 05 41
Noise and Vibration Control for HVAC Piping and Equipment
02-20
23 05 51
Noise and Vibration Control for Boiler Plant
04-20
23 05 93
Testing, Adjusting, and Balancing for HVAC
02-20
23 05 93.01
DVA/USACE Projects Testing, Adjusting, and Balancing for HVAC
08-19
23 07 11
HVAC and Boiler Plant Insulation
02-20
23 08 00
Commissioning of HVAC Systems
02-20
23 08 00.01
DVA/USACE Projects Commissioning of HVAC Systems
08-19
23 08 11
Demonstrations and Tests for Boiler Plant
04-20
23 09 11
Instrumentation and Control for Boiler Plant
08-21
23 09 23
Direct-Digital Control System for HVAC
09-11
23 10 00
Facility Fuel Systems
04-20
23 11 23
Facility Natural-Gas Piping
04-20
23 21 11
Boiler Plant Piping Systems
09-21
23 21 13
Hydronic Piping
02-20
23 21 23
Hydronic Pumps
02-20
23 22 13
Steam and Condensate Heating Piping
02-20
23 22 23
Steam Condensate Pumps
04-20
23 23 00
Refrigerant Piping
02-20
23 25 00
HVAC Water Treatment
02-20
23 31 00
HVAC Ducts and Casings
02-20
23 34 00
HVAC Fans
02-20
23 36 00
Air Terminal Units
02-20
23 37 00
Air Outlets and Inlets
02-20
23 38 13
Commercial-Kitchen Hoods
02-20
23 40 00
HVAC Air Cleaning Devices
03-20
23 50 11
Boiler Plant Mechanical Equipment
11-17
23 51 00
Breechings, Chimneys, and Stacks
04-20
23 52 25
Low-Pressure Water Heating Boilers
08-21
23 52 28
Low Pressure Steam Boilers
08-21
23 52 33
Water-Tube Boilers
08-21
23 52 39
Fire-Tube Boilers
08-21
23 56 00
Solar Energy Heating System
03-20
23 57 33
Geothermal Energy – Direct Use (Heating Applications)
03-20
23 64 00
Packaged Water Chillers
03-20
23 65 00
Cooling Towers
03-20
23 72 00
Air-to-Air Energy Recovery Equipment
03-20
23 73 00
Indoor Central-Station Air-Handling Units
03-20
23 74 13
Packaged, Outdoor, Central-Station Air-Handling Units
03-20
23 81 00
Decentralized Unitary HVAC Equipment
03-20
23 81 23
Computer-Room Air-Conditioners
03-20
23 81 43
Air-Source Unitary Heat Pumps
03-20
23 81 46
Water-Source Unitary Heat Pumps
03-20
23 81 49
Ground-Source Heat Pump
03-20
23 82 00
Convection Heating and Cooling Units
03-20
23 82 16
Air Coils
03-20
23 84 00
Humidity Control Equipment
03-20

DIVISION 25 – INTEGRATED AUTOMATION

25 10 10
Advanced Utility Metering System
02-10

DIVISION 26 – ELECTRICAL

26 05 11
Requirements for Electrical Installations
01-16
26 05 13
Medium-Voltage Cables
01-17
26 05 19
Low-Voltage Electrical Power Conductors and Cables
01-17
26 05 26
Grounding and Bonding for Electrical Systems
01-17
26 05 33
Raceway and Boxes for Electrical Systems
01-18
26 05 36
Wireways for Radiology Equipment
01-18
26 05 39
Underfloor Raceways for Electrical Systems
01-18
26 05 41
Underground Electrical Construction
01-17
26 05 73
Overcurrent Protective Device Coordination Study
01-18
26 08 00
Commissioning of Electrical Systems
11-16
26 08 00.01
DVA/USACE Projects Commissioning of Electrical Systems
08-19
26 09 23
Lighting Controls
01-18
26 11 16
Secondary Unit Substations
01-18
26 12 19
Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers
01-18
26 13 13
Medium-Voltage Circuit Breaker Switchgear
01-17
26 13 16
Medium-Voltage Fusible Interrupter Switches
01-17
26 20 11
Isolated Power Systems
01-18
26 22 00
Low-Voltage Transformers
01-18
26 23 00
Low-Voltage Switchgear
01-17
26 23 13
Generator Paralleling Controls
01-17
26 24 13
Distribution Switchboards
01-18
26 24 16
Panelboards
01-18
26 24 19
Motor Control Centers
01-18
26 25 11
Busways
01-17
26 26 00
Power Distribution Units for Static Uninterruptible Power Systems
01-18
26 27 26
Wiring Devices
01-18
26 29 11
Motor Controllers
01-18
26 29 21
Enclosed Switches and Circuit Breakers
01-17
26 32 13
Engine Generators
01-18
26 33 53
Static Uninterruptible Power Supply
01-17
26 35 26
Harmonic Filters
01-18
26 36 23
Automatic Transfer Switches
01-17
26 41 00
Facility Lightning Protection
01-17
26 42 00
Cathodic Protection
01-17
26 43 13
Surge Protective Devices
01-17
26 51 00
Interior Lighting
01-18
26 55 71
Medical and Surgical Lighting Fixtures
01-18
26 56 00
Exterior Lighting
01-18

DIVISION 27 – COMMUNICATIONS

27 05 11
Requirements for Communications Installations
09-19
27 05 26
Grounding and Bonding for Communications Systems
06-15
27 05 33
Raceways and Boxes for Communications Systems
10-18
27 05 61
Leased Space, Communication Equipment and Systems
06-15
27 08 00
Commissioning of Communications Systems
11-16
27 08 00.01
DVA/USACE Projects Commissioning of Communications Systems
08-19
27 10 00
Control, Communication and Signal Wiring
06-15
27 11 00
Communications Equipment Room Fittings
06-15
27 15 00
Communications Structured Cabling
01-16
27 31 00
Voice Communications Switching and Routing Equipment
06-15
27 31 31
Voice Communications Switching and Routing Equipment - Extension
06-15
27 32 41
Two-Way Radio Equipment and Systems
10-18
27 41 31
Master Antenna Television Equipment and Systems
06-15
27 51 16
Public Address and Mass Notification Systems
10-18
27 51 23
Intercommunications and Program Systems
06-15
27 52 23
Nurse Call and Code Blue Systems
10-18
27 52 41
Miscellaneous Medical Systems
06-15
27 53 19
Distributed Radio Antenna (Within Building) Equipment and System
10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00
Common Work Results for Electronic Safety and Security
04-18
28 05 13
Conductors and Cables for Electronic Safety and Security
10-18
28 05 26
Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33
Conduits and Backboxes for Electronic Safety and Security
09-11
28 08 00
Commissioning of Electronic Safety and Security Systems
11-16
28 08 00.01
DVA/USACE Projects Commissioning of Electronic Safety and Security Systems
08-19
28 13 00
Physical Access Control System
10-11
28 13 16
Physical Access Control System and Database Management
09-11
28 13 53
Security Access Detection
09-11
28 16 00
Intrusion Detection System
10-11
28 23 00
Video Surveillance
09-11
28 26 00
Electronic Personal Protection System
09-11
28 31 00
Fire Detection and Alarm
10-11
28 52 31
Emergency Call System
06-15

DIVISION 31 – EARTHWORK

31 20 00
Earthwork
07-16
31 20 11
Earthwork (Short Form)
10-12
31 23 19
Dewatering
10-12
31 23 23.33
Flowable Fill
10-12
31 32 23
Pressure Grouting Soil Stabilization
10-12
31 62 00
Driven Piles
10-12
31 63 16
Auger Cast Grout Piles
10-12
31 63 26
Drilled Caissons
10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23
Cement and Concrete for Exterior Improvements
08-16
32 12 16
Asphalt Paving
09-15
32 14 16
Brick Unit Paving
08-16
32 17 23
Pavement Markings
08-16
32 31 13
Chain Link Fences and Gates
06-18
32 31 40
High Security Fences and Gates
08-16
32 84 00
Planting Irrigation
08-16
32 90 00
Planting
08-16

DIVISION 33 – UTILITIES

33 08 00
Commissioning of Site Utility Systems
11-16
33 08 00.01
DVA/USACE Projects Commissioning of Site Utility Systems
08-19
33 10 00
Water Utilities
03-17
33 30 00
Sanitary Sewer Utilities
06-13
33 40 00
Storm Sewer Utilities
12-17
33 46 13
Foundation Drainage
10-11
33 51 00
Natural-Gas Distribution
10-11
33 63 00
Steam Energy Distribution
09-17

DIVISION 34 – TRANSPORTATION

34 71 13
Passive Vehicle Barriers
04-18
34 75 13.13
Active Vehicle Barriers
08-16

DIVISION 48 – Electrical Power Generation

48 14 00
Solar Energy Electrical Power Generation System
10-17
48 15 00
Wind Energy Electrical Power Generation System
10-17
48 16 23
Geothermal Energy Electrical Power Generation System
10-17

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for 660-22-114 “Update Non-Sterile Compounding Room” as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer.

C. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.

D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, Room Renovation: The current casework, including the sinks and underlying plumbing system, needs to be updated for hygienic compliance and elements that are out of compliance need to be removed. In addition, the HVAC system must be reconfigured, and a fan coil unit installed with associated controls to better regulate temperatures and meet compliance. Current carpet flooring is also out of compliance and must be replaced with complete rubber sheet flooring. Additional finishes and repairs to walls are to be done to restore the appearance of the room.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including toolboxes and parked machines and take any emergency action.

D. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).

a) Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

b) “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of permits shall be issued for General Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA Medical Center Facility Manager.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. Execute work to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two workdays. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

G. Phasing:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to COR and Contractor.

H. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for preinspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.

I. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

J. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

K. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to reinstallation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.8 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.9 WARRANTY MANAGEMENT

A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction at least 30 days before the planned pre-warranty conference, submit one set of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:

1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.

2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.

3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.

4. A list for each warranted equipment item, feature of construction or system indicating:

a. Name of item.

b. Model and serial numbers.

c. Location where installed.

d. Name and phone numbers of manufacturers and suppliers.

e. Name and phone numbers of manufacturers or suppliers.

f. Names, addresses and phone numbers of sources of spare parts.

g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.

h. Starting point and duration of warranty period.

i. Summary of maintenance procedures required to continue the warranty in force.

j. Cross-reference to specific pertinent Operation and Maintenance manuals.

k. Organizations, names and phone numbers of persons to call for warranty service.

l. Typical response time and repair time expected for various warranted equipment.

5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.

6. Procedure and status of tagging of all equipment covered by extended warranties.

7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.

B. Performance & Payment Bonds: The Performance & Payment Bonds must remain effective throughout the construction period.

1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.

2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.

3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.

C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for Contractor response, and other details deemed necessary by the Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor. This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the Contractor of any of its responsibilities in conjunction with other portions of this provision.

D. Contractor’s Response to Construction Warranty Service Requirements:

E. Following oral or written notification by the Contracting Officer, the Contractor shall respond to construction warranty service requirements in accordance with the “Construction Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period. Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.

1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.

2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.

3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.

4. The “Construction Warranty Service Priority List” is as follows:

a) Code 1-Life Safety Systems

1. Fire suppression systems.

1. Fire alarm system(s).

b) Code 1-Air Conditioning Systems

1) Air conditioning leak in part of the building, if causing damage.

2) Air conditioning system not cooling properly.

c) Code 1 Doors

1. Overhead doors not operational, causing a security, fire or safety problem.

1) Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.

d) Code 3-Doors

1. Overhead doors not operational.

1. Interior/exterior personnel doors or hardware not functioning properly.

e) Code 1-Electrical

1. Power failure (entire area or any building operational after 1600 hours).

1. Security lights.

1. Smoke detectors.

f) Code 2-Electrical

1. Power failure (no power to a room or part of building). Receptacle and lights not operational (in a room or part of building).

g) Code 3-Electrical

1. Exterior lights not operational.

h) Code 1-Gas

1. Leaks and pipeline breaks.

i) Code 1-Heat

1. Power failure affecting heat.

j) Code 1-Plumbing

1. Hot water heater failure.

2) Leaking water supply pipes

k) Code 2-Plumbing

1. Flush valves not operating properly

1. Fixture drain, supply line or any water pipe leaking.

1. Toilet leaking at base.

l) Code 3- Plumbing

1. Leaky faucets.

m) Code 3-Interior

1. Floors damaged.

1. Paint chipping or peeling.

1. Casework damaged.

n) Code 1-Roof Leaks

1. Damage to property is occurring.

o) Code 2-Water (Exterior)

1. No water to facility.

p) Code 2-Water (Hot)

1. No hot water in portion of building listed.

q) Code 3

1. All work not listed above.

F. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the Contracting Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating. Also submit tworecord copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature must remain blank until the project is accepted for beneficial occupancy. Show the following information on the tag.

Warranty Tags

Type of product/material

Model number

Serial number

Contract number

Warranty period from/to

Inspector’s signature

Construction Contractor

Address

Telephone number

Warranty Contact

Address

Telephone number

Warranty response time priority code

1.10 TEMPORARY USE OF EXISTING ELEVATORS

A. Use of existing elevators for handling building materials and Contractor's personnel will be permitted subject to following provisions:

1. Contractor makes all arrangements with the COR for use of elevators. The COR will ascertain that elevators are in proper condition. Personnel for operating elevators will not be provided by the Department of Veterans Affairs.

2. Contractor covers and provides maximum protection of following elevator components:

r) Entrance jambs, heads soffits and threshold plates.

s) Entrance columns, canopy, return panels and inside surfaces of car enclosure walls.

t) Finish flooring.

1.11 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.

B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.

C. Contractor shall install meters at Contractor's expense and furnish the Medical Center a monthly record of the Contractor's usage of electricity as hereinafter specified.

D. Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials:

1. Obtain heat by connecting to Medical Center heating distribution system.

E. Electricity (for Construction and Testing): Furnish all temporary electric services.

1. Obtain electricity by connecting to the Medical Center electrical distribution system. The Contractor shall meter and pay for electricity required for electric cranes and hoisting devices, electrical welding devices and any electrical heating devices providing temporary heat. Electricity for all other uses is available at no cost to the Contractor.

F. Water (for Construction and Testing): Furnish temporary water service.

1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no cost to the Contractor.

2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation (at COR discretion) of use of water from Medical Center's system.

G. Fuel: Natural and LP gas and burner fuel oil required for boiler cleaning, normal initial boiler-burner setup and adjusting, and for performing the specified boiler tests will be furnished by the Government. Fuel required for prolonged boiler-burner setup, adjustments, or modifications due to improper design or operation of boiler, burner, or control devices shall be furnished and paid by the Contractor at Contractor's expense.

1.12 INSTRUCTIONS

A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.

B. Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and subassembly components. Manuals shall include an index covering all component parts clearly crossreferenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system being furnished. Manuals referencing equipment similar to but of a different model, style, and size than that furnished will not be accepted.

C. Instructions: Contractor shall provide qualified, factorytrained manufacturers' representatives to give detailed training to assigned Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. All such training will be at the job site. These requirements are more specifically detailed in the various technical sections. Instructions for different items of equipment that are component parts of a complete system, shall be given in an integrated, progressive manner. All instructors for every piece of component equipment in a system shall be available until instructions for all items included in the system have been completed. This is to assure proper instruction in the operation of inter-related systems. All instruction periods shall be at such times as scheduled by the COR and shall be considered concluded only when the COR is satisfied in regard to complete and thorough coverage. The contractor shall submit a course outline with associated material to the COR for review and approval prior to scheduling training to ensure the subject matter covers the expectations of the VA and the contractual requirements. The Department of Veterans Affairs reserves the right to request the removal of, and substitution for, any instructor who, in the opinion of the COR, does not demonstrate sufficient qualifications in accordance with requirements for instructors above.

SECTION 01 35 26

Safety REQUIREMENTS

TABLE OF CONTENTS

1.1APPLICABLE PUBLICATIONS3
1.2DEFINITIONS5
1.3REGULATORY REQUIREMENTS7
1.4ACCIDENT PREVENTION PLAN (APP)7
1.5ACTIVITY HAZARD ANALYSES (AHAs)13
1.6PRECONSTRUCTION CONFERENCE15
1.7“SITE SAFETY AND HEALTH OFFICER” (SSHO) and “COMPETENT PERSON” (CP)16
1.8TRAINING17
1.9INSPECTIONS18
1.10ACCIDENTS, OSHA 300 LOGS, AND MAN-HOURS19
1.11PERSONAL PROTECTIVE EQUIPMENT (PPE)20
1.12INFECTION CONTROL22
1.13TUBERCULOSIS SCREENING31
1.14FIRE SAFETY32
1.15ELECTRICAL36
1.16FALL PROTECTION38
1.17SCAFFOLDS AND OTHER WORK PLATFORMS38
1.18EXCAVATION AND TRENCHES39
1.19CRANES42
1.20CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)42
1.21CONFINED SPACE ENTRY43
1.22WELDING AND CUTTING43
1.23LADDERS43
1.24FLOOR & WALL OPENINGS44

SECTION 01 35 26

Safety REQUIREMENTS

1.1 APPLICABLE PUBLICATIONS:

A. Latest publications listed below form part of this Article to extent referenced. Publications are referenced in text by basic designations only.

B. American Society of Safety Engineers (ASSE):

A10.1-2011Pre-Project & Pre-Task Safety and Health Planning
A10.34-2012Protection of the Public on or Adjacent to Construction Sites
A10.38-2013Basic Elements of an Employer’s Program to Provide a Safe and Healthful Work Environment American National Standard Construction and Demolition Operations

C. American Society for Testing and Materials (ASTM):

E84-2013 Surface Burning Characteristics of Building Materials D. The Facilities Guidelines Institute (FGI):

FGI Guidelines-2010Guidelines for Design and Construction of Healthcare Facilities E. National Fire Protection Association (NFPA):

10-2018Standard for Portable Fire Extinguishers
30-2018Flammable and Combustible Liquids Code
51B-2019Standard for Fire Prevention During Welding, Cutting and Other Hot Work
70-2020National Electrical Code
70B-2019Recommended Practice for Electrical Equipment Maintenance

This is the start of the file's text. The full file is on GovTribe.