S04- Site Visit Meeting Doc.docx
DOCX document 18 KB Posted
- Solicitation number
- 36C25921R0048
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Ceiling Tile.pdf | ||
| Questions_2nd set 42221.docx | DOCX document | |
| 36C25921R0048 0005.docx | DOCX document | |
| 36C25921R0048 0004.docx | DOCX document | |
| RF 180 Final Study sheet.pdf | ||
| RF180 Fluoroscopy Questions Answers_updated.docx | DOCX document | |
| 36C25921R0048 0003.docx | DOCX document | |
| RF180 Fluoroscopy RFI and Answers.docx | DOCX document | |
| 36C25921R0048 0002.docx | DOCX document | |
| S04- Site Visit Meeting attenadance.pdf | ||
| 36C25921R0048 0001.docx | DOCX document | |
| 36C25921R0048_1.docx | DOCX document | |
| Drawings_RF-M091991-FIN-01-B.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Proposal Site Visit Meeting 36C25921R0048 Site Prep RF180 Fluoroscopy @ Ft. Harrison VAMC
The contractor is to provide all labor, tools, materials, equipment and supervision required to complete the construction of the Site Prep for RF180 Fluoroscopy at the Ft. Harrison VA Medical Center. Work to include preparing area for the fluoroscopy installations and ICRA preparation for the installation site.
Location: Ft. Harrison VA Medical Center
AGENDA:
· Introduction of Joseph Wingfield CO, Wayne Delzer COR
· The pre-proposal meeting/site walk is not mandatory
· QUESTIONS During site visit MUST BE WRITTEN DOWN
· Address where to send RFP:
· Electronic submissions to Christina.Beeler-Blackburn@va.gov
· Pertinent Dates:
· Questions due March 3, 2021 no later than 1:00 PM MT prior to closing of RFP, any questions submitted after this time will not be reviewed or answered! Submit to Christina.Beeler-Blackburn@va.gov
· We’ll get the answers back to you timely
· Proposals due on 3/19/2021 at 10:30 AM MT via email
· Prospective offerors are prohibited from attempting to gain information by inquiring with VA employees about project other than through written questions submitted to Contracting Officer.
· Prospective offerors are prohibited from visiting site other than through formal invitation by Contracting Officer.
· Attendees of walk-through are to stay as a group while walking to various locations and are to leave the future project site once the walk-through is concluded.
· All VA campuses are Tobacco Free, including but not limited to, smokeless tobacco and vaping.
· Masks are to be worn at all times while on VA property.
· Confirmation of construction range is between $250,000 and $500,000.
· Bid Guarantee & Payment/Performance Bonds: Are required at 20% of bid price or $3,000,000.00 whichever is less.
· Contractor shall begin performance within 10 days after Notice To Proceed (NTP) and complete within 30 days.
· Post Award Compliance:
· Compliance with Davis Bacon Wages and Application wage determination shall be expected of the contractor. The contractor can submit their weekly certified payrolls with their monthly invoice.
File details come from the government source that posted it. Updated .