RF 180 Final Study sheet.pdf

PDF 2 MB Posted

Attached to
Z2DA--(CON) MTVA SITE PREP FOR RF180 FLOUROSCOPY UNIT PROJECT # 436-B-70006
Solicitation number
36C25921R0048
Issued by

View the file

Other files

File Type Posted
Ceiling Tile.pdf PDF
Questions_2nd set 42221.docx DOCX document
36C25921R0048 0005.docx DOCX document
36C25921R0048 0004.docx DOCX document
RF180 Fluoroscopy Questions Answers_updated.docx DOCX document
36C25921R0048 0003.docx DOCX document
RF180 Fluoroscopy RFI and Answers.docx DOCX document
36C25921R0048 0002.docx DOCX document
S04- Site Visit Meeting Doc.docx DOCX document
S04- Site Visit Meeting attenadance.pdf PDF
36C25921R0048 0001.docx DOCX document
36C25921R0048_1.docx DOCX document
Drawings_RF-M091991-FIN-01-B.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 - C1 - Cover Sheet 02 - C2 - Disclaimer - Site Readiness 03 - A1 - General Notes 04 - A2 - Equipment Layout 05 - A3 - Section Views 06 - A4 - Equipment Details 07 - A5 - Equipment Details & Delivery (2) 08 - S1 - Structural Notes 09 - S2 - Structural Layout

Fort Harrison, Montana

Douglas Carr

DISCOVERY RF180

REK

GE Healthcare

GE does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete set of final issue drawing. GE cannot accept responsibility for any damage due to the partial use of GE final issue drawings, however caused. All dimensions are in millimeters unless otherwise specified. Do not scale from printed pdf files. GE accepts no responsibility or liability for defective work due to scaling from these drawings. /16RF-M091991-FIN-01-B.DWG

(509) 995-1395

Douglas.carr@med.ge.com

REK 5793724-1EN

USA

1/4"=1'-0"

4641351

09/Mar/2020

VA Montana Healthcare System Fort Harrison

A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the Pre Installation manual will result in incomplete documentation required for site design and preparation.

Pre Installation documents for GE Healthcare products can be accessed on the web at: www.gehealthcare.com/siteplanning -

Drawn by Verified by PIM Manual

SheetFormat

Concession

Scale DateFile Name

RevS.O. (GON)

A3

REV DATE MODIFICATIONS

A 11/Jan/2020 Final drawing based on DC-204880 B 09/Mar/2020 Revision based on DC-221157; modify overhead steel, PIM rev 5, details, weights

FINAL STUDY

10 - S3 - Structural Details (1)

11 - M1 - HVAC

12 - E1 - Electrical Notes 13 - E2 - Electrical Layout 14 - E3 - Electrical Elevations 15 - E4 - Details-Interconnections 16 - E5 - Power Requirements

GENERAL SPECIFICATIONS

GE is not responsible for the installation of developers and associated equipment, lighting, cassette trays and protective screens or derivatives not mentioned in the order.

The final study contains recommendations for the location of GE equipment and associated devices, electrical wiring and room arrangements. When preparing the study, every effort has been made to consider every aspect of the actual equipment expected to be installed.

The layout of the equipment offered by GE, the dimensions given for the premises, the details provided for the pre-installation work and electrical power supply are given according to the information noted during on-site study and the wishes expressed by the customer.

The room dimensions used to create the equipment layout may originate from a previous layout and may not be accurate as they may not have been verified on site. GE cannot take any responsibility for errors due to lack of information.

Dimensions apply to finished surfaces of the room.

Actual configuration may differ from options presented in some typical views or tables.

If this set of final drawings has been approved by the customer, any subsequent modification of the site must be subject to further investigation by GE about the feasibility of installing the equipment. Any reservations must be noted.

The equipment layout indicates the placement and interconnection of the indicated equipment components.

There may be local requirements that could impact the placement of these components. It remains the customer's responsibility to ensure that the site and final equipment placement complies with all applicable local requirements.

All work required to install GE equipment must be carried out in compliance with the building regulations and the safety standards of legal force in the country concerned.

These drawings are not to be used for actual construction purposes. The company cannot take responsibility for any damage resulting therefrom.

CUSTOMER RESPONSIBILITIES

It is the responsibility of the customer to prepare the site in accordance with the specifications stated in the final study. A detailed site readiness checklist is provided by GE. It is the responsibility of the customer to ensure all requirements are fulfilled and that the site conforms to all specifications defined in the checklist and final study. The GE Project Manager of Installation (PMI) will work in cooperation with the customer to follow up and ensure that actions in the checklist are complete, and if necessary, will aid in the rescheduling of the delivery and installation date.

Prior to installation, a structrual engineer of record must ensure that the floor and ceiling is designed in such a way that the loads of the installed system can be securely borne and transferred. The layout of additional structural elements, dimensioning and the selection of appropriate installation methods are the sole responsibility of the structural engineer. Execution of load bearing structures supporting equipment on the ceiling, floor or walls are the customer's responsibility.

RADIO-PROTECTION

Suitable radiological protection must be determined by a qualified radiological physicist in conformation with local regulations. GE does not take responsibility for the specification or provision of radio-protection.

DISCLAIMER

THE UNDERSIGNED, HEREBY CERTIFIES THAT I HAVE READ AND APPROVED THE PLANS IN THIS DOCUMENT.

DATE NAME SIGNATURE

Customer Name: PMI Name:

GON/SO Number: Field Service Name:

Equipment: Country/City or City/State:

Site Visit Date for SRC: SRC Status:

Site Ready Checks at Installation

General Site Planning

Room dimensions, including ceiling height, for all Exam, Equipment/Technical & Control rooms meets GE specifications.

Ceiling support structure, if on the GE drawing, is at correct location and height according to the drawing specifications. Levelness and spacing has been measured. Overhead support Structure has been confirmed with contractor to meet GE criteria.

Rooms that will contain equipment, including staging areas if applicable, are construction debris free. Precautions must be taken to prevent debris from entering rooms containing equipment.

Finished ceiling is installed. If applicable ceiling tiles installed per PMI discretion.

Delivery route from truck to installation space has been reviewed, all communications have occurred, arrangements made for special handling (if needed). Floors along delivery route will support weight of the equipment, reinforcements arranged if needed.

System power & grounding (PDB/MDP) is available as per GE specifications, installed at point of final connection and ready to use. Lock Out Tag Out is available.

System power and grounded audit has been scheduled to be completed during installation of equipment. (If Required) GEHC PM to confirmed if needed.

Adequate room illumination installed and working.

Cableways (floor, wall, ceiling, etc.) ready for GE cables and are of correct length and diameter. Cableways routed per GE Final drawings and access openings installed as determined by GEHC PM. Surface floor duct installed at time of system installation.

HVAC systems Installed, and the site meets minimum environmental operational system requirements.

Network outlets installed and computer network available and working.

Hospital IT/connectivity contacts have been engaged and information has been added to Project management tool. (If Required)

Floor levelness/flatness is measured and within tolerance, and there are no visible defects per GEHC specifications. Floor Strength and thickness have been discussed with customer/contractor and they have confirmed GE requirements are met.

Customer supplied countertops where GE equipment will be installed are in place.

Specific for CT & X-ray

Doors and windows complete or scheduled to be installed. If applicable, radiation protection (shielding) finished & radioprotection regulatory approval for installation obtained.

PMI Signature:

Customer Signature:

FS Signatature: optional

GLOBAL SITE READINESS CHECKLIST (DI)

DOC1809666 Rev. 6

DateRev /16RF-M091991-FIN-01-B.DWG B 09/Mar/2020DISCOVERY RF180VA Montana Healthcare System Fort Harrison C2 - Disclaimer - Site Readiness 02-

ENVIRONMENTAL SPECIFICATIONS

LIGHT REQUIREMENTS

For the electronic ballast of fluorescent lamp in exam room, the operating frequency should be above 42KHz.

MAGNETIC INTERFERENCE

To guarantee specified imaging performance :

X-ray tubes and control console equipment must be located in ambient static field of less than 10 gauss.

ACOUSTIC OUTPUT

Measured 1 m from any point in system.

In-use: less than 65 dBA Stand-by: less than 45 dBA

Any deviation from these drawings must be communicated in writing to and reviewed by your local GE healthcare installation project manager prior to making changes.

Make arrangements for any rigging, special handling, or facility modifications that must be made to deliver the equipment to the installation site. If desired, your local GE healthcare installation project manager can supply a reference list of rigging contractors.

New construction requires the following;

1. Secure area for equipment,

2. Power for drills and other test equipment,

3. Capability for image analysis,

4. Restrooms.

Provide for refuse removal and disposal (e.g. crates, cartons, packing)

It is the customer's responsibility to contract a vibration consultant/engineer to implement site design modifications to meet the GE vibration specification. Refer to the system preinstallation manual for the vibration specification.

CUSTOMER SITE READINESS REQUIREMENTS

DateRev /16RF-M091991-FIN-01-B.DWG B 09/Mar/2020DISCOVERY RF180VA Montana Healthcare System Fort Harrison A1 - General Notes 03

A A'

B B'

ALL INFORMATION IN THIS DRAWING SET IS

PRELIMINARY, SUBJECT TO CHANGE!!

Exam room height

Finished floor to slab height

Finished ceiling height

TBD

9'-3"

BY ITEM DESCRIPTION

MAX HEAT

OUTPUT

(btu)

WEIGHT

(lbs)

A 1 Table (with over-floor plate) 2388 3060

A 2 Generator 3500 200

A 3 Digital Systems Cabinet 1092 242

B 4 15 kVA Transformer - 210

A 5 Operators Console 149 17

A 6 Single Monitor Cart 222 37

B 7 Power Distribution Box (PDB) - 175

A 8 4410m Kalos Rails - -

A 9 OTS with 3m Bridge 1190 833

A 10 Non-Tilting Wallstand - 376

A 11 Partial UPS - 77

A 12 TIMS 2000 on cart (TPC) - 200

A 13 Secondary Console - 110

C 14 Minimum opening for equipment delivery is 47 in. w x 73 in. h, contingent on a 102 in.

corridor width

E 15 Counter top for equipment- provide grommeted openings as required to route cables

E 16 Control wall, to ceiling with lead glass viewing window

LEGEND

A GE Supplied C Customer/contractor supplied and installed

B GE Supplied/contractor installed D Available from GE E Existing/Reinstall

DateRev /16RF-M091991-FIN-01-B.DWG B 09/Mar/2020DISCOVERY RF180VA Montana Healthcare System Fort Harrison A2 - Equipment Layout 04

R/F EXAM

CONTROL

Please note that your Discovery RF180 installation meets the minimum required ceiling height for functionality but has constraints.

Please refer to the Pre-Installation Manual (5793724-1EN, Rev 3, Pages 23-24)

Please note that your Discovery RF180 installation in the selected room does not meet the following minimal requirement:

- 530 mm required distance between the Tube Head and any stationary object.

Therefore we must apply a warning label on both Tube Head sides to remind the Operator about entrapment hazard during Gantry motions.

10'-0"

8'-4"

1'-6"3'-9"

19'-8"

6' -6

9' -1

1"

0' -7

'-4

'-1

1"

3'-7"

5' -8

3' -9

3' -0

3'-8"

EXAM ROOM CEILING HEIGHTS

RECOMMENDED AND MINIMUM ROOM HEIGHTS

CONFIGURATION SPECIFICATION

CEILING HEIGHT

mm ft Table Minimum 2600 8'-6"

Recommended 3000 9'-10"

Overhead Tube Suspension Minimum 2600 8'-6"

Recommended 2920 9'-7"

Monitor Suspension Minimum 2600 8'-6"

Tilting Wall Stand* Minimum 2600 8'-6"

Recommended 2650 8'-8"

Non-tilting Wall Stand Minimum 2400 7'-8"

Recommended 2800 9'-2"

Note : Minimum room height for the table must take into consideration the most protruding object from the ceiling that is in the system area (for example the rails for OTS).

*Not available in USA

SIDE VIEW A-A'

FRONT VIEW B-B'

DateRev /16RF-M091991-FIN-01-B.DWG B 09/Mar/2020DISCOVERY RF180VA Montana Healthcare System Fort Harrison A3 - Section Views 05

9 8

9'-3"

0'-0"

9'-3"

0'-0"

5 15

TYPICAL SIDE VIEW

[3 in]

576.5 [23 in]

[61 in]

[7 in]

[7 in]

[32 in]

TYPICAL FRONT VIEW

[81 in]

[26 in]

TYPICAL FRONT VIEW

[97 in]

[15 in]

[18 in]

[30 in]

[33 in]

[10 in]

[10 in]

[38 in]

[38 in]

TYPICAL FRONT VIEW

DateRev /16RF-M091991-FIN-01-B.DWG B 09/Mar/2020DISCOVERY RF180VA Montana Healthcare System Fort Harrison A4 - Equipment Details 06

DELIVERY

THE CUSTOMER/CONTRACTOR SHOULD:

Provide an area adjacent to the installation site for delivery and unloading of the GE equipment.

Ensure that the dimensions of all doors, corridors, ceiling heights are sufficient to accommodate the movement of GE equipment from the delivery area into the definitive installation room.

Ensure that access routes for equipment will accommodate the weights of the equipment and any transportation, lifting and rigging equipment.

Ensure that all necessary arrangements for stopping and unloading on public or private property not belonging to the customer have been made.

The unit (table main frame and body) can be shipped through a 1200 mm [47 in] door width and 1200 mm [47 in] minimum hallway width. The unit can be divided and the major assemblies can be maneuvered through a 1020 mm [40 in] doorway and 1300 mm [51 in] hallway width (Order has to be placed accordingly, table is shipped in one piece by default). The OTS can be shipped through a 900 mm [35 in] door width and 2600 mm [102.4 in] minimum hallway width or through a 1400 mm [55 in] door width and 1800 mm [71 in] minimum hallway width.

DIMENSIONS OF DELIVERY WITH DOLLY TRANSPORT EQUIPMENT

MAJOR ASSEMBLIES LENGTH (mm) WIDTH (mm) HEIGHT (mm) WEIGHT (kg)

Table main frame and body 2460 [97 in] 1000 [39 in] 1630 [64 in] TBD

Table main frame 2460 [97 in] 680 [27 in] 1535 [60 in] 300 [661 lb] Table body 1268 [50 in] 1000 [39 in] 1630 [64 in] 680 [1499 lb]

OTS (Optional) 3010 [118.5 in] 798.2 [31.5 in] - 378 [833 lb]

Monitor Suspension (Optional) 3010 [118.5 in] 798.2 [31.5 in] - 382 [842 lb]

TABLE

SCALE 1:20

CLEARANCE AREAS

[205 in]

*NOTE: The recommended service area behind the table is 500mm (19.6 in).

The minimum service area behind the table must be 336 mm (13.2 in).

[21 in]

[163 in]

[21 in]

FOCAL SPOT TRAVEL

Cable inlet

KALOS SUSPENSION

SCALE 1:50

Optional cable inlet

X-Ray head travel area

Column travel area

[173 in]

[139 in]

*Distance depends on bridge length

DateRev /16RF-M091991-FIN-01-B.DWG B 09/Mar/2020DISCOVERY RF180VA Montana Healthcare System Fort Harrison A5 - Equipment Details & Delivery (2) 07

CEILING REQUIREMENTS

To allow installation of the stationary rail cross-members, clearance is required between the ends of the stationary rails and the walls.

It is recommended that sprinkler heads not be placed between the stationary rails. All sprinkler heads should be mounted so they do not extend downward more than 6.35 mm from the ceiling while in the 'resting' position.

In addition, there should not be anything mounted in the ceiling (i.e. lights, A/C returns, etc) between the stationary rails. This is because the OTS longitudinal drive belt assembly is located on the movable bridge, approximately centered between the two stationary rails, and may come into contact with those ceiling-mounted items during normal use.

STRUCTURAL NOTES

Methods of support for the steelwork that will permit attachment to structural steel or through bolts in concrete construction should be favored. Do not use concrete or masonry anchors in direct tension.

All units that are wall mounted or wall supported are to be provided with supports where necessary. Wall supports are to be supplied and installed by the customer or his contractors. See plan for suggested locations.

Control walls shall be constructed to minimum 2130mm (7'-0") high.

Dimensions are to finished surfaces of room.

Customers contractor must provide all penetrations in post tension floors.

Customers contractor must provide and install any non-standard anchoring. Documents for standard anchoring methods are included with GE equipment drawings for geographic areas that require such documentation.

Customers contractor must provide and install hardware for "through the floor" anchoring and/or any bracing under access floors. This contractor must also provide floor drilling that cannot be completed because of an obstruction encountered while drilling by the GE installer such as rebar etc.

It is the customer's responsibility to perform any floor or wall penetrations that may be required. The customer is also responsible for ensuring that no subsurface utilities (e.g., electrical or any other form of wiring, conduits, piping, duct work or structural supports (i.e. post tension cables or rebar)) will interfere or come in contact with subsurface penetration operations (e.g. drilling and installation of anchors/screws) performed during the installation process. To ensure worker safety, GE installers will perform surface penetration operations only after the customer's validation and completion of the "GE surface penetration permit".

Different anchor types are used to install the components of the system. Refer to Structural Requirements Section(s) of the Pre-Installation Manual for each anchor requirement.

Refer to the Structural Requirements Section for the required minimum embedment.

The ground surface must be flat and leveled, maximum tolerance for leveling is ±1.5 mm per 1 m (0.2 in per 10 feet). A grout pad provided by the contractor is required to meet this specification. The maximum pad thickness is 6.3 mm (0.25 in).

DateRev /16RF-M091991-FIN-01-B.DWG B 09/Mar/2020DISCOVERY RF180VA Montana Healthcare System Fort Harrison S1 - Structural Notes 08

Proposed Cross Steel Note:

Existing structural grid and proposed additional cross steel must be evaluated by a qualified structural engineer to meet deflection requirements specified on structural details in the pre-installation manual.

ITEM DESCRIPTION

(GE SUPPLIED / CONTRACTOR INSTALLED)

1 Area occupied by GE supplied table baseplate

2 Area occupied by GE supplied wall stand baseplate

3 Area occupied by GE supplied transformer

(CONTRACTOR SUPPLIED & INSTALLED)

4 Support backing, locate as shown.

Structural support below ceiling for fastening ceiling supported equipment. Supports to run continuous with no fittings extending below face of channel, be parallel, square, and in the same horizontal plane, flush with the finished ceiling. Rails are mounted to these supports every 27.56" (700mm) and require 452 lbs. (205 kg) per bolt load. Methods of support that permit attachment to structural steel or through bolts in concrete should be favored. Do not use screw anchors in direct tension.

Existing, reuse if adequate. Structural support in ceiling for fastening ceiling supported equipment. Supports to run continuous with no fittings extending below face of channel, run wall to wall, be parallel, square, and in the same horizontal plane, above the finished ceiling.

Existing, reuse if adequate. Structural support in ceiling for fastening cable drape rail. Supports to run continuous with no fittings extending below face of channel, run wall to wall, be parallel, square, and in the same horizontal plane, above the finished ceiling.

DateRev /16RF-M091991-FIN-01-B.DWG B 09/Mar/2020DISCOVERY RF180VA Montana Healthcare System Fort Harrison S2 - Structural Layout 09

R/F

EXAM

CONTROL

1' -1

1"

EX

ST

2'

-1 1"

E

XS

T 4'

-8 " E

XS

T

10'-11"

4' -3

5' -7

1' -7

5'-9"

0'-6"

9' -1

0'-6"

'-9

0' -4

1'

-0

2'-3"2'-2"2'-2"2'-2"2'-2"2'-2"2'-2"

6' -4

3 4" 3'

-4

SCALE 1:5

STRUCTURAL RAILS PERPENDICULAR TO

SUSPENSION RAILS

[27.56 in]

[27.56 in]

[27.56 in]

[27.56 in]

[27.56 in]

[27.56 in]

SUSPENSION RAILS MOUNTING SPECIFICATIONS

SCALE 1:50

ANCHORING DETAILS

Rail extremities must be separated from the wall by a 150mm [6in] distance Fire sprinklers, lights, air conditioning returns located in the suspension area must not be below the false ceiling Unistrut or equivalent structural support must be fixed perfectly parallel and on the same plane 660mm [26 in] steps are also possible

[3.35 in]

[4.72 in]

[6.69 in]

[0.98 in]

[0.98 in]

Unistrut Bracket H-45

Unistrut or equivalent rail (not supplied by GE)

Longitudinal ceiling rails

Max load on each bolt:

205kg [452 lb]

Bolt M10x30

[1.18 in]

FASTENERS NOT SUPPLIED BY GE

TABLE FLOOR MOUNTING

TABLE FLOOR PLATE FIXATION

NOT TO SCALE

Floor plate

TABLE BASE FIXATION

NOT TO SCALE

Screw M12x35 Spring washer Ø 12 [Ø 0.5 in] Plain washer Ø 12 [Ø 0.5 in]

Table base Floor plate

OVERFLOOR PLATE Unit weight: 1025 kg [2260 lb] Plate weight: 180 kg [397 lb] Total load: 1205 kg [2657 lb] Loading area: 1.90 m² [20.5 ft²] Floor loading: 805kg / m² [165 lb / ft²]

[67 in]

[0.5 in]

[3 in]

[2 in]

[9 in]

[24 in]

[24 in]

Ø 15 Floor fixation (8 holes)

Cable entrance

SCALE 1:20

-Floor plate, M10 screws and washers are delivered with the system.

-The floor thickness must be at least 140 mm [5.5 in].

-Critical flatness region must be flat and level, with deviations of no more than 1.5mm [1/16 in] shims may be used along perimeter of baseplate to improve surface contact

Screw M10

[0.6 in]

[39 in]

Critical flatness region

Base fixation (8 holes)

WALL STAND FLOOR MOUNTING

SCALE 1:10

WALL STAND BASE PLATE

[27 in]

[20 in]

[4 in]

[3 in]

[1 in]

Ø 30 [Ø1 in] Floor fixation (4 holes)

Wall fixation D12-M6 Boss fisher (2 holes)

DateRev /16RF-M091991-FIN-01-B.DWG B 09/Mar/2020DISCOVERY RF180VA Montana Healthcare System Fort Harrison S3 - Structural Details (1) 10

DateRev /16RF-M091991-FIN-01-B.DWG B 09/Mar/2020DISCOVERY RF180VA Montana Healthcare System Fort Harrison M1 - HVAC 11

ROOM DESCRIPTION

STANDBY

(kW)

IN-USE

(kW)

STANDBY

(BTU/hr)

IN-USE

(BTU/hr)

Exam Room

Table 0.700 0.700 2388 2388

Generator 0.022 1.026 75 3500 Digital Systems Cabinet 0.320 0.320 1092 1092

Partial UPS 0.050 0.050 N/A N/A Monitor (single) 0.057 0.057 149 149 Advantech Monitor (single) 0.065 0.065 222 222

OTS 0.350 0.350 1190 1190

HEAT DISSIPATION DETAILS

EXAM ROOM CONTROL ROOM

Temperature Min Recommended Max Min Recommended Max

15°C [59°F]

23°C [73°F]

35°C [95°F]

15°C [59°F]

23°C [73°F]

35°C [95°F]

Relative humidity (1) 75% 75% Heat dissipation max 2.5 kW [8490 BTU/hr] 0.41 kW [1399 BTU/hr]

Temperature -10°C [14°F] to 50°C [122°F] Relative humidity (1) 10% to 80%

TEMPERATURE AND HUMIDITY SPECIFICATIONS

IN-USE CONDITIONS

STORAGE CONDITIONS

NOTE

In case of using air conditioning systems that have a risk of water leakage it is recommended not to install it above electric equipment or to take measures to protect the equipment from dropping water.

AIR RENEWAL

According to local standards.

Material should not be stored for more than 90 days.

(1) non-condensing

ELECTRICAL NOTES

All junction boxes, conduit, duct, duct dividers, switches, circuit breakers, cable tray, etc., are to be supplied and installed by customers electrical contractor.

Conduit and duct runs shall have sweep radius bends Conduits and duct above ceiling or below finished floor must be installed as near to ceiling or floor as possible to reduce run length.

Ceiling mounted junction boxes illustrated on this plan must be installed flush with finished ceiling.

All ductwork must meet the following requirements:

1.Ductwork shall be metal with dividers and have removable, accessible covers.

2.Ductwork shall be certified/rated for electrical power purposes.

3.Ductwork shall be electrically and mechanically bonded together in an approved manner.

4.PVC as a substitute must be used in accordance with all local and national codes.

All openings in access flooring are to be cut out and finished off with grommet material by the customers contractor.

General contractor to insert pull cords for all cable run conduits between the equipment room and the operators control room.

10 foot pigtails at all junction points.

Grounding is critical to equipment function and patient safety. Site must conform to wiring specifications shown on this plan.

1. All wires specified shall be copper stranded, flexible, thermo-plastic, color coded, cut 10 foot long at outlet boxes, duct termination points or stubbed conduit ends. All conductors, power, signal and ground, must be run in a conduit or duct system. Electrical contractor shall ring out and tag all wires at both ends. Wire runs must be continuous copper stranded and free from splices.

1.1. Aluminum or solid wires are not allowed.

2. Wire sizes given are for use of equipment. Larger sizes may be required by local codes.

3. It is recommended that all wires be color coded, as required in accordance with national and local electrical codes.

4. Conduit sizes shall be verified by the architect, electrical engineer or contractor, in accordance with local or national codes.

5. Convenience outlets are not illustrated. Their number and location are to be specified by others. Locate at least one convenience outlet close to the system control, the power distritbution unit and one on each wall of the procedure room. Use hospital approved outlet or equivalent.

6. General room illumination is not illustrated. Caution should be taken to avoid excessive heat from overhead spotlights. Damage can occur to ceiling mounting components and wiring if high wattage bulbs are used.

Recommend low wattage bulbs no higher than 75 watts and use dimmer controls (except MR). Do not mount lights directly above areas where ceiling mounted accessories will be parked.

7. Routing of cable ductwork, conduits, etc., must run direct as possible otherwise may result in the need for greater than standard cable lengths (refer to the interconnection diagram for maximum usable lengths point to point).

8. Conduit turns to have large, sweeping bends with minimum radius in accordance with national and local electrical codes.

9. A special grounding system is required in all procedure rooms by some national and local codes. It is recommended in areas where patients might be examined or treated under present, future, or emergency conditions. Consult the governing electrical code and confer with appropriate customer administrative personnel to determine the areas requiring this type of grounding system.

10. The maximum point to point distances illustrated on this drawing must not be exceeded.

11. Physical connection of primary power to GE equipment is to be made by customers electrical contractor with the supervision of a GE representative. The GE representative would be required to identify the physical connection location, and insure proper handling of GE equipment.

12. GEHC conducts power audits to verify quality of power being delivered to the system. The customer's electrical contractor is required to be available to support this activity.

CONNECTIVITY REQUIREMENTS

All Digital systems are equipped with Broadband fast Ethernet hardware for Service Diagnostics. The systems equipped with Digital Imaging are capable of placing electronic images on the Hospital image Ethernet Network

(DICOM).

The Digital PC (part of the Digital subsystem) is the connectivity point between the system and the hospital. For a Broadband connection, it is the purchaser's responsibility to provide the connection at the Ethernet port on the Digital PC via a Cat 5 Ethernet cable and the hospital Ethernet connection.

Note: System hardware is rated at 100/1000Mbs transfer rate. Hospital connections must be rated for 100/1000Mbs for optimal performance. One RJ45 Ethernet plus should be present in the room.

DateRev /16RF-M091991-FIN-01-B.DWG B 09/Mar/2020DISCOVERY RF180VA Montana Healthcare System Fort Harrison E1 - Electrical Notes 12

C

Additional Conduit Runs (Contractor Supplied and Installed)

From To Qty Size

In. mm 3 phase power

Power Distribution Box

1 AS REQ'D AS REQ'D

Transformer 1 AS REQ'D AS REQ'D

Power Distribution Box Emergency off 1 1/2 16

Transformer 1 AS REQ'D AS REQ'D Warning light

Warning light control 1 1/2 16

1 phase power 1 AS REQ'D AS REQ'D

Generator 1 1/2 16

Door Switch 1 1/2 16

Existing Electrical Note:

Use existing duct/conduits where possible. Additional duct/conduit runs may be necessary if existing system is inadequate in size and/or location for this installation. Verify existing size and location.

ITEM QTY Outlet Legend for GE Equipment

System emergency off (SEO), (recommended height 1.2m [48"] above floor) X-Ray room warning light control panel

X-Ray ON lamp (L1) - 24V

Door interlock switch (needed only if required by state/local codes) Duplex hospital grade, dedicated wall outlet 120-v, single phase power

Network outlet

ELECTRCAL LAYOUT ITEM LIST

1 Power Distribution Box 2 Exst 18" x 3 1/2" Flush wall duct with minimum 2 dividers

3 Exst 18" x 3 1/2" Duct below floor with minimum 2 dividers

4 Exst 10" x 3 1/2" Riser duct with minimum 2 dividers, to floor box

5 Exst Flush floor box 6 Exst Flush ceiling box

7 Exst Flush wall box 8 Box attached to duct (TIMS)

9 Exst One 1 1/2" conduit above ceiling

10 Exst One 2" conduit above ceiling

11 Exst One 2 1/2" conduit above ceiling

12 Exst One 3 1/2" conduit above ceiling

13 One 2" conduit above ceiling

14 One 2 1/2" conduit above ceiling

15 10" x 3 1/2" Surface wall duct with minimum 2 dividers

DateRev /16RF-M091991-FIN-01-B.DWG B 09/Mar/2020DISCOVERY RF180VA Montana Healthcare System Fort Harrison E2 - Electrical Layout 13

5 643

R/F EXAM

CONTROL

8'-4"

9'-5"

1' -7

4' -3

NOTE: IF DOORWAY LEADS TO AN

UNCONTROLLED AREA, A DOOR

INTERLOCK SWITCH AND

WARNING LIGHT WILL BE

REQUIRED.

NOTE: IF DOORWAY LEADS TO AN

UNCONTROLLED AREA, A DOOR

INTERLOCK SWITCH AND

WARNING LIGHT WILL BE

REQUIRED.

14 11 13

A C

DateRev /16RF-M091991-FIN-01-B.DWG B 09/Mar/2020DISCOVERY RF180VA Montana Healthcare System Fort Harrison E3 - Electrical Elevations 14

0' -9

5 8

9'-3"

0'-0"

9'-3"

0'-0"

9'-3"

0'-0"

3' -9

" 5' -0

0' -9

15157 7

2 2

INTERCONNECTION

PDB

WS

UPS††

G

DIG

Console

16m/5m* [52.49ft/16.40ft*]

DIG Digital System Cabinet

G Generator Cabinet OTS Overhead Tube

Suspension PDB Power Distribution

Box UPS Uninterruptible

Power Supple WS Wall Stand

OTS

Table

CONFIGURATION WITH OTS AND WALL STAND

........m [........ft] - Total length

- Usable length........m* [........ft*] 20m/18m*

[65.62ft/59.06ft*]

20m/11m* [65.62ft/36.09ft*]

20m/17m* [65.62ft/55.77ft*]

15m/11m* [49.21ft/36.09ft*]

15m/11m* [49.21ft/36.09ft*]

21m/17m* [68.90ft/55.77ft*]

25m/21m [82.02ft/68.90ft]

15m/12m* [49.21ft/39.37ft*]

11m/9m* [36.09ft/29.53ft*]

15m/12m* [49.21ft/39.37ft*] 3m/2m*

[9.84ft/6.56ft*]

10m/8m* [32.81ft/26.25ft*]

20m/17m* [65.62ft/55.77ft*]

22m/10m* [72.18ft/32.81ft*]

25m/11m* [82.02ft/36.09ft*]

24m/11m* [78.74ft/36.09ft*]

30m/15m* [98.42ft/49.21ft*]

20m/19m* [65.62ft/62.34ft*]

Access Point (option)

TIMS

(option)

15m 49.2ft

UPS†† - USA only option

†† -Not available in

USA

Monitor cart/suspension

CABLE MANAGEMENT

Removable coverplate

DUCT ON THE WALL

NOT TO SCALE

CABLE MANAGEMENT

PIPE UNDER FLOOR

NOT TO SCALE

Removable coverplate

VERTICAL DUCT ON WALL

DateRev /16RF-M091991-FIN-01-B.DWG B 09/Mar/2020DISCOVERY RF180VA Montana Healthcare System Fort Harrison E4 - Details-Interconnections 15

POWER DISTRIBUTION

Main supply 3 phases

480 V Ground cable (PE)

100 A

TAB

480 V OUT

400 V230 V

UPS

OTS

(option)

Power distribution box (PDB)

Cable SUPPLIED BY

CUSTOMER

Equipment SUPPLIED

BY GE

Equipment SUPPLIED

BY CUSTOMER

Cable SUPPLIED BY GE

Notes :

(1) Dry contact: "X-Ray ON", released by the system.

Max. voltage = 30 V

(2) H07RN-F cable with 6.56 ft (2m) extra length on the floor behind the back of generator cabinet (only if required per local requirements)

(3) Max lug size 8 AWG

(4) Fourth wire only needed with UPS option for USA

1 phase power

DLK1

400 V IN

480 V

GEN

(1)

WS

(option)

14 Green 14 White 14 Black

14 Green 14 White 14 Black

RML1

14 Green 14 White 14 Black

14 Green 14 White 14 Black

FEEDER TABLE

MINIMUM FEEDER WIRE SIZE IN mm² AND (AWG)

INPUT VOLTAGE

MINIMUM FEEDER WIRE LENGTH

15m (50') 30m (100') 46m (150') 61m (200') 77m (250') 92m (300') 107m (350') 122m (400')

480 VAC *35 (3) *35 (3) *35 (3) *35 (3) 35 (2) 50 (1) 70 (1/0) 70 (1/0)

* MINIMUM WIRE SIZE FOR CIRCUIT BREAKER, BASED ON RECOMMENDED OVERCURRENT PROTECTION

GENERAL NOTES

In all cases qualified personnel must verify that the feeder (at the point of take-off) and the run to the Radiology system meet all the requirements stated in the PIM.

For a single unit installation, the minimum transformer size is 112.5kva, synthesized power feed is not acceptable. Maximum allowable transient voltage excursions are 2.5% of rated line voltage at a maximum duration of 5 cycles and frequency of 10 times per hour.

Ground wire will be same size as power cable. Ground will run from the equipment back to the power source/main grounding point and always travel in the same conduit with the feeders and neutral. Neutral must be terminated inside the main disconnect panel and not at any

GE cabinet.

14 Green 14 White 14 Black

OTS

On/Off

(Option)

230 V

Equipment SUPPLIED

BY GE, INSTALLED BY

CONTRACTOR

24 V

(2)

(4)

DIG Digital system cabinet DIS Door Interlock Switch GEN Generator cabinet OTS Overhead Tube Suspension (Option) PDB Power Distribution Box RML1 Room light dimmer switch SEO Emergency OFF button, located 4 ft

[1.22m] above floor TAB Patient Table SDT Step-down Transformer, 15kVA UPS Uninterruptible Power Supply WLC Warning Light Controller WL Warning Light WS Wall Stand (Option)

SEO

SDT

WLC

WL Line supply should come into a power distribution box (PDB) containing the protective units and controls.

The section of the supply cable should be calculated in accordance with its length and the maximum permissible voltage drops.

There must be discrimination between supply cable protective device at the beginning of the installation

(main low-voltage transformer side) and the protective devices in the PDB.

SUPPLY CHARACTERISTICS

Power input must be separated from any others which may generate transients (elevators, air conditioning, radiology rooms equipped with high speed film changers...)

All equipment (lighting, power outlets, etc...) installed with GE system components must be powered separately.

GROUND SYSTEM

Equipotential: the equipotential link will be by means of an equipotential bar. This equipotential bar should be connected to the protective earth conductors in the ducts of the non GE cableways and to additional equipotential connections linking up all the conducting units in the rooms where GE units are located.

CABLES

Power and cable installation must comply with the distribution diagram below.

All cables must be isolated and flexible, cable color codes must comply with standards for electrical installation.

Case PDB furnished by GE: The cables for signals and remote control (Y, SEO, L...) will go to PDB with a pigtail length of 1.5m, and will be connected during installation. Each conductor will be identified and isolated (screw connector).

CABLEWAYS

The general rules for laying cableways should meet the conditions laid down in current standards and regulations, with regard to:

Protecting cables against water (cableways should be waterproof) Protecting cables against abnormal temperatures (proximity to heating pipes or ducts) Protecting cables against temperature shocks Replacing cables (cableways should be large enough for cables to be replaced) Metal cableways should be grounded.

POWER REQUIREMENTS

GENERATOR TYPE 65 kW 80 kW

POWER SUPPLY 3 PHASES+N+G 480V ±10%

MAINS FREQUENCY 50/60 Hz ± 2% LINE INPUT REACTIVE POWER (PEAK) 95 kVA 115 kVA LINE INPUT ACTIVE POWER 65 kW 80 kW

DateRev /16RF-M091991-FIN-01-B.DWG B 09/Mar/2020DISCOVERY RF180VA Montana Healthcare System Fort Harrison E5 - Power Requirements 16

File details come from the government source that posted it. Updated .