36C25920Q0188-0001004.docx
DOCX document Posted
- Attached to
- Z2DZ--Fort Riley Relocate Back-Up Generator
- Solicitation number
- 36C25920Q0188
About this file
This document is an amendment to a previous combined solicitation providing additional details for solicitation number 36C25920Q0188. The solicitation is for relocating an existing back-up generator from building 610 to building 409 at Fort Riley, Kansas for the Department of Veterans Affairs. The amendment provides drawings of the existing generator and electrical site plans for both buildings, as well as answers to nine questions from potential offerors. No changes are made to the solicitation terms, with responses still due by March 18, 2020. The work includes removing an existing generator, gas regulator and flow meter, installing a new fence and conduit, and reconnecting utilities at the new location.
36C25920Q0188 0001 36C25920Q0188 0001_1.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25920Q0188-0001006.pdf | ||
| 36C25920Q0188-0001005.pdf | ||
| 36C25920Q0188-0001007.pdf | ||
| 36C25920Q0188-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Opportunity Amendment to a Previous Combined Solicitation
CLASSIFICATION CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
BASE NOTICE TYPE
RESPONSE DATE (MM-DD-YYYY)
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field Contract Opportunity Amendment to a Previous Combined Solicitation
Z2DZ
Fort Riley Relocate Back-Up Generator 80111 36C25920Q0188 03-18-2020 N 238210 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 Charlie Gritzmacher charles.gritzmacher@va.gov Department of Veterans Affairs Member Services 409 Pershing Ct Ft. Riley, KS 66442
USA
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 03-09-2020 702-20-3-2381-0035 None N 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 N 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders
36C25920Q0188 02-06-2020
X x
See CONTINUATION Page
LOA#:
702-3600162-2381-854200-2580 SPG0A00A7
2237#: 702-20-3-2381-0035 x one The purpose of this Amendment is to provide:
1) RFQ questions and answers recived by 2 PM MST Feb. 28, 2020.
2) Drawing with dimensions of existing generator
3) As-built drawing of existing generator at bldg. 610
4) Electrical site plan drawing of existing generator at bldg. 610
**All Other Terms & Conditions Remain the Same**
Erica A Blake Contracting Officer
VA-VHA-SAOW-2019-B0D0EABF
CONTINUATION PAGE
Question and Answer
RFQ 36C25920Q0188
1. Question: Please confirm if the flow meter and gas regulator need to be relocated?
Answer: Yes, the flow meter and gas regulator is to be moved with the generator for final hookup at bldg. 409.
2. Question: Can you please confirm the dimensions and weight of the generator?
Answer: See attached Generator Dimensions PDF. Information as to the weight of the generator is not available.
3. Question: Can the overhead powerlines near the generator be deenergized? If so, what company has jurisdiction to do so?
Answer: Yes. This falls under the responsibility of DPW. The VA will coordinate with DPW to have the line deenergized when the generator is scheduled to be moved. See 1.3.1.2.7 of the PWS: Utility shutdowns/Outages: All shutdowns involving temporary impairment of utilities will be requested by the Contractor, in writing, at least 10 calendar days in advance.
4. Question: Will the future site of the generator have sod installed or be seeded prior to NTP for this project?
Answer: Yes, the site will have either sod or seeded prior to moving the generator.
5. Question: Can you please provide additional detailing showing orientation of the of the generator in the new location?
Answer: See attached Electrical Site Plan PDF.
6. Question: Please confirm if the disconnect and electrical panel in the new location needs to be included in the fencing.
Answer: Yes, the electrical panel and disconnect are to be inside the fence for the generator. The fencing at building 610 is to be removed and re-installed at bldg. 409.
7. Question: Please confirm material and finish of gas piping at the new generator location.
Answer: At this time, the construction contractor has not submitted the proposal to install the gas line. Therefore, this cannot be confirmed.
8. Question: Please confirm if the control conduits for the are going to be installed to the new generator pad.
Answer: Yes, there is to be a 1” conduit installed with controls cable coiled in enclosure near generator for the controls wiring from the generator pad to the enclosure in room 012. See attached Electrical Site Plan PDF.
9. Question: Please confirm the approximate feeder lengths from the ATS to the generator Answer: Estimated to be 200’ +/-.
See attached document: Generator Dimensions.
See attached document: As-Built Generator.
See attached document: Electrical Site Plan.
See attached document: Electrical Site Plan.
See attached document: Generator Dimensions.
See attached document: As-Built Generator.
File details come from the government source that posted it. Updated .