About this file

36C25918R0600 0004 MRI Temporary Covered Walkway - Addendum 3.docx

View the file

Other files for this federal contract opportunity

Other files attached to Construction of a temporary covered walkway (VA-18-00109708), newest first.
File Type Posted
36C25918C0339-000.docx DOCX document
36C25918R0600-0006000.docx DOCX document
36C25918R0600-0005000.docx DOCX document
36C25918R0600-0004000.docx DOCX document
36C25918R0600-0004001.pdf PDF
36C25918R0600-0003000.docx DOCX document
36C25918R0600-0002002.pdf PDF
36C25918R0600-0002001.pdf PDF
36C25918R0600-0002000.docx DOCX document
36C25918R0600-0001000.docx DOCX document
36C25918R0600-0001005.pdf PDF
36C25918R0600-0001004.pdf PDF
36C25918R0600-0001003.pdf PDF
36C25918R0600-0001006.pdf PDF
36C25918R0600-0001007.pdf PDF
36C25918R0600-0001002.pdf PDF
36C25918R0600-0001001.pdf PDF
36C25918R0600-003.pdf PDF
36C25918R0600-006.pdf PDF
36C25918R0600-001.docx DOCX document
36C25918R0600-007.docx DOCX document
36C25918R0600-005.pdf PDF
36C25918R0600-004.pdf PDF
36C25918R0600-002.pdf PDF
36C25918R0600-000.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM

Project: MRI Temporary Covered WalkwayDate: 08/27/2018
Project Number: 442-18-014SAddendum Number: 3

The following changes, additional and/or deletions are hereby made a part of the Construction Documents for the above noted project, fully and completely as is the same were fully contained therein. All other terms, conditions, and specification of the original documents remain unchanged.

Clarification items and other changes included in the Addendum 3 (see clouded areas on plans):

1. A100: Door Schedule updated for Double 36” doors.

2. A101: Site & Floor Plan: Single door on West of Covered Walkway revised to double 36” doors. A small area of sidewalk has been added to create a landing for the doorway. Gutter downspout has been relocated to the center of the structure.

3. A101: Wall Framing Plan: Header revised over larger double door.

4. A101: Roof Framing Plan: Built-up beam upsized to 3-2x12. Angle of roof valley adjusted to 45°. Gutter revised to slope to a downspout in the center, and drain into the grass detention pond area.

End of Addendum 3