36C25918R0391-013.pdf

PDF 2 MB Posted

Attached to
Radiology Rooms 1 & 3 Federal contract opportunity
Solicitation number
36C25918R0391
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

36C25918R0391 GE HEALTH DWGS.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Radiology Rooms 1 & 3, newest first.
File Type Posted
36C25918C0232-000.docx DOCX document
36C25918R0391-00001000.docx DOCX document
36C25918R0391-00001002.docx DOCX document
36C25918R0391-00001001.pdf PDF
36C25918R0391-00001004.docx DOCX document
36C25918R0391-00001003.pdf PDF
36C25918R0391-014.pdf PDF
36C25918R0391-011.pdf PDF
36C25918R0391-016.pdf PDF
36C25918R0391-018.docx DOCX document
36C25918R0391-010.docx DOCX document
36C25918R0391-017.docx DOCX document
36C25918R0391-012.pdf PDF
36C25918R0391-015.pdf PDF
36C25918R0391-009.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Any deviation from these drawings must be communicated in writing to and reviewed by your local GE Healthcare Installation Project Manager prior to making changes.

Make arrangements for any rigging, special handling, or facility modifications that must be made to deliver the equipment to the installation site. If desired, your local GE Healthcare Installation Project Manager can supply a reference list of rigging contractors.

New construction requires the following; 1. Secure area for equipment, analysis, 4. Restrooms.

Provide for refuse removal and disposal (e.g. crates, cartons, packing)

2. Power for drills and other test equipment, 3. Capability for image

Contact a radiation physicist or consultant to specify radiation containment requirements.

R/F Site Planning

GE Healthcare Customer Site Readiness

Requirements Drawing Index

A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the Pre Installation manual will result in incomplete documentation required for site design and preparation.

Pre Installation documents for GE Healthcare products can be accessed on the web at:

www.gehealthcare.com/siteplanning

These sheets are a document set and should not be separated.

Electrical information and references are contained on all sheets.

GE Equipment Delivery Requirements

The items on the GE Healthcare Site Readiness Checklist are REQUIRED to facilitate equipment delivery to the IS site. Equipment will not be delivered if these requirements are not satisfied.

* REQUIRED REFERENCE *

Pre Installation Manual

These drawings indicate the placement and interconnection of the listed equipment components. These drawings are not construction or site preparation drawings. Customer remains ultimately responsible for preparing the site to accommodate the operation of such equipment in compliance with GE Healthcare's written specifications and all applicable federal, state, and/or local requirements.