36C25918R0391-013.pdf
PDF 2 MB Posted
- Attached to
- Radiology Rooms 1 & 3 Federal contract opportunity
- Solicitation number
- 36C25918R0391
About this file
36C25918R0391 GE HEALTH DWGS.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25918C0232-000.docx | DOCX document | |
| 36C25918R0391-00001000.docx | DOCX document | |
| 36C25918R0391-00001002.docx | DOCX document | |
| 36C25918R0391-00001001.pdf | ||
| 36C25918R0391-00001004.docx | DOCX document | |
| 36C25918R0391-00001003.pdf | ||
| 36C25918R0391-014.pdf | ||
| 36C25918R0391-011.pdf | ||
| 36C25918R0391-016.pdf | ||
| 36C25918R0391-018.docx | DOCX document | |
| 36C25918R0391-010.docx | DOCX document | |
| 36C25918R0391-017.docx | DOCX document | |
| 36C25918R0391-012.pdf | ||
| 36C25918R0391-015.pdf | ||
| 36C25918R0391-009.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Any deviation from these drawings must be communicated in writing to and reviewed by your local GE Healthcare Installation Project Manager prior to making changes.
Make arrangements for any rigging, special handling, or facility modifications that must be made to deliver the equipment to the installation site. If desired, your local GE Healthcare Installation Project Manager can supply a reference list of rigging contractors.
New construction requires the following; 1. Secure area for equipment, analysis, 4. Restrooms.
Provide for refuse removal and disposal (e.g. crates, cartons, packing)
2. Power for drills and other test equipment, 3. Capability for image
Contact a radiation physicist or consultant to specify radiation containment requirements.
R/F Site Planning
GE Healthcare Customer Site Readiness
Requirements Drawing Index
A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the Pre Installation manual will result in incomplete documentation required for site design and preparation.
Pre Installation documents for GE Healthcare products can be accessed on the web at:
www.gehealthcare.com/siteplanning
These sheets are a document set and should not be separated.
Electrical information and references are contained on all sheets.
GE Equipment Delivery Requirements
The items on the GE Healthcare Site Readiness Checklist are REQUIRED to facilitate equipment delivery to the IS site. Equipment will not be delivered if these requirements are not satisfied.
* REQUIRED REFERENCE *
Pre Installation Manual
These drawings indicate the placement and interconnection of the listed equipment components. These drawings are not construction or site preparation drawings. Customer remains ultimately responsible for preparing the site to accommodate the operation of such equipment in compliance with GE Healthcare's written specifications and all applicable federal, state, and/or local requirements.
File details come from the government source that posted it.