36C25918R0391-00001002.docx

DOCX document 14 KB Posted

Attached to
Radiology Rooms 1 & 3 Federal contract opportunity
Solicitation number
36C25918R0391
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

36C25918R0391 00001 Questions and Answers.docx

View the file

Other files for this federal contract opportunity

Other files attached to Radiology Rooms 1 & 3, newest first.
File Type Posted
36C25918C0232-000.docx DOCX document
36C25918R0391-00001000.docx DOCX document
36C25918R0391-00001004.docx DOCX document
36C25918R0391-00001003.pdf PDF
36C25918R0391-00001001.pdf PDF
36C25918R0391-010.docx DOCX document
36C25918R0391-013.pdf PDF
36C25918R0391-017.docx DOCX document
36C25918R0391-012.pdf PDF
36C25918R0391-015.pdf PDF
36C25918R0391-014.pdf PDF
36C25918R0391-011.pdf PDF
36C25918R0391-016.pdf PDF
36C25918R0391-018.docx DOCX document
36C25918R0391-009.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

Q1. Does each exam room have its own power source?

A1. Yes, and we will be using the existing breakers.

Q2. Will any new windows be added to exam rooms?

A2. No

Q3. Who will do the final hook ups to the new equipment?

A3. The contractor should plan to be available for final electrical and data hook ups.

Q4. Can CPARS be turned in with the proposal in lieu of the Past performance questionnaires?

A4. Yes.

Q5. Can previous completed PPQ’s be turned in if they are the same?

A5. Yes

Q6. Does Saw cutting need to be completed at night or can it be done during regular business hours?

A6. Plan to do the saw cutting AFTER normal working hours.

Q7. Can any new flooring can be VCT. If not what is the government requiring?

A7. The new flooring can be VCT.

Q8. Does any HVAC needs need relocated? If so, to where?

A8. No, the HVAC does not need to be relocated.

Q9. On the walk it was stated an updated drawing will be issued for AFCA. Is this the case?

A9. The updated AFCA drawing has bee issued.

Q10. Who I the manufacture of the existing ceiling grid?

A10. Do not the manufacturer of the existing ceiling grid.

Q11. Note 4 on plan set 1 states the floor must be =/- 1/8" over 10 feet. Does the exiting floor meet these requirements or does the floor need to be floated out and new flooring installed?

A11. The level of the floor is adequate.