36C25918R0391-00001002.docx
DOCX document 14 KB Posted
- Attached to
- Radiology Rooms 1 & 3 Federal contract opportunity
- Solicitation number
- 36C25918R0391
About this file
36C25918R0391 00001 Questions and Answers.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25918C0232-000.docx | DOCX document | |
| 36C25918R0391-00001000.docx | DOCX document | |
| 36C25918R0391-00001004.docx | DOCX document | |
| 36C25918R0391-00001003.pdf | ||
| 36C25918R0391-00001001.pdf | ||
| 36C25918R0391-010.docx | DOCX document | |
| 36C25918R0391-013.pdf | ||
| 36C25918R0391-017.docx | DOCX document | |
| 36C25918R0391-012.pdf | ||
| 36C25918R0391-015.pdf | ||
| 36C25918R0391-014.pdf | ||
| 36C25918R0391-011.pdf | ||
| 36C25918R0391-016.pdf | ||
| 36C25918R0391-018.docx | DOCX document | |
| 36C25918R0391-009.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS
Q1. Does each exam room have its own power source?
A1. Yes, and we will be using the existing breakers.
Q2. Will any new windows be added to exam rooms?
A2. No
Q3. Who will do the final hook ups to the new equipment?
A3. The contractor should plan to be available for final electrical and data hook ups.
Q4. Can CPARS be turned in with the proposal in lieu of the Past performance questionnaires?
A4. Yes.
Q5. Can previous completed PPQ’s be turned in if they are the same?
A5. Yes
Q6. Does Saw cutting need to be completed at night or can it be done during regular business hours?
A6. Plan to do the saw cutting AFTER normal working hours.
Q7. Can any new flooring can be VCT. If not what is the government requiring?
A7. The new flooring can be VCT.
Q8. Does any HVAC needs need relocated? If so, to where?
A8. No, the HVAC does not need to be relocated.
Q9. On the walk it was stated an updated drawing will be issued for AFCA. Is this the case?
A9. The updated AFCA drawing has bee issued.
Q10. Who I the manufacture of the existing ceiling grid?
A10. Do not the manufacturer of the existing ceiling grid.
Q11. Note 4 on plan set 1 states the floor must be =/- 1/8" over 10 feet. Does the exiting floor meet these requirements or does the floor need to be floated out and new flooring installed?
A11. The level of the floor is adequate.