This solicitation is for construction services to replace a bi-plane in interventional radiology at a Veterans Affairs medical center. The contractor shall demolish existing structures, construct new spaces including an equipment room and control room, install medical equipment and utilities, and perform related renovations. Key requirements include replacing the bi-plane unit by August 2021; complying with specifications, drawings, and construction documents; obtaining necessary permits and certifications; and adhering to a 180-day performance period. The opportunity is set aside for service-disabled veteran-owned small businesses.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES NO
a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________
(hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and tim e offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1 60
36C25821B0001
X
TBD 691-21-1-068-0001
691-CSI-125
Department of Veterans Affairs
NCO22-Gilbert Network Contracting
4135 S Power Road, Suite 103
Mesa AZ 85212
Phoenix VA Healthcare System
4135 S Power Road, Suite 103
Mesa AZ 85212
Kim Leone 480-466-7934
Contractor shall completely prepare site for building operations, including demolition. Coordinate with the
Government's equipment provider and furnish all labor and materials necessary in order to perform work to replace the Bi-Plane as IAW the SOW, supplied drawings and specifications. The contractor shall provide all necessary work to include the renovations in support of replacing the Bi-plane located in Intervention Radiology at Building 500
IAW the SOW, supplied drawings and specifications for the WLA Health Care System located in Los Angeles California.
Awardee shall perform work in strict accordance with General Specifications, Statement of Work, Attachments, Schedule, Site Drawings, and terms and Conditions set forth in the contract.
Wage determination applicable to the solicitation and incorporated by attachment is General Decision Number: CA20200022
The contractor shall be responsible for the correct title and classification of all workers and be in compliance with all applicable wage hours and laws.
Magnitude of this project is Between $1,000,000 and $2,000,000 in accordance with VAAR 836.204
Applicable NAICS Code and Size Standard for this Acquisition is 236220 / $39.5 Million
This procurement is 100% set aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) in accordance with
Public Law (PL) 109-461, 28 United States Cod (U.S.C.) Section 8127. To be eligible to participate in this procurement, the contractor shall be registered/enrolled in the following databases at the time of proposal submission and award: System for Award Management (SAM) https://sam.gov/SAM/pages/public/searchRecords/search.jsf
Vendor Information Pages VIP; https://www.vip.vetbiz.va.gov/
VETS 4212 (DoL) https://www.dol.gov/agencies/vets/programs/vets412#overview
Job Walk will commence: January 6th 2021 @10 a.m. PST (CA Time)
All vendors will meet at the following location for the site walk: BLDG 218 Parking Lot 7 of the WLAVAHCS Los Angeles CA
Due to COVID-19 restrictions vendors must have their temperatures taken and wear masks before entering the hospital.
Attendance is not mandatory; however, ALL INTERESTED BIDDERS ARE ENCOURAGE AND EXPECTED TO ATTEND.
RFIs Due: 13 January 2021 @ 10 a.m. MST (AZ Time) submit toKim.Leone@va.gov
Public Bid Opening, via Microsoft Teams call: 3 p.m. MST (AZ Time) on February 3rd, 2021.
Microsoft Teams call meeting invitation will be sent to contractors who have submitted a bid by the deadline.
ALL BIDS MUST include Attachment 1 MUST BE SUBMITTED VIA EMAIL to Kim.Leone@va.gov
Subject Line of the email: "BID, 36C25821B0001, 691,CSI-125, YOUR COMPANY'S NAME"
Bid amount shall include Material cost, Labor cost, Overhead, Profit, and Grand Total. This information is required and may be used in the event of possible future modifications. Bids will be evaluated on Grand Total amount only.
For further details concerning the times and events noted above, please refer to the "Instructions to All Bidders" portion found at the end of this solicitation.
10 180
X X 52.211-10
X
1 1 p.m. MST
02-03-2021
X
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
PHONE: FAX:
28. NEGOTIATED AGREEMENT 29. AWARD Your
Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont -this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
691-3600162-068-854200-3220 23CINR000
NCO22-Gilbert Network Contracting
4135 S Power Road, Suite 103
Mesa AZ 85212
This is accomplished through the
Tungsten Network located at:
http://www.fsc.va.gov/einvoice.asp
This is mandatory and the sole method for submitting invoices.
Julie Kocinski
VA-VHA-2020-5ED2359E
Table of Contents
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) . 1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION,
OR REPAIR)– BACK
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
A.4 DELIVERY SCHEDULE
SECTION B - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
B.1 INTRODUCTION:
B.2 BACKGROUND / DESCRIPTION OF WORK:
B.3 CONSTRUCTION DOCUMENT:
B.4 SPECIFICATIONS
B.5 SPECIFIC REQUIREMENTS
B.6 CONFORMANCE STANDARDS:
B.7 HOURS OF COVERAGE:
B.8 IDENTIFICATION, PARKING, NO SMOKING, & VA REGULATIONS:
B.9 SECURITY PROCEDURES:
B.10 INFORMATION SECURITY:
B.11 POINTS OF CONTACT AND PHYSICAL LOCATION:
B.12 PERIOD OF PERFORMANCE:
B.13 SUBMITTALS:
B.14 COMMENCEMENT, COMPLETION, AND PAYMENT FOR WORK:
B.15 MODIFICATIONS:
SECTION C - CONTRACT CLAUSES
C.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
C.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND
SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED
ENTITIES (JUL 2018)
C.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (OCT 2018)
C.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984) ALTERNATE I (APR 1984)
C.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(NOV 2020)
C.6 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
C.7 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)
C.8 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT (DEC 2010)
C.9 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)
C.10 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)
ALTERNATE II (APR 1984)
C.11 SUPPLEMENTAL INSURANCE REQUIREMENTS
C.12 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
C.13 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION)
C.14 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND
COMPLIANCE (JUL 2018)
C.15 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND
VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)
C.16 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV
2018)
C.17 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(APR 2019)
C.18 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)
C.19 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)
C.20 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT
ADMINISTRATION (OCT 2020)
C.21 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP
2019)
C.22 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) 37
C.23 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
C.24 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR
PERSONNEL (MAY 2020)
C.25 VAAR 852.223-71 SAFETY AND HEALTH (SEP 2019)
C.26 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION
CONTRACTS (INCLUDING NAS– CPM) (NOV 2018)
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
SECTION E - SOLICITATION PROVISIONS
E.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)
E.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS
AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)
E.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
E.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—
CERTIFICATION (JUL 2020)
E.5 52.214-31 FACSIMILE BIDS (DEC 1989)
E.6 52.216-1 TYPE OF CONTRACT (APR 1984)
E.7 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF
THE WORK (MAY 2014)
E.8 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
E.9 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS (MAY 2014)
E.10 52.228-1 BID GUARANTEE (SEP 1996)
E.11 52.233-2 SERVICE OF PROTEST (SEP 2006)
E.12 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) .54
E.13 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
E.14 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION
(OCT 2018)
SECTION F - STATEMENT TO BIDDERS
F.1 INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO
BIDDERS/OFFERORS
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1.00 JB __________________ __________________
Request Construction Services for the above project per attached construction documents at VHAGLA,11301 Wilshire Blvd, LA, CA
90073.
PER ATTACHED STATEMENT OF WORK, DESIGN, SPECS AND
ALL OTHER DOCUMENTS INCLUDED.
******Bid amount SHALL list Material cost, Labor cost, Overhead, Profit and in a separate line the Grand Total.***
Material Cost: $_______________ Labor Cost: $__________________
Overhead: $___________________
Profit: $________________________
GRAND TOTAL __________________
A.4 DELIVERY SCHEDULE
ITEM NUMBER QUANTITY DELIVERY DATE
0001 SHIP TO: Greater Los Angeles - West Los Angeles
11301 Wilshire Boulevard
Los Angeles, CA 90073 1003 United States
1.00 180 Calendar Days
After NTP
MARK FOR: COR: Tom Phan
SECTION B - DESCRIPTION/SPECIFICATIONS/STATEMENT OF
WORK
Statement of Work Replace Bi-plane in Interventional Radiology at B500
Construction
25 NOVEMBER 2020
Greater Los Angeles, California VA Health Care System (691)
West Los Angeles
B.1 INTRODUCTION:
This requirement is for construction services to necessary to provide construction including select demolition, and new construction for project no. 691-CSI-125 Replace Bi-plane IR
B500 for Interventional Radiology at B500 in the Greater Los Angeles VA Hea lth Care
System (GLAVAHCS). This requirement is classified under construction as it calls for the alteration of real property.
B.2 BACKGROUND / DESCRIPTION OF WORK:
The Veterans Affairs Healthcare System located in Greater Los Angeles, California (691) requires construction services for renovations in support of replacing the Bi-plane located in
Intervention Radiology at Building 500. This project was designed through awarded government contract VA262-16-D-0155 | 36C25818N0663 to the AE firm Triple C- The
A&E Group, LLC.
B.3 CONSTRUCTION DOCUMENT:
Contractor shall furnish all labor, equipment, certification, supervision, and materials necessary to perform all operations in connections with this order. Contractor shall perform work in strict accordance with the General Specifications, Statement of Work, schedule, and all other supporting documents for this contract to include, but not limited to the f ollowing documents:
*Refer to Section D for list of attachments.
B.4 SPECIFICATIONS
A. The VA Master Construction Specifications contain work procedures and material requirements designed to meet regulatory compliance requirements. Whenever possible, the Master Construction Specifications must be used as the basis for project designs, http://www.cfm.va.gov.
B. A complete list of these specifications can be viewed at the following website:
http://www.cfm.va.gov. The Specifications which address EOSH requirements include, but are not limited to, the following:
DIVISION 00 SPECIAL SECTIONS
00 01 11 Seals 00 01 15 List of Drawing Sheets
DIVISION 01 GENERAL REQUIREMENTS
01 00 00 General Requirements 01 00 00 General Requirements Appendix A: Bid Form Template 01 00 00 General Requirements Appendix B: Asbestos Survey Report 01 32 16.15 Project Schedules (Small Projects)
01 33 23 Shop Drawings, Product Data, and Samples 01 35 26 Safety Requirements 01 42 19 Reference Standards 01 45 00 Quality Control
01 45 29 Testing Laboratory Services 01 57 19 Temporary Environmental Controls 01 58 16 Temporary Interior Signage 01 74 19 Construction Waste Management
01 81 13 Sustainable Construction Requirements 01 91 00 General Commissioning Requirements
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition
02 82 11 Traditional Asbestos Abatement 02 82 13.13 Glovebag Asbestos Abatement 02 83 33.13 Lead-Based Paint Removal and Disposal
DIVISION 05 – METALS
05 50 00 Metal Fabrications
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 20 00 Finish Carpentry
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation 07 81 00 Applied Fireproofing 07 84 00 Firestopping 07 92 00 Joint Sealants
DIVISION 08 OPENINGS
08 11 13 Hollow Metal Doors and Frames 08 31 13 Access Doors and Frames 08 71 00 Door Hardware
08 71 13 Automatic Door Operators 08 80 00 Glazing http://www.cfm.va.gov/ http://www.cfm.va.gov/
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 09 22 16 Non-Structural Metal Framing 09 23 00 Gypsum Plastering 09 29 00 Gypsum Board
09 51 00 Acoustical Ceilings 09 65 16 Resilient Sheet Flooring 09 91 00 Painting
DIVISION 10 – SPECIALTIES
10 14 00 Signage 10 26 00 Wall and Door Protection
DIVISION 12 – FURNISHINGS
12 32 00 Manufactured Wood Casework
12 36 00 Countertops
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural Components 13 49 00 Radiation Protection
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 22 08 00 Commissioning of Plumbing Systems 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities
22 63 00 Gas Systems for Laboratory and Healthcare Facilities
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment 23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
23 05 93 Testing, Adjusting, and Balancing for HVAC 23 07 11 HVAC and Boiler Plant Insulation 23 08 00 Commissioning of HVAC Systems 23 08 11 Demonstrations and Tests for Boiler Plant
23 09 23 Direct-Digital Control System for HVAC 23 21 13 Hydronic Piping 23 22 13 Steam and Condensate Heating Piping 23 31 00 HVAC Ducts and Casings
23 34 00 HVAC Fans 23 36 00 Air Terminal Units 23 37 00 Air Outlets and Inlets 23 40 00 HVAC Air Cleaning Devices
23 82 00 Convection Heating and Cooling Units 23 82 16 Air Coils
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations
26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 33 Raceway and Boxes for Electrical Systems 26 05 36 Wireways for Radiology Equipment
26 05 39 Underfloor Raceways for Electrical Systems 26 05 73 Overcurrent Protective Device Coordination Study 26 08 00 Commissioning of Electrical Systems 26 20 11 Isolated Power Systems
26 24 16 Panelboards 26 27 26 Wiring Devices 26 51 00 Interior Lighting 26 55 71 Medical and Surgical Lighting Fixtures
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 27 05 26 Grounding and Bonding for Communications Systems 27 05 33 Raceways and Boxes for Communications Systems 27 08 00 Commissioning of Communications Systems
27 10 00 Control, Communication and Signal Wiring 27 11 00 Telecommunications Room Fittings 27 15 00 Communications Structured Cabling 27 51 23 Intercommunications and Program Systems
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 28 05 13 Conductors and Cables for Electronic Safety and Security 28 05 26 Grounding and Bonding for Electronic Safety and Security
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security 28 08 00 Commissioning of Electronic Safety and Security Systems 28 13 00 Physical Access Control System 28 23 00 Video Surveillance
28 31 00 Fire Detection and Alarm
B.5 SPECIFIC REQUIREMENTS
A. Scope of Work
1. The scope of this project is for the general contractor to provide construction including select demolition, and new construction for Project No. 691-CSI-125 Replace Bi-plane IR B500. Contractor to provide all trades described in contract documents required to support the government in this equipment replacement, including installing government furnished equipment and other vendor’s equipment. The pre-manufactured modular demountable partitions construction barricades/ Mccain wall to the underside of the existing ceiling assembly shall be used as temporary walls.
2. Contractor is also required to provide structural calculations, shop drawings and modifications to install the new equipment and to provide structural support and seismic bracing for all components as detailed in Specification sections 13 05 41
Seismic Restraint Requirements for Non-Structural Components, 05 50 00 Metal Fabrications and 01 45 35 Special Inspection. This will require modifying and shoring up existing structure to provide support and clearance for the new equipment. Contractor shall prepare and submit State of California Structural
Engineer sealed (signed, dated, and stamped) coordination and seismic bracing drawings and details prior to commencing work. The structural modifications must be coordinated with all Philips and Skytron requirements. Prior to the start of work, an acceptable, agreed upon schedule and phased solution is required prior to the start of work, as work will take place in active operating rooms, sterile areas, and interstitial space. Project is located at VA Greater Los Angeles Health Care System, 11301 Wilshire Blvd., Building 500, Los Angeles, CA 90073.
3. Contractor is to provide with all labor, material, and technical expertise to add a GI/Pulmonary unit to an old Angio room that has been used as storage since its removal.
4. The contract documents describe the following scope of work:
a. Procedure Room (RM5218):
1. Provide wiring for new unit and supporting equipment
2. Install 2 new med gas booms with any necessary structural support to include med gases and medical vacuum systems (Nitrous, O2, Air, Vacuum and WAGD), air, suction, data, video, and power)
(Stryker) install 4 new surgery lights (dome, tracking lights in ceiling) (Skytrons)
3. Outfit the wide hallway double door with electronic/automatic open
4. Install multiple video, data, and power connection points including location below table replace existing desk/cabinetry (solid countertop)
5. Install lower cabinetry with solid countertop in front of control room window
6. Remove north door
7. Install full UPS backup and wiring that will allow data backup and table operation during power outage. Unit will reside within IR suite
8. Remove closet in suite; replace with appropriately sized equipment room (new room RM 5220a)
9. Install new flooring and paint
10. Install new ceiling and LED dimmable light
11. Keep existing wall-mounted dimmable indirect lighting install new control panels. Data drops for IR equipment and all supporting mobile medical equipment used for cases
12. Provide new HVAC operating room systems with terminal units/venturi valves, laminar flow diffusers, HEPA filtration, humidifier, stainless steel ductwork and all associated devices and controls
13. Existing medical air and vacuum systems shall be modified with new service to the renovated suite with a new Area Alarm Panel and zone valve box with associated controls to also include below floor service to a new medical gas manifold in addition to the boom service
14. Contractor shall also provide structural designs, calculations and shop drawings for equipment supports and seismic bracing.
b.Equipment Closet (RM5220A)
1. Provide new space for Bi-Plane supporting equipment, including new fire protection, dedicated HVAC, electrical, communications and security services.
2. Contractor shall also provide structural designs, calculations and shop drawings for equipment supports and seismic bracing.
c. Control Room (RM 5218A):
1. Install new control panels.
2. Replace countertop and cabinetry add l-shaped cabinetry (or open shelving) in corner on side opposite of the room from the console (upper and lower cabinetry) provide painting, flooring, and ceiling as shown.
3. Provide data and power necessary for IR equipment and facility computer workstations.
4. Install intercom system between the two IR control rooms with video feed.
d.Sterile storage room (RM5220):
1. Install new wall and hollow metal frame and door.
2. Provide new fire sprinkler head to provide coverage and re-work existing HVAC to serve the new configuration.
5. Comprehensive 3rd party inspections, testing, permits, certifications, and written reports for all Divisions required by this project
a. Minimum inspections required:
1. Utilities (sewer, water, gas, electric, etc.)
2. Mechanical
3. Plumbing and Med Gas
4. Electrical, communications and security
5. Safety/OSHA
6. The General Contractor will be responsible to coordinate with the
Philips/Skytron/ETC. equipment providers and assist with all site preparations required to remove the legacy equipment and install the new equipment. Equipment
Manufacturer, Phillips will de-install and remove the old unit.
7. Contractor to provide Street Cleaners, Water Trucks, and rip rap on site for dust control during construction in addition to following the SWPPP requirements in the
Contract Documents
8. The work is phased. Specification section 01 00 00 General Requirements shows phasing plan.
9. Please see 01 00 00 Appendix B for the Asbestos Survey performed in the Area of
Work. ACM is not shown to be present in the area of work. Should unforeseen ACM be detected Traditional and Glovebag Abatement methods, as stipulated in Specification Sections 02 82 11, 02 82 13.13, and 02 82 13.19, are the only allowable methods of abatement. No alternate abatement methods will be considered.
10. Follow VA standards and guidelines on https://www.cfm.va.gov/til/dManual.asp and all governing codes and standards.
11. Verify as-built drawings provided by VA with site investigation in field.
12. Contractor must bring to the VA’s contracting officer’s attention any discrepancy he may find in the drawings and specs before bidding.
13. Work shall be in compliance with OSHA and all applicable standards and codes described in VA Program Guides and design materials located at the VA Facility Management web site.
14. A copy of the GLA Safety Polices and Permits is included with the bid documents that describe GLA specific safety requirements and all the permits and forms that the contractor shall need during construction.
15. General Requirements 01 00 00 also includes a list of violations with applicable fines enforced by VA’s Safety department.
B. Staging Area
1. The project is on the 5th floor of building 500’s North quadrant. Contractor shall use VA designated space for staging, if available at the time of construction of this project. Verify with VA’s COR for availability. See spec section 01 00 00 for more information.
C. Proposed Timeline
1. It’s General contractor responsibility to coordinate with COR and Phillips contractor for the Bi-Plane equipment installation to meet the delivery deadline NO LATER
THAN August 1st, 2021 for Philips and Skytron equipment installation. Please see drawings.
2. The construction timeline must be strictly adhered to as the operating rooms are a critical area of the hospital and the construction period affects surgery schedules of patients.
3. The contractor is expected to organize adequate labor force to work efficiently to ensure timely completion of project.
4. Contract completion time is noted in the spec section General Requirements 01 00 00.
B.6 CONFORMANCE STANDARDS:
A. All design and construction accomplished pursuant to this contract shall comply with the latest edition of the following documents unless the contractor is directed otherwise by the Contracting Officer. Any exceptions must be approved in writing by the Contracting Officer prior to construction startup.
1. VA Master Construction Specifications
a. https://www.cfm.va.gov/til/spec.asp#01
2. VA Construction Standards
3. VA Seismic Design Handbook
4. VA Space Planning Criteria
5. VA Design Manuals
6. VA CADD Standards
7. NFPA 101, Life Safety Code
8. NFPA 70, National Electric Code
9. NFPA 99, Health Care Facilities
10. NFPA 12, Installation of Sprinkler Systems
11. Accessibility Standards (ADAAG, ABAAS, Barrier Free Design Guide)
12. AIA Guidelines for Construction and Equipment of Hospital and Medical Facilities
13. International Building Codes
14. State and Local codes and guidelines (as applicable)
B.7 HOURS OF COVERAGE:
A. Normal hours of operation are Monday through Friday from 7:30 am to 4:00 pm California time. Some work must be performed after hours including nights, Saturdays, Sundays, and Holidays- at no additional cost to the government. Most work is expected to be performed generally during normal hours of coverage unless requested or approved by the COR or his/her designee.
B. Before commencement of work, the Contractor shall confer with the VA COR and Contracting Office to agree on a sequence of procedures; means of access to premises https://www.cfm.va.gov/til/spec.asp#01 and building. All work performed, to include delivery of materials and equipment, shall be made with minimal interference to Government operations and personnel.
C. Work performed outside the normal hours of coverage must be approved by the COR or his/her designee.
D. Federal Holidays observed by GLAVAHCS are:
New Years' Day Labor Day Martin Luther King Day Columbus Day
Presidents' Day Veterans' Day Memorial Day Thanksgiving Day Independence Day Christmas Day
B.8 IDENTIFICATION, PARKING, NO SMOKING, & VA REGULATIONS:
A. The Contractor's FSEs shall wear visible identification issued by VAHCS Police Section at all times while on the premises of VAHCS. After receiving the NTP the Contractor shall send submittals and obtain PIV cards and security clearance for all the workers to be working in the building for the duration of the construction project.
a. In view of the time required to obtain this clearance the contractor is strongly encouraged to start the process as soon as possible after NTP.
B. It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. VAHCS will not invalidate or make reimbursement for parking violations of the Contractor under any conditions.
C. Smoking is strictly prohibited anywhere on the Veterans Affairs Health Care Facilities, to include main facility, and any other buildings at on the premises.
D. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.
B.9 SECURITY PROCEDURES:
A. General contractor’s employees (Prime and sub) shall not enter the project site without appropriate badge.
B. Contractor staff may also be subject to inspection of their personal effects when entering or leaving the project site.
C. General Contractor’s employees must request 6-month temporary badge after award.
Daily badges can be given while waiting for the 6-month temporary badge. Please contact
COR.
B.10 INFORMATION SECURITY:
A. In accordance with Appendix A, Handbook 6500.6 Checklist blocks 7, the C&A requirements do not apply to this requirement, and Security Accreditation Package is not required. The nature of this requirement is technical; however, there is no information to be protected.
B.11 POINTS OF CONTACT AND PHYSICAL LOCATION:
A. Access to worksite shall be coordinated through:
Point of Contact – COR Mr. Tom Phan
GREATER LOS ANGELES VA HEALTH CARE SYSTEM,
WEST LA (GLA-West):
11301 Wilshire Boulevard, Los Angeles, CA 90073
B.12 PERIOD OF PERFORMANCE:
A. Commencement of work shall begin within 10 days after receipt of written Notice to Proceed (NTP) and should last no longer than a duration of 180 calendar days after date NTP is issued.
B.13 SUBMITTALS:
A. Contractor shall submit all required material/shop drawing submittals to the Contracting Officer within 10 calendar days of award, or as agreed to by the Contracting Officer for approval. No materials shall be installed prior to approval.
B. All material submittals and shop drawings shall contain, and have the Project Title, Project Number, and Contract number clearly indicated.
C. Material submittals and shop drawings shall be checked and signed by the Contractors
Quality Control Manager prior to submission to the Government.
D. Submittals shall be legible and shall include all technical data needed to verify that the item meets requirements of listed specifications, and applicable codes.
E. Contractors will utilize Material Approval Submittal for use as cover sheet when submitting to Government for approval. Forms will be provided to contractor at post-award, pre-construction conference.
B.14 COMMENCEMENT, COMPLETION, AND PAYMENT FOR WORK:
A. The Contractor shall be required to commence work required at the time specified on the Notice to Proceed (NTP), execute the work, and complete the entire work not later than the completion time specified on the NTP. The time stated for completion shall include final cleanup of the premises. At the government’s option, it may choose to specify a two-stage performance period. For example, separating material lead-time from construction days can considerably decrease the length of time occupied buildings are inconvenienced by construction.
B. Before commencement of work, the Contractor shall confer with the VA COR and Contracting Office to agree on a sequence of procedures; means of access to premises and building; space for storage of materials and equipment; delivery of materials and use of approaches; use of corridors, stairways, elevators, and similar means of communications; location of partitions, eating spaces, and restrooms for the Contractor employees; and the like. Delivery of materials and equipment shall be made with minimal interference to Government operations and personnel.
C. The Contractor will be paid every 15 days upon submission of proper invoices for work completed. If the performance period exceeds 30 days and a progress schedule (approved by the Government) has been submitted, partial payment(s) may be authorized. Final payment will be withheld until all discrepancies are corrected and as-built drawings are approved by the Government.
D. The contractor shall attend no less than monthly progress meetings with the COR and/or
Contracting Officer to discuss at a minimum; progression of work, projected progress versus actual progress, action items due from the contractor, action items due from the government, and any other significant issues that require attention. The contractor also shall document the meeting minutes and forward a signed copy to the COR for concurrence of the documentation. Copies of all minutes will be forwarded to the Contracting Officer. In the event of any discrepancies the Contracting Officer will be notified immediately for clarification. Contractor will use the Meeting Minutes form provided for use at the post-award, pre-construction conference.
B.15 MODIFICATIONS:
A. Modifications for this project must be submitted to the assigned COR who will then submit a formal request to the Contracting Officer (CO). New work is not allowed to commence prior to Contracting Officer’s signed and written approval via fully executed
Standard Form (SF) 30 modification.
SECTION C - CONTRACT CLAUSES
C.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS
AND CERTIFICATIONS (DEC 2014)
The Contractor's representations and certifications, including those completed electronically via the
System for Award Management (SAM), are incorporated by reference into the contract.
(End of Clause)
C.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE,
SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY
LAB AND OTHER COVERED ENTITIES (JUL 2018)
(a) Definitions. As used in this clause—Covered article means any hardware, software, or service that—
(1) Is developed or provided by a covered entity;
(2) Includes any hardware, software, or service developed or provided in whole or in part by a covered entity; or
(3) Contains components using any hardware or software developed in whole or in part by a covered entity.
Covered entity means—
(1) Kaspersky Lab;
(2) Any successor entity to Kaspersky Lab;
(3) Any entity that controls, is controlled by, or is under common control with Kaspersky Lab; or
(4) Any entity of which Kaspersky Lab has a majority ownership.
(b) Prohibition. Section 1634 of Division A of the National Defense Authorization Act for Fiscal Year
2018 (Pub. L. 115–91) prohibits Government use of any covered article. The Contractor is prohibited from—
(1) Providing any covered article that the Government will use on or after October 1, 2018; and
(2) Using any covered article on or after October 1, 2018, in the development of data or deliverables first produced in the performance of the contract.
(c) Reporting requirement. (1) In the event the Contractor identifies a covered article provided to the
Government during contract performance, or the Contractor is notified of such by a subcontractor at any tier or any other source, the Contractor shall report, in writing, to the Contracting Officer or, in the case of the Department of Defense, to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the
Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting
Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.
(2) The Contractor shall report the following information pursuant to paragraph (c)(1) of this clause:
(i) Within 1 business day from the date of such identification or notification: The contract number; the order number(s), if applicable; supplier name; brand; model number (Original Equipment Manufacturer
(OEM) number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.
https://dibnet.dod.mil/ https://dibnet.dod.mil/
(ii) Within 10 business days of submitting the report pursuant to paragraph (c)(1) of this clause: Any further available information about mitigation actions undertaken or recommended. In addition, the
Contractor shall describe the efforts it undertook to prevent use or submission of a covered article, any reasons that led to the use or submission of the covered article, and any additional efforts that will be incorporated to prevent future use or submission of covered articles.
(d) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts, including subcontracts for the acquisition of commercial items.
(End of Clause)
C.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION
REGARDING RESPONSIBILITY MATTERS (OCT 2018)
(a) The Contractor shall update the information in the Federal Awardee Performance and Integrity
Information System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the System for Award Management via https://www.sam.gov.
(b) As required by section 3010 of the Supplemental Appropriations Act, 2010 (Pub. L. 111-212), all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available. FAPIIS consists of two segments—
(1) The non-public segment, into which Government officials and the Contractor post information, which can only be viewed by—
(i) Government personnel and authorized users performing business on behalf of the Government; or
(ii) The Contractor, when viewing data on itself; and
(2) The publicly-available segment, to which all data in the non-public segment of FAPIS is automatically transferred after a waiting period of 14 calendar days, except for—
(i) Past performance reviews required by subpart 42.15;
(ii) Information that was entered prior to April 15, 2011; or
(iii) Information that is withdrawn during the 14-calendar-day waiting period by the Government official who posted it in accordance with paragraph (c)(1) of this clause.
(c) The Contractor will receive notification when the Government posts new information to the
Contractor's record.
(1) If the Contractor asserts in writing within 7 calendar days, to the Government official who posted the information, that some of the information posted to the nonpublic segment of FAPIIS is covered by a disclosure exemption under the Freedom of Information Act, the Government official who posted the information must within 7 calendar days remove the posting from FAPIIS and resolve the issue in accordance with agency Freedom of Information procedures, prior to reposting the releasable information.
The contractor must cite 52.209-9 and request removal within 7 calendar days of the posting to FAPIIS.
(2) The Contractor will also have an opportunity to post comments regarding information that has been posted by the Government. The comments will be retained as long as the associated information is retained, i.e., for a total period of 6 years. Contractor comments will remain a part of the record unless the
Contractor revises them.
(3) As required by section 3010 of Pub. L. 111-212, all information posted in FAPIIS on or after April
15, 2011, except past performance reviews, will be publicly available.
https://www.sam.gov/
(d) Public requests for system information posted prior to April 15, 2011, will be handled under
Freedom of Information Act procedures, including, where appropriate, procedures promulgated under
E.O. 12600.
(End of Clause)
C.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984) ALTERNATE I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 days after receipt of notice to proceed. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 10. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
(End of Clause)
C.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM
REREPRESENTATION (NOV 2020)
(a) Definitions. As used in this clause—
Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern—
(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (d) of this clause. Such a concern is ‘‘not dominant in its field of operation’’ when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.
(2) Affiliates, as used in this definition, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.
(b) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, upon occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts—
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, when the
Contracting Officer explicitly requires it for an order issued under a multiple-award contract.
(d) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System
(NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size-standards.
(e) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.
(f) Except as provided in paragraph (h) of this clause, the Contractor shall make the representation(s) required by paragraph (b) and (c) of this clause by validating or updating all its representations in the
Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause, or with its offer for an order (see paragraph (c) of this clause), that the data have been validated or updated, and provide the date of the validation or update.
(g) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (f) or (h) of this clause.
(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code
236220 assigned to contract number TBD.
(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.
(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.
https://www.sba.gov/document/support--table-size-standards
(4) Women-owned small business (WOSB) concern eligible under the WOSB Program. [Complete only if the Contractor represented itself as a women-owned small business concern in paragraph (h)(3) of this clause.] The Contractor represents that—
(i) It [ ] is, [ ] is not a WOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and
(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(4)(i) of this clause is accurate for each WOSB concern eligible under the
WOSB Program participating in the joint venture. [The Contractor shall enter the name or names of the
WOSB concern eligible under the WOSB Program and other small businesses that are participating in the joint venture: _____.] Each WOSB concern eligible under the WOSB Program participating in the joint venture shall submit a separate signed copy of the WOSB representation.
(5) Economically disadvantaged women-owned small business (EDWOSB) concern. [Complete only if the Contractor represented itself as a women-owned small business concern eligible under the WOSB
Program in (h)(4) of this clause.] The Contractor represents that—
(i) It [ ] is, [ ] is not an EDWOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and
(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(5)(i) of this clause is accurate for each EDWOSB concern participating in the joint venture.