36C25818R0263-001.docx

DOCX document 1023 KB Posted

Attached to
Phoenix VA Health Care System Water Treatment and Cooling Tower Preventative Maintenance
Solicitation number
36C25818R0263
Issued by

About this file

36C25818R0263 36C25818R0263.docx

View the file

Other files

File Type Posted
36C25819C0012-000.docx DOCX document
36C25818R0263-0001003.docx DOCX document
36C25818R0263-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25818R0263

PAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

DUNS:

DUNS+4:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. 2/2012)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

36C25818R0263 07-25-2018 Sheri Eiri, Contract Specialist 602-795-4230 08-07-2018 3:00 pm Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix

AZ

85014 811310 $7.5 Million X N/A X Department of Veterans Affairs Phoenix VA Healthcare System 650 E. Indian School Road Phoenix

AZ

85012 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix

AZ

85014

This is accomplished through the Tungsten Network located at:

http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices.

See CONTINUATION Page The Phoenix VA Health Care System has a requirement for water treatment and cooling tower preventative maintenance services.

This is a Total Veteran Owned-Small Business Set A Side.

See CONTINUATION Page X X Table of Contents

SECTION A1
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS1
SECTION B - CONTINUATION OF SF 1449 BLOCKS4
B.1 CONTRACT ADMINISTRATION DATA4
B.2 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011)5
B.3 STATEMENT OF WORK5
Introduction:6
Background:6
Equipment:6
Required Services7
Conformance Standards:18
Hours of Coverage:18
IDENTIFICATION, PARKING, SMOKING, AND VA REGULATIONS:19
Information Security:19
Other Pertinent Information or Special Considerations:20
Period of Performance:20
B.4 PRICE/COST SCHEDULE20
ITEM INFORMATION20
SECTION C - CONTRACT CLAUSES28
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (JAN 2017)28
C.2 52.203-16 PREVENTING PERSONAL CONFLICTS OF INTEREST (DEC 2011)34
C.3 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (APR 2014)37
C.4 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)38
C.5 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)38
C.6 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)39
C.7 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)39
C.8 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997)39
C.9 52.232-18 AVAILABILITY OF FUNDS (APR 1984)40
C.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)40
C.11 SUPPLEMENTAL INSURANCE REQUIREMENTS40
C.12 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)40
C.13 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)41
C.14 VAAR 852.219-11 VA NOTICE OF TOTAL VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION)41
C.15 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012)42
C.16 VAAR 852.237-70 CONTRACTOR RESPONSIBILITIES (APR 1984)43
C.17 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (JAN 2018)43
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS51
SECTION E - SOLICITATION PROVISIONS70
E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (JAN 2017)70
E.2 52.216-1 TYPE OF CONTRACT (APR 1984)71
E.3 52.217-5 EVALUATION OF OPTIONS (JUL 1990)71
E.4 52.233-2 SERVICE OF PROTEST (SEP 2006)71
E.5 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)72
E.6 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014)72
E.7 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (NOV 2017)74
E.8 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (JAN 2008)90
E.9 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (JAN 1998)91
E.10 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)91
E.11 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008)91

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C258

Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X]
52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[]
52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly[]
b. Semi-Annually[]
c. Other[X] Monthly

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

This is accomplished through the Tungsten Network located at:

http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices.

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO
DATE

B.2 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011)

This solicitation includes FAR 52.219-4 Notice of Price Evaluation Preference for HubZone Small Business Concerns. Accordingly, any contract resulting from this solicitation will include this clause. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) retained by VA to assist in assessing the contractor's compliance with the limitations on subcontracting or percentage of work performance requirements specified in the clause. To that end, the support contractor(s) may require access to contractor's offices where the contractor's business records or other proprietary data are retained and to review such business records regarding the contractor's compliance with this requirement. All support contractors conducting this review on behalf of VA will be required to sign an “Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement” to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor's compliance with the limitations on subcontracting or percentage of work performance requirement.

36C25818R0263

Page 1 of Page 1 of

B.3 STATEMENT OF WORK

Performance Work Statement Water Treatment and Cooling Tower Maintenance Services 29 March 2018 Phoenix Veterans Affairs Health Care System (PVAHCS) Introduction:

This requirement is for water treatment maintenance services and materials for all boilers, chillers, cooling towers, closed loop heating and cooling systems at the Phoenix Arizona Veterans Affairs Health Care System in Phoenix, Arizona.

Background:

The Phoenix Arizona VA Health Care System (PVAHCS) requires maintenance services for water treatment and cooling tower (75,000 gallons chilled loop system) that covers 12,000,000 square feet. The required services are to include all personnel, equipment, tools, supervision, and other items and services necessary to provide water treatment services and materials for all boilers, chillers, cooling towers and closed loop heating and cooling system.

Equipment:

Mechanical Equipment List

Boiler Plant:

· Boiler # 1Water Tube6,900 lbs./hour (200 hp.)
· Boiler # 3Water Tube18,500 lbs./hour (530 hp.)

· Base your bid on the following assumptions:

· Steam load ~ 25,000,000 lbs./year

· 15 cycles of concentration

· Base boiler internal treatment on a feedwater hardness average 0.15 ppm

· Condensate Return ~ 75% - used 75% in all CR

· Start date for vendor’s water treatment responsibility is to be determined

Vendor to protect all associated components and equipment listed, but not limited to:

· Deaerator

· Feedwater pumps

· Feedwater lines

· Steam boilers

· Condensate lines

· Condensate receivers & pumps

· Condensate storage tank

Main Chiller Plant:

· Chiller # 1750 ton Trane
· Chiller # 2500 ton Smardt
· Chiller # 3870 ton York
· Chiller # 4870 ton York
· Cooling TowersFour (4) 750 ton Evapco towers

· Base your bid on the following assumptions (PVAHCS’s 2 year average):

· Makeup rate of 18,400,000 gallons/year

· Blowdown rate of 3,680,000 gallons/year

· 5.0 cycles of concentration

· Condenser System Volume ~ 32,000 gallons

· Chilled Loop Volume = 75,000

· Chilled Loop Makeup ~ 18,000 gallons/year (per your logs 2 yr. avg.)

· Start date for vendor’s water treatment responsibility is to be determined

Packaged Chiller Plant:

· Chiller # 5750 ton Trane
· Chiller # 6750 ton Trane
· Cooling TowersTwo (2) 750 ton Marley

· Base your bid on the following assumptions:

· Makeup rate of 7,100,000 gallons/year

· Blowdown rate of 1,420,000 gallons/year

· 5.0 cycles of concentration

· Condenser System Volume ~ 15,000 gallons

· Thermal Storage Volume ~1,450,000 gallons

· Thermal Storage Makeup ~ 50,000 gallons/year

· Start date for vendor’s water treatment responsibility is to be determined.

Heating Hot Water System:

· Base your bid on the following assumptions:

· HHW System Volume ~ CLC 5,000 gallons

· HHW Makeup ~ 1,250 gallons/year

· HHW System Volume ~ C/D Wing 8,000

· HHW Makeup ~ 2,000 gallons/year

· ACC HHW System Volume ~ 15,000

· ACC HHW Makeup ~ 3700 gallons/year

· Building # 31 HHW System – 5000 gallons/year

· Building #31 HHW system Makeup1200 gallons/year

· Building # 29 HHW system -5000 gallons/year

· Building #29 HHW system Makeup 1200 gallon/year

· Estimated Start date for vendor’s water treatment responsibility for new HHW System is to be determined.

Vendor to protect all associated components and equipment listed, but not limited to:

· Cooling tower hot deck, fill, basin

· Condenser water pumps

· Condenser piping

· Cooling tower sump

Required Services A. General

1) Purpose: The purpose of these specifications is to identify required water treatment services and materials for all Phoenix VA boilers, chillers, cooling towers and closed loop heating and cooling systems for the Department of Veterans Affairs, Phoenix VA Health Care System, 650 E. Indian School Road, Phoenix, Arizona. This water treatment contract Scope of Work will include five sections:

a. Traditional Water Treatment for Boiler # 1 & 3, Chillers 1, 2, 3 & 4, and Current Chilled Loop System (75,000 gallons), Hot Water Reheat Loop

b. Cooling Tower Cleaning and Disinfection (2 times yearly – March and October) (Evaco (4) and Marley (2))

c. New 1.45MM gallon Thermal Storage Maintenance Program with quarterly biocide treatment (after warranty period is satisfied: To be determined

d. Traditional Water Treatment for New Packaged Central Plant/Chillers 5 & 6

e. Cooling Tower Cleaning and Disinfection for Packaged Central Plant/Towers 5 & 6

2) Contractor Furnished Supplies and Services: This order established by these specifications requires the contractor to provide all chemicals and testing agents. Hardware, software, supervision and labor. The contractor will identify specialty materials and their cost during the submittal period. Contractor represents and warrants that all articles and services covered by this proposal meet or exceed the safety standards established and promulgated under the Federal Occupational Safety and Health Act of 1970 No. 2006, and its regulations in effect or proposed as of the date of the proposal.

3) Submittal Items:

a. Program Description. This should include an overview of all products and test agents used, tests performed and explanations of product performance and influence on final results.

b. Complete Specifications for all products proposed for use. This information shall include the following:

1. Product name

2. Ingredients

3. Control Range

4. Test procedures

5. Physical state (liquid, powder, etc.)

6. Container size

7. Delivery method

8. Technical data

9. Compatibility with feed system materials presently in use

10. Product bulletins

11. Materials safety data sheets (MSDS)

c. Formal Training Plan. Plan be submitted with specific examples of training program, protocol, etc. This training shall be two fold (hands-on system & testing training as well as cooling/boiler water theory and fundamentals).

4) Government Furnished Supplies: The PVAHCS will provide general testing hardware in the form of glassware, sample containers, conductivity meters, etc.

5) Quality Assurance Surveillance Plan: The Contractor agrees to follow an ongoing quality assurance Surveillance Plan.

6) Contract Security: The C&A requirements do not apply; a Security Accreditation Package is not required.

B. PRODUCTS AND EXECUTION:

1. Purpose: The purpose of these specifications is to establish the guidelines for a water treatment program for the Phoenix VA Health Care System, Phoenix, AZ that will prevent corrosion, promote higher performance efficiency and extend equipment life. A weekly report will indicate boiler water, soft water, condensate return, feed water, chilled water, condenser water, and in year two after new construction warrantee is provided, the packaged condenser system, thermal storage and heating hot water systems. Boiler Plant logs accomplished by Operator on every shift will also be checked for accuracy or discrepancies and report any problems or recommendations to the Plant Supervisor.

A. Boiler Plant Operations:

(1) Tubes to be free of scale and sludge deposits

(2) DA tank, boiler, and condensate systems free of deposits, scale and corrosion.

(3) Boiler to run at highest cycles of concentration allowable based on condensate return (currently ~ 15 COC)

B. Chiller Plant Operations:

(1) All chiller condenser tubes will be free of scale and biofilm.

(2) Cooling towers will be free of scale, biofilm and algae

(3) Cooling tower shall average > 5.0 cycles of concentration to minimize water use and environmental impact

(4) Steel & copper corrosion rates shall be minimized below best practice standards and achieve “Very Good” or “Excellent” corrosion rates as shown below.

Quantitative Classification of Corrosion Rates for Open Recirculation Cooling Water Systems Corrosion Rates (mpy)

Description
Carbon Steel
Copper Alloys
Negligible or Excellent
Less than or equal to 1
Less than or equal to 0.1
Mild or Very Good
1 to 3
0.1 to 0.25
Good
3 to 5
0.25 to 0.35
Moderate to Fair
5 to 8
0.35 to 0.5
Poor
8 to 10
0.5 to 1
Very Poor to Severe
>10
>1

C. Closed loop systems:

(1) Central Plant, Thermal Storage and Heating Hot Water closed loops shall show decreased sediment and corrosive indicators such as turbidity, copper, iron, etc.

(2) Steel & copper corrosion rates shall be minimized below best practice standards and achieve “Excellent” corrosion rates as shown below.

Quantitative Classification of Corrosion Rates for Closed Recirculating Cooling Water Systems Corrosion Rates (mpy)

Description
Carbon Steel
Copper Alloys
Excellent
Less than or equal to 0.2
Less than or equal to 0.1
Good
0.2 to 0.5
0.1 to 0.25
Moderate
0.5 to 0.8
0.25 to 0.35
Poor
0.8 to 1
0.35 to 0.5
Very Poor to Severe
Greater than or equal to 1
Greater than or equal to 0.5

2. Onsite Water Treatment Service Requirements: This is a full-service contract. Vendor will provide all chemicals, materials, equipment, and labor sufficient to maintain the treatment program at the expected level of performance. The vendor will provide a detailed report on the condition of the treatment program, water quality, and usage, etc. in all treated areas for every service visit.

The purpose of the service visits will be to prevent potential problems from arising that will reduce equipment efficiency and/or result in equipment damage. All scheduled visits must be scheduled by contract or in advance and shall be during normal business working hours.

A. Automation requirements:

(1) Scale, dispersion, pH, and microbio control shall be achieved with the use of a cooling tower controller. A new controller will be installed by the vendor with the latest water treatment technology and left in place during the contract, but must be maintained by the water treatment vendor & will be returned to the vendor upon termination of the contract.

(2) The system shall continuously monitor and adjust the product level of the scale and corrosion inhibitor proposed by the service plan submitted in the vendor’s proposal.

(3) The system shall control the proposed water treatment program with minimal operator attention and adjustments

(4) Graphical reporting of the chemical dosage levels in the condenser water systems (scale/corrosion inhibitor)

(5) The system must be capable of compensating for load swings, makeup and blowdown variations (i.e. overflow situations and/or unmetered blowdown).

(6) The system must be capable of controlling chemical levels regardless of the number and/or control of the cycles of concentration

(7) The system must be capable of product dosage to +/- 5.0 ppm.

(8) Vendors are required to submit the controller’s specification sheet and operations manual with the proposal as well as five (5) references of similar health care facilities using this technology serviced by the vendor’s local service team.

(9) For evaluation purposes, if such controller is not proposed by the vendor, the exception to the automation must be outlined. Please describe how the automation will be programmed and the expectations of testing and adjustment frequency. Describe how the program will control the scale and corrosion inhibitor within +/- 5% of the set point.

(10) Biocide Feed Control: The Cooling Tower Conductivity Controller’s dual biocide timers shall both be used for the application of both the bleach (oxidizing) and & 50% Glutaraldehyde (non-oxidizing). Oxidizing biocide feed will be slug fed a minimum of 3 times per week. Non-Oxidizing biocide feed will be slug fed on a weekly basis. Lockout timers are required to prevent bleed immediately after biocide feed. Each biocide dose / slug will be within the parameters on the biocide label as per EPA/FIFRA requirements.

B. Weekly service tasks:

Service visits will be required weekly and during each visit the following minimum services will be performed:

(1) Perform boiler plant, chiller plant, and closed loop system tests.

(2) Check all controllers, pumps, blowdown valves, etc. for proper operation and check piping for any leaks and/or replacement needs.

(3) Review tests with Operations Personnel for training and the expected actions based on the test results.

(4) Review weekly microbio dipslides performed by PVAHCS.

(5) Prepare a written report detailing the status of the water tests, personnel training and inventory of materials.

C. General service requirements & testing:

All tests expected to be performed weekly unless otherwise noted.

(1) City Water will be tested for:

a. Conductivity

b. Total Hardness

c. Calcium Hardness

d. M-Alkalinity (monthly)

(2) Water Softener will be tested for:

a. Conductivity

b. Total Hardness (low level)

c. Chloride Test (monthly, Feed water/Soft Water for an accurate percentage of condensate return)

(3) Online Boiler Water will be tested for:

a. Neutralized Conductivity

b. Hydroxide Alkalinity / OH-Alkalinity

c. Sulfite

d. Boiler Internal Treatment (polymer)

(4) Offline Boiler Water will be tested for:

a. Neutralized Conductivity

b. Sulfite (high range)

c. pH or Hydroxide Alkalinity / OH-Alkalinity

(5) Feed Water will be tested for:

a. Conductivity

b. pH

c. Total Hardness (low level)

d. Chloride Test (monthly, Feed water/Soft Water for an accurate percentage of condensate return)

(6) Return Condensate will be tested for:

a. Conductivity

b. pH

c. Total Hardness (low level)

d. Iron (low level, monthly)

e. Dissolved Oxygen Testing (monthly) Testing Station provided & installed by vendor

(7) Condenser Water will be tested for:

a. Conductivity

b. pH

c. Scale & Corrosion Inhibitor

d. Free Chlorine Biocide

e. Total Aerobic Bacteria (weekly)

f. Iron (monthly)

g. Copper (monthly)

h. Differential Microbio Analysis (quarterly)

i. Sessile Microbio Laboratory Analysis (quarterly) by swabbing the copper coupon twice per side and performed in conjunction with coupon analyses

j. Corrosion Coupon Laboratory Analysis (quarterly)

k. Azole (quarterly)

(8) Closed Loops (CHW, TES, and HHW) will be tested for:

a. Conductivity

b. Corrosion Inhibitor (nitrite until <100 ppm & organic phosphate)

c. Chilled Loop Total Aerobic Bacteria (weekly by PVAHCS)

d. HHW Total Aerobic Bacteria (monthly by PVAHCS)

e. Iron (monthly)

f. Copper (quarterly)

g. Differential Microbio Analysis (quarterly)

h. Sessile Microbio Laboratory Analysis (quarterly) by swabbing the copper coupon twice per side and performed in conjunction with coupon analyses

i. Corrosion Coupon Laboratory Analysis (quarterly)

Findings of test are to be discussed with Plant Supervisor and a written report is to be emailed to the Plant Supervisor.

D. Annual service tasks:

(1) Be present during boiler and chiller inspections to observe interior of the vessels.

(2) Document all equipment inspections with external photographs as well as photos of equipment internals (i.e. boroscope inspections). It is expected that if the PVAHCS provides 2 week notice, a boroscope will be available for inspection and a formal report with photos will be provided subsequent to the inspection.

(3) Conduct water softener elution studies and Rexnord dissolved oxygen tests. The vendor shall provide a Dissolved Oxygen sampling test kit with ampoules for 0-100 ppb.

E. Training service requirements:

(1) In order to ensure that plant personnel are adequately trained, the vendor shall conduct a comprehensive evaluation of each operator involved in testing and training to ensure the program is implemented properly. Training shall be conducted quarterly as a review or earlier if there are any Shift-to-shift discrepancies during the first 90 days of the agreement on all personnel present in the plant at the time of the visit.

(2) Vendor shall develop a comprehensive operator’s manual for each of the systems to be treated and this manual shall be used in the training program.

(3) Vendor shall have a checklist for certification that each operator trained is competent in testing, adjustments, water chemistry fundamentals, etc. The check list shall be reviewed in a practical “test” with the operators by a different member of the vendor’s organization to certify/qualify each operator’s competency. Each operator shall have a dated checklist to be maintained by the vendor.

F. Chemical requirements:

(1) All chemical products must be approved by the Food and Drug Administration and there shall be no objection by that agency to the use of the chemicals for the treating of boiler water where steam contacts food or food products. Chemicals must be delivered to the VA Utility Plant and placed in the vendor provided portable feed containers by the vendor. Plant personnel shall not handle the chemicals. MSDS shall be provided on all chemical products and shall be attached on each bulk tank.

(2) Cooling tower compounds will be liquid form and will be injected into a common header or the sump. PVAHCS owns chemical injection pumps and chemical tubing, but the vendor is to both repair rand provide pump repair kits (liquid ends) and additional chemical tubing to maintain the pumps if appropriate. The vendor is expected to provide proper troubleshooting and due diligence before recommending any chemical pump or other equipment replacement. PVAHCS will purchase replacement equipment after proper evaluation of the failed equipment has been performed and must be approved by plant management.

(3) Condenser Water Scale & Corrosion Inhibitor: The inhibitor shall be a multi-functional blend of the following:

a. Phosphoric Acid (steel corrosion inhibitor)

b. Benzotriazole/Tolyltriazole [BZT/TT] (copper corrosion inhib.)

c. High Stress Polymer (dispersant & stabilizer)

d. Organic Phosphate that does not revert to orthophosphate (corrosion & scale Inhibitor)

e. Inert Chemical Tracer (testing & monitoring)

(4) Condenser Water Oxidizing Biocide (12.5% bleach): Because PVAHCS uses pH adjustment, the oxidizing biocide will be bleach. The vendor must supply bleach through bulk fills through only closed connections. Under no circumstances may bleach be pumped or poured from a drum into the base tank. The base tank may be owned/supplied by a commodity chemical supplier, but the vendor shall be responsible for the chemical fills and cost of the material.

(5) Condenser Water Non-Oxidizing Biocide: Due to its acute health hazard, Isothiazolin (a sensitizer) shall not be used in the condenser water system. 50% Glutaraldehyde is the non-oxidizing biocide of choice, but we understand that there may be certain instances where other non-oxidizers may be used to supplement the condenser or evaporator water treatment’s biocide program. Other non-oxidizing biocides shall be approved by PVAHCS as needed.

(6) Condenser water pH Control (93% sulfuric acid): The vendor must supply bleach through bulk fills through only closed connections. Under no circumstances may acid be pumped or poured from a drum into the base tank. The base tank may be owned/supplied by a commodity chemical supplier, but the vendor shall be responsible for the chemical fills and cost of the material.

(7) Closed Loop Corrosion Inhibitor: Due to past microbio excursions in the main chiller plant’s chilled loop, the decision has been made to move forward with non-nitrite, non-molybdate closed loop corrosion inhibitors. PVAHCS does not expect the vendor to re-charge the loop initially, but is required to test both the old (nitrite) and new inhibitor chemistry until the nitrite is <100 ppm.

(8) The closed loop inhibitor shall contain:

a. An organic phosphonate that does not revert to orthophosphate (steel corrosion inhibitor)

b. A high stress polymer (dispersion & stabilization)

c. Azole (copper corrosion inhibition)

d. Inert tracer (troubleshooting and leak detection) Note: Silicate corrosion inhibitors are not acceptable because they do not offer cathodic protection. No heavy metal corrosion inhibitors (ex. molybdate) shall be used.

(9) Closed Loop Biocide: Due to its acute health hazard, Isothiazolin (a sensitizer) shall not be used unless plant training is conducted annually and signage exceeding the “legal requirements” of OSHA/FIFRA requirements is hung to identify to the hazard clearly to even casual visitors to the plant. The acute sensitizer shall be handled with extreme care and all plant personnel shall be trained to understand the hazard.

(10) The PVAHCS prefers chlorine dioxide (ClO2) as the closed chilled and thermal storage biocide of choice. The main chilled loop currently contains nitrite, so chlorine dioxide shall not be used in the main chilled loop until the nitrite level is <100 ppm. The thermal storage system will not be on nitrite and ClO2 can be used immediately.

(11) Isothiazolin and Glutaraldehyde are the non-oxidizing biocides of choice, but the ability to provide ClO2 dosing is heavily weighted and preferred.

(12) Closed loop biocides shall be dosed a minimum of four times per year on both the Main Chilled Loop and the Thermal Storage System.

(13) Boiler Internal Treatment (all polymer): The boiler internal treatment shall be an all-polymer program. Phosphate, polyphosphate, organophosphate, chelant, phosphate/chelant blended programs shall not be proposed and are not an acceptable boiler internal treatment chemistry.

(14) Boiler Oxygen Scavenger (sulfite): The oxygen scavenger shall be catalyzed sulfite in liquid form. Powdered sulfite shall not be proposed.

(15) Boiler Condensate Treatment (amine): The amine shall be a blend of three different volatility amines to ensure protection of the various legs of the condensate return system. The amine shall be a blend of:

a. Cyclohexylamine

b. Diethylaminoethanol

c. Morpholine

(16) Boiler water treatment will be of the liquid form. PVAHCS owns chemical injection pumps and chemical tubing, but the vendor is to both repair rand provide pump repair kits (liquid ends) and additional chemical tubing to maintain the pumps if appropriate. The vendor is expected to provide proper troubleshooting and due diligence before recommending any chemical pump or other equipment replacement. PVAHCS will purchase replacement equipment after proper evaluation of the failed equipment has been performed and must be approved by plant management.

(17) Volatile Oxygen Scavengers (VOS) will be fed similar to the amine, recommendations from the Contractor and determination by Plant Supervisor as to the best way to inject.

G. Water chemistry operational parameters:

(1) Boiler Water:

a. Neutralized Conductivity4,000 - 4,500 mmho
b. Total Alkalinity100 - 800 ppm
c. Suspended Solids< 500 ppm
d. Polymer600-800 ppm (unless other documentation is provided for your appropriate range)
e. Residual Sulfite30-60 ppm

(2) Feedwater:

a. Conductivity200-400 mmho (record)
b. Hardness< 1.0 ppm
c. pH8.5 - 9.5
d. Chloride Test (monthly)record

e. Chloride condensate return percentage calculation (monthly, FW/Soft chlorides)

(3) Condensate Return:

a. pH range8.2 - 8.8
b. Conductivity< 100 mmho (record)
c. Hardness< 0.1 ppm
d. Condensate Return> 75 % (record)

(4) Condenser water:

a. “M” Alkalinity range (with acid)50-150 ppm
b. Conductivity Levels4.5- 5.5 cycles
c. Calcium Hardness500 - 800 ppm
d. Free Chlorine Residual0.2 – 0.5 ppm

e. Scale & corrosion inhibitor control expected +/- 5% variance from target (Ex. Target = 2.0 ppm Moly; Control range = 1.9 – 2.1 ppm)

(5) Closed loop cooling and heating hot water:

a. Conductivityrecord
b. Non-Reverting Organic Phosphate80-120 ppm
c. Total Azole> 10 ppm
d. Inert TraerTBD, vendor specific

H. Chemical storage, handling and delivery requirements:

We are concerned with chemical storage, drum handling and disposal at our site. To reduce our risk associated with drum handling, we prefer all products delivered to the point of feed. Mild steel drums of any size >5 gallon pails are not acceptable. 5-gallon pails are not acceptable for biocides. To eliminate chemical handling by site personnel, all products must be capable of being fed neat (without dilution or contact) by our operators or your service professionals (no manual dilution onsite will be accepted). In order to minimize our liability in this regard, we require the following regarding chemical delivery and storage.

(1) The vendor will provide a comprehensive delivery program that removes the burden of chemical deliveries and handling. This program utilizes either plastic or stainless steel mini-bulk tanks as the point of use container.

(2) The point of use container must be more than a double walled container and shall serve as appropriate spill containment as well. The spill containment must be able to contain a minimum of 150% of the volume of the base tank within.

(3) All storage tanks (except bleach and acid) shall have a fixed bottom drain/suction capabilities to ensure positive, flooded suction for chemical pumping and injection as well as to allow complete emptying of the vessel without turning it on its side. Vendor will retain ownership of the chemical storage tanks.

(4) Chemical transport equipment must comply with DOT requirements for transporting hazardous materials. This includes subcontractor’s acid and bleach deliveries.

(5) Deliveries must be made by chemical handlers who are:

a. Certified in HAZMAT compliance

b. Equipped with PPE on-site for delivery and transfer of chemical.

c. Equipped with items required to handle spoils and any unexpected incidents.

(6) No empty or full chemical transport equipment is to be stored on-site.

(7) If chemical transfers into the base tank are to be made by either hand-filling (pouring 5 gallon pails into base tank) or via unsealed chemical transfer pumps, a formal written base tank filling safety protocol must be supplied with this proposal for the PVAHCS to evaluate this delivery method for consideration. If this is the vendor’s only option for bulk tank deliveries, please disclose this information for proper evaluation purposes. Vendors will not be disqualified for taking exceptions so long as there is proper justification attached.

(8) Chemical inventory level sensors must be installed to record accurate inventory within +/- 0.5 gallons without exposing personnel to an open drum inventory inspection.

(9) Base tanks shall have a shelf for each pump within the area of the containment basin to catch potential chemical pump leaks. Each pump shall be permanently mounted to the shelf without penetrating the base tank or containment basin.

(10) Base tanks shall be sided appropriately and shall not run below 15% full at any time to avoid interruption to the water treatment program.

(11) Closed/sealed chemical transporters are highly recommended. If used, 5, 15, 30 & 55 gallon drums shall be removed from the site after triple rinsing.

(12) Base tanks and any drum brought onsite must both be labeled per OSHA guidelines. All biocides must adhere to the EPA’s FIFRA requirements and labeling practices.

(13) The PVAHCS is satisfied with the bleach and acid delivery and installation. We recommend the acid and bleach be delivered in a manner similar to the current program. The vendor will be responsible for ordering and supplying both 12.5% sodium hypochlorite and 93% sulfuric acid within the contract. Absolutely no bleach or acid drums or transporters will be left onsite or shipped to the site without immediate transfer into the containment basin by a certified HAZMAT material handler. Fills must occur only through a closed connection (ex. Cam lock fitting and permanently fixed hose)

I. Laboratory analysis requirements: Contractor shall have an in-house laboratory or access to a contract laboratory capable of assisting in solving challenges that arise which may cause loss of efficiency or equipment damage. When samples are taken for resolution of problem or routine analyses (differential microbio analysis, coupons, etc.), the results must be supplied and a written report delivered to the PVAHCS within three weeks. Please provide the name and address of your in-house laboratory.

J. OPTIONAL SERVICES: OVER & ABOVE REPAIR Upon request, the vendor will provide a quote as-needed with pricing for any additional chemistry, equipment or services needed to:

(1) Address unexpected emergencies

(2) Recharge any system

(3) Perform additional laboratory testing outside of this scope

(4) Perform special studies not outlined in this scope

3. Cooling Tower Cleanings with Disinfection:

A. Health and Safety: All of the vendor's service technicians must be respirator fit-tested annually. They also must be formally trained on all aspects of Fall Prevention, Confined Space Entry, and Personal Protective Equipment. Safety is a concern for the PVAHCS and we expect the vendor to be able to supply documentation of training immediately if requested.

B. OSHA Compliance: We expect the cleaning and disinfection to follow Section III, Chapter 7 of the OSHA Technical Manual, Legionnaire’s Disease. This recommendation is critical in complying with the OSHA Title 29 USC Section 654, “Each employer shall furnish to each of his employees employment and a place of employment which are free from recognized hazards that are causing or are likely to cause death or serious physical harm to his employees”. We expect that our vendor follows the cleaning and disinfection guidelines prescribed to reduce the risk of Legionnaire’s Disease, and provide a safer work environment.

C. Although the OSHA recommendation states “Cooling towers should be cleaned and disinfected at least twice a year”, we are requesting QUARTERLY cleanings of each of the cooling towers (4 at central plant and 4 at packaged central plant).

D. Documentation: All aspects of the Cleaning and Disinfection project are to be documented for our records. This record is to show the PVAHCS’ diligence and compliance in following the guidelines and recommendations to reduce the risk of waterborne pathogens in your facility.

E. Frequency: Cleanings and disinfections shall be scheduled and performed quarterly.

F. Procedure and PPE: During the cleaning procedure, all employees shall wear all required personal protective equipment, including Tivek suits, hardhats, gloves, rubber boots, and respirators with appropriate cartridges. During procedures that require fall prevention measures, harnesses and appropriate equipment shall be used. For areas that are considered confined space, whether permit-required or non-permit required, the Cleaning Supervisor shall complete a Confined Space Entry form.

(1) Pre-Disinfecting: This step shall be done before the mechanical cleaning of the tower as a precursor to the actual cleaning process, and will be facilitated by the vendor’s water treatment representative.

If possible, all cooling tower fans will be OFF, and all recirculation pumps for these systems will be ON. Vendor will initiate a thorough disinfecting of the tower by adding elevated levels of an oxidizing biocide to elevate the free chlorine residual, per OSHA and TS425G recommendations. A biodispersant will also be added to the system to increase the performance of the oxidizing biocide. This procedure is done to break up and remove the organics, bacteria, and slime that are trapped in the fill as well as for personal health and safety reasons of the vendor’s employees entering the cooling tower, as well as patients and employees of the PVAHCS.

(2) Manual Cleaning of Cooling Tower: Isolate and drain each cell for cleaning. Our engineering staff will assist the vendor in tower isolation and proper lockout tag-out.

The vendor will utilize high-pressure washers to wash the entire internal and external areas, (as available) to remove as much of the dirt, bacteria, and debris as possible and have it collect in the actual tower sump. Once the majority of the dirt and debris has collected in the tower sump, the vendor shall clean the entire sump and remove the existing debris for disposal.

(3) Final Disinfecting and Passivation of Complete System: After each tower cell is completely refilled, the vendor’s water treatment representative will again disinfect the system, per step 1. Once completed, the water treatment program can be resumed and re-passivation of the metal surfaces initiated (because using an oxidizing biocide increases the potential for flash corrosion).

(4) Documentation and Certification: The vendor shall provide documentation and certification of professional cleaning and disinfecting per The OSHA Technical Manual. The documentation will include the pre-cleaning inspection report, the documentation of the procedures, as well as a completion certificate for your records.

G. PVAHCS will provide the following to facilitate the cleanings:

(1) Isolate the cooling tower (cells) and/ or turn off the chillers before cleaning if applicable.

(2) Remove and clean any system strainers.

(3) Provide a 25 amp, 110V, 60 Hz single-phase electrical supply near to the working area.

(4) Access to water and electricity for any cleaning equipment.

(5) Free, safe and unrestricted access to the cooling tower(s) and associated pipe work for the duration of the cleaning.

(6) A responsible engineering contact that is fully conversant with the system and its operation.

(7) Parking and off loading facilities near the cooling towers to be cleaned.

(8) PVAHCS’s Lock-out/Tag-out procedures are addressed, and responsible operators will be available to facilitate all staff and onsite contractors to follow the procedures.

(9) Updates on any operational changes or requirements of the facility that may affect the vendor’s ability to conduct cleaning and disinfections in a safe and effective manner.

(10) Access to dumpsters for disposal of debris

Conformance Standards:

A. Contract service shall ensure that the equipment functions in conformance with the latest published edition of the applicable standards, such as: NFPA-99, UL, OSHA, VA, CDRH, etc. and the “Manufacturer's Performance standards/ specifications” as used when the equipment was originally procured and that any upgrades/updates will meet the stated standards/specifications.

Hours of Coverage:

A. Normal hours of coverage are Monday through Friday from 6:00 am to 4:00 pm Arizona time (no daylight savings). All service/repairs will be performed during normal hours of coverage unless requested or approved by the COTR or his/her designee.

B. Preventive maintenance will be performed as scheduled by the COTR or their designee. Preventive maintenance will be performed during normal hours of coverage.

C. Work performed outside the normal hours of coverage must be approved by the COTR or his/her designee. Funding for services that are outside the normal coverage hours or on holidays must have approved funding prior to any service being allowed.

NOTE: Hardware/software update/upgrade installations will be scheduled and performed during normal hours of coverage at no additional charge to the government.

D. Federal Holidays observed by PVAHCS are:

New Years' DayLabor Day
Martin Luther King DayColumbus Day
Presidents' DayVeterans' Day
Memorial DayThanksgiving Day
Independence DayChristmas Day

IDENTIFICATION, PARKING, SMOKING, AND VA REGULATIONS:

A. The Contractor's FSEs shall wear visible identification issued by PVAHCS Police Section at all times while on the premises of PVAHCS. It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. PVAHCS will not invalidate or make reimbursement for parking violations of the Contractor under any conditions. Smoking is prohibited inside any buildings at PVAHCS. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.

Information Security:

A. In accordance with Appendix A, Handbook 6500.6 Checklist blocks 7, the C&A requirements do not apply to this requirement, and Security Accreditation Package is not required. The nature of this requirement is technical; however, there is no information to be protected.

Other Pertinent Information or Special Considerations:

A. Delivery of preventative maintenance shall be coordinated through the Operations and Maintenance Office of the located at:

Phoenix Arizona VA Health Care System (644) 650 E. Indian School Road Phoenix, Arizona 85012-1839 Point of Contact – To Be Determined Period of Performance:

A. The period of performance shall be for one base year PLUS up to four (4) option years. The Government may extend the term of the awarded base/option year by written notice to the Contractor within 30 days of annual expiration date, provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary (>60 day) notice does not commit the Government to an extension.

B.4 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12.00
MO
__________________
__________________

Monthly Preventative Maintenance (Main Cooling System | Chillers 1, 2, 3, 4) Contract Period: Base POP Begin: 10-01-2018 POP End: 09-30-2019

12.00
MO
__________________
__________________

Monthly Preventative Maintenance (Steam System - Boiler Plant 1 & 3, Condensing Boilers 1-4)

12.00
MO
__________________
__________________

Thermal Storage 1.45 Million Gallons

12.00
MO
__________________
__________________

Monthly Traditional Treatment of Central Plant Chillers 1-6 (3 Trane, 2-York, 1-Smardt)

2.00
EA
__________________
__________________

Cleaning and Disinfecting of all Cooling Towers & Central PLT Tower (2 times per year - Every six months | 6 Cooling Towers (4-Evapco & 2 Marley))

2.00
EA
__________________
__________________

Testing and Treatment Heating Hot Water Loops (Main Boiler Plant, Dental Bldg. #29, Mental Health Bldg. #31, ACC-Main Clinic) (2 Times Per Year)

1.00
JB
__________________
__________________

Emergency repair services outside the normal preventative maintenance services and after hours service calls.

12.00
MO
__________________
__________________

Monthly Preventative Maintenance (Main Cooling System | Chillers 1, 2, 3, 4) Contract Period: Option 1 POP Begin: 10-01-2019 POP End: 09-30-2020

12.00
MO
__________________
__________________

Monthly Preventative Maintenance (Steam System - Boiler Plant 1 & 3, Condensing Boilers 1-4)

12.00
MO
__________________
__________________

Thermal Storage 1.45 Million Gallons

12.00
MO
__________________
__________________

Monthly Traditional Treatment of Central Plant Chillers 1-6 (3 Trane, 2-York, 1-Smardt)

2.00
EA
__________________
__________________

Cleaning and Disinfecting of all Cooling Towers & Central PLT Tower (2 times per year - Every six months | 6 Cooling Towers (4-Evapco & 2 Marley))

2.00
EA
__________________
__________________

Testing and Treatment Heating Hot Water Loops (Main Boiler Plant, Dental Bldg. #29, Mental Health Bldg. #31, ACC-Main Clinic) (2 Times Per Year)

1.00
JB
__________________
__________________

Emergency repair services outside the normal preventative maintenance services and after hours service calls.

12.00
MO
__________________
__________________

Monthly Preventative Maintenance (Main Cooling System | Chillers 1, 2, 3, 4) Contract Period: Option 2 POP Begin: 10-01-2020 POP End: 09-30-2021

12.00
MO
__________________
__________________

Monthly Preventative Maintenance (Steam System - Boiler Plant 1 & 3, Condensing Boilers 1-4)

12.00
MO
__________________
__________________

Thermal Storage 1.45 Million Gallons

12.00
MO
__________________
__________________

Monthly Traditional Treatment of Central Plant Chillers 1-6 (3 Trane, 2-York, 1-Smardt)

2.00
EA
__________________
__________________

Cleaning and Disinfecting of all Cooling Towers & Central PLT Tower (2 times per year - Every six months | 6 Cooling Towers (4-Evapco & 2 Marley))

2.00
EA
__________________
__________________

Testing and Treatment Heating Hot Water Loops (Main Boiler Plant, Dental Bldg. #29, Mental Health Bldg. #31, ACC-Main Clinic) (2 Times Per Year)

1.00
JB
__________________
__________________

Emergency repair services outside the normal preventative maintenance services and after hours service calls.

12.00
MO
__________________
__________________

Monthly Preventative Maintenance (Main Cooling System | Chillers 1, 2, 3, 4) Contract Period: Option 3 POP Begin: 10-01-2021 POP End: 09-30-2022

12.00
MO
__________________
__________________

Monthly Preventative Maintenance (Steam System - Boiler Plant 1 & 3, Condensing Boilers 1-4)

12.00
MO
__________________
__________________

Thermal Storage 1.45 Million Gallons

12.00
MO
__________________
__________________

Monthly Traditional Treatment of Central Plant Chillers 1-6 (3 Trane, 2-York, 1-Smardt)

2.00
EA
__________________
__________________

Cleaning and Disinfecting of all Cooling Towers & Central PLT Tower (2 times per year - Every six months | 6 Cooling Towers (4-Evapco & 2 Marley))

2.00
EA
__________________
__________________

Testing and Treatment Heating Hot Water Loops (Main Boiler Plant, Dental Bldg. #29, Mental Health Bldg. #31, ACC-Main Clinic) (2 Times Per Year)

1.00
JB
__________________
__________________

Emergency repair services outside the normal preventative maintenance services and after hours service calls.

12.00
MO
__________________
__________________

Monthly Preventative Maintenance (Main Cooling System | Chillers 1, 2, 3, 4)…