This document is an amendment to a Request for Quotation (RFQ) for mold remediation services at the Garland, Texas facility of the North Texas Veterans Healthcare System. The key details are:
The RFQ number is 36C25724Q0609, and it is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. The government is seeking labor, material, and equipment to remediate mold in the approximately 6,800 square foot basement of the facility. The initial due date has been extended to June 6, 2024 at 10:00 AM CDT. Attachments include an asbestos survey report, lead-based paint survey, basement drawing, and site visit sign-in sheet. The government provided answers to 37 contractor questions covering details such as affected areas, disposal requirements, and access to utilities. The expected project duration is 3 weeks from start to finish.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Sign-in Sheet 05-31-2024.pdf | ||
| Basement Drawing.pdf | ||
| 36C25724Q0609 0002_1.docx | DOCX document | |
| Asbestos Survey Report.pdf | ||
| Lead-Based Paint Survey.pdf | ||
| 36C25724Q0609 0001_1.docx | DOCX document | |
| Amendment 36C25724Q0609 0001.pdf | ||
| RFQ 36C25724Q0609 Garland Mold Remediation Service.pdf | ||
| VA Garland Mold Remediation Protocol.pdf | ||
| 36C25724Q0609_1.docx | DOCX document | |
| Wage Determination 1996-0223 rv.61 dated 12-26-2023 Dallas County.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 7
06-05-2024
549-24-3-5096-0244
36C257
Department Of Veterans Affairs Network Contracting Office 17
5441 Babcock Road Ste. 302 San Antonio TX 78240
36C257
Department Of Veterans Affairs Network Contracting Office 17
5441 Babcock Road Ste. 302 San Antonio TX 78240
To all Offerors/Bidders
36C25724Q0609
05-23-2024
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 10:00AM CDT, JUNE 6, 2024.
X 1
The purpose of this amendment is to provide answers to questions and supply requested documents. No additional questions will be answered. The RFQ due date is extended. All quotes shall be received by no later than June 6, 2024, at 10:00AM CDT.
A signed copy of this and all other amendments are required with your quote.
Attached:
Asbestos Survey Report Lead-Based Paint Survey Basement Drawing Site Visit Sign-in Sheet 05-31-2024
RFQ 36C25724Q0609 Amendment 0002
Garland Mold Remediation Service
Question & Answers
Q1. To prepare an accurate estimate for our bid, we require additional information regarding the square footage of the basement.
A1. The square footage of the basement is approximately 6,800SQFT.
Q2. Do you have pictures of the areas?
A2. See Mold Assessment Protocol.
Q3. What year was the building built?
A3. The building was built in 1987.
Q4. Provide the Sq. footage of the affected area, the dimensions of the rooms to be serviced, and the ceiling height of the rooms to be serviced.
A4. The square footage of the basement is approximately 6,800SQFT.
Q5. Can the government extend the due the date to short response time after Q&A posting/due date.
A5. The due date has been extended from the original due date.
Q6. The protocol doesn’t give the measurement. Normally is does…what is the sf of the basement?
A6. The square footage of the basement is approximately 6,800SQFT.
Q7. Is water and electricity for the project will be available or does the contractor needs to provide resource? If not, can the contractor use a generator and access water from another building?
A7. The Basement has both water and Electricity.
Q8. Is the contractor responsible to dispose all the equipment and furnishings?
A8. Follow Protocol, Equipment disposal will be coordinated through COR.
Q9. When can the contractor see the location/site visit (a date wasn’t listed in the RFQ)?
A9. The site visit information was provided with Amendment 0001.
Q10. Can the government provide an asbestos survey for the basement?
A10. See attached asbestos survey.
Q11. As written in the Mold Protocol Section 4: “e. Affected pipe insulation and duct wrap shall be removed and replaced”. As written in the SOW: “1. The Garland VAMC, located at 2300 Marie Curie Blvd. Garland, Texas 75042, requires the GC to provide labor, material and equipment to remediate mold, only the demo of the affected areas no build back”. Please confirm which it is here. The protocol states removal and replacement yet the SOW says no build back.
A11. The Statement of Work remains unchanged. There will be no build back.
Q12. How will the VA address areas not seen or not able to be accessed during the site visit and also not covered in the protocol? (i.e. inaccessible rooms, rooms and areas not surveyed but mold is discovered during remediation, etc.).
A12. The governments requirement has been expressed in the Statement of Work and Mold Remediation protocol and has not changed. If during performance additional mold remediation is required, a bilateral contract modification will be executed.
Q13. The Mold protocol and the SOW call for removal of all floor tiles and pipe insulation. Was an asbestos survey performed. There is no results of any sampling performed. Can the VA provide either 1. A copy of sampling results OR 2. A statement that it was completed, results will be provided upon award, AND that there were no detectable levels of Asbestos in the project area.
A13. See attached asbestos survey.
Q14. The Mold protocol and the SOW call for removal of all Floors and ceiling including painted surfaces. Was an Lead Based Paint survey performed. There is no results of any sampling performed. Can the VA provide either 1. A copy of sampling results OR 2. A statement that it was completed, results will be provided upon award, AND that there were no detectable levels of Lead based painted of surfaces in the project area?
A14. See attached Lead-Based Paint survey.
Q15.The mold remediation protocol does not identify how much square footage of flooring, walls, ceiling, and linear feet of pipe which needs to be remediated, can this be provided?
A15. The square footage of the basement is approximately 6,800SQFT.
Q16. There were numerous NON SDVOSB companies at the site visit. This is a SDVOSB set aside. One of the SDVOSB companies was working directly with a NON SDVOSB company thanking them for coming out to perform the site visit. This is a specialty project agreed and the number of SDVOSB companies that are licensed Mold Remediation companies through the TDLR are few, however still a set aside. Will bidding companies be required to submit with their bid a complete list of subcontractors to be utilized by price and percentage of project to ensure all limitations are followed.
A16. The evaluation criteria requires that contractors make certification at VAAR 852.219-75 VA
NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR
SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION).
Q17. Are the questions generated from this project's solicitation prior to the site visit going to be released?
A17. All questions submitted to date are listed with answers.
Q18. Is the site visit sign in sheet going to be released?
A18. A copy of the site visit sign-in sheet is attached.
Q19. Will the VA entertain a flat price for the project as written on the mold protocol and then a price per square foot or cubic foot for additional mold discovered after removal of protocol covered areas?
A19. This is a firm-fixed priced contract action for the requested service. The size and scope is expressed in the Statement of Work and Mold Remediation Protocol. The size and scope have not changed. If additional mold remediation is required after start of performance, a bilateral contract modification will be executed.
Q20. During the site visit and upon more detailed inspection of the areas to be remediated, it was noted there were several rooms and spaces that were not listed on the SOW and the Mold remediation protocol. How is the VA planning on addressing those areas and how is the contractor to provide pricing for those areas since they are not part of the protocol? (Areas identified not in the protocol: Fresh air intake 50ft shaft, which is full of visible mold and pipe insulation, two each bathrooms near stair case with visible mold on walls and ceilings, All sheetrock above the grid, pipe insulation above the grid, both with viable mold in multiple locations. Mechanical room in hallway with visible mold on ceiling/wall area where there is piping etc.)
A20. This is a firm-fixed priced contract action for the requested service. The size and scope are expressed in the Statement of Work and Mold Remediation Protocol. The size and scope have not changed. If additional mold remediation is required after start of performance, a bilateral contract modification will be executed.
Q21. The SOW calls for All employees to hold specialty licensing and training. In order to be found technically acceptable is the VA ensuring that all companies who submit bids provide a list of all employees and also provide all training certificates for those employees prior to award.
A21. Quotes will be evaluated in accordance with the Basis for Award.
Q22. During the site visit it was stated that there were HVAC units that were coming out as part of another upgrade contract so not part of the bid. However, those units will be covered in mold spores and will need to be cleaned in order to obtain clearance, how is the VA addressing that?
A22. The size and scope are expressed in the Statement of Work and Mold Remediation Protocol. The size and scope have not changed. If additional mold remediation is required after start of performance, a bilateral contract modification will be executed.
Q23. Can a line drawing or a set of blueprints for the basement space be provided for the areas that the VA is planning on having remediated?
A23. See attached basement drawing. The CAD file will be made available upon request after award.
Q24. What is the VA’s expectation for the length of this project to be in terms of remediation time from start to finish?
A24. It is expected that this project will take three weeks from start to finish.
Q25. Can the ICRA and PICRA please be provided for this project?
A25. The ICRA and PCRA will be provided after award.
Q26. During the site visit there were other contractors working on the elevator. Once this is a TDLR regulated mold project there cannot be any intrusion of non-licensed mold remediation personnel in the space, will those contractors be done with the repairs and also not in the space during remediation?
A26. That is correct. Follow the Protocol.
Q27. What is the VA’s expected size and scope value based on market research for this project?
A27. The size and scope are expressed in the Statement of Work and Mold Remediation Protocol.
Q28. The HVAC main inlet ducting is covered in insulation, this is not part of the protocol, how will this be addressed because there were numerous spots of viable mold on that insulation, is it the VA’s intention to have the MRC remove that insulation as well, since obtaining clearance without removing it would be hard. The Protocol references insulation on pipes and the SOW references insulation. Please clarify.
A28. The size and scope are expressed in the Statement of Work and Mold Remediation
Q29. Is the MAC going to be requested to update the protocol to incorporate the additional spaces that were discovered and have become contaminated since the creation of the protocol.
If so, how will the contractor be able to provide a cost estimate until that is completed, if not completed prior to the closing date?
A29. The size and scope are expressed in the Statement of Work and Mold Remediation
Q30. Page 4 Number 4 of the solicitation states "removal of pipe Insulation", Will all piping insulation be removed?
A.30. Follow the Protocol.
Q31. Page 4 Number 5 states " Duct Insulation removal" Clarification on the square footage of duct insulation will be removed?
A31. Follow Protocol.
Q32. Please provide an Asbestos Report.
A32. See attached asbestos report.
Q33. Request for the Government to provide Plans of the basement.
A33. See attached basement drawing. The CAD file will be made available upon request after award.
Q34. The protocol is 'general' and does not contain specific instructions as to extent of removals (2' up, 6' up, entire wall FTC, etc) nor descriptions of areas where removals are to be done. Is there an architectural plan page of the affected area with the assessor's indicators as to what operations are to take place and where on individual walls and other materials?
A34. See attached photos in survey protocol.
Q35. Without the Asbestos Survey, can we assume all materials to be removed must be considered Asbestos-Containing?
A35. See attached Survey Means and Method are for the General Contractor.
Q36. Has the Asbestos Survey been completed as suggested by the Mold Assessment?
A36. See attached asbestos survey.
Q37. Are there pictures or plans available for the basement?
A37. See mold remediation protocol for pictures.