36C25724Q0384 0002.docx
DOCX document 22 KB Posted
- Attached to
- J056--BSL3 HVAC Controls Replacement - Sol Federal contract opportunity
- Solicitation number
- 36C25724Q0384
About this file
This document is an amendment to a federal solicitation for the replacement of HVAC controls in a Biosafety Level 3 (BSL-3) laboratory. The key details are:
The solicitation number is 36C25724Q0384. The Department of Veterans Affairs is seeking to replace the HVAC controls in a BSL-3 laboratory. The work includes installing new pressure monitors, reworking the supply fan sequence, and certifying the BSL-3 lab per BMBL 6th edition requirements. The ceiling may also need to be replaced due to potential moisture damage. Amendment 0002 extends the bid due date to April 29, 2024 at 1:00 PM CST and provides responses to several contractor questions regarding the project scope, ICRA requirements, hazardous materials, and other technical details. The solicitation is a design-bid-build procurement, with the government's architect-engineer responsible for the design.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25724Q0384 0005.docx | DOCX document | |
| BSL - SOW UPDATED 26 ARPIL 24.docx | DOCX document | |
| 36C25724Q0384 0004.docx | DOCX document | |
| 36C25724Q0384 0003.docx | DOCX document | |
| BSL-3 LAB REPAIRS DRAWING and SPECS.pdf | ||
| BSL3 HVAC SOW ILLUSTRATIONS.pdf | ||
| BSL3 HVAC - SIGN IN SHEET 28 MARCH 2024.pdf | ||
| 36C25724Q0384 0001.docx | DOCX document | |
| Past Performance Questionnaire.pdf | ||
| 36C25724Q0384.docx | DOCX document | |
| Wage Determination.pdf | ||
| BSL - SOW Final.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) none
BSL3
00756 Department of Veterans Affairs Contracting Office (138C) 11495 Turner Road El Paso
TX
79936-4221 00756 El Paso Contracting Office Department of Veterans Affairs 11495 Turner Road El Paso
TX
79936-1372 To all Offerors/Bidders
36C25724Q0384
X X X
April 29, 2024 NLT 1:00 PM CST X Amendment 0002 is issued to extend the bid due date to April 29, 2024 at 1:00 PM CST; and to post RFI responses.
Tailor Brown
RFI RESPOSPONSES
1. Are we to dispose/abate of any asbestos, lead, mold or other hazardous material as part of this project? If so, provide appropriate hazardous material site survey report.
No
1. What will the ICRA level be for this project? What is the extent of the required ICRA barriers Level 4 Critical 3 months
1. Are there any required/proprietary subcontractors the general contractor is to hire associated with this project?
No
1. Will all work associated with this project able to be performed during regular working hours?
Yes
1. It is our understanding that the Solicitation is a negotiated Bid (RFP) design-bid-build project with the Government's AE being responsible for the design portion (providing a full and complete set of Specifications and Plans) and the successful offeror being responsible for bidding and building the project based on the Specifications and Plans provided by the Government's AE. Put another way, the successful offeror will not be required to perform any design-build services as part of the contract - correct?
Yes
1. Could you please provide plumbing and electrical as well as supply room floor plans.
Yes
1. Will VA protect material to remain behind?
No
1. Will plans be provided for this project?
Yes
1. May a controller different than the model specified (but equal) be provided?
Check with Entech
1. Does testing need to be performed by a third party?
Yes, ENV Services for certification
1. We understand the work to include air handler controls and not the installation of a new HVAC unit.
Yes
1. Please confirm the project does not require containment and that the outer doors will act as the containment.
The project will require floor mats and a 6mill plastic barrier over the main door.
1. Confirm the project does not require temporary ducted negative air to the outside of the building.
Current condition is a negative air. The project doesn’t need additional negative air.
1. Statement of work paragraph 2.b indicates pressure monitors shall be installed and cabled to pick up the analog signal for pressure reading of the monitored space.
This statement is part of the requirement.
1. Are new pressure monitors required or are we to use the existing pressure monitors?
Supply new pressure monitors and plan on replacing them. For this bid assume they will need to be replaced.
1. How many pressure monitors are there?
1. Will sheetrock need to be removed and patched for the cabling to the pressure monitors?
No. the contractor can use the same opening and J-box the existing pressure monitors uses.
1. Should statement of work paragraph 2.e read “Contractor shall move AH 1-1 and AH 1-2 points over to the existing controller previously used by AH1.3 and AH1-4.”
Yes. AH1.3 and controls is dedicated/emergency power
1. Statement of work paragraph 2.f states “rework supply fan sequence to modulate supply fan speed control to insure all four spaces remain negative and neutral as they should.” Please provide by amendment a designed sequence of operations that contractors can implement and test.
Please see the update sequence of operation
1. Reference SOW paragraph 2.g. Confirm a new VFD is not required.
A new VFD is not required
1. Paragraph 2.i indicates the contractor shall certify BSL-3 lab in accordance with BMBL 6th edition. This document seems to refer to certification of the bio-safety cabinets which we understand is not in the scope of this project. Please clarify what is required for the certification of the BSL-3 lab.
We need to certify the room as a whole. The BMBL 6th edition has requirements for a BSL-3 lab.
1. Can the VA provide names and poc information for the 3rd party companies who have certified BSL labs in the past?
ENV Services
1. SOW paragraph 2.j.i.I indicates “replacement of ceiling due to mold”. The requirement does not indicate to abate mold. At the site visit, we saw that the ceiling was damaged, but we did not notice any mold. If any mold abatement is required, please clarify by amendment including quantities to be abated so that these costs can be included in contractor proposals.
The VA would like to have the entire ceiling replace because there could be mold. Mold was not confirmed to be present, but because the ceiling gotten wet, we require the contractor to replace the ceiling.
1. If any hazardous materials abatement is required, please clarify by amendment and provide an abatement specification.
No abatement is required.
1. SOW paragraph 2.j.III calls to replace insulation around windows to alleviate condensation. How wide should the gypsum board and insulation be removed/replaced from each side of the windows?
Please use 5/8” type X gypsum wall board.
1. SOW paragraph 2.j.IV requires “Enclosing of window to prevent condensation.” The exterior walls have outer windows and inner windows with a substantial gap between them. At the site visit, the VA indicated this scope requires the removal of the inner windows which would then be replaced with insulation and gypsum board walls. Please clarify by amendment if this is the requirement.
Use Rock wool insulation and 5/8” type X wall board for window in enclosure. The contractor will need to frame out window open will metal stubs. The wall should be installed next to the existing exterior window.
1. Confirm the project does not require temporary ducted negative air to the outside of the building.
The project will need to have negative air however the site already has exhaust ducted to fans outside.
1. Statement of work paragraph 2.b indicates pressure monitors shall be installed and cabled to pick up the analog signal for pressure reading of the monitored space.
Please see the response to questions 14 and question 15
1. Are new pressure monitors required or are we to use the existing pressure monitors?
Please see the response to questions 14 and question 15
1. How many pressure monitors are there?
1. Will sheetrock need to be removed and patched for the cabling to the pressure monitors?
No. the contractor can use the same opening and J-box the existing pressure monitors uses.
1. Should statement of work paragraph 2.e read “Contractor shall move AH 1-1 and AH 1-2 points over to the existing controller previously used by AH1.3 and AH1-4.”
Yes. AH1.3 and controls are dedicated/emergency power
1. Statement of work paragraph 2.f states “rework supply fan sequence to modulate supply fan speed control to insure all four spaces remain negative and neutral as they should.” Please provide by amendment a designed sequence of operations that contractors can implement and test.
This is part of the requirements
1. Reference SOW paragraph 2.g. Confirm a new VFD is not required.
Not required. Existing
1. Paragraph 2.i indicates the contractor shall certify BSL-3 lab in accordance with BMBL 6th edition. This document seems to refer to certification of the bio-safety cabinets which we understand is not in the scope of this project. Please clarify what is required for the certification of the BSL-3 lab.
We need to certify the room as a whole. The BMBL 6th edition has requirements for a BSL-3 lab.
1. Can the VA provide names and poc information for the 3rd party companies who have certified BSL labs in the past?
ENV Services
1. SOW paragraph 2.j.i.I indicates “replacement of ceiling due to mold”. The requirement does not indicate to abate mold. At the site visit, we saw that the ceiling was damaged, but we did not notice any mold. If any mold abatement is required, please clarify by amendment including quantities to be abated so that these costs can be included in contractor proposals.
The VA would like to have the entire ceiling replace because there could be mold. Mold was not confirmed to be present, but because the ceiling gotten wet, we require the contractor to replace the ceiling.
1. If any hazardous materials abatement is required, please clarify by amendment and provide an abatement specification.
No abetment is required.
1. SOW paragraph 2.j.III calls to replace insulation around windows to alleviate condensation. How wide should the gypsum board and insulation be removed/replaced from each side of the windows?
Use Rock wool insulation and 5/8” type X wall board for window in enclosure. The contractor will need to frame out window open will metal stubs. The wall should be installed next to the existing exterior window.
1. SOW paragraph 2.j.IV requires “Enclosing of window to prevent condensation.” The exterior walls have outer windows and inner windows with a substantial gap between them. At the site visit, the VA indicated this scope requires the removal of the inner windows which would then be replaced with insulation and gypsum board walls. Please clarify by amendment if this is the requirement.
Use Rock wool insulation and 5/8” type X wall board for window in enclosure. The contractor will need to frame out window open will metal stubs. The wall should be installed next to the existing exterior window.
1. Provide updated SOW as per the site visit findings
These questions will be use are the update information for the SOW
1. Provide Drawings
See Attached Drawings/Specs
1. Provide Specifications
See Attached Drawings/Specs
1. Provide pictures of interior rooms
See Attached Illustrations
1. Provide ceiling detail showing existing
See Attached Illustrations
1. Provide specifications on how to cover the interior windows
See response to question 26
1. Provide specification on who is to remove and relocate the electrical and data comm in the interior rooms between windows
The VA will remove the TempTrak device on the wall and the contractor will need to replace the electrical.
1. Provide updated bid due date required for lead time of materials
Bid due date is extended to April 29, 2024 at 1:00 PM CST
1. Provide mold test results for interior rooms that have water damage
Please see the response to question 23.
1. Provide paint specification and color / finish texture
ICI Paints white whisper gloss
1. Provide nearest location for electrical for roof equipment
Quick-disconnect is in the area.
End of Document See attached document: BSL-3 LAB REPAIRS DRAWING and SPECS.
See attached document: BSL3 HVAC SOW ILLUSTRATIONS.
File details come from the government source that posted it. Updated .