36C25719Q1334-004.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
NTX Ceiling Lifts Federal contract opportunity
Solicitation number
36C25719Q1334
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

36C25719Q1334 2019 CL Room List Combined.xlsx

View the file

Other files for this federal contract opportunity

Other files attached to NTX Ceiling Lifts, newest first.
File Type Posted
-18154.docx DOCX document
36C25719Q1334-0004000.docx DOCX document
36C25719Q1334-0003059.pdf PDF
36C25719Q1334-0003046.pdf PDF
36C25719Q1334-0003047.pdf PDF
36C25719Q1334-0003061.pdf PDF
36C25719Q1334-0003050.pdf PDF
36C25719Q1334-0003051.pdf PDF
36C25719Q1334-0003052.xlsx XLSX spreadsheet
36C25719Q1334-0003060.pdf PDF
36C25719Q1334-0003053.pdf PDF
36C25719Q1334-0003057.pdf PDF
36C25719Q1334-0003043.pdf PDF
36C25719Q1334-0003054.pdf PDF
36C25719Q1334-0003044.pdf PDF
36C25719Q1334-0003042.docx DOCX document
36C25719Q1334-0003048.pdf PDF
36C25719Q1334-0003058.pdf PDF
36C25719Q1334-0003045.pdf PDF
36C25719Q1334-0003049.pdf PDF
36C25719Q1334-0002259.pdf PDF
36C25719Q1334-0002262.pdf PDF
36C25719Q1334-0002257.pdf PDF
36C25719Q1334-0002258.pdf PDF
36C25719Q1334-0002256.pdf PDF
36C25719Q1334-0002264.pdf PDF
36C25719Q1334-0002260.pdf PDF
36C25719Q1334-0002267.pdf PDF
36C25719Q1334-0002268.pdf PDF
36C25719Q1334-0002266.pdf PDF
36C25719Q1334-0002269.pdf PDF
36C25719Q1334-0002255.pdf PDF
36C25719Q1334-0002254.docx DOCX document
36C25719Q1334-0002263.pdf PDF
36C25719Q1334-0002265.pdf PDF
36C25719Q1334-0002261.pdf PDF
36C25719Q1334-0002270.pdf PDF
36C25719Q1334-0002271.pdf PDF
36C25719Q1334-0001000.docx DOCX document
36C25719Q1334-011.pdf PDF
36C25719Q1334-008.pdf PDF
36C25719Q1334-001.pdf PDF
36C25719Q1334-005.pdf PDF
36C25719Q1334-000.docx DOCX document
36C25719Q1334-003.pdf PDF
36C25719Q1334-002.pdf PDF
36C25719Q1334-010.pdf PDF
36C25719Q1334-006.pdf PDF
36C25719Q1334-009.pdf PDF
36C25719Q1334-007.pdf PDF
Show all 50

NTX Ceiling Lifts has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet3

Item #BldgAreaRoom #Lbs.ScaleLine #DesignTiming
7524C221550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
28024C4C-104550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
28124C4C-105550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
21124C4C-107550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
21224C4C-108550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
28224C4C-109550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
28324C4C-111550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
21324C4C-112550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
28424C4C-114550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
21424C4C-119550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
21524C4C-120550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
21624C4C-121550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
21724C4C-207550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
21824C4C-208550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
21924C4C-209550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
28524C4C-219550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
20824C4C-220550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
20724C4C-222550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
28624C4C-223550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
20525C-1005C-119550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
20625C-1005C-119 bed B & C550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
20925C-1005C-123 bed 2 left side550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
21025C-1005C-123 bed 3 right side550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
30625C-4005C-404550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
30725C-4005C-405550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
30825C-4005C-406550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
30925C-4005C-407550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
23625C-4005C-419 left550Yes11Replacing GH2 rail over two beds with new continuous-charge rails on existing supportsCoordinated with patient care
23725C-4005C-419 right550Yes11Replacing GH2 rail over two beds with new continuous-charge rails on existing supportsCoordinated with patient care
23825C-4005C-421 left550Yes11Replacing GH2 rail over two beds with new continuous-charge rails on existing supportsCoordinated with patient care
23925C-4005C-421 right550Yes11Replacing GH2 rail over two beds with new continuous-charge rails on existing supportsCoordinated with patient care
24225C-4005C-426 around the corner550Yes13Replacing GH2 single rail with any traverse design that can cover the most stations in this area, on new supportsCoordinated with patient care
24025C-4005C-426 left550Yes11Replacing GH2 rail with new continuous-charge rails on existing supportsCoordinated with patient care
24125C-4005C-426 right550Yes11Replacing GH2 rail in double room with new continuous-charge rails on existing supportsCoordinated with patient care
22426C6C-106550Yes11Replacing GH2 rail in double room with new continuous-charge rails on existing supportsCoordinated with patient care
22526C6C-108550Yes11Replacing GH2 rail in double room with new continuous-charge rails on existing supportsCoordinated with patient care
29426C6C-109550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
22626C6C-110550Yes11Replacing GH2 rail in double room with new continuous-charge rails on existing supportsCoordinated with patient care
29526C6C-111550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
22926C6C-115550Yes11Replacing GH2 rail in double room with new continuous-charge rails on existing supportsCoordinated with patient care
22826C6C-117550Yes11Replacing GH2 rail in double room with new continuous-charge rails on existing supportsCoordinated with patient care
22726C6C-119550Yes11Replacing GH2 rail in double room with new continuous-charge rails on existing supportsCoordinated with patient care
29626C6C-132550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
29726C6C-134550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
29826C6C-139550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
29926C6C-139 BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with patient care
23026C6C-140550Yes11Replacing GH2 rail in double room with new continuous-charge rails on existing supportsCoordinated with patient care
23126C6C-142550Yes11Replacing GH2 rail in double room with new continuous-charge rails on existing supportsCoordinated with patient care
23226C6C-143550Yes11Replacing GH2 rail in double room with new continuous-charge rails on existing supportsCoordinated with patient care
30026C6C-144550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
30126C6C-145550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
23326C6C-147550Yes11Replacing GH2 rail in double room with new continuous-charge rails on existing supportsCoordinated with patient care
23426C6C-149550Yes11Replacing GH2 rail in double room with new continuous-charge rails on existing supportsCoordinated with patient care
23526C6C-151550Yes11Replacing GH2 rail in double room with new continuous-charge rails on existing supportsCoordinated with patient care
3052Day Surgery4C-401 room 14550No12Replacing GH2F rail with new continuous-charge rails on existing supportsCoordinated with patient care
3022Day Surgery4C-401 room 16550No12Replacing GH2F rail with new continuous-charge rails on existing supportsCoordinated with patient care
3032Day Surgery4C-401 room 26550No12Replacing GH2F rail with new continuous-charge rails on existing supportsCoordinated with patient care
3042Day Surgery4C-401 room 4550No12Replacing GH2F rail with new continuous-charge rails on existing supportsCoordinated with patient care
2922PM&R2C-207 Amputee clinic550Yes14Replacing GH2 on existing continuous charge rail BUT MOVING supports to the other side of the room over the barsCoordinated with patient care
2932PM&R2C-302d550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2202Radiation Oncology CyberknifeBC-127550Yes13ALL NEW Room-covering traverse est. 4m x 4mCoordinated with patient care
2872Urology3C-123550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2882Urology3C-130 procedure room550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2892Urology3C-131 biopsy room550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2902Urology3C-132550Yes11Replacing GH2 rail in double room with new continuous-charge rails on existing supportsCoordinated with patient care
2912Urology3C-140550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
160CLC PT (center)124550Yes2New continuous-charge XY rail, using existing supports if possible, in very large room. Can change orientation of lift rails.Coordinated with COR and CLC PM&R staff
260CLC PT (center)124550Yes2New continuous-charge XY rail, using existing supports if possible, in very large room. Can change orientation of lift rails.Coordinated with COR and CLC PM&R staff
2860Dallas CLC-A104550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
4960Dallas CLC-A105550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
2760Dallas CLC-A106550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
2660Dallas CLC-A107550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
5060Dallas CLC-A108550Yes9New continuous-charge rails on existing supports (single)Coordinated with COR and CLC managers
5160Dallas CLC-A109550Yes9New continuous-charge rails on existing supports (single)Coordinated with COR and CLC managers
5260Dallas CLC-A110550Yes9New continuous-charge rails on existing supports (single)Coordinated with COR and CLC managers
5360Dallas CLC-A118550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
5460Dallas CLC-A119550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
5560Dallas CLC-A120550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
5660Dallas CLC-A121550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
5760Dallas CLC-A122550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
5860Dallas CLC-A123550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
5960Dallas CLC-A124550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
6060Dallas CLC-A125550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
6160Dallas CLC-A126770Yes5New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
6260Dallas CLC-A127550Yes9New continuous-charge rails on existing supports (single)Coordinated with COR and CLC managers
6360Dallas CLC-A128550Yes9New continuous-charge rails on existing supports (single)Coordinated with COR and CLC managers
6460Dallas CLC-A129550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
6560Dallas CLC-A130550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
6660Dallas CLC-A131550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
6760Dallas CLC-A132550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
3660Dallas CLC-A103 BATH550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
3860Dallas CLC-A103 left550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
3760Dallas CLC-A103 right550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
4860Dallas CLC-A104 BATH550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
6960Dallas CLC-A112 bath550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
7060Dallas CLC-A125 bath550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
6860Dallas CLC-A132 bath550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
3960Dallas CLC-A133 BATH550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
4060Dallas CLC-A133 left550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
4160Dallas CLC-A133 right550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
1960Dallas CLC-AA156 Shower550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
1860Dallas CLC-AA156A Shower550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
2060Dallas CLC-BB156550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
3560Dallas CLC-B104550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
4260Dallas CLC-B105550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
4360Dallas CLC-B106550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
4460Dallas CLC-B107550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
4560Dallas CLC-B108550Yes9New continuous-charge rails on existing supports (single)Coordinated with COR and CLC managers
4660Dallas CLC-B109550Yes9New continuous-charge rails on existing supports (single)Coordinated with COR and CLC managers
4760Dallas CLC-B110550Yes9New continuous-charge rails on existing supports (single)Coordinated with COR and CLC managers
7160Dallas CLC-B113550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
7260Dallas CLC-B114550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
7360Dallas CLC-B115550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
7460Dallas CLC-B116550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
7660Dallas CLC-B118550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
2960Dallas CLC-B119550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
3060Dallas CLC-B120550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
7760Dallas CLC-B121550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
7860Dallas CLC-B122550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
7960Dallas CLC-B123550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
8060Dallas CLC-B124550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
8160Dallas CLC-B125550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
8260Dallas CLC-B126550Yes9New continuous-charge rails on existing supports (single)Coordinated with COR and CLC managers
8360Dallas CLC-B127550Yes9New continuous-charge rails on existing supports (single)Coordinated with COR and CLC managers
8460Dallas CLC-B128550Yes9New continuous-charge rails on existing supports (single)Coordinated with COR and CLC managers
8560Dallas CLC-B129550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
8660Dallas CLC-B130550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
8760Dallas CLC-B131550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
8860Dallas CLC-B132550Yes10New continuous-charge rails; new room design to accommodate curtains and door openingCoordinated with COR and CLC managers
3160Dallas CLC-B103 BATH550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
3260Dallas CLC-B103 Left550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
3360Dallas CLC-B103 Right550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
3460Dallas CLC-B104 BATH550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
8960Dallas CLC-B113 Bath550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
9060Dallas CLC-B125 Bath550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
9160Dallas CLC-B130 Bath550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
9260Dallas CLC-B132 Bath550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
960Dallas CLC-BB112770Yes6New continuous-charge rails on redesigned supports to accommodate curtains and door opening (specify and test rail only for 1000 pound capacity)Coordinated with COR and CLC managers
2160Dallas HospiceC-108 left550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
9360Dallas HospiceC-108 right550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
9460Dallas HospiceC-116550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
2274Dallas SCI PT1B-208 PT clinic (Combi lock)550Yes3Rail redesign with PT; no more switch tracks, but the positioning lock is requested. Attached to steel.Coordinated with COR and SCI PT management
2374Dallas SCI PTPT clinic (Switch track)550Yes3Rail redesign with PT; no more switch tracks, but the positioning lock is requested. Attached to steel.Coordinated with COR and SCI PT management
374SCI1D-127 "E"550Yes4New continuous-charge XY system, mounted to steel above ceiling or wall mounted (replacing ARJO system)Coordinated with COR and SCI managers
474SCI1D-131 "F"550Yes4New continuous-charge XY system, mounted to steel above ceiling or wall mounted (replacing ARJO system)Coordinated with COR and SCI managers
574SCI1D-133 "D"550Yes4New continuous-charge XY system, mounted to steel above ceiling or wall mounted (replacing ARJO system)Coordinated with COR and SCI managers
674SCI1D-134 "C"550Yes4New continuous-charge XY system, mounted to steel above ceiling or wall mounted (replacing ARJO system)Coordinated with COR and SCI managers
774SCI1D-138 "B"550Yes4New continuous-charge XY system, mounted to steel above ceiling or wall mounted (replacing ARJO system)Coordinated with COR and SCI managers
874SCI1D-140 "A"550Yes4New continuous-charge XY system, mounted to steel above ceiling or wall mounted (replacing ARJO system)Coordinated with COR and SCI managers
1952J5A5A-224550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
1962J5A5A-228550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
1972J5A5A-230550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
1982J5A5A-248550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
1992J5A5A-250550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
2002J5A5A-262550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
2012J5A5A-264550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
102J5A5A-280825Yes8New continuous-charge rails on existing supports (specify and test rail only for 1000 pound capacity)Coordinated with COR, Bed Control, and 5A managers
2022J5A5A-284550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
2032J5A5A-286550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
2042J5A5A-290550Yes11New continuous-charge rails on existing supportsCoordinated with COR and unit managers
2222JALS room (Clinic 5)3A-158550Yes13ALL NEW Room-covering traverse est. 3m x 4mCoordinated with patient care and activation
2722JCCU 15A-124A550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2732JCCU 105A-124M550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2742JCCU 25A-124D550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2752JCCU 35A-124E550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
172JCCU 45A-124F825Yes7Existing continuous-charge rail (specify and test rail only for 1000 pound capacity)Coordinated with COR, Bed Control, and MICU/CCU managers
2762JCCU 55A-124G550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2772JCCU 65A-124H550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2782JCCU 75A-124J550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2792JCCU 85A-124K550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
122JCCU 95A-124L825Yes7Existing continuous-charge rail (specify and test rail only for 1000 pound capacity)Coordinated with COR, Bed Control, and MICU/CCU managers
2232JDialysis3A-230 bay 6 (southwest corner)550Yes13ALL NEW Room-covering traverse est. 3m x 3mCoordinated with patient care
2642JMICU5A-109J (MICU 1)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2662JMICU5A-109L (MICU 3)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2672JMICU5A-109M (MICU 4)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2682JMICU5A-109N (MICU 5)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2692JMICU5A-109P (MICU 6)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2702JMICU5A-109Q (MICU 7)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2712JMICU5A-109R (MICU 8)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2652JMICU5A-109V (MICU 10)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
132JMICU 25A-109K825Yes7Existing continuous-charge rail (specify and test rail only for 1000 pound capacity)Coordinated with COR, Bed Control, and MICU/CCU managers
142JMICU 95A-109S825Yes7Existing continuous-charge rail (specify and test rail only for 1000 pound capacity)Coordinated with COR, Bed Control, and MICU/CCU managers
2212JNuclear Medicine3B-635550Yes13ALL NEW Room-covering traverse est. 3m x 4mCoordinated with patient care
2482JSICU5B-202H (SICU 2)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2492JSICU5B-202J (SICU 3)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2502JSICU5B-202K (SICU 4)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2512JSICU5B-202L (SICU 5)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2522JSICU5B-202M (SICU6)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2532JSICU5B-202P (SICU 8)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2542JSICU5B-202Q (SICU 9)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2432JSICU5B-202R (SICU 10)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2442JSICU5B-202S (SICU 11)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2452JSICU5B-202W (SICU 13)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2462JSICU5B-202X (SICU 14)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2472JSICU5B-202Y (SICU 15)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
152JSICU 125B-202T825Yes7Existing continuous-charge rail (specify and test rail only for 1000 pound capacity)Coordinated with COR, Bed Control, and SICU/TICU managers
162JSICU 75B-202N825Yes7Existing continuous-charge rail (specify and test rail only for 1000 pound capacity)Coordinated with COR, Bed Control, and SICU/TICU managers
2552JTICU5B-252L (TICU 1)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2572JTICU5B-252Q (TICU 3)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2582JTICU5B-252R (TICU 4)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2592JTICU5B-252S (TICU 5)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2602JTICU5B-252T (TICU 6)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2612JTICU5B-252U (TICU 7)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2622JTICU5B-252V (TICU 8)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2632JTICU5B-252W (TICU 9)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
2562JTICU5B-252X (TICU 10)550Yes15Replacing GH2 on existing continuous charge railCoordinated with patient care
112JTICU 25B-252P825Yes8New continuous-charge rails on existing supports (specify and test rail only for 1000 pound capacity)Coordinated with COR, Bed Control, and SICU/TICU managers
131Bonham NHCUB2201550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
132Bonham NHCUB2202550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
133Bonham NHCUB2203550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
134Bonham NHCUB2204550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
135Bonham NHCUB2205550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
136Bonham NHCUB2206550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
137Bonham NHCUB2207550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
138Bonham NHCUB2301550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
139Bonham NHCUB2303550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
140Bonham NHCUB2304550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
141Bonham NHCUB2305550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
142Bonham NHCUB2306550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
143Bonham NHCUB2307550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
144Bonham NHCUB2308550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
145Bonham NHCUB2401550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
146Bonham NHCUB2403550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
147Bonham NHCUB2404550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
148Bonham NHCUB2405550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
149Bonham NHCUB2406550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
150Bonham NHCUB2407550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
151Bonham NHCUB2408550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
152Bonham NHCUB2201-02BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
153Bonham NHCUB2203BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
154Bonham NHCUB2204BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
155Bonham NHCUB2205-7BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
156Bonham NHCUB2301-3BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
157Bonham NHCUB2304BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
158Bonham NHCUB2305-7BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
159Bonham NHCUB2401-3BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
160Bonham NHCUB2404BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
161Bonham NHCUB2405-7BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
162Bonham NHCUB2406-8BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
163Bonham NHCUBB2208-10BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
165Bonham NHCUBB2208-A550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
164Bonham NHCUBB2209-11BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
166Bonham NHCUBB2209-A550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
167Bonham NHCUBB2210550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
168Bonham NHCUBB2211550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
169Bonham NHCUBB2306-8BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
170Bonham NHCUBB2309-11BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
171Bonham NHCUBB2309-A550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
172Bonham NHCUBB2310-12BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
173Bonham NHCUBB2310-A550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
174Bonham NHCUBB2311550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
175Bonham NHCUBB2312550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
176Bonham NHCUBB2409-11BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
177Bonham NHCUBB2409-A550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
178Bonham NHCUBB2410-12BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
179Bonham NHCUBB2410-A550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
180Bonham NHCUBB2411550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
181Bonham NHCUBB2412550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
24Bonham NHCUBonham CLC-CC3402550Yes1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
25Bonham NHCUBonham CLC-BB2402A550Yes1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
95Bonham NHCUC3201550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
96Bonham NHCUC3202550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
97Bonham NHCUC3203550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
98Bonham NHCUC3204550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
99Bonham NHCUC3205550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
100Bonham NHCUC3206550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
101Bonham NHCUC3207550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
102Bonham NHCUC3208550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
103Bonham NHCUC3306550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
104Bonham NHCUC3308550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
105Bonham NHCUC3401550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
106Bonham NHCUC3403550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
107Bonham NHCUC3404550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
108Bonham NHCUC3405550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
109Bonham NHCUC3406550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
110Bonham NHCUC3407550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
111Bonham NHCUC3408550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
112Bonham NHCUC3201-2BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
113Bonham NHCUC3203BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
114Bonham NHCUC3205-7BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
115Bonham NHCUC3206-8BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
116Bonham NHCUC3401-3BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
117Bonham NHCUC3404BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
118Bonham NHCUC3405-7BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
119Bonham NHCUC3406-8BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
120Bonham NHCUCC3208-10BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
121Bonham NHCUCC3209-11 bath550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
122Bonham NHCUCC3209-A550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
123Bonham NHCUCC3210550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
124Bonham NHCUCC3211550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
182Bonham NHCUCC3301-3BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
183Bonham NHCUCC3303550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
184Bonham NHCUCC3305550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
185Bonham NHCUCC3305-7BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
186Bonham NHCUCC3306-8BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
187Bonham NHCUCC3307550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
188Bonham NHCUCC3309-11BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
189Bonham NHCUCC3309-A550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
190Bonham NHCUCC3310-12BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
191Bonham NHCUCC3310-A550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
192Bonham NHCUCC3312550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
125Bonham NHCUCC3409-11BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
126Bonham NHCUCC3409-A550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
127Bonham NHCUCC3410-12BR550No1New continuous-charge rails on existing supports; shower area means water protection is requiredCoordinated with COR and CLC managers
128Bonham NHCUCC3410-A550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
129Bonham NHCUCC3411550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
130Bonham NHCUCC3412550Yes11New continuous-charge rails on existing supportsCoordinated with COR and CLC managers
193Bonham/1OPC Bldg 1320, moving to Bldg 1 rm 132550Yes13NEW LOCATION: building 1 room 132Coordinated with COR and OPC managers
194Bonham/1OPC Bldg 1403 (Moving to Bldg 2 room 303)550Yes13NEW LOCATION: building 2 room 303Coordinated with COR and OPC managers