36C25718Q0777-008.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- New-Solid Waste Services - CTX Federal contract opportunity
- Solicitation number
- 36C25718Q0777
About this file
36C25718Q0777 CTX VA Pricing Matrix_Pricing Fill-Ins.xlsx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25719C0013-000.docx | DOCX document | |
| 36C25718Q0777-018.docx | DOCX document | |
| 36C25718Q0777-016.docx | DOCX document | |
| 36C25718Q0777-017.docx | DOCX document | |
| 36C25718Q0777-014.pdf | ||
| 36C25718Q0777-013.docx | DOCX document | |
| 36C25718Q0777-015.docx | DOCX document | |
| 36C25718Q0777-012.doc | DOC document | |
| 36C25718Q0777-010.docx | DOCX document | |
| 36C25718Q0777-011.docx | DOCX document | |
| 36C25718Q0777-007.pdf | ||
| 36C25718Q0777-009.docx | DOCX document | |
| 36C25718Q0777-006.pdf | ||
| 36C25718Q0777-005.docx | DOCX document | |
| 36C25718Q0777-004.docx | DOCX document | |
| 36C25718Q0777-000.docx | DOCX document | |
| 36C25718Q0777-001.pdf | ||
| 36C25718Q0777-002.pdf | ||
| 36C25718Q0777-003.xlsx | XLSX spreadsheet |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CURRENT
| Temple Location: | |||||||
| BUILDING NO. | ESTIMATED CONTAINER SIZE | # OF CONTAINERS | SERVICING & DAYS OF WEEK | UNIT PRICE | ESTIMATED SERVICE QUANTITY | ESTIMATED ANNUAL COST ** | |
| Tarrant Lake Park | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ | per month | 12 | ERROR:#VALUE! |
| New Warehouse 206 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | per month | 12 | $ - 0 | |
| 44 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | per month | 12 | $ - 0 | |
| 47 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | per month | 12 | $ - 0 | |
| 53 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | per month | 12 | $ - 0 | |
| 58 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | per month | 12 | $ - 0 | |
| 158 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | per month | 12 | $ - 0 | |
| 205 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | per month | 12 | $ - 0 | |
| Community Life Center 221 | 8 Cubic Yard | 3 | 2 – Tuesday & Friday | per month | 12 | $ - 0 | |
| 171 | Stationary Compactor 6 Yard Container (Vert-Pack) | 1 | 2 – Tuesday & Friday | per month | 12 | $ - 0 | |
| Adjacent to Modular Bldg. 216 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | per month | 12 | $ - 0 | |
| 64 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | per month | 12 | $ - 0 | |
| Incinerator | 40 Yd Roll-Off | 1 | Thursday | per pull | 52 | $ - 0 | |
| 45 (Cardboard Recycling – Govt. owned) | Stationary Compactor 35 yard container | 1 | Thursday | per pull | 52 | $ - 0 | |
| 163 (Dock) | Stationary Compactor 35 yard container | 1 | Each Thursday | per pull | 52 | $ - 0 | |
| 202 (Dock) | Stationary Compactor 35 Yard Container | 1 | Each Thursday | per pull | 52 | $ - 0 | |
| 204 (Dock) | Stationary Compactor 35 Yard Container | 1 | Each Thursday | per pull | 52 | $ - 0 | |
| *163 (Dock) (Cardboard Recycling Govt. owned) | Stationary Compactor 35 Yard Container | 1 | Thursday | per pull | 52 | $ - 0 | |
| TOTAL | 20 | ERROR:#VALUE! | |||||
| ** Plus Disposal Fees which shall be passed through based upon the current landfill rates charged by the Landfill | |||||||
| Waco Location: | |||||||
| BUILDING NO. | ESTIMATED CONTAINER SIZE | # OF CONTAINERS | SERVICING & DAYS OF WEEK | UNIT PRICE | ESTIMATED SERVICE QUANTITY | ESTIMATED ANNUAL COST ** | |
| 1 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | per month | 12 | $ - 0 | |
| 4 | 8 Cubic Yard | 2 | 2 – Monday & Thursday | per month | 12 | $ - 0 | |
| 7 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | per month | 12 | $ - 0 | |
| 8 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | per month | 12 | $ - 0 | |
| 10 | 8 Cubic Yard | 2 | 2 – Monday & Thursday | per month | 12 | $ - 0 | |
| 15 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | per month | 12 | $ - 0 | |
| 17 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | per month | 12 | $ - 0 | |
| 90 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | per month | 12 | $ - 0 | |
| 91 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | per month | 12 | $ - 0 | |
| 92 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | per month | 12 | $ - 0 | |
| 94 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | per month | 12 | $ - 0 | |
| 99 | 8 Cubic Yard | 2 | 2 – Monday & Thursday | per month | 12 | $ - 0 | |
| 202 | Stationary Compactor 6 Yard Container | 1 | 2 – Monday & Thursday | per month | 12 | $ - 0 | |
| Golf Course T113-1 | 40 Yd Roll-Off | 1 | Thursday | per pull | 52 | $ - 0 | |
| Golf Course T113-2 | 40 Yd Roll-Off | 1 | Thursday | per pull | 52 | $ - 0 | |
| 223 (Contractor-owned Cardboard Recycling ) | Stationary Compactor 35 Yard Container | 1 | Thursday | per pull | 52 | $ - 0 | |
| TOTAL | 19 | $ - 0 | |||||
| ** Plus Disposal Fees which shall be passed through based upon the current landfill rates charged by the Landfill | |||||||
| COMBINED TOTAL | 39 | ERROR:#VALUE! | |||||
| ** Plus Disposal Fees which shall be passed through based upon the current landfill rates charged by the Landfill |
&8&D &8&F
CURRENT 6-23-16
| Temple Location: | |||||||
| BUILDING NO. | ESTIMATED CONTAINER SIZE | # OF CONTAINERS | SERVICING & DAYS OF WEEK | UNIT PRICE | ESTIMATED SERVICE QUANTITY | ESTIMATED ANNUAL COST ** | |
| Tarrant Lake Park | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 |
| New Warehouse 206 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 |
| 44 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 |
| 47 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 |
| 53 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 |
| 58 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 |
| 158 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 |
| 205 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 |
| Community Life Center 221 | 8 Cubic Yard | 3 | 2 – Tuesday & Friday | $ 705.00 | per month | 12 | $ 8,460.00 |
| 171 | Stationary Compactor 6 Yard Container (Vert-Pack) | 1 | 2 – Tuesday & Friday | $ 460.00 | per month | 12 | $ 5,520.00 |
| Adjacent to Modular Bldg. 216 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 |
| 64 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 |
| Incinerator | 40 Yd Roll-Off | 1 | Thursday | $ 229.00 | per pull | 52 | $ 11,908.00 |
| 45 (Cardboard Recycling – Govt. owned) | Stationary Compactor 35 yard container | 1 | Thursday | $ 122.00 | per pull | 52 | $ 6,344.00 |
| 163 (Dock) | Stationary Compactor 35 yard container | 1 | Each Thursday | $ 229.00 | per pull | 52 | $ 11,908.00 |
| 202 (Dock) | Stationary Compactor 35 Yard Container | 1 | Each Thursday | $ 229.00 | per pull | 52 | $ 11,908.00 |
| 204 (Dock) | Stationary Compactor 35 Yard Container | 1 | Each Thursday | $ 229.00 | per pull | 52 | $ 11,908.00 |
| *163 (Dock) (Cardboard Recycling Govt. owned) | Stationary Compactor 35 Yard Container | 1 | Thursday | $ 122.00 | per pull | 52 | $ 6,344.00 |
| TOTAL | 20 | $ 103,565.60 | |||||
| ** Plus Disposal Fees which shall be passed through based upon the current landfill rates charged by the Landfill | |||||||
| Waco Location: | |||||||
| BUILDING NO. | ESTIMATED CONTAINER SIZE | # OF CONTAINERS | SERVICING & DAYS OF WEEK | UNIT PRICE | ESTIMATED SERVICE QUANTITY | ESTIMATED ANNUAL COST ** | |
| 1 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 |
| 4 | 8 Cubic Yard | 2 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 |
| 7 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 |
| 8 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 |
| 10 | 8 Cubic Yard | 2 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 |
| 15 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 |
| 90 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 |
| 91 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 |
| 92 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 |
| 94 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 |
| 99 | 8 Cubic Yard | 2 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 |
| 202 | Stationary Compactor 6 Yard Container | 1 | 2 – Monday & Thursday | $ 526.00 | per month | 12 | $ 6,312.00 |
| 226 | 8 Cubic Yard | 2 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 |
| Golf Course T113-1 | 40 Yd Roll-Off | 1 | Thursday | $ 229.00 | per pull | 52 | $ 11,908.00 |
| Golf Course T113-2 | 40 Yd Roll-Off | 1 | Thursday | $ 229.00 | per pull | 52 | $ 11,908.00 |
| 223 (Contractor-owned Cardboard Recycling ) | Stationary Compactor 35 Yard Container | 1 | Thursday | $ 345.00 | per pull | 52 | $ 17,940.00 |
| TOTAL | 20 | $ 85,940.00 | |||||
| ** Plus Disposal Fees which shall be passed through based upon the current landfill rates charged by the Landfill | |||||||
| COMBINED TOTAL | 40 | $ 189,505.60 | |||||
| ** Plus Disposal Fees which shall be passed through based upon the current landfill rates charged by the Landfill |
| Proposed Escallators: | ||
| Option Year 1 | 0% | |
| Option Year 2 | 2% | |
| Option Year 3 | 2% | |
| Option Year 4 | 2% |
&8&D &8&F
OLD
| Temple Location: | ||||||||
| BUILDING NO. | ESTIMATED CONTAINER SIZE | # OF CONTAINERS | SERVICING & DAYS OF WEEK | UNIT PRICE | ESTIMATED SERVICE QUANTITY | ESTIMATED ANNUAL COST ** | ||
| Tarrant Lake Park | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 | |
| New Warehouse 206 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 | |
| 44 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 | |
| 47 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 | |
| 53 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 | |
| 58 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 | |
| 158 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 | |
| 205 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 | |
| Community Life Center 221 | 8 Cubic Yard | 3 | 2 – Tuesday & Friday | $ 705.00 | per month | 12 | $ 8,460.00 | |
| 171 | Stationary Compactor 6 Yard Container (Vert-Pack) | 1 | 2 – Tuesday & Friday | $ 460.00 | per month | 12 | $ 5,520.00 | |
| Adjacent to Modular Bldg. 216 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 | |
| 64 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 | |
| 163 | 8 Cubic Yard | 1 | 2 – Tuesday & Friday | $ 243.88 | per month | 12 | $ 2,926.56 | REMOVED |
| Incinerator | 40 Yd Roll-Off | 1 | Thursday | $ 229.00 | per pull | 52 | $ 11,908.00 | |
| 45 (Cardboard Recycling – Govt. owned) | Stationary Compactor 35 yard container | 1 | Thursday | $ 122.00 | per pull | 52 | $ 6,344.00 | |
| 163 (Dock) | Stationary Compactor 6 Yard Container (Vert-Pack) | 1 | 4 – Monday, Tuesday, Wednesday & Friday | $ 720.00 | per month | 12 | $ 8,640.00 | Changed out with Compactor they rent |
| 202 (Dock) | Stationary Compactor 35 Yard Container | 1 | Each Thursday | $ 229.00 | per pull | 52 | $ 11,908.00 | |
| 204 (Dock) | Stationary Compactor 35 Yard Container | 1 | Each Thursday | $ 229.00 | per pull | 52 | $ 11,908.00 | |
| *163 (Dock) (Cardboard Recycling Govt. owned) | Stationary Compactor 35 Yard Container | 1 | Thursday | $ 122.00 | per pull | 52 | $ 6,344.00 | |
| TOTAL | 21 | $ 103,224.16 | ||||||
| ** Plus Disposal Fees which shall be passed through based upon the current landfill rates charged by the Landfill | ||||||||
| Waco Location: | ||||||||
| BUILDING NO. | ESTIMATED CONTAINER SIZE | # OF CONTAINERS | SERVICING & DAYS OF WEEK | UNIT PRICE | ESTIMATED SERVICE QUANTITY | ESTIMATED ANNUAL COST ** | ||
| 1 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 | |
| 4 | 8 Cubic Yard | 2 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 | |
| 7 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 | |
| 8 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 | |
| 10 | 8 Cubic Yard | 2 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 | |
| 15 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 | |
| 17 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 | |
| 90 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 | |
| 91 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 | |
| 92 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 | |
| 94 | 8 Cubic Yard | 1 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 | |
| 99 | 8 Cubic Yard | 2 | 2 – Monday & Thursday | $ 263.00 | per month | 12 | $ 3,156.00 | |
| 202 | Stationary Compactor 6 Yard Container | 1 | 2 – Monday & Thursday | $ 526.00 | per month | 12 | $ 6,312.00 | |
| Golf Course T113-1 | 40 Yd Roll-Off | 1 | Thursday | $ 229.00 | per pull | 52 | $ 11,908.00 | |
| Golf Course T113-2 | 40 Yd Roll-Off | 1 | Thursday | $ 229.00 | per pull | 52 | $ 11,908.00 | |
| 223 (Contractor-owned Cardboard Recycling ) | Stationary Compactor 35 Yard Container | 1 | Thursday | $ 345.00 | per pull | 52 | $ 17,940.00 | |
| TOTAL | 19 | $ 85,940.00 | ||||||
| ** Plus Disposal Fees which shall be passed through based upon the current landfill rates charged by the Landfill | ||||||||
| COMBINED TOTAL | 40 | $ 189,164.16 | ||||||
| ** Plus Disposal Fees which shall be passed through based upon the current landfill rates charged by the Landfill |
| Proposed Escallators: | ||
| Option Year 1 | 0% | |
| Option Year 2 | 2% | |
| Option Year 3 | 2% | |
| Option Year 4 | 2% |
File details come from the government source that posted it.