36C25619Q0133_0002.pdf
PDF 178 KB Posted
- Attached to
- 564-19-1-150-0010 Equip Lease Mobile MRI System Trailer - Springfield CBOC Federal contract opportunity
- Solicitation number
- 36C25619Q0133
About this file
36C25619Q0133 0002 36C25619Q0133 0002.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25619C0059-000.docx | DOCX document | |
| 36C25619Q0133-0004000.docx | DOCX document | |
| 36C25619Q0133-0004001.pdf | ||
| 36C25619C0036_1.docx | DOCX document | |
| 36C25619Q0133_0003.docx | DOCX document | |
| 36C25619Q0133_0002.docx | DOCX document | |
| 36C25619Q0133_0001.docx | DOCX document | |
| 36C25619Q0133_0001.pdf | ||
| 36C25619Q0133-001.pdf | ||
| 36C25619Q0133-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 5
0002 12-26-2018
564-19-1-150-0010
None
00502
ALEXANDRIA VA HEALTH CARE SYSTEM
NETWORK CONTRACTING OFFICE 16
ALEXANDRIA VA HEALTH CARE SYSTEM
PO BOX 69004
ALEXANDRIA LA 71306-9004
00502
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 16
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HIGHWAY
PINEVILLE LA 71360-4004
To all Offerors/Bidders
36C25619Q0133
12-26-2018
X
See CONTINUATION Page
Not Applicable
X
The purpose of this amendment is to add the "Vendor Questions and Response" document. The change is as follow:
A. Vendor Questions and Response document is hereby added and made a part of the RFQ.
B. All other terms and conditions remain unchanged.
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT
UNIT
PRICE AMOUNT
GRAND
TOTAL
A.2 DELIVERY SCHEDULE
ITEM NUMBER QUANTITY
DELIVERY
DATE
CONTINUATION PAGE
Vendor Questions and Response:
• Is the intent for the patient lift to be under the canopy? No
• Is the patient lift to be facing the building or away from the building? Facing the building
• What will be the orientation of the Mobile Unit on the pad? Parallel to the building
• Can the facility support the (480 Volt A.C., 3 Phase, 125 KVA, fused at 150 Amps) system requirements? See amendment to RFQ which added the Utility infra-structure
• Has the facility completed all siting requirements to accommodate the parking of the trailer? Yes
• SPACE, TWIST, BLADE is Siemens software. Assuming VA desires GE CUBE, TRICKS, and
PROPELLER. Please advise. Equivalent
• If providing 16 channel Flex Coils can we check “Comply” on the 4 channel shoulder, 8 channel foot/ankle/knee coil, and 8 channel wrist? yes
• Please clarify “response within 1 hour” for 24/7 telephone technical support. Does this mean a returned phone call within the hour? yes
• Can contractor provide alternative equipment for 6 months until specified equipment is available?
No... prefer finished Mobile
• Please clarify the reasoning for including “52.232-31 Invitation to Propose Financing Terms” as this is for a lease and not a purchase. Clause is not relevant…please disregard 52.232-31.
• Does the site have a pad and/or power? Yes
• What is the expected date for awarding the contract? (allow approx. 4 weeks for pad construction and power) The expected date of award is January 18, 2019 with delivery and set-up for
February 1, 2019. However, the dates are subject to changed once an award is made.
• 3D HEART is used for Coronary Artery imaging. Is 3D HEART required (pg.15)? No
• Would the Siemens Aera, or Philips Ingenia be considered as substitutes for Voyager? Yes…as long as the unit meet the salient characteristics.
• How many days of applications training are needed (pg. 18)? Week on site and week at the training center with optional follow up as needed.
• Does the cboc currently have imaging services? What unit is in use? Phillips Xrays. Soon to be active Toshiba CT Scanner
• 1 year warranty is mentioned (pg.18), will a service contract be needed for the remaining term?
No…the Vendor is responsible for the maintenance of the unit, including preventative maintenance, parts and labor.
• MAGiC suite (pg.15) can include (brain, and/or prostate) which is required? Brain
• BREASE (Breast Spectroscopy)/ViosWorks (pg. 15,16) are unusual requirements for a clinical setting, are these applications required? No
• TMJ coils (pg.16) are not compatible with the voyager system. Ok…noted.
• CVWorks is part of our standard GE Voyager configuration and includes basic cardiac sequences.
Are additional CMR options required (pg.15)? (Cardio package, Cardio plus, MRI echo) No
• Our standard configuration for a GE Voyager includes 3 (S/M/L) high end 16ch flex coils for
MSK imaging. These 16ch flex coils are used for clinical imaging of the shoulder, elbow, wrist, hip, knee, ankle and foot. Would the flex coils with a higher channel count be considered as replacements for the shoulder/knee/ankle/and foot coils? Yes
• We offer system service from (8am – 9pm) is the unit only to be serviced after normal duty hours
(after 4:30pm)? (pg.15) Flexible
• Our normal system coil configuration is; 32ch Head and neck unit, 32ch Embedded Posterior
Spine Array, 16ch Anterior Array, MSK Flex Coil Suite (small, medium, large) would any additional coils be necessary? Must meet the minimum stated in the RFQ.
• Is the location of the Place of Performance a different location than the primary CBOC, 600 N
Main, Mt Vernon, MO 65712? I know the address in the SF1449, sect. 15 is different but you ref by name the CBOC and I cannot find a facility located at 1800 W. Republic St. all databases point to 600 N Main. The clinic is still named Gene Taylor Community Based Outpatient Clinic
1850 W Republic Rd., Springfield, MO 65810
• In Section 2.1 of the work statement, it says that the contractor is responsible for site construction
(to include utility hook-ups).
o Does this site have an existing pad and power in place to accommodate the mobile MR unit? Yes o If so, has a mobile MR of any mobile imaging system been operational at this location previously? No
• Have you previously used a Mobile MRI at the proposed location? No
• You show you pad is 10’ X43’. Our mobile trailer is 48’ long. It looks like it will still fit. Can you verify that a 48’ Calumet trailer will fit? Verified…the trailer will fit
• Will you require an awning to be built from the MRI system to the facility entrance? If so, how many feet long, wide, and tall should the awning be? Will you build the awning or is this the responsibility of the contractor? Please see amend to RFQ…contractor required to provide an awning long enough to cover entry
• Is there any additional construction required on-site and if so who is responsible for the construction? No
• Do you have dedicated power requirement of 480 volt 3 Phase Y 200 Amp with a Russellstoll
Female Connector Model RUSSELL STOLL # DF2504FRAB (wall mounted) OR DF2504FP
(cable end). We will also require data cables run to the mobile MRI so we connect to your
PACS system and VOIP or phone lines if there is no VOIP? See amendment 0001 to
RFQ…utility infra-structure added to PWS.
• How many days of applications training do you require? See amendment 0001 to RFQ…one week onsite, one week offsite and as needed.
• How many MRI technologists will be trained to operate the system? See amendment 0001 to
RFQ…three Government personnel
• What MRI systems are your current MRI Technologists trained to operate? Phillips 1.5T close magnet and Hitachi 1.2T open magnet
• Does the Gene Taylor Community Based Outpatient clinic currently served by an MRI
Onsite? And if so, what kind of system is currently deployed? No
• Will the government accept an interim MRI unit of similar capabilities until a new unit can be deployed? An “interim” unit will be evaluated. However the requirement calls for a fully functioning and fully operable unit.
• Are proposed technicians currently trained on a unit and what kind of scanner are they currently familiar with? Technicians with the Fayetteville VAMC are currently trained and scanning on a 1.5T close Phillip and 12T open Hitachi MRI Scanner.
• Do technicians currently have a reading solution workstation in their location or will they require additional workstations? Not at the CBOC site. Technician will read the MRIs remotely from the Fayetteville VAMC on the Carestream PACS.
• Is the Gene Taylor Community Based Outpatient Clinic already set up on the VA side with power and plug to accept a mobile unit? Yes.
• Will the VA provide at least two IT data ports? Yes
• Are they willing to allow a temporary interim unit for a few months until a new unit can be delivered approx.. 3-4 months from the award date? The VA prefer the final unit.
• Are there pictures of the proposed parking location available to prospective contractors?
Yes. The RFQ includes site plans and a site visit is scheduled for 12/13/2018 @ 10am.
• Would the facility like to have any logo graphics installed during the lease period to identify the facility or modality? No.