36C25618B0555-0002000.docx
DOCX document 27 KB Posted
- Attached to
- 580-18-116 Replace AHU in B100 and B110 Federal contract opportunity
- Solicitation number
- 36C25618B0555
About this file
36C25618B0555 0002 36C25618B0555 0002.docx
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 06-06-2018 580-18-116 Department of Veterans Affairs
NCO 16
Michael E. DeBakey VA Medical Center 2002 Holcombe Boulevard Houston TX 77030 4298 Department of Veterans Affairs
NCO 16
Michael E. DeBakey VA Medical Center 2002 Holcombe Boulevard Houston TX 77030 To all Offerors/Bidders
36C25618B0555 06-06-2018
X X X 6-14-18 @ 11am Central X RE: Replace AHU in B100 and B110
See clarifications attached. Bid due date is extended until 6/14/18 at 11AM Central. Public bid opening will occur in Building 100, Room 4B-300 at MEDVAMC at the bid closing time.
TABITHA CONTRERAS
CONTRACTING OFFICER
1. The Roof Plans provided do not show the location of the exhaust fans. Also, the photos are not sufficient to determine the duct connections.
See attached plans.
2. Please provide a roof plan for crane purposes of each exhaust fan.
See attached plans.
3. Without duct plans I as a contractor cannot price out this: Contractor shall provide new air flows stations on the supply and return side of ductwork per VA Specs and shall be compatible with BAS.
See attached plans.
4. Without piping plans I as a contractor cannot price out this: Install new DDC Chilled Water and Hot Water Control Valves per VA Specs, please note AHU 87, 89, 91, 95 and 97 heating and cooling coil control valves are 3-way valves.
See attached plans.
5. Without duct plans I as a contractor cannot price out this: Replace all existing dampers of the AHU’s and return fans, dampers shall be in accordance of VA Master Specs.
See attached plans, also damper size may vary depending on new AHU footprint.
6. Without the cuttoff valve size we cannot price out the freezing or the replacement of these valves.
Cut off valves size are provided on document Existing AHU submittals attached to Amendment #1, and also in the attached plans.
7. Without knowing which plenums have existing door and which do not, I cannot price this out: Contractor shall install new duct access doors to intake and outlet plenum locations that lack them to allow cleaning. Size of access door shall be ” x 48” minimum dimensions.
SOW is hereby revised to state, “Contractor shall install new access doors if existing ductwork with access doors are replaced. Door size shall be 24” x 54”.”
8. Without knowing the size of the plenum, I cannot determine the pricing of the following: Contractor shall clean existing intake and outlet louvers and plenums. Contractor shall prime intake and outlet plenum.
See attached plans.
See attached document: Building Roof Plan.
See attached document: Mechanical Bay 3-1 Plan.
See attached document: Mechanical Bay 4-2 Plan.
See attached document: Mechanical Bay 4-3 Plan.
See attached document: Mechanical Bay 4-5 Plan.
See attached document: Mechanical Bay 4-6 Plan.
See attached document: Mechanical Bay 4-7 Plan.
See attached document: Mechanical Bay 4-8 Plan.
See attached document: Mechanical Bay 5-2 Plan.
See attached document: Mechanical Bay 5-3 Plan.
See attached document: Mechanical Bay 6-1 Plan.
See attached document: Mechanical Bay 6-2 Plan.
See attached document: Mechanical Bay 6-3 Plan.
See attached document: Mechanical Bay 6-5 Plan.
See attached document: Mechanical Bay 6-6 Plan.
See attached document: Mechanical Bay B-5 Plan.
See attached document: Penthouse Plan I.
See attached document: Penthouse Plan II.
File details come from the government source that posted it.