36C25618B0555-00001008.pdf

PDF 981 KB Posted

Attached to
580-18-116 Replace AHU in B100 and B110 Federal contract opportunity
Solicitation number
36C25618B0555
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

36C25618B0555 00001 BLDG7AC.pdf

View the file

Other files for this federal contract opportunity

Other files attached to 580-18-116 Replace AHU in B100 and B110, newest first.
File Type Posted
36C25618B0555-0002002.jpg JPG image
36C25618B0555-0002016.jpg JPG image
36C25618B0555-0002006.jpg JPG image
36C25618B0555-0002004.jpg JPG image
36C25618B0555-0002009.jpg JPG image
36C25618B0555-0002012.jpg JPG image
36C25618B0555-0002001.jpg JPG image
36C25618B0555-0002000.docx DOCX document
36C25618B0555-0002007.jpg JPG image
36C25618B0555-0002018.jpg JPG image
36C25618B0555-0002014.jpg JPG image
36C25618B0555-0002008.jpg JPG image
36C25618B0555-0002013.jpg JPG image
36C25618B0555-0002017.jpg JPG image
36C25618B0555-0002015.jpg JPG image
36C25618B0555-0002003.jpg JPG image
36C25618B0555-0002010.jpg JPG image
36C25618B0555-0002011.jpg JPG image
36C25618B0555-0002005.jpg JPG image
36C25618B0555-00001003.pdf PDF
36C25618B0555-00001000.docx DOCX document
36C25618B0555-00001006.pdf PDF
36C25618B0555-00001004.pdf PDF
36C25618B0555-00001001.pdf PDF
36C25618B0555-00001005.pdf PDF
36C25618B0555-00001002.pdf PDF
36C25618B0555-00001007.pdf PDF
36C25618B0555-007.pdf PDF
36C25618B0555-006.docx DOCX document
36C25618B0555-009.docx DOCX document
36C25618B0555-001.docx DOCX document
36C25618B0555-002.docx DOCX document
36C25618B0555-005.pdf PDF
36C25618B0555-004.pdf PDF
36C25618B0555-008.pdf PDF
36C25618B0555-010.pdf PDF
36C25618B0555-003.pdf PDF
36C25618B0555-000.docx DOCX document
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

E

L

Q

ENGINEERING

STEAM PLANT

ENERGY CONTROL

CENTER

GROUNDS

NHCU PKG LOT

RETENTION POND

O

VAN VAN

VAN

VA

N

VA

N

RAMP

B C

D

EDUC

ATION C

TR.

P

VAN

VAN

VAN

HO

LC

OM

BE

RE

TAI

L C

EN

TER

INTR

OGEN

THE

RAPE

UTIC

S IN

C

TRAILER

WASTE DISPOSAL

ENTRANCE 71

ENTRANCE 70

M

HO

LC

OM

BE

RE

TAI

L C

EN

TER

INTR

OGEN

THE

RAPE

UTIC

S IN

C

S

T

K

U / V W

C

D

D

D

D

E

I

GATE

GATE

FISHER HOUSE 1

VA

REGIONAL

OFFICE

102 103 104 105

FISHER HOUSE 2

ENTRANCE 73GRASS MEDIAN

FNC-0.5'N&W

EJB

SIGN

SIGN

GRANITE

WALL (TYP)

ELEC

CONTROL PANEL

WALL (TYP)

GRANITE

IRON FNC

IRON FNC

48" SAN(RECORD)

EN

ER

GY

C

EN

TE

R

DR

106-107

104A

OLD SPANISH

TRAIL

CAMBRIDGE

LE CAPITAN

CA

TE

T

ER

RA

CE

HOLCOMBE BLVD.

RINGNESSAVE

ALMEDA

SO

UT

H

LE

E

WEST LEE

EAST LEE

MIX

ON

AVE

VA

N

VA

N

VA

N

VA

N

VA

N

VA

N

VA

N

ENTRANCE (Locked)

ENTRANCE

102A

STORAGE

N O P

AR

K

IN

G

FISHER HOUSE 3

H

MI

XO

N

AV

E

N

R

F G

H

I

J

REGIONAL OFFICE

MAIN ENTRANCE

EXECUTIVE

VALET

PARKING GARAGE

#432 SPACES

VALET

108A

74 44

VA

N

SHEEHAN AVE

Site

1 8BWGM

VA Medical Center Houston, TxG001

MICHAEL E. DEBAKEY

VAMC

SITE PLAN

S:

En gi ne er in g\ C O M M O N Pr oj ec ts C on st ru ct io n Pr oj ec ts F Y 0-

Re pl ac e

AH

U B

B

Pr oc ur em en t Do cu m en ts B

LD

G7

AC

.d w g

:3 8:

A M

VH

AH

O U Di az A4

4/30/2018

Drawing Title

Approved: Chief Engineer/Division Manager

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT/ENGINEERS:

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

Houston, TX

Michael E. DeBakey VAMC 2002 Holcombe Blvd.

Dept. of Veterans Affairs

Z:\dvaseal2.bmp

CORRECT A/C PROBLEMS

DEPARTMENT OF VETERANS AFFAIRS

580-18-XXX: CORRECT A/C PROBLEMS IN BLDG #7

Site Location

AREA MAPC1

SITE

MICHAEL E. DEBAKEY VA MEDICAL CENTER

M

AI

N

H A R D Y

TO

LL

R O A D

N

2002 HOLCOMBE BLVD, HOUSTON, TEXAS 77030

Michael E. DeBakey VA Medical Center

OST

HOLCOMBE

General Project Notes

Sheet No. Drawing No. Drawing Title

1. THE WORK SHALL COMPLY WITH OR EXCEED ALL THE DEPARTMENT OF THE VETERANS AFFAIRS (VA) PARKING LOT AND RESTORATION STANDARDS. THE CONTRACTOR SHALL USE PROJECT DRAWINGS AND STATEMENT OF WORK TO SUCCESSFULLY MEET AND COMPLETE THE OBJECTIVES IDENTIFIED FOR THIS PROJECT.

2. THE CONTRACTOR SHALL MAINTAIN ALL PATHS FOR THE DURATION OF THE PROJECT. BARRIERS SHALL BE MAINTAINED THROUGHOUT THE DURATION OF THIS PROJECT TO PROHIBIT UNAUTHORIZED PERSONNEL FROM ENTERING THE CONSTRUCTION AREA/SITE DURING THE PROJECT WORK HOURS.

3. CONTRACTOR SHALL PARK IN THE DESIGNATED LOCATIONS REQUIRED BY THE GOVERNMENT. CONSTRUCTION TRAILER, IF ANY BE LOCATED WHERE DETERMINED BY VA COR & VA POLICE. THE GENERAL CONTRACTOR SHALL COORDINATE ACCESS TO/AND ON SITE WITH THE VA COR.

4. PROTECT ALL WORK SCHEDULED TO REMAIN FOR THE DURATION OF THE PROJECT.

5. REMOVE ALL TRASH AND DEBRIS AT THE END OF EACH DAY, DISPOSE OF IN A LEGAL MANNER.

6. ALL SUBSTITUTIONS AND CHANGES TO THESE DRAWINGS SHALL BE SUBMITTED TO THE PROJECT COR FOR APPROVAL.

7. THE GENERAL CONTRACTOR (GC) IS RESPONSIBLE TO INVESTIGATE ALL FIELD CONDITIONS RELEVANT TO THE PROJECT INCLUDING, BUT NOT LIMITED TO, DIMENSIONS AND OTHER MISCELLANEOUS EXISTING CONDITIONS AND SHALL PROMPTLY NOTIFY THE COR OF ANY OF WHICH DO NOT AGREE WITH THOSE IN THE

DRAWINGS / STATEMENT OF WORK.

8. THE GC IS RESPONSIBLE FOR SUPPLYING AND INSTALLING ALL COMPONENTS AND ACCESSORIES, EQUIPMENT, MATERIALS AND OTHER ITEMS NECESSARY, (UNLESS OTHERWISE NOTED) FOR A COMPLETE AND FINISHED JOB CONSISTENT WITH THE DESIGN INTENT PRESENTED IN THESE DRAWINGS. COORDINATE THE PHASES, LOCATION, AND INSTALLATION OF ALL MATERIAL PRIOR TO INSTALLATION.

9. COORDINATE WITH VA COR PRIOR TO COMMENCING WORK PROJECT ACCESS ROUTE, ALLOWABLE WORK TIMES, ALLOWABLE NOISE LEVELS, TOILETS TO BE USED

BY WORKERS.

10. DRAWINGS PROVIDED & STATEMENT OF WORK SHALL BE REVIEWED THOROUGHLY IN ADVANCE PRIOR TO THE START OF ANY WORK AND ALL CONTRACTORS

SHALL FOLLOW ALL INSTRUCTIONS AND DETAILS AS REQUIRED.

1 of 8 G001 COVER SHEET 2 of 8 M101 PLAN VIEW FIRST FLOOR AHU SUPPLY DUCT RUN 3 of 8 M102 PLAN VIEW FIRST FLOOR HOOD AND ROOM EXHAUST 4 of 8 M103 5 of 8 M104

8 of 8 A101 FIRST, SECOND FLOOR AND ROOF DETAILS AND SECTIONS

SITE KEY PLAN

IN BLDG #7

580-18-XXX

AREA OF WORK

CORRECT A/C PROBLEMS IN BLDG #7

DRAWING INDEX

PLAN VIEW SECOND FLOOR AHU SUPPLY DUCT RUN

PLAN VIEW SECOND FLOOR HOOD AND ROOM EXHAUST

6 of 8 M105 7 of 8 M106

PLAN VIEW ROOF PENETRATIONS HOOD AND ROOM EXHAUST FAN LAYOUT

FIRST, SECOND FLOOR AND ROOF AHU, FAN FILTER, DIFUSER, STEAM

TRAPS AND HEAT RECOVERY COIL SCHEDULES

T

TT

T

CFM

CFM

C

A

CFM

B

CFM

B

CFM

B

CFM

B

CFM

B

CFM

B

CFM

B

CFM

B

CFM

A

CFM

A

CFM

B

CFM

B

CFM

A

CFM

B

CFM

B

CFM

A

CFM

A

CFM

C

E 10x4

CFM

E 10x6

CFM

E 10x6

CFM

E 10x6

CFM

E 10x4

CFM

A

CFM

E 10x6

CFM

E 10x6

CFM

E 10x4

CFM

C400

CFM

C600

CFM

C

CFM

12Ø 14Ø 16Ø 18Ø 18Ø 16Ø 14Ø

22x18 22x18 x1

AIR SPACE

4" FILTER

COIL

COIL

COIL

COIL

Site

2 8BWGM

VA Medical Center Houston, TxM101

PLAN VIEW FIRST FLOOR

AHU SUPPLY DUCT RUN

S:

En gi ne er in g\ C O M M O N Pr oj ec ts C on st ru ct io n Pr oj ec ts F Y 0-

Re pl ac e

AH

U B

B

Pr oc ur em en t Do cu m en ts B

LD

G7

AC

.d w g

:3 8:

A M

VH

AH

O U Di az A4

4/30/2018

Drawing Title

Approved: Chief Engineer/Division Manager

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT/ENGINEERS:

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

Houston, TX

Michael E. DeBakey VAMC 2002 Holcombe Blvd.

Dept. of Veterans Affairs

Z:\dvaseal2.bmp

CORRECT A/C PROBLEMS

IN BLDG #7

580-18-XXX

General Notes

1. DUCTS, EXCEPT AS NOTED, SHALL BE SPIRAL ROUND, MINIMUM 24 GAUGE, AS PER SMACNA TABLE 3-2 MAXIMUM 10" W6 ROUND DUCT GAUGE

SELECTION. RECTANGULAR DUCTS MINIMUM 22 GAUGE AS PER SMACNA TABLE 1-1-4 WF. SUPPLY DUCTS SHALL BE INSULATED WITH 1" EXTERNAL ALUMINUM FOIL FACED 3 1/2" PER CUBIC FOOT DENSITY FIBERGLASS INSULATION.

2. ALL DUCTS SHALL BE SEALED TO WATER TIGHTNESS.

3. EXHAUST FANS SHALL BE CLASS II CENTRIFUGAL AIR FOIL WHEELS SIZE AND CAPACITY AS SCHEDULED ON THE DRAWINGS FAN MOTORS SHALL BE

TEFC.

4. AHU'S SHALL BE DOUBLED WALLED WITH STAINLESS STELL DRAIN PANS. FURNISH MAGNAHELIC GAUGES ACROSS FILTER SECTIONS AND ACROSS

FAN SECTION.

5. INSULATED STEAM AND CONDENSATE LINES WITH 1" FIBERGLASS INSULATION UP TO AND INCLUDING 1" DIAMETER, 2" FIBERGLASS ON LINES FROM 1 1/4" DIAMETER UP TO 2" DIAMETER. INSULATE ALL VALVES, FITTINGS WITH FIBERGLASS INSULATION. ON TRAPS, UNIONS STRAINERS, INSULATE WITH REMOVABLE/REUSABLE INSULATED COVERS WITH THE SAME THICKNESS IN MECHANICAL ROOMS AND CRAWL SPACE UNDER

BUILDING.

6. FOR CHW SERVICE, USE RIGID FOAM INSULATION 2" THICK UP TO 4" DIAMETER AND LARGER, PIPING LESS THAN 4" DIAMETER USE 1 1/2 " THICK.

FURNISH INSULATION WITH ALUMINUM JACKET 0.0016" THICKNESS IN MECHANICAL ROOMS AND CRAWL SPACE UNDER BUILDING.

7. RUN 3/4" DIAMETER CONDUIT WITH 3-#8 AND 1-#10 GROUND TO EACH AHU 5 HP MOTOR FROM PANEL #_______ IN BASEMENT OF BUILDING

#7 APPROXIMATELY 175". FURNISH AND INSTALL STARTER SIZE 1 WITH 30 AMP FUSES.

8. INSTALL VAV SUPPLY AIR DIFFUSERS IN THE OFFICES WHERE SHOWN ON DRAWINGS. FURNISH 2'x2' LAY-IN DIFFUSERS WITH PERFORATED FACE, OFF WHITE IN COLOR. FURNISH WITH ROUND NECK. NECK SIZES TO BE SELECTED FOR NC RATING OF 25 OR NECK VELOCITY OF 400 TO 500 FPM.

EXHAUST DIFFUSERS SHALL BE ALUMINUM WITH OBD WITH NECK SIZES AS NOTED. TRANSFER GRILLS IN THE WALL SHALL BE ALUMINUM WITH SINGLE DIFFUSER BLADES. THE TRANSFER CEILING GRILLS SHALL BE ALUMINUM WITH A MINIMUM OF 12" DIAMETER NECK. DAMPERS ARE NOT

REQUIRED.

9. FURNISH AND INSTALL ON EACH FLOOR, A REAL TIME FLOW SENSOR THAT WILL SOUND AN ALARM WHEN AIR VELOCITY DROPS BELOW SAFE

LEVEL. THE DEVICE SHALL HAVE THESE STANDARD FEATURES.:

10. FURNISH AND INSTALL AT EACH HOOD A FUME HOOD AND ROOM PRESSURE ALARM WITH THE FOLLOWING FEATURES:

11. THE CHASE SHOWN THE SECOND FLOOR AS SHOWN ON THE DRAWINGS MUST BE A TWO (2) HOUR RATED CHASE. ENCLOSE ONLY THE FIRST

FLOOR VERTICAL DUCT RISER IN THAT CHASE.

12. REHEAT COILS SHALL BE AS SCHEDULED ON DRAWINGS. ONE ROW-4 FINS PER INCH WITH A MAXIMUM OF 1,200 FPM FACE VELOCITY.

13. FURNISH VOLUME DAMPERS WHERE SHOWN ON THE DRAWINGS. FURNISH 1/2" DIAMETER AIR MEASUREMENT HOLES ON EACH SIDE OF

VOLUME DAMPERS.

A. +/- INDUSTRY ACCURACY

B. MEASURE FUME HOOD FACE VELOCITY

C. MECHANICALLY SAFE SENSOR

D. MINIMAL RE-CALIBRATION

E. ADJUSTABLE NORMAL/CAUTION/ LOW/ HIGH ALARM SET POINTS

F. EASY ACCESS TO CONCEALED SET POINTS

G. AUDIBLE ALARM SILENCE WITH AUTOMATIC RE-SET

H. UNIVERSAL RED, YELLOW OR GREEN ALARM INDICATION

I. REMOTE ALARM CONTACT

J. CORROSION RESISTANT SENSOR

A. +/- INDUSTRY ACCURACY

B. MECHANICALLY SAFE SENSOR TO MEASURE FUME HOOD FACE VELOCITY.

C. ADJUSTABLE LOW AND NORMAL SET POINTS

D. UNIVERSAL RED, YELLOW OR GREEN ALARM INDICATION

E. AUDIBLE ALARM WITH AUTOMATIC RE-SET AND LED MUTE INDICATOR

F. FAIL-SAFE REMOTE ALARM CONTACT

G. 24 VAC POWER REQUIRED

H. MOUNTS IN 2 1/2" DIAMETER ENCLOSURE.

PLAN VIEW FIRST FLOOR SUPPLY-

0' 4' 8' 12'

1/8"=1'-0"

PLAN NORTH

N

D

CFM

1,200

CFM

D

CFM

14Ø

1,200

CFM

D

CFM

D

CFM

D

CFM

D

CFM

1,200

CFM

D

CFM

D

CFM

D

CFM

D

CFM

D

CFM

D

CFM

16Ø

33x16

16Ø 16Ø

10Ø 8Ø

16Ø 16Ø

12Ø 8Ø14Ø 10Ø14Ø10Ø8Ø

COIL

PLENIUM

COIL

PLENIUM

COIL

1,200

CFM

A

A

VD

VD

VD

VD VD

VD

SECTION A-A

INTERSTITIAL SPACE

SECOND FLOOR

INTERSTITIAL SPACE

FIRST FLOOR

H-1 E-1

H-2 E-2

2'-0"

7'-4"

2'-0"

7'-4"

Ø

Ø

Site

3 8BWGM

VA Medical Center Houston, TxM102

PLAN VIEW FIRST FLOOR

HOOD AND ROOM

EXHAUST

S:

En gi ne er in g\ C O M M O N Pr oj ec ts C on st ru ct io n Pr oj ec ts F Y 0-

Re pl ac e

AH

U B

B

Pr oc ur em en t Do cu m en ts B

LD

G7

AC

.d w g

:3 8:

A M

VH

AH

O U Di az A4

4/30/2018

Drawing Title

Approved: Chief Engineer/Division Manager

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT/ENGINEERS:

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

Houston, TX

Michael E. DeBakey VAMC 2002 Holcombe Blvd.

Dept. of Veterans Affairs

Z:\dvaseal2.bmp

CORRECT A/C PROBLEMS

IN BLDG #7

580-18-XXX

PLAN VIEW FIRST FLOOR EXHAUST-

0' 4' 8' 12'

1/8"=1'-0"

T

TT

T

CFM

CFM

C

A

CFM

B

CFM

B

CFM

B

CFM

B

CFM

B

CFM

B

CFM

B

CFM

B

CFM

A

CFM

A

CFM

B

CFM

B

CFM

A

CFM

B

CFM

B

CFM

A

CFM

A

CFM

C

E 10x4

CFM

E 10x6

CFM

E 10x6

CFM

E 10x6

CFM

E 10x4

CFM

A

CFM

E 10x6

CFM

E 10x6

CFM

E 10x4

CFM

C400

CFM

C600

CFM

C

CFM

12Ø 14Ø 16Ø 18Ø 18Ø 16Ø 14Ø

22x18 22x18 x1

AIR SPACE

4" FILTER

COIL

COIL

COIL

COIL

Site

4 8BWGM

VA Medical Center Houston, TxM103

PLAN VIEW SECOND

FLOOR AHU SUPPLY

DUCT RUN

S:

En gi ne er in g\ C O M M O N Pr oj ec ts C on st ru ct io n Pr oj ec ts F Y 0-

Re pl ac e

AH

U B

B

Pr oc ur em en t Do cu m en ts B

LD

G7

AC

.d w g

:3 8:

A M

VH

AH

O U Di az A4

4/30/2018

Drawing Title

Approved: Chief Engineer/Division Manager

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT/ENGINEERS:

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

Houston, TX

Michael E. DeBakey VAMC 2002 Holcombe Blvd.

Dept. of Veterans Affairs

Z:\dvaseal2.bmp

CORRECT A/C PROBLEMS

IN BLDG #7

580-18-XXX

General Notes

1. DUCTS, EXCEPT AS NOTED, SHALL BE SPIRAL ROUND, MINIMUM 24 GAUGE, AS PER SMACNA TABLE 3-2 MAXIMUM 10" W6 ROUND DUCT GAUGE

SELECTION. RECTANGULAR DUCTS MINIMUM 22 GAUGE AS PER SMACNA TABLE 1-1-4 WF. SUPPLY DUCTS SHALL BE INSULATED WITH 1" EXTERNAL ALUMINUM FOIL FACED 3 1/2" PER CUBIC FOOT DENSITY FIBERGLASS INSULATION.

2. ALL DUCTS SHALL BE SEALED TO WATER TIGHTNESS.

3. EXHAUST FANS SHALL BE CLASS II CENTRIFUGAL AIR FOIL WHEELS SIZE AND CAPACITY AS SCHEDULED ON THE DRAWINGS FAN MOTORS SHALL BE

TEFC.

4. AHU'S SHALL BE DOUBLED WALLED WITH STAINLESS STELL DRAIN PANS. FURNISH MAGNAHELIC GAUGES ACROSS FILTER SECTIONS AND ACROSS

FAN SECTION.

5. INSULATED STEAM AND CONDENSATE LINES WITH 1" FIBERGLASS INSULATION UP TO AND INCLUDING 1" DIAMETER, 2" FIBERGLASS ON LINES FROM 1 1/4" DIAMETER UP TO 2" DIAMETER. INSULATE ALL VALVES, FITTINGS WITH FIBERGLASS INSULATION. ON TRAPS, UNIONS STRAINERS, INSULATE WITH REMOVABLE/REUSABLE INSULATED COVERS WITH THE SAME THICKNESS IN MECHANICAL ROOMS AND CRAWL SPACE UNDER

BUILDING.

6. FOR CHW SERVICE, USE RIGID FOAM INSULATION 2" THICK UP TO 4" DIAMETER AND LARGER, PIPING LESS THAN 4" DIAMETER USE 1 1/2 " THICK.

FURNISH INSULATION WITH ALUMINUM JACKET 0.0016" THICKNESS IN MECHANICAL ROOMS AND CRAWL SPACE UNDER BUILDING.

7. RUN 3/4" DIAMETER CONDUIT WITH 3-#8 AND 1-#10 GROUND TO EACH AHU 5 HP MOTOR FROM PANEL #_______ IN BASEMENT OF BUILDING

#7 APPROXIMATELY 175". FURNISH AND INSTALL STARTER SIZE 1 WITH 30 AMP FUSES.

8. INSTALL VAV SUPPLY AIR DIFFUSERS IN THE OFFICES WHERE SHOWN ON DRAWINGS. FURNISH 2'x2' LAY-IN DIFFUSERS WITH PERFORATED FACE, OFF WHITE IN COLOR. FURNISH WITH ROUND NECK. NECK SIZES TO BE SELECTED FOR NC RATING OF 25 OR NECK VELOCITY OF 400 TO 500 FPM.

EXHAUST DIFFUSERS SHALL BE ALUMINUM WITH OBD WITH NECK SIZES AS NOTED. TRANSFER GRILLS IN THE WALL SHALL BE ALUMINUM WITH SINGLE DIFFUSER BLADES. THE TRANSFER CEILING GRILLS SHALL BE ALUMINUM WITH A MINIMUM OF 12" DIAMETER NECK. DAMPERS ARE NOT

REQUIRED.

9. FURNISH AND INSTALL ON EACH FLOOR, A REAL TIME FLOW SENSOR THAT WILL SOUND AN ALARM WHEN AIR VELOCITY DROPS BELOW SAFE

LEVEL. THE DEVICE SHALL HAVE THESE STANDARD FEATURES.:

10. FURNISH AND INSTALL AT EACH HOOD A FUME HOOD AND ROOM PRESSURE ALARM WITH THE FOLLOWING FEATURES:

11. THE CHASE SHOWN THE SECOND FLOOR AS SHOWN ON THE DRAWINGS MUST BE A TWO (2) HOUR RATED CHASE. ENCLOSE ONLY THE FIRST

FLOOR VERTICAL DUCT RISER IN THAT CHASE.

12. REHEAT COILS SHALL BE AS SCHEDULED ON DRAWINGS. ONE ROW-4 FINS PER INCH WITH A MAXIMUM OF 1,200 FPM FACE VELOCITY.

13. FURNISH VOLUME DAMPERS WHERE SHOWN ON THE DRAWINGS. FURNISH 1/2" DIAMETER AIR MEASUREMENT HOLES ON EACH SIDE OF

VOLUME DAMPERS.

A. +/- INDUSTRY ACCURACY

B. MEASURE FUME HOOD FACE VELOCITY

C. MECHANICALLY SAFE SENSOR

D. MINIMAL RE-CALIBRATION

E. ADJUSTABLE NORMAL/CAUTION/ LOW/ HIGH ALARM SET POINTS

F. EASY ACCESS TO CONCEALED SET POINTS

G. AUDIBLE ALARM SILENCE WITH AUTOMATIC RE-SET

H. UNIVERSAL RED, YELLOW OR GREEN ALARM INDICATION

I. REMOTE ALARM CONTACT

J. CORROSION RESISTANT SENSOR

A. +/- INDUSTRY ACCURACY

B. MECHANICALLY SAFE SENSOR TO MEASURE FUME HOOD FACE VELOCITY.

C. ADJUSTABLE LOW AND NORMAL SET POINTS

D. UNIVERSAL RED, YELLOW OR GREEN ALARM INDICATION

E. AUDIBLE ALARM WITH AUTOMATIC RE-SET AND LED MUTE INDICATOR

F. FAIL-SAFE REMOTE ALARM CONTACT

G. 24 VAC POWER REQUIRED

H. MOUNTS IN 2 1/2" DIAMETER ENCLOSURE.

PLAN VIEW SECOND FLOOR SUPPLY-

0' 4' 8' 12'

1/8"=1'-0"

PLAN NORTH

N

Control Notes

1. THE CHILLED WATER CONTROL VALVE SHALL MODULATE TO MAINTAIN 55°F LEAVING AIR TEMPERATURE. IF THE OUTSIDE AIR TEMPERATURE

DROPS BELOW 55°F THE VALVE SHALL CLOSE OFF TO ALLOW THE PRE-HEAT COIL TO MAINTAIN 60°F LEAVING AIR TEMPERATURE.

2. IF THE FREEZE STAT SENSES TEMPERATURE BELOW 40°F LEAVING AIR TEMPERATURE IT SHALL SHUT OFF THE SUPPLY AIR FAN AND THE GENERAL

EXHAUST FAN. UP ONE MANUAL RESET THE SYSTEM SHALL GO BACK TO NORMAL OPERATION.

3. THE ZONE RE-HEAT COILS SHALL BE CONTROLLED BY AN SENSOR IN THE HOOD LABORATORIES. THE THERMOSTAT SHALL MAINTAIN 72°F ROOM

AIR TEMPERATURE BY MODULATING THE RE-HEAT STEAM CONTROL VALVE.

4. THE VAV DIFFUSERS ARE SELF CONTAINED. THEY SHALL BE SET AT 72°F FOR THE OFFICE AREAS. THIS TEMPERATURE MAY BE RESET AT THE

OCCUPANTS REQUEST FOR HIS NOMINAL TEMPERATURE SETTING.

5. THE AHU SHALL BE FURNISHED WITH AN LEAVING SMOKE DETECTOR. THE SMOKE DETECTOR SENSING SMOKE IN THE LEAVING SUPPLY AIR DUCT SHALL SHUT THE FAN DOWN. THE EXHAUST SHALL BE KEPT IN OPERATION FOR SMOKE REMOVAL.

CFM

1,200

CFM

D

CFM

14Ø

1,200

CFM

D

CFM

D

CFM

D

CFM

D

CFM

1,200

CFM

D

CFM

D

CFM

D

CFM

D

CFM

D

CFM

D

CFM

16Ø

33x16

16Ø 16Ø

10Ø 8Ø

16Ø 16Ø

12Ø 8Ø14Ø 10Ø14Ø10Ø8Ø

COIL

PLENIUM

COIL

PLENIUM

COIL

1,200

CFM

VDVD

VD

VD

VD VD

Site

5 8BWGM

VA Medical Center Houston, TxM104

PLAN VIEW SECOND

FLOOR HOOD AND ROOM

EXHAUST

S:

En gi ne er in g\ C O M M O N Pr oj ec ts C on st ru ct io n Pr oj ec ts F Y 0-

Re pl ac e

AH

U B

B

Pr oc ur em en t Do cu m en ts B

LD

G7

AC

.d w g

:3 8:

A M

VH

AH

O U Di az A4

4/30/2018

Drawing Title

Approved: Chief Engineer/Division Manager

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT/ENGINEERS:

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

Houston, TX

Michael E. DeBakey VAMC 2002 Holcombe Blvd.

Dept. of Veterans Affairs

Z:\dvaseal2.bmp

CORRECT A/C PROBLEMS

IN BLDG #7

580-18-XXX

PLAN VIEW SECOND FLOOR EXHAUST-

0' 4' 8' 12'

1/8"=1'-0"

Ø

Ø

Ø

Ø

Ø

20Ø

24Ø 26 Ø

H-2

E-2

H-1

E-1

E-1H-1

H-2

E-2

VD

VD

VD VD

VD

VD

VD

VD

Site

6 8BWGM

VA Medical Center Houston, TxM105

PLAN VIEW ROOF PENETRATIONS HOOD

AND ROOM EXHAUST FAN LAYOUT

S:

En gi ne er in g\ C O M M O N Pr oj ec ts C on st ru ct io n Pr oj ec ts F Y 0-

Re pl ac e

AH

U B

B

Pr oc ur em en t Do cu m en ts B

LD

G7

AC

.d w g

:3 8:

A M

VH

AH

O U Di az A4

4/30/2018

Drawing Title

Approved: Chief Engineer/Division Manager

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT/ENGINEERS:

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

Houston, TX

Michael E. DeBakey VAMC 2002 Holcombe Blvd.

Dept. of Veterans Affairs

Z:\dvaseal2.bmp

CORRECT A/C PROBLEMS

IN BLDG #7

580-18-XXX

PLAN VIEW ROOF-

0' 4' 8' 12'

1/8"=1'-0"

PLAN NORTH

N

General Notes

1. FURNISH AND INSTALL WEATHER-PROOF DISCONNECTS FOR THE ROOF EXHAUST FANS.

2. RUN 3/4" CONDUIT WITH 3-#10 WIRE AND 1-#12 GROUND TO EACH 5 HP FUME HOOD MOTOR FROM PANEL #_______ IN BASEMENT OF BUILDING #7. APPROXIMATE LENGTH OF RUN, 175". INSTALL

STARTER SIZE"0" WITH 30 AMP BREAKERS.

3. RUN 3/4" CONDUIT WITH 3-#10 WIRE AND 1-#12 GROUND TO EACH 5 HP FUME HOOD MOTOR FROM

PANEL #_______ IN BASEMENT.

4. FURNISH AND INSTALL HOUSEKEEPING PAD FOR EACH EXHAUST FAN AND THE EXHAUST STACKS

FOR THE HOOD EXHAUST STACKS FOR THE HOOD EXHAUST FANS AS PER DETAIL.

LEGEND

H-1 HOOD EXHAUST 1ST FLOOR

H-2 HOOD EXHAUST 2ND FLOOR

E-1 ROOM EXHAUST 1ST FLOOR

E-2 ROOM EXHAUST 2ND FLOOR

Site

7 8BWGM

VA Medical Center Houston, TxM106

FIRST, SECOND FLOOR AND ROOF AHU,

FAN, FILTER, DIFFUSER, STEAM TRAPS

AND HEAT RECOVERY COIL SCHEDULES

S:

En gi ne er in g\ C O M M O N Pr oj ec ts C on st ru ct io n Pr oj ec ts F Y 0-

Re pl ac e

AH

U B

B

Pr oc ur em en t Do cu m en ts B

LD

G7

AC

.d w g

:3 8:

A M

VH

AH

O U Di az A4

4/30/2018

Drawing Title

Approved: Chief Engineer/Division Manager

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT/ENGINEERS:

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

Houston, TX

Michael E. DeBakey VAMC 2002 Holcombe Blvd.

Dept. of Veterans Affairs

Z:\dvaseal2.bmp

CORRECT A/C PROBLEMS

IN BLDG #7

580-18-XXX

MARK

ARRANGEMENT

TYPE

AREA SERVED

LOCATION

TOTAL AIR (CFM)/O.A (CFM)

FAN RPM (AT MAX RPM)

FAN TYPE & DIA.

EXTERNAL S.P (IN. WG)

TOTAL S.P (IN. WG)

VOLTS-PHASE-HZ

E

LE

C T

HP-MOTOR RPM

FULL LOAD AMPS (FLA)

G E

N E

R A

L B

LO

W

E R

D A

TA

C O

O

LI

N G

*H E

A

TI

N G

M

IS

C

MIN. COIL FACE AREA (SQ. FT.)

MIN. ROWS / MAX FIN. IN.

SENSIBLE HEAT (BTUH)

TOTAL HEAT (BTUH)

ENT. AIR °F DB/ °F WB

CH. WATER FLOW (GPM)

LVG. AIR °F DB/ °F WB

CH. WATER TEMP. °F ENT/°F LVG

MIN. FACE AREA (SQ. FT.)

MIN. ROWS / MAX FIN. IN.

AIR TEMP. °F ENT/ °F LVG

HEATING CAPACITY (BTUH)

HEATING COIL POSITION

STEAM #HR

ACCESSORIES

ACCESSORIES

REMARKS

VARIABLE SPEED DRIVE NO

DOUBLE WALL UNITS

NO

DOUBLE WALL UNITS

PLEATED 50 NBS.

4" FLAT FILTER

394,200

PRE-HEAT

25 / 75 1 / 6 45 - 54 54 / 53 95 / 80 664,320 352,680 2 - 4/8 5E / 1,750 208 / 3 / 60

1,190 7,300

MECH ROOM

BLDG-7-1ST-EAST

DRAW THRU AF

HORIZONTAL

7-AHU-3

AF 21 1/2"

3/4 2.75"

PLEATED 50 NBS.

4" FLAT FILTER

453,600

PRE-HEAT

25 / 75 1 / 6 45 - 54 54 / 53 95 / 80 763,080 405,000 2 - 4/8 5E / 1,750 208 / 3 / 60

1,240 8,400

MECH ROOM

BLDG-7-2ND-EAST

DRAW THRU AF

HORIZONTAL

7-AHU-4

AF 21 1/2"

3/4 2.75"

MARK

WHEEL

DIAMETER

FAN TYPE BLADE

TYPE

CFM S.P

WG

MAX. OUTLET

VEL (FPM)

MOTOR

H.P. RPM POWER

FAN

RPM

DRIVE SERVICE , LOCATION & CLASS ARRANGEMENT REMARKS

BELT

BELT

BELT

BELT

ROOF / II

ROOF / II

ROOF / II

ROOF / II

9 CWTH FAN MOTOR TEFC

9 CWTH FAN MOTOR TEFC

9 CWTH FAN MOTOR TEFC

9 CWTH FAN MOTOR TEFC

208/3/601,80051,2004"4,800AFCENT221-HEF

208/3/601,80051,2004"4,800AFCENT222-HEF

208/3/601,80051,2001.5"3,500AFCENT271-EF

208/3/601,80051,2001.5"3,500AFCENT272-EF

VA

GRADE

TYPE POSITION CFM FACE SIZE

H X W (IN.)

REMARKS

8,40010VERTICALPLETEDCF-1

7,300PLETEDCF-1

CARTRIDGES

NO. SIZE

24" x 24" x 4" 24" x 24"

MAX FACE

VEL (FPM)

PRESSURE DROP IN W. G.

INITIAL FINAL

EFF (%)

10 24" x 24" x 4" 24" x 24"

.3

.3

1.0

1.0

FACE SIZE REMARKS

A

B

24" x 24"

24" x 24"

MOUNTING SERVICE MATERIAL

& FINISH

NECK SIZE

VAV WITH COOLING & HEATING THERMOSTAT / WATCH CEILING TILE TEXTURE

FURNISH WITH O.B.D. WITH ADJUSTABLE AIR GRILL

TRANSFER GRILL

FURNISH WITH O.B.D.

TRANSFER GRILL IN WALL

* FURNISH WITH O.B.D.

AS NOTED

AS NOTED

AS NOTED

AS NOTED

AS NOTED

STEEL

OFF-WHITE

ALUMINUM

OFF-WHITE

ALUMINUM

OFF-WHITE

ALUMINUM

OFF-WHITE

ALUMINUM

OFF-WHITE

SUPPLY

SUPPLY

TRANSFER

EXHAUST

TRANSFER

LAY - IN

WALL

MOUNTED

LAY - IN

LAY - IN

LAY - IN

NOTED

ON DWG

24" x 24"

24" x 24"

C

E

MARK PRESSURE

DIFFERENTIAL

4-7-1ST FL 2

SERVICE CONNECTION

SIZE

REHEAT

VERTICAL

3/4

TYPE OF

CONNECTION

SCREW

CAPACITY

LBS/HR

TYPE

F/T

BODY WORK'G

PRESSURE STEAM

STEAM

PRESSURE

BODY

MATERIAL

CS

VALVE AND

SEAT MATERIAL

SS

1-7-1ST FL 2 REHEAT 1 1/2 SCREW 800 F/T 125 10 CS SS

4-7-2ND FL 2 REHEAT 3/4 SCREW 90 F/T 125 10 CS SS

1-7-2ND FL 2 REHEAT 1 1/2 SCREW 800 F/T 125 10 CS SS

CFM

2,460

MARK

PREH-1

PREH-2

PREH-3

PREH-4

PREH-5

PREH-6

PREH-7

PREH-8

T

30°F

30°F

30°F

30°F

30°F

30°F

30°F

30°F

1,450

2,050

1,850

2,250

1,450

2,000

1,850

BTU/HR

77,000

# STEAM/HR TRAP CAP AIR PRESSURE

DROP

FACE AREA CONDENSATE

LINE SIZE

PIPE SIZE STEAM PIPE

LINE SIZE

LOCATION

77 150 .25 22x16 3/4 3/4 3/4 2ND FLOOR EAST

60,000 60 120 .25 16x14 3/4 3/4 3/4 2ND FLOOR WEST

66,000 66 130 .25 20x16 3/4 3/4 3/4 2ND FLOOR EAST

47,000 47 100 .25 18x16 3/4 3/4 3/4 2ND FLOOR WEST

71,000 71 140 .25 22x16 3/4 3/4 3/4

60,000 60 120 .25 3/4 3/4 3/4

66,000 66 130 .25 3/4 3/4 3/4 1ST FLOOR EAST

47,000 47 100 .25 3/4 3/4 3/4 1ST FLOOR WEST

1ST FLOOR EAST

1ST FLOOR WEST16x14

20x16

18x16

STEAM IN-SEE PROJECT DWGS. FOR SIZE

GATE VALVE

UNION

UNION

UNION

UNION

UNION

CONTROLLER

VACUUM BREAKER

ALL THREAD RODS TO STRUCTURE USE MANUFACTURER

DIRT LEG FULL SIZE OF CONNECTION

CAP

BY PASS

GATE VALVE

STRAINER

OF. & T TRAP SEE SCHEDULE

CHECK VALVE

GATE VALVE

CONDENSATE OUT SEE PROJECT DWGS FOR SIZES

SUPPORT HOLES USE RODS TO SUIT MFGR HOLES SIZE

CHECK VALVE

DUCT WORK

SWING JOINT

GALV VIBRATION ISOLATORS

HOOD EXHAUST FAN DETAIL

ROOF

6" HOUSE KEEPING PAD

1/2"Ø AIR TEST HOLE

3"+/-

18"Ø

7" MINIMUM

GALV VIBRATION ISOLATORS

ROOM EXHAUST FAN DETAIL

ROOF

6" HOUSE KEEPING PAD

1/2"Ø AIR TEST HOLE

3"+/-

10x15

PREHEAT COILS STEAM RISER

REHEAT #1

77#/HR

-GPM

REHEAT #1

60#/HR

-GPM

REHEAT #1

77#/HR

-GPM

REHEAT #1

66#/HR

-GPM

REHEAT #1

71#/HR

-GPM

REHEAT #1

60#/HR

-GPM

REHEAT #1

47#/HR

-GPM

REHEAT #1

66#/HR

-GPM

P R E H E A T

C O

IL

H R

P R E H E A T

C O

IL

H R

3/4"Ø3/4"Ø

3/4"Ø3/4"Ø

1"Ø1"Ø

1"Ø1"Ø

1 1/4"Ø 1 1/4"Ø

1 1/4"Ø

1 1/4"Ø

1.75' TO MECHANICAL ROOM

4,000 FPM VELOCITY MAX 30 PSIG STEAM

1,344#/HR, 2.7 GPM CONDESATE

1 1/2"Ø

1 1/2"Ø

1"Ø

2"Ø

2"Ø

3/4"Ø3/4"Ø

3/4"Ø3/4"Ø

1"Ø1"Ø

1"Ø1"Ø

1 1/4"Ø 1 1/4"Ø

1 1/4"Ø

1 1/4"Ø

1 1/2"Ø

1"Ø

TYPICAL AIR HANDLING UNIT CASING DRAIN

SHORT NIPPLE

AIR HANDLING UNIT (AHU)

AHU DRAIN CONNECTION

EQUAL TO TOTAL FAN STATIC PRESSURE

SAME SIZE AS CASING CONN

CONNECTION FOR AUX. DRAIN WHERE REQUIRED

TO FLOOR DRAIN

TRAP FOR WATER SEAL, 1" DEEPER THAN TOTAL FAN STATIC PRESSURE

1 5 6 7

STEAM COIL PIPING DETAIL

STRAINER

ELECTRIC STEAM CONTROL VALVE

1/2" CHECK VALVE FOR VACUUM BREAK ON PREHEAT COILS ONLY

STEAM SUPPLY LINE

CONDENSATE RETURN LINE

SHUT OFF VALVE

UNION

1/2" CHECK VALVE FOR VACUUM BREAK

F & T TRAP

CHECK VALVE10

FREEZE STAT11

NOTE:

PREHEAT COILS 1 1/2" STEAM LINE, MAIN LINE 2"Ø

1 1/2" CONDESATE RETURN LINE, MAIN LINE 1"Ø OFF EACH COIL

9 10

T P

T

ZONE T STAT

TYPICAL

2ND FLOOR

AHU

1ST FLOOR

AHU

2 1/2"Ø

4"Ø

6"Ø MAINS

CHW RISER DIAGRAM

DUCT PENETRATION TO ROOF DETAIL

DUCT

DUCT PENETRATION FLASHING

WEATHER SEAL FLASHING PLATE

WATER CUT OFF MASTIC

EXISTING CONCRETE ROOF

1 2 3 4 5

ANNUBAR ULTRASONIC FLOW SENSOR

BUTTERFLY VALVE

BUTTERFLY VALVE WITH MEMORY STOP

2-WAY CONTROL VALVE

THERMOMETER AND THERMAL WELL

PRESSURE GAUGE WITH CHOKE

MANUAL AIR VENT

STRAINER W/ BLOWDOWN VALVE & HOSE CONNECTION

DRAIN VALVE WITH HOSE CONNECTION

UNION 10

TYPICAL

TYPICAL

TYPICAL

6" HOUSEKEEPING PAD

WATER CUT OFF MASTIC

WEATHER SEAL FLASHING PLATE

EXISTING ROOF BUILD UP

EXISTING CONCRETE ROOF

1 2 3 4 5

NEW EXHAUST HOUSEKEEPING DETAIL

Site

8 8BWGM

VA Medical Center Houston, Tx A101

FIRST, SECOND FLOOR

AND ROOF DETAILS

AND SECTIONS

S:

En gi ne er in g\ C O M M O N Pr oj ec ts C on st ru ct io n Pr oj ec ts F Y 0-

Re pl ac e

AH

U B

B

Pr oc ur em en t Do cu m en ts B

LD

G7

AC

.d w g

:3 8:

A M

VH

AH

O U Di az A4

4/30/2018

Drawing Title

Approved: Chief Engineer/Division Manager

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT/ENGINEERS:

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

Houston, TX

Michael E. DeBakey VAMC 2002 Holcombe Blvd.

Dept. of Veterans Affairs

Z:\dvaseal2.bmp

CORRECT A/C PROBLEMS

IN BLDG #7

580-18-XXX

Model
COVER SHEET
PLAN VIEW FIRST FLOOR
PLAN VIEW FIRST FLOOR EXHAUST
PLAN VIEW SECOND FLOOR
PLAN VIEW SECOND FLOOR EXHAUST
PLAN VIEW ROOF PENETREATIONS HOOD AND ROOM EXHAUST
SCHEDULES
DETAILS AND SECTIONS