36C25618B0308-00005002.docx

DOCX document 21 KB Posted

Attached to
NLR IMPROVE SECURITY (VA-18-905700)
Solicitation number
36C25618B0308
Issued by

About this file

36C25618B0308 00005 36C25618B0308 00005.docx

View the file

Other files

File Type Posted
36C25618B0308-00006000.docx DOCX document
36C25618B0308-00004000.docx DOCX document
36C25618B0308-00003000.docx DOCX document
36C25618B0308-00002000.docx DOCX document
36C25618B0308-00002001.pdf PDF
36C25618B0308-00001005.pdf PDF
36C25618B0308-00001002.pdf PDF
36C25618B0308-00001001.pdf PDF
36C25618B0308-00001003.pdf PDF
36C25618B0308-00001004.pdf PDF
36C25618B0308-00001000.docx DOCX document
36C25618B0308-005.pdf PDF
36C25618B0308-001.docx DOCX document
36C25618B0308-004.pdf PDF
36C25618B0308-003.pdf PDF
36C25618B0308-002.pdf PDF
36C25618B0308-000.docx DOCX document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 00005 05-18-2018 598-18-2-8730-0003 598-18-102 Department of Veterans Affairs Chief, A&MM (90C/NLR) Central Arkansas Veterans HCS 2200 Fort Roots Drive, Bldg 41, Room 200 North Little Rock

AR

72114 1706 Department of Veterans Affairs Chief, A&MM (90C/NLR) Central Arkansas Veterans HCS 2200 Fort Roots Drive, Bldg 41, Room 200 North Little Rock

AR

72114 1706 To all Offerors/Bidders

36C25618B0308 05-18-2018

X x X ** HOUR & DATE for Receipt of Offers is EXTENDED to:

May 29, 2018 10:00am x The purpose of this amendment is to post clarifications. (SEE ATTACHED) Invitation for bid has changed from May 23, 2018 at 10:00am to May 29, 2018 at 10:00am.

Location: 2200 Fort Roots Dr., North Little Rock, ar 72114, BLDG 41, conference room 2nd floor.

All other terms and conditions remain the same.

Contracting Officer

CONTINUATION PAGE

Additional RFI Questions NLR Security Project

1. What the Bid Bond percentage needs to be?

Answer: 20% of your bid or 3 million whichever is less.

2. Camera counts/types/models continue to be unidentified. Quantities that are shown on the drawings (site plans and TY502) do not correlate with each other.

Answer: See Attachment A from Amendment 00001 on FedBizOpps.Gov for camera type and model clarification. See Amendment 00003 RFI responses for camera quantity. We recommend each contractor validate their own camera quantities since they will be held responsible.

3. Subsequent Amendment 00002 indicates several camera changes which, when amended on the previous documents mentioned, still display discrepancies.

Answer: No camera changes were mentioned in Amendment 00002.

4. Amendment 00003 the camera Count was confirmed to be 402, which still does not match the information provided.

Answer: 402 is the correct amount for this project. We recommend each contractor validate their own camera quantities since they will be held responsible.

5. Amendment 00003 it states that the Specifications would take precedence over the drawings and/or VA Master Specifications, but that the CO would have the final say. This needs to be defined prior to Bid Submittals so that all parties are working from the same information.

Answer: The plans take precedence over the master specifications to include the RFI responses and Attachment A. Should any issues arise the COR/CO will determine final outcome.

6. Amendment 00003 also indicates that we are to use Standard HID Readers for this project. However, the identified readers do not meet FICAM FIPS 201-2 requirements, do not meet with the manufacturer’s recommendations without the use of additional equipment that greatly increases the cost to the government. Is it possible for you to divulge your formal J&A for any sole source equipment for the statement made in Amendment 0003?

Answer: See RFI responses in Amendment 00003 part numbers for keypad readers and standard readers comply with VA specifications. The part numbers are what we are currently using for our access control system.

7. Are we to assume that the new ACS is to connect to the existing ACS system? If so, we will need the quantity of the existing Hirsch MX4 Panels because they will need to be replaced per your statement in the Amendment 0003 Q7A’s.

Answer: All new door installs will require new MX8 panels. Per the Access Control Chart on TY502 all new installs will require new panels.

8. Are the tables labeled ‘NLR Infrastructure’ Core Switches, Distribution Switches, PoE Injector, Accessories, and Servers a list of new equipment that will be required or a list of existing equipment?

Answer: New equipment to be provided and installed by contractor. Why are 1G SFP fiber modules called for when the Aruba switches they have identified are 10G?

Answer: Please price all network equipment quantities shown on TY502.

9. Are there any existing fiber spares that can be used for this project?

Answer: Bid should include new fiber where fiber connectivity is required. Where is the spec for fiber type and number of strands?

Answer: Provide fiber connectors at all surveillance switch locations as needed for connectivity of dark fiber. TY502 also states provision of fiber jumpers and quantities.

10. Can ½” conduit EMT be used for power wiring and low voltage due to space limitations? “ALL NEW AND EXISTING MAG LOCK INSTALLATIONS FOR DOORS SHALL BE INTERLOCKED WITH THE FIRE ALARM SYSTEM SUCH THAT THE MAG LOCKS RELEASE DURING A FIRE ALARM.” Who is Fire Alarm Contractor and what is their contact information?

Answer: Installation of hardware and wiring is the responsibility of the awarded contractor, programming of the Fire Alarm system to be performed by the VA Engineering Electronics Technicians. The Spec indicates ¾” EMT, but the question was whether or not ½” was acceptable.

Answer: ½” conduit is not acceptable.

11. Are all fiber jumpers from IDF closets to the MDF, in Building 170, included in the quantity on sheet TY502?

Answer: Contractor to provide the necessary quantity of jumpers to provide operational system. Can you provide the type requirement (i.e., OM1, OM2, OM3, 10G fiber)?

Answer: TY502 states the quantity and type of jumpers required.

12. Is the VA providing the patch cables or is the contractor expected to provide patch cables for the Communication room end and the camera end?

Answer: Contractor. Can you provide the Quantity and Length of the patch cables?

Answer: All patch cable lengths will be 10’ at camera end and 7’ at comm room end and provided by the contractor.

13. Could you please clarify the requirement for an RCDD on the project, since there is no design involved? This adds a significant cost to the project.

Answer: No RCDD is required.

14. Could you please clarify the requirement for a BICSI Level I/II Superintendent on the project, since this is a Security project? This adds a significant cost to the project.

Answer: BICSI Level I/II Superintendent not required.

15. How to you intend to verify and insure compliance with these requirements during project performance for the awarded Contractor? The reason we ask, is while we maintain these types of certifications within our staffing, we generally see these types of contracts awarded to local contractors who do not meet these standards.

Answer: See answers to previous questions.

16. You also require (4) past performances, (3) of which is the exact products/configuration. While we understand the reasoning to maintain continuity of the Access Control System (Hirsch) all other components/equipment is COTS, the past performance should be allowed to include any past performance that utilized COTS equipment. We ask this to ensure that we are provided a fair and reasonable opportunity to bid this project with past performance that may include COTS products that meets the scope and size requirement for past performances.

Answer: References of past performance utilizing COTS products will be allowed.

17. In the Amendment 00003 Q&A’s the question of manufacturer substitutions for the cameras was answered by stating that the Sony Cameras were standardized due to the fact that CAVHS holds inventory for the current/existing system. However, during the Site Visit it was indicated that the existing system was analog. With the new system being implemented as an IP system, that inventory would not be useful without additional equipment (i.e., encoders). Can you confirm the type of system is the existing Video Surveillance System?

Answer: The primary system for NLR VA IP base system.