36C25519R0103-006.pdf
PDF 18 MB Posted
- Attached to
- Relocate Step Down Unit P/N: 589-402 Federal contract opportunity
- Solicitation number
- 36C25519R0103
About this file
36C25519R0103 PO9-Final Drawings_Part3.pdf
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEC
F E
FE
F E
C F
E C
F E
C
F E
EaFGGaHJJbKLLaMNNa
Ha
6.7
Ja
8.0 W 9.3
PATIENT RM #7
C364
PATIENT RM #10
C350
PAT. TLT.
C363A
PAT. TLT.
C364A
PAT. TLT.
C365A
STAIR #7
C330
PATIENT RM #6
C363
PATIENT RM #5
C362
PAT. TLT.
C350A
PATIENT RM #4
C361
PAT. TLT.
C349A
PATIENT RM #2
C357
PAT. TLT.
C357A
PAT. TLT.
C356A
NOURISH.
C354
CORR
C3C6
CLEAN UTILITY ROOM
C333
SOILED WORKROOM
C343
SHOWER
C338
STERILE STORAGE
C347
CHART ROOM
C353
NURSE STATION
C355
MEDS.
C352
STOR.
C359
CORR
C3C5
NURSE STATION
C332
HSKPG.
C341
PAT. TLT.
C360A
CORR
C3C4
STAFF TOILET
C336
EQUIP. STORAGE
C345
PATIENT RM #8
C365
PATIENT RM #9
C351
PATIENT RM #11
C349
BARIATRIC PATIENT RM #3
C360
STAFF LOCKERS
C335
SWAMP
C321
CONSULT.
C322
MSA
C325
CORR.
C3C9
OFFICE NURSE MNGR.
C346
PATIENT RM #1
C356
CORR
C3C2
QUIET ROOM
C339
MOBILE X-RAY ALCOVE
D301C
W.C. / STRETCHER ALCOVE
D301B
CORR
C3C3
ELEVATOR LOBBY
D301
BED STORAGE
D302
SOILED
D301A
GREETER
C326
STORAGE
C358
STAFF LOUNGE
C334
EQUIPMENT STORAGE
C327
BARIATRIC ISOLATION
ROOM #14
C328
PAT. TLT.
C328A
ISOLATION PATIENT ROOM
#13
C337
PATIENT RM #12
C348
PAT. TLT.
C348A
FAMILY TOILET
C324
ANTE RM.
C329
MECH
C358A
CORR.
C3C7
PAT. TLT.
C362A PAT. TLT.
C361A
PAT. TLT.
C337A
ELEC.
C340
AREA NOT IN SCOPE
SLEEP
C368
TOILET
C369
PAT. TLT.
C351A
TELEMETRY
C353B
H.R. INTER
D316A
CLOSET
C366
OIT
C358C
ZONE 23
ZONE 21
ZONE 21 ZONE 19
ZONE 19
ZONE 23
LIGHT HAZARD
ORDINARY HAZARD I
ORDINARY HAZARD II
HATCH LEGEND
NO
HATCH
GENERAL NOTES
1. EXISTING STANDPIPES ARE SHOWN IN STAIRWELLS.
2. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR THE
FOLLOWING:
A. REMOVE DISTRIBUTION PIPING BACK TO RISERS. REDISTRIBUTE
MAINS AND BRANCHES TO ACCOMMODATE NEW FLOOR PLAN
AND CEILING HEIGHTS. REFERENCE ARCHITECTURAL CODE
PLAN ON SHEET GI-003 FOR SMOKE COMPARTMENTS.
B. PROVIDE NEW RECESSED HEADS TO ACCOMMODATE NEW
FLOOR PLAN. REMOVED HEADS SHALL NOT BE REINSTALLED.
ALL NEW HEADS ARE TO BE FM-APPROVED, QUICK RESPONSE
TYPE.
C. FIRE SPRINKLER HEADS SHALL BE LOCATED IN CENTER OF TILE
BOTH DIRECTIONS WHEN LOCATED IN LAY-IN CEILINGS. FIRE
SPRINKLER HEADS SHALL BE LOCATED IN SYMMETRICAL
PATTERNS IN ROOMS WITH HARD CEILINGS.
D. COORDINATE SPRINKLER HEAD LOCATIONS WITH ALL CEILING
COMPONENTS INCLUDING ELECTRICAL & MECHANICAL
COMPONENTS AND PATIENT LIFTS.
E. CONTRACTOR TO COORDINATE ELECTRICAL REQUIREMENTS
WITH E.C..
3. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR THE
SPRINKLER HEAD LAYOUTS, CALCULATIONS, AND SEALED
ENGINEERING DRAWINGS AS FOLLOWS:
A. DELEGATED DESIGN: DESIGN SPRINKLER SYSTEM (S),
INCLUDING COMPREHENSIVE ENGINEERING ANALYSIS BY A
QUALIFIED PROFESSIONAL ENGINEER OR NICET LEVEL III
TECHNICIAN, USING PERFORMANCE REQUIREMENTS AND
DESIGN CRITERIA OF NFPA 13.
B. OBTAIN COPY OF FIRE-HYDRANT FLOW TEST RECORDS OR
CONTACT LOCAL WATER AND/OR FIRE DEPARTMENTS TO
PERFORM A FIRE-HYDRANT FLOW TEST. INCLUDE FLOW TEST
RESULTS FOR EACH RISER WITH HYDRAULIC CALCULATIONS.
INCLUDE A 10% SAFETY FACTOR IN HYDRAULIC CALCULATIONS.
C. SPRINKLER SYSTEM SHALL BE APPROVED BY AUTHORITIES
HAVING JURISDICTION.
D. SHOP DRAWINGS: FOR WET-PIPE SPRINKLER SYSTEMS.
INCLUDE PLANS, ELEVATIONS, SECTIONS, DETAILS, AND
ATTACHMENTS TO OTHER WORK.
E. DELEGATED DESIGN SUBMITTAL: ALL SPRINKLER SYSTEMS,
INCLUDING ANALYSIS OF DATA, SHALL BE SIGNED AND SEALED
BY THE QUALIFIED PROFESSIONAL ENGINEER RESPONSIBLE
FOR THEIR PREPARATION. ENGINEER SHALL BE LICENSED IN
THE STATE OF MISSOURI.
F. COORDINATION DRAWINGS: SPRINKLER SYSTEMS, DRAWN TO
SCALE, ON WHICH THE ELECTRICAL, PLUMBING, HVAC,
STRUCTURAL AND OTHER BUILDING SYSTEMS ARE SHOWN AND
COORDINATED WITH EACH OTHER, USING INPUT FROM
INSTALLERS OF THE ITEMS INVOLVED.
G. APPROVED SPRINKLER PIPING DRAWINGS: WORKING PLANS,
PREPARED ACCORDING TO NFPA 13, THAT HAVE BEEN
APPROVED BY AUTHORITIES HAVING JURISDICTION, INCLUDING
HYDRAULIC CALCULATIONS.
4. FP CONTRACTOR RESPONSIBLE FOR VERIFYING EXISTING
CONDITIONS BEFORE BEGINNING WORK.
5. THIS CONTRACTOR IS RESPONSIBLE FOR SUBMITTING FULL
COORDINATION AND LAYOUT DRAWINGS PER FIRE PROTECTION
SPEC SECTION. COORDINATION SHOULD BE COMPLETED WITH ALL
TRADES. CONSTRUCTION SHALL NOT BEGIN UNTIL COORDINATION
DRAWINGS HAVE BEEN REVIEWED BY THE ENGINEER AND COR.
6. SPRINKLER COVERAGE TO INCLUDE WARDROBES WHERE
REQUIRED. REFERENCE ARCHITECTURAL SHEETS FOR WARDROBE
LOCATIONS.
SOME MECHANICAL AND PLUMBING COMPONENTS OF THIS BUILDING
REQUIRE SEISMIC BRACING. IT IS THE RESPONSIBILITY OF THIS
CONTRACTOR AND THE GC TO ENGAGE A SEISMIC DESIGN ENGINEER
TO DETERMINE AND DESIGN THE REQUIRED BRACING FOR EACH
SYSTEM.
SYSTEMS REQUIRING BRACING INCLUDE, BUT ARE NOT LIMITED TO,
THE FOLLOWING:
1. ALL LIFE-SAFETY COMPONENTS INCLUDING FIRE PROTECTION
SYSTEMS.
2. COMPONENTS WEIGHING MORE THAT 400 POUNDS.
3. COMPONENTS WITH A CENTER OF MASS GREATER THAN 4
FEET ABOVE FLOOR LEVEL AND WEIGHING MORE THAN 20
POUNDS. (I.E. TERMINAL UNITS)
4. DISTRIBUTION SYSTEMS WEIGHING MORE THAN 5 POUNDS PER
FOOT. (E.G. 12x12, 22 GAUGE, SHEET STEEL DUCTWORK AND
CHILLED, HEATING, DOMESTIC HOT, AND DOMESTIC COLD
WATER PIPING LARGER THAN 1 1/2".
FLEXIBLE CONNECTIONS ARE REQUIRED BETWEEN ALL COMPONENTS
AND ASSOCIATED DUCTWORK, PIPING, AND CONDUITS.
THE FOLLOWING COMPONENTS ARE NOT REQUIRED TO BE BRACED:
1. PLUMBING FIXTURES
THE CONTRACTOR SHALL PROVIDE ALL COMPONENT SUBMITTALS
WITH COMPONENT WEIGHTS TO SEISMIC DESIGN ENGINEER FOR USE
IN BRACING DESIGN.
BRACING SHALL BE DESIGNED TO MEET ASCE7 AND NFPA 13 BRACING
REQUIREMENTS. REFER TO ASCE7 CHAPTER 13 FOR MORE
INFORMATION ON SYSTEMS REQUIRED TO BE BRACED.
SEISMIC BRACING NOTES
FIRE PROTECTION CONTRACTOR TO PROVIDE TEMPORARY UPRIGHT
SPRINKLERS AS REQUIRED FOR CONSTRUCTION.
NOTE:
GGaH
Ha
AREA NOT IN SCOPE
STORAGE
D213D
MULTI-PURPOSE
D213A
CHAPEL
D213B
ALTAR
D213C
STORAGE
D213G
STORAGE
D213E
A/V CLOSET
D213I
CHAPLAIN SERVICES
D213F
STORAGE
D213K
STORAGE
D213J
PROJECT
LOCATION
PROJECT
LOCATION
1. EXISITNG STANDPIPE "G", 500 GPM, RESIDUAL 162.11 PSI.
2. EXISTING STANDPIPE "ZONE 23", 601.6 GPM, RESIDUAL 110.08 PSI.
3. CUT (EX) STANDPIPE BETWEEN 2ND AND 3RD FLOOR CAP.
PLAN NOTES
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA 51101
712.252.4014
142 N. MOSLEY ST.
WICHITA, KANSAS 67202
316.262.2500
303 S. TOPEKA
WICHITA, KANSAS 67202
316.262.2691
FP101
FIRE PROTECTION HAZARD PLANS RELOCATE STEP DOWN UNIT
Columbia, MO
04/11/2019
589-402
FINAL CONSTRUCTION DOCUMENTS
BOH AR
1/8" = 1'-0"
FIRE PROTECTION PLAN - THIRD FLOOR
4' 8' 16'
1/8" = 1'-0"
0'
N
SHEET LIST
FP101 FIRE PROTECTION HAZARD PLANS
FP101.2 FIRE PROTECTION HAZARD PLANS - BID ITEM #2
(DEDUCT)
1/8" = 1'-0"
FIRE PROTECTION - SECOND FLOOR
4' 8' 16'
1/8" = 1'-0"
0'
N
1" = 100'-0"
KEY MAP - 3RD FLOOR
1" = 100'-0"
KEY MAP - 2ND FLOOR
F E
FE
F E
C F
E C
F E
C
F E
EaFGGaHJJbKLLaMNNa
Ha
6.7
Ja
8.0 W 9.3
PATIENT RM #7
C364
PATIENT RM #10
C350
PAT. TLT.
C363A
PAT. TLT.
C364A
PAT. TLT.
C365A
STAIR #7
C330
PATIENT RM #6
C363
PATIENT RM #5
C362
PAT. TLT.
C350A
PATIENT RM #4
C361
PAT. TLT.
C349A
NOURISH.
C354
CORR
C3C6
CLEAN UTILITY ROOM
C333
SOILED WORKROOM
C343
SHOWER
C338
STERILE STORAGE
C347
CHART ROOM
C353
NURSE STATION
C355
MEDS.
C352
STOR.
C359
CORR
C3C5
NURSE STATION
C332
HSKPG.
C341
PAT. TLT.
C360A
CORR
C3C4
STAFF TOILET
C336
EQUIP. STORAGE
C345
PATIENT RM #8
C365
PATIENT RM #9
C351
PATIENT RM #11
C349
BARIATRIC PATIENT RM #3
C360
STAFF LOCKERS
C335
SWAMP
C321
CONSULT.
C322
MSA
C325
CORR.
C3C9
OFFICE NURSE MNGR.
C346
CORR
C3C2
CORR
C3C3
STORAGE
C358
STAFF LOUNGE
C334
EQUIPMENT STORAGE
C327
BARIATRIC ISOLATION
ROOM #14
C328
PAT. TLT.
C328A
ISOLATION PATIENT ROOM
#13
C337
PATIENT RM #12
C348
PAT. TLT.
C348A
FAMILY TOILET
C324
ANTE RM.
C329
MECH
C358A
PAT. TLT.
C362A PAT. TLT.
C361A
PAT. TLT.
C337A
ELEC.
C340
AREA NOT IN SCOPE
SLEEP
C368
TOILET
C369
PAT. TLT.
C351A
TELEMETRY
C353B
H.R. INTER
D316A
CLOSET
C366
OIT
C358C
ZONE 23
ZONE 21
ZONE 21 ZONE 19
ZONE 19
ZONE 23
GGaH
Ha
AREA NOT IN SCOPE
STORAGE
D213D
MULTI-PURPOSE
D213A
CHAPEL
D213B
ALTAR
D213C
STORAGE
D213G
STORAGE
D213E
A/V CLOSET
D213I
CHAPLAIN SERVICES
D213F
STORAGE
D213K
STORAGE
D213J
GENERAL NOTES
1. EXISTING STANDPIPES ARE SHOWN IN STAIRWELLS.
2. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR THE
FOLLOWING:
A. REMOVE DISTRIBUTION PIPING BACK TO RISERS. REDISTRIBUTE
MAINS AND BRANCHES TO ACCOMMODATE NEW FLOOR PLAN
AND CEILING HEIGHTS. REFERENCE ARCHITECTURAL CODE
PLAN ON SHEET GI-003 FOR SMOKE COMPARTMENTS.
B. PROVIDE NEW RECESSED HEADS TO ACCOMMODATE NEW
FLOOR PLAN. REMOVED HEADS SHALL NOT BE REINSTALLED.
ALL NEW HEADS ARE TO BE FM-APPROVED, QUICK RESPONSE
TYPE.
C. FIRE SPRINKLER HEADS SHALL BE LOCATED IN CENTER OF TILE
BOTH DIRECTIONS WHEN LOCATED IN LAY-IN CEILINGS. FIRE
SPRINKLER HEADS SHALL BE LOCATED IN SYMMETRICAL
PATTERNS IN ROOMS WITH HARD CEILINGS.
D. COORDINATE SPRINKLER HEAD LOCATIONS WITH ALL CEILING
COMPONENTS INCLUDING ELECTRICAL & MECHANICAL
COMPONENTS AND PATIENT LIFTS.
E. CONTRACTOR TO COORDINATE ELECTRICAL REQUIREMENTS
WITH E.C..
3. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR THE
SPRINKLER HEAD LAYOUTS, CALCULATIONS, AND SEALED
ENGINEERING DRAWINGS AS FOLLOWS:
A. DELEGATED DESIGN: DESIGN SPRINKLER SYSTEM (S),
INCLUDING COMPREHENSIVE ENGINEERING ANALYSIS BY A
QUALIFIED PROFESSIONAL ENGINEER OR NICET LEVEL III
TECHNICIAN, USING PERFORMANCE REQUIREMENTS AND
DESIGN CRITERIA OF NFPA 13.
B. OBTAIN COPY OF FIRE-HYDRANT FLOW TEST RECORDS OR
CONTACT LOCAL WATER AND/OR FIRE DEPARTMENTS TO
PERFORM A FIRE-HYDRANT FLOW TEST. INCLUDE FLOW TEST
RESULTS FOR EACH RISER WITH HYDRAULIC CALCULATIONS.
INCLUDE A 10% SAFETY FACTOR IN HYDRAULIC CALCULATIONS.
C. SPRINKLER SYSTEM SHALL BE APPROVED BY AUTHORITIES
HAVING JURISDICTION.
D. SHOP DRAWINGS: FOR WET-PIPE SPRINKLER SYSTEMS.
INCLUDE PLANS, ELEVATIONS, SECTIONS, DETAILS, AND
ATTACHMENTS TO OTHER WORK.
E. DELEGATED DESIGN SUBMITTAL: ALL SPRINKLER SYSTEMS,
INCLUDING ANALYSIS OF DATA, SHALL BE SIGNED AND SEALED
BY THE QUALIFIED PROFESSIONAL ENGINEER RESPONSIBLE
FOR THEIR PREPARATION. ENGINEER SHALL BE LICENSED IN
THE STATE OF MISSOURI.
F. COORDINATION DRAWINGS: SPRINKLER SYSTEMS, DRAWN TO
SCALE, ON WHICH THE ELECTRICAL, PLUMBING, HVAC,
STRUCTURAL AND OTHER BUILDING SYSTEMS ARE SHOWN AND
COORDINATED WITH EACH OTHER, USING INPUT FROM
INSTALLERS OF THE ITEMS INVOLVED.
G. APPROVED SPRINKLER PIPING DRAWINGS: WORKING PLANS,
PREPARED ACCORDING TO NFPA 13, THAT HAVE BEEN
APPROVED BY AUTHORITIES HAVING JURISDICTION, INCLUDING
HYDRAULIC CALCULATIONS.
4. FP CONTRACTOR RESPONSIBLE FOR VERIFYING EXISTING
CONDITIONS BEFORE BEGINNING WORK.
5. THIS CONTRACTOR IS RESPONSIBLE FOR SUBMITTING FULL
COORDINATION AND LAYOUT DRAWINGS PER FIRE PROTECTION
SPEC SECTION. COORDINATION SHOULD BE COMPLETED WITH ALL
TRADES. CONSTRUCTION SHALL NOT BEGIN UNTIL COORDINATION
DRAWINGS HAVE BEEN REVIEWED BY THE ENGINEER AND COR.
6. SPRINKLER COVERAGE TO INCLUDE WARDROBES WHERE
REQUIRED. REFERENCE ARCHITECTURAL SHEETS FOR WARDROBE
LOCATIONS.
SOME MECHANICAL AND PLUMBING COMPONENTS OF THIS BUILDING
REQUIRE SEISMIC BRACING. IT IS THE RESPONSIBILITY OF THIS
CONTRACTOR AND THE GC TO ENGAGE A SEISMIC DESIGN ENGINEER
TO DETERMINE AND DESIGN THE REQUIRED BRACING FOR EACH
SYSTEM.
SYSTEMS REQUIRING BRACING INCLUDE, BUT ARE NOT LIMITED TO,
THE FOLLOWING:
1. ALL LIFE-SAFETY COMPONENTS INCLUDING FIRE PROTECTION
SYSTEMS.
2. COMPONENTS WEIGHING MORE THAT 400 POUNDS.
3. COMPONENTS WITH A CENTER OF MASS GREATER THAN 4
FEET ABOVE FLOOR LEVEL AND WEIGHING MORE THAN 20
POUNDS. (I.E. TERMINAL UNITS)
4. DISTRIBUTION SYSTEMS WEIGHING MORE THAN 5 POUNDS PER
FOOT. (E.G. 12x12, 22 GAUGE, SHEET STEEL DUCTWORK AND
CHILLED, HEATING, DOMESTIC HOT, AND DOMESTIC COLD
WATER PIPING LARGER THAN 1 1/2".
FLEXIBLE CONNECTIONS ARE REQUIRED BETWEEN ALL COMPONENTS
AND ASSOCIATED DUCTWORK, PIPING, AND CONDUITS.
THE FOLLOWING COMPONENTS ARE NOT REQUIRED TO BE BRACED:
1. PLUMBING FIXTURES
THE CONTRACTOR SHALL PROVIDE ALL COMPONENT SUBMITTALS
WITH COMPONENT WEIGHTS TO SEISMIC DESIGN ENGINEER FOR USE
IN BRACING DESIGN.
BRACING SHALL BE DESIGNED TO MEET ASCE7 AND NFPA 13 BRACING
REQUIREMENTS. REFER TO ASCE7 CHAPTER 13 FOR MORE
INFORMATION ON SYSTEMS REQUIRED TO BE BRACED.
SEISMIC BRACING NOTES
FIRE PROTECTION CONTRACTOR TO PROVIDE TEMPORARY UPRIGHT
SPRINKLERS AS REQUIRED FOR CONSTRUCTION.
NOTE:
PROJECT
LOCATION
PROJECT
LOCATION
1. EXISITNG STANDPIPE "G", 500 GPM, RESIDUAL 162.11 PSI.
2. EXISTING STANDPIPE "ZONE 23", 601.6 GPM, RESIDUAL 110.08 PSI.
3. CUT (EX) STANDPIPE BETWEEN 2ND AND 3RD FLOOR CAP.
PLAN NOTES
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA 51101
712.252.4014
142 N. MOSLEY ST.
WICHITA, KANSAS 67202
316.262.2500
303 S. TOPEKA
WICHITA, KANSAS 67202
316.262.2691
FP101.2
FIRE PROTECTION HAZARD PLANS -
BID ITEM #2 (DEDUCT)
RELOCATE STEP DOWN UNIT
Columbia, MO
04/11/2019
589-402
FINAL CONSTRUCTION DOCUMENTS
BOH AR
1/8" = 1'-0"
FIRE PROTECTION PLAN - THIRD FLOOR - BID ITEM #2 (DEDUCT)
1/8" = 1'-0"
FIRE PROTECTION - SECOND FLOOR - BID ITEM #2 (DEDUCT)
N 4' 8' 16'
1/8" = 1'-0"
0'
N 4' 8' 16'
1/8" = 1'-0"
0'
1" = 100'-0"
KEY MAP - 3RD FLOOR
GENERAL NOTES
1. VERIFY JOB SITE CONDITIONS AND DIMENSIONS BEFORE
BEGINNING WORK. PLANS ARE SCHEMATIC IN NATURE.
LAYOUT IS BASED ON BEST AVAILABLE INFORMATION.
CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS
AND DIMENSIONS.
2. NO PIPING, DUCTWORK, ETC. SHALL PENETRATE
STRUCTURAL MEMBERS.
3. PROVIDE MISCELLANEOUS CUTTING, PATCHING AND
REPAIRING OF FINISHES, ROOF, WALLS, ETC., AS
REQUIRED TO ACCOMMODATE THE NEW WORK.
4. G.C. IS TO PATCH ANY OPENINGS IN CORRIDORS
REQUIRED TO BE CONSTRUCTED TO LIMIT THE TRANSFER
OF SMOKE AND IN SMOKE BARRIERS AS REQUIRED TO
MEET CODE REQUIREMENTS. SEE ARCHITECTURAL
DRAWINGS FOR LOCATIONS.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD
VERIFY EXACT LOCATION, CONFIGURATION AND ROUTING
OF EXISTING SYSTEMS REQUIRED TO REMAIN IN
OPERATION DURING THE PROJECT TO PREVENT DAMAGE
DURING DEMOLITION AND PHASING.
6. REMOVE ALL EXISTING EQUIPMENT, DUCTWORK AND
PIPING THAT IS NOT REQUIRED FOR A WORKING
INSTALLATION.
7. COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO
INSTALLATION.
8. ALL CUTTING AND PATCHING SHALL BE CLOSELY
COORDINATED WITH THE G.C.
9. COORDINATE ROUTING OF PLUMBING, AND HVAC PIPING
WITH DUCTWORK, LIGHTS, ARCHITECTURAL CEILING AND
STRUCTURAL ELEMENTS. PIPING SHALL RISE AND DROP,
JOG OR OFFSET AS REQUIRED TO AVOID CONFLICTS.
DUCTWORK SHALL TAKE PRECEDENCE OVER ALL PIPING,
EXCEPT WHERE GRADE MUST BE MAINTAINED FOR
DRAINAGE. REWORK OF INSTALLED WORK TO RESOLVE
CONFLICTS RISING FROM LACK OF COORDINATION SHALL
NOT JUSTIFY AN INCREASE IN THE CONTRACT AMOUNT.
10. ALL PENETRATIONS THROUGH FIRE RATED ASSEMBLIES
SHALL BE FIRE STOPPED BY THE TRADE MAKING THE
PENETRATION. REFER TO ARCHITECTURAL DRAWINGS
AND SPECIFICATIONS FOR REQUIREMENTS.
11. DO NOT ROUTE PIPING OR DUCTWORK OVER ELECTRICAL
PANELS OR EQUIPMENT. PIPING OR DUCTWORK SHALL
NOT BE ROUTED THROUGH ELECTRICAL ROOMS,
TELECOM ROOMS, OR ELEVATOR EQUIPMENT ROOMS
UNLESS SPECIFICALLY SERVING THAT ROOM.
COORDINATE WITH E.C. PROVIDE WATERTIGHT DRIP PAN
WITH DRAIN TO NEAREST APPROVED RECEPTOR WHERE
REQUIRED.
12. COORDINATE SIZE AND LOCATION OF ACCESS DOORS IN
CONSTRUCTION REQUIRED FOR ACCESS TO MECHANICAL
EQUIPMENT WITH G.C.
13. ALL WORK IS TO CONFORM WITH APPLICABLE CODES AND
STANDARDS.
14. COORDINATE ACCESS TO EQUIPMENT AND VALVES
INSTALLED ABOVE 'HARD' CEILINGS AND IN MASONRY
CHASES WITH GENERAL CONTRACTOR. PROVIDE
LOCKING ACCESS DOORS FOR INSTALLATION BY
CONTRACTOR AS REQUIRED TO SERVICE CONCEALED
DAMPERS, VALVES AND EQUIPMENT.
15. REFER TO ARCH FOR PHASING PLAN AND ALLOWABLE
WORK HOURS.
16. THESE DRAWINGS ARE ACCOMPANIED BY
SPECIFICATIONS. REFER TO SPECIFICATIONS FOR
FURTHER INFORMATION.
17. COMPLETE COORDINATION OF DRAWINGS SHALL BE
REQUIRED BY PARAGRAPH "SUBMITTAL" IN SPECIFICATION
SECTION 220511. CONSTRUCTION SHALL NOT START ON
ANY SYSTEM UNTIL THE COORDINATION DRAWINGS HAVE
BEEN APPROVED BY VA.
18. THIS IS A LIFE SAFETY BUILDING WHICH MEANS IT SHALL
REMAIN REASONABLY OPERATIONAL IN THE CASE OF A
SEISMIC EVENT. THEREFORE ALL STATIONARY
EQUIPMENT ON THE FLOOR SHALL BE FIXED RIGIDLY TO
THE STRUCTURE. ALL HANGING PIPING SHALL BE BRACED
TO THE STRUCTURE. REFER TO SPECIFICATION SECTION
130541.
19. PIPE LENGTH FROM RECIRCULATED HOT WATER MAIN TO
LAVATORY HOT WATER STOP SHALL BE NO MORE THAN
15'-6".
20. PIPE LENGTH FROM COLD WATER MAIN TO WATER
CLOSET FLUSH VALVE SHALL BE NO MORE THAN 19'-6".
GENERAL DEMOLITION NOTES
1. VERIFY ALL EXISTING CONDITIONS PRIOR TO
BEGINNING WORK. BRING ANY DISCREPANCIES FROM
THE DRAWINGS AND NOTES TO THE ARCHITECT
IMMEDIATELY. MINOR CHANGES IN THE SCOPE OF THE
DEMOLITION WORK SHALL NOT JUSTIFY AN ADDITIONAL
COST.
2. REMOVAL OF EXISTING FIXTURES AND EQUIPMENT WILL
REQUIRE ISOLATING THE PIPING RISERS OR MAINS VIA
SHUT-OFF VALVES. INSTALL NEW ISOLATION VALVES
WHERE REQUIRED FOR COMPLETION OF WORK.
3. REMOVAL OF EXISTING PLUMBING FIXTURES AND
EQUIPMENT, ETC. WILL REQUIRE CAPPING AND SEALING
EXISTING MAINS OR BRANCHES AS NECESSARY AND
REQUIRED TO ALLOW THE REMAINING SYSTEMS TO
FULLY OPERATE WITHOUT DEGRADATION.
CONTRACTOR SHALL PROVIDE PROTECTIVE PLASTIC
DROP CLOTHS TO PROTECT THE EXISTING OCCUPIED
AREAS AND EQUIPMENT FROM DUST AND DEBRIS
DURING THE CONSTRUCTION WORK, AND SHALL CLEAN
THE AREAS OF ALL CONSTRUCTION DIRT DAILY, AND
UPON COMPLETION OF THE WORK. REFER TO
GENERAL CONDITIONS AND DIVISION 1 SECTIONS IN
THE SPECIFICATIONS.
4. ALL DRAINED PIPING RISERS AND MAINS SHALL BE
REFILLED WITH PROPER FLUID AND PROPERLY VENTED
BY THIS CONTRACTOR, ONCE NEW WORK HAS BEEN
INSTALLED.
5. COORDINATE WITH GENERAL CONTRACTOR THE
REMOVAL AND REPLACEMENT OF ALL EXISTING
CEILINGS, WALLS, ETC. AS REQUIRED FOR MECHANICAL
DEMOLITION WORK.
6. EXISTING PIPING AND EQUIPMENT, ETC., NOT TO BE
UTILIZED IN THE COMPLETED BUILDING SHALL BE
DISCONTINUED OR REMOVED AS REQUIRED. ALL ENDS
OF DISCONTINUED PIPING SHALL BE CAPPED IN THE
NEAREST WALL, CEILING OR FLOOR SO THAT THEY ARE
COMPLETELY CONCEALED. OPENINGS LEFT IN WALLS,
CEILINGS, ETC., WHERE EQUIPMENT AND PIPE, ETC.,
ARE REMOVED AND NOT REPLACED, SHALL BE
PATCHED NEATLY WITH SIMILAR MATERIAL TO
ADJACENT CONSTRUCTION. REFER TO DRAWINGS
DELINEATING NEW WORK FOR ADDITIONAL
INFORMATION REGARDING SYSTEMS OR PORTIONS OF
SYSTEMS WHERE USE IS TO BE DISCONTINUED.
7. EXISTING PIPING, FIXTURES AND EQUIPMENT THAT ARE
NOT TO BE REUSED SHALL BE REMOVED AND SHALL
REMAIN THE PROPERTY OF THE OWNER IF THEY WISH
TO RETAIN OWNERSHIP OF SAME. IF NOT, EQUIPMENT
SHALL BECOME THE PROPERTY OF THIS CONTRACTOR
AND SHALL BE REMOVED FROM THE SITE AS SOON AS
PRACTICAL AND DISPOSED OF IN ACCORDANCE WITH
APPLICABLE LAWS AND REGULATIONS.
8. ALL CUTTING AND CHANNELING OF EXISTING BUILDING
SHALL BE ACCOMPLISHED IN A NEAT AND
WORKMANLIKE MANNER WITHOUT REMOVAL OF
EXCESS MATERIALS. THIS CONTRACTOR SHALL PATCH
AND REPLACE WITH MATERIAL SIMILAR TO ADJACENT
CONSTRUCTION.
9. WHERE EXISTING PIPING AND EQUIPMENT, ETC., THAT
ARE TO BE UTILIZED IN THE COMPLETED PROGRAM
CONFLICT WITH NEW CONSTRUCTION AND THE
REQUIRED DEMOLITION, THEY SHALL BE RELOCATED
AND RECONNECTED TO MAINTAIN THE DESIRED
SERVICE.
10. PORTIONS OF EXISTING SYSTEMS MAY BE SHOWN FOR
CLARITY EVEN THOUGH IT MAY NOT BE NECESSARY TO
MODIFY OR REVISE THEM. ALL EXISTING SYSTEMS ARE
SHOWN BASED ON ORIGINAL OR REMODEL BUILDING
DRAWINGS. CONTRACTOR TO VERIFY ALL EXISTING
CONDITIONS.
11. ALL WORK MUST BE COORDINATED AND SCHEDULED
WITH THE COR SO AS TO PROVIDE THE LEAST AMOUNT
OF DISRUPTION TO BUILDING ACTIVITIES AS POSSIBLE.
ALL ACCESSIBLE ABANDONED PIPING AND DUCTWORK
SHALL BE REMOVED AND PROPERLY DISPOSED OF.
SEISMIC BRACING NOTES
SOME MECHANICAL AND PLUMBING COMPONENTS OF THIS
BUILDING REQUIRE SEISMIC BRACING. IT IS THE
RESPONSIBILITY OF THIS CONTRACTOR AND THE GC TO
ENGAGE A SEISMIC DESIGN ENGINEER TO DETERMINE AND
DESIGN THE REQUIRED BRACING FOR EACH SYSTEM.
SYSTEMS REQUIRING BRACING INCLUDE, BUT ARE NOT
LIMITED TO, THE FOLLOWING:
1. ALL LIFE-SAFETY COMPONENTS INCLUDING FIRE
PROTECTION SYSTEMS.
2. COMPONENTS WEIGHING MORE THAN 400 POUNDS.
3. COMPONENTS WITH A CENTER OF MASS GREATER
THAN 4 FEET ABOVE FLOOR LEVEL AND WEIGHING
MORE THAN 20 POUNDS (E.G. TERMINAL UNITS).
4. DISTRIBUTION SYSTEMS WEIGHING MORE THAN 5
POUNDS PER FOOT. (E.G. 12x12, 22 GAUGE, SHEET
STEEL DUCTWORK AND CHILLED, HEATING,
DOMESTIC HOT, AND DOMESTIC COLD WATER PIPING
LARGER THAN 1 1/2".
FLEXIBLE CONNECTIONS ARE REQUIRED BETWEEN ALL
COMPONENTS AND ASSOCIATED DUCTWORK, PIPING, AND
CONDUITS.
THE FOLLOWING COMPONENTS ARE NOT REQUIRED TO BE
BRACED:
1. PLUMBING FIXTURES
THE CONTRACTOR SHALL PROVIDE ALL COMPONENT
SUBMITTALS WITH COMPONENT WEIGHTS TO SEISMIC
DESIGN ENGINEER FOR USE IN BRACING DESIGN.
BRACING SHALL BE DESIGNED TO MEET ASCE 7 AND NFPA 13
BRACING REQUIREMENTS. REFER TO ASCE 7 CHAPTER 13
FOR MORE INFORMATION ON SYSTEMS REQUIRED TO BE
BRACED.
1. THE EXISTING FLOOR SLAB IS A 2-WAY STRUCTURAL
SLAB. THE CONTRACTOR SHALL LOCATE ALL
REINFORCING BARS IN SLAB PRIOR TO CORE-DRILLING
AND PROVIDE THE SERVICES OF A LICENSED
STRUCTURAL ENGINEER TO VERIFY ALL FLOOR
PENETRATIONS.
CORE DRILLING NOTE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA 51101
712.252.4014
142 N. MOSLEY ST.
WICHITA, KANSAS 67202
316.262.2500
303 S. TOPEKA
WICHITA, KANSAS 67202
316.262.2691
PP001
PLUMBING NOTES AND SYMBOLS RELOCATE STEP DOWN UNIT
Columbia, MO
04/11/2019
589-402
FINAL CONSTRUCTION DOCUMENTS
JAC JGA
SHEET LIST
PP001 PLUMBING NOTES AND SYMBOLS
PD101 PLUMBING DEMOLITION PLAN - PARTIAL 2ND FLOOR
PD102 PLUMBING DEMOLITION PLAN - PARTIAL 3RD FLOOR
PL101 PLUMBING PLAN - PARTIAL 2ND FLOOR
PL102 PLUMBING PLAN - PARTIAL 3RD FLOOR
PL103 ENLARGED PLUMBING PLAN - PARTIAL 3RD FLOOR NORTH
PL104 ENLARGED PLUMBING PLAN - PARTIAL 3RD FLOOR SOUTH
PL104.2 ENLARGED PLUMBING PLAN - PARTIAL 3RD FLOOR SOUTH -
BID ITEM #2 (DEDUCT)
PL201 MEDICAL GAS PLAN - PARTIAL 3RD FLOOR
PL301 PLUMBING RISERS
PL501 PLUMBING SCHEDULES AND DETAILS
EaFGGaHJJbKLLaMNNa w 6.3
Ha
6.2
6.7
Ja
8.0
W 9.3
B
A
B
A
B
B
B
A
A
A
A
A
(EX)2-1/2"CW
(EX)1-1/2"HW
(EX)3/4"HWC
(EX)4"W (S-6)
(EX)1/2"
(EX)1/2"
REMOVE
(EX)2-1/2"CW
(EX)1-1/4"HW
(EX)1"HWC
UP (W-16) CAP AT
TOP OF RISER
(EX)1-1/2"HW
REMOVE
(EX)4"W
(EX)2"CW
(EX)3/4"HW
(EX)1/2"HWC
UP
CAP (EX)CW RISER DOWN (W-14)
(EX)1-1/4"HW (W-13)
(EX)2-1/2"CW
(EX)1-1/4"HW
(EX)1/2"HWC
CAP(EX)2-1/2"CW
(EX)1-1/4"HW
(EX)1"HW
(EX)3/4"HWC
CAP (EX)2"CW
(E X
)3 /4
(E
X )3
/4
(E X
)1 /2
(E X
)1 /2
(EX)2-1/2"CW
(EX)1-1/4"HW
(EX)3/4"HWC
(EX)2-1/2"CW
(EX)1-1/4"HW
(EX)3/4"HWC
(EX)3/4" (EX)3/4"
(EX)1 1/2"
(EX)2-1/2""CW
(EX)1-1/2"HW
(EX)1"HWC
CAP (EX)2-1/2"CW DOWN
TIE (EX)1-1/4"HW & 1"HWC TOGETHER ABOVE CEILING
REMOVE (EX)SINK AND ASSOCIATED PIPING.
CAP HW, CW & WASTE AT MAINS ABOVE
FIRST FLOOR CEILING, CAP VENT AT MAIN
ABOVE CEILING FOR NEW SINK
SOCIAL WORKER (EXTG)
C243
PSY (EXTG)
C241
PSY (EXTG)
C239
BH SECTY (EXTG)
C237
MHC RN(EXTG)
C237A
HEALTH INFO MGT (EXTG)
D218 CHIEF HEALTH INFO MGT
(EXTG)
D218C
INFO MGT. SVC (EXTG)
D218B
CLINICAL DOC SPEC (EXTG)
D218A
STAIR #6
D216D
CORR (EXTG)
C2C3
CORR (EXTG)
C2D4
ELEC / TELE / MECH (EXTG)
D217
SERVERS (EXTG)
D216
ALTAR
D213C
STORAGE
D213G
STORAGE
D213E
STORAGE
D213D
MULTI-PURPOSE
D213A
CHAPEL
D213B
B
B
REMOVE 2"W UP
TO (EX)HUB DRAIN
BEING REMOVED
REMOVE (EX)6"RL RISER TO
ABOVE 1ST FLOOR CEILING
A A B
B B
REMOVE
(EX)4"W & 3"V
REMOVE (EX)4"W RISER
REMOVE (EX)3"V RISER
CAP AT MAIN
REMOVE (EX)3"W, & (EX)2-1/2"CW,
(EX)1-1/4"HW, & 1"HWC UP
REMOVE (EX)2"W A B
(EX)4"W & 3"V UP
TO REMAIN
CAP
CAP
CAP
(EX)4"W
(EX)3"V
CAP (EX)2"CW DOWN (W-1A)
(EX)1"HW & 1/2"HWC DOWN (W-1A)
(EX)3"V & 4"W(EX)4"W
(EX)4"W & 3"V DOWN
(EX)3"V
(EX)4"W
REMOVE 3"V UP (EX)3/4"HWC TO REMAIN
CAP (EX)2-1/2"CW ABOVE CEILING
TIE 3/4"HW & 1/2"HWC TOGETHER ABOVE CEILING (W-14)
(EX)3"V UP
REMOVE
(EX)2-1/2"CW
(EX)1-1/2"HW
(EX)1"HWC
UP
A
A
(S-51)
REMOVE (EX)3"V UP
(S-50)
A
AREMOVE (EX)4"W UP
(EX)3"V UP
(S-33)
CAP 4"W AT TOP OF RISER
D235A
D235B
D234
D233C232 C231
GROUP RM (EXTG)
D205
VOCATIONAL REHAB. ASST.
(EXTG)
D205B
ELECT. CL. (EXTG)
D206B
ELEV 6
SOCIAL WORKER (EXTG)
D205C
INFO MGT. SVC (EXTG)
D208
OI&T (EXTG)
D209
TLT (EXTG)
D215TLT (EXTG)
D214
TLT (EXTG)
D210
(EX)2-1/2"CW
(EX)1-1/4"CW
PLUMBING DEMO NOTES
1. PLANS ARE SCHEMATIC IN NATURE.
LAYOUT IS BASED ON BEST AVAILABLE
INFORMATION. CONTRACTOR SHALL
FIELD VERIFY EXISTING CONDITIONS AND
DIMENSIONS.
2. ALL CUTTING, PATCHING AND
DEMOLITION WORK SHALL BE CLOSELY
COORDINATED WITH THE EXISTING
CONDITIONS AND THE REQUIRED NEW
WORK. G.C. SHALL PATCH AND FINISH
PENETRATIONS OF EXISTING SPACES TO
MATCH ADJACENT SURFACES.
3. ALL PIPING TO BE REMOVED SHALL BE
CAPPED AT THE MAINS UNLESS
OTHERWISE NOTED.
4. ALL ACCESSIBLE ABANDONED PIPING
SHALL BE REMOVED.
A. REMOVE (EX) WASTE LINE UP TO
FIXTURE BEING REMOVED OR TO
ROUGH-INS OF FIXTURES PREVIOUSLY
REMOVED.
B. REMOVE (EX) WATERLINES UP TO
FIXTURE BEING REMOVED OR TO
ROUGH-INS OF FIXTURES PREVIOUSLY
REMOVED. CAP AT MAINS BELOW 3RD
FLOOR ABOVE CEILING OF 2ND FLOOR.
PLAN NOTES
PROJECT
LOCATION
C223
C224
C225
C226
C226A
C228
C230
C227C
C252 C251 C235 C257
C236C256 C250
C249E
C227BC227
C227A C249D
C249C C255 C238
C240 C254
C242C253
C249B
C248 C246
C247
C222
D212F
D212C
D212E D212B
D212A D212D
C201
C201B
C201C
C201E C201F
C202
C201D C201A
C2B1
A202 A201
D202
D202B D212
D206A
D206 D205A
D201A
D201 D203
D204
D219B
D219C
D219
D220
D219F
D219E
D219A
D209A
D207B D207C
C2D1
D207
C221
C2D2
C2C3
C2D3
C2C2
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA 51101
712.252.4014
142 N. MOSLEY ST.
WICHITA, KANSAS 67202
316.262.2500
303 S. TOPEKA
WICHITA, KANSAS 67202
316.262.2691
PD101
PLUMBING DEMOLITION PLAN -
PARTIAL 2ND FLOOR
RELOCATE STEP DOWN UNIT
Columbia, MO
04/11/2019
589-402
FINAL CONSTRUCTION DOCUMENTS
JAC JGA
1/8" = 1'-0"
PLUMBING DEMOLITION PLAN - PARTIAL 2ND FLOOR
4' 8' 16'
1/8" = 1'-0"
0'
N
(EX)3"V DOWN
RELOCATE (EX)4"VTR
(EX)4"V DOWN
(EX)4"VTR
(EX)4"V DOWN(EX)4"VTR
(EX)3"V DOWN
(EX)6"RD TO REMAIN
(EX)6"RL DOWN
(EX)6"RD TO REMAIN
REMOVE (EX)6"RL DOWN
(EX)1-1/4"HW UP
(EX)1-1/4"CW UP
(EX)1/2"HWC UP
(EX)1-1/4"HW UP
(EX)1-1/2"HW DN.
(EX)1-1/2"CW UP
(EX)2-1/2"CW DN.
(EX)3/4"HWC UP & DN.
(EX)LINES CAPPED
(EX)1-1/2"HW UP/DN.
(EX)2-1/2"CW UP/DN.
(EX)1"HWC UP/DN.
(EX)1"HW DN.
(EX)2-1/2"CW DN.
(EX)1"HWC DN.
(EX)2"CW DN.
(EX)3/4"HW DN.
(EX)1/2"HWC DN.
(EX)2"CW DN.
(EX)1"HW DN.
(EX)1/2"HWC DN.
(EX)3/4"CW DN.
(EX)3/4"HW DN.
(EX)1/2"HWC DN.
(EX)3/4"CW DN.
(EX)3/4"HW DN.
(EX)1/2"HWC DN.
(EX)1-1/2"CW DN.
(EX)3/4"HW DN.
(EX)1/2"HWC DN.
(EX)1-1/2"CW DN.
(EX)3/4"HW DN.
(EX)1/2"HWC DN.
(EX)3/4"CW DN.
(EX)3/4"HW DN.
(EX)1/2"HWC DN.
(EX)3/4"CW DN.
(EX)3/4"HW DN.
(EX)4"VTR
(EX)3"V DOWN
(EX)3/4"CW DN.
(EX)3/4"HW DN.
(EX)2"CW DOWN
(EX)3/4"HW DOWN
(EX)1/2"HWC DOWN
(EX)3/4"CW & 2"W UP
(EX)4"(EX)2 1/2"(EX)1 1/4" (EX)1 1/2" (EX)2 1/2"
(EX)1 1/2"
(EX)1 1/4"
(EX)4"
(EX)4" W
(E X
)4
"W(EX)3"V
(E X
)2
/2
(E X
)1
/2
(E X
)3 /4
(E X
)3
(E X
)2
(E X
)1 /2
(EX)2-1/2"CW UP
(EX)1-1/2"HW UP
(EX)1"HWC UP
(EX)3"CW
(EX)2"HW
(EX)1"HWC
(E X
)1
(E X
)1
(E X
)4 "W
(EX)3"V
(EX)3" STACK
(EX)3/4"HW UP
(EX)3/4"CW UP
(EX)1/2"HWC UP
(EX)3/4"HW UP
(EX)3/4"CW UP
(EX)1/2"HWC UP
(EX)3/4"HW UP
(EX)3/4"CW UP
(EX)1/2"HWC UP
(EX)2-1/2"CW DOWN
(EX)1-1/4"HW DOWN
(EX)3/4"HWC DOWN
(EX)2"
(EX)2"
(EX)2"
(EX)2"
(EX)3/4"HW UP
(EX)3/4"CW UP
(EX)1/2"HWC UP
(EX)4"W
(EX)3"V
(EX)2"(EX)2"
(EX)2"(EX)4"W
(EX)2"CW UP
(EX)3/4"HW UP
(EX)1/2"HWC UP
(EX)3/4"HW UP
(EX)3/4"CW UP
(EX)1/2"HWC UP
(EX)2"
(EX)2-1/2"CW DN.
(EX)1-1/4"HW DN.
(EX)3/4"HWC DN.
(E X
)4 "W
(EX)1"HW UP
(EX)1"CW UP
(EX)1/2"HWC UP
(EX)1 1/4"
(E X
)3 /4
(E
X )3
/4
(E X
)3 "V
(EX)3/4"HW UP
(EX)3/4"CW UP
(EX)1/2"HWC UP
(EX)2"W UP
(EX)2"
(EX)2"
(EX)2-1/2"CW DN.
(EX)1-1/4"HW DN.
(EX)3/4"HWC DN.
(EX)3/4"HW UP
(EX)3/4"CW UP
(EX)1/2"HWC UP
(EX)2"W UP
(EX)2"W (EX)4"W
(E X
)2 "W
(EX)3"
(EX)ICE MAKER BOX
(EX)LAUNDRY TUB
(EX)3"CW
(EX)2"HW
(EX)1"HWC UP
(E X
)2 "W
(EX)2"W
(EX)4"W
EaFGGaHJJbKLLaMNNaP w 6.3
Ha
6.2
6.7
Ja
8.0 W 9.3
A B
B
DA
A
A
B
B
B
A
B
A
A
D
B
B
A
B
(EX)FIXTURES AND PIPING TO REMAIN
(E)RL
D
A
A
A
B
A
REMOVE (EX)4"W DOWN
(EX)3"V DOWNB
A B
(EX)3"V &
4"W DOWN
A
A (EX)4"W & 3"V DOWN
(EX)1"
C
B
(EX)4"VTR
(EX)3"V DOWND
REMOVE (EX)4"VTR
REMOVE (EX)HUB DRAIN
REMOVE, CLEAN &
STORE (EX)LAVATORY,
FAUCET & FOOT PEDALS
LAVATORY TO REMAIN:
BID ITEM 2 (DEDUCT)
E
(EX)4"W UP
(EX)3"V UP
(EX)5" RL RISER
(EX)4"W
(EX)3/4"CW
(EX)3/4"HW
(EX)1/2"HWC UP
(EX)4"W UP
(EX)3"V UP
(S-33)
(EX)3"W
PLUMBING DEMO NOTES
1. PLANS ARE SCHEMATIC IN NATURE.
LAYOUT IS BASED ON BEST AVAILABLE
INFORMATION. CONTRACTOR SHALL
FIELD VERIFY EXISTING CONDITIONS AND
DIMENSIONS.
2. ALL CUTTING, PATCHING AND
DEMOLITION WORK SHALL BE CLOSELY
COORDINATED WITH THE EXISTING
CONDITIONS AND THE REQUIRED NEW
WORK. G.C. SHALL PATCH AND FINISH
PENETRATIONS OF EXISTING SPACES TO
MATCH ADJACENT SURFACES.
3. ALL PIPING TO BE REMOVED SHALL BE
CAPPED AT THE MAINS UNLESS
OTHERWISE NOTED.
4. ALL ACCESSIBLE ABANDONED PIPING
SHALL BE REMOVED.
A. REMOVE (EX) PLUMBING FIXTURE AND
ASSOCIATED PIPING. CAP AT MAINS.
B. REMOVE (EX) PIPING DOWN, CAP AT
MAINS ABOVE SECOND FLOOR CEILING
OR AS INDICATED.
C. REMOVE AND RELOCATE 4"W & 3"V
RISERS.
D. REMOVE AND RELOCATE VENT RISER.
E. REMOVE (EX) PLUMBING FIXTURE AND
ASSOCIATED PIPING. CAP IN WALL.
PLAN NOTES
K
CHAPEL
D309
LACTATION RM
D310
CHAPLAIN SVC.
D312
OFFICE
D312A
MECH. EQUIP. / STOR.
D317
ELEC. CLOSET
D309A
TLT.
D311A
SHR. RM.
D311B
TLT.
D310A
CT ON-CALL
D311
STAIR #6
D320
PIV BADGE ISSUANCE
D321
H.R. SPEC. ST. & RCMT.
D322
H.R. SPEC. RETIREMENT
BENEFITS
D323
W. PUB. TLT.
D318
UNISEX TLT.
D319
H.R. SPEC. ST. & RCMT.
D324
SUPV. H.R. SPEC.
D325
H.R. SPEC. OWCP/ LEAVE/
AWARDS
D326
CLOSET
D310B
CHIEF OF H.R.
D327
SUPV. HR SPEC.
D328
H.R. SPEC. EMPLOYEE/
LABOR RELATIONS
D329
FREIGHT ELEV. LOBBY
D301
SOILED DISPATCH
D301A
UNISEX TLT.
D304
CLEAN UTIL.
D302
WK. RM.
D307B
N. ED. OFFICE
D307A
ORG. IMPROV.
D307
BUISNESS HUB
D308B
CLASSROOM 2
D308A
CLASSROOM 1
D308
TABLE/ CHAIR STG.
D308C
PROG. SUPPORT OFFICE
D305
DIR.
D306A
LEARNING ORG.
D306
JAN.
D314
ELEC. CLOSET
D314A
VOL. SVC. STG.
D315
COPY RM.
D316
H.R. INTERN
D316A
CREDENTIALS COORD.
C300
HEALTH ADMIN. SVC
C301
PAT. SVC.
C302
PRIVACY OFFICER
C303
CREDENTIALING SECT.
C300A
VACANT
C301A
HPDP HEALTH BEHVR.
COORD.
C301B
CHIEF OF H. AS.
C301C
OFFICE
C301D
HPDP PROG. MGR.
C301E
OFFICE
C321E
PRINT RM
C321A
MEDIA
C321D
OFFICE
C322D
WK. RM.
C322B
OFFICE
C323
H.B.P.C. ST.
C326
OFFICE
C327
H.B.P.C. ST.
C328
CL
C328A
CL
C329B
TLT.
C329A
OFFICE
C329
STAIR #7
C330
LIB. RESOURCE CTR.
C341
UNISEX TLT.
C342
CONF. RM.
C343
DATA ANALYSIS
C343A
ELEC. PANELS
C3C4B
OFFICE
C325C
INFO. SECURITY OFFICE
C325D
OFFICE
C341C
FAM. N. OFFICE
C341E
LIB. OFFICE
C341A
PHY. LNGE.
C334
STG.
C334A
JAN.
C333
FIRE CL.
C333A
CORR.
C3C3
CATHOLIC CHAPLAIN
C337
PHYSICIAN ON-CALL
C331
TLT.
C331A
CLOSET
C331B
CLOSET
C332A
MED. ON-CALL
C332
ANEST. ON-CALL
C335
TLT.
C335A
CLOSET
C335B
CLOSET
C336A
F. RES. ON-CALL
C336
DONATION STG.
D353
STG.
D353A
VOL.SVC PROG.COORD.
D332DVOL. SVC. WK.
D332A
STG.
D332B
STG.
D332C
VOL. SVC.
D332
SOCIAL WK.
D333
SOCIAL WK.
D333A
WK. RM.
D333B
PATIO VEST.
D334
OFFICE
A301
RECREATION
A302
H.R.
D330
STAIR #2
D331
CORR.
C3D4
H.R. SPEC. STF & RCMT.
D316C
HALL
C3D3
HALL
C3D3
STG.
C324A
WK. RM.
C321B
SAFETY TRAIN.
C324
FIRE CL.
D331A
VEND EQUIP
D331B
ELEC
D331C
CORR.
C3C4
CORR.
C3C2
ELEV. LOBBY
A300
EQUIP. RM.
D352
CORR.
C3D1
CORR.
C3C6
CORR.
C3B2
ELEV.
ELEV.
ELEV.
ELEV #3 ELEV #2 ELEV #1
ELEV.
ELEV.
PATIO
PLATFORM
C101N
RECEPT
C101O
PROJECT
LOCATION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA 51101
712.252.4014
142 N. MOSLEY ST.
WICHITA, KANSAS 67202
316.262.2500
303 S. TOPEKA
WICHITA, KANSAS 67202
316.262.2691
PD102
PLUMBING DEMOLITION PLAN -
PARTIAL 3RD FLOOR
RELOCATE STEP DOWN UNIT
Columbia, MO
04/11/2019
589-402
FINAL CONSTRUCTION DOCUMENTS
JAC JGA
1/8" = 1'-0"
PLUMBING DEMOLITION PLAN - PARTIAL 3RD FLOOR
N 4' 8' 16'
1/8" = 1'-0"
0'
1" = 100'-0"
KEY MAP - 3RD FLOOR
BID ITEM #2
w 6.3
Ha
6.2
6.7
Ja
8.0
W 9.3
3"V UP
3"V 3"V UP
3"V UP
3"V UP INTO CHASE
B
A
C
B
C
A
C
B
B
C
B
C
C B
B
C
C
B
C
C
B
B B
B
C
B C
E
C
B
B
B
C
C
C
C
B A
C
4"W
4"CO
CONNECT 4"W TO
(EX)4"W RISER (S-74)
CONNECT 3"V TO (EX)3"V
4"W UP TO FD-E
2"V UP
P-528
EXTEND 1-1/2"V TO (EX)VENT
ABOVE CEILING, EXTEND
1/2"CW, 1/2"HW & 2"W TO
(EX)WATER & WASTE ABOVE
1ST FLOOR CEILING
SOCIAL WORKER (EXTG)
C243
PSY (EXTG)
C241
PSY (EXTG)
C239
BH SECTY (EXTG)
C237
MHC RN(EXTG)
C237A
HEALTH INFO MGT (EXTG)
D218
CHIEF HEALTH INFO MGT
(EXTG)
D218C
INFO MGT. SVC (EXTG)
D218B
CLINICAL DOC SPEC (EXTG)
D218A
STAIR #6
D216D
CORR (EXTG)
C2D4
ELEC / TELE / MECH (EXTG)
D217
SERVERS (EXTG)
D216
ALTAR
D213C
STORAGE
D213G
STORAGE
D213E
STORAGE
D213D
MULTI-PURPOSE
D213A
CHAPEL
D213B
4"CO
"W
6"RL UP INTO CHASE ABOVE
6"RL DOWN IN CHASE. CONNECT TO
(EX)6"RL ABOVE 1ST FLOOR CEILING
R L
CONNECT 4"W TO
(EX)4"W RISER (S-73)
4"CO
4"CO
CONNECT 4"W TO
(EX)4"W RISER (S-47)
"W
"W
CONNECT 4"W TO (EX)4"W RISER
(S-48) & 3"V TO (EX)3"V
3"V UP INTO CHASE
"W
CONNECT 4"W TO
(EX)4"W RISER (S-49)4"CO
"W
4"CO
C
"W
4"W
CONNECT 4"W TO
(EX)4"W RISER (S-50)
"W
CONNECT 3"V TO
(EX)3"V RISER (S-50)
4"W
(EX)S-6 RISER
CONNECT 4"W TO
(EX)4"W RISER (S-71)
(EX)4"W RISER
& 3"V RISER
BCONNECT 4"W TO (EX)4"W
4"CO
"W
4"CO
CONNECT 3"V TO (EX)3"V RISER (S-51)
CONNECT 4"W TO
(EX)4"W RISER (S-51)
CONNECT 4"W TO (EX)4"W RISER (S-70)(EX)3"V RISER
4"CO
C
C
2"W
C
C
C
C
C
C C
C
C
C
CD
3"V UP
INSULATE 2"W LINE INCLUDING
"P" TRAP FROM DRAIN TO MAIN
4"W UP TO FD-E
D
CONNECT 2"W TO (EX)4"W RISER (S-72)
CONNECT 3/4"HWC
TO (EX)1-1/4"HW
CONNECT 3/4"HWC
TO (EX)3/4"HWC
CONNECT
(EX)3/4"HWC
TO (EX)1"HW
(EX)1 1/4" HW
CONNECT (EX)1"HW TO (EX)1/2"HWC
4"W 4"CO
(EX)2-1/2"CW,
(EX)1-1/4"HW &
(EX)1"HWC DOWN
(W-9)
CONNECT (EX)1"HWC
TO (EX)1-1/2"HW
(EX)2-1/2"CW, 1-1/4"HW & 1"HWC DOWN (W-16)
B
(EX)3"V
RISER (S-33)
"V
3"V UP
CONNECT 3"V TO (EX)3"V
CHAPLAIN SERVICES
D213F
CHAPLAIN HALL
D218D
STORAGE
D213J
STORAGE
D213K
A/V CLOSET
D213I
GROUP RM (EXTG)
D205
INFO MGT. SVC (EXTG)
D208 OI&T (EXTG)
D209
TLT (EXTG)
D210
TLT (EXTG)
D214
TLT (EXTG)
D215
D235B
D235AD234
D233 C232
C231
SOCIAL WORKER (EXTG)
D205C
ELECT. CL. (EXTG)
D206B
VOCATIONAL REHAB. ASST.
(EXTG)
D205B
(EX)3/4" HWC
F
F
F
F
1-1/2"V UP
A. 2"W & 1-1/2"V UP TO SHOWER DRAIN
B. 4"W UP INTO CHASE ABOVE
C. 2"W UP INTO WALL ABOVE
D. 2"W UP TO FLOOR DRAIN
E. 3"W & 2"V UP TO MOP BASIN
F. INSTALL CIRCUIT SETTER SET FOR 0.5
GPM
PLAN NOTES
1. PLANS ARE SCHEMATIC IN NATURE. LAYOUT IS BASED ON BEST
AVAILABLE INFORMATION. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS AND DIMENSIONS.
2. ALL CUTTING, PATCHING AND DEMOLITION WORK SHALL BE CLOSELY
COORDINATED WITH THE EXISTING CONDITIONS AND THE REQUIRED NEW
WORK. G.C. SHALL PATCH AND FINISH PENETRATIONS OF EXISTING
SURFACES TO MATCH ADJACENT SURFACES.
3. FIELD VERIFY BEST ROUTING FOR NEW PIPING AND DUCTWORK.
COORDINATE WITH EXISTING EQUIPMENT, PIPING AND DUCTWORK. NEW
PIPING SHALL RISE AND DROP, JOG OR OFFSET AS REQUIRED TO AVOID
CONFLICTS. DUCTWORK SHALL TAKE PRECEDENCE OVER ALL PIPING,
EXCEPT WHERE GRADE MUST BE MAINTAINED FOR DRAINAGE. ANY
EXPENSES RISING FROM LACK OF COORDINATION SHALL BE MADE AT
THE CONTRACTOR’S EXPENSE.
4. REFER TO ARCHITECTURAL SPECIFICATIONS AND PLANS FOR PHASING
OF DEMOLITION AND NEW WORK. ADJACENT AREAS ARE 100% OCCUPIED
AND CONTRACTOR SHALL WORK CLOSELY WITH COR TO SCHEDULE
DEMOLITION AND CONSTRUCTION TO BE AS LEAST DISRUPTIVE AS
POSSIBLE.
5. ALL WORK SHALL BE DONE AT NIGHT AND/OR WEEKENDS, OR AS
DIRECTED BY THE COR.
6. WATER PIPING SHALL BE INSTALLED AS INDICATED TO COMPLY WITH THE
VA PLUMBING DESIGN MANUAL. DEVIATION FROM ROUTING ONLY
PERMISSIBLE BY APPROVAL OF COR. IN ADDTION:
GENERAL NOTES
a. PIPE LENGTH FROM RECIRCULATED HOT WATER MAIN TO
LAVATORY HOT WATER STOP SHALL BE NO MORE THAN 15'-6".
b. PIPE LENGTH FROM COLD WATER MAIN TO WATER CLOSET
FLUSH VALVE SHALL BE NO MORE THAN 19'-6".
7. COMPLETE COORDINATION OF DRAWINGS SHALL BE REQUIRED BY
PARAGRAPH "SUBMITTAL" IN SPECIFICATION SECTION 220511.
CONSTRUCTION SHALL NOT START ON ANY SYSTEM UNTIL THE
COORDINATION DRAWINGS HAVE BEEN APPROVED BY VA.
PROJECT
LOCATION
C223
C224
C225
C226
C226A
C228
C230
C227C C252 C251 C235 C257
C236C256 C250
C249E
C227B C227
C227A C249D
C249C C255 C238
C240 C254
C242C253
C249B
C248
C246
C247
C222
D212F
D212C
D212ED212B
D212A D212D
C201 C201B
C201C
C201E C201F
C202
C201D C201A
C2B1
A202 A201
D202
D202B
D212
D206A
D206 D205A
D201A
D201 D203
D204
D219B
D219C
D219
D220
D219F
D219E
D219A
D209A
D207B D207C
C2D1
D207
D209 D208
C221
C2D2
C2C3
C2D3
C2C2
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA 51101
712.252.4014
142 N. MOSLEY ST.
WICHITA, KANSAS 67202
316.262.2500
303 S. TOPEKA
WICHITA, KANSAS 67202
316.262.2691
PL101
PLUMBING PLAN - PARTIAL 2ND
FLOOR
RELOCATE STEP DOWN UNIT
Columbia, MO
04/11/2019
589-402
FINAL CONSTRUCTION DOCUMENTS
JAC JGA
1/8" = 1'-0"
PLUMBING PLAN - PARTIAL 2ND FLOOR
N 4' 8' 16'
1/8" = 1'-0"
0' w 6.3
Ha
6.2
6.7
Ja
8.0
W 9.3
P-102
P-418
P-423
P-422
P-418
P-528
P-422
P-529
P-529
P-422
P-423
P-422
P-102 P-102
P-102 P-102 P-102
P-102
P-102
P-102
P-102
P-102
P-102
P-115
P-102
P-115
P-704
P-102
P-704
P-502
P-418
P-505
PATIENT RM #7
C364
PATIENT RM #10
C350
PAT. TLT.
C363A
PAT. TLT.
C364A
PAT. TLT.
C365A
STAIR #7
C330
PATIENT RM #6
C363
PATIENT RM #5
C362
PAT. TLT.
C350A
PATIENT RM #4
C361
PAT. TLT.
C349A
PATIENT RM #2
C357
PAT. TLT.
C357A
PAT. TLT.
C356A
NOURISH.
C354
CORR
C3C6
CLEAN UTILITY ROOM
C333
SOILED WORKROOM
C343
SHOWER
C338
STERILE STORAGE
C347
CHART ROOM
C353
NURSE STATION
C355
MEDS.
C352
STOR.
C359
CORR
C3C5
NURSE STATION
C332
HSKPG.
C341
PAT. TLT.
C360A
CORR
C3C4
STAFF TOILET
C336
EQUIP. STORAGE
C345
PATIENT RM #8
C365
PATIENT RM #9
C351
PATIENT RM #11
C349
BARIATRIC PATIENT RM #3
C360
STAFF LOCKERS
C335
SWAMP
C321
CONSULT.
C322
MSA
C325
CORR.
C3C9
OFFICE NURSE MNGR.
C346
PATIENT RM #1
C356
CORR
C3C2
QUIET ROOM
C339
MOBILE X-RAY ALCOVE
D301C
W.C. / STRETCHER ALCOVE
D301B
CORR
C3C3
ELEVATOR LOBBY
D301
BED STORAGE
D302
SOILED
D301A
GREETER
C326
STORAGE
C358
STAFF LOUNGE
C334
EQUIPMENT STORAGE
C327
BARIATRIC ISOLATION
ROOM #14
C328
PAT. TLT.
C328A
ISOLATION PATIENT ROOM
#13
C337
PATIENT RM #12
C348
PAT. TLT.
C348A
FAMILY TOILET
C324
ANTE RM.
C329
MECH
C358A
CORR.
C3C7
PAT. TLT.
C362A
PAT. TLT.
C361A
PAT. TLT.
C337A
ELEC.
C340
CONNECT 6"RL TO (EX)6"RD
(E)RL
P-422
P-423
P-423
P-115
P-418
P-423
P-423
P-423
P-422
P-422
P-423 P-423 P-423
P-423 P-423
P-422
P-422 P-422
P-422
P-422
P-422
P-422 P-422
P-423
P-423
MSA
C325
TOILET
C369SLEEP
C368
P-102 P-704
P-710
PL103
4"VTR
"V
PL104
FD-E
2"V DOWN
RE-INSTALL (EX)
LAVATORY, FAUCET
AND FOOT PEDALS.
INSTALL WITH NEW
CARRIER, TRAP, STOPS
AND SUPPLIES. (EX)
LAVATORY TO REMAIN:
BID ITEM 2 (DEDUCT)
PAT. TLT.
C351A
P-529
RL
RUN 6"RL AS HIGH AS POSSIBLE
P-809
P-809P-809P-809P-809
P-809
P-809
P-809
P-809
P-809
P-809
P-809
P-809
P-809
FD-E
CONNECT 4"V TO
(EX)4"V RISER
PL104.2
1/2"
H.R. INTER
D316A
OIT
C358C
TELEMETRY
C353B
2"FD-M VALVE & CONNECT 1/2"CW WITH
WATER HAMMER ARRESTOR "A"
TO STEAM GENERATOR
PROJECT
LOCATION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA 51101
712.252.4014
142 N. MOSLEY ST.
WICHITA, KANSAS 67202
316.262.2500
303 S. TOPEKA
WICHITA, KANSAS 67202
316.262.2691
PL102
PLUMBING PLAN - PARTIAL 3RD
FLOOR
RELOCATE STEP DOWN UNIT
Columbia, MO
04/11/2019
589-402
FINAL CONSTRUCTION DOCUMENTS
JAC JGA
1/8" = 1'-0"
PLUMBING PLAN - PARTIAL 3RD FLOOR
N 4' 8' 16'
1/8" = 1'-0"
0'
JJbKLLaMNNa
Ha
6.7
Ja
8.0
W 9.3
P-102 P-423
P-422
P-422
P-704
P-102
P-418 P-115
P-529
P-505
P-502
P-418
P-102
P-704
P-528
P-422
P-422
P-423
P-102
P-423
P-704
P-115
P-418
P-115
P-418
4"W DOWN
4"W DOWN
2"FD-C
2"FD-C
4"W DOWN
4"W DOWN
3"V DOWN
4"W DOWN
SWAMP
C321
SLEEP
C368
TOILET
C369
EQUIPMENT STORAGE
C327
CONSULT.
C322
PAT. TLT.
C328A
BARIATRIC ISOLATION
ROOM #14
C328
ANTE RM.
C329
ISOLATION PATIENT ROOM
#13
C337
PAT. TLT.
C337A
PATIENT RM #12
C348
PAT. TLT.
C348A
PATIENT RM #11
C349
CORR
C3C3
STERILE STORAGE
C347
STAFF TOILET
C336
STAFF LOCKERS
C335
STAFF LOUNGE
C334
NURSE STATION
C332
CLEAN UTILITY ROOM
C333
CORR.
C3C9
BED STORAGE
D302
FAMILY TOILET
C324
CLOSET
C366
ELEVATOR LOBBY
D301
SOILED
D301A
W.C. / STRETCHER ALCOVE
D301B
QUIET ROOM
C339
SHOWER
C338
ELEC.
C340
SOILED WORKROOM
C343
HSKPG.
C341
EQUIP. STORAGE
C345
OFFICE NURSE MNGR.
C346
CORR
C3C5
MOBILE X-RAY ALCOVE
D301C
MSA
C325
"V
(E X
)3
"V3"V DOWN
1 1/4"
1 1/4"
WHA-A
WHA-A
1 1/4"
WHA-A
WHA-A
WHA-A
1 1/4"
WHA-A 1 1/4"
1/
"V
3"V 3"V
(E X
)4 "W
"W
1 1/4"
(E X
)3 "V
(EX)3"V & 4"W DOWN (S-71)
2"V
(EX)4"W
"V
"V
3/4"
WHA-A
WHA-A
1 1/4"
1 1/2"V
(EX)3"V
CONNECT 2-1/2"CW, 1-1/2"HW
& 1"HWC TO (EX) LINES,
ABOVE CEILING THIS AREA
(EX)1-1/2"HW
1"HWC
2-1/2"CW
UP
CONNECT 2-1/2"CW TO
(EX)3"CW,1-1/2"HW TO
(EX)2"HW & 1"HWC TO
(EX)1"HWC
1/
2" 2 1/2"
3/4"
2" 2"
1/
1 1/2" 1 1/2"
3/4"
2" V
2 1/2"
2" 2" 3/4"
1/
/4
1 1/2"
/4
/4
2"
3/4"
2 1/2"
2"
VALVE AND CAP 2"CW &
3/4"HWC ABOVE CEILING
1/
1/
1 1/4"
1/
2 1/2"
(EX)4"W
(EX)4"W
(EX)2"W
(EX)2"W (EX)4"W
"W
1-1/4" RPZ ON WALL, SERVING DIALYSES BOXES, RUN DISCHARGE TO ABOVE MOP BASIN
P-809
P-809
P-809
"V
A A
3"V
2"V
INSTALL DRAIN PAN BETWEEN
ANY PIPING AND ELECTRICAL
PANELS THIS ROOM
(EX)3/4"HW UP
(EX)3/4"CW UP
(EX)1/2"HWC UP
(EX)2"W UP
(EX)3/4"HW UP
(EX)3/4"CW UP
(EX)1/2"HWC UP
(EX)2"W UP
(EX)3/4"HW UP
(EX)3/4"CW UP
(EX)1/2"HWC UP
(EX)2"W UP
(EX)3/4"HW UP
(EX)3/4"CW UP
(EX)1/2"HWC UP
(EX)2"W UP
(EX)2"CW UP
(EX)4"W UP
(EX)3"V UP
(EX)2"CW UP
(EX)4"W UP
(EX)1"HW UP
(EX)1"CW UP
(EX)1/2"HWC UP
(EX)1-1/4"CW UP
(EX)2"CW UP
(EX)4"W UP
(EX)2"CW UP
(EX)3/4"HW UP
(EX)1/2"HWC UP
(EX)4"W UP
(EX)3/4"CW UP
(EX)3/4"HW UP
(EX)1/2"HWC UP
(EX)2"W UP
(EX)3/4"HW UP
(EX)3/4"CW UP
(EX)1/2"HWC UP
(EX)2"W UP
(EX)2"CW UP
(EX)4"W UP
(EX)2"CW UP
(EX)4"W UP
3/4"
1 1/2"
(EX)3"CW UP
(EX)2"HW UP
(EX)1"HWC UP
(EX)4"W & (EX)3"V
RISER (S-70)
PIPING TO RE-FEED
FLOORS ABOVE
3/4"3/4"1/2" 1/2"
1/2"
3/4"
/2
1 1/4"
1 1/4"
/4
1/
"V
1 1/2"V2"V
1/
1/
1 1/2"
1 1/2"
1/
1 1/4"
1"
1"
3/4"
3"V
(EX)3"V UP
2"V
4"W DOWN
F
F
OIT
C358C
(EX)3"V UP
(EX)4"W UP
(EX)2"W UP
(EX)4"W UP
4"W
(EX)5"RL RISER
(EX)4"W DOWN (S-5)
CONNECT 4"W TO (EX)4"W UP
CONNECT 3"W TO (EX)3"W UP
CONNECT 3"W TO (EX)3"W UP
CONNECT 2"W TO (EX)2"W
4"W
CONNECT 3"W
TO (EX)3"W
4"W DOWN
CONNECT 3"V TO (EX)3"V
3"V DOWN
4"CO
BALANCE VALVE SET FOR 4 GPM
BALANCE VALVE SET FOR 2 GPM
BALANCE VALVE SET FOR 4.5 GPM
1"
(EX)3"V
G
J
J
H
G
J
J
J
H
J
J
H
J
J
H
J
J
H
J
J
H
J H
J
J
J H
J
J
H3/4"
J
J
J
F
1. PLANS ARE SCHEMATIC IN NATURE. LAYOUT IS BASED ON BEST
AVAILABLE INFORMATION. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS AND DIMENSIONS.
2. ALL CUTTING, PATCHING AND DEMOLITION WORK SHALL BE CLOSELY
COORDINATED WITH THE EXISTING CONDITIONS AND THE REQUIRED NEW
WORK. G.C. SHALL PATCH AND FINISH PENETRATIONS OF EXISTING
SURFACES TO MATCH ADJACENT SURFACES.
3. FIELD VERIFY BEST ROUTING FOR NEW PIPING AND DUCTWORK.
COORDINATE WITH EXISTING EQUIPMENT, PIPING AND DUCTWORK. NEW
PIPING SHALL RISE AND DROP, JOG OR OFFSET AS REQUIRED TO AVOID
CONFLICTS. DUCTWORK SHALL TAKE PRECEDENCE OVER ALL PIPING,
EXCEPT WHERE GRADE MUST BE MAINTAINED FOR DRAINAGE. ANY
EXPENSES RISING FROM LACK OF COORDINATION SHALL BE MADE AT
THE CONTRACTOR’S EXPENSE.
4. REFER TO ARCHITECTURAL SPECIFICATIONS AND PLANS FOR PHASING
OF DEMOLITION AND NEW WORK. ADJACENT AREAS ARE 100% OCCUPIED
AND CONTRACTOR SHALL WORK CLOSELY WITH COR TO SCHEDULE
DEMOLITION AND CONSTRUCTION TO BE AS LEAST DISRUPTIVE AS
POSSIBLE.
5. ALL WORK SHALL BE DONE AT NIGHT AND/OR WEEKENDS, OR AS
DIRECTED BY THE COR.
6. WATER PIPING SHALL BE INSTALLED AS INDICATED TO COMPLY WITH THE
VA PLUMBING DESIGN MANUAL. DEVIATION FROM ROUTING ONLY
PERMISSIBLE BY APPROVAL OF COR. IN ADDTION:
GENERAL NOTES
a. PIPE LENGTH FROM RECIRCULATED HOT WATER MAIN TO
LAVATORY HOT WATER STOP SHALL BE NO MORE THAN 15'-6".
b. PIPE LENGTH FROM COLD WATER MAIN TO WATER CLOSET
FLUSH VALVE SHALL BE NO MORE THAN 19'-6".
7. COMPLETE COORDINATION OF DRAWINGS SHALL BE REQUIRED BY
PARAGRAPH "SUBMITTAL" IN SPECIFICATION SECTION 220511.
CONSTRUCTION SHALL NOT START ON ANY SYSTEM UNTIL THE
COORDINATION DRAWINGS HAVE BEEN APPROVED BY VA.
A. ICE MAKER BOX ABOVE BACKSPLASH
B. 4"W UP INTO CHASE ABOVE
C. 2"W UP INTO WALL ABOVE
D. 2"W UP TO FLOOR DRAIN
E. 3"W & 2"V UP TO MOP BASIN
F. 2"W RUN HORIZONTALLY IN WALL ABOVE
FLOOR, WHERE POSSIBLE
G. ALL WALL PENETRATIONS AROUND
ISOLATION ROOMS SHALL BE SEALED
H. INSTALL CIRCUIT SETTER ON 1/2"HWC AS
IT CONNECTS TO EXISTING. SET FOR 0.5
GPM
PLAN NOTES
J. INSTALL BALL VALVE ON LINE AS IT
CONNECTS TO EXISTING
PROJECT
LOCATION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA 51101
712.252.4014
142 N. MOSLEY ST.
WICHITA, KANSAS 67202
316.262.2500
303 S. TOPEKA
WICHITA, KANSAS 67202
316.262.2691
PL103
ENLARGED PLUMBING PLAN -
PARTIAL 3RD FLOOR NORTH
RELOCATE STEP DOWN UNIT
Columbia, MO
04/11/2019
589-402
FINAL CONSTRUCTION DOCUMENTS
JAC JGA
1/4" = 1'-0"
ENLARGED PLUMBING PLAN - PARTIAL 3RD FLOOR NORTH
N 2' 4' 8'0'
1/4" = 1'-0"
HaJa
P-102
P-529
P-422
P-102 P-102
P-102 P-102
P-102
P-102
P-102
P-102
P-102
P-102
(EX)6"RD TO REMAIN
(E)RL
(EX)6"RD DOWN
3"V DOWN
(EX)4"VTRP-423
P-423
P-423
P-423
P-422 P-422
P-423 P-423
P-423
P-423 P-423
P-422
P-422
P-422
P-422
P-422
P-422
P-422
P-422
P-423
P-423
3"V DOWN
P-710
3"V DOWN
3"V DOWN
"V
3"V
2"V
2"V
1/
WHA-A
WHA-A
3"V
1 1/4"
A
WHA-A
WHA-A
1 1/4"
A
A A
B B
/2
B B
A
B
"V
WHA-A
3"V
WHA-A
"V
3"V
1 1/4"
1 1/4"
1 1/4"
"V
"V
B
AWHA-A
WHA-A
1 1/4"
A
WHA-A
1/2"
1 1/4"
B
A
1 1/4"
WHA-A
2"V
(EX)4"VTR
(EX)4"VTR
1/
"V
WHA-A
(EX)4"VTR
PATIENT RM #7
C364
PATIENT RM #10
C350
PAT. TLT.
C363A
PAT. TLT.
C364A
PAT. TLT.
C365A
STAIR #7
C330
PATIENT RM #6
C363
PATIENT RM #5
C362
PAT. TLT.
C350A
PATIENT RM #4
C361
PAT. TLT.
C349A
PATIENT RM #2
C357
PAT. TLT.
C357A
PAT. TLT.
C356A
NOURISH.
C354
CORR
C3C6
CHART ROOM
C353
NURSE STATION
C355
MEDS.
C352
STOR.
C359
CORR
C3C5
PAT. TLT.
C360A
CORR
C3C4
PATIENT RM #8
C365
PATIENT RM #9
C351
PATIENT RM #11
C349
BARIATRIC PATIENT RM #3
C360
OFFICE NURSE MNGR.
C346
PATIENT RM #1
C356
CORR
C3C3
PAT. TLT.
C362A
PAT. TLT.
C361A
B
B
3"V
2"V
2 1/2"
2 1/2"
2 1/2" 2 1/2"
2 1/2"
2"
VALVE AND CAP 1"CW,
1-1/4"HW & 2"CW
ABOVE CEILING
2"
TELEMETRY
C353B
P-529
1 1/2"
1 1/2"
"V
2"VTR
3"VTR
6"RL DOWN
P-809
P-809
P-809
P-809
P-809
P-809
P-809
P-809
P-809
P-809
P-809
D
FD-M
PAT. TLT.
C351A
A
"V
3"V DOWN
1/
1/
1/
1 1/4"
1/
1"
/4
/4
1"
2 1/2"
1 1/4"
1/
1/
1/
1/
1/
1/
1/
1/
1/
1 1/4"
1/
1/
"V
A
C
1/
1. PLANS ARE SCHEMATIC IN NATURE. LAYOUT IS BASED ON BEST
AVAILABLE INFORMATION. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS AND DIMENSIONS.
2. ALL CUTTING, PATCHING AND DEMOLITION WORK SHALL BE CLOSELY
COORDINATED WITH THE EXISTING CONDITIONS AND THE REQUIRED NEW
WORK. G.C. SHALL PATCH AND FINISH PENETRATIONS OF EXISTING
SURFACES TO MATCH ADJACENT SURFACES.
3. FIELD VERIFY BEST ROUTING FOR NEW PIPING AND DUCTWORK.
COORDINATE WITH EXISTING EQUIPMENT, PIPING AND DUCTWORK. NEW
PIPING SHALL RISE AND DROP, JOG OR OFFSET AS REQUIRED TO AVOID
CONFLICTS. DUCTWORK SHALL TAKE PRECEDENCE OVER ALL PIPING,
EXCEPT WHERE GRADE MUST BE MAINTAINED FOR DRAINAGE. ANY
EXPENSES RISING FROM LACK OF COORDINATION SHALL BE MADE AT
THE CONTRACTOR’S EXPENSE.
4. REFER TO ARCHITECTURAL SPECIFICATIONS AND PLANS FOR PHASING
OF DEMOLITION AND NEW WORK. ADJACENT AREAS ARE 100% OCCUPIED
AND CONTRACTOR SHALL WORK CLOSELY WITH COR TO SCHEDULE
DEMOLITION AND CONSTRUCTION TO BE AS LEAST DISRUPTIVE AS
POSSIBLE.
5. ALL WORK SHALL BE DONE AT NIGHT AND/OR WEEKENDS, OR AS
DIRECTED BY THE COR.
6. WATER PIPING SHALL BE INSTALLED AS INDICATED TO COMPLY WITH THE
VA PLUMBING DESIGN MANUAL. DEVIATION FROM ROUTING ONLY
PERMISSIBLE BY APPROVAL OF COR. IN ADDTION:
GENERAL NOTES
a. PIPE LENGTH FROM RECIRCULATED HOT WATER MAIN TO
LAVATORY HOT WATER STOP SHALL BE NO MORE THAN 15'-6".
b. PIPE LENGTH FROM COLD WATER MAIN TO WATER CLOSET
FLUSH VALVE SHALL BE NO MORE THAN 19'-6".
7. COMPLETE COORDINATION OF DRAWINGS SHALL BE REQUIRED BY
PARAGRAPH "SUBMITTAL" IN SPECIFICATION SECTION 220511.
CONSTRUCTION SHALL NOT START ON ANY SYSTEM UNTIL THE
COORDINATION DRAWINGS HAVE BEEN APPROVED BY VA.
A. 2"W RUN HORIZONTALLY IN WALL ABOVE
FLOOR, WHERE POSSIBLE
B. 4"W DOWN
C. ICE MAKER BOX ABOVE BACKSPLASH
D. 1/2"CW DOWN IN WALL. CONNECT w/STOP
TO OWNER FURNISHED WATER FILTER IN
MILLWORK BELOW. TERMINATE w/STOP AT
36" A.F.F. FOR CONNECTION TO ICE
MACHINE
PLAN NOTES
PROJECT
LOCATION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA 51101
712.252.4014
142 N. MOSLEY ST.
WICHITA, KANSAS 67202
316.262.2500
303 S. TOPEKA
WICHITA, KANSAS 67202
316.262.2691
PL104
ENLARGED PLUMBING PLAN -
PARTIAL 3RD FLOOR SOUTH
RELOCATE STEP DOWN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.