36C25519R0094-003.pdf

PDF 6 MB Posted

Attached to
FCA-Replace Windows in Buildings 2, 18, 25, and 52, P/N: 657-18-302JB
Solicitation number
36C25519R0094
Issued by

About this file

36C25519R0094 03 657 18 302JB Plans Abatement BID Docs 218 25_053019 final.pdf

View the file

Other files

File Type Posted
36C25519R0094-002.pdf PDF
36C25519R0094-001.pdf PDF
36C25519R0094-000.docx DOCX document
36C25519R0094-004.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L1

L2

L1

L2

L1

L2

L1

L2

L1

L2

L1

L2

L1

UP

UP

UP

UP

UP

UP

UP

DN

L2

L1 L2L1 L2 L1 L2

L1 L2 L1 L2 L1

L2

L1 L2

L1 L2

L1 L2

L1 L2

L1 L2L1 L2

L1 L2L1 L2

L1 L2L1 L2

L1 L2

L1 L2

L2

L1

L2

L1

L1

L2

L1

L2

L1

L2

L1

L2

8718 BOTTS LANE,

SAN ANTONIO, TX 78217

T 210.881.9714

F 210.881.6808 www.hfscompany.com

6 SOUTH OLD ORCHARD

ST. LOUIS, MO 63119

T 314.918.8383

F 314.918.1766 www.rossbar.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

ROBERT A. JURGIEL, PE, CSP

(PE LICENSE NO. 029078)

A

M

02-HA-111

ABATEMENT FLOOR PLAN

BLDG 02 - FLOOR 01

657-25-302JB

BID DOCUMENTS

REPLACE WINDOWS IN BUILDINGS 2, 18,

25, 52 FOR ENERGY EFFICIENCY

5/8/19

ABATEMENT FLOOR PLAN - BLDG 02 - FLOOR 01

BMD

GKY

SHEET KEY NOTES:#

REMOVE CEILING TILES THAT HAVE TO BE DISPLACED TO

REMOVE AND REPLACE THE WINDOW, INSPECT THE CEILING

TILES AND OTHER HORIZONTAL SURFACES FOR LBP CHIPS,

INSPECT WALLS FOR LOOSE, CURLING OR DELAMINATED LBP

(WITHIN 2' OF CEILING TILE OPENING) THAT COULD DISLODGE

DURING WINDOW REPLACEMENT ACTIVITIES. IF THE

IDENTIFIED AREAS ARE LESS THAN 2 SF, THE ROOM OR WORK

AREA SHOULD BE ISOLATED WITH CRITICAL BARRIERS, DROP

CLOTHS SHOULD BE PLACED BELOW THE IMMEDIATE WORK

AREA AND LOCALIZED NEGATIVE PRESSURE ESTABLISHED.

THE LOOSE, CURLING OR DELAMINATED LBP IN THESE

IDENTIFIED AREAS SHALL BE REMOVED USING

NON-MECHANICAL MEANS. THE CEILING TILES AND OTHER

HORIZONTAL SURFACES SHALL BE HEPA VACUUMED. IF THE

AFFECTED AREAS ARE GREATER THAN 2 SF, WORK WILL HAVE

TO BE CONDUCTED IN A NEGATIVE PRESSURE ROLLING

MINI-CONTAINMENT (WITH HEPA FILTRATION) OR HEPA CART.

- 28 WINDOWS WITH IDENTIFIED AREAS <2 SF

- 4 WINDOWS WITH IDENTIFIED AREAS >2 SF

ONCE WINDOWS HAVE BEEN REMOVED BY GENERAL

CONTRACTOR OR SUBCONTRACTOR; HEPA-VACUUM

EXPOSED WINDOW CAVITY, WET WIPE WITH AN

EPA-REGISTERED ANTI-MICROBIAL SOLUTION AND CLEAN ANY

DEBRIS FROM DROP CLOTH. ONCE WINDOW HAS BEEN

REPLACED BY GENERAL CONTRACTOR OR SUBCONTRACTOR,

CONDUCT FINAL CLEANING INCLUDING REMOVING THE DROP

CLOTHS AND OTHER DUST PROTECTION MEASURES.

- 32 WINDOWS

L1.

L2.

3/16" = 1'-0"

PLAN

NORTH

TRUE

NORTH

ABATEMENT GENERAL NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

THE KNOWN HAZARDS ASSOCIATED WITH THIS PROJECT

CONSIST OF INTACT LEAD-BASED PAINT (LBP) OR

LEAD-CONTAINING PAINT ON WALLS, CEILINGS AND/OR TRIM

AROUND WINDOWS (BLDGS. 2, 18 & 25), LOOSE, CURLING OR

DELAMINATED LBP ON WALLS AND CEILINGS ABOVE CEILING

TILES (BLDG. 2) AND DETERIORATED LBP IN WINDOW CAVITIES

(BLDGS. 2, 18 & 25).

THE SCOPE OF THE LEAD ABATEMENT WORK IN BUILDINGS 2,

18 & 25 CONSISTS OF HEPA-VACUMMING AND CLEANING

CEILING TILES ADJACENT TO WINDOWS CONTAMINATED WITH

LEAD-BASED PAINT (LBP) CHIPS / DEBRIS (BLDG. 2),

REMOVING LOOSE, CURLING OR DELAMINATED LBP FROM

WALLS AND CEILINGS ADJACENT TO WINDOWS (BLDG. 2), AND

CLEANING WINDOW OPENINGS ONCE WINDOWS HAVE BEEN

REMOVED BY GENERAL CONTRACTOR OR SUBCONTRACTOR

(BLDGS. 2, 18 & 25). ALL WORK SHALL BE CONDUCTED IN

ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL

REGULATIONS AND THE CONTRACT SPECIFICATIONS.

ABATEMENT CONTRACTOR WILL RESTRICT ACCESS TO

ROOMS WHERE WORK IS TO BE PERFORMED, COVER ALL

CONTENTS IN THE ROOM WITH 4-MIL OR 6-MIL POLY SHEETING

AND PLACE 6-MIL POLY DROP CLOTHS ON THE FLOOR BELOW

WORK AREAS, PRIOR TO IMPACTING ANY LBP. IN LIEU OF

COVERING ALL CONTENTS WITH POLY SHEETING IN LARGE

OPEN ROOMS, FLOOR TO CEILING DUST PARTITIONS MAY BE

ERECTED TO ISOLATE CONTENTS FROM WORK AREAS. IF THE

DUST PARTITION OPTION IS CHOSEN, CARE SHALL BE GIVEN

TO ENSURE THE WORK SPACE IS LARGE ENOUGH FOR

ABATEMENT WORK AND THE REMOVAL AND REPLACEMENT

OF WINDOWS BY GENERAL CONTRACTOR OR

SUBCONTRACTOR.

THE ABATEMENT SUPERVISOR AND THE VPIH SHALL ACT AS

COMPETENT PERSONS ONSITE TO ENSURE NO SUSPECT

ASBESTOS MATERIALS OR OTHER UPSET CONDITIONS ARE

IDENTIFIED DURING THE COURSE OF THE WINDOW

REPLACEMENT PROJECT THAT COULD ALTER THE CONTROL

REQUIREMENTS.

STRICT COORDINATION BETWEEN VA OCCUPANTS, VA COR,

VPIH, GENERAL CONTRACTOR, ALL SUBCONTRACTORS AND

THE ABATEMENT CONTRACTOR IS PARAMOUNT FOR THE

SUCCESS OF THIS PROJECT.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR

MOVING, REMOVING OR RELOCATING ALL DATA EQUIPMENT,

COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL

HANGINGS, ETC., FROM THE WINDOW WORK AREAS. A

SUFFICIENT AMOUNT OF ROOM MUST BE GIVEN FOR THE

CONTRACTORS TO COMPLETE THEIR WORK WITHOUT

IMPEDENCE BY CONTENTS.

ABATEMENT WORK SHALL BE CONDUCTED 3:00 PM TO 12:00

AM MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. WORK

IN STAIRWELLS, LOBBIES OR OTHER EGRESS LOCATIONS MAY

HAVE TO BE ACCOMPLISHED ON WEEKENDS (5:00 PM FRIDAY

TO 6:00 PM SUNDAY).

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES,

CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO

THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED

BY THE ABATEMENT CONTRACTOR.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH

THE VA COR AND VPIH. THE LOCATIONS OF WASTE DISPOSAL

CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR

AND VPIH.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE-RETARDANT TYPE.

ALL IN-PROGRESS PERIMETER AIR MONITORING AND

CLEARANCE SAMPLING WILL BE CONDUCTED BY THE VPIH.

WIPE SAMPLES WILL BE COLLECTED AT THE COMPLETION OF

THE WORK (ABATEMENT AND WINDOW REPLACEMENT). ON A

PERIODIC BASIS, WIPE SAMPLES WILL BE COLLECTED INSIDE

THE ROLLING MINI-CONTAINMENTS OR HEPA CART (IF

UTILIZED) TO ENSURE PROPER CLEANING PROCEDURES ARE

BEING FOLLOWED. A THRESHOLD OF 200 MICROGRAMS PER

SQUARE FOOT (µg/ft²) WILL BE USED.

ALL IN-PROGRESS INSIDE WORK AREA AND OSHA

COMPLIANCE AIR SAMPLES WILL BE CONDUCTED BY THE

CPIH. PERSONNEL MONITORING WILL CONTINUE UNTIL AN

APPROPRIATE EXPOSURE ASSESSMENT CAN BE ACHIEVED

(TYPICALLY 3 SHIFTS) PER BUILDING. ONCE THIS EXPOSURE

ASSESSMENT IS ACHIEVED, THE CPIH INVOLVEMENT IN THE

PROJECT CAN BE SUSPENDED. THE EXPOSURE ASSESSMENT

SHALL BE VALID FOR 1 YEAR, UNLESS THERE ARE

SIGNIFICANT CHANGES TO THE PROCESS OR OTHER

CONDITIONS. AFTER 1 YEAR, THE AIR MONITORING OF TASKS

SHALL BE REPEATED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION

OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT

AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT

RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD

EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR

NORMAL DEMOLITION OR CONSTRUCTION ACTIVITIES IS LOW,

ACTUAL LEAD EXPOSURE MAY VARY SIGNIFICANTLY

DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND

OTHER WORK AREA CONDITIONS. PROPER OSHA

COMPLIANCE IS CONSIDERED PERFORMANCE BASED AND

INCLUDES EVALUATING POTENTIAL WORK EXPOSURES WITH

AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING

(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE

DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE

EXPOSURE FOR LEAD.

LBP AND LEAD-CONTAINING MATERIALS WERE IDENTIFIED

THAT SHOULD NOT BE IMPACTED BY THE PROJECT (SEE THE

LIMITED ASBESTOS, LEAD AND MOLD SURVEY). CARE SHOULD

BE TAKEN TO ENSURE THESE MATERIALS ARE NOT IMPACTED.

PROTECT AS REQUIRED.

49 61

L1

L2

L1

L2

L1

L2

L1

L2

L1

L2

L1

L2

L1 L2

L1 L2

L1 L2

L1 L2

L1 L2

L1 L2

L1 L2

L1 L2 L1 L2

L1 L2 L1 L2

UP

UP

DN

UP

ROOF BELOW

L1 L2

L1 L2

L1 L2

L1 L2L1 L2

L1 L2L1 L2

L1 L2

L1 L2

L1 L2

L1 L2

L1 L2L1 L2

L1 L2L1 L2L1 L2

8718 BOTTS LANE,

SAN ANTONIO, TX 78217

T 210.881.9714

F 210.881.6808 www.hfscompany.com

6 SOUTH OLD ORCHARD

ST. LOUIS, MO 63119

T 314.918.8383

F 314.918.1766 www.rossbar.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

ROBERT A. JURGIEL, PE, CSP

(PE LICENSE NO. 029078)

A

M

02-HA-121

ABATEMENT FLOOR PLAN

BLDG 02 - FLOOR 02

657-25-302JB

BID DOCUMENTS

REPLACE WINDOWS IN BUILDINGS 2, 18,

25, 52 FOR ENERGY EFFICIENCY

5/8/19

ABATEMENT FLOOR PLAN - BLDG 02 - FLOOR 02

BMD

GKY

SHEET KEY NOTES:#

USING A ROLLING MINI-CONTAINMENT OR HEPA CART, REMOVE

CEILING TILES NEAR WINDOWS, REMOVE ANY LOOSE, CURLING

OR DELAMINATED LBP FROM WALLS AND CEILINGS (WITHIN 2'

OF CEILING TILE OPENING) THAT COULD DISLODGE DURING

WINDOW REPLACEMENT AND HEPA VACUUM ALL CEILING TILES

AND HORIZONTAL SURFACES ADJACENT TO THE WINDOWS.

ONCE THE LEAD REMOVAL IS COMPLETE, THE ROLLING

MINI-CONTAINMENT OR HEPA CART WILL BE CLEANED, SEALED

AND MOVED TO THE NEXT WORK LOCATION.

- 36 WINDOWS

ONCE WINDOWS HAVE BEEN REMOVED BY GENERAL

CONTRACTOR OR SUBCONTRACTOR; HEPA VACUUM EXPOSED

WINDOW CAVITY, WET WIPE WITH AN EPA-REGISTERED

ANTI-MICROBIAL SOLUTION AND CLEAN ANY DEBRIS FROM

DROP CLOTH. ONCE WINDOW HAS BEEN REPLACED BY

GENERAL CONTRACTOR OR SUBCONTRACTOR, CONDUCT

FINAL CLEANING INCLUDING REMOVING THE DROP CLOTHS

AND OTHER DUST PROTECTION MEASURES.

- 36 WINDOWS

L1.

L2.

3/16" = 1'-0"

ABATEMENT GENERAL NOTES:

PLAN

NORTH

TRUE

NORTH

50 61

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

THE KNOWN HAZARDS ASSOCIATED WITH THIS PROJECT

CONSIST OF INTACT LEAD-BASED PAINT (LBP) OR

LEAD-CONTAINING PAINT ON WALLS, CEILINGS AND/OR TRIM

AROUND WINDOWS (BLDGS. 2, 18 & 25), LOOSE, CURLING OR

DELAMINATED LBP ON WALLS AND CEILINGS ABOVE CEILING

TILES (BLDG. 2) AND DETERIORATED LBP IN WINDOW CAVITIES

(BLDGS. 2, 18 & 25).

THE SCOPE OF THE LEAD ABATEMENT WORK IN BUILDINGS 2,

18 & 25 CONSISTS OF HEPA-VACUMMING AND CLEANING

CEILING TILES ADJACENT TO WINDOWS CONTAMINATED WITH

LEAD-BASED PAINT (LBP) CHIPS / DEBRIS (BLDG. 2),

REMOVING LOOSE, CURLING OR DELAMINATED LBP FROM

WALLS AND CEILINGS ADJACENT TO WINDOWS (BLDG. 2), AND

CLEANING WINDOW OPENINGS ONCE WINDOWS HAVE BEEN

REMOVED BY GENERAL CONTRACTOR OR SUBCONTRACTOR

(BLDGS. 2, 18 & 25). ALL WORK SHALL BE CONDUCTED IN

ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL

REGULATIONS AND THE CONTRACT SPECIFICATIONS.

ABATEMENT CONTRACTOR WILL RESTRICT ACCESS TO

ROOMS WHERE WORK IS TO BE PERFORMED, COVER ALL

CONTENTS IN THE ROOM WITH 4-MIL OR 6-MIL POLY SHEETING

AND PLACE 6-MIL POLY DROP CLOTHS ON THE FLOOR BELOW

WORK AREAS, PRIOR TO IMPACTING ANY LBP. IN LIEU OF

COVERING ALL CONTENTS WITH POLY SHEETING IN LARGE

OPEN ROOMS, FLOOR TO CEILING DUST PARTITIONS MAY BE

ERECTED TO ISOLATE CONTENTS FROM WORK AREAS. IF THE

DUST PARTITION OPTION IS CHOSEN, CARE SHALL BE GIVEN

TO ENSURE THE WORK SPACE IS LARGE ENOUGH FOR

ABATEMENT WORK AND THE REMOVAL AND REPLACEMENT

OF WINDOWS BY GENERAL CONTRACTOR OR

SUBCONTRACTOR.

THE ABATEMENT SUPERVISOR AND THE VPIH SHALL ACT AS

COMPETENT PERSONS ONSITE TO ENSURE NO SUSPECT

ASBESTOS MATERIALS OR OTHER UPSET CONDITIONS ARE

IDENTIFIED DURING THE COURSE OF THE WINDOW

REPLACEMENT PROJECT THAT COULD ALTER THE CONTROL

REQUIREMENTS.

STRICT COORDINATION BETWEEN VA OCCUPANTS, VA COR,

VPIH, GENERAL CONTRACTOR, ALL SUBCONTRACTORS AND

THE ABATEMENT CONTRACTOR IS PARAMOUNT FOR THE

SUCCESS OF THIS PROJECT.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR

MOVING, REMOVING OR RELOCATING ALL DATA EQUIPMENT,

COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL

HANGINGS, ETC., FROM THE WINDOW WORK AREAS. A

SUFFICIENT AMOUNT OF ROOM MUST BE GIVEN FOR THE

CONTRACTORS TO COMPLETE THEIR WORK WITHOUT

IMPEDENCE BY CONTENTS.

ABATEMENT WORK SHALL BE CONDUCTED 3:00 PM TO 12:00

AM MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. WORK

IN STAIRWELLS, LOBBIES OR OTHER EGRESS LOCATIONS MAY

HAVE TO BE ACCOMPLISHED ON WEEKENDS (5:00 PM FRIDAY

TO 6:00 PM SUNDAY).

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES,

CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO

THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED

BY THE ABATEMENT CONTRACTOR.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH

THE VA COR AND VPIH. THE LOCATIONS OF WASTE DISPOSAL

CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR

AND VPIH.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE-RETARDANT TYPE.

ALL IN-PROGRESS PERIMETER AIR MONITORING AND

CLEARANCE SAMPLING WILL BE CONDUCTED BY THE VPIH.

WIPE SAMPLES WILL BE COLLECTED AT THE COMPLETION OF

THE WORK (ABATEMENT AND WINDOW REPLACEMENT). ON A

PERIODIC BASIS, WIPE SAMPLES WILL BE COLLECTED INSIDE

THE ROLLING MINI-CONTAINMENTS OR HEPA CART (IF

UTILIZED) TO ENSURE PROPER CLEANING PROCEDURES ARE

BEING FOLLOWED. A THRESHOLD OF 200 MICROGRAMS PER

SQUARE FOOT (µg/ft²) WILL BE USED.

ALL IN-PROGRESS INSIDE WORK AREA AND OSHA

COMPLIANCE AIR SAMPLES WILL BE CONDUCTED BY THE

CPIH. PERSONNEL MONITORING WILL CONTINUE UNTIL AN

APPROPRIATE EXPOSURE ASSESSMENT CAN BE ACHIEVED

(TYPICALLY 3 SHIFTS) PER BUILDING. ONCE THIS EXPOSURE

ASSESSMENT IS ACHIEVED, THE CPIH INVOLVEMENT IN THE

PROJECT CAN BE SUSPENDED. THE EXPOSURE ASSESSMENT

SHALL BE VALID FOR 1 YEAR, UNLESS THERE ARE

SIGNIFICANT CHANGES TO THE PROCESS OR OTHER

CONDITIONS. AFTER 1 YEAR, THE AIR MONITORING OF TASKS

SHALL BE REPEATED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION

OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT

AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT

RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD

EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR

NORMAL DEMOLITION OR CONSTRUCTION ACTIVITIES IS LOW,

ACTUAL LEAD EXPOSURE MAY VARY SIGNIFICANTLY

DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND

OTHER WORK AREA CONDITIONS. PROPER OSHA

COMPLIANCE IS CONSIDERED PERFORMANCE BASED AND

INCLUDES EVALUATING POTENTIAL WORK EXPOSURES WITH

AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING

(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE

DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE

EXPOSURE FOR LEAD.

LBP AND LEAD-CONTAINING MATERIALS WERE IDENTIFIED

THAT SHOULD NOT BE IMPACTED BY THE PROJECT (SEE THE

LIMITED ASBESTOS, LEAD AND MOLD SURVEY). CARE SHOULD

BE TAKEN TO ENSURE THESE MATERIALS ARE NOT IMPACTED.

L1

L2

L1

L2

L1

L2

L1

L2

L1

L2

L1

UP

DN

DN

DN

L2

L1 L2

L1 L2

L1 L2

L1 L2

L1

L1 L2 L1 L2

L1 L2

L1 L2

L1 L2

L1 L2

L1 L2 L1 L2

L2

L1 L2

L1 L2L1 L2

L1 L2

L1 L2

L1 L2

L1 L2L1 L2L1 L2

L1 L2L1 L2L1 L2L1 L2L1 L2

8718 BOTTS LANE,

SAN ANTONIO, TX 78217

T 210.881.9714

F 210.881.6808 www.hfscompany.com

6 SOUTH OLD ORCHARD

ST. LOUIS, MO 63119

T 314.918.8383

F 314.918.1766 www.rossbar.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

ROBERT A. JURGIEL, PE, CSP

(PE LICENSE NO. 029078)

A

M

02-HA-131

ABATEMENT FLOOR PLAN

BLDG 02 - FLOOR 03

657-25-302JB

BID DOCUMENTS

REPLACE WINDOWS IN BUILDINGS 2, 18,

25, 52 FOR ENERGY EFFICIENCY

5/8/19

ABATEMENT FLOOR PLAN - BLDG 02 - FLOOR 03

BMD

GKY

SHEET KEY NOTES:#

3/16" = 1'-0"

ABATEMENT GENERAL NOTES:

USING A ROLLING MINI-CONTAINMENT OR HEPA CART,

REMOVE CEILING TILES NEAR WINDOWS, REMOVE ANY

LOOSE, CURLING OR DELAMINATED LBP FROM WALLS AND

CEILINGS (WITHIN 2' OF CEILING TILE OPENING) THAT COULD

DISLODGE DURING WINDOW REPLACEMENT AND HEPA

VACUUM ALL CEILING TILES AND HORIZONTAL SURFACES

ADJACENT TO THE WINDOWS. ONCE THE LEAD REMOVAL IS

COMPLETE, THE ROLLING MINI-CONTAINMENT OR HEPA CART

WILL BE CLEANED, SEALED AND MOVED TO THE NEXT WORK

LOCATION.

- 36 WINDOWS

ONCE WINDOWS HAVE BEEN REMOVED BY GENERAL

CONTRACTOR OR SUBCONTRACTOR; HEPA-VACUUM

EXPOSED WINDOW CAVITY, WET WIPE WITH AN

EPA-REGISTERED ANTI-MICROBIAL SOLUTION AND CLEAN ANY

DEBRIS FROM DROP CLOTH. ONCE WINDOW HAS BEEN

REPLACED BY GENERAL CONTRACTOR OR SUBCONTRACTOR,

CONDUCT FINAL CLEANING INCLUDING REMOVING THE DROP

CLOTHS AND OTHER DUST PROTECTION MEASURES.

- 36 WINDOWS

L1.

L2.

PLAN

NORTH

TRUE

NORTH

51 61

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

THE KNOWN HAZARDS ASSOCIATED WITH THIS PROJECT

CONSIST OF INTACT LEAD-BASED PAINT (LBP) OR

LEAD-CONTAINING PAINT ON WALLS, CEILINGS AND/OR TRIM

AROUND WINDOWS (BLDGS. 2, 18 & 25), LOOSE, CURLING OR

DELAMINATED LBP ON WALLS AND CEILINGS ABOVE CEILING

TILES (BLDG. 2) AND DETERIORATED LBP IN WINDOW CAVITIES

(BLDGS. 2, 18 & 25).

THE SCOPE OF THE LEAD ABATEMENT WORK IN BUILDINGS 2,

18 & 25 CONSISTS OF HEPA-VACUMMING AND CLEANING

CEILING TILES ADJACENT TO WINDOWS CONTAMINATED WITH

LEAD-BASED PAINT (LBP) CHIPS / DEBRIS (BLDG. 2),

REMOVING LOOSE, CURLING OR DELAMINATED LBP FROM

WALLS AND CEILINGS ADJACENT TO WINDOWS (BLDG. 2), AND

CLEANING WINDOW OPENINGS ONCE WINDOWS HAVE BEEN

REMOVED BY GENERAL CONTRACTOR OR SUBCONTRACTOR

(BLDGS. 2, 18 & 25). ALL WORK SHALL BE CONDUCTED IN

ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL

REGULATIONS AND THE CONTRACT SPECIFICATIONS.

ABATEMENT CONTRACTOR WILL RESTRICT ACCESS TO

ROOMS WHERE WORK IS TO BE PERFORMED, COVER ALL

CONTENTS IN THE ROOM WITH 4-MIL OR 6-MIL POLY SHEETING

AND PLACE 6-MIL POLY DROP CLOTHS ON THE FLOOR BELOW

WORK AREAS, PRIOR TO IMPACTING ANY LBP. IN LIEU OF

COVERING ALL CONTENTS WITH POLY SHEETING IN LARGE

OPEN ROOMS, FLOOR TO CEILING DUST PARTITIONS MAY BE

ERECTED TO ISOLATE CONTENTS FROM WORK AREAS. IF THE

DUST PARTITION OPTION IS CHOSEN, CARE SHALL BE GIVEN

TO ENSURE THE WORK SPACE IS LARGE ENOUGH FOR

ABATEMENT WORK AND THE REMOVAL AND REPLACEMENT

OF WINDOWS BY GENERAL CONTRACTOR OR

SUBCONTRACTOR.

THE ABATEMENT SUPERVISOR AND THE VPIH SHALL ACT AS

COMPETENT PERSONS ONSITE TO ENSURE NO SUSPECT

ASBESTOS MATERIALS OR OTHER UPSET CONDITIONS ARE

IDENTIFIED DURING THE COURSE OF THE WINDOW

REPLACEMENT PROJECT THAT COULD ALTER THE CONTROL

REQUIREMENTS.

STRICT COORDINATION BETWEEN VA OCCUPANTS, VA COR,

VPIH, GENERAL CONTRACTOR, ALL SUBCONTRACTORS AND

THE ABATEMENT CONTRACTOR IS PARAMOUNT FOR THE

SUCCESS OF THIS PROJECT.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR

MOVING, REMOVING OR RELOCATING ALL DATA EQUIPMENT,

COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL

HANGINGS, ETC., FROM THE WINDOW WORK AREAS. A

SUFFICIENT AMOUNT OF ROOM MUST BE GIVEN FOR THE

CONTRACTORS TO COMPLETE THEIR WORK WITHOUT

IMPEDENCE BY CONTENTS.

ABATEMENT WORK SHALL BE CONDUCTED 3:00 PM TO 12:00

AM MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. WORK

IN STAIRWELLS, LOBBIES OR OTHER EGRESS LOCATIONS MAY

HAVE TO BE ACCOMPLISHED ON WEEKENDS (5:00 PM FRIDAY

TO 6:00 PM SUNDAY).

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES,

CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO

THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED

BY THE ABATEMENT CONTRACTOR.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH

THE VA COR AND VPIH. THE LOCATIONS OF WASTE DISPOSAL

CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR

AND VPIH.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE-RETARDANT TYPE.

ALL IN-PROGRESS PERIMETER AIR MONITORING AND

CLEARANCE SAMPLING WILL BE CONDUCTED BY THE VPIH.

WIPE SAMPLES WILL BE COLLECTED AT THE COMPLETION OF

THE WORK (ABATEMENT AND WINDOW REPLACEMENT). ON A

PERIODIC BASIS, WIPE SAMPLES WILL BE COLLECTED INSIDE

THE ROLLING MINI-CONTAINMENTS OR HEPA CART (IF

UTILIZED) TO ENSURE PROPER CLEANING PROCEDURES ARE

BEING FOLLOWED. A THRESHOLD OF 200 MICROGRAMS PER

SQUARE FOOT (µg/ft²) WILL BE USED.

ALL IN-PROGRESS INSIDE WORK AREA AND OSHA

COMPLIANCE AIR SAMPLES WILL BE CONDUCTED BY THE

CPIH. PERSONNEL MONITORING WILL CONTINUE UNTIL AN

APPROPRIATE EXPOSURE ASSESSMENT CAN BE ACHIEVED

(TYPICALLY 3 SHIFTS) PER BUILDING. ONCE THIS EXPOSURE

ASSESSMENT IS ACHIEVED, THE CPIH INVOLVEMENT IN THE

PROJECT CAN BE SUSPENDED. THE EXPOSURE ASSESSMENT

SHALL BE VALID FOR 1 YEAR, UNLESS THERE ARE

SIGNIFICANT CHANGES TO THE PROCESS OR OTHER

CONDITIONS. AFTER 1 YEAR, THE AIR MONITORING OF TASKS

SHALL BE REPEATED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION

OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT

AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT

RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD

EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR

NORMAL DEMOLITION OR CONSTRUCTION ACTIVITIES IS LOW,

ACTUAL LEAD EXPOSURE MAY VARY SIGNIFICANTLY

DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND

OTHER WORK AREA CONDITIONS. PROPER OSHA

COMPLIANCE IS CONSIDERED PERFORMANCE BASED AND

INCLUDES EVALUATING POTENTIAL WORK EXPOSURES WITH

AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING

(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE

DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE

EXPOSURE FOR LEAD.

LBP AND LEAD-CONTAINING MATERIALS WERE IDENTIFIED

THAT SHOULD NOT BE IMPACTED BY THE PROJECT (SEE THE

LIMITED ASBESTOS, LEAD AND MOLD SURVEY). CARE SHOULD

L2L1

L2L1 L2L1

L2L1 L2L1

L2L1

L2L1

8718 BOTTS LANE,

SAN ANTONIO, TX 78217

T 210.881.9714

F 210.881.6808 www.hfscompany.com

6 SOUTH OLD ORCHARD

ST. LOUIS, MO 63119

T 314.918.8383

F 314.918.1766 www.rossbar.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

ROBERT A. JURGIEL, PE, CSP

(PE LICENSE NO. 029078)

A

M

02-HA-141

ABATEMENT FLOOR PLAN

BLDG 02 - FLOOR 04 (ATTIC)

657-25-302JB

BID DOCUMENTS

REPLACE WINDOWS IN BUILDINGS 2, 18,

25, 52 FOR ENERGY EFFICIENCY

5/8/19

ABATEMENT FLOOR PLAN - BLDG 02 - FLOOR 04 (ATTIC)

BMD

GKY

SHEET KEY NOTES:#

HEPA VACUUM ANY LOOSE, CURLING OR DELAMINATED LBP

FROM WINDOW FRAMES, SILLS AND HEPA VACUUM THE

FLOOR IN A 5 FOOT RADIUS OF THE WINDOWS.

- 7 WINDOWS

ONCE WINDOWS HAVE BEEN REMOVED BY GENERAL

CONTRACTOR OR SUBCONTRACTOR; HEPA-VACUUM

EXPOSED WINDOW CAVITY, WET WIPE WITH AN

EPA-REGISTERED ANTI-MICROBIAL SOLUTION AND CLEAN ANY

DEBRIS FROM DROP CLOTH. ONCE WINDOW HAS BEEN

REPLACED BY GENERAL CONTRACTOR OR SUBCONTRACTOR,

CONDUCT FINAL CLEANING INCLUDING REMOVING THE DROP

CLOTHS AND OTHER DUST PROTECTION MEASURES.

- 7 WINDOWS

L1.

L2.

3/16" = 1'-0"

ABATEMENT GENERAL NOTES:

PLAN

NORTH

TRUE

NORTH

52 61

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

THE KNOWN HAZARDS ASSOCIATED WITH THIS PROJECT

CONSIST OF INTACT LEAD-BASED PAINT (LBP) OR

LEAD-CONTAINING PAINT ON WALLS, CEILINGS AND/OR TRIM

AROUND WINDOWS (BLDGS. 2, 18 & 25), LOOSE, CURLING OR

DELAMINATED LBP ON WALLS AND CEILINGS ABOVE CEILING

TILES (BLDG. 2) AND DETERIORATED LBP IN WINDOW CAVITIES

(BLDGS. 2, 18 & 25).

THE SCOPE OF THE LEAD ABATEMENT WORK IN BUILDINGS 2,

18 & 25 CONSISTS OF HEPA-VACUMMING AND CLEANING

CEILING TILES ADJACENT TO WINDOWS CONTAMINATED WITH

LEAD-BASED PAINT (LBP) CHIPS / DEBRIS (BLDG. 2),

REMOVING LOOSE, CURLING OR DELAMINATED LBP FROM

WALLS AND CEILINGS ADJACENT TO WINDOWS (BLDG. 2), AND

CLEANING WINDOW OPENINGS ONCE WINDOWS HAVE BEEN

REMOVED BY GENERAL CONTRACTOR OR SUBCONTRACTOR

(BLDGS. 2, 18 & 25). ALL WORK SHALL BE CONDUCTED IN

ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL

REGULATIONS AND THE CONTRACT SPECIFICATIONS.

ABATEMENT CONTRACTOR WILL RESTRICT ACCESS TO

ROOMS WHERE WORK IS TO BE PERFORMED, COVER ALL

CONTENTS IN THE ROOM WITH 4-MIL OR 6-MIL POLY SHEETING

AND PLACE 6-MIL POLY DROP CLOTHS ON THE FLOOR BELOW

WORK AREAS, PRIOR TO IMPACTING ANY LBP. IN LIEU OF

COVERING ALL CONTENTS WITH POLY SHEETING IN LARGE

OPEN ROOMS, FLOOR TO CEILING DUST PARTITIONS MAY BE

ERECTED TO ISOLATE CONTENTS FROM WORK AREAS. IF THE

DUST PARTITION OPTION IS CHOSEN, CARE SHALL BE GIVEN

TO ENSURE THE WORK SPACE IS LARGE ENOUGH FOR

ABATEMENT WORK AND THE REMOVAL AND REPLACEMENT

OF WINDOWS BY GENERAL CONTRACTOR OR

SUBCONTRACTOR.

THE ABATEMENT SUPERVISOR AND THE VPIH SHALL ACT AS

COMPETENT PERSONS ONSITE TO ENSURE NO SUSPECT

ASBESTOS MATERIALS OR OTHER UPSET CONDITIONS ARE

IDENTIFIED DURING THE COURSE OF THE WINDOW

REPLACEMENT PROJECT THAT COULD ALTER THE CONTROL

REQUIREMENTS.

STRICT COORDINATION BETWEEN VA OCCUPANTS, VA COR,

VPIH, GENERAL CONTRACTOR, ALL SUBCONTRACTORS AND

THE ABATEMENT CONTRACTOR IS PARAMOUNT FOR THE

SUCCESS OF THIS PROJECT.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR

MOVING, REMOVING OR RELOCATING ALL DATA EQUIPMENT,

COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL

HANGINGS, ETC., FROM THE WINDOW WORK AREAS. A

SUFFICIENT AMOUNT OF ROOM MUST BE GIVEN FOR THE

CONTRACTORS TO COMPLETE THEIR WORK WITHOUT

IMPEDENCE BY CONTENTS.

ABATEMENT WORK SHALL BE CONDUCTED 3:00 PM TO 12:00

AM MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. WORK

IN STAIRWELLS, LOBBIES OR OTHER EGRESS LOCATIONS MAY

HAVE TO BE ACCOMPLISHED ON WEEKENDS (5:00 PM FRIDAY

TO 6:00 PM SUNDAY).

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES,

CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO

THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED

BY THE ABATEMENT CONTRACTOR.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH

THE VA COR AND VPIH. THE LOCATIONS OF WASTE DISPOSAL

CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR

AND VPIH.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE-RETARDANT TYPE.

ALL IN-PROGRESS PERIMETER AIR MONITORING AND

CLEARANCE SAMPLING WILL BE CONDUCTED BY THE VPIH.

WIPE SAMPLES WILL BE COLLECTED AT THE COMPLETION OF

THE WORK (ABATEMENT AND WINDOW REPLACEMENT). ON A

PERIODIC BASIS, WIPE SAMPLES WILL BE COLLECTED INSIDE

THE ROLLING MINI-CONTAINMENTS OR HEPA CART (IF

UTILIZED) TO ENSURE PROPER CLEANING PROCEDURES ARE

BEING FOLLOWED. A THRESHOLD OF 200 MICROGRAMS PER

SQUARE FOOT (µg/ft²) WILL BE USED.

ALL IN-PROGRESS INSIDE WORK AREA AND OSHA

COMPLIANCE AIR SAMPLES WILL BE CONDUCTED BY THE

CPIH. PERSONNEL MONITORING WILL CONTINUE UNTIL AN

APPROPRIATE EXPOSURE ASSESSMENT CAN BE ACHIEVED

(TYPICALLY 3 SHIFTS) PER BUILDING. ONCE THIS EXPOSURE

ASSESSMENT IS ACHIEVED, THE CPIH INVOLVEMENT IN THE

PROJECT CAN BE SUSPENDED. THE EXPOSURE ASSESSMENT

SHALL BE VALID FOR 1 YEAR, UNLESS THERE ARE

SIGNIFICANT CHANGES TO THE PROCESS OR OTHER

CONDITIONS. AFTER 1 YEAR, THE AIR MONITORING OF TASKS

SHALL BE REPEATED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION

OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT

AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT

RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD

EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR

NORMAL DEMOLITION OR CONSTRUCTION ACTIVITIES IS LOW,

ACTUAL LEAD EXPOSURE MAY VARY SIGNIFICANTLY

DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND

OTHER WORK AREA CONDITIONS. PROPER OSHA

COMPLIANCE IS CONSIDERED PERFORMANCE BASED AND

INCLUDES EVALUATING POTENTIAL WORK EXPOSURES WITH

AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING

(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE

DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE

EXPOSURE FOR LEAD.

LBP AND LEAD-CONTAINING MATERIALS WERE IDENTIFIED

THAT SHOULD NOT BE IMPACTED BY THE PROJECT (SEE THE

LIMITED ASBESTOS, LEAD AND MOLD SURVEY). CARE SHOULD

UP

UP

UP

PIPE

CHASE

Z001

MECH.

RM.

CORRIDOR

H001

CORRIDOR

H002

ELEVATOR

MACHINE

RM.

STAIRWELL

NO.

S002

TOILET,

UNISEX

TOILET,

FEMALE

HAC

BREAK

RM.

OFFICE

OFFICE,

CHIEF

OFFICE

OFFICE

VENDING

H003

OFFICE

MECH.

RM.

003A

MECH.

RM.

OI&T

003B

FE

FAP

FAP

FAP

DF

FEC

6" A.F.F.

6" A.F.F.

ELEVATOR

LOBBY

AP

RAD

AP

FLOOR ELEVATION

-10' - 1"

ELEVATOR

E1

18-007A 18-010A 18-010B

18-010C 18-011A

18-011B

18-013A

18-012A

18-003A

18-012B18-008A

18-005A

L1

L1 L1

L1

L1

L1L1

L1

L1

L1

8718 BOTTS LANE,

SAN ANTONIO, TX 78217

T 210.881.9714

F 210.881.6808 www.hfscompany.com

6 SOUTH OLD ORCHARD

ST. LOUIS, MO 63119

T 314.918.8383

F 314.918.1766 www.rossbar.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

ROBERT A. JURGIEL, PE, CSP

(PE LICENSE NO. 029078)

A

M

18-HA-101

ABATEMENT FLOOR PLAN

BLDG 18 - FLOOR 00 (BASEMENT)

BMD

GKY

657-25-302JB

BID DOCUMENTS

REPLACE WINDOWS IN BUILDINGS 2, 18,

25, 52 FOR ENERGY EFFICIENCY

5/8/19

1/8" = 1'-0"

ABATEMENT FLOOR PLAN - BUILDING 18 - FLOOR 00 (BASEMENT)

SHEET KEY NOTES:#

ONCE WINDOWS HAVE BEEN REMOVED BY GENERAL

CONTRACTOR OR SUBCONTRACTOR; HEPA-VACUUM

EXPOSED WINDOW CAVITY, WET WIPE WITH AN

EPA-REGISTERED ANTI-MICROBIAL SOLUTION AND CLEAN ANY

DEBRIS FROM DROP CLOTH. ONCE WINDOW HAS BEEN

REPLACED BY GENERAL CONTRACTOR OR SUBCONTRACTOR,

CONDUCT FINAL CLEANING INCLUDING REMOVING THE DROP

CLOTHS AND OTHER DUST PROTECTION MEASURES.

- 12 WINDOWS

L1.

ABATEMENT GENERAL NOTES:

TRUE

NORTH

PLAN

NORTH

53 61

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

THE KNOWN HAZARDS ASSOCIATED WITH THIS PROJECT

CONSIST OF INTACT LEAD-BASED PAINT (LBP) OR

LEAD-CONTAINING PAINT ON WALLS, CEILINGS AND/OR TRIM

AROUND WINDOWS (BLDGS. 2, 18 & 25), LOOSE, CURLING OR

DELAMINATED LBP ON WALLS AND CEILINGS ABOVE CEILING

TILES (BLDG. 2) AND DETERIORATED LBP IN WINDOW CAVITIES

(BLDGS. 2, 18 & 25).

THE SCOPE OF THE LEAD ABATEMENT WORK IN BUILDINGS 2,

18 & 25 CONSISTS OF HEPA-VACUMMING AND CLEANING

CEILING TILES ADJACENT TO WINDOWS CONTAMINATED WITH

LEAD-BASED PAINT (LBP) CHIPS / DEBRIS (BLDG. 2),

REMOVING LOOSE, CURLING OR DELAMINATED LBP FROM

WALLS AND CEILINGS ADJACENT TO WINDOWS (BLDG. 2), AND

CLEANING WINDOW OPENINGS ONCE WINDOWS HAVE BEEN

REMOVED BY GENERAL CONTRACTOR OR SUBCONTRACTOR

(BLDGS. 2, 18 & 25). ALL WORK SHALL BE CONDUCTED IN

ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL

REGULATIONS AND THE CONTRACT SPECIFICATIONS.

ABATEMENT CONTRACTOR WILL RESTRICT ACCESS TO

ROOMS WHERE WORK IS TO BE PERFORMED, COVER ALL

CONTENTS IN THE ROOM WITH 4-MIL OR 6-MIL POLY SHEETING

AND PLACE 6-MIL POLY DROP CLOTHS ON THE FLOOR BELOW

WORK AREAS, PRIOR TO IMPACTING ANY LBP. IN LIEU OF

COVERING ALL CONTENTS WITH POLY SHEETING IN LARGE

OPEN ROOMS, FLOOR TO CEILING DUST PARTITIONS MAY BE

ERECTED TO ISOLATE CONTENTS FROM WORK AREAS. IF THE

DUST PARTITION OPTION IS CHOSEN, CARE SHALL BE GIVEN

TO ENSURE THE WORK SPACE IS LARGE ENOUGH FOR

ABATEMENT WORK AND THE REMOVAL AND REPLACEMENT

OF WINDOWS BY GENERAL CONTRACTOR OR

SUBCONTRACTOR.

THE ABATEMENT SUPERVISOR AND THE VPIH SHALL ACT AS

COMPETENT PERSONS ONSITE TO ENSURE NO SUSPECT

ASBESTOS MATERIALS OR OTHER UPSET CONDITIONS ARE

IDENTIFIED DURING THE COURSE OF THE WINDOW

REPLACEMENT PROJECT THAT COULD ALTER THE CONTROL

REQUIREMENTS.

STRICT COORDINATION BETWEEN VA OCCUPANTS, VA COR,

VPIH, GENERAL CONTRACTOR, ALL SUBCONTRACTORS AND

THE ABATEMENT CONTRACTOR IS PARAMOUNT FOR THE

SUCCESS OF THIS PROJECT.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR

MOVING, REMOVING OR RELOCATING ALL DATA EQUIPMENT,

COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL

HANGINGS, ETC., FROM THE WINDOW WORK AREAS. A

SUFFICIENT AMOUNT OF ROOM MUST BE GIVEN FOR THE

CONTRACTORS TO COMPLETE THEIR WORK WITHOUT

IMPEDENCE BY CONTENTS.

ABATEMENT WORK SHALL BE CONDUCTED 3:00 PM TO 12:00

AM MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. WORK

IN STAIRWELLS, LOBBIES OR OTHER EGRESS LOCATIONS MAY

HAVE TO BE ACCOMPLISHED ON WEEKENDS (5:00 PM FRIDAY

TO 6:00 PM SUNDAY).

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES,

CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO

THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED

BY THE ABATEMENT CONTRACTOR.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH

THE VA COR AND VPIH. THE LOCATIONS OF WASTE DISPOSAL

CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR

AND VPIH.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE-RETARDANT TYPE.

ALL IN-PROGRESS PERIMETER AIR MONITORING AND

CLEARANCE SAMPLING WILL BE CONDUCTED BY THE VPIH.

WIPE SAMPLES WILL BE COLLECTED AT THE COMPLETION OF

THE WORK (ABATEMENT AND WINDOW REPLACEMENT). ON A

PERIODIC BASIS, WIPE SAMPLES WILL BE COLLECTED INSIDE

THE ROLLING MINI-CONTAINMENTS OR HEPA CART (IF

UTILIZED) TO ENSURE PROPER CLEANING PROCEDURES ARE

BEING FOLLOWED. A THRESHOLD OF 200 MICROGRAMS PER

SQUARE FOOT (µg/ft²) WILL BE USED.

ALL IN-PROGRESS INSIDE WORK AREA AND OSHA

COMPLIANCE AIR SAMPLES WILL BE CONDUCTED BY THE

CPIH. PERSONNEL MONITORING WILL CONTINUE UNTIL AN

APPROPRIATE EXPOSURE ASSESSMENT CAN BE ACHIEVED

(TYPICALLY 3 SHIFTS) PER BUILDING. ONCE THIS EXPOSURE

ASSESSMENT IS ACHIEVED, THE CPIH INVOLVEMENT IN THE

PROJECT CAN BE SUSPENDED. THE EXPOSURE ASSESSMENT

SHALL BE VALID FOR 1 YEAR, UNLESS THERE ARE

SIGNIFICANT CHANGES TO THE PROCESS OR OTHER

CONDITIONS. AFTER 1 YEAR, THE AIR MONITORING OF TASKS

SHALL BE REPEATED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION

OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT

AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT

RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD

EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR

NORMAL DEMOLITION OR CONSTRUCTION ACTIVITIES IS LOW,

ACTUAL LEAD EXPOSURE MAY VARY SIGNIFICANTLY

DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND

OTHER WORK AREA CONDITIONS. PROPER OSHA

COMPLIANCE IS CONSIDERED PERFORMANCE BASED AND

INCLUDES EVALUATING POTENTIAL WORK EXPOSURES WITH

AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING

(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE

DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE

EXPOSURE FOR LEAD.

LBP AND LEAD-CONTAINING MATERIALS WERE IDENTIFIED

THAT SHOULD NOT BE IMPACTED BY THE PROJECT (SEE THE

LIMITED ASBESTOS, LEAD AND MOLD SURVEY). CARE SHOULD

L1

L1

L1

UP

UP

UP

UP

UP

UP

OFFICE

OFFICE

OFFICE

FILE

RM.

OFFICE

OFFICE

WORK

RM.

STORAGE

TOILET,

MALE

ELEVATOR

LOBBY

TOILET,

FEMALE

STAIRWELL

NO.

S102

CORRIDOR

H102

CORRIDOR

H103

OI&T

OFFICE

CORRIDOR

H101

RECEPTION

STAIRWELL

NO.

S101

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

LIBRARY

CORRIDOR

H104

CONFERENCE

RM.

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

114A

OFFICE

BREAK

RM.

115A

OFFICE,

OPEN

OFFICE

OFFICE,

CHIEF

113A

OFFICE

OFFICE

OFFICE

CORRIDOR

H105

CLOSET

115C

CLOSET

115B

AP

FEC

FAP

FEC

FEC

FAP

FAP

FAP

RAD

RAD

RAD

ELEVATOR

E1

CHASE

CH-1-1

STAIRWELL

NO.

S103

DN

RAD

18-114B 18-114A

18-116A 18-112A18-111A18-110A

18-115A

18-120C18-121A18-123A

18-129A18-131A

18-133A

18-134A

18-132A 18-130A

18-124A 18-122A 18-119A 18-119B

18-101A

18-120B 18-104A18-104B18-120A

18-109A18-106A 18-107A

18-115D18-115E

18-108A18-105A

18-127A 18-125A

18-113A 18-113B

18-128A 18-126A

L1 L1

L1

L1 L1

L1

L1 L1 L1

L1 L1

L1

L1

L1

L1L1

L1

L1L1

L1

L1

L1L1

L1L1

L1

L1L1L1

L1

L1L1

L1

8718 BOTTS LANE,

SAN ANTONIO, TX 78217

T 210.881.9714

F 210.881.6808 www.hfscompany.com

6 SOUTH OLD ORCHARD

ST. LOUIS, MO 63119

T 314.918.8383

F 314.918.1766 www.rossbar.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

ROBERT A. JURGIEL, PE, CSP

(PE LICENSE NO. 029078)

A

M

18-HA-111

ABATEMENT FLOOR PLAN

BLDG 18 - FLOOR 01

BMD

GKY

657-25-302JB

BID DOCUMENTS

REPLACE WINDOWS IN BUILDINGS 2, 18,

25, 52 FOR ENERGY EFFICIENCY

5/8/19

1/8" = 1'-0"

ABATEMENT FLOOR PLAN - BUILDING 18 - FLOOR 01

SHEET KEY NOTES:#

ONCE WINDOWS HAVE BEEN REMOVED BY GENERAL

CONTRACTOR OR SUBCONTRACTOR; HEPA-VACUUM

EXPOSED WINDOW CAVITY, WET WIPE WITH AN

EPA-REGISTERED ANTI-MICROBIAL SOLUTION AND CLEAN ANY

DEBRIS FROM DROP CLOTH. ONCE WINDOW HAS BEEN

REPLACED BY GENERAL CONTRACTOR OR SUBCONTRACTOR,

CONDUCT FINAL CLEANING INCLUDING REMOVING THE DROP

CLOTHS AND OTHER DUST PROTECTION MEASURES.

- 37 WINDOWS

L1.

ABATEMENT GENERAL NOTES:

TRUE

NORTH

PLAN

NORTH

__ __54 61

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

THE KNOWN HAZARDS ASSOCIATED WITH THIS PROJECT

CONSIST OF INTACT LEAD-BASED PAINT (LBP) OR

LEAD-CONTAINING PAINT ON WALLS, CEILINGS AND/OR TRIM

AROUND WINDOWS (BLDGS. 2, 18 & 25), LOOSE, CURLING OR

DELAMINATED LBP ON WALLS AND CEILINGS ABOVE CEILING

TILES (BLDG. 2) AND DETERIORATED LBP IN WINDOW CAVITIES

(BLDGS. 2, 18 & 25).

THE SCOPE OF THE LEAD ABATEMENT WORK IN BUILDINGS 2,

18 & 25 CONSISTS OF HEPA-VACUMMING AND CLEANING

CEILING TILES ADJACENT TO WINDOWS CONTAMINATED WITH

LEAD-BASED PAINT (LBP) CHIPS / DEBRIS (BLDG. 2),

REMOVING LOOSE, CURLING OR DELAMINATED LBP FROM

WALLS AND CEILINGS ADJACENT TO WINDOWS (BLDG. 2), AND

CLEANING WINDOW OPENINGS ONCE WINDOWS HAVE BEEN

REMOVED BY GENERAL CONTRACTOR OR SUBCONTRACTOR

(BLDGS. 2, 18 & 25). ALL WORK SHALL BE CONDUCTED IN

ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL

REGULATIONS AND THE CONTRACT SPECIFICATIONS.

ABATEMENT CONTRACTOR WILL RESTRICT ACCESS TO

ROOMS WHERE WORK IS TO BE PERFORMED, COVER ALL

CONTENTS IN THE ROOM WITH 4-MIL OR 6-MIL POLY SHEETING

AND PLACE 6-MIL POLY DROP CLOTHS ON THE FLOOR BELOW

WORK AREAS, PRIOR TO IMPACTING ANY LBP. IN LIEU OF

COVERING ALL CONTENTS WITH POLY SHEETING IN LARGE

OPEN ROOMS, FLOOR TO CEILING DUST PARTITIONS MAY BE

ERECTED TO ISOLATE CONTENTS FROM WORK AREAS. IF THE

DUST PARTITION OPTION IS CHOSEN, CARE SHALL BE GIVEN

TO ENSURE THE WORK SPACE IS LARGE ENOUGH FOR

ABATEMENT WORK AND THE REMOVAL AND REPLACEMENT

OF WINDOWS BY GENERAL CONTRACTOR OR

SUBCONTRACTOR.

THE ABATEMENT SUPERVISOR AND THE VPIH SHALL ACT AS

COMPETENT PERSONS ONSITE TO ENSURE NO SUSPECT

ASBESTOS MATERIALS OR OTHER UPSET CONDITIONS ARE

IDENTIFIED DURING THE COURSE OF THE WINDOW

REPLACEMENT PROJECT THAT COULD ALTER THE CONTROL

REQUIREMENTS.

STRICT COORDINATION BETWEEN VA OCCUPANTS, VA COR,

VPIH, GENERAL CONTRACTOR, ALL SUBCONTRACTORS AND

THE ABATEMENT CONTRACTOR IS PARAMOUNT FOR THE

SUCCESS OF THIS PROJECT.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR

MOVING, REMOVING OR RELOCATING ALL DATA EQUIPMENT,

COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL

HANGINGS, ETC., FROM THE WINDOW WORK AREAS. A

SUFFICIENT AMOUNT OF ROOM MUST BE GIVEN FOR THE

CONTRACTORS TO COMPLETE THEIR WORK WITHOUT

IMPEDENCE BY CONTENTS.

ABATEMENT WORK SHALL BE CONDUCTED 3:00 PM TO 12:00

AM MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. WORK

IN STAIRWELLS, LOBBIES OR OTHER EGRESS LOCATIONS MAY

HAVE TO BE ACCOMPLISHED ON WEEKENDS (5:00 PM FRIDAY

TO 6:00 PM SUNDAY).

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES,

CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO

THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED

BY THE ABATEMENT CONTRACTOR.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH

THE VA COR AND VPIH. THE LOCATIONS OF WASTE DISPOSAL

CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR

AND VPIH.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE-RETARDANT TYPE.

ALL IN-PROGRESS PERIMETER AIR MONITORING AND

CLEARANCE SAMPLING WILL BE CONDUCTED BY THE VPIH.

WIPE SAMPLES WILL BE COLLECTED AT THE COMPLETION OF

THE WORK (ABATEMENT AND WINDOW REPLACEMENT). ON A

PERIODIC BASIS, WIPE SAMPLES WILL BE COLLECTED INSIDE

THE ROLLING MINI-CONTAINMENTS OR HEPA CART (IF

UTILIZED) TO ENSURE PROPER CLEANING PROCEDURES ARE

BEING FOLLOWED. A THRESHOLD OF 200 MICROGRAMS PER

SQUARE FOOT (µg/ft²) WILL BE USED.

ALL IN-PROGRESS INSIDE WORK AREA AND OSHA

COMPLIANCE AIR SAMPLES WILL BE CONDUCTED BY THE

CPIH. PERSONNEL MONITORING WILL CONTINUE UNTIL AN

APPROPRIATE EXPOSURE ASSESSMENT CAN BE ACHIEVED

(TYPICALLY 3 SHIFTS) PER BUILDING. ONCE THIS EXPOSURE

ASSESSMENT IS ACHIEVED, THE CPIH INVOLVEMENT IN THE

PROJECT CAN BE SUSPENDED. THE EXPOSURE ASSESSMENT

SHALL BE VALID FOR 1 YEAR, UNLESS THERE ARE

SIGNIFICANT CHANGES TO THE PROCESS OR OTHER

CONDITIONS. AFTER 1 YEAR, THE AIR MONITORING OF TASKS

SHALL BE REPEATED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION

OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT

AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT

RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD

EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR

NORMAL DEMOLITION OR CONSTRUCTION ACTIVITIES IS LOW,

ACTUAL LEAD EXPOSURE MAY VARY SIGNIFICANTLY

DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND

OTHER WORK AREA CONDITIONS. PROPER OSHA

COMPLIANCE IS CONSIDERED PERFORMANCE BASED AND

INCLUDES EVALUATING POTENTIAL WORK EXPOSURES WITH

AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING

(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE

DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE

EXPOSURE FOR LEAD.

LBP AND LEAD-CONTAINING MATERIALS WERE IDENTIFIED

THAT SHOULD NOT BE IMPACTED BY THE PROJECT (SEE THE

LIMITED ASBESTOS, LEAD AND MOLD SURVEY). CARE SHOULD

L1 L1

L1

L1 L1 L1 L1

L1

L1 L1

L1

L1

L1

L1

L1

L1

L1

L1 L1

L1 L1

L1

L1 L1

L1 L1

L1 L1

L1

L1 L1 L1 L1

L1

L1 L1

L1

UP

UP

DN

8718 BOTTS LANE,

SAN ANTONIO, TX 78217

T 210.881.9714

F 210.881.6808 www.hfscompany.com

6 SOUTH OLD ORCHARD

ST. LOUIS, MO 63119

T 314.918.8383

F 314.918.1766 www.rossbar.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

ROBERT A. JURGIEL, PE, CSP

(PE LICENSE NO. 029078)

A

M

18-HA-121

ABATEMENT FLOOR PLAN

BLDG 18 - FLOOR 02

BMD

GKY

657-25-302JB

BID DOCUMENTS

REPLACE WINDOWS IN BUILDINGS 2, 18,

25, 52 FOR ENERGY EFFICIENCY

5/8/19

1/8" = 1'-0"

ABATEMENT FLOOR PLAN - BUILDING 18 - FLOOR 02

SHEET KEY NOTES:#

ONCE WINDOWS HAVE BEEN REMOVED BY GENERAL

CONTRACTOR OR SUBCONTRACTOR; HEPA-VACUUM

EXPOSED WINDOW CAVITY, WET WIPE WITH AN

EPA-REGISTERED ANTI-MICROBIAL SOLUTION AND CLEAN ANY

DEBRIS FROM DROP CLOTH. ONCE WINDOW HAS BEEN

REPLACED BY GENERAL CONTRACTOR OR SUBCONTRACTOR,

CONDUCT FINAL CLEANING INCLUDING REMOVING THE DROP

CLOTHS AND OTHER DUST PROTECTION MEASURES.

- 38 WINDOWS

L1.

ABATEMENT GENERAL NOTES:

TRUE

NORTH

PLAN

NORTH

__ __55 61

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

THE KNOWN HAZARDS ASSOCIATED WITH THIS PROJECT

CONSIST OF INTACT LEAD-BASED PAINT (LBP) OR

LEAD-CONTAINING PAINT ON WALLS, CEILINGS AND/OR TRIM

AROUND WINDOWS (BLDGS. 2, 18 & 25), LOOSE, CURLING OR

DELAMINATED LBP ON WALLS AND CEILINGS ABOVE CEILING

TILES (BLDG. 2) AND DETERIORATED LBP IN WINDOW CAVITIES

(BLDGS. 2, 18 & 25).

THE SCOPE OF THE LEAD ABATEMENT WORK IN BUILDINGS 2,

18 & 25 CONSISTS OF HEPA-VACUMMING AND CLEANING

CEILING TILES ADJACENT TO WINDOWS CONTAMINATED WITH

LEAD-BASED PAINT (LBP) CHIPS / DEBRIS (BLDG. 2),

REMOVING LOOSE, CURLING OR DELAMINATED LBP FROM

WALLS AND CEILINGS ADJACENT TO WINDOWS (BLDG. 2), AND

CLEANING WINDOW OPENINGS ONCE WINDOWS HAVE BEEN

REMOVED BY GENERAL CONTRACTOR OR SUBCONTRACTOR

(BLDGS. 2, 18 & 25). ALL WORK SHALL BE CONDUCTED IN

ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL

REGULATIONS AND THE CONTRACT SPECIFICATIONS.

ABATEMENT CONTRACTOR WILL RESTRICT ACCESS TO

ROOMS WHERE WORK IS TO BE PERFORMED, COVER ALL

CONTENTS IN THE ROOM WITH 4-MIL OR 6-MIL POLY SHEETING

AND PLACE 6-MIL POLY DROP CLOTHS ON THE FLOOR BELOW

WORK AREAS, PRIOR TO IMPACTING ANY LBP. IN LIEU OF

COVERING ALL CONTENTS WITH POLY SHEETING IN LARGE

OPEN ROOMS, FLOOR TO CEILING DUST PARTITIONS MAY BE

ERECTED TO ISOLATE CONTENTS FROM WORK AREAS. IF THE

DUST PARTITION OPTION IS CHOSEN, CARE SHALL BE GIVEN

TO ENSURE THE WORK SPACE IS LARGE ENOUGH FOR

ABATEMENT WORK AND THE REMOVAL AND REPLACEMENT

OF WINDOWS BY GENERAL CONTRACTOR OR

SUBCONTRACTOR.

THE ABATEMENT SUPERVISOR AND THE VPIH SHALL ACT AS

COMPETENT PERSONS ONSITE TO ENSURE NO SUSPECT

ASBESTOS MATERIALS OR OTHER UPSET CONDITIONS ARE

IDENTIFIED DURING THE COURSE OF THE WINDOW

REPLACEMENT PROJECT THAT COULD ALTER THE CONTROL

REQUIREMENTS.

STRICT COORDINATION BETWEEN VA OCCUPANTS, VA COR,

VPIH, GENERAL CONTRACTOR, ALL SUBCONTRACTORS AND

THE ABATEMENT CONTRACTOR IS PARAMOUNT FOR THE

SUCCESS OF THIS PROJECT.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR

MOVING, REMOVING OR RELOCATING ALL DATA EQUIPMENT,

COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL

HANGINGS, ETC., FROM THE WINDOW WORK AREAS. A

SUFFICIENT AMOUNT OF ROOM MUST BE GIVEN FOR THE

CONTRACTORS TO COMPLETE THEIR WORK WITHOUT

IMPEDENCE BY CONTENTS.

ABATEMENT WORK SHALL BE CONDUCTED 3:00 PM TO 12:00

AM MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. WORK

IN STAIRWELLS, LOBBIES OR OTHER EGRESS LOCATIONS MAY

HAVE TO BE ACCOMPLISHED ON WEEKENDS (5:00 PM FRIDAY

TO 6:00 PM SUNDAY).

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES,

CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO

THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED

BY THE ABATEMENT CONTRACTOR.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH

THE VA COR AND VPIH. THE LOCATIONS OF WASTE DISPOSAL

CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR

AND VPIH.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE-RETARDANT TYPE.

ALL IN-PROGRESS PERIMETER AIR MONITORING AND

CLEARANCE SAMPLING WILL BE CONDUCTED BY THE VPIH.

WIPE SAMPLES WILL BE COLLECTED AT THE COMPLETION OF

THE WORK (ABATEMENT AND WINDOW REPLACEMENT). ON A

PERIODIC BASIS, WIPE SAMPLES WILL BE COLLECTED INSIDE

THE ROLLING MINI-CONTAINMENTS OR HEPA CART (IF

UTILIZED) TO ENSURE PROPER CLEANING PROCEDURES ARE

BEING FOLLOWED. A THRESHOLD OF 200 MICROGRAMS PER

SQUARE FOOT (µg/ft²) WILL BE USED.

ALL IN-PROGRESS INSIDE WORK AREA AND OSHA

COMPLIANCE AIR SAMPLES WILL BE CONDUCTED BY THE

CPIH. PERSONNEL MONITORING WILL CONTINUE UNTIL AN

APPROPRIATE EXPOSURE ASSESSMENT CAN BE ACHIEVED

(TYPICALLY 3 SHIFTS) PER BUILDING. ONCE THIS EXPOSURE

ASSESSMENT IS ACHIEVED, THE CPIH INVOLVEMENT IN THE

PROJECT CAN BE SUSPENDED. THE EXPOSURE ASSESSMENT

SHALL BE VALID FOR 1 YEAR, UNLESS THERE ARE

SIGNIFICANT CHANGES TO THE PROCESS OR OTHER

CONDITIONS. AFTER 1 YEAR, THE AIR MONITORING OF TASKS

SHALL BE REPEATED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION

OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT

AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT

RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD

EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR

NORMAL DEMOLITION OR CONSTRUCTION ACTIVITIES IS LOW,

ACTUAL LEAD EXPOSURE MAY VARY SIGNIFICANTLY

DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND

OTHER WORK AREA CONDITIONS. PROPER OSHA

COMPLIANCE IS CONSIDERED PERFORMANCE BASED AND

INCLUDES EVALUATING POTENTIAL WORK EXPOSURES WITH

AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING

(BLOOD LEAD…