36C25519R0094-003.pdf
PDF 6 MB Posted
- Solicitation number
- 36C25519R0094
About this file
36C25519R0094 03 657 18 302JB Plans Abatement BID Docs 218 25_053019 final.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25519R0094-002.pdf | ||
| 36C25519R0094-001.pdf | ||
| 36C25519R0094-000.docx | DOCX document | |
| 36C25519R0094-004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L1
L2
L1
L2
L1
L2
L1
L2
L1
L2
L1
L2
L1
UP
UP
UP
UP
UP
UP
UP
DN
L2
L1 L2L1 L2 L1 L2
L1 L2 L1 L2 L1
L2
L1 L2
L1 L2
L1 L2
L1 L2
L1 L2L1 L2
L1 L2L1 L2
L1 L2L1 L2
L1 L2
L1 L2
L2
L1
L2
L1
L1
L2
L1
L2
L1
L2
L1
L2
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714
F 210.881.6808 www.hfscompany.com
6 SOUTH OLD ORCHARD
ST. LOUIS, MO 63119
T 314.918.8383
F 314.918.1766 www.rossbar.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans
Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
ROBERT A. JURGIEL, PE, CSP
(PE LICENSE NO. 029078)
A
M
02-HA-111
ABATEMENT FLOOR PLAN
BLDG 02 - FLOOR 01
657-25-302JB
BID DOCUMENTS
REPLACE WINDOWS IN BUILDINGS 2, 18,
25, 52 FOR ENERGY EFFICIENCY
5/8/19
ABATEMENT FLOOR PLAN - BLDG 02 - FLOOR 01
BMD
GKY
SHEET KEY NOTES:#
REMOVE CEILING TILES THAT HAVE TO BE DISPLACED TO
REMOVE AND REPLACE THE WINDOW, INSPECT THE CEILING
TILES AND OTHER HORIZONTAL SURFACES FOR LBP CHIPS,
INSPECT WALLS FOR LOOSE, CURLING OR DELAMINATED LBP
(WITHIN 2' OF CEILING TILE OPENING) THAT COULD DISLODGE
DURING WINDOW REPLACEMENT ACTIVITIES. IF THE
IDENTIFIED AREAS ARE LESS THAN 2 SF, THE ROOM OR WORK
AREA SHOULD BE ISOLATED WITH CRITICAL BARRIERS, DROP
CLOTHS SHOULD BE PLACED BELOW THE IMMEDIATE WORK
AREA AND LOCALIZED NEGATIVE PRESSURE ESTABLISHED.
THE LOOSE, CURLING OR DELAMINATED LBP IN THESE
IDENTIFIED AREAS SHALL BE REMOVED USING
NON-MECHANICAL MEANS. THE CEILING TILES AND OTHER
HORIZONTAL SURFACES SHALL BE HEPA VACUUMED. IF THE
AFFECTED AREAS ARE GREATER THAN 2 SF, WORK WILL HAVE
TO BE CONDUCTED IN A NEGATIVE PRESSURE ROLLING
MINI-CONTAINMENT (WITH HEPA FILTRATION) OR HEPA CART.
- 28 WINDOWS WITH IDENTIFIED AREAS <2 SF
- 4 WINDOWS WITH IDENTIFIED AREAS >2 SF
ONCE WINDOWS HAVE BEEN REMOVED BY GENERAL
CONTRACTOR OR SUBCONTRACTOR; HEPA-VACUUM
EXPOSED WINDOW CAVITY, WET WIPE WITH AN
EPA-REGISTERED ANTI-MICROBIAL SOLUTION AND CLEAN ANY
DEBRIS FROM DROP CLOTH. ONCE WINDOW HAS BEEN
REPLACED BY GENERAL CONTRACTOR OR SUBCONTRACTOR,
CONDUCT FINAL CLEANING INCLUDING REMOVING THE DROP
CLOTHS AND OTHER DUST PROTECTION MEASURES.
- 32 WINDOWS
L1.
L2.
3/16" = 1'-0"
PLAN
NORTH
TRUE
NORTH
ABATEMENT GENERAL NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
THE KNOWN HAZARDS ASSOCIATED WITH THIS PROJECT
CONSIST OF INTACT LEAD-BASED PAINT (LBP) OR
LEAD-CONTAINING PAINT ON WALLS, CEILINGS AND/OR TRIM
AROUND WINDOWS (BLDGS. 2, 18 & 25), LOOSE, CURLING OR
DELAMINATED LBP ON WALLS AND CEILINGS ABOVE CEILING
TILES (BLDG. 2) AND DETERIORATED LBP IN WINDOW CAVITIES
(BLDGS. 2, 18 & 25).
THE SCOPE OF THE LEAD ABATEMENT WORK IN BUILDINGS 2,
18 & 25 CONSISTS OF HEPA-VACUMMING AND CLEANING
CEILING TILES ADJACENT TO WINDOWS CONTAMINATED WITH
LEAD-BASED PAINT (LBP) CHIPS / DEBRIS (BLDG. 2),
REMOVING LOOSE, CURLING OR DELAMINATED LBP FROM
WALLS AND CEILINGS ADJACENT TO WINDOWS (BLDG. 2), AND
CLEANING WINDOW OPENINGS ONCE WINDOWS HAVE BEEN
REMOVED BY GENERAL CONTRACTOR OR SUBCONTRACTOR
(BLDGS. 2, 18 & 25). ALL WORK SHALL BE CONDUCTED IN
ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL
REGULATIONS AND THE CONTRACT SPECIFICATIONS.
ABATEMENT CONTRACTOR WILL RESTRICT ACCESS TO
ROOMS WHERE WORK IS TO BE PERFORMED, COVER ALL
CONTENTS IN THE ROOM WITH 4-MIL OR 6-MIL POLY SHEETING
AND PLACE 6-MIL POLY DROP CLOTHS ON THE FLOOR BELOW
WORK AREAS, PRIOR TO IMPACTING ANY LBP. IN LIEU OF
COVERING ALL CONTENTS WITH POLY SHEETING IN LARGE
OPEN ROOMS, FLOOR TO CEILING DUST PARTITIONS MAY BE
ERECTED TO ISOLATE CONTENTS FROM WORK AREAS. IF THE
DUST PARTITION OPTION IS CHOSEN, CARE SHALL BE GIVEN
TO ENSURE THE WORK SPACE IS LARGE ENOUGH FOR
ABATEMENT WORK AND THE REMOVAL AND REPLACEMENT
OF WINDOWS BY GENERAL CONTRACTOR OR
SUBCONTRACTOR.
THE ABATEMENT SUPERVISOR AND THE VPIH SHALL ACT AS
COMPETENT PERSONS ONSITE TO ENSURE NO SUSPECT
ASBESTOS MATERIALS OR OTHER UPSET CONDITIONS ARE
IDENTIFIED DURING THE COURSE OF THE WINDOW
REPLACEMENT PROJECT THAT COULD ALTER THE CONTROL
REQUIREMENTS.
STRICT COORDINATION BETWEEN VA OCCUPANTS, VA COR,
VPIH, GENERAL CONTRACTOR, ALL SUBCONTRACTORS AND
THE ABATEMENT CONTRACTOR IS PARAMOUNT FOR THE
SUCCESS OF THIS PROJECT.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
MOVING, REMOVING OR RELOCATING ALL DATA EQUIPMENT,
COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL
HANGINGS, ETC., FROM THE WINDOW WORK AREAS. A
SUFFICIENT AMOUNT OF ROOM MUST BE GIVEN FOR THE
CONTRACTORS TO COMPLETE THEIR WORK WITHOUT
IMPEDENCE BY CONTENTS.
ABATEMENT WORK SHALL BE CONDUCTED 3:00 PM TO 12:00
AM MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. WORK
IN STAIRWELLS, LOBBIES OR OTHER EGRESS LOCATIONS MAY
HAVE TO BE ACCOMPLISHED ON WEEKENDS (5:00 PM FRIDAY
TO 6:00 PM SUNDAY).
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE
COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,
UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE
ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED
SUBMITTALS. ANY CHANGES TO THE PROCEDURES,
CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO
THE VA COR AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED
BY THE ABATEMENT CONTRACTOR.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH
THE VA COR AND VPIH. THE LOCATIONS OF WASTE DISPOSAL
CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR
AND VPIH.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT
PROJECT SHALL BE OF THE FIRE-RETARDANT TYPE.
ALL IN-PROGRESS PERIMETER AIR MONITORING AND
CLEARANCE SAMPLING WILL BE CONDUCTED BY THE VPIH.
WIPE SAMPLES WILL BE COLLECTED AT THE COMPLETION OF
THE WORK (ABATEMENT AND WINDOW REPLACEMENT). ON A
PERIODIC BASIS, WIPE SAMPLES WILL BE COLLECTED INSIDE
THE ROLLING MINI-CONTAINMENTS OR HEPA CART (IF
UTILIZED) TO ENSURE PROPER CLEANING PROCEDURES ARE
BEING FOLLOWED. A THRESHOLD OF 200 MICROGRAMS PER
SQUARE FOOT (µg/ft²) WILL BE USED.
ALL IN-PROGRESS INSIDE WORK AREA AND OSHA
COMPLIANCE AIR SAMPLES WILL BE CONDUCTED BY THE
CPIH. PERSONNEL MONITORING WILL CONTINUE UNTIL AN
APPROPRIATE EXPOSURE ASSESSMENT CAN BE ACHIEVED
(TYPICALLY 3 SHIFTS) PER BUILDING. ONCE THIS EXPOSURE
ASSESSMENT IS ACHIEVED, THE CPIH INVOLVEMENT IN THE
PROJECT CAN BE SUSPENDED. THE EXPOSURE ASSESSMENT
SHALL BE VALID FOR 1 YEAR, UNLESS THERE ARE
SIGNIFICANT CHANGES TO THE PROCESS OR OTHER
CONDITIONS. AFTER 1 YEAR, THE AIR MONITORING OF TASKS
SHALL BE REPEATED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT
CONTRACTOR USING TCLP ANALYTICAL METHODS TO
DETERMINE PROPER WASTE DISPOSAL METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION
OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT
AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT
RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD
EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR
NORMAL DEMOLITION OR CONSTRUCTION ACTIVITIES IS LOW,
ACTUAL LEAD EXPOSURE MAY VARY SIGNIFICANTLY
DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND
OTHER WORK AREA CONDITIONS. PROPER OSHA
COMPLIANCE IS CONSIDERED PERFORMANCE BASED AND
INCLUDES EVALUATING POTENTIAL WORK EXPOSURES WITH
AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING
(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE
DEMOLITION CONTRACTOR HAS HISTORICAL DATA
DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR
SAMPLING SHALL BE CONDUCTED BY THE CPIH ON
REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE
EXPOSURE FOR LEAD.
LBP AND LEAD-CONTAINING MATERIALS WERE IDENTIFIED
THAT SHOULD NOT BE IMPACTED BY THE PROJECT (SEE THE
LIMITED ASBESTOS, LEAD AND MOLD SURVEY). CARE SHOULD
BE TAKEN TO ENSURE THESE MATERIALS ARE NOT IMPACTED.
PROTECT AS REQUIRED.
49 61
L1
L2
L1
L2
L1
L2
L1
L2
L1
L2
L1
L2
L1 L2
L1 L2
L1 L2
L1 L2
L1 L2
L1 L2
L1 L2
L1 L2 L1 L2
L1 L2 L1 L2
UP
UP
DN
UP
ROOF BELOW
L1 L2
L1 L2
L1 L2
L1 L2L1 L2
L1 L2L1 L2
L1 L2
L1 L2
L1 L2
L1 L2
L1 L2L1 L2
L1 L2L1 L2L1 L2
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714
F 210.881.6808 www.hfscompany.com
6 SOUTH OLD ORCHARD
ST. LOUIS, MO 63119
T 314.918.8383
F 314.918.1766 www.rossbar.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans
Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
ROBERT A. JURGIEL, PE, CSP
(PE LICENSE NO. 029078)
A
M
02-HA-121
ABATEMENT FLOOR PLAN
BLDG 02 - FLOOR 02
657-25-302JB
BID DOCUMENTS
REPLACE WINDOWS IN BUILDINGS 2, 18,
25, 52 FOR ENERGY EFFICIENCY
5/8/19
ABATEMENT FLOOR PLAN - BLDG 02 - FLOOR 02
BMD
GKY
SHEET KEY NOTES:#
USING A ROLLING MINI-CONTAINMENT OR HEPA CART, REMOVE
CEILING TILES NEAR WINDOWS, REMOVE ANY LOOSE, CURLING
OR DELAMINATED LBP FROM WALLS AND CEILINGS (WITHIN 2'
OF CEILING TILE OPENING) THAT COULD DISLODGE DURING
WINDOW REPLACEMENT AND HEPA VACUUM ALL CEILING TILES
AND HORIZONTAL SURFACES ADJACENT TO THE WINDOWS.
ONCE THE LEAD REMOVAL IS COMPLETE, THE ROLLING
MINI-CONTAINMENT OR HEPA CART WILL BE CLEANED, SEALED
AND MOVED TO THE NEXT WORK LOCATION.
- 36 WINDOWS
ONCE WINDOWS HAVE BEEN REMOVED BY GENERAL
CONTRACTOR OR SUBCONTRACTOR; HEPA VACUUM EXPOSED
WINDOW CAVITY, WET WIPE WITH AN EPA-REGISTERED
ANTI-MICROBIAL SOLUTION AND CLEAN ANY DEBRIS FROM
DROP CLOTH. ONCE WINDOW HAS BEEN REPLACED BY
GENERAL CONTRACTOR OR SUBCONTRACTOR, CONDUCT
FINAL CLEANING INCLUDING REMOVING THE DROP CLOTHS
AND OTHER DUST PROTECTION MEASURES.
- 36 WINDOWS
L1.
L2.
3/16" = 1'-0"
ABATEMENT GENERAL NOTES:
PLAN
NORTH
TRUE
NORTH
50 61
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
THE KNOWN HAZARDS ASSOCIATED WITH THIS PROJECT
CONSIST OF INTACT LEAD-BASED PAINT (LBP) OR
LEAD-CONTAINING PAINT ON WALLS, CEILINGS AND/OR TRIM
AROUND WINDOWS (BLDGS. 2, 18 & 25), LOOSE, CURLING OR
DELAMINATED LBP ON WALLS AND CEILINGS ABOVE CEILING
TILES (BLDG. 2) AND DETERIORATED LBP IN WINDOW CAVITIES
(BLDGS. 2, 18 & 25).
THE SCOPE OF THE LEAD ABATEMENT WORK IN BUILDINGS 2,
18 & 25 CONSISTS OF HEPA-VACUMMING AND CLEANING
CEILING TILES ADJACENT TO WINDOWS CONTAMINATED WITH
LEAD-BASED PAINT (LBP) CHIPS / DEBRIS (BLDG. 2),
REMOVING LOOSE, CURLING OR DELAMINATED LBP FROM
WALLS AND CEILINGS ADJACENT TO WINDOWS (BLDG. 2), AND
CLEANING WINDOW OPENINGS ONCE WINDOWS HAVE BEEN
REMOVED BY GENERAL CONTRACTOR OR SUBCONTRACTOR
(BLDGS. 2, 18 & 25). ALL WORK SHALL BE CONDUCTED IN
ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL
REGULATIONS AND THE CONTRACT SPECIFICATIONS.
ABATEMENT CONTRACTOR WILL RESTRICT ACCESS TO
ROOMS WHERE WORK IS TO BE PERFORMED, COVER ALL
CONTENTS IN THE ROOM WITH 4-MIL OR 6-MIL POLY SHEETING
AND PLACE 6-MIL POLY DROP CLOTHS ON THE FLOOR BELOW
WORK AREAS, PRIOR TO IMPACTING ANY LBP. IN LIEU OF
COVERING ALL CONTENTS WITH POLY SHEETING IN LARGE
OPEN ROOMS, FLOOR TO CEILING DUST PARTITIONS MAY BE
ERECTED TO ISOLATE CONTENTS FROM WORK AREAS. IF THE
DUST PARTITION OPTION IS CHOSEN, CARE SHALL BE GIVEN
TO ENSURE THE WORK SPACE IS LARGE ENOUGH FOR
ABATEMENT WORK AND THE REMOVAL AND REPLACEMENT
OF WINDOWS BY GENERAL CONTRACTOR OR
SUBCONTRACTOR.
THE ABATEMENT SUPERVISOR AND THE VPIH SHALL ACT AS
COMPETENT PERSONS ONSITE TO ENSURE NO SUSPECT
ASBESTOS MATERIALS OR OTHER UPSET CONDITIONS ARE
IDENTIFIED DURING THE COURSE OF THE WINDOW
REPLACEMENT PROJECT THAT COULD ALTER THE CONTROL
REQUIREMENTS.
STRICT COORDINATION BETWEEN VA OCCUPANTS, VA COR,
VPIH, GENERAL CONTRACTOR, ALL SUBCONTRACTORS AND
THE ABATEMENT CONTRACTOR IS PARAMOUNT FOR THE
SUCCESS OF THIS PROJECT.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
MOVING, REMOVING OR RELOCATING ALL DATA EQUIPMENT,
COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL
HANGINGS, ETC., FROM THE WINDOW WORK AREAS. A
SUFFICIENT AMOUNT OF ROOM MUST BE GIVEN FOR THE
CONTRACTORS TO COMPLETE THEIR WORK WITHOUT
IMPEDENCE BY CONTENTS.
ABATEMENT WORK SHALL BE CONDUCTED 3:00 PM TO 12:00
AM MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. WORK
IN STAIRWELLS, LOBBIES OR OTHER EGRESS LOCATIONS MAY
HAVE TO BE ACCOMPLISHED ON WEEKENDS (5:00 PM FRIDAY
TO 6:00 PM SUNDAY).
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE
COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,
UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE
ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED
SUBMITTALS. ANY CHANGES TO THE PROCEDURES,
CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO
THE VA COR AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED
BY THE ABATEMENT CONTRACTOR.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH
THE VA COR AND VPIH. THE LOCATIONS OF WASTE DISPOSAL
CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR
AND VPIH.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT
PROJECT SHALL BE OF THE FIRE-RETARDANT TYPE.
ALL IN-PROGRESS PERIMETER AIR MONITORING AND
CLEARANCE SAMPLING WILL BE CONDUCTED BY THE VPIH.
WIPE SAMPLES WILL BE COLLECTED AT THE COMPLETION OF
THE WORK (ABATEMENT AND WINDOW REPLACEMENT). ON A
PERIODIC BASIS, WIPE SAMPLES WILL BE COLLECTED INSIDE
THE ROLLING MINI-CONTAINMENTS OR HEPA CART (IF
UTILIZED) TO ENSURE PROPER CLEANING PROCEDURES ARE
BEING FOLLOWED. A THRESHOLD OF 200 MICROGRAMS PER
SQUARE FOOT (µg/ft²) WILL BE USED.
ALL IN-PROGRESS INSIDE WORK AREA AND OSHA
COMPLIANCE AIR SAMPLES WILL BE CONDUCTED BY THE
CPIH. PERSONNEL MONITORING WILL CONTINUE UNTIL AN
APPROPRIATE EXPOSURE ASSESSMENT CAN BE ACHIEVED
(TYPICALLY 3 SHIFTS) PER BUILDING. ONCE THIS EXPOSURE
ASSESSMENT IS ACHIEVED, THE CPIH INVOLVEMENT IN THE
PROJECT CAN BE SUSPENDED. THE EXPOSURE ASSESSMENT
SHALL BE VALID FOR 1 YEAR, UNLESS THERE ARE
SIGNIFICANT CHANGES TO THE PROCESS OR OTHER
CONDITIONS. AFTER 1 YEAR, THE AIR MONITORING OF TASKS
SHALL BE REPEATED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT
CONTRACTOR USING TCLP ANALYTICAL METHODS TO
DETERMINE PROPER WASTE DISPOSAL METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION
OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT
AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT
RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD
EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR
NORMAL DEMOLITION OR CONSTRUCTION ACTIVITIES IS LOW,
ACTUAL LEAD EXPOSURE MAY VARY SIGNIFICANTLY
DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND
OTHER WORK AREA CONDITIONS. PROPER OSHA
COMPLIANCE IS CONSIDERED PERFORMANCE BASED AND
INCLUDES EVALUATING POTENTIAL WORK EXPOSURES WITH
AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING
(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE
DEMOLITION CONTRACTOR HAS HISTORICAL DATA
DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR
SAMPLING SHALL BE CONDUCTED BY THE CPIH ON
REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE
EXPOSURE FOR LEAD.
LBP AND LEAD-CONTAINING MATERIALS WERE IDENTIFIED
THAT SHOULD NOT BE IMPACTED BY THE PROJECT (SEE THE
LIMITED ASBESTOS, LEAD AND MOLD SURVEY). CARE SHOULD
BE TAKEN TO ENSURE THESE MATERIALS ARE NOT IMPACTED.
L1
L2
L1
L2
L1
L2
L1
L2
L1
L2
L1
UP
DN
DN
DN
L2
L1 L2
L1 L2
L1 L2
L1 L2
L1
L1 L2 L1 L2
L1 L2
L1 L2
L1 L2
L1 L2
L1 L2 L1 L2
L2
L1 L2
L1 L2L1 L2
L1 L2
L1 L2
L1 L2
L1 L2L1 L2L1 L2
L1 L2L1 L2L1 L2L1 L2L1 L2
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714
F 210.881.6808 www.hfscompany.com
6 SOUTH OLD ORCHARD
ST. LOUIS, MO 63119
T 314.918.8383
F 314.918.1766 www.rossbar.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans
Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
ROBERT A. JURGIEL, PE, CSP
(PE LICENSE NO. 029078)
A
M
02-HA-131
ABATEMENT FLOOR PLAN
BLDG 02 - FLOOR 03
657-25-302JB
BID DOCUMENTS
REPLACE WINDOWS IN BUILDINGS 2, 18,
25, 52 FOR ENERGY EFFICIENCY
5/8/19
ABATEMENT FLOOR PLAN - BLDG 02 - FLOOR 03
BMD
GKY
SHEET KEY NOTES:#
3/16" = 1'-0"
ABATEMENT GENERAL NOTES:
USING A ROLLING MINI-CONTAINMENT OR HEPA CART,
REMOVE CEILING TILES NEAR WINDOWS, REMOVE ANY
LOOSE, CURLING OR DELAMINATED LBP FROM WALLS AND
CEILINGS (WITHIN 2' OF CEILING TILE OPENING) THAT COULD
DISLODGE DURING WINDOW REPLACEMENT AND HEPA
VACUUM ALL CEILING TILES AND HORIZONTAL SURFACES
ADJACENT TO THE WINDOWS. ONCE THE LEAD REMOVAL IS
COMPLETE, THE ROLLING MINI-CONTAINMENT OR HEPA CART
WILL BE CLEANED, SEALED AND MOVED TO THE NEXT WORK
LOCATION.
- 36 WINDOWS
ONCE WINDOWS HAVE BEEN REMOVED BY GENERAL
CONTRACTOR OR SUBCONTRACTOR; HEPA-VACUUM
EXPOSED WINDOW CAVITY, WET WIPE WITH AN
EPA-REGISTERED ANTI-MICROBIAL SOLUTION AND CLEAN ANY
DEBRIS FROM DROP CLOTH. ONCE WINDOW HAS BEEN
REPLACED BY GENERAL CONTRACTOR OR SUBCONTRACTOR,
CONDUCT FINAL CLEANING INCLUDING REMOVING THE DROP
CLOTHS AND OTHER DUST PROTECTION MEASURES.
- 36 WINDOWS
L1.
L2.
PLAN
NORTH
TRUE
NORTH
51 61
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
THE KNOWN HAZARDS ASSOCIATED WITH THIS PROJECT
CONSIST OF INTACT LEAD-BASED PAINT (LBP) OR
LEAD-CONTAINING PAINT ON WALLS, CEILINGS AND/OR TRIM
AROUND WINDOWS (BLDGS. 2, 18 & 25), LOOSE, CURLING OR
DELAMINATED LBP ON WALLS AND CEILINGS ABOVE CEILING
TILES (BLDG. 2) AND DETERIORATED LBP IN WINDOW CAVITIES
(BLDGS. 2, 18 & 25).
THE SCOPE OF THE LEAD ABATEMENT WORK IN BUILDINGS 2,
18 & 25 CONSISTS OF HEPA-VACUMMING AND CLEANING
CEILING TILES ADJACENT TO WINDOWS CONTAMINATED WITH
LEAD-BASED PAINT (LBP) CHIPS / DEBRIS (BLDG. 2),
REMOVING LOOSE, CURLING OR DELAMINATED LBP FROM
WALLS AND CEILINGS ADJACENT TO WINDOWS (BLDG. 2), AND
CLEANING WINDOW OPENINGS ONCE WINDOWS HAVE BEEN
REMOVED BY GENERAL CONTRACTOR OR SUBCONTRACTOR
(BLDGS. 2, 18 & 25). ALL WORK SHALL BE CONDUCTED IN
ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL
REGULATIONS AND THE CONTRACT SPECIFICATIONS.
ABATEMENT CONTRACTOR WILL RESTRICT ACCESS TO
ROOMS WHERE WORK IS TO BE PERFORMED, COVER ALL
CONTENTS IN THE ROOM WITH 4-MIL OR 6-MIL POLY SHEETING
AND PLACE 6-MIL POLY DROP CLOTHS ON THE FLOOR BELOW
WORK AREAS, PRIOR TO IMPACTING ANY LBP. IN LIEU OF
COVERING ALL CONTENTS WITH POLY SHEETING IN LARGE
OPEN ROOMS, FLOOR TO CEILING DUST PARTITIONS MAY BE
ERECTED TO ISOLATE CONTENTS FROM WORK AREAS. IF THE
DUST PARTITION OPTION IS CHOSEN, CARE SHALL BE GIVEN
TO ENSURE THE WORK SPACE IS LARGE ENOUGH FOR
ABATEMENT WORK AND THE REMOVAL AND REPLACEMENT
OF WINDOWS BY GENERAL CONTRACTOR OR
SUBCONTRACTOR.
THE ABATEMENT SUPERVISOR AND THE VPIH SHALL ACT AS
COMPETENT PERSONS ONSITE TO ENSURE NO SUSPECT
ASBESTOS MATERIALS OR OTHER UPSET CONDITIONS ARE
IDENTIFIED DURING THE COURSE OF THE WINDOW
REPLACEMENT PROJECT THAT COULD ALTER THE CONTROL
REQUIREMENTS.
STRICT COORDINATION BETWEEN VA OCCUPANTS, VA COR,
VPIH, GENERAL CONTRACTOR, ALL SUBCONTRACTORS AND
THE ABATEMENT CONTRACTOR IS PARAMOUNT FOR THE
SUCCESS OF THIS PROJECT.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
MOVING, REMOVING OR RELOCATING ALL DATA EQUIPMENT,
COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL
HANGINGS, ETC., FROM THE WINDOW WORK AREAS. A
SUFFICIENT AMOUNT OF ROOM MUST BE GIVEN FOR THE
CONTRACTORS TO COMPLETE THEIR WORK WITHOUT
IMPEDENCE BY CONTENTS.
ABATEMENT WORK SHALL BE CONDUCTED 3:00 PM TO 12:00
AM MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. WORK
IN STAIRWELLS, LOBBIES OR OTHER EGRESS LOCATIONS MAY
HAVE TO BE ACCOMPLISHED ON WEEKENDS (5:00 PM FRIDAY
TO 6:00 PM SUNDAY).
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE
COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,
UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE
ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED
SUBMITTALS. ANY CHANGES TO THE PROCEDURES,
CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO
THE VA COR AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED
BY THE ABATEMENT CONTRACTOR.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH
THE VA COR AND VPIH. THE LOCATIONS OF WASTE DISPOSAL
CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR
AND VPIH.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT
PROJECT SHALL BE OF THE FIRE-RETARDANT TYPE.
ALL IN-PROGRESS PERIMETER AIR MONITORING AND
CLEARANCE SAMPLING WILL BE CONDUCTED BY THE VPIH.
WIPE SAMPLES WILL BE COLLECTED AT THE COMPLETION OF
THE WORK (ABATEMENT AND WINDOW REPLACEMENT). ON A
PERIODIC BASIS, WIPE SAMPLES WILL BE COLLECTED INSIDE
THE ROLLING MINI-CONTAINMENTS OR HEPA CART (IF
UTILIZED) TO ENSURE PROPER CLEANING PROCEDURES ARE
BEING FOLLOWED. A THRESHOLD OF 200 MICROGRAMS PER
SQUARE FOOT (µg/ft²) WILL BE USED.
ALL IN-PROGRESS INSIDE WORK AREA AND OSHA
COMPLIANCE AIR SAMPLES WILL BE CONDUCTED BY THE
CPIH. PERSONNEL MONITORING WILL CONTINUE UNTIL AN
APPROPRIATE EXPOSURE ASSESSMENT CAN BE ACHIEVED
(TYPICALLY 3 SHIFTS) PER BUILDING. ONCE THIS EXPOSURE
ASSESSMENT IS ACHIEVED, THE CPIH INVOLVEMENT IN THE
PROJECT CAN BE SUSPENDED. THE EXPOSURE ASSESSMENT
SHALL BE VALID FOR 1 YEAR, UNLESS THERE ARE
SIGNIFICANT CHANGES TO THE PROCESS OR OTHER
CONDITIONS. AFTER 1 YEAR, THE AIR MONITORING OF TASKS
SHALL BE REPEATED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT
CONTRACTOR USING TCLP ANALYTICAL METHODS TO
DETERMINE PROPER WASTE DISPOSAL METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION
OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT
AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT
RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD
EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR
NORMAL DEMOLITION OR CONSTRUCTION ACTIVITIES IS LOW,
ACTUAL LEAD EXPOSURE MAY VARY SIGNIFICANTLY
DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND
OTHER WORK AREA CONDITIONS. PROPER OSHA
COMPLIANCE IS CONSIDERED PERFORMANCE BASED AND
INCLUDES EVALUATING POTENTIAL WORK EXPOSURES WITH
AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING
(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE
DEMOLITION CONTRACTOR HAS HISTORICAL DATA
DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR
SAMPLING SHALL BE CONDUCTED BY THE CPIH ON
REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE
EXPOSURE FOR LEAD.
LBP AND LEAD-CONTAINING MATERIALS WERE IDENTIFIED
THAT SHOULD NOT BE IMPACTED BY THE PROJECT (SEE THE
LIMITED ASBESTOS, LEAD AND MOLD SURVEY). CARE SHOULD
L2L1
L2L1 L2L1
L2L1 L2L1
L2L1
L2L1
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714
F 210.881.6808 www.hfscompany.com
6 SOUTH OLD ORCHARD
ST. LOUIS, MO 63119
T 314.918.8383
F 314.918.1766 www.rossbar.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans
Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
ROBERT A. JURGIEL, PE, CSP
(PE LICENSE NO. 029078)
A
M
02-HA-141
ABATEMENT FLOOR PLAN
BLDG 02 - FLOOR 04 (ATTIC)
657-25-302JB
BID DOCUMENTS
REPLACE WINDOWS IN BUILDINGS 2, 18,
25, 52 FOR ENERGY EFFICIENCY
5/8/19
ABATEMENT FLOOR PLAN - BLDG 02 - FLOOR 04 (ATTIC)
BMD
GKY
SHEET KEY NOTES:#
HEPA VACUUM ANY LOOSE, CURLING OR DELAMINATED LBP
FROM WINDOW FRAMES, SILLS AND HEPA VACUUM THE
FLOOR IN A 5 FOOT RADIUS OF THE WINDOWS.
- 7 WINDOWS
ONCE WINDOWS HAVE BEEN REMOVED BY GENERAL
CONTRACTOR OR SUBCONTRACTOR; HEPA-VACUUM
EXPOSED WINDOW CAVITY, WET WIPE WITH AN
EPA-REGISTERED ANTI-MICROBIAL SOLUTION AND CLEAN ANY
DEBRIS FROM DROP CLOTH. ONCE WINDOW HAS BEEN
REPLACED BY GENERAL CONTRACTOR OR SUBCONTRACTOR,
CONDUCT FINAL CLEANING INCLUDING REMOVING THE DROP
CLOTHS AND OTHER DUST PROTECTION MEASURES.
- 7 WINDOWS
L1.
L2.
3/16" = 1'-0"
ABATEMENT GENERAL NOTES:
PLAN
NORTH
TRUE
NORTH
52 61
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
THE KNOWN HAZARDS ASSOCIATED WITH THIS PROJECT
CONSIST OF INTACT LEAD-BASED PAINT (LBP) OR
LEAD-CONTAINING PAINT ON WALLS, CEILINGS AND/OR TRIM
AROUND WINDOWS (BLDGS. 2, 18 & 25), LOOSE, CURLING OR
DELAMINATED LBP ON WALLS AND CEILINGS ABOVE CEILING
TILES (BLDG. 2) AND DETERIORATED LBP IN WINDOW CAVITIES
(BLDGS. 2, 18 & 25).
THE SCOPE OF THE LEAD ABATEMENT WORK IN BUILDINGS 2,
18 & 25 CONSISTS OF HEPA-VACUMMING AND CLEANING
CEILING TILES ADJACENT TO WINDOWS CONTAMINATED WITH
LEAD-BASED PAINT (LBP) CHIPS / DEBRIS (BLDG. 2),
REMOVING LOOSE, CURLING OR DELAMINATED LBP FROM
WALLS AND CEILINGS ADJACENT TO WINDOWS (BLDG. 2), AND
CLEANING WINDOW OPENINGS ONCE WINDOWS HAVE BEEN
REMOVED BY GENERAL CONTRACTOR OR SUBCONTRACTOR
(BLDGS. 2, 18 & 25). ALL WORK SHALL BE CONDUCTED IN
ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL
REGULATIONS AND THE CONTRACT SPECIFICATIONS.
ABATEMENT CONTRACTOR WILL RESTRICT ACCESS TO
ROOMS WHERE WORK IS TO BE PERFORMED, COVER ALL
CONTENTS IN THE ROOM WITH 4-MIL OR 6-MIL POLY SHEETING
AND PLACE 6-MIL POLY DROP CLOTHS ON THE FLOOR BELOW
WORK AREAS, PRIOR TO IMPACTING ANY LBP. IN LIEU OF
COVERING ALL CONTENTS WITH POLY SHEETING IN LARGE
OPEN ROOMS, FLOOR TO CEILING DUST PARTITIONS MAY BE
ERECTED TO ISOLATE CONTENTS FROM WORK AREAS. IF THE
DUST PARTITION OPTION IS CHOSEN, CARE SHALL BE GIVEN
TO ENSURE THE WORK SPACE IS LARGE ENOUGH FOR
ABATEMENT WORK AND THE REMOVAL AND REPLACEMENT
OF WINDOWS BY GENERAL CONTRACTOR OR
SUBCONTRACTOR.
THE ABATEMENT SUPERVISOR AND THE VPIH SHALL ACT AS
COMPETENT PERSONS ONSITE TO ENSURE NO SUSPECT
ASBESTOS MATERIALS OR OTHER UPSET CONDITIONS ARE
IDENTIFIED DURING THE COURSE OF THE WINDOW
REPLACEMENT PROJECT THAT COULD ALTER THE CONTROL
REQUIREMENTS.
STRICT COORDINATION BETWEEN VA OCCUPANTS, VA COR,
VPIH, GENERAL CONTRACTOR, ALL SUBCONTRACTORS AND
THE ABATEMENT CONTRACTOR IS PARAMOUNT FOR THE
SUCCESS OF THIS PROJECT.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
MOVING, REMOVING OR RELOCATING ALL DATA EQUIPMENT,
COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL
HANGINGS, ETC., FROM THE WINDOW WORK AREAS. A
SUFFICIENT AMOUNT OF ROOM MUST BE GIVEN FOR THE
CONTRACTORS TO COMPLETE THEIR WORK WITHOUT
IMPEDENCE BY CONTENTS.
ABATEMENT WORK SHALL BE CONDUCTED 3:00 PM TO 12:00
AM MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. WORK
IN STAIRWELLS, LOBBIES OR OTHER EGRESS LOCATIONS MAY
HAVE TO BE ACCOMPLISHED ON WEEKENDS (5:00 PM FRIDAY
TO 6:00 PM SUNDAY).
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE
COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,
UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE
ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED
SUBMITTALS. ANY CHANGES TO THE PROCEDURES,
CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO
THE VA COR AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED
BY THE ABATEMENT CONTRACTOR.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH
THE VA COR AND VPIH. THE LOCATIONS OF WASTE DISPOSAL
CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR
AND VPIH.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT
PROJECT SHALL BE OF THE FIRE-RETARDANT TYPE.
ALL IN-PROGRESS PERIMETER AIR MONITORING AND
CLEARANCE SAMPLING WILL BE CONDUCTED BY THE VPIH.
WIPE SAMPLES WILL BE COLLECTED AT THE COMPLETION OF
THE WORK (ABATEMENT AND WINDOW REPLACEMENT). ON A
PERIODIC BASIS, WIPE SAMPLES WILL BE COLLECTED INSIDE
THE ROLLING MINI-CONTAINMENTS OR HEPA CART (IF
UTILIZED) TO ENSURE PROPER CLEANING PROCEDURES ARE
BEING FOLLOWED. A THRESHOLD OF 200 MICROGRAMS PER
SQUARE FOOT (µg/ft²) WILL BE USED.
ALL IN-PROGRESS INSIDE WORK AREA AND OSHA
COMPLIANCE AIR SAMPLES WILL BE CONDUCTED BY THE
CPIH. PERSONNEL MONITORING WILL CONTINUE UNTIL AN
APPROPRIATE EXPOSURE ASSESSMENT CAN BE ACHIEVED
(TYPICALLY 3 SHIFTS) PER BUILDING. ONCE THIS EXPOSURE
ASSESSMENT IS ACHIEVED, THE CPIH INVOLVEMENT IN THE
PROJECT CAN BE SUSPENDED. THE EXPOSURE ASSESSMENT
SHALL BE VALID FOR 1 YEAR, UNLESS THERE ARE
SIGNIFICANT CHANGES TO THE PROCESS OR OTHER
CONDITIONS. AFTER 1 YEAR, THE AIR MONITORING OF TASKS
SHALL BE REPEATED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT
CONTRACTOR USING TCLP ANALYTICAL METHODS TO
DETERMINE PROPER WASTE DISPOSAL METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION
OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT
AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT
RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD
EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR
NORMAL DEMOLITION OR CONSTRUCTION ACTIVITIES IS LOW,
ACTUAL LEAD EXPOSURE MAY VARY SIGNIFICANTLY
DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND
OTHER WORK AREA CONDITIONS. PROPER OSHA
COMPLIANCE IS CONSIDERED PERFORMANCE BASED AND
INCLUDES EVALUATING POTENTIAL WORK EXPOSURES WITH
AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING
(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE
DEMOLITION CONTRACTOR HAS HISTORICAL DATA
DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR
SAMPLING SHALL BE CONDUCTED BY THE CPIH ON
REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE
EXPOSURE FOR LEAD.
LBP AND LEAD-CONTAINING MATERIALS WERE IDENTIFIED
THAT SHOULD NOT BE IMPACTED BY THE PROJECT (SEE THE
LIMITED ASBESTOS, LEAD AND MOLD SURVEY). CARE SHOULD
UP
UP
UP
PIPE
CHASE
Z001
MECH.
RM.
CORRIDOR
H001
CORRIDOR
H002
ELEVATOR
MACHINE
RM.
STAIRWELL
NO.
S002
TOILET,
UNISEX
TOILET,
FEMALE
HAC
BREAK
RM.
OFFICE
OFFICE,
CHIEF
OFFICE
OFFICE
VENDING
H003
OFFICE
MECH.
RM.
003A
MECH.
RM.
OI&T
003B
FE
FAP
FAP
FAP
DF
FEC
6" A.F.F.
6" A.F.F.
ELEVATOR
LOBBY
AP
RAD
AP
FLOOR ELEVATION
-10' - 1"
ELEVATOR
E1
18-007A 18-010A 18-010B
18-010C 18-011A
18-011B
18-013A
18-012A
18-003A
18-012B18-008A
18-005A
L1
L1 L1
L1
L1
L1L1
L1
L1
L1
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714
F 210.881.6808 www.hfscompany.com
6 SOUTH OLD ORCHARD
ST. LOUIS, MO 63119
T 314.918.8383
F 314.918.1766 www.rossbar.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans
Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
ROBERT A. JURGIEL, PE, CSP
(PE LICENSE NO. 029078)
A
M
18-HA-101
ABATEMENT FLOOR PLAN
BLDG 18 - FLOOR 00 (BASEMENT)
BMD
GKY
657-25-302JB
BID DOCUMENTS
REPLACE WINDOWS IN BUILDINGS 2, 18,
25, 52 FOR ENERGY EFFICIENCY
5/8/19
1/8" = 1'-0"
ABATEMENT FLOOR PLAN - BUILDING 18 - FLOOR 00 (BASEMENT)
SHEET KEY NOTES:#
ONCE WINDOWS HAVE BEEN REMOVED BY GENERAL
CONTRACTOR OR SUBCONTRACTOR; HEPA-VACUUM
EXPOSED WINDOW CAVITY, WET WIPE WITH AN
EPA-REGISTERED ANTI-MICROBIAL SOLUTION AND CLEAN ANY
DEBRIS FROM DROP CLOTH. ONCE WINDOW HAS BEEN
REPLACED BY GENERAL CONTRACTOR OR SUBCONTRACTOR,
CONDUCT FINAL CLEANING INCLUDING REMOVING THE DROP
CLOTHS AND OTHER DUST PROTECTION MEASURES.
- 12 WINDOWS
L1.
ABATEMENT GENERAL NOTES:
TRUE
NORTH
PLAN
NORTH
53 61
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
THE KNOWN HAZARDS ASSOCIATED WITH THIS PROJECT
CONSIST OF INTACT LEAD-BASED PAINT (LBP) OR
LEAD-CONTAINING PAINT ON WALLS, CEILINGS AND/OR TRIM
AROUND WINDOWS (BLDGS. 2, 18 & 25), LOOSE, CURLING OR
DELAMINATED LBP ON WALLS AND CEILINGS ABOVE CEILING
TILES (BLDG. 2) AND DETERIORATED LBP IN WINDOW CAVITIES
(BLDGS. 2, 18 & 25).
THE SCOPE OF THE LEAD ABATEMENT WORK IN BUILDINGS 2,
18 & 25 CONSISTS OF HEPA-VACUMMING AND CLEANING
CEILING TILES ADJACENT TO WINDOWS CONTAMINATED WITH
LEAD-BASED PAINT (LBP) CHIPS / DEBRIS (BLDG. 2),
REMOVING LOOSE, CURLING OR DELAMINATED LBP FROM
WALLS AND CEILINGS ADJACENT TO WINDOWS (BLDG. 2), AND
CLEANING WINDOW OPENINGS ONCE WINDOWS HAVE BEEN
REMOVED BY GENERAL CONTRACTOR OR SUBCONTRACTOR
(BLDGS. 2, 18 & 25). ALL WORK SHALL BE CONDUCTED IN
ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL
REGULATIONS AND THE CONTRACT SPECIFICATIONS.
ABATEMENT CONTRACTOR WILL RESTRICT ACCESS TO
ROOMS WHERE WORK IS TO BE PERFORMED, COVER ALL
CONTENTS IN THE ROOM WITH 4-MIL OR 6-MIL POLY SHEETING
AND PLACE 6-MIL POLY DROP CLOTHS ON THE FLOOR BELOW
WORK AREAS, PRIOR TO IMPACTING ANY LBP. IN LIEU OF
COVERING ALL CONTENTS WITH POLY SHEETING IN LARGE
OPEN ROOMS, FLOOR TO CEILING DUST PARTITIONS MAY BE
ERECTED TO ISOLATE CONTENTS FROM WORK AREAS. IF THE
DUST PARTITION OPTION IS CHOSEN, CARE SHALL BE GIVEN
TO ENSURE THE WORK SPACE IS LARGE ENOUGH FOR
ABATEMENT WORK AND THE REMOVAL AND REPLACEMENT
OF WINDOWS BY GENERAL CONTRACTOR OR
SUBCONTRACTOR.
THE ABATEMENT SUPERVISOR AND THE VPIH SHALL ACT AS
COMPETENT PERSONS ONSITE TO ENSURE NO SUSPECT
ASBESTOS MATERIALS OR OTHER UPSET CONDITIONS ARE
IDENTIFIED DURING THE COURSE OF THE WINDOW
REPLACEMENT PROJECT THAT COULD ALTER THE CONTROL
REQUIREMENTS.
STRICT COORDINATION BETWEEN VA OCCUPANTS, VA COR,
VPIH, GENERAL CONTRACTOR, ALL SUBCONTRACTORS AND
THE ABATEMENT CONTRACTOR IS PARAMOUNT FOR THE
SUCCESS OF THIS PROJECT.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
MOVING, REMOVING OR RELOCATING ALL DATA EQUIPMENT,
COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL
HANGINGS, ETC., FROM THE WINDOW WORK AREAS. A
SUFFICIENT AMOUNT OF ROOM MUST BE GIVEN FOR THE
CONTRACTORS TO COMPLETE THEIR WORK WITHOUT
IMPEDENCE BY CONTENTS.
ABATEMENT WORK SHALL BE CONDUCTED 3:00 PM TO 12:00
AM MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. WORK
IN STAIRWELLS, LOBBIES OR OTHER EGRESS LOCATIONS MAY
HAVE TO BE ACCOMPLISHED ON WEEKENDS (5:00 PM FRIDAY
TO 6:00 PM SUNDAY).
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE
COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,
UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE
ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED
SUBMITTALS. ANY CHANGES TO THE PROCEDURES,
CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO
THE VA COR AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED
BY THE ABATEMENT CONTRACTOR.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH
THE VA COR AND VPIH. THE LOCATIONS OF WASTE DISPOSAL
CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR
AND VPIH.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT
PROJECT SHALL BE OF THE FIRE-RETARDANT TYPE.
ALL IN-PROGRESS PERIMETER AIR MONITORING AND
CLEARANCE SAMPLING WILL BE CONDUCTED BY THE VPIH.
WIPE SAMPLES WILL BE COLLECTED AT THE COMPLETION OF
THE WORK (ABATEMENT AND WINDOW REPLACEMENT). ON A
PERIODIC BASIS, WIPE SAMPLES WILL BE COLLECTED INSIDE
THE ROLLING MINI-CONTAINMENTS OR HEPA CART (IF
UTILIZED) TO ENSURE PROPER CLEANING PROCEDURES ARE
BEING FOLLOWED. A THRESHOLD OF 200 MICROGRAMS PER
SQUARE FOOT (µg/ft²) WILL BE USED.
ALL IN-PROGRESS INSIDE WORK AREA AND OSHA
COMPLIANCE AIR SAMPLES WILL BE CONDUCTED BY THE
CPIH. PERSONNEL MONITORING WILL CONTINUE UNTIL AN
APPROPRIATE EXPOSURE ASSESSMENT CAN BE ACHIEVED
(TYPICALLY 3 SHIFTS) PER BUILDING. ONCE THIS EXPOSURE
ASSESSMENT IS ACHIEVED, THE CPIH INVOLVEMENT IN THE
PROJECT CAN BE SUSPENDED. THE EXPOSURE ASSESSMENT
SHALL BE VALID FOR 1 YEAR, UNLESS THERE ARE
SIGNIFICANT CHANGES TO THE PROCESS OR OTHER
CONDITIONS. AFTER 1 YEAR, THE AIR MONITORING OF TASKS
SHALL BE REPEATED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT
CONTRACTOR USING TCLP ANALYTICAL METHODS TO
DETERMINE PROPER WASTE DISPOSAL METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION
OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT
AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT
RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD
EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR
NORMAL DEMOLITION OR CONSTRUCTION ACTIVITIES IS LOW,
ACTUAL LEAD EXPOSURE MAY VARY SIGNIFICANTLY
DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND
OTHER WORK AREA CONDITIONS. PROPER OSHA
COMPLIANCE IS CONSIDERED PERFORMANCE BASED AND
INCLUDES EVALUATING POTENTIAL WORK EXPOSURES WITH
AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING
(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE
DEMOLITION CONTRACTOR HAS HISTORICAL DATA
DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR
SAMPLING SHALL BE CONDUCTED BY THE CPIH ON
REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE
EXPOSURE FOR LEAD.
LBP AND LEAD-CONTAINING MATERIALS WERE IDENTIFIED
THAT SHOULD NOT BE IMPACTED BY THE PROJECT (SEE THE
LIMITED ASBESTOS, LEAD AND MOLD SURVEY). CARE SHOULD
L1
L1
L1
UP
UP
UP
UP
UP
UP
OFFICE
OFFICE
OFFICE
FILE
RM.
OFFICE
OFFICE
WORK
RM.
STORAGE
TOILET,
MALE
ELEVATOR
LOBBY
TOILET,
FEMALE
STAIRWELL
NO.
S102
CORRIDOR
H102
CORRIDOR
H103
OI&T
OFFICE
CORRIDOR
H101
RECEPTION
STAIRWELL
NO.
S101
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
LIBRARY
CORRIDOR
H104
CONFERENCE
RM.
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
114A
OFFICE
BREAK
RM.
115A
OFFICE,
OPEN
OFFICE
OFFICE,
CHIEF
113A
OFFICE
OFFICE
OFFICE
CORRIDOR
H105
CLOSET
115C
CLOSET
115B
AP
FEC
FAP
FEC
FEC
FAP
FAP
FAP
RAD
RAD
RAD
ELEVATOR
E1
CHASE
CH-1-1
STAIRWELL
NO.
S103
DN
RAD
18-114B 18-114A
18-116A 18-112A18-111A18-110A
18-115A
18-120C18-121A18-123A
18-129A18-131A
18-133A
18-134A
18-132A 18-130A
18-124A 18-122A 18-119A 18-119B
18-101A
18-120B 18-104A18-104B18-120A
18-109A18-106A 18-107A
18-115D18-115E
18-108A18-105A
18-127A 18-125A
18-113A 18-113B
18-128A 18-126A
L1 L1
L1
L1 L1
L1
L1 L1 L1
L1 L1
L1
L1
L1
L1L1
L1
L1L1
L1
L1
L1L1
L1L1
L1
L1L1L1
L1
L1L1
L1
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714
F 210.881.6808 www.hfscompany.com
6 SOUTH OLD ORCHARD
ST. LOUIS, MO 63119
T 314.918.8383
F 314.918.1766 www.rossbar.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans
Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
ROBERT A. JURGIEL, PE, CSP
(PE LICENSE NO. 029078)
A
M
18-HA-111
ABATEMENT FLOOR PLAN
BLDG 18 - FLOOR 01
BMD
GKY
657-25-302JB
BID DOCUMENTS
REPLACE WINDOWS IN BUILDINGS 2, 18,
25, 52 FOR ENERGY EFFICIENCY
5/8/19
1/8" = 1'-0"
ABATEMENT FLOOR PLAN - BUILDING 18 - FLOOR 01
SHEET KEY NOTES:#
ONCE WINDOWS HAVE BEEN REMOVED BY GENERAL
CONTRACTOR OR SUBCONTRACTOR; HEPA-VACUUM
EXPOSED WINDOW CAVITY, WET WIPE WITH AN
EPA-REGISTERED ANTI-MICROBIAL SOLUTION AND CLEAN ANY
DEBRIS FROM DROP CLOTH. ONCE WINDOW HAS BEEN
REPLACED BY GENERAL CONTRACTOR OR SUBCONTRACTOR,
CONDUCT FINAL CLEANING INCLUDING REMOVING THE DROP
CLOTHS AND OTHER DUST PROTECTION MEASURES.
- 37 WINDOWS
L1.
ABATEMENT GENERAL NOTES:
TRUE
NORTH
PLAN
NORTH
__ __54 61
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
THE KNOWN HAZARDS ASSOCIATED WITH THIS PROJECT
CONSIST OF INTACT LEAD-BASED PAINT (LBP) OR
LEAD-CONTAINING PAINT ON WALLS, CEILINGS AND/OR TRIM
AROUND WINDOWS (BLDGS. 2, 18 & 25), LOOSE, CURLING OR
DELAMINATED LBP ON WALLS AND CEILINGS ABOVE CEILING
TILES (BLDG. 2) AND DETERIORATED LBP IN WINDOW CAVITIES
(BLDGS. 2, 18 & 25).
THE SCOPE OF THE LEAD ABATEMENT WORK IN BUILDINGS 2,
18 & 25 CONSISTS OF HEPA-VACUMMING AND CLEANING
CEILING TILES ADJACENT TO WINDOWS CONTAMINATED WITH
LEAD-BASED PAINT (LBP) CHIPS / DEBRIS (BLDG. 2),
REMOVING LOOSE, CURLING OR DELAMINATED LBP FROM
WALLS AND CEILINGS ADJACENT TO WINDOWS (BLDG. 2), AND
CLEANING WINDOW OPENINGS ONCE WINDOWS HAVE BEEN
REMOVED BY GENERAL CONTRACTOR OR SUBCONTRACTOR
(BLDGS. 2, 18 & 25). ALL WORK SHALL BE CONDUCTED IN
ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL
REGULATIONS AND THE CONTRACT SPECIFICATIONS.
ABATEMENT CONTRACTOR WILL RESTRICT ACCESS TO
ROOMS WHERE WORK IS TO BE PERFORMED, COVER ALL
CONTENTS IN THE ROOM WITH 4-MIL OR 6-MIL POLY SHEETING
AND PLACE 6-MIL POLY DROP CLOTHS ON THE FLOOR BELOW
WORK AREAS, PRIOR TO IMPACTING ANY LBP. IN LIEU OF
COVERING ALL CONTENTS WITH POLY SHEETING IN LARGE
OPEN ROOMS, FLOOR TO CEILING DUST PARTITIONS MAY BE
ERECTED TO ISOLATE CONTENTS FROM WORK AREAS. IF THE
DUST PARTITION OPTION IS CHOSEN, CARE SHALL BE GIVEN
TO ENSURE THE WORK SPACE IS LARGE ENOUGH FOR
ABATEMENT WORK AND THE REMOVAL AND REPLACEMENT
OF WINDOWS BY GENERAL CONTRACTOR OR
SUBCONTRACTOR.
THE ABATEMENT SUPERVISOR AND THE VPIH SHALL ACT AS
COMPETENT PERSONS ONSITE TO ENSURE NO SUSPECT
ASBESTOS MATERIALS OR OTHER UPSET CONDITIONS ARE
IDENTIFIED DURING THE COURSE OF THE WINDOW
REPLACEMENT PROJECT THAT COULD ALTER THE CONTROL
REQUIREMENTS.
STRICT COORDINATION BETWEEN VA OCCUPANTS, VA COR,
VPIH, GENERAL CONTRACTOR, ALL SUBCONTRACTORS AND
THE ABATEMENT CONTRACTOR IS PARAMOUNT FOR THE
SUCCESS OF THIS PROJECT.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
MOVING, REMOVING OR RELOCATING ALL DATA EQUIPMENT,
COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL
HANGINGS, ETC., FROM THE WINDOW WORK AREAS. A
SUFFICIENT AMOUNT OF ROOM MUST BE GIVEN FOR THE
CONTRACTORS TO COMPLETE THEIR WORK WITHOUT
IMPEDENCE BY CONTENTS.
ABATEMENT WORK SHALL BE CONDUCTED 3:00 PM TO 12:00
AM MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. WORK
IN STAIRWELLS, LOBBIES OR OTHER EGRESS LOCATIONS MAY
HAVE TO BE ACCOMPLISHED ON WEEKENDS (5:00 PM FRIDAY
TO 6:00 PM SUNDAY).
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE
COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,
UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE
ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED
SUBMITTALS. ANY CHANGES TO THE PROCEDURES,
CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO
THE VA COR AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED
BY THE ABATEMENT CONTRACTOR.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH
THE VA COR AND VPIH. THE LOCATIONS OF WASTE DISPOSAL
CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR
AND VPIH.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT
PROJECT SHALL BE OF THE FIRE-RETARDANT TYPE.
ALL IN-PROGRESS PERIMETER AIR MONITORING AND
CLEARANCE SAMPLING WILL BE CONDUCTED BY THE VPIH.
WIPE SAMPLES WILL BE COLLECTED AT THE COMPLETION OF
THE WORK (ABATEMENT AND WINDOW REPLACEMENT). ON A
PERIODIC BASIS, WIPE SAMPLES WILL BE COLLECTED INSIDE
THE ROLLING MINI-CONTAINMENTS OR HEPA CART (IF
UTILIZED) TO ENSURE PROPER CLEANING PROCEDURES ARE
BEING FOLLOWED. A THRESHOLD OF 200 MICROGRAMS PER
SQUARE FOOT (µg/ft²) WILL BE USED.
ALL IN-PROGRESS INSIDE WORK AREA AND OSHA
COMPLIANCE AIR SAMPLES WILL BE CONDUCTED BY THE
CPIH. PERSONNEL MONITORING WILL CONTINUE UNTIL AN
APPROPRIATE EXPOSURE ASSESSMENT CAN BE ACHIEVED
(TYPICALLY 3 SHIFTS) PER BUILDING. ONCE THIS EXPOSURE
ASSESSMENT IS ACHIEVED, THE CPIH INVOLVEMENT IN THE
PROJECT CAN BE SUSPENDED. THE EXPOSURE ASSESSMENT
SHALL BE VALID FOR 1 YEAR, UNLESS THERE ARE
SIGNIFICANT CHANGES TO THE PROCESS OR OTHER
CONDITIONS. AFTER 1 YEAR, THE AIR MONITORING OF TASKS
SHALL BE REPEATED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT
CONTRACTOR USING TCLP ANALYTICAL METHODS TO
DETERMINE PROPER WASTE DISPOSAL METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION
OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT
AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT
RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD
EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR
NORMAL DEMOLITION OR CONSTRUCTION ACTIVITIES IS LOW,
ACTUAL LEAD EXPOSURE MAY VARY SIGNIFICANTLY
DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND
OTHER WORK AREA CONDITIONS. PROPER OSHA
COMPLIANCE IS CONSIDERED PERFORMANCE BASED AND
INCLUDES EVALUATING POTENTIAL WORK EXPOSURES WITH
AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING
(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE
DEMOLITION CONTRACTOR HAS HISTORICAL DATA
DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR
SAMPLING SHALL BE CONDUCTED BY THE CPIH ON
REPRESENTATIVE TASKS TO DOCUMENT A NEGATIVE
EXPOSURE FOR LEAD.
LBP AND LEAD-CONTAINING MATERIALS WERE IDENTIFIED
THAT SHOULD NOT BE IMPACTED BY THE PROJECT (SEE THE
LIMITED ASBESTOS, LEAD AND MOLD SURVEY). CARE SHOULD
L1 L1
L1
L1 L1 L1 L1
L1
L1 L1
L1
L1
L1
L1
L1
L1
L1
L1 L1
L1 L1
L1
L1 L1
L1 L1
L1 L1
L1
L1 L1 L1 L1
L1
L1 L1
L1
UP
UP
DN
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714
F 210.881.6808 www.hfscompany.com
6 SOUTH OLD ORCHARD
ST. LOUIS, MO 63119
T 314.918.8383
F 314.918.1766 www.rossbar.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans
Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
ROBERT A. JURGIEL, PE, CSP
(PE LICENSE NO. 029078)
A
M
18-HA-121
ABATEMENT FLOOR PLAN
BLDG 18 - FLOOR 02
BMD
GKY
657-25-302JB
BID DOCUMENTS
REPLACE WINDOWS IN BUILDINGS 2, 18,
25, 52 FOR ENERGY EFFICIENCY
5/8/19
1/8" = 1'-0"
ABATEMENT FLOOR PLAN - BUILDING 18 - FLOOR 02
SHEET KEY NOTES:#
ONCE WINDOWS HAVE BEEN REMOVED BY GENERAL
CONTRACTOR OR SUBCONTRACTOR; HEPA-VACUUM
EXPOSED WINDOW CAVITY, WET WIPE WITH AN
EPA-REGISTERED ANTI-MICROBIAL SOLUTION AND CLEAN ANY
DEBRIS FROM DROP CLOTH. ONCE WINDOW HAS BEEN
REPLACED BY GENERAL CONTRACTOR OR SUBCONTRACTOR,
CONDUCT FINAL CLEANING INCLUDING REMOVING THE DROP
CLOTHS AND OTHER DUST PROTECTION MEASURES.
- 38 WINDOWS
L1.
ABATEMENT GENERAL NOTES:
TRUE
NORTH
PLAN
NORTH
__ __55 61
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
THE KNOWN HAZARDS ASSOCIATED WITH THIS PROJECT
CONSIST OF INTACT LEAD-BASED PAINT (LBP) OR
LEAD-CONTAINING PAINT ON WALLS, CEILINGS AND/OR TRIM
AROUND WINDOWS (BLDGS. 2, 18 & 25), LOOSE, CURLING OR
DELAMINATED LBP ON WALLS AND CEILINGS ABOVE CEILING
TILES (BLDG. 2) AND DETERIORATED LBP IN WINDOW CAVITIES
(BLDGS. 2, 18 & 25).
THE SCOPE OF THE LEAD ABATEMENT WORK IN BUILDINGS 2,
18 & 25 CONSISTS OF HEPA-VACUMMING AND CLEANING
CEILING TILES ADJACENT TO WINDOWS CONTAMINATED WITH
LEAD-BASED PAINT (LBP) CHIPS / DEBRIS (BLDG. 2),
REMOVING LOOSE, CURLING OR DELAMINATED LBP FROM
WALLS AND CEILINGS ADJACENT TO WINDOWS (BLDG. 2), AND
CLEANING WINDOW OPENINGS ONCE WINDOWS HAVE BEEN
REMOVED BY GENERAL CONTRACTOR OR SUBCONTRACTOR
(BLDGS. 2, 18 & 25). ALL WORK SHALL BE CONDUCTED IN
ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL
REGULATIONS AND THE CONTRACT SPECIFICATIONS.
ABATEMENT CONTRACTOR WILL RESTRICT ACCESS TO
ROOMS WHERE WORK IS TO BE PERFORMED, COVER ALL
CONTENTS IN THE ROOM WITH 4-MIL OR 6-MIL POLY SHEETING
AND PLACE 6-MIL POLY DROP CLOTHS ON THE FLOOR BELOW
WORK AREAS, PRIOR TO IMPACTING ANY LBP. IN LIEU OF
COVERING ALL CONTENTS WITH POLY SHEETING IN LARGE
OPEN ROOMS, FLOOR TO CEILING DUST PARTITIONS MAY BE
ERECTED TO ISOLATE CONTENTS FROM WORK AREAS. IF THE
DUST PARTITION OPTION IS CHOSEN, CARE SHALL BE GIVEN
TO ENSURE THE WORK SPACE IS LARGE ENOUGH FOR
ABATEMENT WORK AND THE REMOVAL AND REPLACEMENT
OF WINDOWS BY GENERAL CONTRACTOR OR
SUBCONTRACTOR.
THE ABATEMENT SUPERVISOR AND THE VPIH SHALL ACT AS
COMPETENT PERSONS ONSITE TO ENSURE NO SUSPECT
ASBESTOS MATERIALS OR OTHER UPSET CONDITIONS ARE
IDENTIFIED DURING THE COURSE OF THE WINDOW
REPLACEMENT PROJECT THAT COULD ALTER THE CONTROL
REQUIREMENTS.
STRICT COORDINATION BETWEEN VA OCCUPANTS, VA COR,
VPIH, GENERAL CONTRACTOR, ALL SUBCONTRACTORS AND
THE ABATEMENT CONTRACTOR IS PARAMOUNT FOR THE
SUCCESS OF THIS PROJECT.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
MOVING, REMOVING OR RELOCATING ALL DATA EQUIPMENT,
COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL
HANGINGS, ETC., FROM THE WINDOW WORK AREAS. A
SUFFICIENT AMOUNT OF ROOM MUST BE GIVEN FOR THE
CONTRACTORS TO COMPLETE THEIR WORK WITHOUT
IMPEDENCE BY CONTENTS.
ABATEMENT WORK SHALL BE CONDUCTED 3:00 PM TO 12:00
AM MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. WORK
IN STAIRWELLS, LOBBIES OR OTHER EGRESS LOCATIONS MAY
HAVE TO BE ACCOMPLISHED ON WEEKENDS (5:00 PM FRIDAY
TO 6:00 PM SUNDAY).
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE
COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,
UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE
ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED
SUBMITTALS. ANY CHANGES TO THE PROCEDURES,
CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO
THE VA COR AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED
BY THE ABATEMENT CONTRACTOR.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH
THE VA COR AND VPIH. THE LOCATIONS OF WASTE DISPOSAL
CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR
AND VPIH.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT
PROJECT SHALL BE OF THE FIRE-RETARDANT TYPE.
ALL IN-PROGRESS PERIMETER AIR MONITORING AND
CLEARANCE SAMPLING WILL BE CONDUCTED BY THE VPIH.
WIPE SAMPLES WILL BE COLLECTED AT THE COMPLETION OF
THE WORK (ABATEMENT AND WINDOW REPLACEMENT). ON A
PERIODIC BASIS, WIPE SAMPLES WILL BE COLLECTED INSIDE
THE ROLLING MINI-CONTAINMENTS OR HEPA CART (IF
UTILIZED) TO ENSURE PROPER CLEANING PROCEDURES ARE
BEING FOLLOWED. A THRESHOLD OF 200 MICROGRAMS PER
SQUARE FOOT (µg/ft²) WILL BE USED.
ALL IN-PROGRESS INSIDE WORK AREA AND OSHA
COMPLIANCE AIR SAMPLES WILL BE CONDUCTED BY THE
CPIH. PERSONNEL MONITORING WILL CONTINUE UNTIL AN
APPROPRIATE EXPOSURE ASSESSMENT CAN BE ACHIEVED
(TYPICALLY 3 SHIFTS) PER BUILDING. ONCE THIS EXPOSURE
ASSESSMENT IS ACHIEVED, THE CPIH INVOLVEMENT IN THE
PROJECT CAN BE SUSPENDED. THE EXPOSURE ASSESSMENT
SHALL BE VALID FOR 1 YEAR, UNLESS THERE ARE
SIGNIFICANT CHANGES TO THE PROCESS OR OTHER
CONDITIONS. AFTER 1 YEAR, THE AIR MONITORING OF TASKS
SHALL BE REPEATED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT
CONTRACTOR USING TCLP ANALYTICAL METHODS TO
DETERMINE PROPER WASTE DISPOSAL METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION
OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT
AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT
RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD
EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR
NORMAL DEMOLITION OR CONSTRUCTION ACTIVITIES IS LOW,
ACTUAL LEAD EXPOSURE MAY VARY SIGNIFICANTLY
DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND
OTHER WORK AREA CONDITIONS. PROPER OSHA
COMPLIANCE IS CONSIDERED PERFORMANCE BASED AND
INCLUDES EVALUATING POTENTIAL WORK EXPOSURES WITH
AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING
(BLOOD LEAD…