36C25519R0094-001.pdf
PDF 6 MB Posted
- Solicitation number
- 36C25519R0094
About this file
36C25519R0094 01 657 18 302JB Plans Arch BID Docs 2 18 25_053019 final.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25519R0094-002.pdf | ||
| 36C25519R0094-003.pdf | ||
| 36C25519R0094-000.docx | DOCX document | |
| 36C25519R0094-004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KOCH ROAD
JE
FFERSO
N D
RIV
E
N O
R T H
G A T E E
N T R
A N
C E D
R
IV
E
SO
U
TH
G
ATE E
N
TR
AN
C E D
R
IV
E
KOCH ROAD
TO INTERSTATE 255 →
JEFFERSON BARRACKS
NATIONAL CEMETERY
PHASE 1 TRANSFER
JEFFERSON BARRACKS
NATIONAL CEMETERY
PHASE 2 TRANSFER
FUTURE PROPERTY LINE
GRAVEL
PARKING
AREA
MISSISSIPPI RIVER
JEFFERSON
BARRACKS
NATIONAL
CEMETERY
CONSTRUCTION ZONE
CONSTRUCTION
ZONE
CONSTRUCTION ZONE
CONSTRUCTION ZONE
CONST. ZONE
3 18
60T 51T
104T
102T
101T
53T
1CC
1CC
1CC
1CC
93 86
UNDER CONSTRUCTION
4T
1CC
3T
GL
4 160 VO LTS
D UST CO LLECTO R
LIQ
UEFIED PETRO
LEUM
G
AS
FLAM
M
ABLE G
AS 2
TRASH CO M PACTO R
P S
ILVER
B
UILDING
1 23
B UILDING 23
VA PO LICE
E LECTR IC AC CESS
TRANSFO RM ER
TRANSFO RM ER
TRANSFO RM ER
BUILDING 25
BUILDING 02
BUILDING 18
BUILDING 52PLAN
NORTH
BUILDING SCHEDULE
1 CLINICS - ADMIN - DIAG - RESEARCH
1CC CONNECTING CORRIDORS
2 EDUCATION
3 DOMICILIARY
3T DOMICILIARY OFFICES (MODULAR BLDG)
4 EMPTY
4T EMPTY
5 M&O SHOP
7 M&O SHOP
8 M&O SHOP
18 ADMINISTRATION
23 PROSTHETICS - M&O SHOPS
24 AUDITORIUM - CANTEEN - LIBRARY
25 NATIONAL CANTEEN SERVICE (OUTLEASED)
32 FLAGPOLE
35 STORAGE
44 CONCRETE PLATFORM
45 CONCRETE PLATFORM
48 EMPTY
51 INPATIENT PSYCHIATRIC
51T NEURO PSYCHIATRIC (MODULAR BLDG)
52 LONG TERM SCI - DOM
53 NURSING HOME
53T MEDICAL REHAB (MODULAR BLDG)
54 REHAB BUILDING (UNDER CONSTRUCTION)
55 CLINIC BUILDING (UNDER CONSTRUCTION)
56 TENANT BUILDING
57 ENGINEERING - WAREHOUSE (UNDER ACTIVATION)
58 MENTAL HEALTH CLINIC
59 FISCHER HOUSE
60 MAIN KITCHEN
60T FOOD - NUTRITION - DIETETICS
61 REHAB
63 GYM - POOL
75 ENERGY PLANT - GENERATOR BLDG & SUBSTATION
81 BUS STOP
83 EMERGENCY GENERATOR
84 EMERGENCY GENERATOR
86 EMERGENCY GENERATOR
87 EMERGENCY GENERATOR
89 SECURITY STATION
93 HAZARDOUS WASTE STORAGE
101T MAJOR PROJECTS (MODULAR BLDG)
102T ENGINEERING - MAJOR PROJECTS (MODULAR BLDG)
104T M&O SHOP (MODULAR BLDG)
GL GRAVEL LOT
GRAVEL LOT IS DESIGNATED
LOCATION FOR LONG TERM
EQUIPMENT AND MATERIALS
STORAGE. COORDINATE
FINAL LOCATION WITH VA.
IT
E
C T
I R
U
S
PIERCE
I
R E
FO
ET
AT
S
M
ALAN
NUMBER
S
H
O
CARD
RE
AR005805I
G
S
T E
BRADFORD
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714 F 210.881.6808 www.hfscompany.com
6 SOUTH OLD ORCHARD
ST. LOUIS, MO 63119
T 314.918.8383 F 314.918.1766 www.rossbar.com th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA ST. LOUIS HEALTH CARE SYSTEM
VA PROJECT NUMBER:
JEFFERSON BARRACKS
REPLACE WINDOWS IN BUILDINGS
2,18, 25 & 52 FOR ENERGY
EFFICIENCY
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
BRADFORD ALAN PIERCE
AR005805
5/8/19
/8
/2
:3
:2
A
M
00-GI-000
COVER SHEET
CJM
1 61
BAP
657-18-302JB
BID DOCUMENTS
REPLACE WINDOWS IN BUILDINGS 2, 18,
25, 52 FOR ENERGY EFFICIENCY
5/8/19
657-18-302JB
OVERALL CAMPUS SITE PLAN, BUILDING NUMBER, AND PROJECT LOCATOR
00 GI - GENERAL
NON BUILDING SPECIFIC
00-GI-000 COVER SHEET 1
00-GI-001 APPLICABLE CODES, LEGENDS, SYMBOLS, ABBREVIATIONS 2
00-GI-002 PROJECT NOTES 3
05 AE - ARCHITECTURAL ELEMENTS
BUILDING 02
02-AE-101 FLOOR PLAN - BLDG 02 - FLOOR 00 4
02-AE-111 FLOOR PLAN - BLDG 02 - FLOOR 01 5
02-AE-121 FLOOR PLAN - BLDG 02 - FLOOR 02 6
02-AE-131 FLOOR PLAN - BLDG 02 - FLOOR 03 7
02-AE-141 FLOOR PLAN - BLDG 02 - FLOOR 04 (ATTIC) 8
02-AE-211 EXTERIOR ELEVATIONS - BLDG 02 9
02-AE-601 WINDOW SCHEDULES AND WINDOW TYPES - BLDG 02 10
02-AE-711 WINDOW HEAD DETAILS - BLDG 02 11
02-AE-721 WINDOW JAMB DETAILS - BLDG 02 12
02-AE-731 WINDOW SILL DETAILS - BLDG 02 13
BUILDING 18
18-AE-101 FLOOR PLAN - BLDG 18 - FLOOR 00 14
18-AE-111 FLOOR PLAN - BLDG 18 - FLOOR 01 15
18-AE-121 FLOOR PLAN - BLDG 18 - FLOOR 02 16
18-AE-131 FLOOR PLAN - BLDG 18 - FLOOR 03 17
18-AE-141 FLOOR PLAN - BLDG 18 - FLOOR 04 (ATTIC) 18
18-AE-211 EXTERIOR ELEVATIONS - BLDG 18 - EAST AND SOUTH 19
18-AE-212 EXTERIOR ELEVATIONS - BLDG 18 - WEST AND NORTH 20
18-AE-601 WINDOW SCHEDULES AND WINDOW TYPES - BLDG 18 21
18-AE-711 WINDOW HEAD DETAILS - BLDG 18 22
18-AE-721 WINDOW JAMB DETAILS - BLDG 18 23
18-AE-731 WINDOW SILL DETAILS - BLDG 18 24
BUILDING 25
25-AE-111 FLOOR PLAN - BLDG 25 - FLOOR 01 25
25-AE-121 FLOOR PLAN - BLDG 25 - FLOOR 02 26
25-AE-131 FLOOR PLAN - BLDG 25 - FLOOR 03 27
25-AE-141 FLOOR PLAN - BLDG 25 - FLOOR 04 (ATTIC) 28
25-AE-211 EXTERIOR ELEVATIONS - BLDG 25 29
25-AE-601 WINDOW SCHEDULES AND WINDOW TYPES - BLDG 25 30
25-AE-711 WINDOW HEAD DETAILS - BLDG 25 31
25-AE-721 WINDOW JAMB DETAILS - BLDG 25 32
25-AE-731 WINDOW SILL DETAILS - BLDG 25 33
BUILDING 52
52-AE-101 FLOOR PLAN - BUILDING 52 - FLOOR 00 - NORTH 34
52-AE-102 FLOOR PLAN - BUILDING 52 - FLOOR 00 - SOUTH 35
52-AE-111 FLOOR PLAN - BUILDING 52 - FLOOR 01 - NORTH 36
52-AE-112 FLOOR PLAN - BUILDING 52 - FLOOR 01 - SOUTH 37
52-AE-121 FLOOR PLAN - BUILDING 52 - FLOOR 02 - NORTH 38
52-AE-122 FLOOR PLAN - BUILDING 52 - FLOOR 02 - SOUTH 39
52-AE-131 FLOOR PLAN - BUILDING 52 - FLOOR 03 - PENTHOUSE 40
52-AE-201 EXTERIOR ELEVATIONS - NORTH & SOUTH - BLDG 52 41
52-AE-202 EXTERIOR ELEVATIONS - WEST - BLDG 52 42
52-AE-203 EXTERIOR ELEVATIONS - EAST - BLDG 52 43
52-AE-204 EXTERIOR ELEVATIONS - MISC. FACADES - BLDG 52 44
52-AE-601 WINDOW SCHEDULES AND WINDOW TYPES - BLDG 52 45
52-AE-711 WINDOW HEAD DETAILS - BLDG 52 46
52-AE-721 WINDOW JAMB DETAILS - BLDG 52 47
52-AE-731 WINDOW SILL DETAILS - BLDG 52 48
06 HA - HAZARD AND ABATEMENT
BUILDING 02
02-HA-111 ABATEMENT FLOOR PLAN - BLDG 02 - FLOOR 01 49
02-HA-121 ABATEMENT FLOOR PLAN - BLDG 02 - FLOOR 02 50
02-HA-131 ABATEMENT FLOOR PLAN - BLDG 02 - FLOOR 03 51
02-HA-141 ABATEMENT FLOOR PLAN - BLDG 02 - FLOOR 04 (ATTIC) 52
BUILDING 18
18-HA-101 ABATEMENT FLOOR PLAN - BLDG 18 - FLOOR 00 (BASEMENT) 53
18-HA-111 ABATEMENT FLOOR PLAN - BLDG 18 - FLOOR 01 54
18-HA-121 ABATEMENT FLOOR PLAN - BLDG 18 - FLOOR 02 55
18-HA-131 ABATEMENT FLOOR PLAN - BLDG 18 - FLOOR 03 56
18-HA-141 ABATEMENT FLOOR PLAN - BLDG 18 - FLOOR 04 57
BUILDING 25
25-HA-111 ABATEMENT FLOOR PLAN - BLDG 25 - FLOOR 01 58
25-HA-121 ABATEMENT FLOOR PLAN - BLDG 25 - FLOOR 02 59
25-HA-131 ABATEMENT FLOOR PLAN - BLDG 25 - FLOOR 03 60
25-HA-141 ABATEMENT FLOOR PLAN - BLDG 25 - FLOOR 04 61
DRAWING INDEX
CONTACT INFORMATION
Contract Number: VA255-17-D-0116
Task Order Number: 36C25518N3219
Project COR: Lydia Oswald 314-652-4100 x6-6719 lydia.oswald@va.gov
Contracting Officer: Kevin Knight 913-946-1143 kevin.knight2@va.gov
Arch/Engineer Project Manager: Nick Andrews 210-881-9714 nick@hfscompany.com
P
(ATTIC)
P
(ATTIC)
ABBREVIATIONS
EXISTING PARTITION OR WALL
TO REMAIN
NEW PARTITION
NORTH ARROW
ARCHITECTURAL
SYMBOLS
EXISTING PARTITION OR
CONSTRUCTION TO BE
REMOVED
EXISTING DOOR TO
REMAIN
NEW DOOR
PARTITION TYPE
ROOM NAME AND NUMBER
DOOR NUMBER
SECTION - BUILDING
CEILING HEIGHT
FINISH FLOOR ELEVATION
INTERIOR ELEVATION
COLUMN LINES
REVISION
EXISTING DOOR TO BE REMOVED
EXTERIOR BUILDING
ELEVATION
WINDOW TYPE
SIGNAGE TYPE
Name
Elevation
KEYNOTE#
A101
A101
AD888
AD888
SIM
SECTION - WALL
SECTION - CASEWORK
1 Ref
R e f
1Ref
R e f
PLAN
NORTH
TRUE
NORTH
ARCHITECTURAL ANNOTATION ARCHITECTURAL MODELING
A101
EXISTING PHOTO
VANTAGE POINT
Room Name
G3F1A
R308A
10'-0"
NOT ALL SYMBOLS ARE USED NOT ALL SYMBOLS ARE USED
Date Dr. Check Comment
AD888
SECTION - DETAIL
GENERAL MATERIALS LEGEND
(DETAIL/SECTION)
EARTH
CMU
GRANULAR FILL
SAND
CONCRETE STEEL
PARTICLE BOARD
WOOD SHIMWOOD BLOCKING
(SECTION)
INSULATION-BATT
INSULATION-RIGID
(DETAIL/SECTION)
GYP BD
(SECTION/DETAILS)
WOOD
(DETAIL/SECTION)
INSULATION-SPRAYED ON
FACE BRICK PLYWOOD
NOT ALL SYMBOLS ARE USED
1. INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2009
2. INTERNATIONAL BUILDING CODE (IBC) 2009
3. ENERGY CONSERVATION CODE (2009 IBC/IMC)
4. INFECTION CONTROL RISK ASSESSMENT (ICRA) (BUILDING 52 ONLY)
5. 2016 GUIDING PRINCIPLES CHECKLIST FOR EXISTING BUILDINGS V2.1
6. VA SUSTAINABLE DESIGN MANUAL, MAY 2014
7. STATE OF MISSOURI, SHPO
8. NAFS – NORTH AMERICAN FENESTRATION STANDARD - AAMA/WDMA/CSA
101/I.S.2/A440-08
9. VA MASTER CONSTRUCTION SPECIFICATIONS, PROGRAM GUIDE, HYPERLINK
"HTTP://WWW.CFM.VA.GOV/TIL/SPEC.ASP" PG-18-1;
HTTP://WWW.CFM.VA.GOV/TIL/SPEC.ASP
10. VA DESIGN AND CONSTRUCTION PROCEDURES, HYPERLINK
"HTTP://WWW.CFM.VA.GOV/TIL/CPRO.ASP" PG-18-3;
HTTP://WWW.CFM.VA.GOV/TIL/CPRO.ASP
11. VA STANDARD DETAILS, HYPERLINK "HTTP://WWW.CFM.VA.GOV/TIL/SDETAIL.ASP"
PG-18-4, VOLUMES 1, 3, 4, 5, 6 & 7; HTTP://WWW.CFM.VA.GOV/TIL/SDETAIL.ASP
12. VA EQUIPMENT GUIDE LIST, HYPERLINK
"HTTP://WWW.CFM.VA.GOV/TIL/EQUIP.ASP" PG-18-5;
HTTP://WWW.CFM.VA.GOV/TIL/EQUIP.ASP
13. VA HYPERLINK "HTTP://WWW.CFM.VA.GOV/TIL/DMANUAL.ASP" DESIGN MANUALS
FOR THE APPLICABLE DISCIPLINES, HYPERLINK
"HTTP://WWW.CFM.VA.GOV/TIL/DMANUAL.ASP" \O "PG-18-10" PG-18-10;
HTTP://WWW.CFM.VA.GOV/TIL/DMANUAL.ASP
14. VA DESIGN GUIDES FOR GRAPHICS, HYPERLINK
"HTTP://WWW.CFM.VA.GOV/TIL/DGUIDE.ASP" \O "PG-18-12" PG-18-12;
HTTP://WWW.CFM.VA.GOV/TIL/DGUIDE.ASP
15. VA BARRIER FREE DESIGN GUIDE, HYPERLINK
"HTTP://WWW.CFM.VA.GOV/TIL/ACCESSIBILITY.ASP" PG-18-13;
HTTP://WWW.CFM.VA.GOV/TIL/ACCESSIBILITY.ASP
16. VA ENVIRONMENTAL COMPLIANCE MANUAL, HYPERLINK
"HTTP://WWW.CFM.VA.GOV/TIL/SPCLRQMTS.ASP" \L "EC" \O "PG-18-17" PG-18-17;
HYPERLINK "HTTP://WWW.CFM.VA.GOV/TIL/SPCLRQMTS.ASP" \L "EC" \O "PG-18-17"
HTTP://WWW.CFM.VA.GOV/TIL/SPCLRQMTS.ASP#EC
17. VA DESIGN ALERTS AND QUALITY HYPERLINK
"HTTP://WWW.CFM.VA.GOV/TIL/ALERT.ASP" ALERTS;
HTTP://WWW.CFM.VA.GOV/TIL/ALERT.ASP
18. VA CAD STANDARDS; HTTP://WWW.CFM.VA.GOV/TIL/PROJREQ.ASP#CAD
19. VA HYPERLINK "HTTP://WWW.CFM.VA.GOV/TIL/PROJREQ.ASP" \L "REVIEWCHECK"
DESIGN REVIEW CHECKLISTS; HYPERLINK
"HTTP://WWW.CFM.VA.GOV/TIL/PROJREQ.ASP" \L "REVIEWCHECK"
HTTP://WWW.CFM.VA.GOV/TIL/PROJREQ.ASP#REVIEWCHECK
20. VA AE DESIGN SUBMISSION REQUIREMENTS;
HTTP://WWW.CFM.VA.GOV/TIL/AEDESSUBREQ.ASP
21. OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT DESIGN MANUAL,
ARCHITECTURAL DESIGN MANUAL,
HTTP://WWW.CFM.VA.GOV/TIL/DMANUAL/DMARHOSP.PDF
22. VA MEDICAL CENTER MEMORANDUMS (“MCM”)
APPLICABLE CODES AND STANDARDS
IT
E
C T
I R
U
S
PIERCE
I
R E
FO
ET
AT
S
M
ALAN
NUMBER
S
H
O
CARD
RE
AR005805I
G
S
T E
BRADFORD
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714 F 210.881.6808 www.hfscompany.com
6 SOUTH OLD ORCHARD
ST. LOUIS, MO 63119
T 314.918.8383 F 314.918.1766 www.rossbar.com th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
BRADFORD ALAN PIERCE
AR005805
5/8/19
/8
/2
:3
:2
A
M
00-GI-001
APPLICABLE CODES, LEGENDS,
SYMBOLS, ABBREVIATIONS
CJM
2 61
BAP
657-18-302JB
BID DOCUMENTS
REPLACE WINDOWS IN BUILDINGS 2, 18,
25, 52 FOR ENERGY EFFICIENCY
5/8/19
REFR REFRIGERATOR
REINF REINFORCING OR REINFORCEMENT
REQD REQUIRED
REV REVISION
RM ROOM
RO ROUGH OPENING
RTU ROOF TOP UNIT
S SOUTH
S STL STAINLESS STEEL
SA SUPPLY AIR
SAN SANITARY
SC SOLID CORE
SCHED SCHEDULE
SD SMOKE DETECTOR
SECT SECTION
SF SQUARE FEET
SHT SHEET
SHWR SHOWER
SIM SIMILAR
SND SANITARY NAPKIN DISPENSER
SNR SANITARY NAPKIN RECEPTACLE
SPAN SPANDREL
SPEC SPECIFICATION
SPMR SINGLE PLY MEMBRANE ROOF(ING)
SQ SQUARE
SS STAINLESS STEEL
SSK SERVICE SINK
SSM SOLID SURFACE MATERIAL
SST SAFETY STATION
STD STANDARD
STL STEEL
STOR STORAGE
STRUC STRUCTURE
SUSP SUSPENDED
T & B TOP AND BOTTOM
T & G TONGUE AND GROOVE
TB. TACKBOARD
TELE TELEPHONE
TEMP TEMPERED
TH THICK
THRU THROUGH
TO TOP OF
TOC TOP OF CURB
TOP TOP OF PAVEMENT
TOW TOP OF WALL
TP TOILET PAPER
TS TACK SURFACE
TTD TOILET TISSUE DISPENSER
TV TELEVISION
TYP TYPICAL
UC UNDER COUNTER
UC REFR UNDERCOUNTER REFRIGERATOR
UH UNIT HEATER
UL UNDERWRITER'S LABORATORY
UNIFN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UR URINAL
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
W WEST
W WIDE
W/(O) WITH / WITHOUT
WC WATER CLOSET
WD WOOD
WH WALL HYDRANT
WIND WINDOW
WS WIRE SHELVING
WWF WELDED WRE FABRIC
WWM WELDED WIRE MESH
XFI X-RAY FILM ILLUNINATOR
YD YARD
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GL GLASS
GR GRADE
GRND GROUND
GWB GYPSUM WALLBOARD
GYP GYPSUM
H HIGH
HB HOSE BIBB
HD HEAD
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
HVAC HEATING, VENTILATING AND AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
JST JOIST
JT JOINT
KIT KITCHEN
LAM LAMINATE OR LAMINATED
LAV LAVATORY
LBR LUMBER
LDR LABOR, DELIVERY AND RECOVERY
(PATIENT ROOM)
LDRP LABOR, DELIVERY, RECOVERY AND
POST PARTUM (PAITENT ROOM)
LKR LOCKER
LT LIGHT
M MALE
MACH MACHINE
MANUF MANUFACTURER
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFR MANUFACTURER
MGSOV MEDICAL GAS SHUT OFF VALVE
MGZV MEDICAL GAS ZONE VALVE
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTD MOUNTED
MTL METAL / MATERIAL
MULL MULLION
N NORTH
NC NURSE CALL
NIC NOT IN CONTRACT
NO or # NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED, CONTRACTOR
INSTALLED
OFF OFFICE
OFOI OWNER FURNISHED, OWNER INSTALLED
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLWD PLYWOOD
PR PAIR
PREFAB PREFABRICATED
PREFIN PREFINISHED
PROJ PROJECTION
PRTN PARTITION
PT PAINT
PT PRESSURE TREATED
PTAC PACKAGE TERMINAL AIR CONDITIONER
PTD PAPER TOWEL DISPENSER
RA RETURN AIR
RAD RADIUS
RCP REFLECTED CEILING PLAN
REF REFERENCE/REFER TO
ACOUST ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
ADJ ADJACENT
AFF ABOVE FINISH FLOOR
AGG AGGREGATE
ALT ALTERNATE or ALTERNATIVE
ALUM ALUMINUM
APPROX APPROXIMATE(LY)
ARCH ARCHITECTURAL/ARCHITECT
ASPH ASPHALT
ATTN ATTENTION
BD BOARD
BITUM BITUMINOUS
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BEAM
BO BOTTOM OF
BRG BEARING
BSMT BASEMENT
BUR BUILT-UP ROOFING
CAB(S) CABINET(S)
CCT CUBICLE CURTAIN TRACK
CFCI CONTRACTOR FURNISHED,
CONTRACTOR INSALLED
CG CORNER GUARD
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLOS CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
D DEEP / DEPTH
DBL DOUBLE
DEG DEGREE
DEMOUNT DEMOUNTABLE
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIM DIMENSION
DISP DISPENSER
DN DOWN
DS DOWNSPOUT
DT DRAIN TILE
DTL DETAIL
DWG(S) DRAWING(S)
DWR DRAWER
E EAST
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
ENGR ENGINEER
EP ELECTRICAL PANEL
EQ. EQUAL
EQUIP EQUIPMENT
ESMT EASEMENT
EW EYE WASH
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXP AGG EXPOSED AGGRETATE
EXT EXTERIOR
FA FIRE ALARM
FCU FAN COIL UNIT
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FIN FINISH
FLASH FLASHING
FLR FLOOR
FND FOUNDATION
FRZ FREEZER
FT FEET (FOOT)
FTG FOOTING
FUR FURRING
FUT FUTURE
FV FIELD VERIFY
##-XX-###
DISCIPLINE DESIGNATORS EXAMPLES
GI = GENERAL INFORMATION
CS = CIVIL SITE
AD = ARCHITECTURAL DEMOLITION
AS = ARCHITECTURAL SITE
AE = ARCHITECTURAL ELEMENTS
GENERAL & FLOOR PLANS
AI = ARCHITECTURAL INTERIORS
AG = ARCHITECTURAL GRAPHICS
AF = ARCHITECTURAL FINISHES
AC = ARCHITECTURAL CEILING PLAN
AW = ARCHITECTURAL WAYFINDING
AP = ARCHITECTURAL SPACE PLANNING
FLOOR PLANS & SCHEDULES
AL = ARCHITECTURAL LIFE SAFETY
DRAWINGS
SF = STRUCTURAL FRAMING
MH = MECHANICAL HVAC
PL = PLUMBING FIXTURES
EL = ELECTRICAL LIGHTING
DRAWING INDEX LEGEND
SHEET TYPE DESIGNATORS
0 = GENERAL
1 = PLANS
2 = ELEVATIONS
3 = SECTIONS
4 = LARGE-SCALE VIEWS
5 = DETAILS
6 = SCHEDULES & DIAGRAMS
7 = USER DEFINED
8 = USER DEFINED
9 = 3D REPRESENTATIONS
BUILDING NUMBER
FLOOR NUMBER ON PLAN SHEETS
SHEET NUMBER
CONTRACTOR NOTES
1. ALL EXISTING DUCTWORK, ELECTRICAL, PIPING, CABLE TRAYS, ETC. IS NOT
SHOWN ON THE DRAWINGS NOR PART OF SCOPE OF WORK.
2. BEFORE CONTRACTOR(S) BID THE JOB, IT IS IMPERATIVE THEY VISIT THE JOBSITE
AND FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING EQUIPMENT, OFFICE
FURNITURE, A/C UNITS, ETC. THAT ARE ADJACENT TO WINDOWS. IT WILL BE PART
OF THE CONTRACTOR'S RESPONSIBILITY AND THE CONTRACTOR WILL BEAR THE
COST TO RELOCATE ANY EXISTING OBSTACLES WHICH WILL INTERFERE WITH THE
CONTRACTOR'S ABILITY TO INSTALL ALL NEW WORK IN THIS PROJECT.
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN FIELD AND NOTIFY VA PROJECT
ENGINEER OF ALL DISCREPANCIES IF ANY, FOUND PRIOR TO PLACEMENT OF ANY
COMPONENTS.
4. THE CONTRACTOR WILL TAKE ALL NECESSARY PRECAUTIONS INCLUDING THE
CONSTRUCTION AND MAINTENANCE OF DUST TIGHT PARTITIONS, DAILY
VACUUMING, SWEEPING, AND PROVISION OF CLEAN FLOOR MATS AT THE
PROJECT ENTRANCES, TO PREVENT THE INFILTRATION OF DIRT AND DUST FROM
THE CONSTRUCTION AREAS INTO THE OWNER OCCUPIED AREAS
5. PATCH ALL FINISHES WHERE DISTURBED BY THE WORK AND WHERE UNFINISHED
SURFACES HAVE BEEN EXPOSED BY DEMOLITION. PATCHING MUST MATCH
ADJACENT MATERIALS, COLORS, AND FINISHES. WALL SURFACES THAT ARE
PATCHED SHALL HAVE THE FINISHES (PAINT, VINYL WALL COVERING, ETC.)
REPLACED FROM CORNER TO CORNER AND FLOOR TO CEILING.
6. UTILITY WORK THAT WILL REQUIRE A SHUTDOWN OF EXISTING SERVICE(S) WILL
BE DONE AFTER NORMAL WORKING HOURS (NIGHTS, WEEKENDS, HOLIDAYS,
ETC.) AT NO ADDITIONAL COST TO THE GOVERNMENT. WORK MUST BE
SCHEDULED WITH THE V.A. PROJECT ENGINEER.
7. WORK THAT MUST OCCUR IN OCCUPIED AREAS OF THE MEDICAL CENTER OR
DISRUPT A MEDICAL CENTER FUNCTION WILL BE DONE AT TIMES OTHER THAN
NORMAL WORKING HOURS (NIGHTS, WEEKENDS, HOLIDAYS, ETC.) AT NO
ADDITIONAL COST TO THE GOVERNMENT. WORK MUST BE SCHEDULED WITH THE
V.A. PROJECT ENGINEER.
8. THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING ALL EXISTING
ACCESS DOORS TO CONSTRUCTION AREAS, EXISTING MECHANICAL AND
ELECTRICAL AREAS, ASSIGNED STORAGE AREAS, EQUIPMENT ACCESS AREAS,
ETC. DOORS MUST BE RESTORED TO THE CONDITION ENCOUNTERED AT
BEGINNING OF PROJECT.
9. LIFE SAFETY MEASURES: COORDINATE WITH EMPLOYEES, WHEN AND WHERE
CONSTRUCTION WILL OCCUR. PROVIDE PROPER SIGNAGE AND FLAGGING OFF
OF AREAS BY GENERAL CONTRACTOR TO AVOID PATIENT OR EMPLOYEE RISK.
CONTROL ACCESS ZONES TO BE BARRICADED OFF BELOW WINDOW OPENINGS
AT EXTERIOR AREAS DURING CONSTRUCTION.
10. DUST CONTROL: COVER ALL FURNITURE IN WITHIN DUST PRODUCING AREA WITH
PLASTIC. USE SHOP VACS AND OTHER VACUUM DEVICES TO LIMIT DUST
CREATION DURING DEMOLITION AND INSTALLATION. ERECT TEMPORARY
PORTABLE DUST PARTITIONS TO CONFINE DUST TO THE SPECIFIC WORK AREAS
AND ENSURE PRIMARY CUTTING ACTIVITIES OCCUR OUTSIDE OF BUILDING AT
PRE-DETERMINED WORKSTATION.
11. WORK LIMITS: ENSURE A PROJECT COORDINATION MEETING IS ATTENDED BY ALL
PARTIES INVOLVED WITH CONSTRUCTION. PROVIDE LAYOUT WORK TIMES AND
SCHEDULES AS NEEDED TO RETAIN BUILDING ACCESSIBILITY DURING
CONSTRUCTION.
12. ENVIRONMENTAL COMFORT: PROVIDE A REALISTIC CONSTRUCTION SCHEDULE
SO THAT NO WINDOW OPENING IS LEFT OVER NIGHT. IN THE EVENT WINDOW
REPLACEMENT OCCURS OVER MULTIPLE DAYS, GENERAL CONTRACTOR WILL
PROVIDE TEMPORARY SECURITY MEASURES AND ENVIRONMENTAL CONTROLS IN
AFFECTED AREA.
13. LAYDOWN AREA: CONTRACTOR WILL REQUIRE AN AREA NEAR EACH BUILDING OF
CONSTRUCTION OF APPROXIMATELY 50’ X 30’ FOR TRAILERS/DUMPSTERS/
EQUIPMENT DURING THE PROJECT DURATION. GENERAL CONTRACTOR AND
VETERANS AFFAIRS TO COORDINATE THIS LOCATION AT EACH BUILDING PRIOR
TO CONSTRUCTION.
14. PROJECT COORDINATION: A PRECONSTRUCTION MEETING WITH ALL INVOLVED
PARTIES (GENERAL CONTRACTOR, SUBCONTRACTOR, ARCHITECT AND VETERANS
AFFAIRS) TO COORDINATE SCHEDULE.
15. PROJECT SCHEDULE: ALL PARTIES SHALL DEVELOP AN AGREEABLE SCHEDULE
DETAILING DURATIONS, BUILDING SEQUENCES, ETC.
16. SECURITY: ALL TRADESMAN SHALL BE BADGED AND TAKE BACKGROUND
CHECKS, ETC. FOR ACCESS TO THE CONSTRUCTION SITE.
17. LIMITED AREA ACCESS: GENERAL CONTRACTOR SHALL SUPPLY SIGNAGE,
BARRICADES, AND CAUTION TAPE IN ALL AREAS WHERE CONSTRUCTION IS
TAKING PLACE.
18. WORKSTATION AND OFFICE FURNITURE REMOVAL: GENERAL CONTRACTOR
SHALL COORDINATE REMOVAL OF FURNITURE ADJACENT TO WINDOW OPENING.
PROVIDE 6’ OF ACCESS TO WINDOWS FOR CONSTRUCTION.
19. ON-SITE STORAGE: PROVIDE A 30’ X 50’ AREA FOR WINDOW STORAGE,
DUMPSTERS, AND EQUIPMENT STORAGE.
20. INTERIOR/EXTERIOR ACCESS: PROVIDE A MUTUALLY AGREEABLE SCHEDULE WILL
ALLOW FOR ACCESS TO THE INTERIOR OF OFFICES, PATIENT ROOMS, ETC.
DURING CONSTRUCTION.
21. HOURS OF CONSTRUCTION: CONSTRUCTION HOURS MAY VARY PER BUILDING,
GENERAL CONTRACTOR AND VETERANS AFFAIRS SHALL COORDINATE HOURS OF
ALLOWED CONSTRUCTION.
22. NOISE CONTROL: MEETING WITH VETERANS AFFAIRS TO DETERMINE ALLOWABLE
DAY TIME HOURS OF CONSTRUCTION WILL BE NECESSARY. ENSURE THAT NOISE
OR VIBRATIONS ARE KEPT TO A MINIMUM TO AVOID DISRUPTION OF OFFICE AND
PATIENT ACTIVITIES. LIMIT HIGH VOLUME ACTIVITIES (DRILLING) TO OFF PEAK
HOURS FOR LOCAL EMPLOYEES. LIMIT CUTTING TO DESIGNATED AREAS OUTSIDE
OF BUILDING TO AVOID ANY UNNECESSARY NOISE INSIDE.
23. DISRUPTION TO OPERATIONS AND BUILDING UTILITIES: DURING
PRECONSTRUCTION MEETING LET ALL VETERANS AFFAIRS STAFF KNOW WHEN
THEY CAN EXPECT DISRUPTIONS TWO WEEKS PRIOR TO START OF
CONSTRUCTION WORK. GENERAL CONTRACTOR SHALL WORK AROUND STAFF
SCHEDULES THAT DO NOT ALLOW FOR DISRUPTIONS.
INFECTION CONTROL PROTOCOLS (I.C.P.) -
APPLICABLE TO BUILDING 52
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM. IF NECESSARY, SHUT DOWN HVAC SYSTEM
IN WORK AREA. BLOCK OFF AND SEAL AIR VENTS.
2. BEFORE CONSTRUCTION BEGINS COMPLETE ALL CRITICAL BARRIERS BY TAPING
ALL DOORS TO HARD CEILING ABOVE OR IMPLEMENT CONTROL CUBE METHOD,
BY USING AN AIRTIGHT PLASTIC BARRIER FROM FLOOR TO CEILING, SEALED AT
ALL SEAMS. SEAL UNUSED DOORS WITH DUCT TAPE.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA-
EQUIPPED AIR FILTRATION UNITS FOR EXHAUST TO THE OUTSIDE. INSIDE AIR
WILL BE HEPA FILTERED WITH PARTICLE COUNTER; IH TO SET LIMITS, IH TO
RECOMMEND ABATEMENT EXHAUST HOOD UNIT OF STANDARD SIZE; NO METER
WILL BE REQUIRED. IF AIR WILL BE REINTRODUCED INTO THE HOSPITAL
ENVIRONMENT, ALL NEGATIVE AIR MUST BE EXHAUSTED BEYOND DOORS OR
TEMPORARY BARRIERS AS INDICATED BY NOTE 2.
4. MINIMIZE FOOT TRAFFIC AROUND WORK AREA.
5. PROVIDE ADHESIVE WALK-OFF MATS AT ENTRANCE TO WORK AREA OR WITHIN
THE ANTEROOM. STICKY MATS SHOULD HAVE NUMBERED TEAR-OFFS AND
SHOULD BE REPLACED DAILY OR MORE AS NEEDED. PROVIDE ADHESIVE WALK-
OFF MATS AT ENTRANCE TO WORK AREA OR ADDITIONALLY, PROVIDE DAMP
WALK-OFF MATS PRIOR TO THE ADHESIVE WALK-OFF MATS THAT SHOULD BE
MISTED WITH WATER OF SUFFICIENT LENGTH TO CLEAN DUST OFF WHEELS OF
CARTS AS A PRECURSOR TO THE STICKY MATS.
6. WORK SURFACES ARE TO BE MISTED WITH WATER BEFORE CUTTING
7. MIST CEILING TILE BEFORE REMOVAL FOR TRANSPORT OUT OF THE AREA AND
REPLACE WITH NEW CEILING TILES AT THE EARLIEST OPPORTUNITY.
8. FLUSH WATER SYSTEMS AFTER SERVICE INTERRUPTION
9. CLEAN WORK AREA COMPLETELY BEFORE LEAVING WORK EVERYDAY. WORK
SURFACES ARE TO BE WIPED DOWN WITH HOSPITAL APPROVED DISINFECTANT.
WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING
THE WORK AREA.
10. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL PROJECT IS COMPLETED
AND AREA IS CLEANED BY EMS AND INSPECTED BY INFECTION PREVENTION AND
SAFETY OFFICER. AT THE COMPLETION OF THE PROJECT CAREFULLY REMOVE
BARRIERS TO MINIMIZE SPREADING OF DUST AND DEBRIS ASSOCIATED WITH
CONSTRUCTION. RE-USE OF ANY PLASTIC BARRIERS IS PROHIBITED.
11. CONTAIN CONSTRUCTION WASTE IN TIGHTLY COVERED CONTAINERS AND
TRANSPORT OUT OF THE AREA. REMOVER SHALL TAKE THE MOST DIRECT
ROUTE. COVER TRANSPORT RECEPTACLE OR CARTS; TAPE COVERING.
12. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED AND THOROUGHLY CLEAN THE AREA
13. DUST WILL BE CONTAINED WITH NEGATIVE AIR BARRIERS. PERSONNEL MUST
DUST-OFF PRIOR TO DEPARTING THE AREA AND DUSTY AND/OR DIRTY
CLOTHING IS NOT PERMITTED THROUGH THE HOSPITAL.
14. PROTECT THE EXISTING FIRE SPRINKLER HEADS WITH PLASTIC BAGS.
15. PRIOR TO OCCUPANCY ALL VENTS MUST BE CLEANED AND WATER LINES AT THE
SITE AND ADJACENT AREAS ARE TO BE FLUSHED.
16. INFECTION CONTROL WILL INSPECT THE AREA PRIOR TO REENTRY BY
EMPLOYEES OR PATIENTS. THE AREA MUST BE THOROUGHLY CLEANED BY THE
CONTRACTOR AND APPROVED BY THE VA PROJECT ENGINEER.
GENERAL NOTES
1. CONTRACTOR IS NOT AUTHORIZED TO SCALE CONSTRUCTION DOCUMENTS.
CONTRACTOR AND ARCHITECT ARE TO BE NOTIFIED IN THE EVENT A
DISCREPANCY IS FOUND IN EITHER SPECIFICATIONS OR CONTRACT DOCUMENTS
AT THE EARLIEST PRACTICAL OPPORTUNITY.
2. GENERAL CONTRACTOR WILL OBSERVE AND COMPLY WITH ALL REGULATIONS
IMPOSED BY GOVERNING BODIES HAVING JURISDICTION, AND RELATING TO
STANDARD CONSTRUCTION PRACTICE.
3. ALL WRITTEN CORRESPONDENCE WILL BE TRANSMITTED FROM
SUBCONTRACTOR THROUGH GENERAL CONTRACTOR THROUGH ARCHITECT TO
OWNER. ALL PARTIES CORRESPONDENCE ARE TO RECEIVE WRITTEN AND
SIGNED COPIES OF SUCH. NO VERBAL AGREEMENTS AFFECTING COST OR
ALTERNATIVE CONSTRUCTION METHODS AND ARRANGEMENTS WILL BE
CONSIDERED VALID OR BINDING, AND ARE THEREFORE, DISALLOWED.
4. GENERAL CONTRACTOR WILL COMPLY WITH ALL DIRECTIVES OF THE OWNER. IF
CONFLICTS BETWEEN DRAWINGS, SPECIFICATIONS, AND REQUIREMENTS OF
BUILDING OWNER AND/OR OPERATORS ARISE, THEY WILL BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT IMMEDIATELY.
5. ALL TRADES ARE REQUIRED TO VISIT THE PROJECT SITE AND DETERMINE THAT
ALL WORK CAN BE ACHIEVED IN A COMPLETE MANNER UNDER THEIR BID.
6. THE CONTRACTOR WILL CONTAIN ALL CONSTRUCTION ACTIVITY, INCLUDING
STORAGE OF MATERIAL AND EQUIPMENT, WITHIN THE CONSTRUCTION LIMITS,
AT ALL TIMES BEING RESPONSIBLE FOR AND ABIDING BY RULES AND
REGULATIONS OF THE OWNER.
7. GENERAL CONTRACTOR WILL REMOVE ALL CONSTRUCTION DEBRIS FROM
JOBSITE. ALL CONSTRUCTION DEBRIS WILL BE CONTAINED INSIDE
CONSTRUCTION LIMITS.
8. CONTRACTOR WILL SATISFACTORILY REPAIR SURFACE DAMAGE TO MATCH
EXISTING CONDITIONS.
9. WHERE REQUIRED, REINFORCED WALLS WILL HAVE CONCEALED, FIRE TREATED
WOOD BLOCKING OR METAL STRAP BACKING SIZED TO ACCOMMODATE THE
WEIGHT OF THE MOUNTED ITEM.
HAZARDOUS MATERIAL ABATEMENT
POTENTIAL HAZARDOUS MATERIAL ABATEMENT WILL BE REQUIRED AT BUILDINGS 2,
18, 25. THE FOLLOWING IS A LIST OF THE SCOPE. SEE ABATEMENT DRAWINGS FOR
ADDITIONAL INFORMATION
BUILDINGS 2, 18, AND 25:
INFECTION CONTROL CLASS: CLASS 2 (DUST PARTITIONS)
PROPOSED WORK AREA CONTROLS (DUST CONTROL WITH ABATEMENT
CONTRACTOR PRESENT):
1. RESTRICT ACCESS TO THE ROOM(S) WHERE WORK IS BEING CONDUCTED.
2. MOVE CONTENTS AWAY FROM WINDOW AND COVER ALL CONTENTS IN ROOM
WITH PLASTIC SHEETING.
3. PLACE DROP CLOTHS BELOW IMMEDIATE WORK AREAS.
4. (BLDG 2 ONLY) ABATEMENT CONTRACTOR TO HEPA VACUUM THE CEILING TILES
AND REMOVE ANY DELAMINATED LEAD-BASED PAINT THAT MAY DISLODGE
DURING WORK ACTIVITIES. IF THE CLEANUP OF THE DELAMINATION IS
EXTENSIVE (AS SEEN IN SOME AREAS), THE USE OF A NEGATIVE PRESSURE MINI-
CONTAINMENT OR NEGATIVE PRESSURE HEPA CART WOULD BE REQUIRED.
5. WINDOW CONTRACTOR TO REMOVE WINDOW SYSTEM.
6. (BLDG 25 ONLY) VPIH TO INSPECT EXPOSED WINDOW CAVITY AND COLLECT
BULK SAMPLES OF ANY UNASSESSED MATERIALS SINCE THE WINDOW COULD
NOT BE REMOVED DURING PREVIOUS ASSESSMENT.
7. ABATEMENT CONTRACTOR TO HEPA VACUUM THE EXPOSED WINDOW CAVITY,
WET WIPE WITH AN EPA-REGISTERED ANTIMICROBIAL SOLUTION, AND CLEAN
ANY DEBRIS ON THE DROP CLOTHS.
8. WINDOW CONTRACTOR TO REPLACE WINDOW SYSTEM.
9. ABATEMENT CONTRACTOR TO CONDUCT ALL FINAL CLEANING IN THE ROOM
ONCE COMPLETE.
BUILDING 52
INFECTION CONTROL CLASS: CLASS 4 (NEGATIVE PRESSURE WORK AREAS AND
ANTI-CHAMBERS)
PROPOSED WORK AREA CONTROLS (MAJORITY OF WORK CONDUCTED FROM
EXTERIOR):
1. RESTRICT ACCESS TO THE ROOM(S) WHERE WORK IS BEING CONDUCTED AND
SETUP HEPA FILTRATION UNIT IN ROOM.
2. MOVE CONTENTS AWAY FROM WINDOW AND PLACE DROP CLOTHS BELOW
IMMEDIATE WORK AREAS.
3. WINDOW CONTRACTOR TO CONDUCT INITIAL WORK INSIDE THE ROOM (REMOVE
WINDOW PANES, INTERIOR SNAP TRIM, DISCONNECT WINDOW FASTENERS), AND
THEN COVER WINDOW OPENING WITH HARD BARRIER THAT IS SEALED TO WALL.
4. WINDOW CONTRACTOR TO REMOVE REMAINING WINDOW SYSTEMS AND
REINSTALL WINDOW FROM THE EXTERIOR USING MAN-LIFTS.
5. ONCE COMPLETE, THE INTERIOR WINDOW BARRIER SHOULD BE REMOVED AND
INTERIOR WINDOW TRIM SHOULD BE INSTALLED.
6. ROOM TO BE FINAL CLEANED ONCE WORK IS COMPLETE.
BUILDING 2
A. INTACT LEAD-BASED PAINT (LBP) OR LEAD-CONTAINING PAINT ON WALLS, ABOVE
ACT CEILINGS AND/OR TRIM AROUND WINDOW OPENINGS.
B. ORIGINAL WOOD FRAMES AND SILLS WITH LEAD-BASED PAINT
C. LOOSE, CURLING OR DELAMINATED LEAD-BASED PAINT ABOVE THE DROP
CEILINGS MAINLY ON 2ND AND 3RD FLOORS
D. INITIAL LEAD-BASED PAINT REMOVAL AND CLEANUP ABOVE THE CEILINGS ON
FLOORS 2 & 3 WILL BE CONDUCTED IN A MOBILE MINI-CONTAINMENT WITH
NEGATIVE AIR.
E. WIPE CLEARANCE SAMPLES WILL BE CONDUCTED FOLLOWING ALL INITIAL LEAD
CLEAN-UP ACTIVITIES THAT ARE GREATER THAN 2 SF. NO LEAD WIPE
CLEARANCE SAMPLES WILL BE COLLECTED FOR THE INITIAL LEAD CLEAN-UP
ACTIVITIES THAT ARE LESS THAN 2 SF.
F. ONCE THE WINDOW REPLACEMENT CONTRACTOR REMOVES THE WINDOWS,
THE EXPOSED WINDOW CAVITY WITH DETERIORATED LEAD-BASED PAINT WILL
BE HEPA VACUUMED AND WET-WIPED WITH AN EPA REGISTERED ANTI-
MICROBIAL SOLUTION BY A LEAD ABATEMENT CONTRACTOR. CLEARANCE WIPE
SAMPLES FOLLOWING THIS WORK WILL BE COLLECTED FOR THE FIRST 5
WINDOWS AND THEN 10% OF THE REMAINING WINDOWS RANDOMLY.
G. EXISTING EIFS SYSTEM IS INSTALLED OVER ORIGINAL ASBESTOS & LEAD
CONTAINING, STUCCO SYSTEM. AT NO TIME SHALL CONTRACTOR DISTURB,
REMOVE AND DAMAGE EXISTING STUCCO SYSTEM.
BUILDING 18
A. NO INITIAL LEAD CLEAN-UP ACTIVITIES WILL BE REQUIRED FOR THIS BUILDING.
B. ONCE THE WINDOW REPLACEMENT CONTRACTOR REMOVES THE WINDOWS,
THE EXPOSED WINDOW CAVITY WITH DETERIORATED LEAD-BASED PAINT WILL
BE HEPA VACUUMED AND WET-WIPED WITH AN EPA REGISTERED ANTI-
MICROBIAL SOLUTION BY A LEAD ABATEMENT CONTRACTOR. CLEARANCE WIPE
SAMPLES FOLLOWING THIS WORK WILL BE COLLECTED FOR THE FIRST 5
WINDOWS AND THEN 10% OF THE REMAINING WINDOWS RANDOMLY.
C. INTACT LEAD-BASED PAINT (LBP) OR LEAD-CONTAINING PAINT ON WALLS, ABOVE
ACT CEILINGS AND/OR TRIM AROUND WINDOW OPENINGS.
D. SPORADIC ORIGINAL WOOD FRAMES AND SILLS WITH LEAD-BASED PAINT
(MAINLY THE WEST OFFICES)
E. EXISTING EIFS SYSTEM IS INSTALLED OVER ORIGINAL ASBESTOS & LEAD
CONTAINING, STUCCO SYSTEM. AT NO TIME SHALL CONTRACTOR DISTURB,
REMOVE AND DAMAGE EXISTING STUCCO SYSTEM.
BUILDING 25
A. NO INITIAL LEAD CLEAN-UP ACTIVITIES WILL BE REQUIRED FOR THIS BUILDING.
B. ONCE THE WINDOW REPLACEMENT CONTRACTOR REMOVES THE WINDOWS,
THE EXPOSED WINDOW CAVITY WITH DETERIORATED LEAD-BASED PAINT WILL
BE HEPA VACUUMED AND WET-WIPED WITH AN EPA REGISTERED ANTI-
MICROBIAL SOLUTION BY A LEAD ABATEMENT CONTRACTOR. CLEARANCE WIPE
SAMPLES FOLLOWING THIS WORK WILL BE COLLECTED FOR THE FIRST 5
WINDOWS AND THEN 10% OF THE REMAINING WINDOWS RANDOMLY.
C. INTACT LEAD-BASED PAINT (LBP) OR LEAD-CONTAINING PAINT ON WALLS, ABOVE
ACT CEILINGS AND/OR TRIM AROUND WINDOW OPENINGS.
D. ORIGINAL WOOD FRAMES AND SILLS WITH LEAD-BASED PAINT IN THE ATTIC
E. 3RD FLOOR RESTROOMS: LEAD GLAZED CERAMIC TILE AROUND WINDOWS
F. ROOMS 202, 203: METAL WINDOW FRAMES WITH LEAD-BASED PAINT (SUSPECT
ORIGINAL)
G. ROOM 209D: WALLS AND ORIGINAL WINDOW FRAMES WITH LEAD-BASED PAINT
H. ROOM 112: WALLS WITH LEAD-BASED PAINT
I. WEST MIDDLE STAIRWELL: WALLS, CERAMIC TILE, AND ORIGINAL WINDOW
FRAMES WITH LEAD-BASED PAINT
J. EXISTING EIFS SYSTEM IS INSTALLED OVER ORIGINAL ASBESTOS & LEAD
CONTAINING, STUCCO SYSTEM. AT NO TIME SHALL CONTRACTOR DISTURB,
REMOVE AND DAMAGE EXISTING STUCCO SYSTEM.
BUILDING 52
A. ABATEMENT CONTRACTOR NOT REQUIRED FOR THIS WORK SINCE NO
ASBESTOS OR LEAD-BASED PAINT WAS IDENTIFIED, HOWEVER, PAINT WAS
IDENTIFIED THAT CONTAINED LEAD AT QUANTITIES BELOW THE THRESHOLD TO
BE CONSIDERED LEAD-BASED PAINT. THE GENERAL CONTRACTOR WILL NEED TO
COMPLY WITH 29 CFR 1926.62, LEAD IN CONSTRUCTION STANDARD.
B. ONCE THE WINDOWS ARE REMOVED, THE CONTRACTOR AND THE VPIH WILL
INSPECT WINDOW CAVITIES FOR ASBESTOS AND / OR PAINT THAT DIFFERS
FROM THE MATERIALS OBSERVED DURING THE PILOT STUDY THAT TESTED
NEGATIVE OR BELOW HUD THRESHOLDS.
C. ALL LOOSE PAINT CHIPS SHOULD BE CLEANED UP AND NOT ALLOWED TO FALL
TO THE GROUND.
IT
E
C T
I R
U
S
PIERCE
I
R E
FO
ET
AT
S
M
ALAN
NUMBER
S
H
O
CARD
RE
AR005805I
G
S
T E
BRADFORD
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714 F 210.881.6808 www.hfscompany.com
6 SOUTH OLD ORCHARD
ST. LOUIS, MO 63119
T 314.918.8383 F 314.918.1766 www.rossbar.com th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
BRADFORD ALAN PIERCE
AR005805
5/8/19
/8
/2
:1
:5
P
M
00-GI-002
PROJECT NOTES
CJM
3 61
BAP
657-18-302JB
BID DOCUMENTS
REPLACE WINDOWS IN BUILDINGS 2, 18,
25, 52 FOR ENERGY EFFICIENCY
5/8/19
UP
KOCH ROAD
JE
FFERSO
N D
RIV
E
N O
R T H
G A T E E
N T R
A N
C E D
R
IV
E
S O
U
TH
G A
TE E
N
TR
AN
C E D
R
IV
E
KOCH ROAD
JEFFERSON BARRACKS
NATIONAL CEMETERY
PHASE 1 TRANSFER
JEFFERSON BARRACKS
NATIONAL CEMETERY
PHASE 2 TRANSFER
FUTURE PROPERTY LINE
GRAVEL
PARKING
AREA
MISSISSIPPI RIVER
JEFFERSON
BARRACKS
NATIONAL
CEMETERY
CONSTRUCTION ZONE
CONSTRUCTION
ZONE
CONSTRUCTION ZONE
CONSTRUCTION ZONE
CONST. ZONE
3 18
60T 51T
104T
102T
101T
53T
1CC
1CC
1CC
1CC
93 86
UNDER CONSTRUCTION
4T
1CC
3T
GL
4160 VO LTS
DUST CO LLECTO R
LIQ
UEFIED PETRO
LEUM
G
AS
FLAM
M
ABLE G
AS 2
TRASH CO M PACTO R
P SILVERBUILDING
1 23
BUILDING 23
VA PO LICE
E LECTRIC ACCESS
TRANSFO RM ER
TRANSFO RM ER
TRANSFO RM ER
STORAGE
G06
STORAGE
G07A
TOILET
G05A
HAC
G05B STORAGE
G05
OI&T
G04
CORRIDOR
H001
STORAGE
G03
ELEVATOR EQUIP.
G01
TRANSFORMER
RM.
G09
CORRIDOR
H003
STAIRWELL NO. 1
S001
ELEVATOR NO. 1
E-00
SORAGE/ COPY
RM.
G02A
STORAGE
G02B
FAP
FE
UNEXCAVATED UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
STAIRWELL NO. 1
S001
FE
UNEXCAVATED
STORAGE
G02
CHASE
CH-0-1
STORAGE
G07
02-AE-211
02-AE-2112
02-AE-211
02-AE-211 4
02-007B 02-007A 02-008B 02-008A 02-002J 02-002H02-002K02-002L02-002M
02-002C
02-007C
02-007F
02-007E
02-007D 02-002G
02-007G 02-007H 02-007J 02-005C 02-005A 02-005B 02-001A
02-002D
02-002E
02-002F
02-003A 02-002A 02-002B
MECH. RM.
G08
A. INSTALL CONTINUOUS JOINT SEALANT AT ALL INTERIOR WINDOW JOINT
LOCATIONS (TYP.)
B. REPLACEMENT OF BLOCKING SHALL BE REQUIRED IF BLOCKING IS LOOSE OR IN
POOR CONDITION.
C. SEE ABATEMENT NOTES ON SHEET 00-GI-002 AND ABATEMENT "XX-AH-XX"
SHEETS.
D. EXIST WINDOW SILL FLASHING SHALL BE LEFT IN PLACE. CUT VERTICAL LEG OF
SILL FLASHING FOR INSTALLATION OF NEW METAIL SILL.
E. REMOVE EXISTING SURFACE MOUNTED WINDOW BLINDS AT WINDOW OPENINGS.
PATCH AND TOUCH UP SURFACE WITH COLOR TO MATCH ADACENT PAINT
COLOR.
F. CONTRACTOR TO REMOVE FURNITURE AND ANY ACCESSORIES FOR
REINSTALLATION PRIOR TO WINDOW CONSTRUCTION. ONCE WINDOW
INSTALLATION IS COMPLETE REINSTALL FURNITURE AND ANY ACCESSORIES TO
MATCH PRECONSTRUCTION CONDITIONS.
G. RADIATORS (RAD) WALL MOUNTED OR RECESSED UNDER WINDOWS SHALL BE
COVERED AND PROTECTED DURING CONSTRUCTION.
GENERAL FLOOR PLAN NOTES
BUILDING NUMBER
NOTE: WINDOWS ARE NUMBERED INDIVIDUALLY; NOT BY TYPE.
WINDOW NUMBERING LEGEND
ROOM NUMBER (FOR TYPICAL ROOMS)
BB-225A
ROOM NUMBER (FOR SOME ADJACENT ROOMS)
FLOOR NUMBER IN BUILDING
WINDOW NUMBER SUFFIX WITHIN BUILDING
BUILDING 2
DESIGNATED
LOCATION FOR LONG
TERM EQUIPMENT AND
MATERIALS STORAGE.
COORDINATE FINAL
LOCATION WITH VA.
DESIGNATED TEMPORARY STORAGE AND
WORK SPACE AREA. COORDINATE FINAL
LOCATION WITH VA
IT
E
C T
I R
U
S
PIERCE
I
R E
FO
ET
AT
S
M
ALAN
NUMBER
S
H
O
CARD
RE
AR005805I
G
S
T E
BRADFORD
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714 F 210.881.6808 www.hfscompany.com
6 SOUTH OLD ORCHARD
ST. LOUIS, MO 63119
T 314.918.8383 F 314.918.1766 www.rossbar.com th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
BRADFORD ALAN PIERCE
AR005805
5/8/19
/8
/2
:4
:4
P
M
02-AE-101
FLOOR PLAN - BLDG 02 - FLOOR 00
CJM
4 61
BAP
657-25-302JB
BID DOCUMENTS
REPLACE WINDOWS IN BUILDINGS 2, 18,
25, 52 FOR ENERGY EFFICIENCY
5/8/19
1/8" = 1'-0"
OVERALL FLOOR PLAN - BUILDING 02 - FLOOR 00PLAN
NORTH
TRUE
NORTH
1" = 300'-0"
CAMPUS MAPPLAN
NORTH
TRUE
NORTH
UP
UP
UP
UP
UP
OFFICE
CLOSET
116A
TOILET
CORRIDOR
H105
OFFICE
OFFICE
OFFICE
MECH. RM.
OFFICE
OFFICE
STORAGE
110A
OFFICE
OFFICE
CORRIDOR
H101
OFFICE
OFFICE
105A
OFFICE
OFFICE
CORRIDOR
H103
CLOSET
118A
OFFICE
OFFICE
OFFICE
119A
OFFICE
TOILET
STAIRWELL NO. 1
S101
LOBBY
ELEVATOR LOBBY
123A
VEST.
CORRIDOR
H102
ELEVATOR NO. 1
E-01
PLAN
NORTH
TRUE
NORTH
CLOSET
113ACORRIDOR
H104
FEC
FAP FAP
FAP
DN
CHASE
CH-1-1
CHASE
CH-1-3
02-AE-211
02-AE-2112
02-AE-211
02-AE-211 4
02-118A 02-119D 02-119C 02-119B 02-119A 02-105A02-105B02-104A02-104B
02-106B
02-118B
02-117A
02-116A
02-106A
02-107A
02-108B
02-116B 02-115A 02-114A 02-114B 02-113A 02-113B 02-111A 02-111B 02-110B 02-110A 02-109A
02-108A
02-124B02-124A
02-112A
RADRADRADRADRADRAD
RAD
RAD RAD RAD RAD RAD
RAD
RAD
A. INSTALL CONTINUOUS JOINT SEALANT AT ALL INTERIOR WINDOW JOINT
LOCATIONS (TYP.)
B. REPLACEMENT OF BLOCKING SHALL BE REQUIRED IF BLOCKING IS LOOSE OR IN
POOR CONDITION.
C. SEE ABATEMENT NOTES ON SHEET 00-GI-002 AND ABATEMENT "XX-AH-XX"
SHEETS.
D. EXIST WINDOW SILL FLASHING SHALL BE LEFT IN PLACE. CUT VERTICAL LEG OF
SILL FLASHING FOR INSTALLATION OF NEW METAIL SILL.
E. REMOVE EXISTING SURFACE MOUNTED WINDOW BLINDS AT WINDOW OPENINGS.
PATCH AND TOUCH UP SURFACE WITH COLOR TO MATCH ADACENT PAINT
COLOR.
F. CONTRACTOR TO REMOVE FURNITURE AND ANY ACCESSORIES FOR
REINSTALLATION PRIOR TO WINDOW CONSTRUCTION. ONCE WINDOW
INSTALLATION IS COMPLETE REINSTALL FURNITURE AND ANY ACCESSORIES TO
MATCH PRECONSTRUCTION CONDITIONS.
G. RADIATORS (RAD) WALL MOUNTED OR RECESSED UNDER WINDOWS SHALL BE
COVERED AND PROTECTED DURING CONSTRUCTION.
GENERAL FLOOR PLAN NOTES
BUILDING NUMBER
NOTE: WINDOWS ARE NUMBERED INDIVIDUALLY; NOT BY TYPE.
WINDOW NUMBERING LEGEND
ROOM NUMBER (FOR TYPICAL ROOMS)
BB-225A
ROOM NUMBER (FOR SOME ADJACENT ROOMS)
FLOOR NUMBER IN BUILDING
WINDOW NUMBER SUFFIX WITHIN BUILDING
IT
E
C T
I R
U
S
PIERCE
I
R E
FO
ET
AT
S
M
ALAN
NUMBER
S
H
O
CARD
RE
AR005805I
G
S
T E
BRADFORD
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714 F 210.881.6808 www.hfscompany.com
6 SOUTH OLD ORCHARD
ST. LOUIS, MO 63119
T 314.918.8383 F 314.918.1766 www.rossbar.com th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
BRADFORD ALAN PIERCE
AR005805
5/8/19
/8
/2
:4
:4
P
M
02-AE-111
FLOOR PLAN - BLDG 02 - FLOOR 01
CJM
5 61
BAP
657-25-302JB
BID DOCUMENTS
REPLACE WINDOWS IN BUILDINGS 2, 18,
25, 52 FOR ENERGY EFFICIENCY
5/8/19
1/8" = 1'-0"
OVERALL FLOOR PLAN - BLDG 02 - FLOOR 01
CONFERENCE RM.
OFFICE
212E
OFFICE
212C
OFFICE
212F
OFFICE
212A
VENDING
TOILET, MALE
TOILET, FEMALE
OFFICE
OFFICE
OFFICE
OFFICE
STAIRWELL NO. 1
S201
STORAGE
201A
PLAN
NORTH
TRUE
NORTH
HAC
FEC
FEC
OFFICE
CORRIDOR
H202
ELEVATOR NO. 1
E-02
8 SF
CHASE
CH-2-1
4 SF
CHASE
CH-2-2
DN
RAD
RAD
OFFICE
212D
UP
CHASE
CH-2-3
CHASE
CH-2-4
ROOF BELOW
FE
FAP
FAP
02-AE-211
02-AE-2112
02-AE-211
02-AE-211 4
02-212E 02-212H 02-212D 02-212G 02-212C 02-202A02-202B02-201B02-201C
02-203B
02-212J
02-212K
02-212L
02-203A
02-204A
02-205B
02-212M 02-212N 02-212P 02-212Q 02-212R 02-212A 02-209A 02-209B 02-208A 02-207A 02-207B
02-205A
02-2XXA 02-2YYA
02-212F 02-201A02-201F 02-201E 02-201D
02-210A
RAD
RAD
RADRADRADRADRAD
RADRADRADRAD
RAD
A. INSTALL CONTINUOUS JOINT SEALANT AT ALL INTERIOR WINDOW JOINT
LOCATIONS (TYP.)
B. REPLACEMENT OF BLOCKING SHALL BE REQUIRED IF BLOCKING IS LOOSE OR IN
POOR CONDITION.
C. SEE ABATEMENT NOTES ON SHEET 00-GI-002 AND ABATEMENT "XX-AH-XX"
SHEETS.
D. EXIST WINDOW SILL FLASHING SHALL BE LEFT IN PLACE. CUT VERTICAL LEG OF
SILL FLASHING FOR INSTALLATION OF NEW METAIL SILL.
E. REMOVE EXISTING SURFACE MOUNTED WINDOW BLINDS AT WINDOW OPENINGS.
PATCH AND TOUCH UP SURFACE WITH COLOR TO MATCH ADACENT PAINT
COLOR.
F. CONTRACTOR TO REMOVE FURNITURE AND ANY ACCESSORIES FOR
REINSTALLATION PRIOR TO WINDOW CONSTRUCTION. ONCE WINDOW
INSTALLATION IS COMPLETE REINSTALL FURNITURE AND ANY ACCESSORIES TO
MATCH PRECONSTRUCTION CONDITIONS.
G. RADIATORS (RAD) WALL MOUNTED OR RECESSED UNDER WINDOWS SHALL BE
COVERED AND PROTECTED DURING CONSTRUCTION.
GENERAL FLOOR PLAN NOTES
BUILDING NUMBER
NOTE: WINDOWS ARE NUMBERED INDIVIDUALLY; NOT BY TYPE.
WINDOW NUMBERING LEGEND
ROOM NUMBER (FOR TYPICAL ROOMS)
BB-225A
ROOM NUMBER (FOR SOME ADJACENT ROOMS)
FLOOR NUMBER IN BUILDING
WINDOW NUMBER SUFFIX WITHIN BUILDING
IT
E
C T
I R
U
S
PIERCE
I
R E
FO
ET
AT
S
M
ALAN
NUMBER
S
H
O
CARD
RE
AR005805I
G
S
T E
BRADFORD
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714 F 210.881.6808 www.hfscompany.com
6 SOUTH OLD ORCHARD
ST. LOUIS, MO 63119
T 314.918.8383 F 314.918.1766 www.rossbar.com th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
BRADFORD ALAN PIERCE
AR005805
5/8/19
/8
/2
:4
:4
P
M
02-AE-121
FLOOR PLAN - BLDG 02 - FLOOR 02
CJM
6 61
BAP
657-25-302JB
BID DOCUMENTS
REPLACE WINDOWS IN BUILDINGS 2, 18,
25, 52 FOR ENERGY EFFICIENCY
5/8/19
1/8" = 1'-0"
OVERALL FLOOR PLAN - BLDG 02 - FLOOR 02
OFFICE
TOILET
OFFICE
OFFICE
316A
OFFICE
316B
KITCHENETTE
STAIRWELL NO. 1
S301
STORAGE
301A
OFFICE
302A
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
307A
OFFICE
MECH. RM.
OFFICE
OFFICE
310A
OFFICE
OI&T
317A
MECH. RM.
317C
OI&T
317B
OFFICE
OFFICE
CLOSET
304A
OI&T
311A
CORRIDOR
H302
PLAN
NORTH
TRUE
NORTH
FAP
FAP
FAP
ELEVATOR NO. 1
E-03DN
DN
AP FEC
RAD
AP
DN
CHASE
CH-3-1
02-AE-211
02-AE-2112
02-AE-211
02-AE-211 4
02-315A 02-316D 02-316C 02-316B 02-302C02-302D02-301C
02-302B
02-315B
02-314A
02-313A
02-302A
02-303A
02-304A
02-313B 02-311B 02-311A 02-310A 02-310C 02-310B 02-308B 02-308A 02-307A 02-307B 02-306A
02-304B
02-3XXA 02-3YYA
02-317A 02-301A02-301F 02-301E 02-301D
02-309A
02-301B02-316A
RAD RAD RAD
RAD RAD
RAD RAD
RAD
RADRADRADRADRADRAD RAD
RAD
RAD
A. INSTALL CONTINUOUS JOINT SEALANT AT ALL INTERIOR WINDOW JOINT
LOCATIONS (TYP.)
B. REPLACEMENT OF BLOCKING SHALL BE REQUIRED IF BLOCKING IS LOOSE OR IN
POOR CONDITION.
C. SEE ABATEMENT NOTES ON SHEET 00-GI-002 AND ABATEMENT "XX-AH-XX"
SHEETS.
D. EXIST WINDOW SILL FLASHING SHALL BE LEFT IN PLACE. CUT VERTICAL LEG OF
SILL FLASHING FOR INSTALLATION OF NEW METAIL SILL.
E. REMOVE EXISTING SURFACE MOUNTED WINDOW BLINDS AT WINDOW OPENINGS.
PATCH AND TOUCH UP SURFACE WITH COLOR TO MATCH ADACENT PAINT
COLOR.
F. CONTRACTOR TO REMOVE FURNITURE AND ANY ACCESSORIES FOR
REINSTALLATION PRIOR TO WINDOW CONSTRUCTION. ONCE WINDOW
INSTALLATION IS COMPLETE REINSTALL FURNITURE AND ANY ACCESSORIES TO
MATCH PRECONSTRUCTION CONDITIONS.
G. RADIATORS (RAD) WALL MOUNTED OR RECESSED UNDER WINDOWS SHALL BE
COVERED AND PROTECTED DURING CONSTRUCTION.
GENERAL FLOOR PLAN NOTES
BUILDING NUMBER
NOTE: WINDOWS ARE NUMBERED INDIVIDUALLY; NOT BY TYPE.
WINDOW NUMBERING LEGEND
ROOM NUMBER (FOR TYPICAL ROOMS)
BB-225A
ROOM NUMBER (FOR SOME ADJACENT ROOMS)
FLOOR NUMBER IN BUILDING
WINDOW NUMBER SUFFIX WITHIN BUILDING
IT
E
C T
I R
U
S
PIERCE
I
R E
FO
ET
AT
S
M
ALAN
NUMBER
S
H
O
CARD
RE
AR005805I
G
S
T E
BRADFORD
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714 F 210.881.6808 www.hfscompany.com
6 SOUTH OLD ORCHARD
ST. LOUIS, MO 63119
T 314.918.8383 F 314.918.1766 www.rossbar.com th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
BRADFORD ALAN PIERCE
AR005805
5/8/19
/8
/2
:4
:4
P
M
02-AE-131
FLOOR PLAN - BLDG 02 - FLOOR 03
CJM
7 61
BAP
657-25-302JB
BID DOCUMENTS
REPLACE WINDOWS IN BUILDINGS 2, 18,
25, 52 FOR ENERGY EFFICIENCY
5/8/19
1/8" = 1'-0"
OVERALL FLOOR PLAN - BLDG 02 - FLOOR 03
02-AE-211
02-AE-2112
02-AE-211
02-AE-211 4
02-401B 02-401A02-401D 02-401C
02-401E 02-401G02-401F
OPEN AND EXPOSED STRUCTURE
A. INSTALL CONTINUOUS JOINT SEALANT AT ALL INTERIOR WINDOW JOINT
LOCATIONS (TYP.)
B. REPLACEMENT OF BLOCKING SHALL BE REQUIRED IF BLOCKING IS LOOSE OR IN
POOR CONDITION.
C. SEE ABATEMENT NOTES ON SHEET 00-GI-002 AND ABATEMENT "XX-AH-XX"
SHEETS.
D. EXIST WINDOW SILL FLASHING SHALL BE LEFT IN PLACE. CUT VERTICAL LEG OF
SILL FLASHING FOR INSTALLATION OF NEW METAIL SILL.
E. REMOVE EXISTING SURFACE MOUNTED WINDOW BLINDS AT WINDOW OPENINGS.
PATCH AND TOUCH UP SURFACE WITH COLOR TO MATCH ADACENT PAINT
COLOR.
F. CONTRACTOR TO REMOVE FURNITURE AND ANY ACCESSORIES FOR
REINSTALLATION PRIOR TO WINDOW CONSTRUCTION. ONCE WINDOW
INSTALLATION IS COMPLETE REINSTALL FURNITURE AND ANY ACCESSORIES TO
MATCH PRECONSTRUCTION CONDITIONS.
G. RADIATORS (RAD) WALL MOUNTED OR RECESSED UNDER WINDOWS SHALL BE
COVERED AND PROTECTED DURING CONSTRUCTION.
GENERAL FLOOR PLAN NOTES
BUILDING NUMBER
NOTE: WINDOWS ARE NUMBERED INDIVIDUALLY; NOT BY TYPE.
WINDOW NUMBERING LEGEND
ROOM NUMBER (FOR TYPICAL ROOMS)
BB-225A
ROOM NUMBER (FOR SOME ADJACENT ROOMS)
FLOOR NUMBER IN BUILDING
WINDOW NUMBER SUFFIX WITHIN BUILDING
IT
E
C T
I R
U
S
PIERCE
I
R E
FO
ET
AT
S
M
ALAN
NUMBER
S
H
O
CARD
RE
AR005805I
G
S
T E
BRADFORD
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714 F 210.881.6808 www.hfscompany.com
6 SOUTH OLD ORCHARD
ST. LOUIS, MO 63119
T 314.918.8383 F 314.918.1766 www.rossbar.com th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
BRADFORD ALAN PIERCE
AR005805
5/8/19
/8
/2
:4
:4
P
M
02-AE-141
FLOOR PLAN - BLDG 02 - FLOOR 04
(ATTIC)
CJM
8 61
BAP
657-25-302JB
BID DOCUMENTS
REPLACE WINDOWS IN BUILDINGS 2, 18,
25, 52 FOR ENERGY EFFICIENCY
5/8/19
1/8" = 1'-0"
OVERALL FLOOR PLAN - BUILDING 02 - FLOOR 04 (ATTIC)PLAN
NORTH
FLOOR 00
0' - 0"
FLOOR 01
9' - 0"
FLOOR 02
19' - 6"
FLOOR 03
30' - 0"
FLOOR 04
40' - 0"
FLOOR 01B
6' - 0"
02-007B02-007C 02-007A 02-008B 02-008A 02-002J02-002K02-002L02-002M
02-118A 02-119D 02-119C 02-119B 02-119A 02-105A02-105B02-104A02-104B 02-106B
02-212E 02-212H 02-212D 02-212G 02-212C 02-202A02-202B02-201B02-201C 02-203B
02-315A 02-316D 02-316C 02-316B 02-302C02-302D02-301C 02-302B
02-201F
02-201E
02-301D02-301F
02-301E
02-212F
02-317A
02-201A
02-301A
02-401B 02-401A02-401D 02-401C
02-201D
02-002H
FLOOR 00
0' - 0"
FLOOR 01
9' - 0"
FLOOR 02
19' - 6"
FLOOR 03
30' - 0"
FLOOR 04
40' - 0"
FLOOR 01B
6' - 0"
02-002E02-002F02-002G
02-106A 02-107A 02-108B
02-203A 02-204A 02-205B
02-302A 02-303A 02-304A
02-124B
FLOOR 00
0' - 0"
FLOOR 01
9' - 0"
FLOOR 02
19' - 6"
FLOOR 03
30' - 0"
FLOOR 04
40' - 0"
FLOOR 01B
6' - 0"
02-007G02-007H02-007J02-005C02-005A02-005B02-001A02-003A02-002A02-002B02-002C02-002D
02-116B02-115A02-114A02-114B02-113A02-113B02-111A02-111B02-110B02-110A02-109A02-108A
02-212M02-212N02-212P02-212Q02-212R02-212A02-209A02-209B02-208A02-207A02-207B02-205A
02-313B02-311B02-311A02-310A02-310C02-310B02-308B02-308A02-307A02-307B02-306A02-304B
02-2XXA
02-3XXA
02-2YYA
02-3YYA
02-401E02-401G 02-401F
02-112A
02-210A
02-309A
FLOOR 00
0' - 0"
FLOOR 01
9' - 0"
FLOOR 02
19' - 6"
FLOOR 03
30' - 0"
FLOOR 04
40' - 0"
FLOOR 01B
6' - 0"
02-007F 02-007E 02-007D
02-118B02-117A02-116A
02-212J02-212K02-212L
02-315B02-314A02-313A
02-124A
A. INSTALL NEW JOINT SEALANT AT ALL WINDOW PERIMETER JOINTS (TYP).
B. WINDOW REMOVAL AND INSTALLATION SHALL OCCUR FROM THE INTERIOR SIDE
OF THE WINDOW.
C. SEE ABATEMENT NOTES ON SHEET 00-GI-002 AND ABATEMENT "XX-AH-XX" SHEETS.
D. EXIST WINDOW SILL FLASHING SHALL BE LEFT IN PLACE. CUT VERTICAL LEG OF
SILL FLASHING FOR INSTALLATION OF NEW METAIL SILL.
E. EXISTING EIFS SYSTEM IS INSTALLED OVER ORIGINAL ASBESTOS & LEAD
CONTAINING, STUCCO SYSTEM. AT NO TIME SHALL CONTRACTOR DISTURB,
REMOVE AND DAMAGE EXISTING STUCCO SYSTEM.
GENERAL ELEVATION NOTES
1. EXISTING EXTERIOR METAL FINISH TO REMAIN.
EXTERIOR ELEVATION KEYNOTES#
BUILDING NUMBER
NOTE: WINDOWS ARE NUMBERED INDIVIDUALLY; NOT BY TYPE.
WINDOW NUMBERING LEGEND
ROOM NUMBER (FOR TYPICAL ROOMS)
BB-225A
ROOM NUMBER (FOR SOME ADJACENT ROOMS)
FLOOR NUMBER IN BUILDING
WINDOW NUMBER SUFFIX WITHIN BUILDING
IT
E
C T
I R
U
S
PIERCE
I
R E
FO
ET
AT
S
M
ALAN
NUMBER
S
H
O
CARD
RE
AR005805I
G
S
T E
BRADFORD
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714 F 210.881.6808 www.hfscompany.com
6 SOUTH OLD ORCHARD
ST. LOUIS, MO 63119
T 314.918.8383 F 314.918.1766 www.rossbar.com th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.