36C25518R0540-003.pdf
PDF 8 MB Posted
- Attached to
- Replace Mechanical, Electrical and Plumbing P/N:589A4-17-182 Federal contract opportunity
- Solicitation number
- 36C25518R0540
About this file
36C25518R0540 Drawings-Replace MEP 589A4-17-182- VOL 1.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25518C0212-000.docx | DOCX document | |
| 36C25518R0540-0002000.docx | DOCX document | |
| 36C25518R0540-0001011.pdf | ||
| 36C25518R0540-0001013.pdf | ||
| 36C25518R0540-0001000.docx | DOCX document | |
| 36C25518R0540-0001001.pdf | ||
| 36C25518R0540-0001010.pdf | ||
| 36C25518R0540-0001004.pdf | ||
| 36C25518R0540-0001008.pdf | ||
| 36C25518R0540-0001007.pdf | ||
| 36C25518R0540-0001003.pdf | ||
| 36C25518R0540-0001006.pdf | ||
| 36C25518R0540-0001009.pdf | ||
| 36C25518R0540-0001014.pdf | ||
| 36C25518R0540-0001005.pdf | ||
| 36C25518R0540-0001002.pdf | ||
| 36C25518R0540-0001012.pdf | ||
| 36C25518R0540-0001015.pdf | ||
| 36C25518R0540-002.pdf | ||
| 36C25518R0540-006.pdf | ||
| 36C25518R0540-004.pdf | ||
| 36C25518R0540-005.pdf | ||
| 36C25518R0540-001.docx | DOCX document | |
| 36C25518R0540-000.docx | DOCX document |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GI-00 COVER SHEET
23-A01 DESIGN OPTION 23: CHILLER HOUSE - NEW FENCING
25-A01 DESIGN OPTION 25: ELECTRICAL ROOM A047A - DEMOLITION AND NEW WORK
31-A01 DESIGN OPTION 31: ELECTRICAL ROOM D227-D227A DEMO AND NEW
00-M01 MECHANICAL SYMBOLS & ABBREVIATIONS
00-M02 CHILLED WATER RISER DIAGRAM
01-M01 DESIGN OPTION 01 - DEMO STEAM AND CONDENSATE DEAD LEGS - ZONE 1
01-M02 DESIGN OPTION 01 - DEMO STEAM AND CONDENSATE DEAD LEGS - ZONE 2
01-M03 DESIGN OPTION 01 - DEMO STEAM AND CONDENSATE DEAD LEGS - ZONE 3
01-M04 DESIGN OPTION 01 - DEMO STEAM AND CONDENSATE DEAD LEGS - ZONE 4
01-M05 DESIGN OPTION 01 - DEMO STEAM AND CONDENSATE DEAD LEGS - BOILER ROOM
01-M06 DESIGN OPTION 01 - DEMO STEAM AND CONDENSATE DEAD LEGS - ZONE 1 BASEMENT
01-M07 DESIGN OPTION 01 - DEMO STEAM AND CONDENSATE DEAD LEGS - ZONE 2 BASEMENT
01-M08 DESIGN OPTION 01 - DEMO STEAM AND CONDENSATE DEAD LEGS - ZONE 3 BASEMENT
01-M09 DESIGN OPTION 01 - DEMO STEAM AND CONDENSATE DEAD LEGS - ZONE 4 BASEMENT
02-M01 DESIGN OPTION 02 - REPLACE STEAM CONDENSATE TANK
03-M01 DESIGN OPTION 03 - STEAM GATE VALVE REPLACEMENT
04-M01 NOT USED
05-M01 DESIGN OPTION 05 - ADD PICVs TO AHU CHILLED WATER COILS
06-M01 DESIGN OPTION 06 - UPGRADE CHILLED WATER SYSTEM TEMPERATURE CONTROLS
06-M02 DESIGN OPTION 06 - UPGRADE CHILLED WATER SYSTEM TEMPERATURE CONTROLS
08-M01 DESIGN OPTION 08 - REPLACE CHILLED WATER PLANT AIR SEPARATOR
09-M01 DESIGN OPTION 09 - REPLACE SECONDARY CHILLED WATER PUMPS
10-M01 DESIGN OPTION 10 - DESIGN AND IMPLEMENTATION OF NEW OPERATIONAL STRATEGY
10-M02 DESIGN OPTION 10 - DESIGN AND IMPLEMENTATION OF NEW OPERATIONAL STRATEGY
12-M01 DESIGN OPTION 12 - REPLACE 2ND FLOOR HEAT EXCHANGER PLANS
13-M01 DESIGN OPTION 13 - REPLACE PENTHOUSE HEAT EXCHANGER PLANS
14-M01 DESIGN OPTION 14 - ADD SHUT-OFF VALVES TO HOT WATER RISERS - REHEAT HOT WATER RISER DIAGRAM
14-M02 DESIGN OPTION 14 - ADD SHUT-OFF VALVES TO HOT WATER RISERS - INDUCTION LOOP RISER DIAGRAM
15-M01 DESIGN OPTION 15 - ADD PIPE LABELS TO PIPES - ZONE 1
15-M02 DESIGN OPTION 15 - ADD PIPE LABELS TO PIPES - ZONE 2
15-M03 DESIGN OPTION 15 - ADD PIPE LABELS TO PIPES - ZONE 3
15-M04 DESIGN OPTION 15 - ADD PIPE LABELS TO PIPES - ZONE 4
15-M05 DESIGN OPTION 15 - ADD PIPE LABELS TO PIPES - C221 AND PENTHOUSE
16-M01 DESIGN OPTION 16 - INSTALL CONDENSER WATER SYSTEM FILTER
17-M01 DESIGN OPTION 17 - REPLACE CONDENSER WATER PUMPS
31-M01 DESIGN OPTION 31 - PROVIDE VENTILATION TO ROOM D227
00-E00 ELECTRICAL LEGEND AND ABBREVIATIONS
09-E01 DESIGN OPTION 09: ELECTRICAL CHILLER FLOOR PLANS AND ONE-LINE
16-E01 DESIGN OPTION 16: ELECTRICAL CONDENSER WATER SYSTEM
17-E01 DESIGN OPTION 17: ELECTRICAL REPLACE CONDENSER WATER PUMPS DEMO AND NEW WORK
21-E01 DESIGN OPTION 21: ELECTRICAL CHILLER #4 DISCONNECT ELECTRICAL PLANS AND ONE-LINE
21-E10 DESIGN OPTION 21: ELECTRICAL EQUIPMENT LABELING
22-E01 DESIGN OPTION 22: ELECTRICAL RISER H9 480V NORMAL BRANCH PLANS AND ONE-LINE
22-E02 DESIGN OPTION 22: ELECTRICAL RISER H9 480V NORMAL BRANCH PLANS AND ONE-LINE
22-E03 DESIGN OPTION 22: ELECTRICAL RISER H9 480V NORMAL BRANCH PLANS AND ONE-LINE
22-E11 DESIGN OPTION 22: ELECTRICAL RISER H9 208V NORMAL BRANCH PLANS AND ONE-LINE
22-E12 DESIGN OPTION 22: ELECTRICAL RISER H9 208V NORMAL BRANCH PLANS AND ONE-LINE
22-E13 DESIGN OPTION 22: ELECTRICAL RISER H9 208V NORMAL BRANCH PLANS AND ONE-LINE
22-E21 DESIGN OPTION 22: ELECTRICAL RISER H9 208V LIFE SAFETY BRANCH PLANS AND ONE-LINE
22-E31 DESIGN OPTION 22: FINAL ELECTRICAL RISER H9 AND SCHEDULES
23-E01 DESIGN OPTION 23: CHILLER HOUSE ELECTRICAL PLAN AND ONE-LINE DIAGRAM
23-E02 DESIGN OPTION 23: CHILLER HOUSE ELECTRICAL PLAN AND ONE-LINE DIAGRAM
23-E03 DESIGN OPTION 23: CHILLER HOUSE ELECTRICAL PLAN AND ONE-LINE DIAGRAM
24-E01 DESIGN OPTION 24: RISER C1 NORMAL POWER FLOOR PLANS AND ONE-LINE
24-E02 DESIGN OPTION 24: RISER C1 NORMAL POWER FLOOR PLANS AND ONE-LINE
24-E03 DESIGN OPTION 24: RISER C1 NORMAL POWER FLOOR PLANS AND ONE-LINE
25-E01 DESIGN OPTION 25: ELECTRICAL RISER E4 FLOOR PLANS
25-E02 DESIGN OPTION 25: ELECTRICAL RISER E4 208V CRITICAL BRANCH
25-E03 DESIGN OPTION 25: ELECTRICAL RISER E4 208V CRITICAL BRANCH
25-E04 DESIGN OPTION 25: ELECTRICAL RISER E4 208V CRITICAL BRANCH
25-E05 DESIGN OPTION 25: ELECTRICAL RISER E4 208V CRITICAL BRANCH
25-E06 DESIGN OPTION 25: ELECTRICAL RISER E4 208V CRITICAL BRANCH
25-E07 DESIGN OPTION 25: ELECTRICAL RISER E4 CRITICAL BRANCH
25-E08 DESIGN OPTION 25: ELECTRICAL RISER E4 480V CRITICAL BRANCH
25-E09 DESIGN OPTION 25: ELECTRICAL RISER E4 FINAL LAYOUT
25-E10 DESIGN OPTION 25: ELECTRICAL RISER E4 FINAL ONE-LINE
26-E01 DESIGN OPTION 26: RISER L4-PARTIAL PIPE BASEMENT & BASEMENT FLOOR PLANS
26-E02 DESIGN OPTION 26: RISER L4 - FIRST - THIRD FLOOR PARTIAL FLOOR PLANS
26-E03 DESIGN OPTION 26: RISER L4 -FIFTH FLOOR DEMOLITION AND NEW FLOOR PLANS
26-E11 DESIGN OPTION 26: RISER L4 - ELECTRICAL ONE-LINE 120 VOLT CRITICAL POWER
26-E12 DESIGN OPTION 26: RISER L4 - ELECTRICAL ONE-LINE 120 VOLT CRITICAL POWER
26-E13 DESIGN OPTION 26: RISER L4 - ELECTRICAL ONE-LINE 120 VOLT CRITICAL POWER
26-E14 DESIGN OPTION 26: RISER L4 - ELECTRICAL ONE-LINE 120 VOLT CRITICAL POWER
26-E15 DESIGN OPTION 26: RISER L4 - ELECTRICAL ONE-LINE 120 VOLT CRITICAL POWER
26-E16 DESIGN OPTION 26: RISER L4 - ELECTRICAL ONE-LINE 120 VOLT CRITICAL POWER
26-E21 DESIGN OPTION 26: RISER L4 - ELECTRICAL ONE-LINE BASEMENT - SIXTH FLOOR
26-E22 DESIGN OPTION 26: RISER L4 - ELECTRICAL ONE-LINE BASEMENT - SIXTH FLOOR
26-E23 DESIGN OPTION 26: RISER L4 - ELECTRICAL ONE-LINE BASEMENT - SIXTH FLOOR
26-E24 DESIGN OPTION 26: RISER L4 - ELECTRICAL ONE-LINE BASEMENT - SIXTH FLOOR
26-E25 DESIGN OPTION 26: RISER L4 - ELECTRICAL ONE-LINE BASEMENT - SIXTH FLOOR
26-E26 DESIGN OPTION 26: RISER L4 - ELECTRICAL ONE-LINE BASEMENT - SIXTH FLOOR
26-E27 DESIGN OPTION 26: RISER L4 - ELECTRICAL ONE-LINE PIPE BASEMENT - SECOND FLOOR
26-E28 DESIGN OPTION 26: RISER L4 - ELECTRICAL ONE-LINE PIPE BASEMENT - SECOND FLOOR
26-E29 DESIGN OPTION 26: RISER L4 - ELECTRICAL ONE-LINE PIPE BASEMENT - SECOND FLOOR
26-E30 DESIGN OPTION 26: RISER L4 - FINAL ELECTRICAL ONE-LINE
26-E31 DESIGN OPTION 26: ELECTRICAL PANEL SCHEDULES
27-E01 DESIGN OPTION 27: ELECTRICAL RISER S9 DEMOLITION FLOOR PLANS AND ONE-LINE
27-E11 DESIGN OPTION 27: ELECTRICAL RISER S9 DEMOLITION FLOOR PLANS AND ONE-LINE
27-E12 DESIGN OPTION 27: ELECTRICAL RISER S9 DEMOLITION FLOOR PLANS AND ONE-LINE
27-E21 DESIGN OPTION 27: ELECTRICAL RISER S9 DEMOLITION FLOOR PLANS AND ONE-LINE
27-E22 DESIGN OPTION 27: ELECTRICAL RISER S9 DEMOLITION FLOOR PLANS AND ONE-LINE
27-E31 DESIGN OPTION 27: ELECTRICAL RISER S9 DEMOLITION FLOOR PLANS AND ONE-LINE
27-E32 DESIGN OPTION 27: ELECTRICAL RISER S9 DEMOLITION FLOOR PLANS AND ONE-LINE
27-E41 DESIGN OPTION 27: ELECTRICAL RISER S9 DEMOLITION FLOOR PLANS AND ONE-LINE
28-E01 DESIGN OPTION 28: W-01 ELECTRICAL ONE-LINE AND FLOOR PLAN
29-E01 DESIGN OPTION 29: ELECTRICAL RISER J9 FLOOR PLANS
29-E02 DESIGN OPTION 29: ELECTRICAL RISER J9 FINAL FLOOR PLANS
29-E11 DESIGN OPTION 29: RISER J9 CRITICAL BRANCH ONE-LINE
29-E12 DESIGN OPTION 29: RISER J9 CRITICAL BRANCH ONE-LINE
29-E13 DESIGN OPTION 29: RISER J9 CRITICAL BRANCH ONE-LINE
29-E14 DESIGN OPTION 29: RISER J9 CRITICAL BRANCH ONE-LINE
29-E21 DESIGN OPTION 29: RISER J9 NORMAL BRANCH ONE-LINE
29-E22 DESIGN OPTION 29: RISER J9 NORMAL BRANCH ONE-LINE
29-E23 DESIGN OPTION 29: RISER J9 NORMAL BRANCH ONE-LINE
29-E24 DESIGN OPTION 29: RISER J9 NORMAL BRANCH ONE-LINE
29-E31 DESIGN OPTION 29: RISER J9 LIFE SAFETY BRANCH ONE-LINE
29-E32 DESIGN OPTION 29: RISER J9 LIFE SAFETY BRANCH ONE-LINE
29-E33 DESIGN OPTION 29: RISER J9 LIFE SAFETY BRANCH ONE-LINE
29-E40 DESIGN OPTION 29: FINAL RISER J9 ONE-LINE
30-E01 DESIGN OPTION 30: RISER G10 ELECTRICAL ONE-LINE AND FLOOR PLAN
31-E01 DESIGN OPTION 31: ELECTRICAL RISER C6 FLOOR PLANS
31-E11 DESIGN OPTION 31: RISER C6 LIFE SAFETY ONE-LINES
31-E21 DESIGN OPTION 31: RISER C6 208V NORMAL POWER ONE-LINE
31-E22 DESIGN OPTION 31: RISER C6 208V NORMAL POWER ONE-LINE
31-E31 DESIGN OPTION 31: RISER C6 480V NORMAL POWER ONE-LINE
31-E40 DESIGN OPTION 31: FINAL PARTIAL RISER C6 ONE-LINE AND PANELBOARD SCHEDULES
32-E10 DESIGN OPTION 32: RISER D6.3 208V EQUIPMENT BRANCH FLOOR PLANS AND ONE-LINE
32-E11 DESIGN OPTION 32: RISER D6.3 208V EQUIPMENT BRANCH FLOOR PLANS AND ONE-LINE
32-E12 DESIGN OPTION 32: RISER D6.3 208V EQUIPMENT BRANCH FLOOR PLANS AND ONE-LINE
32-E20 DESIGN OPTION 32: RISER D6.3 480V EQUIPMENT BRANCH FLOOR PLANS AND ONE-LINE
32-E30 DESIGN OPTION 32: RISER D6.3 480V CRITICAL BRANCH FLOOR PLANS AND ONE-LINE
32-E40 DESIGN OPTION 32: RISER D6.3 208V CRITICAL BRANCH FLOOR PLANS AND ONE-LINE
32-E50 DESIGN OPTION 32: RISER D6.3 NORMAL BRANCH FLOOR PLANS AND ONE-LINE
32-E60 DESIGN OPTION 32: RISER D6.3 DEMOLITION FLOOR PLANS AND ONE-LINE
33-E01 DESIGN OPTION 33: RISER D2 NORMAL POWER FLOOR PLANS AND ONE-LINE
33-E02 DESIGN OPTION 33: RISER D2 NORMAL POWER FLOOR PLANS AND ONE-LINE
33-E11 DESIGN OPTION 33: RISER D2 480V CRITICAL POWER FLOOR PLANS AND ONE-LINE
33-E12 DESIGN OPTION 33: RISER D2 480V CRITICAL POWER FLOOR PLANS AND ONE-LINE
33-E21 DESIGN OPTION 33: RISER D2 208V CRITICAL POWER FLOOR PLANS AND ONE-LINE
33-E22 DESIGN OPTION 33: RISER D2 208V CRITICAL POWER FLOOR PLANS AND ONE-LINE
33-E31 DESIGN OPTION 33: RISER D2 FLOOR PLANS AND ONE-LINE
34-E01 DESIGN OPTION 34: RISER D10 FLOOR PLANS AND ONE-LINE
35-E01 DESIGN OPTION 35: LPPB-R9-120VN FLOOR PLANS
35-E02 DESIGN OPTION 35: LPPB-R9-120VN ONE-LINE AND PANELBOARD SCHEDULES
R D
F O R U M
NIFONG
S
IN
C L A
IR
S T
.KK
BLVD.
B E T H E L
P R O V
ID
E N C E
S T
AC
W.
M A N O R
S T A D
IU
M
GRANT
CHAPEL
RD.
S C O T T
TT
GILLESPIE BR.
B L V D
L A N E
B L V D
HI
LL
R D
C O L L E G E
P A R K
D R
ZZ
C L
IN
K S C A L E S
WEST BROADWAY
D R
B L V D
E
PPMEXICO
O A K L A N D
G R E A S Y
S P R
IN
G S
R D
ST. C
HARL
ES
CLARK
C O L L E G E
A V E
W
IL
L I A
MRD.
R O C K
A S H L A N D
PROJECT
SITE
RD.
GREEN
MEADOWS
STADIUM
W E S T
R D
ROLLINS
Q U A R R Y
SHEPARD
BLV
D.
BLVD.
WW
VANDIVER
DR.
EAST
S
EX
TO
N
G A R T H
B L V D
STEWART
WORLEY ST.
RD.
S T
A V E
BUS.
LOOP
BROADWAY
K E E N E
S
B
RD
B A L L E N G E R
L N
LANE
S T A
R D
H
IN
K S O
C
GR
AV
EL
SMILEY LANE
BLUE
RID
GE
P A
IS
D
R D
G R A V E L
RD.
B R O W N
R O G E R S
R D
W Y A
L
RD.
RD.
LOCATION MAP
PLAN
NORTH
S
O U
T H
O L
D O
R C
H A
R D
S T
L O
U
IS
M
O
T
.9
.8
F
.9
.1 w w w .r o s s b a r.
c o m
D ra w in g T it le
P ro je c t
T it le
B u il d in g
N u m b e r:
D ra w in g N u m b e r:
D ep a r tm en t o f
V et er a n s A ff a ir s
D w g o f:
D ra w n
C h e c k e d
D a te
P ro je c t
N o
R
B P ro je c t
N o
-0
B
O T
T S
L A
N E
S
A N
A N
T O
N
IO
T
X
T
.8
.9
F
.8
.6
IN
F
O
H F
S C
O M
P A
N Y
.C O
M H
F S
C O
M P
A N
Y .C
O M
/1
/2
:0 :5
P
M
GI
-0
C
O V
E R
S H
E E
T H
A R
R Y
S . T
R U
M A
N V
A M
C R
E P
LA
C
E M
E C
H A
N
IC
A L, E
LE
C
TR
IC
A
L, A
N D
P
LU
M B
IN
G
H
O S
P
IT
A L D
R
IV
E C
O L U
M B
IA
M
O
A
-1
-1
/1
/2
D B
C
J D
W
P R
O J E
C T
S T
A T
U S
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
VETERANS HEALTH ADMINISTRATION
HARRY S. TRUMAN
MEMORIAL VETERANS' HOSPITAL
COLUMBIA, MISSOURI
REPLACE MECHANICAL,
ELECTRICAL AND PLUMBING
PROJECT NO. 589A4-17-182
BID ITEM 1: BASE BID INCLUDED ALL DRAWINGS AND SPECIFICATIONS
BID ITEM 2: BASE BID DEDUCT OF DESIGN OPTIONS 01, 02 AND 03
BID ITEM 3: BASE BID DEDUCT OF DESIGN OPTIONS 32, 33 AND 34
DOCUMENT SIGN-OFF
SIGNATURE BLOCK
MEDICAL CENTER DIRECTOR
ASSOCIATE MEDICAL CENTER DIRECTOR
ASSOCIATE DIRECTOR OF PATIENT
SERVICES
ASSISTANT DIRECTOR
SPECIALTY CARE CHIEF
CHIEF ENGINEER
INFECTION CONTROL PRACTICIONER
SAFETY OFFICER
R E
V
IS
IO
N
S
N O
D E
S C
R
IP
T
IO
N D
A
AHU 1
KEYED NOTE
SECTION NUMBER
SHEET WHERE LOCATED
INTERFACE, EXISTING TO NEW
UNIT NUMBER
EQUIPMENT DESIGNATION
M101
SIM
ELBOW DOWN
ELBOW UP
TEE DOWN
TEE UP
CAP
FLANGE
DEMO TO BE REMOVED
CONCENTRIC
REDUCER/INCREASER
ECCENTRIC
REDUCER/INCREASER
MEDIUM DETAIL FINE DETAIL
GENERAL NOTES:
GENERAL ABBREVIATIONS GENERAL ABBREVIATIONS, CONTINUED
GENERAL SYMBOLS
PLAN NUMBER
SHEET WHERE LOCATED
M101
AHU-1 EXISTING EQUIPMENT DESIGNATION
GENERAL ABBREVIATIONS, CONTINUED GENERAL ABBREVIATIONS, CONTINUED
BUILDING NUMBER
1-
QUICK-COUPLE HOSE CONNECTOR
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
PRESSURE GAGE
THERMOMETER
VENTURI FLOW METER
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
PIPING ACCESSORIES SEE DETAIL
INVERTED BUCKET TRAP SET INCLUDING
PIPE UP
PIPE DOWN
REFRIGERANT SIGHT GLASS
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
AV
MANUAL AIR VENTMV
THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
GENERAL PIPING SYMBOLS
HOT WATER HEATING SUPPLY
CONDENSATE PUMP DISCHARGE
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 50 PSIG)
VENT LINE
SOLAR WATER RETURN
SOLAR WATER SUPPLY
GLYCOL-WATER HEATING RETURN
GLYCOL-WATER HEATING SUPPLY
REFRIGERANT SUCTION
REFRIGERANT HOT GAS
REFRIGERANT LIQUID
CHILLED WATER SUPPLY
CHILLED WATER RETURN
DRAIN LINE
MAKE-UP WATER
CONDENSER WATER RETURN (TO TOWER)
CHILLED GLYCOL-WATER RETURN
CHILLED GLYCOL-WATER SUPPLY
CONDENSER WATER SUPPLY (FROM TOWER)
HOT WATER HEATING RETURN
S-50
CR-50
S-15
CR-15
PC
HWS
HWR
GHS
GHR
V
SWS
SWR
CWR
CHR
GCR
RL
RS
RHG
CWS
CHS
GCS
MW
D
GLYCOL-WATER RUN AROUND SUPPLY
GLYCOL-WATER RUN AROUND RETURNGRR
GRS
EXISTING PIPE TO BE REMOVED
PIPING SYMBOLS
FEEDWATER SAMPLE (FROM DEAERATOR)
CHEMICAL FEED
BOILER BLOWOFF
OVERFLOW
COLD WATER (CITY WATER)
HOT WATER
CONDENSATE TRANSFER PUMP SUCTION
CONDENSATE TRANSFER PUMP DISCHARGE
FEEDWATER PUMP DISCHARGE
FEEDWATER PUMP SUCTION
CTPS
CTPD
FWPS
FWPD
CF
FWS
BO
OFL
HW
CW
HEATING COOLING SUPPLY
HEATING COOLING RETURNHCR
HCS
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WATER LEVEL CONTROLLER
FLOW METER
LC
M
BALL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC BALANCING CONTROL VALVE
PRESSURE SAFETY VALVE
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
FLEXIBLE CONNECTION
WATER BALANCE DEVICE
MODULATING CONTROL BUTTERFLY VALVE
CIRCUIT SETTER VALVE
WYE STRAINER WITH VALVED DRAIN AND
QUICK-COUPLE HOSE CONNECTOR
VALVE SYMBOLS
VACUUM BREAKER
IN-LINE PUMP
S
O U
T H
O L
D O
R C
H A
R D
S T
L O
U
IS
M
O
T
.9
.8
F
.9
.1 w w w .r o s s b a r.
c o m
D ra w in g T it le
P ro je c t
T it le
B u il d in g
N u m b e r:
D ra w in g N u m b e r:
D ep a r tm en t o f
V et er a n s A ff a ir s
D w g o f:
D ra w n
C h e c k e d
D a te
P ro je c t
N o
R
B P ro je c t
N o
-0
B
O T
T S
L A
N E
S
A N
A N
T O
N
IO
T
X
T
.8
.9
F
.8
.6
IN
F
O
H F
S C
O M
P A
N Y
.C O
M H
F S
C O
M P
A N
Y .C
O M
/1
/2
:1
:4
A
M
-M
M
E C
H A
N
IC
A L
S Y
M B
O
LS
A
B B
R E
V
IA
T
IO
N S
H A
R R
Y S
. T R
U M
A N
V A
M C
R E
P
LA
C E
M E
C H
A N
IC
A
L, E
LE
C
TR
IC
A L, A N
D P
LU
M
B
IN
G
H
O S
P
IT
A L D
R
IV
E C
O L U
M B
IA
M
O
A
-1
-1
/1
/2
T R
T
J D
W
P R
O J E
C T
S T
A T
U S
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
RLA RUNNING LOAD AMPS
RM ROOM
RND ROUND
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAN SANITARY
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCI SPINAL CODE INJURY
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD SMOKE DAMPER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEC'N SECTION
SEER SEASONAL ENERGY EFFICIENCY RATIO
SENS SENSIBLE
SF SQUARE FOOT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH SENSIBLE HEAT
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SHT SHEET
SI SQUARE INCHES
SND SOUND
SOL SOLENOID
SP STATIC PRESSURE
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD STATIC PRESSURE DIFFERENTIAL
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SPT STATIC PRESSURE TRANSMITTER
SQ SQUARE
SR SUPPLY AIR REGISTER
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
SST STAINLESS STEEL
ST STEAM TRAP
STL STEEL
STM STEAM
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
SW SOFTWATER
SWHX STEAM TO WATER HEAT EXCHANGER
T&P TEMPERATURE AND PRESSURE
TAB TESTING, ADJUSTING, BALANCE
TC TEMPERATURE CONTROL
TD THERMODYNAMIC OR TEMPERATURE DIFFERENTIAL (PER CONTEXT)
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TEMP TEMPERATURE
TG TRANSFER GRILLE
TOT TOTAL
TP TRAP
TPD TOTAL PRESSURE DROP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
TYP TYPICAL
U UNDERWRITERS LABORATORY
UC UNDERCUT DOOR
UC UNIT COOLER
UG UNDERGROUND
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
URV UPBLAST UNIT VENTILATOR
V VOLTS
V VALVE
VAC VACUUM
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL)
VEL VELOCITY
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VOL VOLUME
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VTR VENT THRU ROOF
VUH VERTICAL UNIT HEATER
W WATT OR WIDTH (PER CONTEXT)
W/ WITH
W/O WITHOUT
WAG WAST ANETHESIA GAS
WB WET BULB
WC WATER COLUMN
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAUGE
WPD WATER SIDE PRESSURE DROP
WT WEIGHT
YR YEAR
LAT LEAVING AIR TEMPERATURE
LB(S) POUNDS
LBS/HR POUNDS PER HOUR
LF LINEAR FEET
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPG LIQUEFIED PETROLEUM GAS
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LRA LOCKED ROTOR AMPS
LS LIGHT SPACE
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVL LEVEL
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METERS PER SECOND (OR METERS/SECOND)
MA MIXED AIR
MAN MANUAL
MANU MANUFACTURER
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MAX MAXIMUM
MB MIXING BOX
MBH THOUSAND BRITISH THERMAL UNITS PER HOUR
MCA MINIMUM CIRCUIT AMPS
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE (ASHRAE 52.2)
MFR MANUFACTURER
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM OR MINUTE (PER CONTEXT)
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING
MTD MOUNTED
MTD MEAN TEMPERATURE DIFFERENCE
MTL METAL
MV MANUAL VENT
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
NA NOT APPLICABLE
NC NORMALLY CLOSED OR NOISE CRITERIA (PER CONTEXT)
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
NIC NOT IN CONTRACT
Nm NEWTON METER
NO NORMALLY OPEN OR NUMBER (PER CONTEXT)
NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD REQUIRED
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAG OUTDOOR AIR GRILLE
OAI OUTDOOR AIR INTAKE
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
OT OIL TRAP
P PUMP
PA PIPE ANCHOR
Pa PASCAL
PBD PARALLEL BLADE DAMPER
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PENT PENTHOUSE
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PH PHASE
PHC PREHEAT COIL
PLBG PLUMBING
PNEU PNEUMATIC
PPM PARTS PER MILLION
PRESS PRESSURE
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
QTY QUANTITY
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD RADIATED
RAD RETURN AIR DAMPER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD ROOF DRAIN
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
REA RELIEF AIR
REFR REFRIGERANT
RELAD RELIEF AIR DAMPER
REQ REQUIRED
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
ENT ENTERING
EQ EQUAL
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
EUH ELECTRIC UNIT HEATER
EWB ENTERING AIR WET BULB TEMPERATURE
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXIST, EX EXISTING
EXT EXTERNAL
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FDC FIRE DEPARTMENT CONNECTION
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT EXCHANGER
FIN FINISHED
FLR FLOOR
FM FLOW METER
FOHX FUEL OIL HEAT EXCHANGER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FPF FINS PER FOOT
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-HD HEAD IN FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GC GENERAL CONTRACTOR
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HEIGHT
H HUMIDIFIER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HEV HOSE END VALVE
HOA HAND/OFF/AUTOMATIC
HORIZ HORIZONTAL
HP HORSEPOWER
HP HEAT PUMP
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HR HOUR
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTG HEATING DUCT (HOT DECK)
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVAC HEATING, VENTILATING & AIR CONDITIONING
HVD HOISTWAY VENT DAMPER
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IE INVERT ELEVATION
IFB INTEGRAL FACE AND BYPASS
IN INCH/INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
INDIC INDICATOR
IPLV INTEGRATED PART-LOAD VALUE
IRH INFRARED HEATER
IS INSECT SCREEN
ISP INTERNAL STATIC PRESSURE
IU INDUCTION UNIT
IV INLET VANES
JS JOIST SPACE
KG KILOGRAMS
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATTS
KWH KILOWATT HOUR
L LENGTH
L LITER
L/h LITERS PER HOUR (OR LITERS/HOUR)
L/m LITERS PER MINUTE (OR LITERS/MINUTE)
L/s LITERS PER SECOND (OR LITERS/SECOND)
A/E ARCHITECT / ENGINEER
AAV AUTOMATIC AIR VENT
ACCH AIR COOLED CHILLER
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AHU AIR-HANDLING UNIT
AI ANALOG SIGNAL INPUT
AMB AMBIENT
AMP AMPERE
AO ANALOG SIGNAL OUTPUT
AP ACCESS PANEL
APD AIR PRESSURE DROP
APLV APPLICATION PART LOAD VALUE
APPROX APPROXIMATE
AQST AQUASTAT
ARCH ARCHITECTURE/ARCHITECT
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
AUX AUXILIARY
AVG AVERAGE
B BOILER
BD BUTTERFLY DAMPER
BDD BACK DRAFT DAMPER
BFC BELOW FINISHED CEILING
BFP BACKFLOW PREVENTER
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BI BINARY SIGNAL INPUT
BMS BUILDING MANAGEMENT SYSTEM
BO BINARY SIGNAL OUTPUT
BOB BOTTOM OF BEAM
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BT BLOWOFF TANK
BTC BLOWOFF TANK CONTROL VALVE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNITS PER HOUR
C CENTIGRADE (CELSIUS)
CAP CAPACITY
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CFT CUBIC FEET
CH CHILLER
CHP CHILLED WATER PUMP
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CHW CHILLED WATER
CI CAST IRON
CLG COOLING
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO CARBON MONOXIDE
CONC CONCRETE
COND CONDENSATE
CONN CONNECTION
COP COEFFICIENT OF PERFORMANCE
CORR CORRIDOR
CP CONDENSATE PUMP
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONTROL VALVE / CONSTANT VOLUME (PER CONTEXT)
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO COOLING TOWER)
CWS CONDENSER WATER SUPPLY (FROM COOLING TOWER)
D DEPTH
DB DRY BULB TEMPERATURE
DBA DECIBELS
DCW DOMESTIC COLD WATER
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DEFL DEFLECTION
DEG DEGREES
DEG F DEGREES FAHRENHEIT
DES DESIGN
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DIM DIMENSION
DISCH DISCHARGE
DIV DIVISION
DIW DEIONIZED WATER
DN DOWN
DP DEW POINT TEMPERATURE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DPT DIFFERENTIAL PRESSURE TRANSMITTER
DT DELTA T
DTL DETAIL
DWG(S) DRAWING(S)
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR OR EACH (PER CONTEXT)
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENT RATIO
EF EXHAUST FAN
EFF EFFICIENCY
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
ELEC ELECTRIC
ELEV ELEVATION
EMD END OF MAIN DRIP (STEAM)
10. ALL WORK SHALL BE INSTALLED PER THE REFERENCE DETAILS, REGARDLESS OF WHETHER OR NOT THE DETAILS ARE CALLED OUT ON THE PLANS. DETAILS ARE SHOWN EACH DESIGN OPTION AS REQUIRED.
11. PROVIDE VENTS AT ALL HYDRONIC PIPING HIGH POINTS, AND DRAINS AT ALL PIPING LOW POINTS, REGARDLESS OF WHETHER SHOWN OR NOT.
12. ALL DUCTWORK SHALL COMPLY WITH "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE," 3RD EDITION, SMACNA 2005, EXCEPT WHERE MORE RESTRICTIVE REQUIREMENTS ARE SPECIFIED. ANY PLAN REFERENCES TO "SMACNA FIGURE ---" REFERS TO THIS STANDARD. SEE SPECIFICATIONS FOR SCHEDULE OF
DUCT PRESSURE CLASS AND SEAL CLASS.
13. IT IS THE INTENT OF THESE DRAWINGS THAT A MANUAL BALANCING DAMPER BE PROVIDED AT EVERY INDIVIDUAL DUCTED CONNECTION TO AN AIR DEVICE, UNLESS A BALANCING DAMPER IS SCHEDULED TO BE FURNISHED WITH AIR DEVICE. VAV BOXES WITH SINGLE DIFFUSERS ARE NOT REQUIRED TO HAVE A
BALANCING DAMPER.
14. ALL NEW DUCTWORK SIZES SHOWN ON PLANS ARE CLEAR INSIDE DIMENSIONS. CONTRACTOR SHALL ADJUST
SHEET METAL SIZES AS NECESSARY TO ACCOMMODATE INTERNAL DUCT LINER, IF SPECIFIED.
15. ALL EXISTING TEMPERATURE CONTROLS THAT ARE BEING DEMOLISHED OR DISABLED AS WORK OF THIS
CONTRACT SHALL BE COMPLETELY REMOVED FROM BUILDING.
16. THE CONTRACTOR SHALL CONNECT THE NEW HVAC SYSTEM TO THE OWNER'S EXISTING BUILDING CONTROL
SYSTEM. REFER TO THE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
17. CONTRACTOR SHALL HAVE THE DOCUMENTS REVIEWED COMPLETELY BY A CERTIFIED BALANCING CONTRACTOR FOR THE INCLUSION OF THE NECESSARY ADDITIONAL AIR AND HYDRONIC SYSTEM BALANCING DEVICES NOT SHOWN IN THESE DOCUMENTS FOR COMPLETE HVAC SYSTEM BALANCING. REFER TO
SPECIFICATION SECTION 230593 FOR CONSTRUCTION DOCUMENT EXAMINATION REPORT.
18. FIRESTOP ALL NEW PENETRATIONS OF FLOORS AND/OR FIRE-RATED WALLS. SEE SPECIFICATION SECTION
078400 - FIRESTOPPING FOR MORE INFORMATION.
1. THESE PLANS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR SHALL BE PREPARED TO MAKE SOME ALTERATIONS TO THE EXACT LOCATION OF DUCTWORK, PIPING AND EQUIPMENT FROM THE LOCATION
INDICATED ON THESE DRAWINGS TO FIT ACTUAL JOB CONDITIONS.
2. ALL ELBOWS, FITTINGS, ETC., IN PIPING AND DUCTWORK REQUIRED TO CLEAR ALL JOB OBSTRUCTIONS ARE NOT NECESSARILY INDICATED. ALL NECESSARY TRANSITIONS, FITTINGS AND OFFSETS ARE REQUIRED
WHETHER SHOWN OR NOT.
3. BECAUSE OF THE LIMITED SPACE AVAILABLE TO INSTALL ALL OF THE MECHANICAL WORK, COORDINATION BETWEEN THE VARIOUS TRADES IS OF THE UTMOST IMPORTANCE. SEE SPECIFICATION 230100 FOR REQUIRED
COORDINATION DRAWINGS.
4. THE CONTRACTOR SHALL COORDINATE STAGING AND SCHEDULING WITH THE OWNER'S REPRESENTATIVE.
5. EXISTING CONDITIONS ARE BASED ON INFORMATION OBTAINED FROM PREVIOUS CONSTRUCTION DOCUMENTS AND INFORMAL FIELD OBSERVATION AND SHALL NOT BE CONSTITUTED AS "AS BUILT." THE CONTRACTOR SHALL FIELD-VERIFY EXISTING CONDITIONS BEFORE THE ONSET OF CONSTRUCTION.
6. DEMOLISH ALL PIPING, DUCTWORK EQUIPMENT, ETC., SHOWN TO BE REMOVED, IN ITS ENTIRETY, INCLUDING
ALL HANGERS AND SUPPORTS.
7. WHERE CONTRACTOR IS REQUIRED TO CONCEAL NEW WORK, REMOVE OR MODIFY EXISTING CONSTRUCTION OR EQUIPMENT, OR ATTACH TO EXISTING CONSTRUCTION, THE CONTRACTOR SHALL REPAIR OR REPLACE EXISTING CONSTRUCTION AND MATERIALS TO MATCH CONDITIONS AT THE ONSET OF CONSTRUCTION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REMOVE AND REPLACE EXISTING CEILINGS AND WALLS REQUIRED
FOR INSTALLATION OF MECHANICAL SYSTEMS.
8. THE OWNER SHALL MAINTAIN ALL SALVAGE RIGHTS OF EQUIPMENT AND MATERIALS REMOVED. ALL EQUIPMENT AND MATERIALS NOT CLAIMED BY THE OWNER SHALL BE REMOVED FROM THE PREMISES BY THIS
CONTRACTOR.
9. CONTRACTOR SHALL PROVIDE SEISMIC BRACING AND MOUNTING OF EQUIPMENT AND MATERIALS IN COMPLIANCE WITH ALL LOCAL CODE REQUIREMENTS AND THE REQUIREMENTS OF SPECIFICATION SECTION
SEISMIC PROTECTION.
R E
V
IS
IO
N
S
N O
D E
S C
R
IP
T
IO
N D
A
SUBBASEMENT
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR
FIFTH FLOOR
SIXTH FLOOR
PENTHOUSE
PENTHOUSE ROOF
10" CHS/R
4" CHS/R
3" CHS/R
AHU-25
[Laundry]
CAP:450
DESIGN GPM: 90
REVISED GPM: 64
3" CHS/R
10" CHS/R
10" CHS/R
10" CHS/R
6" CHS/R
2 1/2" CHS/R
8" CHS/R
8" CHS/R
4" CHS/R
8" CHS/R5" CHS/R
3" CHS/R
AC-S10
[New Cardiology]
CAP: 929
DESIGN GPM:132
REVISED GPM: 133
3" CHS/R
5" CHS/R
CH-3
CAP: 12000
GPM: 1714
AHU-3
[ACA]
CAP: 1227
DESIGN GPM: 175
REVISED GPM: 175
8" CHS/R
2 1/2" CHS/R
4" CHS/R
AHU-6
[ACA]
CAP: 1805
DESIGN GPM: 360
REVISED GPM: 258
8" CHS/R
10" CHS/R
10" CHS/R
10" CHS/R
8" CHS/R
4" CHS/R
6" CHS/R
1-CRAC1
[ROOM C308]
CAP: 87.4
GPM: 22.7
2 1/2" CHS/R
1 1/2" CHS/R
1 1/2" CHS/R
6" CHS/R
6" CHS/R
3" CHS/R
FUTURE AHU-X
CAP:
GPM:
3" CHS/R
2 1/2" CHS/R
5" CHS/R
6" CHS/R
PAC-X
CAP: 21
GPM:3 (est)
1" CHS/R
3" CHS/R
PIPE BASEMENT (MAIN) MECHANICAL ROOM
ACA
MECHANICAL
ROOM
4-PIPE UNITS
[2ND FLOOR]
CAP: 42
GPM: 6 (est)
(PATIENT PRIVACY SURGERY)
1" CHS/R
4" CHS/R
FCU 1-3
[6th Floor Suites]
CAP: 25
GPM: 5.4
CHILLER HOUSE
2ND FLOOR
MECHANICAL ROOM
PENTHOUSE
MECHANICAL ROOM
UTILITY CHASE
"H9" CHASE (BY CL H & 9)
"K8" CHASE (BY CL K & 8)
FCU 1-4
[OT/PT/Rehab]
CAP: 80
GPM: 13.9
4" CHS/R
TO INDUCTION LOOP (HYDRAULICALLY SEPARATED)
(NEW MRI SUITE 2011)
AHU-27
[New ICU]
CAP: 968
GPM: 79
(INTENSIVE CARE UNIT 2015)
INTERSTITIAL SPACE
AHU-24
[Canteen & Kitchen]
CAP: 787
DESIGN GPM: 130
REVISED GPM: 112
(RENOVATE 2-EAST REHAB MEDICINE 2012)
ACA-AHU-7
[Dental Clinic]
CAP: 367
GPM: 53
FCU 1-4
[Dental Clinic]
CAP: 118
GPM: 17.2
(NUCLEAR
MEDICINE
2016)
4" CHS/R
2 1/2" CHS/R
5" CHS/R
3" CHS/R
5" CHS/R
ABZ CDEFGHIJKLMNaPQRSTUVWXY
AC-S6
[Theater / IRM]
CAP: 208
GPM: 39.4
PCP 1-5CHP 1-7
ABZ CDEFGHIJKLMNaPQRSTUVWXY
10" CHR
8" CHR 8" CHR
10" CHR
(TYP FOR SIZES ABOVE)
5" CHS/R
12" CWS
12" CWS
5" CHS/R
5" CHS/R5" CWS
(TYP FOR SIZES ABOVE)
18" CHR
18" CHS/R
CH-7
CAP: 14400
GPM: 2058
CH-1
CAP: 6000
GPM: 858
CH-2
CAP: 12000
GPM: 1714
CHP-1-CHP-6
HEAD: 40'
GPM: 858
CHP-7
HEAD: 40'
GPM: 2058
PCP-1-PCP-3
HEAD: 95'
GPM: 2550
PCP-4-PCP-5
HEAD: 85'
GPM: 429
AHU-2
[Chiller House]
CAP: 369
GPM: 54.6
AHU-1
[Chiller House]
CAP: 369
GPM: 54.6
3" CHS/R
AC-S25
[Magnetic Imaging]
CAP: 252
GPM: 36
AHU-2
[ACA]
CAP: 1227
GPM: 175
AHU-1
[ACA]
CAP: 1227
DESIGN GPM: 175
REVISED GPM: 175
AHU-4
[ACA]
CAP: 272
GPM: 38.9
AC-17B
[SPD-ECC]
CAP: 88
GPM: 21.9
AC-17C
[SPD-ECC]
CAP: 59
GPM: 11.9
AC-17A
[SPD-ECC]
CAP: 183
GPM: 36.5
AC-S7/8
[Mental Health]
CAP: 490
DESIGN GPM: 95
REVISED GPM: 70
AC-S15
[Morgue/Nuc Med]
CAP: 533
DESIGN GPM: 110
REVISED GPM: 76
AHU-28
[Nuc. Medicine]
CAP: 249
GPM: 35.2
AC-S12
[Imaging]
CAP: 840
DESIGN GPM: 120
REVISED GPM: 120
AC-S11
[Cardio, Dental, Police]
CAP: 750
DESIGN GPM:100
REVISED GPM: 107
AC-S14
[Pathology]
CAP: 2152
DESIGN GPM: 440
REVISED GPM: 307
AC-S16
[East Research]
CAP: 1283
DESIGN GPM: 171
REVISED GPM: 183
AC-S19
[Dietary Kitchen]
CAP: 1988
DESIGN GPM: 284
REVISED GPM: 284
AC-S18
[West Research]
CAP: 2282
DESIGN GPM: 326
REVISED GPM: 326
AC-S13
[Audiology]
CAP: 490
DESIGN GPM: 98
REVISED GPM: 70
AHU-29
[Patient Privacy]
CAP: 1753
DESIGN GPM: 420
REVISED GPM: 250
AHU-T
[Construction Transitions]
CAP: 2308
GPM: 325
AC-S1
[Building Perimeter]
CAP: 1572
GPM: 235
AC-S3
[2nd, 3rd Fl. Core]
CAP: 1920
DESIGN GPM: 320
REVISED GPM: 274
AC-S5
[6th Floor]
CAP: 442
DESIGN GPM: 75
REVISED GPM: 63
AC-S2
[4th, 5th, 6th Fl. Core]
CAP: 1483
GPM: 265
AC-S20
[Surgery Team Base]
CAP: 126
GPM: 36
AC-S4
[Step Down]
CAP: 574
DESIGN GPM: 115
REVISED GPM: 82
HV-2
[Mail and Locker]
CAP: 655.2
DESIGN GPM: 84
REVISED GPM: 94
HV-6
[Maint. Shops]
CAP: 1008
DESIGN GPM: 126
REVISED GPM: 144
ACA-AHU-8
[ACA]
CAP: 1021
GPM: 140
AC-S21
[Biomed]
CAP: 75
GPM: 15
BASEMENT
PHX-1
CAP: 6020
GPM: 860
BYPASS
6" CHS/R
5" CHS/R
4" CHS/R
4" CHS/R
4" CHS/R
5" CHS/R
8" CHS/R
AHU-10
[Sterile Processing]
CAP: 1793
DESIGN GPM: 257
REVISED GPM: 256
AHU-9
[OR Staff Offices]
CAP: 978
DESIGN GPM: 140
REVISED GPM: 140
AHU-8
[OR Nurse's Station]
CAP: 1575
DESIGN GPM: 235
REVISED GPM: 225
AHU-7B
[OR Suite]
CAP: 1174
DESIGN GPM: 164
REVISED GPM: 164
AHU-7A
[OR Suite]
CAP: 1147
GPM:164
OR MECHANICAL ROOM
18" CHS/R
12" CHS/R
16" CHS/R
EMERGENCY OBSERVATION IN ACA (6,000 SF)
[FUTURE EXPANSION]
ASSUMED CAPACITY: 360
ASSUMED GPM: 52
2 1/2" CHS/R
4" CHS/R
4" CHS/R
3" CHS/R
2 1/2" CHS/R
2 1/2" CHS/R
1 1/4" CHS/R
1 1/4" CHS/R
2" CHS/R
3" CHS/R
3" CHS/R
2" CHS/R
8" CHS/R
CH-5
CAP: 162.4
GPM: 278
CH-6
CAP: 162.4
GPM: 278
6" SCHS/R
4" CHS/R
3" CHS/R
4" CHS/R
4" CHS/R
EXPAND PHARMACY
AND LOBBY (NE
CORNER OF ACA)
(DX ONLY)
FUTURE ANIMAL
RESEARCH AHU
(WILL BE DX)
2 1/2" CHS/R
4" CHS/R
3" CHS/R 3" CHS/R
3" CHS/R
TESTING SITE 5:
503 GPM
TESTING SITE 1:
3,365 GPM
TESTING SITE 2:
545 GPM
TESTING SITE 3:
417 GPM
TESTING SITE 4:
719 GPM
6" CHS/R
18" CHS/R
2 1/2" CHS/R
6" CHS/R
3" CHS/R
3" CHS/R
CHILLERS CH-4, CH-5,
AND CH-6 SHOWN
FOR REFERENCE
8" CHS/R
6" CHS/R
10" CHS/R
BYPASS
6" CHS/R
8" CHS/R
10" CHS/R4" CHS/R
1-CRAC2
[ROOM C308]
CAP: 87.4
GPM: 22.7
1 1/4" CHS/R
6" CHS/R
2" CHS/R FCU 4-8
[6th Floor Suites]
CAP: 54
GPM: 12
2 1/2" CHS/R
1 1/2" CHS/R1" CHS/R
1 1/2" CHS/R
10" CHS/R
ON THIRD FLOOR ROOF
ON ACA THIRD FLOOR ROOF
ON SIXTH FLOOR ROOF
ON FIRST FLOOR ROOFON FIRST FLOOR ROOF
ON FIRST FLOOR ROOFIN INTERSTITIAL SPACE
FCU 5-6
[ACA]
CAP: 97
GPM: 14
PAC-XX
CAP: 21
GPM:3 (est)
8" CHS/R
6" CHS/R
3" CHS/R
2 1/2" CHS/R
4" CHS/R
4" CHS/R
FCU ?
[6th Floor]
CAP: 525
GPM: 75
FCU ?
[6th Floor]
CAP: 315
GPM: 45
AS-1
CH-4
GLYCOL SYSTEM
2 22
2 2 2
2 2 222 222
3 33
6" CHS/R
CAPACITIES SHOWN ARE IN MBH.
THIS SHEET PROVIDES AN OVERVIEW OF THE ENTIRE HOSPITAL CHILLED WATER
SYSTEM. IT SHOWS ALL CHILLED WATER COMPONENTS CONNECTED TO THIS
SYSTEM THAT WERE DOCUMENTED ON EXISTING DRAWINGS OR FOUND IN THE
FIELD, AND AS SUCH PROVIDES INFORMATION UTILIZED IN THE FOLLOWING COST
OPTIONS:
GENERAL NOTES:
1.
2.
3.
- DESIGN OPTION 05: ADD PRESSURE INDEPENDENT CONTROL VALVES TO CHILLED
WATER COILS.
- DESIGN OPTION 08: REPLACE CHILLER PLANT AIR SEPARATOR.
- DESIGN OPTION 09: REPLACE SECONDARY CHILLED WATER PUMPS.
THE 'TESTING SITE' WATER FLOWS WERE RECORDED ON DECEMBER 14, 2017. A
DESIGN DAY WAS SIMULATED BY DISABLING ALL CHILLERS (SO NO ACTUAL CHILLED
WATER COOLING OCCURED AT THE AIR-HANDLERS), AND ONE SECONDARY CHILLED
WATER PUMP WAS OPERATED IN HAND (100% DESIGN FLOW) AND ONE PUMP WAS
OPERATING AT 49 HZ AS DETERMINED BY THE BAS. THE THIRD CHILLED WATER
PUMP WAS OFF.
S
O U
T H
O L
D O
R C
H A
R D
S T
L O
U
IS
M
O
T
.9
.8
F
.9
.1 w w w .r o s s b a r.
c o m
D ra w in g T it le
P ro je c t
T it le
B u il d in g
N u m b e r:
D ra w in g N u m b e r:
D ep a r tm en t o f
V et er a n s A ff a ir s
D w g o f:
D ra w n
C h e c k e d
D a te
P ro je c t
N o
R
B P ro je c t
N o
-0
B
O T
T S
L A
N E
S
A N
A N
T O
N
IO
T
X
T
.8
.9
F
.8
.6
IN
F
O
H F
S C
O M
P A
N Y
.C O
M H
F S
C O
M P
A N
Y .C
O M
-M
C
H
IL
LE
D
W A
T E
R R
IS
E
R D
IA
G
R A
M H
A R
R Y
S . T
R U
M A
N V
A M
C R
E P
LA
C
E M
E C
H A
N
IC
A L, E
LE
C
TR
IC
A
L, A
N D
P
LU
M B
IN
G
H
O S
P
IT
A L D
R
IV
E C
O L U
M B
IA
M
O
A
-1
-1
/1
/2
D B
C
J D
W
P R
O J E
C T
S T
A T
U S
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
NOT TO SCALE
CHILLED WATER PIPING SCHEMATIC
KEYED NOTES:
1 CRAC UNITS HAVE BOTH CHILLED WATER AND DX HEAT REJECTION OPTION. THEY
ARE ALMOST ALWAYS OPERATED IN DX MODE.
2 CHANGE EXISTING 2-WAY CONTROL VALVE TO PROVIDE WITH 2-WAY PICV. SEE
DETAILS ON SHEET 05-M01.
3 CHANGE EXISTING 3-WAY CONTROL VALVE TO 2-WAY PICV. SEE DETAILS ON SHEET
05-M01.
4 DEMOLISH EXISTING 2-WAY CONTROL VALVE IN BYPASS. SEE DETAILS ON SHEET
05-M01.
R E
V
IS
IO
N
S
N O
D E
S C
R
IP
T
IO
N D
A
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
JbKL
La
MNNaPQRST
W 2
W 2.8
W 3.7
W 7.2
W 8.2
6.2
5.4
6.7
5.7
W 4.6
8.3
5.1
W 6.3
8.0
W 1.9
W 5.5
W 9.3
E 1.10
CP-2
CP-1
CP-EX
HX-C-3
RHC-19A
CP-EX
RHC-19A
RHC-11
"S
-5
"S
-1
2"CR-15
"S
-1
"S
-1
"S
-5
1"PC
"S
-1
"S
-1
2"CR-15
2"CR-15
UP
AC-S19
AC-S11
AC-S18
USG-2 USG-1
2"CR-15
STAIR #3
1"S-15
3/4"S-15
LPS UP
"C
R -1
DEAD LEGS
2"S-15
"S
-1
UP THRU FLOOR
2"S-15
"S
-1
1"CR-15
2"S-15
DEAD LEGS
"S
-1
"C
R -1
"C
R -5
3"CR-50
1"CR-15
2"S-15
1"PC
3"PC
12"S-50
OR STEAM PIPING
1 1/2"S-15
1 1/2"S-15
DEAD LEG
3"CR-50
FT
DEAD LEG
DEAD LEG
1"S-15
DEAD LEGS
1"CR-50
12"S-50
3"PC
HOSE TO
GRADE
1/2" DEAD LEGS
1" DEAD LEG
DEAD LEG
1 1/2" DEAD LEG
3"S-50
2"S-50
1 1/2"CR-15
1 1/2"CR-50
2"S-50
2"S-15
PRV
PPT
DEAD LEGS
DEAD LEGS
3/4" LEAK
1" DEAD LEG
3/4"CR-50
1/4"CR-50
"C
R -5
2"S-50
2"S-15
2 1/2" VENT
PRV
LPS HIGH
1"CR-15
8"S-50
"P
C
PPT CONNECTS ON TOP
2 1/2"CR-15
2"CR-50
P
2 1/2"S-50
PRV
PRV
"P
C
CAP
CAP
CAP
CAP
CAP
UP
CAP
2"S-50
2"S-50
"C
R -5
CAP
CAP
CAP
/2 "C
R -1
/2 "C
R -1
CAP
UP
UP
UP
UP
UP
CAP
CAP
UP
UP
UP
UP
/4
"S -5
1"S-15
CAP
CAP
2"S-50
1 1/2"S-15
PIPES EXIT MECHANICAL ROOM
HIGH, GO TO BASEMENT LEVEL
"S
-5 0 3
"P C
"P
C
"S
-5
12"S-50
3"PC
1"CR-15
3"CR-50
2"S-15
2 1/2"S-50
1"PC
12"S-50
3"PC
1"PC
CAP
CAP
1.
2.
3.
DESIGN OPTION 01 INTENT IS TO REMOVE ALL STEAM AND CONDENSATE DEAD
LEGS THROUGHOUT PIPE BASEMENT AND UP TO END-USE DEVICES NOT BEING
USED ANYMORE.
CONTRACTOR TO VERIFY ALL PIPING SHOWN TO BE REMOVED IS ABANDONED
AND NOT BEING USED. COORDINATE WITH FACILITIES PRIOR TO DEMOLITION.
DEMOLITION OF DEAD LEGS SHALL INCLUDE ALL PIPE HANGERS, INSULATIONS,
TRAPS, VALVES, TEMPERATURE CONTROLS, THERMOMETERS, PRESSURE GAGES,
EQUIPMENT, ETC. THAT IS ALSO INSTALLED IN THE STEAM AND STEAM
CONDENSATE LINES.
PATCH WALLS AND FLOORS AFTER DEMOLITION TO MATCH EXISTING
CONSTRUCTION AND FINISHES.
GENERAL NOTES:
S
O U
T H
O L
D O
R C
H A
R D
S T
L O
U
IS
M
O
T
.9
.8
F
.9
.1 w w w .r o s s b a r.
c o m
D ra w in g T it le
P ro je c t
T it le
B u il d in g
N u m b e r:
D ra w in g N u m b e r:
D ep a r tm en t o f
V et er a n s A ff a ir s
D w g o f:
D ra w n
C h e c k e d
D a te
P ro je c t
N o
R
B P ro je c t
N o
-0
KEY PLAN
B
O T
T S
L A
N E
S
A N
A N
T O
N
IO
T
X
T
.8
.9
F
.8
.6
IN
F
O
H F
S C
O M
P A
N Y
.C O
M H
F S
C O
M P
A N
Y .C
O M
-M
D
E S
IG
N
O P
T
IO
N
- D
E M
O S
T E
A M
A N
D C
O N
D E
N S
A T
E D
E A
D
LE
G S
Z
O N
E
H A
R R
Y S
. T R
U M
A N
V A
M C
R E
P
LA
C E
M E
C H
A N
IC
A
L, E
LE
C
TR
IC
A L, A N
D P
LU
M
B
IN
G
H
O S
P
IT
A L D
R
IV
E C
O L U
M B
IA
M
O
A
-1
-1
/1
/2
A M
S
J D
W
P R
O J E
C T
S T
A T
U S
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
1/8" = 1'-0"
DESIGN OPTION 01 - DEMO STEAM AND
STEAM CONDENSATE DEAD LEGS - PIPE
BASEMENT ZONE 1
KEYED NOTES:
1 UP TO LAB EQUIPMENT ON LEVEL ABOVE. LAB PERSONNEL INDICATED THAT THE
STEAM FUNCTION OF THEIR EQUIPMENT IS NOT UTILIZED. CONTRACTOR MUST
COORDINATE WITH DEPARTMENT IF THIS PIPING CAN BE DEMOLISHED.
2 COULD NOT ACCESS AREA ON LEVEL ABOVE DURING INITIAL FIELD SURVEY.
CONFIRM DEMOLITION WITH FACILITIES.
3 AREA ON LEVEL ABOVE WAS IN CONSTRUCTION DURING INITIAL FIELD SURVEY.
CONFIRM DEMOLITION WITH FACILITIES.
4 CAPPED AT FLOOR OF KITCHEN. DEMOLISH AND CAP AS SHOWN.
R E
V
IS
IO
N
S
N O
D E
S C
R
IP
T
IO
N D
A T
E
R e v is io n
D a te
T
T
T
T
T
TT
T
T
T
T
T
T
ABCDEEaFGHJJb
E 1
W 2
E 5.5 w 6.3
6.2
5.4
6.7
5.7
5.8
E 2.8
E 1.9
E 2
E 3.7
E 4.6
E 6.3
E 7.2
6"CR-15
"S
-5
"P
C
"C
R -1
PRV
PRV
PRV
UP
CONNECT ON
BOTTOM OF TANK
"C
R -1
/2 "C
R -1
"S
-5
/2 "S
-1
"S -5
/4
"C R
-5
2"S-50
2"S-50
"C
R -5
CAP
/2 "C
R -1
UP
UP
UP
UP
CAP
UP
CAP
"C
R -5
1"CR-15
1 1/2"CR-50
2"S-15
2 1/2"S-15
3"S-50
2 1/2"S-15
3"S-50
1 1/2"CR-15
CAP
UP
UP
CRT-1EX
UP
UP
UP
UP
UP
UP
CAP
CAP
1"S-15
FLASH TANK
1UP
1 1/4"S-50
CAP
CAP
CAP
1.
2.
3.
CONTRACTOR TO VERIFY ALL PIPING SHOWN TO BE REMOVED IS ABANDONED
AND NOT BEING USED. COORDINATE WITH FACILITIES PRIOR TO DEMOLITION.
DEMOLITION OF DEAD LEGS SHALL INCLUDE ALL PIPE HANGERS, INSULATION,
TRAPS, VALVES, TEMPERATURE CONTROLS, THERMOMETERS, PRESSURE GAGES,
EQUIPMENT, ETC. THAT IS ALSO INSTALLED IN THE STEAM AND STEAM
CONDENSATE LINES.
PATCH WALLS AND FLOORS AFTER DEMOLITION TO MATCH EXISTING
CONSTRUCTION AND FINISHES.
GENERAL NOTES:
S
O U
T H
O L
D O
R C
H A
R D
S T
L O
U
IS
M
O
T
.9
.8
F
.9
.1 w w w .r o s s b a r.
c o m
D ra w in g T it le
P ro je c t
T it le
B u il d in g
N u m b e r:
D ra w in g N u m b e r:
D ep a r tm en t o f
V et er a n s A ff a ir s
D w g o f:
D ra w n
C h e c k e d
D a te
P ro je c t
N o
R
B P ro je c t
N o
-0
KEY PLAN
B
O T
T S
L A
N E
S
A N
A N
T O
N
IO
T
X
T
.8
.9
F
.8
.6
IN
F
O
H F
S C
O M
P A
N Y
.C O
M H
F S
C O
M P
A N
Y .C
O M
-M
D
E S
IG
N
O P
T
IO
N
- D
E M
O S
T E
A M
A N
D C
O N
D E
N S
A T
E D
E A
D
LE
G S
Z
O N
E
H A
R R
Y S
. T R
U M
A N
V A
M C
R E
P
LA
C E
M E
C H
A N
IC
A
L, E
LE
C
TR
IC
A L, A N
D P
LU
M
B
IN
G
H
O S
P
IT
A L D
R
IV
E C
O L U
M B
IA
M
O
A
-1
-1
/1
/2
A M
S
J D
W
P R
O J E
C T
S T
A T
U S
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
1/8" = 1'-0"
DESIGN OPTION 01 - DEMO STEAM AND
STEAM CONDENSATE DEAD LEGS - ZONE 2
KEYED NOTES:
1 UP TO LAB EQUIPMENT ON LEVEL ABOVE. LAB PERSONNEL INDICATED THAT THE
STEAM FUNCTION OF THEIR EQUIPMENT IS NOT UTILIZED. CONTRACTOR MUST
COORDINATE WITH DEPARTMENT IF THIS PIPING CAN BE DEMOLISHED.
2 PIPES ARE CAPPED AT LEVEL ABOVE. CONFIRM DEMOLITION OF PIPING FROM LEVEL
ABOVE BACK TO PIPE BASEMENT WITH FACILITIES.
3 COULD NOT ACCESS AREA ON LEVEL ABOVE DURING INITIAL FIELD SURVEY.
CONFIRM DEMOLITION WITH FACILITIES.
R E
V
IS
IO
N
S
N O
D E
S C
R
IP
T
IO
N D
A T
E
R e v is io n
D a
T
T
T
T
T
T
T
T
T
T
T
T
T
KLLaMNNaPQRST
W 7.2
W 8.2
W 9.1
W 10.4
11.5
12.5
13.5
Ra
Rb
8.0
CP-EX
RHC-EX
"C
R -1
8"S-50
"S
-5
"S
-1
2"CR-15
"S
-1
"S
-5
2"CR-15
LPS
LPS
LPS
LPS
"S
-1
12"S-15
AC-S14
AC-S13
AC-S16
AC-S19
AC-17A
2"CR-15
1 1/2" DEAD LEG
3/4"CR-50
4"S-50
8"S-50
2 1/2"S-15
2 1/2"S-15
UP
2"CR-50
FT
HX
PPT
HUB DRAIN
P R
V
PRV
PRV
CONNECTS
ON TOP
DEAD LEG
CONNECTS ON TOP
2 1/2"CR-15
2"CR-50
P
P
P
1"CR-15
3/4" DEAD LEG
/4
"C R
-1 5 3 /4
"C R
-1
/2 "C
R -1
UP UP
UP
CAP
UP
UP
"C
R -1
UP
CAP
CAP
UP
CAP
UP
UP
UP
1"CR-15
/4
"C R
-1
UP
2"CR-50
"S
-5
CAP
CAP
CAP
UP
CAP
BROKEN PIPE WITH
VALVE AND STRAINER
1"S-15
/4
"C R
-1
12"S-15
8"4"4"3"
8" 3" 6" 4" 12"
6"
CAP
CAP
CAP
OPEN PIPE. DEMO BACK
TO CONDENSATE
RETURN TANK AREA.
1.
2.
3.
CONTRACTOR TO VERIFY ALL PIPING SHOWN TO BE REMOVED IS ABANDONED
AND NOT BEING USED. COORDINATE WITH OWNER PRIOR TO DEMOLITION.
DEMOLITION OF DEAD LEGS SHALL INCLUDE ALL PIPE HANGERS, INSULATION,
TRAPS, VALVES, TEMPERATURE CONTROLS, THERMOMETERS, PRESSURE GAGES,
EQUIPMENT, ETC. THAT IS ALSO INSTALLED IN THE STEAM AND STEAM
CONDENSATE LINES.
PATCH WALLS AND FLOORS AFTER DEMOLITION TO MATCH EXISTING
CONSTRUCTION AND FINISHES.
GENERAL NOTES:
S
O U
T H
O L
D O
R C
H A
R D
S T
L O
U
IS
M
O
T
.9
.8
F
.9
.1 w w w .r o s s b a r.
c o m
D ra w in g T it le
P ro je c t
T it le
B u il d in g
N u m b e r:
D ra w in g N u m b e r:
D ep a r tm en t o f
V et er a n s A ff a ir s
D w g o f:
D ra w n
C h e c k e d
D a te
P ro je c t
N o
R
B P ro je c t
N o
-0
KEY PLAN
B
O T
T S
L A
N E
S
A N
A N
T O
N
IO
T
X
T
.8
.9
F
.8
.6
IN
F
O
H F
S C
O M
P A
N Y
.C O
M H
F S
C O
M P
A N
Y .C
O M
-M
D
E S
IG
N
O P
T
IO
N
- D
E M
O S
T E
A M
A N
D C
O N
D E
N S
A T
E D
E A
D
LE
G S
Z
O N
E
H A
R R
Y S
. T R
U M
A N
V A
M C
R E
P
LA
C E
M E
C H
A N
IC
A
L, E
LE
C
TR
IC
A L, A N
D P
LU
M
B
IN
G
H
O S
P
IT
A L D
R
IV
E C
O L U
M B
IA
M
O
A
-1
-1
/1
/2
A M
S
J D
W
P R
O J E
C T
S T
A T
U S
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
1/8" = 1'-0"
DESIGN OPTION 01 - DEMO STEAM AND
STEAM CONDENSATE DEAD LEGS - ZONE 3
KEYED NOTES:
1 PIPES ARE CAPPED AT LEVEL ABOVE. CONFIRM DEMOLITION OF PIPING FROM LEVEL
ABOVE BACK TO PIPE BASEMENT WITH FACILITIES.
2 CAPPED AND ABANDONED. DEMOLISH AND CAP AS SHOWN.
3 PIPE IS BROKEN AT PIPE BASEMENT LEVEL. FACILITIES MUST CONFIRM WITH LEVEL
ABOVE THAT STEAM IS NOT NEEDED AND THEN DEMOLISH.
4 COULD NOT CONFIRM EXISTENCE ON LEVEL ABOVE. BELIEVE THERE IS NO CURRENT
STEAM-USING EQUIPMENT IN THIS AREA, AND BELIEVE THAT EQUIPMENT THAT WAS
USED IS NOW GONE. CONFIRM DEMOLITION OF PIPING ON LEVEL ABOVE BACK TO
PIPE BASEMENT WITH FACILITIES.
R E
V
IS
IO
N
S
N O
D E
S C
R
IP
T
IO
N D
A T
E
R e v is io n
D a
T
T
T
T
T
T
T
T
T
T T
T
ABCDEEaFGGaHJ
11.5
12.5
13.5
BaBb
Ha
8.0
E 7.2
E 8.2
E 10.4
E 9.1
8"S-50
8"S-50
"S
-5
"S
-5
"S
-5
"S
-5
"S
-5
"S
-5
8"S-50
1"CR-50
6"CR-15
"C
R -1
"C
R -1
PRV
2 1/2"S-50
3/4"CR-15
12"S-50
6"S-50
"C
R -5
FT
UNINSULATED
DEAD LEG
DEAD
LEG
HX
PRV
UP
UP
UP
"S
-5
DEAD LEG
CAP
UP
3/4"CR-15
1"CR-15
"S
-5
3/4"CR-50
CAP
3"S-50
1 1/2"CR-50
UP
UP
UP
CAP
2"S-50
1 1/2"CR-15
1 1/2"CR-50
1"S-50
2 1/2"S-50
/2 "S
-1
01-M05
CAP
CAP
CAP
CAP
1.
2.
3.
CONTRACTOR TO VERIFY ALL PIPING SHOWN TO BE REMOVED IS ABANDONED
AND NOT BEING USED. COORDINATE WITH FACILITIES PRIOR TO DEMOLITION.
DEMOLITION OF DEAD LEGS SHALL INCLUDE ALL PIPE HANGERS, INSULATION,
TRAPS, VALVES, TEMPERATURE CONTROLS, THERMOMETERS, PRESSURE
GAGES, EQUIPMENT, ETC. THAT IS ALSO INSTALLED IN THE STEAM AND STEAM
CONDENSATE LINES.
PATCH WALLS AND FLOORS AFTER DEMOLITION TO MATCH EXISTING
CONSTRUCTION AND FINISHES.
GENERAL NOTES:
S
O U
T H
O L
D O
R C
H A
R D
S T
L O
U
IS
M
O
T
.9
.8
F
.9
.1 w w w .r o s s b a r.
c o m
D ra w in g T it le
P ro je c t
T it le
B u il d in g
N u m b e r:
D ra w in g N u m b e r:
D ep a r tm en t o f
V et er a n s A ff a ir s
D w g o f:
D ra w n
C h e c k e d
D a te
P ro je c t
N o
R
B P ro je c t
N o
-0
KEY PLAN
B
O T
T S
L A
N E
S
A N
A N
T O
N
IO
T
X
T
.8
.9
F
.8
.6
IN
F
O
H F
S C
O M
P A
N Y
.C O
M H
F S
C O
M P
A N
Y .C
O M
-M
D
E S
IG
N
O P
T
IO
N
- D
E M
O S
T E
A M
A N
D C
O N
D E
N S
A T
E D
E A
D
LE
G S
Z
O N
E
H A
R R
Y S
. T R
U M
A N
V A
M C
R E
P
LA
C E
M E
C H
A N
IC
A
L, E
LE
C
TR
IC
A L, A N
D P
LU
M
B
IN
G
H
O S
P
IT
A L D
R
IV
E C
O L U
M B
IA
M
O
A
-1
-1
/1
/2
A M
S
J D
W
P R
O J E
C T
S T
A T
U S
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
1/8" = 1'-0"
DESIGN OPTION 01 - DEMO STEAM AND
STEAM CONDENSATE DEAD LEGS - ZONE 4
KEYED NOTES:
1 PIPES ARE CAPPED AT LEVEL ABOVE. CONFIRM DEMOLITION OF PIPING FROM LEVEL
ABOVE BACK TO PIPE BASEMENT WITH FACILITIES.
R E
V
IS
IO
N
S
N O
D E
S C
R
IP
T
IO
N D
A T
E
R e v is io n
D a
EaFGGa
11.5
3/4"CR-15
FT
3/4"CR-15
"C
R -1
"S
-5
UP TO BOILER
(DEAD LEG)
PRV
12"S-50
HX
HX
H X
3"V
1 1/2"
1 1/2"
1 1/2"CR-50
V
EXISTING
ELECTRIC
STEAM BOILER
3"V
EaFGGa
11.5
Room
D003C
OFFICE
D004K
BOILER
D018
EF
LEAVE EXISTING LOUVER AND
PLENUM BOX. PATCH EXHAUST
AIR DUCT CONNECTION.
6ø EA
8ø EA
10ø EA
12ø EA
V
1 1/2"
1 1/2"
2 1/2"S-50
3"S-50
1 1/2"CR-50
EXISTING GAS-
FIRED STEAM
BOILER
EXISTING
DEAERATOR
1 2
1.
2.
3.
4.
CONTRACTOR TO VERIFY ALL PIPING SHOWN TO BE REMOVED IS ABANDONED AND
NOT BEING USED. COORDINATE WITH FACILITIES PRIOR TO DEMOLITION.
DEMOLITION OF DEAD LEGS SHALL INCLUDE ALL PIPE HANGERS, INSULATION,
TRAPS, VALVES, TEMPERATURE CONTROLS, THERMOMETERS, PRESSURE GAGES,
EQUIPMENT, ETC. THAT IS ALSO INSTALLED IN THE STEAM AND STEAM
CONDENSATE LINES.
REMOVE ALL PIPING, VENTING, EQUIPMENT, AND ACCESSORIES RELATED TO THE
REMOVAL OF THE STEAM BOILER AND THE ELECTRIC BOILER.
PATCH WALLS AND FLOORS AFTER DEMOLITION TO MATCH EXISTING
CONSTRUCTION AND FINISHES.
GENERAL NOTES:
S
O U
T H
O L
D O
R C
H A
R D
S T
L O
U
IS
M
O
T
.9
.8
F
.9
.1 w w w .r o s s b a r.
c o m
D ra w in g T it le
P ro je c t
T it le
B u il d in g
N u m b e r:
D ra w in g N u m b e r:
D ep a r tm en t o f
V et er a n s A ff a ir s
D w g o f:
D ra w n
C h e c k e d
D a te
P ro je c t
N o
R
B P ro je c t
N o
-0
KEY PLAN
B
O T
T S
L A
N E
S
A N
A N
T O
N
IO
T
X
T
.8
.9
F
.8
.6
IN
F
O
H F
S C
O M
P A
N Y
.C O
M H
F S
C O
M P
A N
Y .C
O M
/1
/2
:1
:5
A
M
-M
D
E S
IG
N
O P
T
IO
N
- D
E M
O S
T E
A M
A N
D C
O N
D E
N S
A T
E D
E A
D
LE
G S
B
O
IL
E R
R O
O M
H A
R R
Y S
. T R
U M
A N
V A
M C
R E
P
LA
C E
M E
C H
A N
IC
A
L, E
LE
C
TR
IC
A L, A N
D P
LU
M
B
IN
G
H
O S
P
IT
A L D
R
IV
E C
O L U
M B
IA
M
O
A
-1
-1
/1
/2
D B
C
J D
W
P R
O J E
C T
S T
A T
U S
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
1/4" = 1'-0"
DESIGN OPTION 01 - DEMO STEAM AND
STEAM CONDENSATE DEAD LEGS - LOWER
BOILER ROOM ON PIPE BASEMENT LEVEL
1/4" = 1'-0"
DESIGN OPTION 01 - DEMO STEAM AND
STEAM CONDENSATE DEAD LEGS - UPPER
BOILER ROOM ON BASEMENT LEVEL
R E
V
IS
IO
N
S
N O
D E
S C
R
IP
T
IO
N D
A T
E
KEYED NOTES:
1 IT IS SUSPECTED THAT BOTH BOILERS HAVE ASBESTOS INSULATION. SEE
SPECIFICATION SECTION ... FOR INFORMATION ON ABATEMENT REQUIREMENTS.
2 DEMOLISH GAS PIPING AND ASSOCIATED GAS TRAIN COMPONENTS BACK TO MAIN
AND CAP.
JbKL
La
MNNaPQRST
W 2
W 2.8
W 3.7 w 6.3
W 7.2
W 8.2
Rb
6.2
5.4
6.7
5.7
5.8
Ja
W 4.6
8.3
7.6
7.1
3.6
OR
4.1
4.7
5.1
6.1
W 6.3
1.6
3.2
2.7
8.0
W 1.9
W 5.5
W 9.3
E 1.10
OPHTHALMOLOGY RSCH.
B032
OFFICE
B033
OPHTHALMOLOGY
B031
FIRE CL.
CBB4A
PULMONARY RSCH.
B027
TRANS. RM.
B027A
COLD RM.
B037
PHARMACOLOGY RSCH.
B039
COLD RM.
B037A
SIGNAL PANELS
B033A
JAN.
B034
STAIR #3
B036A
ELEC. CLOSET
B030
CORR.
CBB3
LAB.
B026
LAB.
B023
CORR.
CBB4
PHARMACOLOGY RSCH.
B042
OFFICE
B039A
RSCH. INVESTIGATOR
B022 RSCH. INVESTIGATOR
B021
OFFICE
B017
OFFICE
B018
OFFICE
B016
OFFICE
B014
RSCH. INVESTIGATOR
B012
CORR.
B020
PHARMACOLOGY RSCH.
B048
GLASS WASH
B051
RSCH. COMMON RM.
B045
RSCH. INVESTIGATOR
B047
RSCH. OFFICE
B046
OFFICE
B049
RSCH. INVESTIGATOR
B015
RADIOISOTOPE PREP. & STG.
B010
IMAGE REVIEW
B009
NUCLEAR MED., MED. DIR.
B008
OFFICE
B046A
BREAK RM.
B006
IMAGING STRESS LAB.
B005
IMAGING STRESS LAB.
B005A
HEALTH PHYSICS LAB.
B050
ELEC. CLOSET
B009A
CORR.
CBB1
CLOSET
B026A
CORR.
CBB2
ELEC. CLOSET
B024A
OFFICE
B025B
RHEUMATOLOGY RSCH.
B024
RSCH. CORE AREA
B019 OFFICE
B013A
CLINICAL SUPPORT
B013
EXAM RM.
B011
TREADMILL
B001S
TLT.
B007
TLT.
B001R
IMAGING OFFICE
B001Q
PAT. WAITING AREA
B001P
CORR.
B001DIETETICS STG.
B002D
DIETETICS OFFICE
B002A
CORR.
CBA13
CORR.
CBA14
CORR.
CBA1
CORR.
CBB1A
F. TLT.
A001
M. TLT.
A002
IT CLOSET
A056A
STAIR #1
A056
Room
A054B
ELEV. LOBBY
D054
CORR.
CBD4
AUTOPSY
D031
JAN.
D001A
TRASH
D001
BREAK RM.
B002G
OFFICE
B002F
DISH CLEAN
B002K
EXAM RM.
B001M
OFFICE
B001F
UTIL. RM.
B001L
EXAM RM.
B001K
RADIOPHARMACY
B001H
CART CLEAN
B001C
CLEANING AREA
B001A
ELEC. CLOSET
C001F
MECH. CHASE
C001G
FIRE CL.
CBC3A
DIETETICS OFFICE
C009A
REF.
C009B
JAN.
B002E
REF.
C009D
CLOSET
B001E
FOOD PREP./ COOK
B001B
FOOD PREP./ COOK
B002
FOOD PREP.
C009
MECH.
C012
CORR.
G003
ELEC. CLOSET
B009B
OI&T
C001
CHIEF OF SERVICE
C001A
ELEV #4
ELEV #5
ELEV #3
ELEV #7
ELEV #8
CORR
B340F
FIRE CL.
ORIGINAL PLANS SAY THIS
GOES TO LAB EQUIPMENT
ORIGINAL PLANS SAY THIS
GOES TO LAB EQUIPMENT
ORIGINAL PLANS SAY THIS
GOES TO LAB EQUIPMENT
ORIGINAL PLANS SAY UP TO LAB
EQUIPMENT IN B-118G
CAPPED AT FLOOR
ORIGINAL PLANS SAY THIS
GOES TO LAB EQUIPMENT
ORIGINAL PLANS SAY THIS
GOES TO LAB EQUIPMENT
ORIGINAL PLANS SAY THIS
GOES TO LAB EQUIPMENT ORIGINAL PLANS SAY THIS
GOES TO LAB EQUIPMENT
S
O U
T H
O L
D O
R C
H A
R D
S T
L O
U
IS
M
O
T
.9
.8
F
.9
.1 w w w .r o s s b a r.
c o m
D ra w in g T it le
P ro je c t
T it le
B u il d in g
N u m b e r:
D ra w in g N u m b e r:
D ep a r tm en t o f
V et er a n s A ff a ir s
D w g o f:
D ra w n
C h e c k e d
D a te
P ro je c t
N o
R
B P ro je c t
N o
-0
KEY PLAN
B
O T
T S
L A
N E
S
A N
A N
T O
N
IO
T
X
T
.8
.9
F
.8
.6
IN
F
O
H F
S C
O M
P A
N Y
.C O
M H
F S
C O
M P
A N
Y .C
O M
/1
/2
:1
:5
A
M
-M
D
E S
IG
N
O P
T
IO
N
- D
E M
O S
T E
A M
A N
D C
O N
D E
N S
A T
E D
E A
D
LE
G S
Z
O N
E
B A
S E
M E
N T
H A
R R
Y S
. T R
U M
A N
V A
M C
R E
P
LA
C E
M E
C H
A N
IC
A
L, E
LE
C
TR
IC
A L, A N
D P
LU
M
B
IN
G
H
O S
P
IT
A L D
R
IV
E C
O L U
M B
IA
M
O
A
-1
-1
/1
/2
D B
C
J D
W
P R
O J E
C T
S T
A T
U S
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
1/8" = 1'-0"
BASEMENT - ZONE 1
R E
V
IS
IO
N
S
N O
D E
S C
R
IP
T
IO
N D
A T
E
R e v is io n
D a
ABCDEEaFG
Ga
HJJb
E 1
W 2
E 5.5 w 6.3
6.2
5.4
6.7
ACA
10.6
ACA
A
5.7
5.8
Ja
E 2.8
E 1.9
E 2
E 3.7
E 4.6
E 6.3
E 7.2
TREADMILL
B001S
CORR.
CBA13
CORR.
CBA14
CORR.
CBA1
F. TLT.
A001
M. TLT.
A002
RADIOPHARMACY RSCH.
A003
FIRE CL.
CBA2A
CORR.
CBA2
CORR.
CBA3
RADIOPHARMACY RSCH.
A007
RADIOPHARMACY RSCH.
A009
PHY. RSCH.
A009A
RSCH. WK. RM.
A010
ENDOCRINE/ HYPERTENSION RSCH.
A012
CORR.
CBA4
ENDOCRINE/ HYPERTENSION RSCH.
A019
ENDOCRINE/ HYPERTENSION RSCH.
A020
CORR.
CBA5
NEURO. SLEEP RSCH.
A023
OFFICE
A023A
STG.
A042A
STG.
A042
VMU OFFICE
A043
ANIMAL WARD
A045
ANIMAL SURG.
A045A
DARK RM.
A015A
RADIOPHARMACEUTICAL SCIENCES
RSCH.
A017
ANIMAL X-RAY RM.
A015
COLD. RM.
A014
SHR./ LNGE.
A011
NEURO. SLEEP RSCH.
A018 SURG. SUITE
A021
CORR.
CBA6
RADIOPHARMACEUTICAL SCIENCES
RSCH.
A049
OFFIC…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.