36C25518R0540-0001002.pdf

PDF 9 MB Posted

Attached to
Replace Mechanical, Electrical and Plumbing P/N:589A4-17-182 Federal contract opportunity
Solicitation number
36C25518R0540
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

36C25518R0540 0001 Drawings-Replace MEP 589A4-17-182 VOL 1 - Pages 35.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace Mechanical, Electrical and Plumbing P/N:589A4-17-182, newest first.
File Type Posted
36C25518C0212-000.docx DOCX document
36C25518R0540-0002000.docx DOCX document
36C25518R0540-0001007.pdf PDF
36C25518R0540-0001003.pdf PDF
36C25518R0540-0001006.pdf PDF
36C25518R0540-0001009.pdf PDF
36C25518R0540-0001011.pdf PDF
36C25518R0540-0001013.pdf PDF
36C25518R0540-0001000.docx DOCX document
36C25518R0540-0001001.pdf PDF
36C25518R0540-0001010.pdf PDF
36C25518R0540-0001004.pdf PDF
36C25518R0540-0001008.pdf PDF
36C25518R0540-0001014.pdf PDF
36C25518R0540-0001005.pdf PDF
36C25518R0540-0001012.pdf PDF
36C25518R0540-0001015.pdf PDF
36C25518R0540-002.pdf PDF
36C25518R0540-006.pdf PDF
36C25518R0540-003.pdf PDF
36C25518R0540-004.pdf PDF
36C25518R0540-005.pdf PDF
36C25518R0540-001.docx DOCX document
36C25518R0540-000.docx DOCX document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IT

E C T

I R U

S

PIERCE

I

R E

FO

E

T A T S

M

ALAN

NUMBER

S

H

O

CARD

RE

AR005805I

G S

T E

BRADFORD

06/19/18

C T

I R U

S

PIERCE

I

R E

FO

E

T A T S

M

ALAN

NUMBER

S

H

O

CARD

RE

AR005805I

G S

T E

C T

I R U

S

PIERCE

I

R E

FO

E

T A T S

M

ALAN

NUMBER

S

H

O

CARD

RE

AR005805I

G S

T E

C T

I R U

S

PIERCE

I

R E

FO

E

T A T S

M

ALAN

NUMBER

S

H

O

CARD

RE

AR005805I

G S

T E

AHU 1

KEYED NOTE

SECTION NUMBER

SHEET WHERE LOCATED

INTERFACE, EXISTING TO NEW

UNIT NUMBER

EQUIPMENT DESIGNATION

M101

SIM

ELBOW DOWN

ELBOW UP

TEE DOWN

TEE UP

CAP

FLANGE

DEMO TO BE REMOVED

CONCENTRIC

REDUCER/INCREASER

ECCENTRIC

REDUCER/INCREASER

MEDIUM DETAIL FINE DETAIL

GENERAL NOTES:

GENERAL ABBREVIATIONS GENERAL ABBREVIATIONS, CONTINUED

GENERAL SYMBOLS

PLAN NUMBER

SHEET WHERE LOCATED

M101

AHU-1 EXISTING EQUIPMENT DESIGNATION

GENERAL ABBREVIATIONS, CONTINUED GENERAL ABBREVIATIONS, CONTINUED

BUILDING NUMBER

1-

QUICK-COUPLE HOSE CONNECTOR

ANCHOR

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

ECCENTRIC REDUCER

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

UNION

RISE OR DROP IN PIPE

CAPPED OUTLET

PRESSURE GAGE

THERMOMETER

VENTURI FLOW METER

FLOAT & THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES SEE DETAIL

PIPING ACCESSORIES SEE DETAIL

INVERTED BUCKET TRAP SET INCLUDING

PIPE UP

PIPE DOWN

REFRIGERANT SIGHT GLASS

TEST PLUG (PRESSURE/TEMPERATURE)

AUTOMATIC AIR VENT

AV

MANUAL AIR VENTMV

THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES SEE DETAIL

GENERAL PIPING SYMBOLS

HOT WATER HEATING SUPPLY

CONDENSATE PUMP DISCHARGE

LOW PRESSURE STEAM CONDENSATE RETURN

LOW PRESSURE STEAM (15 PSIG AND BELOW)

MEDIUM PRESSURE STEAM CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16 PSIG THRU 50 PSIG)

VENT LINE

SOLAR WATER RETURN

SOLAR WATER SUPPLY

GLYCOL-WATER HEATING RETURN

GLYCOL-WATER HEATING SUPPLY

REFRIGERANT SUCTION

REFRIGERANT HOT GAS

REFRIGERANT LIQUID

CHILLED WATER SUPPLY

CHILLED WATER RETURN

DRAIN LINE

MAKE-UP WATER

CONDENSER WATER RETURN (TO TOWER)

CHILLED GLYCOL-WATER RETURN

CHILLED GLYCOL-WATER SUPPLY

CONDENSER WATER SUPPLY (FROM TOWER)

HOT WATER HEATING RETURN

S-50

CR-50

S-15

CR-15

PC

HWS

HWR

GHS

GHR

V

SWS

SWR

CWR

CHR

GCR

RL

RS

RHG

CWS

CHS

GCS

MW

D

GLYCOL-WATER RUN AROUND SUPPLY

GLYCOL-WATER RUN AROUND RETURNGRR

GRS

EXISTING PIPE TO BE REMOVED

PIPING SYMBOLS

FEEDWATER SAMPLE (FROM DEAERATOR)

CHEMICAL FEED

BOILER BLOWOFF

OVERFLOW

COLD WATER (CITY WATER)

HOT WATER

CONDENSATE TRANSFER PUMP SUCTION

CONDENSATE TRANSFER PUMP DISCHARGE

FEEDWATER PUMP DISCHARGE

FEEDWATER PUMP SUCTION

CTPS

CTPD

FWPS

FWPD

CF

FWS

BO

OFL

HW

CW

HEATING COOLING SUPPLY

HEATING COOLING RETURNHCR

HCS

CONDENSATE DRAINCD

GATE VALVE WITH GLOBE-VALVED BYPASS

PLUG VALVE

CONTROL VALVE (CV) - FLOAT-OPERATED

PRESSURE REDUCING VALVE (PRV)

WATER LEVEL CONTROLLER

FLOW METER

LC

M

BALL VALVE

GATE VALVE WITH 3/4" HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC BALANCING CONTROL VALVE

PRESSURE SAFETY VALVE

GATE VALVE - THREADED/FLANGED

GLOBE VALVE - THREADED/FLANGED

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)

FLEXIBLE CONNECTION

WATER BALANCE DEVICE

MODULATING CONTROL BUTTERFLY VALVE

CIRCUIT SETTER VALVE

WYE STRAINER WITH VALVED DRAIN AND

QUICK-COUPLE HOSE CONNECTOR

VALVE SYMBOLS

VACUUM BREAKER

IN-LINE PUMP

S

O U

T H

O L

D O

R C

H A

R D

S T

L O

U

IS

M

O

T

.9

.8

F

.9

.1 w w w .r o s s b a r.

c o m

D ra w in g T it le

P ro je c t

T it le

B u il d in g

N u m b e r:

D ra w in g N u m b e r:

D ep a r tm en t o f

V et er a n s A ff a ir s

D w g o f:

D ra w n

C h e c k e d

D a te

P ro je c t

N o

R

B P ro je c t

N o

-0

B

O T

T S

L A

N E

S

A N

A N

T O

N

IO

T

X

T

.8

.9

F

.8

.6

IN

F

O

H F

S C

O M

P A

N Y

.C O

M H

F S

C O

M P

A N

Y .C

O M

The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the embossed or wet seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this document, unless the changes are made by the Engineer or with the Engineer's written authorization.

© ROSS & BARUZZINI, INC 2018

June 19, 2018

/1

/2

:0 :5

P

M

-M

M

E C

H A

N

IC

A L

S Y

M B

O

LS

A

B B

R E

V

IA

T

IO

N S

H A

R R

Y S

. T R

U M

A N

V A

M C

R E

P

LA

C E

M E

C H

A N

IC

A

L, E

LE

C

TR

IC

A L, A N

D P

LU

M

B

IN

G

H

O S

P

IT

A L D

R

IV

E C

O L U

M B

IA

M

O

A

-1

-1

/2

/2

T R

T

J D

W

P R

O J E

C T

S T

A T

U S

B

ID

S

E T

F

O R

C O

N S

T R

U C

T

IO

N

RLA RUNNING LOAD AMPS

RM ROOM

RND ROUND

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAN SANITARY

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCI SPINAL CODE INJURY

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SD SMOKE DAMPER

SD-1 SCHEMATIC DESIGN (SUBMISSION1)

SD-2 SCHEMATIC DESIGN (SUBMISSION2)

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEC'N SECTION

SEER SEASONAL ENERGY EFFICIENCY RATIO

SENS SENSIBLE

SF SQUARE FOOT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH SENSIBLE HEAT

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SHT SHEET

SI SQUARE INCHES

SND SOUND

SOL SOLENOID

SP STATIC PRESSURE

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD STATIC PRESSURE DIFFERENTIAL

SPD SUPPLY PROCESS AND DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SPT STATIC PRESSURE TRANSMITTER

SQ SQUARE

SR SUPPLY AIR REGISTER

SSHX STEAM TO STEAM HEAT EXCHANGER

SSR SOLID SEPARATOR

SST STAINLESS STEEL

ST STEAM TRAP

STL STEEL

STM STEAM

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING VALVE

SVS STEAM VENT SILENCER

SW SOFTWATER

SWHX STEAM TO WATER HEAT EXCHANGER

T&P TEMPERATURE AND PRESSURE

TAB TESTING, ADJUSTING, BALANCE

TC TEMPERATURE CONTROL

TD THERMODYNAMIC OR TEMPERATURE DIFFERENTIAL (PER CONTEXT)

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TEMP TEMPERATURE

TG TRANSFER GRILLE

TOT TOTAL

TP TRAP

TPD TOTAL PRESSURE DROP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

TYP TYPICAL

U UNDERWRITERS LABORATORY

UC UNDERCUT DOOR

UC UNIT COOLER

UG UNDERGROUND

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

URV UPBLAST UNIT VENTILATOR

V VOLTS

V VALVE

VAC VACUUM

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL)

VEL VELOCITY

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VOL VOLUME

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE) RETURN

VSD VARIABLE SPEED DRIVE

VTR VENT THRU ROOF

VUH VERTICAL UNIT HEATER

W WATT OR WIDTH (PER CONTEXT)

W/ WITH

W/O WITHOUT

WAG WAST ANETHESIA GAS

WB WET BULB

WC WATER COLUMN

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMPS

WCPU WATER COOLED PACKAGED UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAUGE

WPD WATER SIDE PRESSURE DROP

WT WEIGHT

YR YEAR

LAT LEAVING AIR TEMPERATURE

LB(S) POUNDS

LBS/HR POUNDS PER HOUR

LF LINEAR FEET

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPG LIQUEFIED PETROLEUM GAS

LPR LOW PRESSURE RETURN (STEAM CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN (CLEAN)

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LRA LOCKED ROTOR AMPS

LS LIGHT SPACE

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVL LEVEL

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/S METERS PER SECOND (OR METERS/SECOND)

MA MIXED AIR

MAN MANUAL

MANU MANUFACTURER

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAX MAXIMUM

MAX MAXIMUM

MB MIXING BOX

MBH THOUSAND BRITISH THERMAL UNITS PER HOUR

MCA MINIMUM CIRCUIT AMPS

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MCC MOTOR CONTROL CENTER

MECH MECHANICAL

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING VALUE (ASHRAE 52.2)

MFR MANUFACTURER

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM OR MINUTE (PER CONTEXT)

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING

MTD MOUNTED

MTD MEAN TEMPERATURE DIFFERENCE

MTL METAL

MV MANUAL VENT

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

NA NOT APPLICABLE

NC NORMALLY CLOSED OR NOISE CRITERIA (PER CONTEXT)

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

NIC NOT IN CONTRACT

Nm NEWTON METER

NO NORMALLY OPEN OR NUMBER (PER CONTEXT)

NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NPSHA NET POSITIVE SUCTION HEAD AVAILABLE

NPSHR NET POSITIVE SUCTION HEAD REQUIRED

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTDOOR AIR DAMPER

OAG OUTDOOR AIR GRILLE

OAI OUTDOOR AIR INTAKE

OBD OPPOSED BLADE DAMPER

OC ON CENTER

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OR OPERATING ROOM

OT OIL TRAP

P PUMP

PA PIPE ANCHOR

Pa PASCAL

PBD PARALLEL BLADE DAMPER

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PENT PENTHOUSE

PF PRE-FILTER

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER (SOLUTION)

PH PHASE

PHC PREHEAT COIL

PLBG PLUMBING

PNEU PNEUMATIC

PPM PARTS PER MILLION

PRESS PRESSURE

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAUGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR CONDITIONER

QTY QUANTITY

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD RADIATED

RAD RETURN AIR DAMPER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD ROOF DRAIN

RD REFRIGERANT DISCHARGE

RDS ROOM DATA SHEETS

REA RELIEF AIR

REFR REFRIGERANT

RELAD RELIEF AIR DAMPER

REQ REQUIRED

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

ENT ENTERING

EQ EQUAL

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EWB ENTERING AIR WET BULB TEMPERATURE

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EXH EXHAUST

EXIST, EX EXISTING

EXT EXTERNAL

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FDC FIRE DEPARTMENT CONNECTION

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT EXCHANGER

FIN FINISHED

FLR FLOOR

FM FLOW METER

FOHX FUEL OIL HEAT EXCHANGER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FPF FINS PER FOOT

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT WC FEET OF WATER COLUMN

FT-HD HEAD IN FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GC GENERAL CONTRACTOR

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

H HEIGHT

H HUMIDIFIER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HD HOOD

HEV HOSE END VALVE

HOA HAND/OFF/AUTOMATIC

HORIZ HORIZONTAL

HP HORSEPOWER

HP HEAT PUMP

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HR HOUR

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTG HEATING DUCT (HOT DECK)

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVAC HEATING, VENTILATING & AIR CONDITIONING

HVD HOISTWAY VENT DAMPER

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HX HEAT EXCHANGER

HZ HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IE INVERT ELEVATION

IFB INTEGRAL FACE AND BYPASS

IN INCH/INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

INDIC INDICATOR

IPLV INTEGRATED PART-LOAD VALUE

IRH INFRARED HEATER

IS INSECT SCREEN

ISP INTERNAL STATIC PRESSURE

IU INDUCTION UNIT

IV INLET VANES

JS JOIST SPACE

KG KILOGRAMS

KG/HR KILOGRAM PER HOUR

kPa KILOPASCAL

KW KILOWATTS

KWH KILOWATT HOUR

L LENGTH

L LITER

L/h LITERS PER HOUR (OR LITERS/HOUR)

L/m LITERS PER MINUTE (OR LITERS/MINUTE)

L/s LITERS PER SECOND (OR LITERS/SECOND)

A/E ARCHITECT / ENGINEER

AAV AUTOMATIC AIR VENT

ACCH AIR COOLED CHILLER

ACU AIR CONDITIONING UNIT

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AFMS AIR FLOW MEASURING STATION

AHU AIR-HANDLING UNIT

AI ANALOG SIGNAL INPUT

AMB AMBIENT

AMP AMPERE

AO ANALOG SIGNAL OUTPUT

AP ACCESS PANEL

APD AIR PRESSURE DROP

APLV APPLICATION PART LOAD VALUE

APPROX APPROXIMATE

AQST AQUASTAT

ARCH ARCHITECTURE/ARCHITECT

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

AUX AUXILIARY

AVG AVERAGE

B BOILER

BD BUTTERFLY DAMPER

BDD BACK DRAFT DAMPER

BFC BELOW FINISHED CEILING

BFP BACKFLOW PREVENTER

BG BOTTOM GRILLE

BHP BRAKE HORSEPOWER

BI BINARY SIGNAL INPUT

BMS BUILDING MANAGEMENT SYSTEM

BO BINARY SIGNAL OUTPUT

BOB BOTTOM OF BEAM

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BT BLOWOFF TANK

BTC BLOWOFF TANK CONTROL VALVE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNITS PER HOUR

C CENTIGRADE (CELSIUS)

CAP CAPACITY

CAV CONSTANT AIR VOLUME

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)

CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)

CFM CUBIC FEET PER MINUTE

CFP CHEMICAL FEED PUMP

CFT CUBIC FEET

CH CHILLER

CHP CHILLED WATER PUMP

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CHW CHILLED WATER

CI CAST IRON

CLG COOLING

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO CARBON MONOXIDE

CONC CONCRETE

COND CONDENSATE

CONN CONNECTION

COP COEFFICIENT OF PERFORMANCE

CORR CORRIDOR

CP CONDENSATE PUMP

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONTROL VALVE / CONSTANT VOLUME (PER CONTEXT)

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN (TO COOLING TOWER)

CWS CONDENSER WATER SUPPLY (FROM COOLING TOWER)

D DEPTH

DB DRY BULB TEMPERATURE

DBA DECIBELS

DCW DOMESTIC COLD WATER

DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)

DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)

DDC DIRECT DIGITAL CONTROLS

DEFL DEFLECTION

DEG DEGREES

DEG F DEGREES FAHRENHEIT

DES DESIGN

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DIA DIAMETER

DIM DIMENSION

DISCH DISCHARGE

DIV DIVISION

DIW DEIONIZED WATER

DN DOWN

DP DEW POINT TEMPERATURE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DPT DIFFERENTIAL PRESSURE TRANSMITTER

DT DELTA T

DTL DETAIL

DWG(S) DRAWING(S)

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

EA EXHAUST AIR OR EACH (PER CONTEXT)

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENT RATIO

EF EXHAUST FAN

EFF EFFICIENCY

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

ELEC ELECTRIC

ELEV ELEVATION

EMD END OF MAIN DRIP (STEAM)

10. ALL WORK SHALL BE INSTALLED PER THE REFERENCE DETAILS, REGARDLESS OF WHETHER OR NOT THE DETAILS ARE CALLED OUT ON THE PLANS. DETAILS ARE SHOWN EACH DESIGN OPTION AS REQUIRED.

11. PROVIDE VENTS AT ALL HYDRONIC PIPING HIGH POINTS, AND DRAINS AT ALL PIPING LOW POINTS, REGARDLESS OF WHETHER SHOWN OR NOT.

12. ALL DUCTWORK SHALL COMPLY WITH "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE," 3RD EDITION, SMACNA 2005, EXCEPT WHERE MORE RESTRICTIVE REQUIREMENTS ARE SPECIFIED. ANY PLAN REFERENCES TO "SMACNA FIGURE ---" REFERS TO THIS STANDARD. SEE SPECIFICATIONS FOR SCHEDULE OF

DUCT PRESSURE CLASS AND SEAL CLASS.

13. IT IS THE INTENT OF THESE DRAWINGS THAT A MANUAL BALANCING DAMPER BE PROVIDED AT EVERY INDIVIDUAL DUCTED CONNECTION TO AN AIR DEVICE, UNLESS A BALANCING DAMPER IS SCHEDULED TO BE FURNISHED WITH AIR DEVICE. VAV BOXES WITH SINGLE DIFFUSERS ARE NOT REQUIRED TO HAVE A

BALANCING DAMPER.

14. ALL NEW DUCTWORK SIZES SHOWN ON PLANS ARE CLEAR INSIDE DIMENSIONS. CONTRACTOR SHALL ADJUST

SHEET METAL SIZES AS NECESSARY TO ACCOMMODATE INTERNAL DUCT LINER, IF SPECIFIED.

15. ALL EXISTING TEMPERATURE CONTROLS THAT ARE BEING DEMOLISHED OR DISABLED AS WORK OF THIS

CONTRACT SHALL BE COMPLETELY REMOVED FROM BUILDING.

16. THE CONTRACTOR SHALL CONNECT THE NEW HVAC SYSTEM TO THE OWNER'S EXISTING BUILDING CONTROL

SYSTEM. REFER TO THE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

17. CONTRACTOR SHALL HAVE THE DOCUMENTS REVIEWED COMPLETELY BY A CERTIFIED BALANCING CONTRACTOR FOR THE INCLUSION OF THE NECESSARY ADDITIONAL AIR AND HYDRONIC SYSTEM BALANCING DEVICES NOT SHOWN IN THESE DOCUMENTS FOR COMPLETE HVAC SYSTEM BALANCING. REFER TO

SPECIFICATION SECTION 230593 FOR CONSTRUCTION DOCUMENT EXAMINATION REPORT.

18. FIRESTOP ALL NEW PENETRATIONS OF FLOORS AND/OR FIRE-RATED WALLS. SEE SPECIFICATION SECTION

078400 - FIRESTOPPING FOR MORE INFORMATION.

1. THESE PLANS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR SHALL BE PREPARED TO MAKE SOME ALTERATIONS TO THE EXACT LOCATION OF DUCTWORK, PIPING AND EQUIPMENT FROM THE LOCATION

INDICATED ON THESE DRAWINGS TO FIT ACTUAL JOB CONDITIONS.

2. ALL ELBOWS, FITTINGS, ETC., IN PIPING AND DUCTWORK REQUIRED TO CLEAR ALL JOB OBSTRUCTIONS ARE NOT NECESSARILY INDICATED. ALL NECESSARY TRANSITIONS, FITTINGS AND OFFSETS ARE REQUIRED

WHETHER SHOWN OR NOT.

3. BECAUSE OF THE LIMITED SPACE AVAILABLE TO INSTALL ALL OF THE MECHANICAL WORK, COORDINATION BETWEEN THE VARIOUS TRADES IS OF THE UTMOST IMPORTANCE. SEE SPECIFICATION 230100 FOR REQUIRED

COORDINATION DRAWINGS.

4. THE CONTRACTOR SHALL COORDINATE STAGING AND SCHEDULING WITH THE OWNER'S REPRESENTATIVE.

5. EXISTING CONDITIONS ARE BASED ON INFORMATION OBTAINED FROM PREVIOUS CONSTRUCTION DOCUMENTS AND INFORMAL FIELD OBSERVATION AND SHALL NOT BE CONSTITUTED AS "AS BUILT." THE CONTRACTOR SHALL FIELD-VERIFY EXISTING CONDITIONS BEFORE THE ONSET OF CONSTRUCTION.

6. DEMOLISH ALL PIPING, DUCTWORK EQUIPMENT, ETC., SHOWN TO BE REMOVED, IN ITS ENTIRETY, INCLUDING

ALL HANGERS AND SUPPORTS.

7. WHERE CONTRACTOR IS REQUIRED TO CONCEAL NEW WORK, REMOVE OR MODIFY EXISTING CONSTRUCTION OR EQUIPMENT, OR ATTACH TO EXISTING CONSTRUCTION, THE CONTRACTOR SHALL REPAIR OR REPLACE EXISTING CONSTRUCTION AND MATERIALS TO MATCH CONDITIONS AT THE ONSET OF CONSTRUCTION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REMOVE AND REPLACE EXISTING CEILINGS AND WALLS REQUIRED

FOR INSTALLATION OF MECHANICAL SYSTEMS.

8. THE OWNER SHALL MAINTAIN ALL SALVAGE RIGHTS OF EQUIPMENT AND MATERIALS REMOVED. ALL EQUIPMENT AND MATERIALS NOT CLAIMED BY THE OWNER SHALL BE REMOVED FROM THE PREMISES BY THIS

CONTRACTOR.

9. CONTRACTOR SHALL PROVIDE SEISMIC BRACING AND MOUNTING OF EQUIPMENT AND MATERIALS IN COMPLIANCE WITH ALL LOCAL CODE REQUIREMENTS AND THE REQUIREMENTS OF SPECIFICATION SECTION

SEISMIC PROTECTION.

R E

V

IS

IO

N

S

N O

D E

S C

R

IP

T

IO

N D

A T

SUBBASEMENT

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

FOURTH FLOOR

FIFTH FLOOR

SIXTH FLOOR

PENTHOUSE

PENTHOUSE ROOF

10" CHS/R

4" CHS/R

3" CHS/R

AHU-25

[Laundry]

CAP:450

DESIGN GPM: 90

REVISED GPM: 64

3" CHS/R

10" CHS/R

10" CHS/R

10" CHS/R

6" CHS/R

2 1/2" CHS/R

8" CHS/R

8" CHS/R

4" CHS/R

8" CHS/R5" CHS/R

3" CHS/R

AC-S10

[New Cardiology]

CAP: 929

DESIGN GPM:132

REVISED GPM: 133

3" CHS/R

5" CHS/R

CH-3

CAP: 12000

GPM: 1714

AHU-3

[ACA]

CAP: 1227

DESIGN GPM: 175

REVISED GPM: 175

8" CHS/R

2 1/2" CHS/R

4" CHS/R

AHU-6

[ACA]

CAP: 1805

DESIGN GPM: 360

REVISED GPM: 258

8" CHS/R

10" CHS/R

10" CHS/R

10" CHS/R

8" CHS/R

4" CHS/R

6" CHS/R

1-CRAC1

[ROOM C308]

CAP: 87.4

GPM: 22.7

2 1/2" CHS/R

1 1/2" CHS/R

1 1/2" CHS/R

6" CHS/R

6" CHS/R

3" CHS/R

FUTURE AHU-X

CAP:

GPM:

3" CHS/R

2 1/2" CHS/R

5" CHS/R

6" CHS/R

PAC-X

CAP: 21

GPM:3 (est)

1" CHS/R

3" CHS/R

PIPE BASEMENT (MAIN) MECHANICAL ROOM

ACA

MECHANICAL

ROOM

4-PIPE UNITS

[2ND FLOOR]

CAP: 42

GPM: 6 (est)

(PATIENT PRIVACY SURGERY)

1" CHS/R

4" CHS/R

FCU 1-3

[6th Floor Suites]

CAP: 25

GPM: 5.4

CHILLER HOUSE

2ND FLOOR

MECHANICAL ROOM

PENTHOUSE

MECHANICAL ROOM

UTILITY CHASE

"H9" CHASE (BY CL H & 9)

"K8" CHASE (BY CL K & 8)

FCU 1-4

[OT/PT/Rehab]

CAP: 80

GPM: 13.9

4" CHS/R

TO INDUCTION LOOP (HYDRAULICALLY SEPARATED)

(NEW MRI SUITE 2011)

AHU-27

[New ICU]

CAP: 968

GPM: 79

(INTENSIVE CARE UNIT 2015)

INTERSTITIAL SPACE

AHU-24

[Canteen & Kitchen]

CAP: 787

DESIGN GPM: 130

REVISED GPM: 112

(RENOVATE 2-EAST REHAB MEDICINE 2012)

ACA-AHU-7

[Dental Clinic]

CAP: 367

GPM: 53

FCU 1-4

[Dental Clinic]

CAP: 118

GPM: 17.2

(NUCLEAR

MEDICINE

2016)

4" CHS/R

2 1/2" CHS/R

5" CHS/R

3" CHS/R

5" CHS/R

ABZ CDEFGHIJKLMNaPQRSTUVWXY

AC-S6

[Theater / IRM]

CAP: 208

GPM: 39.4

PCP 1-5CHP 1-7

ABZ CDEFGHIJKLMNaPQRSTUVWXY

10" CHR

8" CHR 8" CHR

10" CHR

(TYP FOR SIZES ABOVE)

5" CHS/R

12" CWS

12" CWS

5" CHS/R

5" CHS/R5" CWS

(TYP FOR SIZES ABOVE)

18" CHR

18" CHS/R

CH-7

CAP: 14400

GPM: 2058

CH-1

CAP: 6000

GPM: 858

CH-2

CAP: 12000

GPM: 1714

CHP-1-CHP-6

HEAD: 40'

GPM: 858

CHP-7

HEAD: 40'

GPM: 2058

PCP-1-PCP-3

HEAD: 95'

GPM: 2550

PCP-4-PCP-5

HEAD: 85'

GPM: 429

AHU-2

[Chiller House]

CAP: 369

GPM: 54.6

AHU-1

[Chiller House]

CAP: 369

GPM: 54.6

3" CHS/R

AC-S25

[Magnetic Imaging]

CAP: 252

GPM: 36

AHU-2

[ACA]

CAP: 1227

GPM: 175

AHU-1

[ACA]

CAP: 1227

DESIGN GPM: 175

REVISED GPM: 175

AHU-4

[ACA]

CAP: 272

GPM: 38.9

AC-17B

[SPD-ECC]

CAP: 88

GPM: 21.9

AC-17C

[SPD-ECC]

CAP: 59

GPM: 11.9

AC-17A

[SPD-ECC]

CAP: 183

GPM: 36.5

AC-S7/8

[Mental Health]

CAP: 490

DESIGN GPM: 95

REVISED GPM: 70

AC-S15

[Morgue/Nuc Med]

CAP: 533

DESIGN GPM: 110

REVISED GPM: 76

AHU-28

[Nuc. Medicine]

CAP: 249

GPM: 35.2

AC-S12

[Imaging]

CAP: 840

DESIGN GPM: 120

REVISED GPM: 120

AC-S11

[Cardio, Dental, Police]

CAP: 750

DESIGN GPM:100

REVISED GPM: 107

AC-S14

[Pathology]

CAP: 2152

DESIGN GPM: 440

REVISED GPM: 307

AC-S16

[East Research]

CAP: 1283

DESIGN GPM: 171

REVISED GPM: 183

AC-S19

[Dietary Kitchen]

CAP: 1988

DESIGN GPM: 284

REVISED GPM: 284

AC-S18

[West Research]

CAP: 2282

DESIGN GPM: 326

REVISED GPM: 326

AC-S13

[Audiology]

CAP: 490

DESIGN GPM: 98

REVISED GPM: 70

AHU-29

[Patient Privacy]

CAP: 1753

DESIGN GPM: 420

REVISED GPM: 250

AHU-T

[Construction Transitions]

CAP: 2308

GPM: 325

AC-S1

[Building Perimeter]

CAP: 1572

GPM: 235

AC-S3

[2nd, 3rd Fl. Core]

CAP: 1920

DESIGN GPM: 320

REVISED GPM: 274

AC-S5

[6th Floor]

CAP: 442

DESIGN GPM: 75

REVISED GPM: 63

AC-S2

[4th, 5th, 6th Fl. Core]

CAP: 1483

GPM: 265

AC-S20

[Surgery Team Base]

CAP: 126

GPM: 36

AC-S4

[Step Down]

CAP: 574

DESIGN GPM: 115

REVISED GPM: 82

HV-2

[Mail and Locker]

CAP: 655.2

DESIGN GPM: 84

REVISED GPM: 94

HV-6

[Maint. Shops]

CAP: 1008

DESIGN GPM: 126

REVISED GPM: 144

ACA-AHU-8

[ACA]

CAP: 1021

GPM: 140

AC-S21

[Biomed]

CAP: 75

GPM: 15

BASEMENT

PHX-1

CAP: 6020

GPM: 860

BYPASS

6" CHS/R

5" CHS/R

4" CHS/R

4" CHS/R

4" CHS/R

5" CHS/R

8" CHS/R

AHU-10

[Sterile Processing]

CAP: 1793

DESIGN GPM: 257

REVISED GPM: 256

AHU-9

[OR Staff Offices]

CAP: 978

DESIGN GPM: 140

REVISED GPM: 140

AHU-8

[OR Nurse's Station]

CAP: 1575

DESIGN GPM: 235

REVISED GPM: 225

AHU-7B

[OR Suite]

CAP: 1174

DESIGN GPM: 164

REVISED GPM: 164

AHU-7A

[OR Suite]

CAP: 1147

GPM:164

OR MECHANICAL ROOM

18" CHS/R

12" CHS/R

16" CHS/R

EMERGENCY OBSERVATION IN ACA (6,000 SF)

[FUTURE EXPANSION]

ASSUMED CAPACITY: 360

ASSUMED GPM: 52

2 1/2" CHS/R

4" CHS/R

4" CHS/R

3" CHS/R

2 1/2" CHS/R

2 1/2" CHS/R

1 1/4" CHS/R

1 1/4" CHS/R

2" CHS/R

3" CHS/R

3" CHS/R

2" CHS/R

8" CHS/R

CH-5

CAP: 162.4

GPM: 278

CH-6

CAP: 162.4

GPM: 278

6" SCHS/R

4" CHS/R

3" CHS/R

4" CHS/R

4" CHS/R

EXPAND PHARMACY

AND LOBBY (NE

CORNER OF ACA)

(DX ONLY)

FUTURE ANIMAL

RESEARCH AHU

(WILL BE DX)

2 1/2" CHS/R

4" CHS/R

3" CHS/R 3" CHS/R

3" CHS/R

TESTING SITE 5:

503 GPM

TESTING SITE 1:

3,365 GPM

TESTING SITE 2:

545 GPM

TESTING SITE 3:

417 GPM

TESTING SITE 4:

719 GPM

6" CHS/R

18" CHS/R

2 1/2" CHS/R

6" CHS/R

3" CHS/R

3" CHS/R

CHILLERS CH-4, CH-5,

AND CH-6 SHOWN

FOR REFERENCE

8" CHS/R

6" CHS/R

10" CHS/R

BYPASS

6" CHS/R

8" CHS/R

10" CHS/R4" CHS/R

1-CRAC2

[ROOM C308]

CAP: 87.4

GPM: 22.7

1 1/4" CHS/R

6" CHS/R

2" CHS/R FCU 4-8

[6th Floor Suites]

CAP: 54

GPM: 12

2 1/2" CHS/R

1 1/2" CHS/R1" CHS/R

1 1/2" CHS/R

10" CHS/R

ON THIRD FLOOR ROOF

ON ACA THIRD FLOOR ROOF

ON SIXTH FLOOR ROOF

ON FIRST FLOOR ROOFON FIRST FLOOR ROOF

ON FIRST FLOOR ROOFIN INTERSTITIAL SPACE

FCU 5-6

[ACA]

CAP: 97

GPM: 14

PAC-XX

CAP: 21

GPM:3 (est)

8" CHS/R

6" CHS/R

3" CHS/R

2 1/2" CHS/R

4" CHS/R

4" CHS/R

FCU ?

[6th Floor]

CAP: 525

GPM: 75

FCU ?

[6th Floor]

CAP: 315

GPM: 45

AS-1

CH-4

GLYCOL SYSTEM

2 22

2 2 2

2 2 222 222

3 33

6" CHS/R

CAPACITIES SHOWN ARE IN MBH.

THIS SHEET PROVIDES AN OVERVIEW OF THE ENTIRE HOSPITAL CHILLED WATER

SYSTEM. IT SHOWS ALL CHILLED WATER COMPONENTS CONNECTED TO THIS

SYSTEM THAT WERE DOCUMENTED ON EXISTING DRAWINGS OR FOUND IN THE

FIELD, AND AS SUCH PROVIDES INFORMATION UTILIZED IN THE FOLLOWING COST

OPTIONS:

GENERAL NOTES:

1.

2.

3.

- DESIGN OPTION 05: ADD PRESSURE INDEPENDENT CONTROL VALVES TO CHILLED

WATER COILS.

- DESIGN OPTION 08: REPLACE CHILLER PLANT AIR SEPARATOR.

- DESIGN OPTION 09: REPLACE SECONDARY CHILLED WATER PUMPS.

THE 'TESTING SITE' WATER FLOWS WERE RECORDED ON DECEMBER 14, 2017. A

DESIGN DAY WAS SIMULATED BY DISABLING ALL CHILLERS (SO NO ACTUAL CHILLED

WATER COOLING OCCURED AT THE AIR-HANDLERS), AND ONE SECONDARY CHILLED

WATER PUMP WAS OPERATED IN HAND (100% DESIGN FLOW) AND ONE PUMP WAS

OPERATING AT 49 HZ AS DETERMINED BY THE BAS. THE THIRD CHILLED WATER

PUMP WAS OFF.

S

O U

T H

O L

D O

R C

H A

R D

S T

L O

U

IS

M

O

T

.9

.8

F

.9

.1 w w w .r o s s b a r.

c o m

D ra w in g T it le

P ro je c t

T it le

B u il d in g

N u m b e r:

D ra w in g N u m b e r:

D ep a r tm en t o f

V et er a n s A ff a ir s

D w g o f:

D ra w n

C h e c k e d

D a te

P ro je c t

N o

R

B P ro je c t

N o

-0

B

O T

T S

L A

N E

S

A N

A N

T O

N

IO

T

X

T

.8

.9

F

.8

.6

IN

F

O

H F

S C

O M

P A

N Y

.C O

M H

F S

C O

M P

A N

Y .C

O M

The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the embossed or wet seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this document, unless the changes are made by the Engineer or with the Engineer's written authorization.

© ROSS & BARUZZINI, INC 2018

June 19, 2018

-M

C

H

IL

LE

D

W A

T E

R R

IS

E

R D

IA

G

R A

M H

A R

R Y

S . T

R U

M A

N V

A M

C R

E P

LA

C

E M

E C

H A

N

IC

A L, E

LE

C

TR

IC

A

L, A

N D

P

LU

M B

IN

G

H

O S

P

IT

A L D

R

IV

E C

O L U

M B

IA

M

O

A

-1

-1

/2

/2

D B

C

J D

W

P R

O J E

C T

S T

A T

U S

B

ID

S

E T

F

O R

C O

N S

T R

U C

T

IO

N

NOT TO SCALE

CHILLED WATER PIPING SCHEMATIC

KEYED NOTES:

1 CRAC UNITS HAVE BOTH CHILLED WATER AND DX HEAT REJECTION OPTION. THEY

ARE ALMOST ALWAYS OPERATED IN DX MODE.

2 CHANGE EXISTING 2-WAY CONTROL VALVE TO PROVIDE WITH 2-WAY PICV. SEE

DETAILS ON SHEET 05-M01.

3 CHANGE EXISTING 3-WAY CONTROL VALVE TO 2-WAY PICV. SEE DETAILS ON SHEET

05-M01.

4 DEMOLISH EXISTING 2-WAY CONTROL VALVE IN BYPASS. SEE DETAILS ON SHEET

05-M01.

R E

V

IS

IO

N

S

N O

D E

S C

R

IP

T

IO

N D

A

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

JbKL

La

MNNaPQRST

W 2

W 2.8

W 3.7

W 7.2

W 8.2

6.2

5.4

6.7

5.7

W 4.6

8.3

5.1

W 6.3

8.0

W 1.9

W 5.5

W 9.3

E 1.10

CP-2

CP-1

CP-EX

HX-C-3

RHC-19A

CP-EX

RHC-19A

RHC-11

"S

-5

"S

-1

2"CR-15

"S

-1

"S

-1

"S

-5

1"CR-15

"S

-1

"S

-1

2"CR-15

2"CR-15

UP

AC-S19

AC-S11

AC-S18

USG-2 USG-1

2"CR-15

STAIR #3

1"S-15

3/4"S-15

LPS UP

"C

R -1

DEAD LEGS

2"S-15

"S

-1

UP THRU FLOOR

2"S-15

"S

-1

1"CR-15

2"S-15

DEAD LEGS

"S

-1

"C

R -1

"C

R -5

3"CR-50

1"CR-15

2"S-15

3"CR-15

3"PC

12"S-50

OR STEAM PIPING

1 1/2"S-15

1 1/2"S-15

DEAD LEG

3"CR-50

FT

DEAD LEG

DEAD LEG

1"S-15

DEAD LEGS

1"CR-50

12"S-50

3"PC

HOSE TO

GRADE

1/2" DEAD LEGS

1" DEAD LEG

DEAD LEG

1 1/2" DEAD LEG

3"S-50

2"S-50

1 1/2"CR-15

1 1/2"CR-50

2"S-50

2"S-15

PRV

PPT

DEAD LEGS

DEAD LEGS

3/4" LEAK

1" DEAD LEG

3/4"CR-50

1/4"CR-50

"C

R -5

2"S-50

2"S-15

2 1/2" VENT

PRV

LPS HIGH

1"CR-15

8"S-50

"P

C

PPT CONNECTS ON TOP

3"CR-15

2"CR-50

P

2 1/2"S-50

PRV

PRV

"C

R -1

CAP

CAP

CAP

CAP

CAP

UP

CAP

2"S-50

2"S-50

"C

R -5

CAP

CAP

CAP

"C

R -1

"C

R -1

CAP

UP

UP

UP

UP

UP

CAP

CAP

UP

UP

UP

UP

/4

"S -5

1"S-15

CAP

CAP

2"S-50

1 1/2"S-15

PIPES EXIT MECHANICAL ROOM

HIGH, GO TO BASEMENT LEVEL

"S

-5 0 3

"P C

"P

C

"S

-5

12"S-50

3"PC

1"CR-15

3"CR-50

2"S-15

2 1/2"S-50

3"CR-15

12"S-50

3"PC

1"CR-15

CAP

CAP

1.

2.

3.

4.

DESIGN OPTION 01 INTENT IS TO REMOVE ALL STEAM AND CONDENSATE DEAD

LEGS THROUGHOUT PIPE BASEMENT AND UP TO END-USE DEVICES NOT BEING

USED ANYMORE.

REFER TO DRAWING 00-M01 FOR GENERAL NOTES.

CONTRACTOR TO VERIFY ALL PIPING SHOWN TO BE REMOVED IS ABANDONED

AND NOT BEING USED. COORDINATE WITH FACILITIES PRIOR TO DEMOLITION.

DEMOLITION OF DEAD LEGS SHALL INCLUDE ALL PIPE HANGERS, INSULATIONS,

TRAPS, VALVES, TEMPERATURE CONTROLS, THERMOMETERS, PRESSURE GAGES,

EQUIPMENT, ETC. THAT IS ALSO INSTALLED IN THE STEAM AND STEAM

CONDENSATE LINES.

PATCH WALLS AND FLOORS AFTER DEMOLITION TO MATCH EXISTING

CONSTRUCTION AND FINISHES.

GENERAL NOTES:

S

O U

T H

O L

D O

R C

H A

R D

S T

L O

U

IS

M

O

T

.9

.8

F

.9

.1 w w w .r o s s b a r.

c o m

D ra w in g T it le

P ro je c t

T it le

B u il d in g

N u m b e r:

D ra w in g N u m b e r:

D ep a r tm en t o f

V et er a n s A ff a ir s

D w g o f:

D ra w n

C h e c k e d

D a te

P ro je c t

N o

R

B P ro je c t

N o

-0

KEY PLAN

B

O T

T S

L A

N E

S

A N

A N

T O

N

IO

T

X

T

.8

.9

F

.8

.6

IN

F

O

H F

S C

O M

P A

N Y

.C O

M H

F S

C O

M P

A N

Y .C

O M

The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the embossed or wet seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this document, unless the changes are made by the Engineer or with the Engineer's written authorization.

© ROSS & BARUZZINI, INC 2018

June 19, 2018

-M

D

E S

IG

N

O P

T

IO

N

- D

E M

O S

T E

A M

A N

D C

O N

D E

N S

A T

E D

E A

D

LE

G S

Z

O N

E

H A

R R

Y S

. T R

U M

A N

V A

M C

R E

P

LA

C E

M E

C H

A N

IC

A

L, E

LE

C

TR

IC

A L, A N

D P

LU

M

B

IN

G

H

O S

P

IT

A L D

R

IV

E C

O L U

M B

IA

M

O

A

-1

-1

/2

/2

A M

S

J D

W

P R

O J E

C T

S T

A T

U S

B

ID

S

E T

F

O R

C O

N S

T R

U C

T

IO

N

1/8" = 1'-0"

DESIGN OPTION 01 - DEMO STEAM AND

STEAM CONDENSATE DEAD LEGS - PIPE

BASEMENT ZONE 1

KEYED NOTES:

1 UP TO LAB EQUIPMENT ON LEVEL ABOVE. LAB PERSONNEL INDICATED THAT THE

STEAM FUNCTION OF THEIR EQUIPMENT IS NOT UTILIZED. CONTRACTOR MUST

COORDINATE WITH DEPARTMENT AND FACILITY OPERATIONS PERSONNEL IF THIS

PIPING CAN BE DEMOLISHED.

2 ORIGINAL PLANS SAYS THIS SERVES B-118G. IT IS BELIEVED THAT THERE IS NO

LONGER STEAM USING EQUIPMENT IN THIS AREA ON THE FIRST FLOOR. CONFIRM

WITH FACILITIES BEFORE DEMOLITION.

3 AREA ON LEVEL ABOVE WAS IN CONSTRUCTION DURING INITIAL FIELD SURVEY.

CONFIRM DEMOLITION WITH FACILITIES.

4 CAPPED AT FLOOR OF KITCHEN. DEMOLISH AND CAP AS SHOWN.

R E

V

IS

IO

N

S

N O

D E

S C

R

IP

T

IO

N D

A

T

T

T

T

T

TT

T

T

T

T

T

T

T

ABCDEEaFGHJJb

E 1

W 2

E 5.5 w 6.3

6.2

5.4

6.7

5.7

5.8

E 2.8

E 1.9

E 2

E 3.7

E 4.6

E 6.3

E 7.2

6"CR-15

"S

-5

"P

C

"C

R -1

PRV

PRV

PRV

UP

CONNECT ON

BOTTOM OF TANK

"C

R -1

/2 "C

R -1

"S

-5

/2 "S

-1

"S -5

/4

"C R

-5

2"S-50

2"S-50

"C

R -5

CAP

"C

R -1

UP

UP

UP

UP

CAP

UP

CAP

"C

R -5

1"CR-15

1 1/2"CR-50

2"S-15

2 1/2"S-15

3"S-50

2 1/2"S-15

3"S-50

1 1/2"CR-15

CAP

UP

UP

CRT-1EX

UP

UP

UP

UP

UP

UP

CAP

CAP

1"S-15

FLASH TANK

1UP

1 1/4"S-50

CAP

CAP

CAP

4"V

1.

2.

3.

4.

DESIGN OPTION 01 INTENT IS TO REMOVE ALL STEAM AND CONDENSATE DEAD

LEGS THROUGHOUT PIPE BASEMENT AND UP TO END-USE DEVICES NOT BEING

USED ANYMORE.

REFER TO DRAWING 00-M01 FOR GENERAL NOTES.

CONTRACTOR TO VERIFY ALL PIPING SHOWN TO BE REMOVED IS ABANDONED

AND NOT BEING USED. COORDINATE WITH FACILITIES PRIOR TO DEMOLITION.

DEMOLITION OF DEAD LEGS SHALL INCLUDE ALL PIPE HANGERS, INSULATIONS,

TRAPS, VALVES, TEMPERATURE CONTROLS, THERMOMETERS, PRESSURE GAGES,

EQUIPMENT, ETC. THAT IS ALSO INSTALLED IN THE STEAM AND STEAM

CONDENSATE LINES.

PATCH WALLS AND FLOORS AFTER DEMOLITION TO MATCH EXISTING

CONSTRUCTION AND FINISHES.

GENERAL NOTES:

S

O U

T H

O L

D O

R C

H A

R D

S T

L O

U

IS

M

O

T

.9

.8

F

.9

.1 w w w .r o s s b a r.

c o m

D ra w in g T it le

P ro je c t

T it le

B u il d in g

N u m b e r:

D ra w in g N u m b e r:

D ep a r tm en t o f

V et er a n s A ff a ir s

D w g o f:

D ra w n

C h e c k e d

D a te

P ro je c t

N o

R

B P ro je c t

N o

-0

KEY PLAN

B

O T

T S

L A

N E

S

A N

A N

T O

N

IO

T

X

T

.8

.9

F

.8

.6

IN

F

O

H F

S C

O M

P A

N Y

.C O

M H

F S

C O

M P

A N

Y .C

O M

The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the embossed or wet seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this document, unless the changes are made by the Engineer or with the Engineer's written authorization.

© ROSS & BARUZZINI, INC 2018

June 19, 2018

-M

D

E S

IG

N

O P

T

IO

N

- D

E M

O S

T E

A M

A N

D C

O N

D E

N S

A T

E D

E A

D

LE

G S

Z

O N

E

H A

R R

Y S

. T R

U M

A N

V A

M C

R E

P

LA

C E

M E

C H

A N

IC

A

L, E

LE

C

TR

IC

A L, A N

D P

LU

M

B

IN

G

H

O S

P

IT

A L D

R

IV

E C

O L U

M B

IA

M

O

A

-1

-1

/2

/2

A M

S

J D

W

P R

O J E

C T

S T

A T

U S

B

ID

S

E T

F

O R

C O

N S

T R

U C

T

IO

N

1/8" = 1'-0"

DESIGN OPTION 01 - DEMO STEAM AND

STEAM CONDENSATE DEAD LEGS - ZONE 2

KEYED NOTES:

1 UP TO LAB EQUIPMENT ON LEVEL ABOVE. LAB PERSONNEL INDICATED THAT THE

STEAM FUNCTION OF THEIR EQUIPMENT IS NOT UTILIZED. CONTRACTOR MUST

COORDINATE WITH DEPARTMENT AND FACILITY OPERATIONS PERSONNEL IF THIS

PIPING CAN BE DEMOLISHED.

2 PIPES ARE CAPPED AT LEVEL ABOVE. CONFIRM DEMOLITION OF PIPING FROM LEVEL

ABOVE BACK TO PIPE BASEMENT WITH FACILITIES.

3 PREVIOUSLY SERVED LAB EQUIPMENT ON FLOOR ABOVE. CONFIRM DEMOLITION

WITH FACILITIES.

R E

V

IS

IO

N

S

N O

D E

S C

R

IP

T

IO

N D

A

T

T

T

T

T

T

T

T

T

T

T

T

T

KLLaMNNaPQRST

W 7.2

W 8.2

W 9.1

W 10.4

11.5

12.5

13.5

Ra

Rb

8.0

CP-EX

RHC-EX

"C

R -1

8"S-50

"S

-5

"S

-1

2"CR-15

"S

-1

"S

-5

2"CR-15

LPS

LPS

LPS

"S

-1

12"S-15

AC-S14

AC-S13

AC-S16

AC-S19

AC-17A

2"CR-15

1 1/2" DEAD LEG

3/4"CR-50

4"S-50

8"S-50

2 1/2"S-15

2 1/2"S-15

UP

2"CR-50

FT

HX

PPT

HUB DRAIN

P R

V

PRV

PRV

CONNECTS

ON TOP

DEAD LEG

CONNECTS ON TOP

3"CR-15

2"CR-50

P

P

P

1"CR-15

3/4" DEAD LEG

/4

"C R

-1 5 3 /4

"C R

-1

"C

R -1

UP UP

UP

CAP

UP

UP

"C

R -1

UP

CAP

CAP

UP

CAP

UP

UP

UP

1"CR-15

/4

"C R

-1

UP

2"CR-50

"S

-5

CAP

CAP

CAP

UP

CAP

BROKEN PIPE WITH

VALVE AND STRAINER

1"S-15

/4

"C R

-1

12"S-15

8"4"4"3"

8" 3" 6" 4" 12"

6"

CAP

CAP

CAP

OPEN PIPE. DEMO BACK

TO CONDENSATE

RETURN TANK AREA.

8"V 2"V

UNIT HEATER

1"CR-15

UP

1.

2.

3.

4.

DESIGN OPTION 01 INTENT IS TO REMOVE ALL STEAM AND CONDENSATE DEAD

LEGS THROUGHOUT PIPE BASEMENT AND UP TO END-USE DEVICES NOT BEING

USED ANYMORE.

REFER TO DRAWING 00-M01 FOR GENERAL NOTES.

CONTRACTOR TO VERIFY ALL PIPING SHOWN TO BE REMOVED IS ABANDONED

AND NOT BEING USED. COORDINATE WITH FACILITIES PRIOR TO DEMOLITION.

DEMOLITION OF DEAD LEGS SHALL INCLUDE ALL PIPE HANGERS, INSULATIONS,

TRAPS, VALVES, TEMPERATURE CONTROLS, THERMOMETERS, PRESSURE GAGES,

EQUIPMENT, ETC. THAT IS ALSO INSTALLED IN THE STEAM AND STEAM

CONDENSATE LINES.

PATCH WALLS AND FLOORS AFTER DEMOLITION TO MATCH EXISTING

CONSTRUCTION AND FINISHES.

GENERAL NOTES:

S

O U

T H

O L

D O

R C

H A

R D

S T

L O

U

IS

M

O

T

.9

.8

F

.9

.1 w w w .r o s s b a r.

c o m

D ra w in g T it le

P ro je c t

T it le

B u il d in g

N u m b e r:

D ra w in g N u m b e r:

D ep a r tm en t o f

V et er a n s A ff a ir s

D w g o f:

D ra w n

C h e c k e d

D a te

P ro je c t

N o

R

B P ro je c t

N o

-0

KEY PLAN

B

O T

T S

L A

N E

S

A N

A N

T O

N

IO

T

X

T

.8

.9

F

.8

.6

IN

F

O

H F

S C

O M

P A

N Y

.C O

M H

F S

C O

M P

A N

Y .C

O M

The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the embossed or wet seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this document, unless the changes are made by the Engineer or with the Engineer's written authorization.

© ROSS & BARUZZINI, INC 2018

June 19, 2018

-M

D

E S

IG

N

O P

T

IO

N

- D

E M

O S

T E

A M

A N

D C

O N

D E

N S

A T

E D

E A

D

LE

G S

Z

O N

E

H A

R R

Y S

. T R

U M

A N

V A

M C

R E

P

LA

C E

M E

C H

A N

IC

A

L, E

LE

C

TR

IC

A L, A N

D P

LU

M

B

IN

G

H

O S

P

IT

A L D

R

IV

E C

O L U

M B

IA

M

O

A

-1

-1

/2

/2

A M

S

J D

W

P R

O J E

C T

S T

A T

U S

B

ID

S

E T

F

O R

C O

N S

T R

U C

T

IO

N

1/8" = 1'-0"

DESIGN OPTION 01 - DEMO STEAM AND

STEAM CONDENSATE DEAD LEGS - ZONE 3

KEYED NOTES:

1 CAPPED AND ABANDONED. DEMOLISH AND CAP AS SHOWN.

2 PIPE IS BROKEN AT PIPE BASEMENT LEVEL. FACILITIES MUST CONFIRM WITH LEVEL

ABOVE THAT STEAM IS NOT NEEDED AND THEN DEMOLISH.

3 COULD NOT CONFIRM EXISTENCE ON LEVEL ABOVE. BELIEVE THERE IS NO CURRENT

STEAM-USING EQUIPMENT IN THIS AREA, AND BELIEVE THAT EQUIPMENT THAT WAS

USED IS NOW GONE. CONFIRM DEMOLITION OF PIPING ON LEVEL ABOVE BACK TO

PIPE BASEMENT WITH FACILITY OPERATIONS PERSONNEL.

R E

V

IS

IO

N

S

N O

D E

S C

R

IP

T

IO

N D

A

T

T

T

T

T

T

T

T

T

T T

T

ABCDEEaFGGaHJ

11.5

12.5

13.5

BaBb

Ha

8.0

E 7.2

E 8.2

E 10.4

E 9.1

8"S-50

8"S-50

"S

-5

"S

-5

"S

-5

"S

-5

"S

-5

"S

-5

8"S-50

1"CR-50

6"CR-15

"C

R -1

"C

R -1

PRV

2 1/2"S-50

3/4"CR-15

12"S-15

6"S-15

"C

R -5

FT

UNINSULATED

DEAD LEG

DEAD

LEG

HX

PRV

UP

UP

UP

"S

-5

DEAD LEG

CAP

UP

3/4"CR-15

1"CR-15

"S

-1

3/4"CR-50

CAP

3"S-50

1 1/2"CR-50

UP

UP

UP

CAP

2"S-50

1 1/2"CR-15

1 1/2"CR-50

1"S-50

2 1/2"S-50

/2 "S

-1

01-M05

CAP

CAP

CAP

6"V

1"CR-50

1.

2.

3.

4.

DESIGN OPTION 01 INTENT IS TO REMOVE ALL STEAM AND CONDENSATE DEAD

LEGS THROUGHOUT PIPE BASEMENT AND UP TO END-USE DEVICES NOT BEING

USED ANYMORE.

REFER TO DRAWING 00-M01 FOR GENERAL NOTES.

CONTRACTOR TO VERIFY ALL PIPING SHOWN TO BE REMOVED IS ABANDONED

AND NOT BEING USED. COORDINATE WITH FACILITIES PRIOR TO DEMOLITION.

DEMOLITION OF DEAD LEGS SHALL INCLUDE ALL PIPE HANGERS, INSULATIONS,

TRAPS, VALVES, TEMPERATURE CONTROLS, THERMOMETERS, PRESSURE GAGES,

EQUIPMENT, ETC. THAT IS ALSO INSTALLED IN THE STEAM AND STEAM

CONDENSATE LINES.

PATCH WALLS AND FLOORS AFTER DEMOLITION TO MATCH EXISTING

CONSTRUCTION AND FINISHES.

GENERAL NOTES:

S

O U

T H

O L

D O

R C

H A

R D

S T

L O

U

IS

M

O

T

.9

.8

F

.9

.1 w w w .r o s s b a r.

c o m

D ra w in g T it le

P ro je c t

T it le

B u il d in g

N u m b e r:

D ra w in g N u m b e r:

D ep a r tm en t o f

V et er a n s A ff a ir s

D w g o f:

D ra w n

C h e c k e d

D a te

P ro je c t

N o

R

B P ro je c t

N o

-0

KEY PLAN

B

O T

T S

L A

N E

S

A N

A N

T O

N

IO

T

X

T

.8

.9

F

.8

.6

IN

F

O

H F

S C

O M

P A

N Y

.C O

M H

F S

C O

M P

A N

Y .C

O M

The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the embossed or wet seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this document, unless the changes are made by the Engineer or with the Engineer's written authorization.

© ROSS & BARUZZINI, INC 2018

June 19, 2018

-M

D

E S

IG

N

O P

T

IO

N

- D

E M

O S

T E

A M

A N

D C

O N

D E

N S

A T

E D

E A

D

LE

G S

Z

O N

E

H A

R R

Y S

. T R

U M

A N

V A

M C

R E

P

LA

C E

M E

C H

A N

IC

A

L, E

LE

C

TR

IC

A L, A N

D P

LU

M

B

IN

G

H

O S

P

IT

A L D

R

IV

E C

O L U

M B

IA

M

O

A

-1

-1

/2

/2

A M

S

J D

W

P R

O J E

C T

S T

A T

U S

B

ID

S

E T

F

O R

C O

N S

T R

U C

T

IO

N

1/8" = 1'-0"

DESIGN OPTION 01 - DEMO STEAM AND

STEAM CONDENSATE DEAD LEGS - ZONE 4

KEYED NOTES:

1 PIPES ARE CAPPED AT LEVEL ABOVE. CONFIRM DEMOLITION OF PIPING FROM LEVEL

ABOVE BACK TO PIPE BASEMENT WITH FACILITY OPERATIONS PERSONNEL.

R E

V

IS

IO

N

S

N O

D E

S C

R

IP

T

IO

N D

A

EaFGGa

11.5

3/4"CR-15

FT

3/4"CR-15

"C

R -1

"S

-1

UP TO BOILER

(DEAD LEG)

PRV

12"S-15

HX

HX

H X

3"V

1 1/2"

1 1/2"

1 1/2"CR-50

V

EXISTING

ELECTRIC

STEAM BOILER

3"V

OPEN TO

FLOOR DRAIN

EaFGGa

11.5

Room

D003C

OFFICE

D004K

BOILER

D018

EF

LEAVE EXISTING LOUVER AND

PLENUM BOX. PATCH EXHAUST

AIR DUCT CONNECTION.

6ø EA

8ø EA

10ø EA

12ø EA

V

1 1/2"

1 1/2"

2 1/2"S-50

3"S-50

1 1/2"CR-50

EXISTING GAS-

FIRED STEAM

BOILER

EXISTING

DEAERATOR

1 2

1.

2.

3.

4.

5.

DESIGN OPTION 01 INTENT IS TO REMOVE ALL STEAM AND CONDENSATE DEAD

LEGS THROUGHOUT PIPE BASEMENT AND UP TO END-USE DEVICES NOT BEING

USED ANYMORE.

REFER TO DRAWING 00-M01 FOR GENERAL NOTES.

CONTRACTOR TO VERIFY ALL PIPING SHOWN TO BE REMOVED IS ABANDONED

AND NOT BEING USED. COORDINATE WITH FACILITIES PRIOR TO DEMOLITION.

DEMOLITION OF DEAD LEGS SHALL INCLUDE ALL PIPE HANGERS, INSULATION,

TRAPS, VALVES, TEMPERATURE CONTROLS, THERMOMETERS, PRESSURE

GAGES, EQUIPMENT, ETC. THAT IS ALSO INSTALLED IN THE STEAM AND STEAM

CONDENSATE LINES.

REMOVE ALL PIPING, VENTING, EQUIPMENT, AND ACCESSORIES RELATED TO

THE STEAM BOILER AND THE ELECTRIC BOILER.

PATCH WALLS AND FLOORS AFTER DEMOLITION TO MATCH EXISTING

CONSTRUCTION AND FINISHES.

GENERAL NOTES:

S

O U

T H

O L

D O

R C

H A

R D

S T

L O

U

IS

M

O

T

.9

.8

F

.9

.1 w w w .r o s s b a r.

c o m

D ra w in g T it le

P ro je c t

T it le

B u il d in g

N u m b e r:

D ra w in g N u m b e r:

D ep a r tm en t o f

V et er a n s A ff a ir s

D w g o f:

D ra w n

C h e c k e d

D a te

P ro je c t

N o

R

B P ro je c t

N o

-0

KEY PLAN

B

O T

T S

L A

N E

S

A N

A N

T O

N

IO

T

X

T

.8

.9

F

.8

.6

IN

F

O

H F

S C

O M

P A

N Y

.C O

M H

F S

C O

M P

A N

Y .C

O M

The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the embossed or wet seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this document, unless the changes are made by the Engineer or with the Engineer's written authorization.

© ROSS & BARUZZINI, INC 2018

June 19, 2018

/1

/2

:0 :1

P

M

-M

D

E S

IG

N

O P

T

IO

N

- D

E M

O S

T E

A M

A N

D C

O N

D E

N S

A T

E D

E A

D

LE

G S

B

O

IL

E R

R O

O M

H A

R R

Y S

. T R

U M

A N

V A

M C

R E

P

LA

C E

M E

C H

A N

IC

A

L, E

LE

C

TR

IC

A L, A N

D P

LU

M

B

IN

G

H

O S

P

IT

A L D

R

IV

E C

O L U

M B

IA

M

O

A

-1

-1

/2

/2

D B

C

J D

W

P R

O J E

C T

S T

A T

U S

B

ID

S

E T

F

O R

C O

N S

T R

U C

T

IO

N

1/4" = 1'-0"

DESIGN OPTION 01 - DEMO STEAM AND

STEAM CONDENSATE DEAD LEGS - LOWER

BOILER ROOM ON PIPE BASEMENT LEVEL

1/4" = 1'-0"

DESIGN OPTION 01 - DEMO STEAM AND

STEAM CONDENSATE DEAD LEGS - UPPER

BOILER ROOM ON BASEMENT LEVEL

KEYED NOTES:

1 DEMOLITION OF THE BOILER AND BOILER FLUE (FUEL-FIRED ONLY) IS NOT IN THIS

CONTRACT.

2 DEMOLISH GAS PIPING AND ASSOCIATED GAS TRAIN COMPONENTS BACK TO MAIN

AND CAP.

R E

V

IS

IO

N

S

N O

D E

S C

R

IP

T

IO

N D

A

JbKL

La

MNNaPQRST

W 2

W 2.8

W 3.7 w 6.3

W 7.2

W 8.2

Rb

6.2

5.4

6.7

5.7

5.8

Ja

W 4.6

8.3

7.6

7.1

3.6

OR

4.1

4.7

5.1

6.1

W 6.3

1.6

3.2

2.7

8.0

W 1.9

W 5.5

W 9.3

E 1.10

OPHTHALMOLOGY RSCH.

B032

OFFICE

B033

OPHTHALMOLOGY

B031

FIRE CL.

CBB4A

PULMONARY RSCH.

B027

TRANS. RM.

B027A

COLD RM.

B037

PHARMACOLOGY RSCH.

B039

COLD RM.

B037A

SIGNAL PANELS

B033A

JAN.

B034

STAIR #3

B036A

ELEC. CLOSET

B030

CORR.

CBB3

LAB.

B026

LAB.

B023

CORR.

CBB4

PHARMACOLOGY RSCH.

B042

OFFICE

B039A

RSCH. INVESTIGATOR

B022 RSCH. INVESTIGATOR

B021

OFFICE

B017

OFFICE

B018

OFFICE

B016

OFFICE

B014

RSCH. INVESTIGATOR

B012

CORR.

B020

PHARMACOLOGY RSCH.

B048

GLASS WASH

B051

RSCH. COMMON RM.

B045

RSCH. INVESTIGATOR

B047

RSCH. OFFICE

B046

OFFICE

B049

RSCH. INVESTIGATOR

B015

RADIOISOTOPE PREP. & STG.

B010

IMAGE REVIEW

B009

NUCLEAR MED., MED. DIR.

B008

OFFICE

B046A

BREAK RM.

B006

IMAGING STRESS LAB.

B005

IMAGING STRESS LAB.

B005A

HEALTH PHYSICS LAB.

B050

ELEC. CLOSET

B009A

CORR.

CBB1

CLOSET

B026A

CORR.

CBB2

ELEC. CLOSET

B024A

OFFICE

B025B

RHEUMATOLOGY RSCH.

B024

RSCH. CORE AREA

B019 OFFICE

B013A

CLINICAL SUPPORT

B013

EXAM RM.

B011

TREADMILL

B001S

TLT.

B007

TLT.

B001R

IMAGING OFFICE

B001Q

PAT. WAITING AREA

B001P

CORR.

B001DIETETICS STG.

B002D

DIETETICS OFFICE

B002A

CORR.

CBA13

CORR.

CBA14

CORR.

CBA1

CORR.

CBB1A

F. TLT.

A001

M. TLT.

A002

IT CLOSET

A056A

STAIR #1

A056

Room

A054B

ELEV. LOBBY

D054

CORR.

CBD4

AUTOPSY

D031

JAN.

D001A

TRASH

D001

BREAK RM.

B002G

OFFICE

B002F

DISH CLEAN

B002K

EXAM RM.

B001M

OFFICE

B001F

UTIL. RM.

B001L

EXAM RM.

B001K

RADIOPHARMACY

B001H

CART CLEAN

B001C

CLEANING AREA

B001A

ELEC. CLOSET

C001F

MECH. CHASE

C001G

FIRE CL.

CBC3A

DIETETICS OFFICE

C009A

REF.

C009B

JAN.

B002E

REF.

C009D

CLOSET

B001E

FOOD PREP./ COOK

B001B

FOOD PREP./ COOK

B002

FOOD PREP.

C009

MECH.

C012

CORR.

G003

ELEC. CLOSET

B009B

OI&T

C001

CHIEF OF SERVICE

C001A

ELEV #4

ELEV #5

ELEV #3

ELEV #7

ELEV #8

CORR

B340F

FIRE CL.

CAPPED AT FLOOR,

DEMOLISH

OPEN AT FLOOR, DEMOLISH

1.

2.

3.

4.

DESIGN OPTION 01 INTENT IS TO REMOVE ALL STEAM AND CONDENSATE DEAD

LEGS THROUGHOUT PIPE BASEMENT AND UP TO END-USE DEVICES NOT BEING

USED ANYMORE.

REFER TO DRAWING 00-M01 FOR GENERAL NOTES.

CONTRACTOR TO VERIFY ALL PIPING SHOWN TO BE REMOVED IS ABANDONED

AND NOT BEING USED. COORDINATE WITH FACILITIES PRIOR TO DEMOLITION.

DEMOLITION OF DEAD LEGS SHALL INCLUDE ALL PIPE HANGERS, INSULATIONS,

TRAPS, VALVES, TEMPERATURE CONTROLS, THERMOMETERS, PRESSURE GAGES,

EQUIPMENT, ETC. THAT IS ALSO INSTALLED IN THE STEAM AND STEAM

CONDENSATE LINES.

PATCH WALLS AND FLOORS AFTER DEMOLITION TO MATCH EXISTING

CONSTRUCTION AND FINISHES.

GENERAL NOTES:

S

O U

T H

O L

D O

R C

H A

R D

S T

L O

U

IS

M

O

T

.9

.8

F

.9

.1 w w w .r o s s b a r.

c o m

D ra w in g T it le

P ro je c t

T it le

B u il d in g

N u m b e r:

D ra w in g N u m b e r:

D ep a r tm en t o f

V et er a n s A ff a ir s

D w g o f:

D ra w n

C h e c k e d

D a te

P ro je c t

N o

R

B P ro je c t

N o

-0

KEY PLAN

B

O T

T S

L A

N E

S

A N

A N

T O

N

IO

T

X

T

.8

.9

F

.8

.6

IN

F

O

H F

S C

O M

P A

N Y

.C O

M H

F S

C O

M P

A N

Y .C

O M

The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the embossed or wet seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this document, unless the changes are made by the Engineer or with the Engineer's written authorization.

© ROSS & BARUZZINI, INC 2018

June 19, 2018

/1

/2

:0 :1

P

M

-M

D

E S

IG

N

O P

T

IO

N

- D

E M

O S

T E

A M

A N

D C

O N

D E

N S

A T

E D

E A

D

LE

G S

Z

O N

E

B A

S E

M E

N T

H A

R R

Y S

. T R

U M

A N

V A

M C

R E

P

LA

C E

M E

C H

A N

IC

A

L, E

LE

C

TR

IC

A L, A N

D P

LU

M

B

IN

G

H

O S

P

IT

A L D

R

IV

E C

O L U

M B

IA

M

O

A

-1

-1

/2

/2

D B

C

J D

W

P R

O J E

C T

S T

A T

U S

B

ID

S

E T

F

O R

C O

N S

T R

U C

T

IO

N 1/8" = 1'-0"

BASEMENT - ZONE 1

R E

V

IS

IO

N

S

N O

D E

S C

R

IP

T

IO

N D

A T

E

KEYED NOTES:

1 TO LAB EQUIPMENT. LAB PERSONNEL INDICATED THAT THE STEAM FUNCTION OF

THEIR EQUIPMENT IS NOT UTILIZED. CONTRACTOR MUST COORDINATE WITH

DEPARTMENT AND FACILITY OPERATIONS PERSONNEL IF THIS PIPING CAN BE

DEMOLISHED.

2 ORIGINALLY UP TO LAB EQUIPMENT, BUT NO LAB EQUIPMENT WAS OBSERVED

DURING SURVEY. CONTRACTOR MUST COORDINATE WITH DEPARTMENT AND

FACILITY OPERATIONS PERSONNEL IF THIS PIPING CAN BE DEMOLISHED.

3 PIPES ARE CAPPED AT LEVEL BELOW. DEMOLISH.

ABCDEEaFG

Ga

HJJb

E 1

W 2

E 5.5 w 6.3

6.2

5.4

6.7

ACA

10.6

ACA

A

5.7

5.8

Ja

E 2.8

E 1.9

E 2

E 3.7

E 4.6

E 6.3

E 7.2

TREADMILL

B001S

CORR.

CBA13

CORR.

CBA14

CORR.

CBA1

F. TLT.

A001

M. TLT.

A002

RADIOPHARMACY RSCH.

A003

FIRE CL.

CBA2A

CORR.

CBA2 CORR.

CBA3

RADIOPHARMACY RSCH.

A007

RADIOPHARMACY RSCH.

A009

PHY. RSCH.

A009A

RSCH. WK. RM.

A010

ENDOCRINE/ HYPERTENSION RSCH.

A012

CORR.

CBA4

ENDOCRINE/ HYPERTENSION RSCH.

A019

ENDOCRINE/ HYPERTENSION RSCH.

A020

CORR.

CBA5

NEURO. SLEEP RSCH.

A023

OFFICE

A023A

STG.

A042A

STG.

A042

VMU OFFICE

A043

ANIMAL WARD

A045

ANIMAL SURG.

A045A

DARK RM.

A015A

RADIOPHARMACEUTICAL SCIENCES

RSCH.

A017

ANIMAL X-RAY RM.

A015

COLD. RM.

A014

SHR./ LNGE.

A011

NEURO. SLEEP RSCH.

A018 SURG. SUITE

A021

CORR.

CBA6

RADIOPHARMACEUTICAL SCIENCES

RSCH.

A049

OFFICE

A006A

OFFICE

A051A

RADIOPHARMACY RSCH.

A055

ELEC. CLOSET

CBA10A

OFFICE

A004A

RSCH. INVESTIGATOR

A005

RADIOPHARMACY RSCH.

A006

ANIMAL WARD

A008A

PHY. RSCH.

A008

CORR.

CBA8*

CORR.

CBA18

CORR.

CBA15

CORR.

CBA8

RADIOPHARMACEUTICAL SCIENCES

RSCH.

A016

RSCH.INVESTIGATOR

A013

OFFICE

A022

RSCH. OFFICE

A020A

Room

A025B

JAN.

A025

FIRE CL.

B061

STAIR #4

A024A

PATHOGEN FREE SUITE

A026

ANIMAL WARD

A027A

ANIMAL WARD

A027

ANIMAL WARD

A029

ANIMAL WARD

A028

CORR.

CBA7

ANIMAL WARD

A031

ANIMAL WARD

A030

ANIMAL WARD

A033

ANIMAL WARD

A035

ANIMAL WARD

A032

ANIMAL WARD

A034

STAIR CORR.

A024B

CORR.

CBA9

CORR.

CBA10

RADIOPHARMACY RSCH.

A004

PAINT SHOP

D006

OFFICE

D004D

LAUNDRY & MENDING

D004C

CORR.

CBA11

CORR.

CBA17

OFFICE

D005 SAFETY/EMERGENCY

D005A

ELEC. SHOP

D007

TELEPHONE OPERATORS

D004L

LOST AND FOUND

D004N

STG.

D004O

ENTR. VEST.

D004E

TELEPHONE OPERATOR SUPER.

D004M

M. TLT.

D004A

TLT.

D004B

CORR.

CBD1

REPRODUCTIVE

D002

IT CLOSET

A056A

STAIR #1

A056

Room

A054B

ELEC. CLOSET

A053

RSCH. STG.

A054

BIOHAZARD STG.

A057

CLOSET

A059A

MAIL RM.

A059

DMARC

A060

P.M.I. SHOP

A061

RADIATION LAB.

A052

RADIOPHARMACEUTICAL SCIENCES

RSCH.

A050

RSCH. INVESTIGATOR

A048

RADIOPHARMACEUTICAL SCIENCES

RSCH.

A047

SHR. RM.

A062D

M. ST. LNGE.

A062

M. LKR. RM.

A062B

M. TLT.

A062C

F. TLT.

A063C

F. ST. LNGE.

A063A

ANIMAL WARD

A040

ANIMAL WARD

A039

CORR.

CBA8*A

EQUIP. STG.

A036

FUTURE ANIMAL WARD

A037

MECH RM.

A038

CART WASH (DIRTY)

A046

CAGE WASH

A041

F. LKR. RM.

A063B

SHR. RM.

A063D

SHR. RM.

A063E

ELEV. LOBBY

D054

TRASH

D001B

JAN.

D001A

TRASH

D001

WK. RM.

E002B

STG. RSCH. SVC.

A033*

STG. RSCH.

A033A

STG.

A033B

OFFICE

E002L

M.F.M.R. EXECUTIVE DIR.

E002K

CLINICAL RSCH.

E002J

R.C.O., R&D

E002I

OFFICE

E002H

ELEC. CLOSET

A047A

ONCOLOGY RESCH.

A051

OUTPATIENT PHARM. SUPV.

E001E

SUPV. INPATIENT PHARM.

E001F

LAUNDRY STORAGE

ELEV #4

ELEV #5

ELEV #3 ELEV #2 ELEV #1

CORR

B340F

FIRE CL.

DEAD LEGS CAPPED AT THIS

ROOM, DEMOLISH

1.

2.

3.

4.

DESIGN OPTION 01 INTENT IS TO REMOVE ALL STEAM AND CONDENSATE DEAD

LEGS THROUGHOUT PIPE BASEMENT AND UP TO END-USE DEVICES NOT BEING

USED ANYMORE.

REFER TO DRAWING 00-M01 FOR GENERAL NOTES.

CONTRACTOR TO VERIFY ALL PIPING SHOWN TO BE REMOVED IS ABANDONED

AND NOT BEING USED. COORDINATE WITH FACILITIES PRIOR TO DEMOLITION.

DEMOLITION OF DEAD LEGS SHALL INCLUDE ALL PIPE HANGERS, INSULATIONS,

TRAPS, VALVES, TEMPERATURE CONTROLS, THERMOMETERS, PRESSURE GAGES,

EQUIPMENT, ETC. THAT IS ALSO INSTALLED IN THE STEAM AND STEAM

CONDENSATE LINES.

PATCH WALLS AND FLOORS AFTER DEMOLITION TO MATCH EXISTING

CONSTRUCTION AND FINISHES.

GENERAL NOTES:

S

O U

T H

O L

D O

R C

H A

R D

S T

L O

U

IS

M

O

T

.9

.8

F

.9

.1 w w w .r o s s b a r.

c o m

D ra w in g T it le

P ro je c t

T it le

B u il d in g

N u m b e r:

D ra w in g N u m b e r:

D ep a r tm en t o f

V et er a n s A ff a ir s

D w g o f:

D ra w n

C h e c k e d

D a te

P ro je c t

N o

R

B P ro je c t

N o

-0

KEY PLAN

B

O T

T S

L A

N E

S

A N

A N

T O

N

IO

T

X

T

.8

.9

F

.8

.6

IN

F

O

H F

S C

O M

P A

N Y

.C O

M…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.