36C25518R0540-0001003.pdf
PDF 8 MB Posted
- Attached to
- Replace Mechanical, Electrical and Plumbing P/N:589A4-17-182 Federal contract opportunity
- Solicitation number
- 36C25518R0540
About this file
36C25518R0540 0001 Drawings-Replace MEP 589A4-17-182-VOL 2- pages 13.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25518C0212-000.docx | DOCX document | |
| 36C25518R0540-0002000.docx | DOCX document | |
| 36C25518R0540-0001007.pdf | ||
| 36C25518R0540-0001006.pdf | ||
| 36C25518R0540-0001009.pdf | ||
| 36C25518R0540-0001014.pdf | ||
| 36C25518R0540-0001005.pdf | ||
| 36C25518R0540-0001002.pdf | ||
| 36C25518R0540-0001012.pdf | ||
| 36C25518R0540-0001015.pdf | ||
| 36C25518R0540-0001008.pdf | ||
| 36C25518R0540-0001011.pdf | ||
| 36C25518R0540-0001013.pdf | ||
| 36C25518R0540-0001000.docx | DOCX document | |
| 36C25518R0540-0001001.pdf | ||
| 36C25518R0540-0001010.pdf | ||
| 36C25518R0540-0001004.pdf | ||
| 36C25518R0540-002.pdf | ||
| 36C25518R0540-006.pdf | ||
| 36C25518R0540-003.pdf | ||
| 36C25518R0540-004.pdf | ||
| 36C25518R0540-005.pdf | ||
| 36C25518R0540-001.docx | DOCX document | |
| 36C25518R0540-000.docx | DOCX document |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T
T
TT
T
T
T
T
T
ABCDEEaFGHJJb
E 1
W 2
E 5.5 w 6.3
6.2
5.4
6.7
5.7
5.8
E 2.8
E 1.9
E 2
E 3.7
E 4.6
E 6.3
E 7.2
8"CHR
8"CHS
"C
H R
"C
H S
6"CR-15
"S
-5
"P
C
"C
R -1
PRV
PRV
PRV
UP
CONNECT ON
BOTTOM OF TANK
"C
R -1
/2 "C
R -1
"S
-5
/2 "S
-1
"S -5
/4
"C R
-5
2"S-50
CAP
"C
R -1
UP
UP
UP
CAP
CAP
"C
R -5
1"CR-15
1 1/2"CR-50
2 1/2"S-15
3"S-50
2 1/2"S-15
3"S-50
1 1/2"CR-15
CAP
UP
UP
CRT-1EX
UP
UP
UP
CAP
FLASH TANK
1 1/4"S-50
CAP
CAP
2"CHS
2"CHR
8"CHR
8"CHS
/2 "S
-5
/2 "S
-1
2 1/2"S-15
3/4"CR-50
3"S-50
"S
-1
/4
"C R
-1
4" SANITARY
1.
2.
3.
4.
5.
DESIGN OPTION 15 INVOLVES ADDING PIPE LABELS TO THE CHILLED WATER,
HEATING HOT WATER AND STEAM/STEAM CONDENSATE PIPING IN THE PIPE
BASEMENT, MAIN MECHANICAL ROOM, 2ND FLOOR MECHANICAL ROOM, AND
7TH FLOOR MECHANICAL ROOM.
REFER TO DRAWING 00-M01 FOR GENERAL NOTES.
PIPING SHOWN ON THIS DRAWING DOES NOT NECESSARILY SHOW ALL PIPING
TO BE LABELED. FIELD VERIFY EXISTING CONDITIONS PRIOR TO BID.
PROVIDE THE FOLLOWING DESIGNATIONS:
- CHILLED WATER: CWS/CWR
- HEATING HOT WATER: HWS/HWR
- LOW PRESSURE STEAM AND STEAM CONDENSATE: S-15/CR-15
- MEDIUM PRESSURE STEAM AND STEAM CONDENSATE: S-50/CR-50
EACH DESIGNATION SHALL HAVE A FLOW ARROW.
PROVIDE LABELING PER THE SPECIFICATIONS AND AT THE FOLLOWING
LOCATIONS:
- NEAR EACH VALVE AND CONTROL DEVICE.
- NEAR EACH BRANCH, EXCLUDING SHORT TAKEOFFS FOR FIXTURES
AND TERMINAL UNITS. MARK EACH PIPE AT BRANCH, IF FLOW
PATTERN IS NOT OBVIOUS.
- NEAR LOCATIONS WHERE PIPES PASS THROUGH WALLS, FLOORS,
CEILINGS, OR ENTER NON-ACCESSIBLE ENCLOSURES.
- AT ACCESS DOORS AND SIMILAR ACCESS POINTS THAT PERMIT VIEW
OF CONCEALED PIPING.
- NEAR MAJOR EQUIPMENT ITEMS AND OTHER POINTS OF ORIGINATION
AND TERMINATION.
- SPACED AT MAXIMUM OF 50-FOOT (15-M) INTERVALS ALONG EACH
RUN. REDUCE INTERVALS TO 25 FEET (7.5 M) IN CONGESTED AREAS
OF PIPING AND EQUIPMENT.
FOR EXISTING PIPE LABELS THAT DO NOT MEET THE DESIGNATIONS NOTED
ABOVE OR DO NOT MEET THE REQUIREMENTS OF THE SPECIFICATIONS IN
TERMS OF SIZE AND TYPE, REPLACE WITH THE REQUIRED LABELS.
GENERAL NOTES:
S
O U
T H
O L
D O
R C
H A
R D
S T
L O
U
IS
M
O
T
.9
.8
F
.9
.1 w w w .r o s s b a r.
c o m
D ra w in g T it le
P ro je c t
T it le
B u il d in g
N u m b e r:
D ra w in g N u m b e r:
D ep a r tm en t o f
V et er a n s A ff a ir s
D w g o f:
D ra w n
C h e c k e d
D a te
P ro je c t
N o
R
B P ro je c t
N o
-0
KEY PLAN
B
O T
T S
L A
N E
S
A N
A N
T O
N
IO
T
X
T
.8
.9
F
.8
.6
IN
F
O
H F
S C
O M
P A
N Y
.C O
M H
F S
C O
M P
A N
Y .C
O M
The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the embossed or wet seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this document, unless the changes are made by the Engineer or with the Engineer's written authorization.
© ROSS & BARUZZINI, INC 2018
June 19, 2018
/1
/2
:0 :0
P
M
-M
D
E S
IG
N
O P
T
IO
N
- A
D D
P
IP
E L
A B
E
LS
T O
P
IP
E S
Z
O N
E
H A
R R
Y S
. T R
U M
A N
V A
M C
R E
P
LA
C E
M E
C H
A N
IC
A
L, E
LE
C
TR
IC
A L, A N
D P
LU
M
B
IN
G
H
O S
P
IT
A L D
R
IV
E C
O L U
M B
IA
M
O
A
-1
-1
/2
/2
D B
C
J D
W
P R
O J E
C T
S T
A T
U S
B
ID
S
E T
F
O R
C O
N S
T R
U C
T
IO
N
1/8" = 1'-0"
DESIGN OPTION 15 - ADD PIPE LABELS TO
PIPES - PIPE BASEMENT ZONE 2
R E
V
IS
IO
N
S
N O
D E
S C
R
IP
T
IO
N D
A
E
T
T
T
T
T
T
KLLaMNNaPQRST
W 7.2
W 8.2
W 9.1
W 10.4
11.5
12.5
13.5
Ra
Rb
8.0
CP-EX
RHC-EX
"C
R -1
8"S-50
"S
-5
"S
-1
2"CR-15
"S
-1
"S
-5
2"CR-15
8"CHS
8"CHR
"C
H S
"C
H R
2"CHS
12"CHS
10"CHS
10"CHR
8"CHR
8"CHS
10"CHS
10"CHR
8"CHS
8"CHR
"C
H R
"C
H S
/2 "C
H R
/2 "C
H S
2"CHR
2"CHS
18"CHS
18"CHR
4"CWS
4"CWR
8"CHS
8"CHR
LPS
LPS
LPS
"S
-1
12"S-15
"C
H S
"C
H S
8"CHR
8"CHS
AC-S14
AC-S13
AC-S16
AC-S19
AC-17A
2"CR-15
3/4"CR-50
4"S-50
8"S-50
UP
2"CR-50
FT
HX
HUB DRAIN
PRV
CONNECTS
ON TOP
CONNECTS ON TOP
3"CR-15
P
P
P
1"CR-15
/4
"C R
-1 5 3 /4
"C R
-1
"C
R -1
UP UP
UP
CAP
UP
"C
R -1
UP
CAP
CAP
UP
CAP
UP
1"CR-15
/4
"C R
-1
CAP
CAP
UP
CAP
/4
"C R
-1
12"S-15
8"4"4"3"
8" 3" 6" 4" 12"
6"
CAP
CAP
CAP
8"CHS
8"CHR
1"CR-15
8"S-50
"C
R -1
"S
-1
10"CHR
10"CHS
1.
2.
3.
4.
5.
DESIGN OPTION 15 INVOLVES ADDING PIPE LABELS TO THE CHILLED WATER,
HEATING HOT WATER AND STEAM/STEAM CONDENSATE PIPING IN THE PIPE
BASEMENT, MAIN MECHANICAL ROOM, 2ND FLOOR MECHANICAL ROOM, AND
7TH FLOOR MECHANICAL ROOM.
REFER TO DRAWING 00-M01 FOR GENERAL NOTES.
PIPING SHOWN ON THIS DRAWING DOES NOT NECESSARILY SHOW ALL PIPING
TO BE LABELED. FIELD VERIFY EXISTING CONDITIONS PRIOR TO BID.
PROVIDE THE FOLLOWING DESIGNATIONS:
- CHILLED WATER: CWS/CWR
- HEATING HOT WATER: HWS/HWR
- LOW PRESSURE STEAM AND STEAM CONDENSATE: S-15/CR-15
- MEDIUM PRESSURE STEAM AND STEAM CONDENSATE: S-50/CR-50
EACH DESIGNATION SHALL HAVE A FLOW ARROW.
PROVIDE LABELING PER THE SPECIFICATIONS AND AT THE FOLLOWING
LOCATIONS:
- NEAR EACH VALVE AND CONTROL DEVICE.
- NEAR EACH BRANCH, EXCLUDING SHORT TAKEOFFS FOR FIXTURES
AND TERMINAL UNITS. MARK EACH PIPE AT BRANCH, IF FLOW
PATTERN IS NOT OBVIOUS.
- NEAR LOCATIONS WHERE PIPES PASS THROUGH WALLS, FLOORS,
CEILINGS, OR ENTER NON-ACCESSIBLE ENCLOSURES.
- AT ACCESS DOORS AND SIMILAR ACCESS POINTS THAT PERMIT VIEW
OF CONCEALED PIPING.
- NEAR MAJOR EQUIPMENT ITEMS AND OTHER POINTS OF ORIGINATION
AND TERMINATION.
- SPACED AT MAXIMUM OF 50-FOOT (15-M) INTERVALS ALONG EACH
RUN. REDUCE INTERVALS TO 25 FEET (7.5 M) IN CONGESTED AREAS
OF PIPING AND EQUIPMENT.
FOR EXISTING PIPE LABELS THAT DO NOT MEET THE DESIGNATIONS NOTED
ABOVE OR DO NOT MEET THE REQUIREMENTS OF THE SPECIFICATIONS IN
TERMS OF SIZE AND TYPE, REPLACE WITH THE REQUIRED LABELS.
GENERAL NOTES:
S
O U
T H
O L
D O
R C
H A
R D
S T
L O
U
IS
M
O
T
.9
.8
F
.9
.1 w w w .r o s s b a r.
c o m
D ra w in g T it le
P ro je c t
T it le
B u il d in g
N u m b e r:
D ra w in g N u m b e r:
D ep a r tm en t o f
V et er a n s A ff a ir s
D w g o f:
D ra w n
C h e c k e d
D a te
P ro je c t
N o
R
B P ro je c t
N o
-0
KEY PLAN
B
O T
T S
L A
N E
S
A N
A N
T O
N
IO
T
X
T
.8
.9
F
.8
.6
IN
F
O
H F
S C
O M
P A
N Y
.C O
M H
F S
C O
M P
A N
Y .C
O M
The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the embossed or wet seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this document, unless the changes are made by the Engineer or with the Engineer's written authorization.
© ROSS & BARUZZINI, INC 2018
June 19, 2018
/1
/2
:0 :1
P
M
-M
D
E S
IG
N
O P
T
IO
N
- A
D D
P
IP
E L
A B
E
LS
T O
P
IP
E S
Z
O N
E
H A
R R
Y S
. T R
U M
A N
V A
M C
R E
P
LA
C E
M E
C H
A N
IC
A
L, E
LE
C
TR
IC
A L, A N
D P
LU
M
B
IN
G
H
O S
P
IT
A L D
R
IV
E C
O L U
M B
IA
M
O
A
-1
-1
/2
/2
D B
C
J D
W
P R
O J E
C T
S T
A T
U S
B
ID
S
E T
F
O R
C O
N S
T R
U C
T
IO
N
1/8" = 1'-0"
DESIGN OPTION 15 - ADD PIPE LABELS TO
PIPES - PIPE BASEMENT ZONE 3
R E
V
IS
IO
N
S
N O
D E
S C
R
IP
T
IO
N D
A
T
T
T
T
T
T T
ABCDEEaFGGaHJ
11.5
12.5
13.5
BaBb
Ha
8.0
E 7.2
E 8.2
E 10.4
E 9.1
"C
H R
"C
H S
8"CHS
8"CHR
"C
H R
"C
H S
/2 "C
H R
/2 "C
H S
2"CHR
2"CHS
"C
H S
"C
H R
10"CHR
10"CHS
"C
H S
"C
H R
"C
H S
"C
H R
8"S-50
8"S-50
"S
-5
"S
-5
"S
-5
"S
-5
"S
-5
"S
-5
8"S-50
1"CR-50
6"CR-15
"C
R -1
"C
R -1
2 1/2"S-50
3/4"CR-15
"C
R -1
"S
-1
12"S-15
6"S-15
"C
R -5
FT
HX
PRV
UP
UP
"S
-5
CAP
3/4"CR-15
1"CR-15
"S
-1
3/4"CR-50
CAP
UP
UP
UP
CAP
2"S-50
1 1/2"CR-15
/2 "S
-1
CAP
CAP
CAP
CAP
4"CHS
4"CHR
4"CHR
4"CHS
1.
2.
3.
4.
5.
DESIGN OPTION 15 INVOLVES ADDING PIPE LABELS TO THE CHILLED WATER,
HEATING HOT WATER AND STEAM/STEAM CONDENSATE PIPING IN THE PIPE
BASEMENT, MAIN MECHANICAL ROOM, 2ND FLOOR MECHANICAL ROOM, AND
7TH FLOOR MECHANICAL ROOM.
REFER TO DRAWING 00-M01 FOR GENERAL NOTES.
PIPING SHOWN ON THIS DRAWING DOES NOT NECESSARILY SHOW ALL PIPING
TO BE LABELED. FIELD VERIFY EXISTING CONDITIONS PRIOR TO BID.
PROVIDE THE FOLLOWING DESIGNATIONS:
- CHILLED WATER: CWS/CWR
- HEATING HOT WATER: HWS/HWR
- LOW PRESSURE STEAM AND STEAM CONDENSATE: S-15/CR-15
- MEDIUM PRESSURE STEAM AND STEAM CONDENSATE: S-50/CR-50
EACH DESIGNATION SHALL HAVE A FLOW ARROW.
PROVIDE LABELING PER THE SPECIFICATIONS AND AT THE FOLLOWING
LOCATIONS:
- NEAR EACH VALVE AND CONTROL DEVICE.
- NEAR EACH BRANCH, EXCLUDING SHORT TAKEOFFS FOR FIXTURES
AND TERMINAL UNITS. MARK EACH PIPE AT BRANCH, IF FLOW
PATTERN IS NOT OBVIOUS.
- NEAR LOCATIONS WHERE PIPES PASS THROUGH WALLS, FLOORS,
CEILINGS, OR ENTER NON-ACCESSIBLE ENCLOSURES.
- AT ACCESS DOORS AND SIMILAR ACCESS POINTS THAT PERMIT VIEW
OF CONCEALED PIPING.
- NEAR MAJOR EQUIPMENT ITEMS AND OTHER POINTS OF ORIGINATION
AND TERMINATION.
- SPACED AT MAXIMUM OF 50-FOOT (15-M) INTERVALS ALONG EACH
RUN. REDUCE INTERVALS TO 25 FEET (7.5 M) IN CONGESTED AREAS
OF PIPING AND EQUIPMENT.
FOR EXISTING PIPE LABELS THAT DO NOT MEET THE DESIGNATIONS NOTED
ABOVE OR DO NOT MEET THE REQUIREMENTS OF THE SPECIFICATIONS IN
TERMS OF SIZE AND TYPE, REPLACE WITH THE REQUIRED LABELS.
GENERAL NOTES:
S
O U
T H
O L
D O
R C
H A
R D
S T
L O
U
IS
M
O
T
.9
.8
F
.9
.1 w w w .r o s s b a r.
c o m
D ra w in g T it le
P ro je c t
T it le
B u il d in g
N u m b e r:
D ra w in g N u m b e r:
D ep a r tm en t o f
V et er a n s A ff a ir s
D w g o f:
D ra w n
C h e c k e d
D a te
P ro je c t
N o
R
B P ro je c t
N o
-0
KEY PLAN
B
O T
T S
L A
N E
S
A N
A N
T O
N
IO
T
X
T
.8
.9
F
.8
.6
IN
F
O
H F
S C
O M
P A
N Y
.C O
M H
F S
C O
M P
A N
Y .C
O M
The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the embossed or wet seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this document, unless the changes are made by the Engineer or with the Engineer's written authorization.
© ROSS & BARUZZINI, INC 2018
June 19, 2018
/1
/2
:0 :1
P
M
-M
D
E S
IG
N
O P
T
IO
N
- A
D D
P
IP
E L
A B
E
LS
T O
P
IP
E S
Z
O N
E
H A
R R
Y S
. T R
U M
A N
V A
M C
R E
P
LA
C E
M E
C H
A N
IC
A
L, E
LE
C
TR
IC
A L, A N
D P
LU
M
B
IN
G
H
O S
P
IT
A L D
R
IV
E C
O L U
M B
IA
M
O
A
-1
-1
/2
/2
D B
C
J D
W
P R
O J E
C T
S T
A T
U S
B
ID
S
E T
F
O R
C O
N S
T R
U C
T
IO
N
1/8" = 1'-0"
DESIGN OPTION 15 - ADD PIPE LABELS TO
PIPES - PIPE BASEMENT ZONE 4
R E
V
IS
IO
N
S
N O
D E
S C
R
IP
T
IO
N D
A
T T
T T
T
T T
T
T
T T
T T
LLaMNNa
8.0
12-M01
1-SSH
AC-S10
AC-S7/8
AC-S15
PRESSURE
REDUCING
STATION
CR-15
CR-15
S-15
CR-15
S-15
S-50
CR-15
CR-50
HWSHWR
HWR
S-15
S-15
S-15
HWS
HWR
1-ST 1
1-ST 2
1-CPF 1
1-HX-C 02
P-3
P-4
MECH. RM. / STG.
C221
HJJb
KL
6.2
5.4
6.7
W 9.3
13-ME01
6"HCS
6"HCR
P-2 P-1
1-CPF 2RTU-T
AC-S1
AC-S2
AC-S4
HJJbKL
6.2
5.4
6.7
W 9.3
13-ME01
1-HX-C 01
AC-S3
AC-S5
AC-S20
S-15
S-15
S-15
CR-15
PRESSURE
REDUCING
STATION
1-ST 3
1-ST 4
1-AS 3
6"HCR
6"HCS
1.
2.
3.
4.
5.
DESIGN OPTION 15 INVOLVES ADDING PIPE LABELS TO THE CHILLED WATER,
HEATING HOT WATER AND STEAM/STEAM CONDENSATE PIPING IN THE PIPE
BASEMENT, MAIN MECHANICAL ROOM, 2ND FLOOR MECHANICAL ROOM, AND
7TH FLOOR MECHANICAL ROOM.
REFER TO DRAWING 00-M01 FOR GENERAL NOTES.
PIPING SHOWN ON THIS DRAWING DOES NOT NECESSARILY SHOW ALL PIPING
TO BE LABELED. FIELD VERIFY EXISTING CONDITIONS PRIOR TO BID.
PROVIDE THE FOLLOWING DESIGNATIONS:
- CHILLED WATER: CWS/CWR
- HEATING HOT WATER: HWS/HWR
- LOW PRESSURE STEAM AND STEAM CONDENSATE: S-15/CR-15
- MEDIUM PRESSURE STEAM AND STEAM CONDENSATE: S-50/CR-50
EACH DESIGNATION SHALL HAVE A FLOW ARROW.
PROVIDE LABELING PER THE SPECIFICATIONS AND AT THE FOLLOWING
LOCATIONS:
- NEAR EACH VALVE AND CONTROL DEVICE.
- NEAR EACH BRANCH, EXCLUDING SHORT TAKEOFFS FOR FIXTURES
AND TERMINAL UNITS. MARK EACH PIPE AT BRANCH, IF FLOW
PATTERN IS NOT OBVIOUS.
- NEAR LOCATIONS WHERE PIPES PASS THROUGH WALLS, FLOORS,
CEILINGS, OR ENTER NON-ACCESSIBLE ENCLOSURES.
- AT ACCESS DOORS AND SIMILAR ACCESS POINTS THAT PERMIT VIEW
OF CONCEALED PIPING.
- NEAR MAJOR EQUIPMENT ITEMS AND OTHER POINTS OF ORIGINATION
AND TERMINATION.
- SPACED AT MAXIMUM OF 50-FOOT (15-M) INTERVALS ALONG EACH
RUN. REDUCE INTERVALS TO 25 FEET (7.5 M) IN CONGESTED AREAS
OF PIPING AND EQUIPMENT.
FOR EXISTING PIPE LABELS THAT DO NOT MEET THE DESIGNATIONS NOTED
ABOVE OR DO NOT MEET THE REQUIREMENTS OF THE SPECIFICATIONS IN
TERMS OF SIZE AND TYPE, REPLACE WITH THE REQUIRED LABELS.
GENERAL NOTES:
S
O U
T H
O L
D O
R C
H A
R D
S T
L O
U
IS
M
O
T
.9
.8
F
.9
.1 w w w .r o s s b a r.
c o m
D ra w in g T it le
P ro je c t
T it le
B u il d in g
N u m b e r:
D ra w in g N u m b e r:
D ep a r tm en t o f
V et er a n s A ff a ir s
D w g o f:
D ra w n
C h e c k e d
D a te
P ro je c t
N o
R
B P ro je c t
N o
-0
KEY PLAN
B
O T
T S
L A
N E
S
A N
A N
T O
N
IO
T
X
T
.8
.9
F
.8
.6
IN
F
O
H F
S C
O M
P A
N Y
.C O
M H
F S
C O
M P
A N
Y .C
O M
The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the embossed or wet seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this document, unless the changes are made by the Engineer or with the Engineer's written authorization.
© ROSS & BARUZZINI, INC 2018
June 19, 2018
/1
/2
:0 :1
P
M
-M
D
E S
IG
N
O P
T
IO
N
- A
D D
P
IP
E L
A B
E
LS
T O
P
IP
E S
C
A N
D P
E N
T H
O U
S E
H A
R R
Y S
. T R
U M
A N
V A
M C
R E
P
LA
C E
M E
C H
A N
IC
A
L, E
LE
C
TR
IC
A L, A N
D P
LU
M
B
IN
G
H
O S
P
IT
A L D
R
IV
E C
O L U
M B
IA
M
O
A
-1
-1
/2
/2
D B
C
J D
W
P R
O J E
C T
S T
A T
U S
B
ID
S
E T
F
O R
C O
N S
T R
U C
T
IO
N
1/4" = 1'-0"
DESIGN OPTION 15 - ADD PIPE LABELS TO
PIPES - 2ND FLOOR MECHANICAL ROOM
C221
1/8" = 1'-0"
DESIGN OPTION 15 - ADD PIPE LABELS TO
PIPES - 7TH FLOOR MECHANICAL ROOM
LOWER PENTHOUSE
1/8" = 1'-0"
DESIGN OPTION 15 - ADD PIPE LABELS TO
PIPES - 7TH FLOOR MECHANICAL ROOM
UPPER PENTHOUSE
R E
V
IS
IO
N
S
N O
D E
S C
R
IP
T
IO
N D
A
PCP-5
PCP-4
EX 2"CHS
EX 2"CHR
EX 18"CHR
EX 18"CHR
EX 18"CHS
AHU-01
AHU-02
EX 24"CWS
EX 24"CWR
CWP-7 CWP-6 CWP-5 CWP-4 CWP-3 CWP-2 CWP-1
CHP-7 CHP-6 CHP-5 CHP-4 CHP-3 CHP-2 CHP-1
AS-1
EX 24"CWR
EX 4"CWR
EX 4"CWS
EX 24"CWS
16-M01
PHX-1
23-CS 1
CH-1
CH-3
CH-2
CH-4
PCP-3 PCP-2
PCP-1
4.3.2.1.41.
E.
D.
C.
B.4
B.
EX 24"CWS
EX 18"CHS
8"CWS
1.
DESIGN OPTION 16 INTENT IS TO INSTALL CONDENSER WATER SYSTEM SIDE-
STREAM FILTER.
REFER TO DRAWING 00-M01 FOR GENERAL NOTES.
GENERAL NOTES:
C W
S C
W S
SIDESTREAM
SEPARATOR
FD
INTEGRAL
PUMP
SEPARATOR DETAIL WITH
SIDESTREAM PUMP
CWP-7
PCP-5
23-CS 1
E. D. C.
CH-1
10"CWS
8"CWS
24"CWS
8"CWS
8"CWR
8"CHS
TO PLATE AND
FRAME HEAT
EXCHANGER
8"CWS
8"CHS
S
O U
T H
O L
D O
R C
H A
R D
S T
L O
U
IS
M
O
T
.9
.8
F
.9
.1 w w w .r o s s b a r.
c o m
D ra w in g T it le
P ro je c t
T it le
B u il d in g
N u m b e r:
D ra w in g N u m b e r:
D ep a r tm en t o f
V et er a n s A ff a ir s
D w g o f:
D ra w n
C h e c k e d
D a te
P ro je c t
N o
R
B P ro je c t
N o
-0
KEY PLAN
B
O T
T S
L A
N E
S
A N
A N
T O
N
IO
T
X
T
.8
.9
F
.8
.6
IN
F
O
H F
S C
O M
P A
N Y
.C O
M H
F S
C O
M P
A N
Y .C
O M
The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the embossed or wet seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this document, unless the changes are made by the Engineer or with the Engineer's written authorization.
© ROSS & BARUZZINI, INC 2018
June 19, 2018
-M
D
E S
IG
N
O P
T
IO
N
- I
N S
T A
LL
C
O N
D E
N S
E R
W A
T E
R S
Y S
T E
M F
IL
T
E R
H A
R R
Y S
. T R
U M
A N
V A
M C
R E
P
LA
C E
M E
C H
A N
IC
A
L, E
LE
C
TR
IC
A L, A N
D P
LU
M
B
IN
G
H
O S
P
IT
A L D
R
IV
E C
O L U
M B
IA
M
O
A
-1
-1
/2
/2
D B
C
S W
D
P R
O J E
C T
S T
A T
U S
B
ID
S
E T
F
O R
C O
N S
T R
U C
T
IO
N
1/4" = 1'-0"
DESIGN OPTION 16 - INSTALL CONDENSER
WATER SYSTEM FILTER
1. SEE EQUIPMENT DATA SCHEDULE ON SHEET 16-E01 FOR ELECTRICAL INFORMATION.
NOTES:
SOLID SEPARATOR SCHEDULE (SIDE STREAM)
PLAN MARK TYPE LOCATION SERVICE
SIZE (IN / OUT) CAPACITY MAX WPD
AUTOMATIC VALVE
PRESSURE RANGE DRY WEIGHT
SIDE
STREAM PUMP #
ELECTRICAL MOTOR
REMARKSIN [mm] GPM [L/S] FT [kPa] PSIG [kPa] LBS [kg] HP [kW] PHASE VOLT MAX RPM
SPEED
CONTROL
CS 1 CYCLONIC SEPARATOR CHILLER PLANT CONDENSER WATER 10 / 8 [ 250 / 200 ] 1670 110 0 [ 0 ] N/A N/A 2488 [ 1129 ] YES - 30 [ 22 ] 3 460 1750 CONSTANT (1)
NOT TO SCALE
SIDESTREAM SOLID SEPARATOR
1/4" = 1'-0"
CONDENSER WATER FILTER SECTION VIEW
R E
V
IS
IO
N
S
N O
D E
S C
R
IP
T
IO
N D
A
RST
W 10.4
11.5
Ra
Rb
4"CWR
4"CWS
4"CWS
4"CWR
4"CWR
4"CWS
1-P 37
1-P 36
4"CWS
3"CWS
3"CWS
4"CWS
3"CWS
4"CWS
RST
W 10.4
11.5
Ra
Rb
4"CWS
4"CWR
4"CWS
4"CWS
4"CWR
P-37
P-36
1.
DESIGN OPTION 17 INTENT IS TO REPLACE CONDENSER WATER PUMPS P-36 AND
P-37.
REFER TO DRAWING 00-M01 FOR GENERAL NOTES.
GENERAL NOTES:
1/2" [15mm]
FLEXIBLE
CONNECTOR, TYP
PUMP
FLOOR
1" [25mm] MIN.
DIA. PIPE STAND
EXISTING CONCRETE
BASE
DRAIN
1/2" [15mm]
PRESSURE GAUGE
BUTTERFLY SHUT OFF
VALVE, TYP
CHECK VALVE
3" [75mm]
3" [75mm]
RST
11.5
RaRb
MECH.
C011
A
RST
11.5
RaRb
17-M01
MECH.
C011
1-CS 1
4"CWS
4"CWR
BASEMENT FLOOR
722' - 2 3/4"
SUBBASEMENT
713' - 6 5/8"
Ra Rb
CRAWL SPACE
715' - 2 3/4"
1-CS 1
3"CWS
3"CWS
S
O U
T H
O L
D O
R C
H A
R D
S T
L O
U
IS
M
O
T
.9
.8
F
.9
.1 w w w .r o s s b a r.
c o m
D ra w in g T it le
P ro je c t
T it le
B u il d in g
N u m b e r:
D ra w in g N u m b e r:
D ep a r tm en t o f
V et er a n s A ff a ir s
D w g o f:
D ra w n
C h e c k e d
D a te
P ro je c t
N o
R
B P ro je c t
N o
-0
KEY PLAN
B
O T
T S
L A
N E
S
A N
A N
T O
N
IO
T
X
T
.8
.9
F
.8
.6
IN
F
O
H F
S C
O M
P A
N Y
.C O
M H
F S
C O
M P
A N
Y .C
O M
The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the embossed or wet seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this document, unless the changes are made by the Engineer or with the Engineer's written authorization.
© ROSS & BARUZZINI, INC 2018
June 19, 2018
/1
/2
:0 :2
P
M
-M
D
E S
IG
N
O P
T
IO
N
- R
E P
LA
C
E C
O N
D E
N S
E R
W A
T E
R P
U M
P S
H A
R R
Y S
. T R
U M
A N
V A
M C
R E
P
LA
C E
M E
C H
A N
IC
A
L, E
LE
C
TR
IC
A L, A N
D P
LU
M
B
IN
G
H
O S
P
IT
A L D
R
IV
E C
O L U
M B
IA
M
O
A
-1
-1
/2
/2
D B
C
S W
D
P R
O J E
C T
S T
A T
U S
B
ID
S
E T
F
O R
C O
N S
T R
U C
T
IO
N
1/4" = 1'-0"
DESIGN OPTION 17 - REPLACE CONDENSER
WATER PUMPS NEW WORK PLAN
2. PROVIDE WITH INVERTER-READY OR INVERTER-DUTY MOTOR FOR VARIABLE SPEED OPERATION.
1. SEE EQUIPMENT DATA SCHEDULE ON SHEET 17-E01 FOR ELECTRICAL INFORMATION.
NOTES:
CONDENSER WATER PUMPS
PLAN MARK LOCATION SERVICE TYPE
CIRCULATING FLUID
MIN %
EFF
ELECTRICAL MOTOR
REMARKSFLUID
FLOW HEAD NPSH AVAILABLE TEMPERATURE
SP GR
NOMINAL
POWER
PHASE VOLT
MAX
RPM
SPEED
CONTROLGPM [L/s] FT [kPa] FT [kPa] °F [°C] HP [kW]
P 36 MAIN MECHANICAL ROOM REFRIGERATION UNITS CONDENSER WATER END SUCTION CONDENSER WATER 120 [ 8 ] 75 [ 1200 ] 7.2 [ 110 ] 54 [ 12 ] 1 59.6 5 [ 4 ] 3 460 1800 VARIABLE (2)
P 37 MAIN MECHANICAL ROOM REFRIGERATION UNITS CONDENSER WATER END SUCTION CONDENSER WATER 120 [ 8 ] 75 [ 1200 ] 7.2 [ 110 ] 54 [ 12 ] 1 59.6 5 [ 4 ] 3 460 1800 VARIABLE (2)
1/4" = 1'-0"
DESIGN OPTION 17 - REPLACE CONDENSER
WATER PUMPS DEMO PLAN
NOT TO SCALE
SINGLE SUCTION FLOOR-MOUNTED PUMPS
- CONNECTIONS WITH FLEXIBLE
CONNECTORS
1/4" = 1'-0"
DESIGN OPTION 17 - REPLACE CONDENSER
WATER PUMPS DEMO PLAN - PLATFORM
1/4" = 1'-0"
DESIGN OPTION 17 - REPLACE CONDENSER
WATER PUMPS NEW WORK PLAN -
PLATFORM
NOT TO SCALE
A
CONDENSER WATER FILTRATION PHOTO
SOLID SEPARATOR SCHEDULE
PLAN MARK TYPE LOCATION SERVICE
SIZE (IN /
OUT) CAPACITY MAX WPD
AUTOMATIC VALVE
PRESSURE RANGE SIDE
STREAM
DRY WEIGHT
REMARKSIN [mm] GPM [L/S] FT [kPa] PSIG [kPa] LBS [kg]
CS 1 FULL STREAM SOLID SEPARATOR MAIN MECHANICAL ROOM REFRIGERATION UNITS CONDENSER WATER 2.5 [ 63 ] 120 [ 8 ] 10 [ 30 ] - [ - ] NO 202 [ 92 ] -
1/4" = 1'-0"
CONDENSER WATER FILTER SECTION
R E
V
IS
IO
N
S
N O
D E
S C
R
IP
T
IO
N D
A
File details come from the government source that posted it.