36C25223Q0927 0003.docx
DOCX document 100 KB Posted
- Attached to
- J047--Bldg 200 Sub-Basement Mechanical Repairs Federal contract opportunity
- Solicitation number
- 36C25223Q0927
About this file
This document is an amended solicitation for emergency sub-basement mechanical repairs at the Edward Hines Jr. VA Hospital in Hines, Illinois. The contractor shall provide labor, materials, equipment, and project management to repair steam pipes, replace sanitary pipes between structural columns S-10 to J-10 through S-3 to J-3, remove abandoned equipment including a water booster and 120 feet of conveyor system, and provide as-built drawings. Repairs include steam line drips legs and condensate lines. Replacements include eight kitchen floor drains, sump pumps, and associated piping. The period of performance is 160 days with onsite construction not to exceed 100 days. The solicitation was issued by the Department of Veterans Affairs Great Lakes Acquisition Center. Offer responses are due by September 14th at 4:00pm Central Time.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02-Attachment 1 M23125 Sub-Base Needs.docx | DOCX document | |
| S02-Attachment 3 M23125 Site Plan.pdf | ||
| S02-Attachment 4 Kitchen Drains (8).pdf | ||
| S02-ATTACHMENT 6 -bldg 200 sec C stone space.pdf | ||
| 36C25223Q0927 0002.docx | DOCX document | |
| 36C25223Q0927 0001.docx | DOCX document | |
| S02-ATTACHMENT 2-Basement Part Plan A.pdf | ||
| 36C25223Q0927.docx | DOCX document | |
| S02-ATTACHMENT 3-2-7-2-1753 Basement Part Plan B.pdf | ||
| P07 - Cook County WD 2015-5017 (Rev-24) dated 07.07.2023.pdf | ||
| S02-ATTACHMENT 4 -2-7-2-1754 Basement Part Plan C.pdf | ||
| S02-ATTACHMENT 5 -2-7-2-1755 Basement Part Plan D.pdf | ||
| S02-Attachment 1 M23125.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) None 09/11/2023 578-23-4-6098-1906 Department of Veterans Affairs
GLAC (69D)
115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 Department of Veterans Affairs
GLAC-MILWAUKEE (69D)
Great Lakes Acquisition Center - HC 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders
36C25223Q0927 08-30-2023
X x x September 14th at 16:00 pm central time See CONTINUATION Page X REFERENCE SOLICITATION 36C25223Q0927 FOR EMERGENCY SUB-BASEMENT MECHANICAL REPAIRS FOR THE EDWARD HINES VAMC LOCATED IN HINES IL. THIS AMENDMENT WILL ANSWER QUESTIONS SUBMITTED BY VENDORS AND THOSE ASKED ON THE SITE VISIT. THIS AMENDMENT WILL ALSO MAKE CHANGES TO THE STATEMENT OF WORK. SEE BELOW FOR ALL ANSWERS TO THOSE QUESTIONS SUBMITTED AND
CHANGES TO THE STATEMENT OF WORK
ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
AARON ROGERS
Responses to the following RFQ questions submitted by vendors are in RED.
Great Lakes Acquisition Center 115 S. 84th Street, Suite 100 Milwaukee, Wisconsin 53214
RE: Solicitation #36C25223Q0927 - BLDG 200 Sub-Basement Utility System Repairs
Question #01:
· The following active leaks were identified during the site visit which are not listed in the scope of work. Please advise whether these items should be incorporated into the project scope. Yes
| Structural Column |
| DESCRIPTION |
| K-6 |
| REPLACE CONDENSATE VALVES |
| R-4 / R-5 |
| REPLACE CONDENSATE LINE |
Question #02:
· Attachment 1 under CLIN 1 identified the active leaks below at structural column D-8. However, during the site visit no active leaks were observed. Is this system currently active? Will the system be active in heating season in the next month and require a steam shutdown to replace? Please advise whether these items should be incorporated into the project scope of work and if so, provide detail on quantity, size, fittings which are desired to be replaced. Work still needed.
| Structural Column |
| DESCRIPTION |
| D-8 |
| REPAIR STEAM LINE DRIP LEG |
| D-8 |
| REPAIR CONDENSATE LINE |
Question #03:
· Addendum 0002 Attachment 1 defines the required quantities for the demolition and replacement scope of work under the kitchen and lab. Addendum 0002 Section B2.6.b.iv. narrowed the scope of work as all piping between columns marked S-10 to J-10 through S-4 to J-4 in the building 200 sub-basement per referenced blueprints. Please advise which section of the SOW governs, as these statements are in conflict. Please see Attachment 3 and SOW
· Portions of the existing sanitary systems extend to the S-3 to J-3 columns and the total quantity of plumbing to replace is greater than the quantities listed in the SOW. Should bidders provide pricing on the quantity of plumbing listed in the SOW, or should they bid on the quantity of plumbing they believe represents the entirety of work to replace the system within the bounds of the project area and list that quantity in their schedule of services? Please see updated SOW. Contractors should include quantities and linear feet on their bids.
· Please clarify the work area and quantities related to the plumbing desired to be replaced. Please see Attachment 3 and SOW
Question #04:
· Please advise what chemicals are utilized within the facility that would be impacting the new acid waste pipes serving the labs so that the proper schedule pipe material can be identified or identify the schedule of pipe to be utilized for the waste pipes serving the lab. Orion or equivalent for chemical piping.
Question # 05:
· Addendum 0001 Question #4 confirmed no scope of work located above the ceiling line of the sub-basement. With the inclusion of the kitchen floor drains in Addendum 0002, please confirm work within the kitchen area is now required. Who will be the facility’s point of contact to provide after-hours/overnight access and coordination of facility terminal cleaning services overnight so that the kitchen is operational and not impacted by 0500? Please see updated SOW. 8 Kitchen drains can be accessed and worked on during regular hours when scheduled with Hines staff.
Question # 06:
· Is it acceptable to perform repairs to the kitchen and lab at night, and each day tie the new piping to be into the existing system to avoid an impact to hospital kitchen operations? Are lab services and plumbing active overnight? Please see updated SOW
· Addendum 0002 notes kitchen work must take place between 9:00pm Friday – 4:00am Monday. If a weekend shutdown associated with the kitchen/lab plumbing must be completed, how many weekend shutdowns are allowable? Kitchen work can be accomplished during regular work hours. Tie-ins from old to new should be scheduled with Hines Engineering/Kitchen staff when impacting patient food services. The less shutdowns of weekends the better.
Question # 07:
· With the inclusion of the kitchen floor drains in Addendum 0002, please define what level of containment is required. Is a temporary Visqueen containment system for dust control sufficient? Can the containment system remain in place during the daytime operations, or must it be removed at the end of each workday? Containment left during Kitchen hours should be hard containment. Contractor shall leave work area in same condition as start, food sanitary clean.
Question # 08:
· The September 9th site visit appears to have identified more than 13 floor drains. Please confirm the appropriate number of floor drains incorporated in the scope of work. Please see updated SOW and Attachment 4
· Please advise if a commercially available floor drain and cover is acceptable. The current floor drain covers were custom fabricated by the VA Hines Machine Shop. Selections must be okayed through Hines Engineering.
Question # 09:
· Please confirm the appropriate number of pumps for the Column Q-2 sump pump system. Does the facility want one 2-inch grinder pump or a dual stainless steel ½ horsepower system? Please see updated Attachment 1. Selections must be approved by Hines Engineering
Question #10:
· Please provide a more thorough breakdown of the required removals associated with Section 6.c. xiii. Addendum #0001 Question #12 confirmed the exclusion of the several pieces of abandoned equipment in Quadrant D. Please advise. Please see updated SOW and Attachment 3
Question #11:
· Addendum 0002 notes the Contractor shall remove 120’ of abandoned conveyor system. Please confirm the remaining portions of the conveyor system are to remain in place. Contractor shall remove abandoned conveyor machinery from door to door of hallway serving better access from Quadrant D-A
· What are the hot work permit requirements associated with working in the sub-basement to remove the conveyor? None
· Are all ventilation systems operating properly within the subbasement to achieve adequate air exchange to facilitate construction work? Yes
Question #12:
· Addendum 0001 Questions #13 & #14 indicated C017 as the access point to the sub-basement. Quadrant D can be accessed from the loading dock drive. Please confirm if the driveway into the loading dock can be utilized as a work area for demolition material and access, so long as the loading dock remains operational. Noting majority of this work will be occurring off hours and overnight when use of the loading dock is minimal. Deliveries and schedules for dumpster placement must be approved by Hines Engineering
Question #13:
Please provide quantities of ACM insulation to be abated as part of this contract. Minimal (8) small joints at most throughout different regions of basement.
Question #14:
Please provide a cleaning specification for the kitchen area around the drains Please see updated SOW. After work, contractor shall leave area in same condition as found, sanitary.
Question #15:
Do the sump pumps need to be on a duplex system with generator backups? No Question #16:
Please issue specifications for the materials to be used in this project. Please see updated SOW
B.2 STATEMENT OF WORK/PWS
*UPDATED* STATEMENT OF WORK
Building 200 Sub-Basement Utility Repair
1. Location of Service The Contractor shall provide all labor, material, tools, travel, management, and equipment necessary for the repair of items described in this document at the Edward Hines Jr. VA Hospital (Hines VAH), 5000 South 5th Avenue, Hines, Illinois 60141.
2. Period of Performance The period of performance shall not exceed one hundred sixty (160) days after contract award. This period reflects the entire contract period to include preconstruction periods, administrative time, and contract close out. Actual onsite construction time is not expected to exceed one hundred (100) days from initial mobilization. A detailed schedule must be provided to the Contracting Officer Representative (COR) within 20 days after receiving the contract Notice to Proceed (NTP) and prior to any onsite work.
3. Background/History/Current Conditions Hines VA is an active medical campus. The contractor must not interfere with patient care or VA staff unless given permission in writing from the COR/ Contracting Officer (CO). Building 200 sub-basement had a catastrophic failure in sewage pipes that left raw sewage draining into existing gravel surface. A remediation company already on-site, mobilized to contain, remove damaged stone, and disinfect affected area.
4. Objective The services and personnel shall be provided by the contractor that has specifically trained field support or technical support representatives for all plumbing, pipefitting, and labor needed to replace the plumbing and repair the steam.
5. Scope of Work This contract includes the repair of various steam pipes and all drains and vents between columns marked S-10 to J-10 through S-3 to J-3 in sub-basement.
6. Deliverables and Tasks
a. CLIN 1 – Repair Steam Pipes
i. Contractor shall repair all steam lines at marked locations. (Attachment 1)
ii. Contractor shall remove asbestos (AB) insulation at affected joints and replace with appropriately sized fiberglass pipe insulation. AB removal is considered “glove-bag” due to the quantity.
iii. Any steam shutdowns will be coordinated through Douglas Crombie, Hines VAH Pipe Shop Supervisor.
b. CLIN 2 – Replace Sanitary Pipes
iv. Contractor shall replace all sanitary pipes and joined vent pipes, between columns marked S-10 to J-10 through S-3 to J-3 in building 200 sub-basement with “no-hub” cast iron. Please note: S column represents exterior concrete wall on the west and the J column represents the concrete hallway wall separating Quadrant A from Quadrant D. (Attachment 3) This contract does not include underground work below the stone grade of sub-basement. Any “new” copper/cast iron drains/vents shall not need to be replaced. Pipes that travel past designated work area shall be cut at boundary line then attached and run throughout.
v. All abandoned pipes in work area and pipes in need of replacement, shall be disposed of properly and removed from campus by contractor.
vi. All vertical piping through concrete deck above, shall be cut (reasonable distance 3”-6” from deck above) and joined to new piping systems. Exception: (8) Kitchen Floor Drains (Attachment 4)
vii. All horizontal piping through walls shall be sealed accordingly. Where necessary for contractor to create new horizontal penetrations, contractor shall repair the walls of old penetrations.
viii. Contractor shall work with Hines Engineering and Kitchen staff for work requirements under Kitchen and in area. Kitchen working hours are 5:00am – 8:30pm every day. Any sanitary shutdown in the kitchen, must be scheduled two (2) weeks in advance.
ix. Contractor shall replace eight (8) floor drains on the Kitchen floor with appropriately sized heavy gauge strainers able to withstand rolling carts, connecting to new sanitary below. Replacement of floor drains shall be scheduled with Hines Engineering/Kitchen staff in advance. Containment and work must not interfere with Kitchen. Contractor shall clean area to sanitary conditions after work completion.
x. Contractor shall repair damaged floor around new drains. Epoxy, sealed concrete, or other COR approved method shall be used around the finished floor to the drain when less than 6 inches beyond the edge of finished drain. If the demolition of the drain results in a larger than 6-inch gap from existing tile to finished drain, then a replacement porcelain tile shall be used to patch in. Final tile selection shall be approved by COR prior to install.
xi. Contractor shall replace six (6) sump pumps located in Attachment 1.
xii. All sanitary shutdowns for other lines will be coordinated two (2) weeks in advance and can be shutdown for five (5) working days maximum, through Hines VAH Engineering, Pipe Shop Supervisor, and COR.
c. CLIN 3 – Remove Heavy Equipment (Attachment 3)
xiii. Remove abandoned Water Booster located under kitchen.
xiv. Contractor shall approximately remove 120’ of abandoned conveyer system with disconnection of power and hydraulics to allow access to South of work area.
b. CLIN 4 – As Built
i. Provide pdf showing all new plumbing lines and pipe installed during this project. Drawing can be schematical but cannot be hand drawn redlines.
7. Hours of Operation Contractor shall ensure that all work shall be performed to minimize impact on hospital operations and patient care. This could necessitate evening and weekend work to mitigate an impact on hospital operations. Pricing shall be based on the possibility of working after hours.
2. Work outside of the business hours of Monday-Friday 6:00am-5:00pm, or during federal holidays shall be confirmed and approved by COR.
2. Utility shutdowns that would prevent patient care require minimum 20 calendar day notice.
2. The contractor shall complete the delivery on the specified above. If for any reason the scheduled time for a deliverable cannot be met, the contractor is required to explain why (include the original deliverable due date) in writing to the CO, including a firm commitment of when the work shall be completed. This notice to the CO shall cite the reasons for the delay, and the impact on the overall project. The CO will then review the facts and issue response in accordance with applicable regulations.
8. Reports and Documentation
6. Bids from contractors should include sizes, number of fittings, and linear feet of the different sized pipe for bid evaluation.
6. Schedule. The contractor is responsible for submitting a schedule of sufficient detail for approval by the COR/CO.
4. Equipment Lead time. The contractor shall make an informed bid submission by working with suppliers and considering all potential long-lead items involved with the project reasonably known or considered to impact the start, performance, and completion of the project. All deliveries, dumpster placements, and movement of materials shall be coordinated with Hines Engineering during scheduling period.
4. The schedule shall be submitted within 20 days of the signed Notice to Proceed (NTP) and must be approved prior to any onsite work beginning.
4. Work outside of the business hours of Monday-Friday 6:00am-5:00pm, or during federal holidays shall be confirmed and approved by COR.
4. Utility shutdowns that would prevent patient care require minimum 14 calendar day notice.
4. The contractor shall complete the delivery on the specified above within 120 calendar days of the signed NTP. If for any reason the scheduled time for a deliverable cannot be met, the contractor is required to explain why (include the original deliverable due date) in writing to the CO, including a firm commitment of when the work shall be completed. This notice to the CO shall cite the reasons for the delay, and the impact on the overall project. The CO will then review the facts and issue response in accordance with applicable regulations.
4. This contract shall contain 40 days for inspections and close-out after contractor completes CLINs.
6. Weekly Report: The contractor shall provide a weekly report of all work performed, services provided, and service inspection.
5. The contractor shall provide written report electronically to COR.
6. Site Survey. On completion of work, contractor shall supply updated blueprints of sanitary piping for sub-basement in bldg. 200.
9. Changes to the Contract
6. Any changes to this Statement of Work (SOW), or the executed contract shall be authorized only through a contract modification from the CO. Costs incurred by the contractor through the actions of parties other than the CO shall be borne by the contractor. If the contractor finds an issue that is not a part of the statement of work, the contractor shall notify the COR with a written description of the issue and provide a quote to remedy the problem. Contracting Officer shall issue a modification or new purchase order if it is determined to be needed by the COR.
10. General Requirements
6. Where a conflict exists between the SOW requirements and the requirements of other associated contract documents, the SOW requirements shall prevail.
6. The awarded contractor will adhere to all codes, standards, guidelines, and design requirements found in the VA’s TIL https://www.cfm.va.gov/til/index.asp.
6. Wood studs, plywood, OSB, particle board, pressboard, or other flammable materials are not allowed at Hines.
6. Contractor shall cover all sprinkler heads (daily), signs, data transmitters, and light fixtures. Contractor shall prevent the spread of dust and fumes to other areas outside the work zone.
6. The contractor shall post and maintain the final signed emergency contact information (when issued) at the entrance to the jobsite for the duration of the project. See Attachments for the details of these forms. The contractor shall update the postings when new documents are issued.
6. Contractor shall be responsible for providing all utility hookups and other items or work as required such that the final product performs to the requirements per OSHA and VA guidelines. Any clarifications needed that would affect contract cost must be confirmed via RFI prior to work. Contractor is responsible for the cost of all assumptions made.
6. Hines VA Local Permits: Unless otherwise stated the contractor shall submit for all required permits fourteen (14) calendar days prior to the event based on the approved project schedule with the COR.
Attachement 1: **Identifiers in the Structural Column tab are actual spray painted numbers on the structural columns in the building 200 Basement.**
COLUMN
(match to As Builts)
| DESCRIPTION |
| CLIN |
| A-10 |
| REPLACE RELIEF VALVE @ STEAM STATION - LEAKING / WEAK SPRING |
| 1 |
| L-12 |
| LEAK @ UNION ON PUMPING TRAP / REPLACE SIGHT GLASS (2) |
| 1 |
| D-10 |
| 1-1/2" UNION LEAK HP STEAM TO AC100 HUM. |
| 1 |
| G-3 |
| REPLACE RELIEF VALVE @ STEAM STATION - LEAKING / WEAK SPRING |
| 1 |
| L-3 |
| RECONNECT BROKEN CONDENSATE LINE AFTER TRAPSET |
| 1 |
| J-3 / J-4 |
| PINHOLE LEAK@ LP CONDENSATE RETURN ( AB ON PIPE) |
| 1 |
| M-7 |
| 1-1/4" UNION LEAK (LP COND RETURN) ELIMINATE UNION |
| 1 |
| M-7 |
| REMOVE OLD HW BOOSTER AND PUMPIMG TRAP (DEAD EQUIPMENT) |
| 3 |
| Hallway separating quadrant D-C |
| REMOVE 120’ OF ABANDONED CONVEYOR SYSTEM |
| 3 |
| N-7 |
| 1-1/4" UNION LEAK (LP COND RETURN) ELIMINATE UNION |
| 1 |
| Q-8 |
| HOT WATER LEAK @ CAP |
| 2 |
| R-3 |
| REPLACE / REPIPE SUMP PUMP |
| 2 |
| ½ hp; 110 volts; cast iron body; integral float switch |
| Q-2 |
| REPLACE/REPIPE DUAL PUMP WITH SINGLE 2" GRINDER AND NEW LID |
| 2 |
| ½ hp; 110 volts; cast iron body; integral float switch |
| L-3 |
| REPLACE/ REPIPE SUMP PUMP |
| 2 |
| ½ hp; 110 volts; cast iron body; integral float switch |
| K-6 |
| REPLACE/ REPIPE SUMP PUMP |
| 2 |
| ½ hp; 110 volts; cast iron body; integral float switch |
| CONV TUNNEL |
| REPLACE/ REPIPE SUMP PUMP |
| 2 |
| ½ hp; 110 volts; cast iron body; integral float switch |
| B-8 |
| CLOGGED OPEN SITE DRAIN / REPLACE LINE (not in kitchen area) |
| 2 |
| D-8 |
| REPAIR STEAM LINE DRIP LEG |
| 1 |
| D-8 |
| REPAIR CONDENSATE LINE |
| 1 |
| K-6 |
| REPLACE CONDENSATE VALVES |
| 1 |
| R-4/R-5 |
| REPLACE CONDENSATE LINE |
| 1 |
Under Kitchen & Lab S-10 to J-10 through S-3 to J-3 image1.emf
File details come from the government source that posted it. Updated .