36C25223Q0927 0001.docx

DOCX document 38 KB Posted

Attached to
J047--Bldg 200 Sub-Basement Mechanical Repairs Federal contract opportunity
Solicitation number
36C25223Q0927
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This document contains an amendment to a federal solicitation for emergency sub-basement mechanical repairs at a Department of Veterans Affairs medical center located in Hines, Illinois. The amendment provides responses to vendor questions, announces a second site visit on September 8, 2023 at 9:00 AM, extends the response deadline to September 14, 2023 at 4:00 PM, and indicates the statement of work will be updated. Key details include a revised statement of work will be posted by September 5, emergency repairs are needed for active leaks and five sump pumps, cast iron piping shall be used, a minimum of five cleanouts shall be installed, larger abandoned equipment does not require removal, and contractors shall submit critical lift plans and obtain crane permits if needed. The solicitation number is 36C25223Q0927 and is issued by the Department of Veterans Affairs Great Lakes Acquisition Center for the Veterans Health Administration VISN 12.

View the file

Other files for this federal contract opportunity

Other files attached to J047--Bldg 200 Sub-Basement Mechanical Repairs, newest first.
File Type Posted
S02-Attachment 1 M23125 Sub-Base Needs.docx DOCX document
36C25223Q0927 0003.docx DOCX document
S02-Attachment 3 M23125 Site Plan.pdf PDF
S02-Attachment 4 Kitchen Drains (8).pdf PDF
36C25223Q0927 0002.docx DOCX document
S02-ATTACHMENT 6 -bldg 200 sec C stone space.pdf PDF
P07 - Cook County WD 2015-5017 (Rev-24) dated 07.07.2023.pdf PDF
S02-ATTACHMENT 4 -2-7-2-1754 Basement Part Plan C.pdf PDF
S02-ATTACHMENT 2-Basement Part Plan A.pdf PDF
36C25223Q0927.docx DOCX document
S02-ATTACHMENT 3-2-7-2-1753 Basement Part Plan B.pdf PDF
S02-ATTACHMENT 5 -2-7-2-1755 Basement Part Plan D.pdf PDF
S02-Attachment 1 M23125.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) None 08/30/2023 578-23-4-6098-1906 Department of Veterans Affairs

GLAC (69D)

115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 Department of Veterans Affairs

GLAC-MILWAUKEE (69D)

Great Lakes Acquisition Center - HC 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders

36C25223Q0927 08-30-2023

X x x September 14th at 16:00 pm central time See CONTINUATION Page X REFERENCE SOLICITATION 36C25223Q0927 FOR EMERGENCY SUB-BASEMENT MECHANICAL REPAIRS FOR THE EDWARD HINES VAMC LOCATED IN

HINES IL. THIS AMENDMENT WILL ANSWER QUESTIONS SUBMITTED BY VENDORS AND

THOSE ASKED ON THE SITE VISIT. THIS AMENDMENT

WILL ALSO EXTEND THE SOLICITATION TO ACCOMADATE THE CHANGES TO THE STATEMENT OF WORK, SECOND SITE VISIT AND TIME FOR THE

VENDORS TO REVIEW THE ANSWERS TO THOSE QUESTIONS SUBMITTED.

ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.

AARON ROGERS

Due to the number of questions raised by the Vendors that attended the site visit, the VA is revamping the Statement of Work to alleviate some of the concerns that were raised and correct some language to make the statement of work more concise. The CO will post the updated Statement of Work by Tuesday 09/05/2023 at 10:00 am. A second site visit will be held at the HINES VAMC to ensure that the VA addressed all questions and concerns, this site visit will be on 09/08/23 at 09:00 AM central time. MEET COR JASON SARENY IN BUILDING 2 BASEMENT ROOM 011A. All vendors must check-in with the police desk. Questions after the site visit on 09/08/23 shall be submitted no later than 09/11/2023 at 07:00 am.

Responses to the following RFQ questions submitted by vendors are in RED.

Question # 01:

· Will selection criteria include firms which demonstrate an understanding of the scope of work gained during the walk through, by providing sufficient detail and quantities in proposal submittal to minimize the potential for modifications?

The Selection criteria is listed in section E of the solicitation. Offerors that attend the site visit and show a better understanding of the scope of work will receive better consideration (this will need to be shown through their submitted package). The Government will award based on “best value”.

Question # 02:

· Will the VA be providing an electronic copy of the site visit sign in sheet?

NO

Question #03:

· Is there a required completion priority between CLIN 0001, 0002, and 0003? For instance, do the active leaks in CLIN 0001 need to be repaired first? Contractor discretion

Question #04:

· Please clarify that all work is to be performed in the stone space / sub-basement. That is, NO work shall be performed in the kitchen, lab or outside of the mechanical space. Plumbing systems will connect to existing penetrations in the deck system. True. No work needs to be accomplished above ceiling line of sub-basement.

Question #05:

· Please confirm the work hours for this project. Repairs to the various leaks will require a shutdown and are likely to occur on weekends or outside normal business hours to limit curtailment of hospital operations. The sanitary sewer systems must remain active from approximately 0400-2000 each day to allow for normal function of the kitchen and hospital operations. Therefore, repairs to the kitchen and lab will need to be performed at night, and each day the new piping will need to be tied into the existing system. To minimize impact on hospital operations and patient care, it appears all scope of work/pricing should be based on working after hours (overtime rates). Some work might have to be done off hours. See Section 7 of the STATEMENT OF WORK.

Question #06:

· Is a Cook County Asbestos Abatement permit application required? No

Question #07:

· Please provide a more thorough breakdown of the required scope of work for the below item in Attachment 1. Seeking clarity so all bidders uniformly approach this solicitation. None. This will be taken out of future SOW. Updated SOW will be posted ASAP.

Structural Column
DESCRIPTION
Qty
Size
Item
Notes
C-10
REMOVE OLD PIPING FOR Building "50" SEAL PENETRATION
325.00
12 - 0 "
Pipe
Supply Line & Return Line.
325.00
3 - 0 "
Pipe

Question #08:

· The following active leaks were identified during the site visit. Please advise whether these items should be incorporated in CLIN 0001. All steam repairs are encapsulated in CLIN 1. This list was given by Pipe Shop Supervisor and not in order of CLINs.

Structural Column
DESCRIPTION
K-6
RFI Question: REPLACE CONDENSATE VALVES
R-4 / R-5
RFI Question: REPLACE CONDENSATE LINE

Question #09:

· Please provide a more thorough breakdown of the required repairs associated with the five sump pump items identified in Attachment 1 under CLIN 0001. Specific information on required replacement is necessary to provide an accurate bid package (i.e., pump sizes, pump voltage, electrical service connections / point of connection, and linear footage of piping). The following table provides quantity and sizing requirements as identified by AZIMUTH during the site visit. Please advise on accuracy. Please see updated Attachment 1. This will be posted with updated SOW.

Structural Column
DESCRIPTION
Qty
Size
Item
Notes
R-3
REPLACE / REPIPE SUMP PUMP
1.00
1/2 HP
Sump Pump
Utilize Existing Electrical Service (120V) & Piping
Q-2
REPLACE/REPIPE DUAL PUMP WITH SINGLE 2" GRINDER AND NEW LID
1.00
2 - 0 "
Sewage Pump
Utilize Existing Electrical Service (120V). New Lid Required! Remove Dual Pump System.
1.00
36 - 0 “
Steel Sump Lid
6.00
2 - 0 "
Piping
L-3
REPLACE/ REPIPE SUMP PUMP
1.00
1/2 HP
Sump Pump
Utilize Existing Electrical Service (120V) & Piping
K-6
REPLACE/ REPIPE SUMP PUMP
1.00
1/2 HP
Sump Pump
Utilize Existing Electrical Service (120V) & Piping
CONV TUNNEL
REPLACE/ REPIPE SUMP PUMP
1.00
1/2 HP
Sump Pump
Utilize Existing Electrical Service (120V) & Piping

Question #10:

· Please confirm all replacement sanitary piping shall be cast iron per VA standards. True, all new pipes shall be up to code.

Question #11:

· How many cleanouts are required to be installed? We recommend a minimum of 5 cleanouts be installed to improve access for maintenance and prevent future environmental hazards. Cleanouts should be brought up to Cook County Code.

Question #12:

· The following items were identified as abandoned in the vicinity of the work during the site visit. How should the contractor handle removal of these larger equipment items identified in the below table? Should we assume disconnecting the electrical services as well as salvaging and disposing of any Freon is INCLUDED in the CLIN 0003 line item? None of these. Only water booster located under Kitchen.

Structural Column
DESCRIPTION
Qty
Size
Item
Notes
P-3
RFI Question: REMOVE LIEBERT A/C UNITS
2.00
EACH
--
Isolate, remove the Freon, cap off piping, and disconnect electrical.
P-3 (CAGE AREA)
RFI Question: REMOVE 100 HP MOTOR
1.00
EACH
--
--
P-3 / N-4
RFI Question: REMOVE ABANDONED A/C UNITS
2.00
EACH
--
Isolate, remove the Freon, cap off piping, and disconnect electrical.

Question #13:

· Will contractors be provided space for dumpster and material laydown in the loading dock area? Not in loading dock. CO-17 for all deliveries.

Question #14:

· If a crane is necessary will the contractor be required to submit critical lift plan and crane permit? Yes. Lifts should go to CO-17.