36C25218B0192 S02 - Infection Control Risk Assessment for Construction.doc
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Infection Control Risk Assessment for Construction / Renovation Projects
| Project Name: Multiple door replacement |
| Project Number: 578-10019 |
| Project Planner: |
| Extension: x |
| Building Number: |
| Floor(s): |
| Project start date |
| Projected completion date: |
| Construction Activity |
| Infection control risk group |
TYPE A: Inspection, non-invasive activity, low noise, no vibration
DUST LEVEL Low
| X |
| GROUP 1: Low office areas, FMS areas, all non-patient care areas. |
TYPE B: Small scale, short duration, low-moderate noise, low-moderate vibration
DUST LEVEL: Moderate to High
GROUP 2: Medium All other patient care areas i.e. ultrasound, Rehab, Occupational Therapy.
| X |
| TYPE C: Requires more than one work shift to complete, low-moderate noise, moderate–high vibration |
DUST LEVEL Moderate to High
GROUP 3: Medium/High ED, Radiology/MRI, , , admissions, food service areas, laboratories.
TYPE D: Major demolition and construction activities Requiring consecutive work shifts, moderate-high noise, moderate-high vibration
DUST LEVEL High
GROUP 4: Highest Operating rooms, SPD ICU’s Outpatient areas, oncology anesthesia, post anesthetic recovery all scope areas, Pharmacy, Renal Dialysis
Project Class Determination Matrix
Construction Activity ( Risk Level ( Type
“A” Type
“B” Type
“C” Type
“D”
| Group 1 |
| I |
| II |
| II |
| III |
| Group 2 |
| I |
| II |
| III |
| IV |
| Group 3 |
| I |
| III |
| III |
| IV |
| Group 4 |
| III |
| IV |
| IV |
| IV |
Contractors Actions by Project Class
CLASS
I
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace any ceiling tile displaced for visual inspection.
3. Contain construction waste before transport in tightly covered containers.
4. Emergency Preparedness training/posting/ID card.
CLASS
II
1. Provide active means to prevent air-borne dust from dispersing into atmosphere.
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tap
4. Block off and seal air vents.
5. Wipe surfaces with disinfectant.
6. Contain construction waste before transport in tightly covered containers.
7. Emergency Preparedness training/posting/ID card.
CLASS
III
1. Isolate HVAC system in area where work is being done to prevent contamination of the duct system.
2. Complete all critical barriers before any work begins.
3. Maintain negative air pressure within work area utilizing HEPA equipped air filtration units.
4. Provide dust mat at entrance and exit of work area.
5. Contain construction waste before transport in tightly covered containers.
6. Wet mop or vacuum with HEPA filtered vacuum before leaving work area.
7. Cover transport receptacles or carts. Tape covering.
8. Emergency Preparedness training/posting/ID card.
CLASS
IV
1. Isolate HVAC system in area where work is being done to prevent contamination of the duct system.
2. Complete all critical barriers before any work begins.
3. Maintain negative air pressure within work area utilizing HEPA equipped air filtration units.
4. Provide adhesive walk-off mat with dust mat at entrance and exit of work area. In the anteroom at entrance and exit of work area.
5. Seal holes, pipes, conduits and punctures appropriately.
6. Vacuum the entire work area with HEPA vacuums or wet mop with disinfectant at the completion of project.
7. Do not remove barriers from work area until completed project is thoroughly cleaned by housekeeping and inspected by the Infection Control Department Safety Section and Engineering Service.
8. Remove barrier materials carefully to minimize spreading dust and debris associated with construction.
9. Contain construction waste before transport in tightly covered containers.
10. Cover transport receptacles or carts. Tape covering.
11. Remove isolation of HVAC system in areas where work was performed at the end of the project.
12. Emergency Preparedness training/posting/ID card.
Projects Classification
Date_________________ Project Planners signature_________________________________________________
Contractor’s signature____________________________________________________ Onsite construction Supervisor signature _____________________________________