Hazardous Material Report.pdf

PDF 2 MB Posted

Attached to
Z2DA--Repair and Replace Doors 539-22-202 Federal contract opportunity
Solicitation number
36C25026B0003
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document is a 35% Schematic Design Submission for Asbestos & Lead Paint Summary at Cincinnati and Ft. Thomas VA Medical Centers, focusing on a door repair and replacement project (22.8001.01). The site visit on November 14, 2022, conducted by Castle Hill Associates, revealed asbestos-containing materials in wood fire door cores and lead paint presence in specific locations.

The hazardous materials summary shows varied findings across multiple buildings. At the Cincinnati VAMC, Buildings 1 and 3 have asbestos present in wood fire doors on certain floors, while at Ft. Thomas VAMC, Building 64 shows more extensive contamination, with asbestos in wood fire doors on basement, first, second, and third floors. Notably, a specific door frame (C-B-4-2) in the basement of Building 64 tested positive for lead paint. The XRF lead paint testing data, performed using a Viken Detection Pb200i analyzer, provides detailed readings for doors and door frames across the buildings, with most readings being negative for lead concentration.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Repair and Replace Doors 539-22-202, newest first.
File Type Posted
36C25026B0003 0002.docx DOCX document
36C25026B0003 0001.docx DOCX document
Attachment VII - VHA Directive 1192.01, Flu.pdf PDF
Attachment VI - 852.219-75 LOS.docx DOCX document
Attachment IV - RFI Form.pdf PDF
Attachment III - Drawings Rev 8-4-25.pdf PDF
Attachment II - Specifications Rev 8-4-25.pdf PDF
Attachment XI - PCRA-ICRA.pdf PDF
Attachment VIII - Best Sole Source J-A Redacted.pdf PDF
Attachment V - EMR Form.pdf PDF
Attachment I - WD OH20250082.pdf PDF
36C25026B0003.docx DOCX document
Attachment XIII - WD KY20250088.pdf PDF
Attachmennt XII - NEPA Repair and Replace Doors.pdf PDF
Attachment X - JCI Sole Source J-A - Redacted.pdf PDF
Attachment IX - Corbin Russwin J-A - Redacted.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

35% SCHEMATIC DESIGN SUBMISSION

ASBESTOS & LEAD PAINT SUMMARY

CINCINNATI & FT. THOMAS VA MEDICAL CENTER

REPAIR AND REPLACE DOORS 22.8001.01

Date: November 15, 2022

Item: Summary Results of HazMat Site Visit (asbestos & lead paint)

Site Visit: November 14, 2022

Inspectors: Brett Brumbaugh & Matt Brumbaugh - Castle Hill Associates

Findings: Asbestos containing materials are assumed present in wood fire doors interiors

Lead paint is present at Ft. Thomas VAMC (C-B-4-2 Door Frame in Basement 2)

BUILDING HAZMAT SUMMARIES

CINCINNATI VAMC

Building Number

Floor Asbestos Present?

(Cores of Wood Fire Doors)

Lead Paint Present?

(Doors & Door

Frames)

1 Basement No No

1 3rd Floor YES No

1 7th Floor YES No

3 Basement No No

3 1st Floor No No

15 1st Floor No No

FT. THOMAS VAMC

Building Number

Floor Asbestos Present?

(Cores of Wood Fire Doors)

Lead Paint Present?

(Doors & Door

Frames)

64 Basement YES

YES

(C-B-4-2 Door Frame)

64 1st Floor YES No

64 2nd Floor YES No

64 3rd Floor YES No

Notes:

• The wood passage and hallway doors are assumed to contain an asbestos core insulation. Sampling was not conducted on the wood cores.

• Metal passage and entry doors are not considered suspect for asbestos interior insulation.

35% SCHEMATIC DESIGN SUBMISSION

ASBESTOS & LEAD PAINT SUMMARY

CINCINNATI & FT. THOMAS VA MEDICAL CENTER

REPAIR AND REPLACE DOORS 22.8001.01

LEAD PAINT TESTING DATA

Project: VA Cincinnati & Ft. Thomas Repair and Replace Doors

Buildings: 1, 3, 15, and 64

Technician: Brett Brumbaugh

Dates: 11/14/2022

XRF Mfg.: Viken Detection

Model: Pb200i

Type: XRF Lead Paint Analyzer

Serial # 2757

Reading # Building Floor Room Component Substrate Pb Conc.

mg/cm2 Result

1 1 Basement C*B*7 Door Metal 0.3 Negative

2 1 Basement C*B*7 Door frame Metal 0.2 Negative

3 1 Basement A023 Door Metal 0.2 Negative

4 1 Basement A023 Door frame Metal 0.1 Negative

5 1 Basement B013 Door Metal 0.0 Negative

6 1 Basement B013 Door frame Metal 0.1 Negative

7 1 3rd Floor C*3*9 Door Metal 0.1 Negative

8 1 3rd Floor C*3*17 Door frame Metal 0.2 Negative

9 1 3rd Floor B303 Door frame Metal 0.2 Negative

10 1 3rd Floor C-3-7 Door frame Metal 0.0 Negative

11 1 3rd Floor C*3*6 Door frame Metal -0.1 Negative

12 1 7th Floor S-7-2 Door frame Metal 0.3 Negative

13 1 7th Floor S-7-2 Door Metal 0.1 Negative

14 1 7th Floor A720 Door frame Metal 0.0 Negative

15 1 7th Floor A717 Door frame Metal -0.1 Negative

16 1 7th Floor A723 Door frame Metal 0.2 Negative

17 1 7th Floor A725 Door frame Metal 0.0 Negative

18 1 7th Floor A710 Door frame Metal -0.1 Negative

19 1 7th Floor A707 Door frame Metal 0.2 Negative

20 1 7th Floor A704 Door frame Metal -0.1 Negative

21 1 7th Floor A-727A Door Metal 0.0 Negative

22 1 7th Floor A-727A Door frame Metal 0.2 Negative

23 3 Basement 13 Door Metal 0.3 Negative

24 3 Basement 13 Door frame Metal 0.2 Negative

25 3 Sub-basement sub4 Door Metal 0.5 Negative

26 3 Sub-basement sub4 Door frame Metal 0.0 Negative

27 15 1st floor 117 Door Metal 0.1 Negative

28 15 1st floor 117 Door frame Metal -0.1 Negative

29 15 1st floor 119 Door Metal 0.2 Negative

30 15 1st floor 119 Door frame Metal -0.1 Negative

31 64 Basement 1 C-B-1 Door Metal 0.1 Negative

32 64 Basement 1 C-B-1 Door frame Metal 0.2 Negative

33 64 Basement 1 4 Door Metal 0.2 Negative

34 64 Basement 1 4 Door frame Metal 0.3 Negative

35 64 Basement 1 2 Door Metal 0.0 Negative

36 64 Basement 1 2 Door frame Metal 0.1 Negative

37 64 Basement 1 28 Door Metal 0.2 Negative

38 64 Basement 1 002A Door frame Metal 0.2 Negative

39 64 Basement 1 C-B-2 Door Metal 0.0 Negative

Project: VA Cincinnati & Ft. Thomas Repair and Replace Doors

Buildings: 1, 3, 15, and 64

Technician: Brett Brumbaugh

Dates: 11/14/2022

XRF Mfg.: Viken Detection

Model: Pb200i

Type: XRF Lead Paint Analyzer

Serial # 2757

Reading # Building Floor Room Component Substrate Pb Conc.

mg/cm2 Result

40 64 Basement 1 C-B-2 Door frame Metal 0.2 Negative

41 64 Basement 2 C-B-4-2 Door Metal -0.1 Negative

42 64 Basement 2 C-B-4-2 Door frame Metal 6.2 POSITIVE

43 64 Basement 2 C-B-4-1 Door Metal 0.0 Negative

44 64 Basement 2 C-B-4-1 Door frame Metal -0.1 Negative

45 64 Basement 2 29 Door Metal -0.1 Negative

46 64 Basement 2 29 Door frame Metal 0.2 Negative

47 64 1st floor 100 Door Metal 0.1 Negative

48 64 1st floor 100 Door frame Metal 0.0 Negative

49 64 1st floor 108 Door frame Metal 0.2 Negative

50 64 1st floor 138 Door frame Metal 0.3 Negative

51 64 1st floor 148a Door frame Metal 0.2 Negative

52 64 1st floor 123 Door frame Metal 0.0 Negative

53 64 1st floor 127 Door frame Metal -0.1 Negative

54 64 1st floor 155 Door frame Metal 0.3 Negative

55 64 1st floor 125 Door frame Metal -0.1 Negative

56 64 2nd floor 264 Door frame Metal 0.3 Negative

57 64 2nd floor c-2-5 Door frame Metal 0.0 Negative

58 64 2nd floor 233 Door frame Metal -0.1 Negative

59 64 3rd Floor S-3-5 Door Metal -0.1 Negative

60 64 3rd Floor S-3-5 Door frame Metal 0.2 Negative

61 64 3rd Floor 360 Door frame Metal 0.0 Negative

62 64 3rd Floor 356 Door frame Metal 0.0 Negative

63 64 3rd Floor 352 Door frame Metal 0.0 Negative

64 64 3rd Floor 305 Door frame Metal 0.2 Negative

65 64 3rd Floor 324 Door frame Metal 0.0 Negative

66 64 3rd Floor S-3-5 Door frame Metal 0.2 Negative

File details come from the government source that posted it. Updated .