36C25025Q0750.docx
DOCX document 125 KB Posted
- Solicitation number
- 36C25025Q0750
About this file
This document is a Request for Quotes (RFQ) for triennial electrical inspection and maintenance services issued by the Department of Veterans Affairs Network Contracting Office (NCO) for the Dayton VA Medical Center. The solicitation is set-aside exclusively for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with a NAICS code 541350 and a small business size standard of $11.5 Million. The procurement involves comprehensive electrical system inspection, testing, and maintenance across multiple buildings and substations, including transformers, circuit breakers, switches, and related electrical equipment.
The RFQ requires a detailed technical approach, NETA certification, OSHA safety training documentation, pricing breakdown, and past performance references. The contractor must perform extensive electrical system inspections, including visual examinations, mechanical testing, electrical tests, and infrared inspections of equipment in various buildings. The contract has a 365-calendar day performance period, with a site visit scheduled for July 24, 2025, and quotes due by July 29, 2025 at 4 PM EDT. The government will evaluate quotes based on price, technical approach, and past performance, with the aim of selecting the offer providing the best overall value to the government.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25025Q0750 0003.docx | DOCX document | |
| 36C25025Q0750 0002.docx | DOCX document | |
| 36C25025Q0750 0002.docx | DOCX document | |
| 36C25025Q0750 0001.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25025Q0750
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE
DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a.
PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
UEI:
EFT:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE
ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26.
TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL
PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
552-25-4-6104-0059 36C25025Q0750 07-17-2025 Mary Jane Crim 937-268-6511 X3065 07-29-2025
4PM
EDT
36C250 Department of Veterans Affairs Network Contracting Office (NCO) 10 3140 Governor’s Place Blvd. Suite 210 Kettering OH 45409-1337 X X 541350 $11.5 Million N/A X 36C250 Department of Veterans Affairs Dayton VA Medical Center 4100 West Third Street Dayton OH 45428-9000 36C250 Department of Veterans Affairs Network Contracting Office (NCO) 10 Governor's Place Blvd. Suite 210 Kettering OH 45409-1337
Department of Veterans Affairs Financial Services Center Invoices To Be Submitted Electronically https://www.ob10.com/us/en/veterans-affairs// Invoice Setup Info Phone 877 353 9791 512 460 5429 See CONTINUATION Page This solicitation is a request for quotes (RFQ) for triennial electrical inspection and maintenance services.
The government intends to award a firm-fixed price purchase order. The contractor shall provide all personnel, supervision, labor, equipment, materials, and disposal necessary to provide the triennial electrical inspection and maintenance services at the Dayton VA Medical Center pursuant to the Statement of Work described herein.
The following wage determination applies to this RFQ:
Wage Determination: 2015-4731 Revision Number: 26 Date of Revision: 5/8/2025 Available at www.sam.gov **Note: All quotes shall be emailed to maryjane.crim@va.gov.
See CONTINUATION Page X X X Mary Jane Crim Contracting Officer Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 CONTRACT ADMINISTRATION DATA | 3 |
| B.2 STATEMENT OF WORK | 4 |
| B.3 PRICE/COST SCHEDULE | 30 |
| ITEM INFORMATION | 30 |
| SECTION C - CONTRACT CLAUSES | 31 |
| C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 31 |
| C.2 52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (APR 1984) | 31 |
| C.3 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 31 |
| C.4 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION) | 31 |
| C.5 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) | 34 |
| C.6 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 36 |
| C.7 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 37 |
| C.8 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025) (DEVIATION FEB 2025) | 37 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 45 |
| SECTION E - SOLICITATION PROVISIONS | 46 |
| E.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 46 |
| E.2 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021) | 46 |
| E.4 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2024) (DEVIATION FEB 2025) | 48 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR: TBD
b. GOVERNMENT: Contracting Officer 36C250 Mary Jane Crim
Department of Veterans Affairs Network Contracting Office (NCO) 10 3140 Governor’s Place Blvd. Suite 210 Kettering OH 45409-1337
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
B.2 STATEMENT OF WORK
1. INTRODUCTION:
A. This SOW describes the requirements for the maintenance, inspection, testing, and/or calibration of the Electrical Power Distribution System and all of its components at the Dayton VA Medical Center, 4100 West Third Street, Dayton, OH 45428. These work items are referenced as “Testing and Maintenance” in this document, hereafter.
B. This SOW describes the requirements for the Qualified Electrical Contract Professionals – known as “Contractors” in this document, hereafter. Contractors who are contracted by VA Medical Center to perform testing and maintenance of the Electrical Power Distribution System, and all of its components shall meet all requirements stated in Section 2 of this SOW.
C. This SOW describes the requirements to establish testing and maintenance reports.
2. QUALIFICATIONS OF CONTRACTORS:
A. Contractors shall be experienced Electrical Contractors, having properly trained and licensed permanent staff required to perform the proposed work. Electrical Contracting (i.e. the construction, repair, testing and maintenance of industrial and commercial electrical distribution systems) shall be the primary interest/specialty of the Contractor’s business. Contractor shall be located within a 100-mile radius of the Dayton VA Medical Center.
B. Contractors shall be certified by the InterNational Electrical Testing Association, Inc. (NETA) as Certified Technicians with each having completed the Occupational Safety & Health Administration (OSHA) approved 10-hour construction safety training. An on-site Competent Person as defined by the National Fire Protection Association (NFPA) 70E shall have completed the OSHA 30-hour Construction Safety Training. A NETA Certified Field Service Engineer is required to supervise the maintenance, inspection, testing and/or calibration of the Electrical Power Distribution System and all of its components as outlined in the specifications.
C. Contractors shall be a member of NETA, have technical training, and demonstrate track records of working experience in maintenance, inspection, testing, and/or calibration of Electrical Power Distribution Systems and related components in healthcare, industrial, educational, and commercial facilities for a minimum of ten (10) continuous years. Electrical components on which the Contractors have experience shall include, but not be limited to, switchboards & switchgear (low and medium voltage); low voltage controls; emergency and standby generators; automatic transfer switches, wiring, transformers, meters, and other electrical appurtenances. Provide a list of three (3) jobs that are similar is scope and cost.
D. Contractors shall have safety trainings, either on-the-job or classroom type, in electrical safety outlined in OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S – Electrical and NFPA 70E – Standard for Electrical Safety in the Workplace. Training certification shall be provided indicating each technician is a Qualified Person as defined by NFPA 70E. Training certifications shall be submitted to the VA Contracting Officer prior to work. If no training certifications are available, the contractor’ Employer shall certify that he/she has met this requirement in writing and submit it to the VA Contracting Officer prior to work.
E. Contractors shall have ready access to and knowledge of the latest versions of the following references:
1) NFPA 70, National Electrical Code
2) NFPA 70B, Recommended Practice for Electrical Equipment Maintenance
3) NFPA 70E, Standard for Electrical Safety for the Workplace
4) NFPA 110, Standard for Emergency and Standby Power System
5) OSHA Standard 29 CFR 1910, Subparts I & S
6) NETA – Maintenance and Testing Specifications
7) Operating/Maintenance manuals, and specifications of the electrical equipment to be maintained and tested. These documents may be obtained from the VHA Medical Center, or the equipment manufacturers.
8) VHA Directive 1028, Electrical Power Distribution System
F. Contractors shall have and provide all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E. Prior to initiating work, Contractor shall provide documentation that all instruments, test equipment, tools and PPE have current calibration. Dated calibration labels shall be visible on all instruments, test equipment, tools and PPE as appropriate.
3. SUMMARY OF WORK:
A. Transformers, including all related components, are inspected, tested, and maintained ,to include the lab testing for the liquids in all wet type transformers.
B. Electrical equipment (including, but not limited to switchgears, switchboards, distribution panels, motor control centers, and all related components) are required to be inspected, tested, maintained, or calibrated.
NOTE: The National Electrical Testing Association (NETA) provides guidance which is considered best practice for the maintenance of electrical equipment; these practices should be followed to the maximum extent possible.
C. An Infra-Red Inspection will be performed of the hospital equipment located in Buildings 310, 322, 330, 335, 340 & 341 before associated outages occur. The Dayton VAMC will supply a person to assist the technicians with locating the equipment included in the infrared inspections.
D. The Contractor shall provide a proposed schedule within 14 days of award date. The schedule shall be in the form of a progress chart of suitable scale to indicate the work scheduled for completion by any given date during the work period. The proposed schedule shall be reviewed by the COR; any requirements for adjusting the schedule (e.g. to minimize disruption to the Dayton VAMC) shall be incorporated by the Contractor.
E. The proposed work is investigative in nature and could reveal a need for corrective maintenance, replacement of parts, or even replacement of complete system elements. Contractors shall report deficiencies that are deemed critical or catastrophic immediately to the Contracting Officer and COR for immediate actions. The contractor shall not take any action to repair without a proper purchase order as these services are not covered in this SOW. Any unapproved repair work shall be deemed to have been performed at the convenience of the contractor and Government shall make no reimbursement for the services rendered.
F. All work shall be coordinated and scheduled through the COR as to minimize disruption to normal patient care. Power outages must be carefully planned and preapproved by the Medical Center. Outages must be performed after normal business hours unless otherwise approved by the Medical Center. Outages must be scheduled with the COR a minimum of two-weeks before planned outages are to occur.
G. Contractor shall have 365 calendar days from the Notice to Proceed (NTP) to complete the work.
4. DELIVERABLES:
A. A complete written report of the work performed shall be provided to the VA within 14 days of completion. Information shown in the report shall be formatted as follows:
1) Company’s name, addresses, telephone number
2) Name and signature of contractors who perform the maintenance and testing
3) VA Contract and Purchase Order
4) Contracting Officer (CO) and Contracting Officer’s Representative (COR) names and contact information
5) Date and Time of work
6) Copies of all contractor valid licenses, professional and training certificates
7) Descriptions and model number of specialized tools and equipment used, such as torque wrench or infrared scanning camera
8) Location, type, name, and nameplate information of electrical equipment to be maintained and tested
9) Descriptions of work items
10) Test data
11) Reference materials such as equipment manufacturer’s specifications, coordination study, etc.
12) Remarks on conditions of electrical equipment. List all deficiencies, if any.
13) Recommend corrective actions, if any, to include feedback on overall system.
B. Submit one electronic copy of the complete written report to the COR within 14 calendar days of completion of all services. All reference materials shall be included in the electronic version of the report, either through scanning or other means of electronic text import methods.
C. Submit two (2) hard copies of the complete written report in a binder neatly arranged with dividers for each item and sub-item, and one (1) CD-ROM or DVD of the electronic version of the report in Microsoft Word or PDF format to the COR within 14 calendar days of completion of all services. All reference materials shall be included in the electronic version of the report, either through scanning or other means of electronic text import methods.
The following equipment must be inspected, tested, lubricated, and cleaned as noted:
69KV SUBSTATION (SOUTH)
| ITEM # | ONE (1) S&C ELECTRIC 69KV TYPE SERIES 2000 THREE PHASE SF6 GANG OPERATED CIRCUIT SWITCHER. | |
| Inspect and test as per appendix #1 |
| ITEM # | THREE (3) WESTINGHOUSE ELECTRIC 69KV SINGLE PHASE STATION CLASS SURGE ARRESTERS. | |
| Clean, inspect, and test as per appendix #2. |
| ITEM # | ONE (1) WESTINGHOUSE 67KV-12470/7200V 10/12.5MVA THREE- PHASE OIL FILLED POWER TRANSFORMER WITH LOAD TAP CHANGER, HAVING 360 GALLONS OF MINERAL OIL (SERIAL# SLL5467-2) |
| Clean, inspect, and test as per appendix #3. |
| ITEM # | THREE (3) GENERAL ELECTRIC 15KV SINGLE PHASE STATION CLASS SURGE ARRESTERS. | |
| Clean, inspect, and test as per appendix #2. |
| ITEM # | FIVE (5) WESTINGHOUSE 15KV TYPE VCP-W 1200A THREE-PHASE DRAW OUT VACUUM CIRCUIT BREAKERS | |
| Clean, inspect, lubricate, and test as per Appendix #4. |
| ITEM # | THREE (3) WESTINGHOUSE TYPE HU-87 SINGLE PHASE TRANSFORMER DIFFERENTIAL RELAYS | |
| Clean, inspect, and test as per Appendix #5. |
| ITEM # | THREE (3) WESTINGHOUSE TYPE CV6-27 SINGLE PHASE UNDERVOLTAGE RELAYS | |
| Clean, inspect, and test as per Appendix #5. |
| ITEM # | THREE (3) WESTINGHOUSE TYPE KAB-87 SINGLE PHASE BUS DIFFERENTIAL RELAYS | |
| Clean, inspect, and test as per Appendix #5. |
| ITEM # | THREE (3) WESTINGHOUSE TYPE CO9-50/51 SINGLE PHASE TIME OVER-CURRENT RELAYS | |
| Clean, inspect, and test as per Appendix #5. |
| ITEM # | TWENTY (20) WESTINGHOUSE TYPE CO9-51 SINGLE PHASE TIME OVER-CURRENT RELAYS | |
| Clean, inspect, and test as per Appendix #5. |
69KV SUBSTATION (NORTH)
| ITEM # | ONE (1) S&C ELECTRIC 69KV TYPE SERIES 2000 THREE PHASE SF6 GANG OPERATED CIRCUIT SWITCHER. | |
| Inspect and test as per appendix #1 |
| ITEM # | THREE (3) WESTINGHOUSE ELECTRIC 69KV SINGLE PHASE STATION CLASS SURGE ARRESTERS | |
| Clean, inspect, and test as per Appendix #2. |
| ITEM # | ONE (1) WESTINGHOUSE 67KV-12470/7200V 10/12.5MVA THREE- PHASE OIL FILLED POWER TRANSFORMER WITH LOAD TAP CHANGER, HAVING 360 GALLONS OF MINERAL OIL (SERIAL# SLL5467-1) |
| Clean, inspect, and test as per Appendix #3. |
| ITEM # | THREE (3) GENERAL ELECTRIC 15KV SINGLE PHASE STATION CLASS SURGE ARRESTERS | |
| Clean, inspect, and test as per Appendix #2. |
| ITEM # | SEVEN (7) WESTINGHOUSE 15KV TYPE VCP-W 1200A THREE-PHASE DRAW OUT VACUUM CIRCUIT BREAKERS | |
| Clean, inspect, lubricate, and test as per Appendix #4. |
| ITEM # | THREE (3) WESTINGHOUSE TYPE HU-87 SINGLE PHASE TRANSFORMER DIFFERENTIAL RELAYS | |
| Clean, inspect, and test as per Appendix #5. |
| ITEM # | THREE (3) WESTINGHOUSE TYPE CV6-27 SINGLE PHASE UNDERVOLTAGE RELAYS | |
| Clean, inspect, and test as per Appendix #5. |
| ITEM # | THREE (3) WESTINGHOUSE TYPE KAB-87 SINGLE PHASE BUS DIFFERENTIAL RELAYS | |
| Clean, inspect, and test as per Appendix #5. |
| ITEM # | THREE (3) WESTINGHOUSE TYPE CO9-50/51 SINGLE PHASE TIME OVER-CURRENT RELAYS | |
| Clean, inspect, and test as per Appendix #5. |
| ITEM # | TWENTY-EIGHT (28) WESTINGHOUSE TYPE CO9-51 SINGLE PHASE TIME OVER-CURRENT RELAYS | |
| Clean, inspect, and test as per Appendix #5. |
BLDG #310 SUBSTATION #1 (A/B)
| ITEM # | FOUR (4) SQUARE D ELECTRIC 15KV 600A TYPE HVL METAL ENCLOSED GANG-OPERATED LOAD INTERRUPTER SWITCHES. |
| Clean, inspect, lubricate and test as per appendix #6 |
| ITEM # | TWO (2) SQUARE D ELECTRIC 1000KVA 12470-480/277V THREE-PHASE BIO TEMP FILLED DISTRIBUTION TRANSFORMERS. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
| ITEM # | SIX (6) SQUARE D ELECTRIC SINGLE PHASE 15KV CLASS SURGE ARRESTERS. |
| Clean, inspect, and test as per appendix #2 |
| ITEM # | FOUR (4) SQUARE D ELECTRIC 480V TYPE NW-16-H3 1600A THREE-PHASE DRAWS OUT ELECTICAL OPERATED AIR FRAME CIRCUIT BREAKERS | |
| Clean, inspect, lubricate, and test as per Appendix #8. |
| ITEM # | EIGHT (8) SQUARE D ELECRIC 480V TYPE NW-08-H3 800A THREE PHASE DRAW OUT AIR FRAME CIRCUIT BREAKERS | |
| Clean, inspect, lubricate, and test as per Appendix #8. |
BLDG #310 GENERATOR BREAKERS
ITEM # TWO (2) SQUARE D 480V 800A TYPE NT-08LI THREE PHASE STAIONARY MOUNTED INSULATED CASE CIRCUIT BREAKERS.
Clean, inspect, and test as per appendix #10
ITEM # FIVE (5) SQUARE D 480V 600A TYPE PJ THREE PHASE STAIONARY MOUNTED INSULATED CASE CIRCUIT BREAKERS.
Clean, inspect, and test as per appendix #10
BLDG #330 SUBSTATION (USA, USB)
| ITEM # | FOUR (4) WESTINGHOUSE 15KV 600A TYPE WLI METAL ENCLOSED GANG-OPERATED AIR SWITCHES. |
| Clean, inspect, lubricate and test as per appendix #6 |
| ITEM # | TWO (2) SQUARE D 2000KVA 12470-480/277V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMERS. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
| ITEM # | SIX (6) WESTINGHOUSE SINGLE PHASE 15KV CLASS SURGE ARRESTERS. |
| Clean, inspect, and test as per appendix #2 |
| ITEM # | TWO (2) WESTINGHOUSE 480V TYPE DS-632 3200A THREE-PHASE DRAW OUT AIR FRAME CIRCUIT BREAKERS | |
| Clean, inspect, lubricate, and test as per Appendix #8. |
| ITEM # | SIX (6) WESTINGHOUSE 480V TYPE DS-416 1600A THREE PHASE DRAW OUT AIR FRAME CIRCUIT BREAKERS | |
| Clean, inspect, lubricate, and test as per Appendix #8. |
BLDG #330 SUBSTATION (US1A, US1B)
| ITEM # | FOUR (4) WESTINGHOUSE 15KV 600A TYPE WLI METAL ENCLOSED GANG-OPERATED AIR SWITCHES. |
| Clean, inspect, lubricate and test as per appendix #6 |
| ITEM # | TWO (2) WESTINGHOUSE 1500KVA 12470-480/277V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMERS. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. | |
| Clean, inspect, and test as per appendix #7 |
| ITEM # | SIX (6) WESTINGHOUSE SINGLE PHASE 15KV CLASS SURGE ARRESTERS. |
| Clean, inspect, and test as per appendix #2 |
| ITEM # | THREE (3) WESTINGHOUSE 480V TYPE DS-632 3200A THREE-PHASE DRAW OUT AIR FRAME CIRCUIT BREAKERS | |
| Clean, inspect, lubricate, and test as per Appendix #8. |
| ITEM # | TWELVE (12) WESTINGHOUSE 480V TYPE DS-416 1600A THREE- PHASE DRAW OUT AIR FRAME CIRCUIT BREAKERS | |
| Clean, inspect, lubricate, and test as per Appendix #8. |
BLDG #330 SUBSTATION (US1C, US1D)
| ITEM # | FOUR (4) WESTINGHOUSE 15KV 600A TYPE WLI METAL ENCLOSED GANG-OPERATED AIR SWITCHES. |
| Clean, inspect, lubricate and test as per appendix #6 |
| ITEM # | TWO (2) WESTINGHOUSE 1500KVA 12470-480/277V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMERS. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
| ITEM # | SIX (6) WESTINGHOUSE SINGLE PHASE 15KV CLASS SURGE ARRESTERS. |
| Clean, inspect, and test as per appendix #2 |
| ITEM # | THREE (3) WESTINGHOUSE 480V TYPE DS-632 3200A THREE-PHASE DRAW OUT AIR FRAME CIRCUIT BREAKERS | |
| Clean, inspect, lubricate, and test as per Appendix #8. |
| ITEM # | TWENTY (20) WESTINGHOUSE 480V TYPE DS-416 1600A THREE-PHASE DRAW OUT AIR FRAME CIRCUIT BREAKERS | |
| Clean, inspect, lubricate, and test as per Appendix #8. |
BLDG #330 SUBSTATION (US1X, US1P)
| ITEM # | FOUR (4) WESTINGHOUSE 15KV 600A TYPE WLI METAL ENCLOSED GANG-OPERATED AIR SWITCHES. |
| Clean, inspect, lubricate and test as per appendix #6 |
| ITEM # | ONE (1) WESTINGHOUSE 1500KVA 12470-480/277V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMERS (US-1P). |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
| ITEM # | ONE (1) WESTINGHOUSE 1000KVA 12470-480/277V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMERS (US-1X). |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
| ITEM # | SIX (6) WESTINGHOUSE SINGLE PHASE 15KV CLASS SURGE ARRESTERS. |
| Clean, inspect, and test as per appendix #2 |
| ITEM # | ONE (1) WESTINGHOUSE 480V TYPE DS-632 3200A THREE PHASE DRAW OUT AIR FRAME CIRCUIT BREAKER. | |
| Clean, inspect, lubricate and test as per Appendix #8 |
| ITEM # | TWO (2) WESTINGHOUSE 480V TYPE DS-420 2000A THREE PHASE DRAW OUT AIR FRAME CIRCUIT BREAKERS. | |
| Clean, inspect, lubricate and test as per Appendix #8 |
| ITEM # | FOURTEEN (14) WESTINGHOUSE 480V TYPE DS-416 1600A THREE PHASE DRAW OUT AIR FRAME CIRCUIT BREAKERS. | |
| Clean, inspect, lubricate and test as per Appendix #8 |
BLDG #330 GENERATOR BREAKERS (UNITS 1-4)
| ITEM # | NINE (9) SQUARE D 480V TYPE NW-16H 1600A THREE PHASE DRAW OUT AIR FRAME CIRCUIT BREAKERS. | |
| Clean, inspect, lubricate and test as per Appendix #8 |
| ITEM # | ONE (1) SQUARE D 480V TYPE NW-08H 800A THREE PHASE DRAW OUT AIR FRAME CIRCUIT BREAKER. | |
| Clean, inspect, lubricate and test as per Appendix #8 |
BLDG #330 GENERATOR BREAKERS (UNITS 6-7)
| ITEM # | FOUR (4) SQUARE D 480V TYPE NW-32H 3200A THREE PHASE DRAW OUT AIR FRAME CIRCUIT BREAKERS. | |
| Clean, inspect, lubricate and test as per Appendix #8 |
| ITEM # | ONE (1) SQUARE D 480V TYPE NW-16H 1600A THREE PHASE DRAW OUT AIR FRAME CIRCUIT BREAKER. | |
| Clean, inspect, lubricate and test as per Appendix #8 |
| ITEM # | FOUR (4) SQUARE D 480V TYPE NW-08H 800A THREE PHASE DRAW OUT AIR FRAME CIRCUIT BREAKERS. | |
| Clean, inspect, lubricate and test as per Appendix #8 |
BLDG #147 SUBSTATION (T-1)
| ITEM # | ONE (1) SQUARE D 500KVA 12470-480/277V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #126 SUBSTATION (T-2)
| ITEM # | ONE (1) ASEA BROWN BOVERI 225KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #128 SUBSTATION (T-3)
| ITEM # | ONE (1) WESTINGHOUSE ELECTRIC 150KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #118 SUBSTATION (T-4.1) (PROTESTANT CHAPEL)
| ITEM # | ONE (1) COOPER ELECTRIC 167KVA 12470-240/120V SINGLE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #9
BLDG #119 SUBSTATION (T-4.2)
| ITEM # | ONE (1) ASEA BROWN BOVERI 50KVA 7200-240/120V SINGLE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #9
BLDG #121 SUBSTATION (T-4.3)
| ITEM # | ONE (1) ASEA BROWN BOVERI 150KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #116 SUBSTATION (T-5)
| ITEM # | ONE (1) ASEA BROWN BOVERI 150KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #120 SUBSTATION (T-5A/T-5B)
| ITEM # | TWO (2) ASEA BROWN BOVERI 150 & 500 KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #115 SUBSTATION (T-6)
| ITEM # | ONE (1) ASEA BROWN BOVERI 500KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
ITEM # ONE (1) WESTINGHOUSE 208V 2000A TYPE THREE PHASE STAIONARY MOUNTED INSULATED CASE CIRCUIT BREAKER (DIGITRIP 310).
Clean, inspect, and test as per appendix #10
BLDG #400 SUBSTATION (T-7)
| ITEM # | ONE (1) ASEA BROWN BOVERI 300KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #210/214 SUBSTATION (T-8)
| ITEM # | ONE (1) ASEA BROWN BOVERI 1225KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #162 SUBSTATION (T-9)
| ITEM # | ONE (1) ASEA BROWN BOVERI 75KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #305 SUBSTATION (T-12)
| ITEM # | ONE (1) ASEA BROWN BOVERI 500KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
ITEM # ONE (1) GENERAL ELECTRIC 480V 1600A TYPE POWER BREAK THREE PHASE STATIONARY MOUNTED INSULATED CASE CIRCUIT BREAKER. (MICRO-VERSA TRIP PLUS) Clean, inspect, and test as per appendix #10
BLDG #408 SUBSTATION (T-13)
| ITEM # | ONE (1) ASEA BROWN BOVERI 500KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
ITEM # ONE (1) GENERAL ELECTRIC 480V 1600A TYPE POWER BREAK THREE PHASE STATIONARY MOUNTED INSULATED CASE CIRCUIT BREAKER. (MICRO-VERSA TRIP PLUS) Clean, inspect, and test as per appendix #10
BLDG #143 SUBSTATION (T-14)
| ITEM # | ONE (1) ASEA BROWN BOVERI 500KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #131 SUBSTATION (T-14A)
| ITEM # | ONE (1) ASEA BROWN BOVERI 75KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #425 SUBSTATION (T-15)
| ITEM # | ONE (1) EATON 150KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #127 SUBSTATION (T-16)
| ITEM # | ONE (1) ASEA BROWN BOVERI 150KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #129 SUBSTATION (T-16A)
| ITEM # | ONE (1) ASEA BROWN BOVERI 150KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #402 SUBSTATION (T-17.1)
| ITEM # | ONE (1) T&R ELECTRIC 500KVA 12470/7200-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #401 SUBSTATION (T-17.2)
| ITEM # | ONE (1) ASEA BROWN BOVERI 225KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #225 SUBSTATION (T-18.1)
| ITEM # | ONE (1) ASEA BROWN BOVERI 100KVA 7200-240/120V SINGLE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #9
BLDG #226 SUBSTATION (T-18.2)
| ITEM # | ONE (1) ASEA BROWN BOVERI 100KVA 7200-240/120V SINGLE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #9
BLDG #302 SUBSTATION (T-19)
| ITEM # | ONE (1) ASEA BROWN BOVERI 500KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
ITEM # ONE (1) GENERAL ELECTRIC 480V 1200A TYPE POWER BREAK THREE PHASE STATIONARY MOUNTED INSULATED CASE CIRCUIT BREAKER. (MICRO-VERSA TRIP PLUS) Clean, inspect, and test as per appendix #10 ITEM # ONE (1) GENERAL ELECTRIC 480V 1600A TYPE POWER BREAK THREE PHASE STATIONARY MOUNTED INSULATED CASE CIRCUIT BREAKER. (MICRO-VERSA TRIP PLUS) Clean, inspect, and test as per appendix #10
BLDG #410 SUBSTATION (T-20.1)
| ITEM # | ONE (1) SQUARE D ELECTRIC 750KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
ITEM # ONE (1) SQUARE D 480V 2000A TYPE RG-2000 THREE PHASE STAIONARY MOUNTED INSULATED CASE CIRCUIT BREAKER.
Clean, inspect, and test as per appendix #10
ITEM # ONE (1) SQUARE D 480V 800A TYPE PJ THREE PHASE STAIONARY MOUNTED INSULATED CASE CIRCUIT BREAKER.
Clean, inspect, and test as per appendix #10
ITEM # ONE (1) GENERAL ELECTRIC 480V 800A TYPE POWER BREAK THREE PHASE STATIONARY MOUNTED INSULATED CASE CIRCUIT BREAKER. (MICRO-VERSA TRIP PLUS) Clean, inspect, and test as per appendix #10
BLDG #411 SUBSTATION (T-20.2)
| ITEM # | ONE (1) ASEA BROWN BOVERI 750KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
| ITEM # | ONE (1) GENERAL ELECTRIC 480V TYPE AKR-4A-75 3000A THREE-PHASE DRAWS OUT ELECTICAL OPERATED AIR FRAME CIRCUIT BREAKER | |
| Clean, inspect, lubricate, and test as per Appendix #8. |
TEM # ONE (1) GENERAL ELECTRIC 480V 2000A TYPE POWER BREAK THREE PHASE STATIONARY MOUNTED INSULATED CASE CIRCUIT BREAKER. (MICRO-VERSA TRIP PLUS) Clean, inspect, and test as per appendix #10
BLDG #411 SUBSTATION (T-20.3)
| ITEM # | ONE (1) VANTRAN ELECTRIC 1000KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #409 SUBSTATION (T-21)
| ITEM # | ONE (1) ASEA BROWN BOVERI 500KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
| ITEM # | ONE (1) WESTINGHOUSE 480V TYPE DS-416 1600A THREE-PHASE STATIONARY MOUNTED AIR FRAME CIRCUIT BREAKER | |
| Clean, inspect, lubricate, and test as per Appendix #10. |
ITEM # ONE (1) SQUARE D 480V 2000A TYPE RG-2000 THREE PHASE STAIONARY MOUNTED INSULATED CASE CIRCUIT BREAKER.
Clean, inspect, and test as per appendix #10
ITEM # ONE (1) SQUARE D 480V 1200A TYPE PG THREE PHASE STAIONARY MOUNTED INSULATED CASE CIRCUIT BREAKER.
Clean, inspect, and test as per appendix #10
ITEM # ONE (1) GENERAL ELECTRIC 480V 1200A TYPE SPECTRA RMS THREE PHASE STATIONARY MOUNTED INSULATED CASE CIRCUIT BREAKER. (MICRO-VERSA TRIP PLUS) Clean, inspect, and test as per appendix #10
BLDG #412 SUBSTATION (T-22)
| ITEM # | ONE (1) ASEA BROWN BOVERI 500KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
ITEM # ONE (1) GENERAL ELECTRIC 480V 1600A TYPE POWER BREAK THREE PHASE STATIONARY MOUNTED INSULATED CASE CIRCUIT BREAKER. (MICRO-VERSA TRIP PLUS) Clean, inspect, and test as per appendix #10
BLDG #135/137/139 SUBSTATION (T-23)
| ITEM # | ONE (1) ASEA BROWN BOVERI 150KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #128 SUBSTATION (SL-26.3)
| ITEM # | ONE (1) ASEA BROWN BOVERI 45KVA 12470-480/277V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #214 SUBSTATION (SL-27)
| ITEM # | ONE (1) ASEA BROWN BOVERI 45KVA 12470-480/277V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #116 SUBSTATION (SL-28)
| ITEM # | ONE (1) ASEA BROWN BOVERI 45KVA 12470-480/277V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #135 SUBSTATION (SL-29)
| ITEM # | ONE (1) ASEA BROWN BOVERI 45KVA 12470-480/277V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #320 480V SUBSTATION (T-30)
| ITEM # | ONE (1) WESTINGHOUSE 15KV 600A TYPE WLI METAL ENCLOSED GANG-OPERATED AIR SWITCH. |
| Clean, inspect, lubricate and test as per appendix #6 |
| ITEM # | ONE (1) WESTINGHOUSE ELECTRIC 750KVA 12470-480/277V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
| ITEM # | THREE (3) WESTINGHOUSE SINGLE PHASE 15KV CLASS SURGE ARRESTERS. |
| Clean, inspect, and test as per appendix #2 |
ITEM # ONE (1) WESTINGHOUSE ELECTRIC 480V TYPE DS-416 1600A THREE-PHASE STATIONARY MOUNTED AIR FRAME CIRCUIT BREAKER WITH AMPTECTOR 1A TRIP UNIT (T-30 Secondary Main) Clean, inspect, lubricate, and test as per Appendix #10.
BLDG #315 SUBSTATION (T-33)
| ITEM # | ONE (1) ASEA BROWN BOVERI 750KVA 12470-480/277V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #1301 SUBSTATION (T-34)
| ITEM # | ONE (1) ASEA BROWN BOVERI 300KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #108 SUBSTATION (T-35)
| ITEM # | ONE (1) ASEA BROWN BOVERI 225KVA 12470-480/277V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #340 SUBSTATION (T-36)
| ITEM # | ONE (1) COOPER ELECTRIC 750KVA 12470-480/277V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
BLDG #133 SUBSTATION (T-37)
| ITEM # | ONE (1) ASEA BROWN BOVERI 75KVA 12470-208/120V THREE-PHASE OIL FILLED DISTRIBUTION TRANSFORMER. |
| PRIMARY & SECONDARY CABLES WILL BE DISCONNECTED. |
Clean, inspect, and test as per appendix #7
15KV PADMOUNT SWITCHES
| ITEM # | TWENTY (20) FPE ELECTRIC 15KV 600A THREE PHASE PADMOUNT METAL ENCLOSED SWITCHES. | |
| Clean, inspect, and perform infrared inspection as per appendix #11 |
INFRA-RED INSPECTION
ITEM # INFRA-RED INSPECTION.OF HOSPITAL EQUIPMENT LOCATED IN BUILDINGS 310, 322, 330, 335, 340 & 341.
EQUIPMENT INCLUDES DRY-TYPE TRANSFORMERS, DISTRIBUTION PANELS/MCCS AND ATS SWITCHES, BOTH NORMAL AND EMERGENCY POWER.
An infra-red inspection should be performed on your entire electrical system each year. This will indicate any loose electrical connections, insufficient contact pressures, excessive conductor loading, etc. This inspection should be completed under normal loading conditions and in advance of any upcoming equipment shutdown periods. With this inspection, you will receive a photograph(s) and an engineering report, which will indicate any problem areas found during this inspection.
BLDG #310 – 208/120 V Transformers
| ITEM # | FOURTEEN (14) 30 kVA – 75 kVA 480 V-208/120 V THREE-PHASE DRY TYPE TRANSFORMERS |
| Inspect, infrared, and clean exterior enclosures only |
BLDG #322 – 208/120 V Transformers
| ITEM # | TEN (10) 30 kVA – 75 kVA 480 V-208/120 V THREE-PHASE DRY TYPE TRANSFORMERS |
| Inspect, infrared, and clean exterior enclosures only |
BLDG #330 – 208/120 V Transformers
| ITEM # | SEVENTY-FIVE (75) 15 kVA – 75 kVA 480 V-208/120 V THREE-PHASE DRY TYPE TRANSFORMERS |
| Inspect, infrared, and clean exterior enclosures only |
BLDG #335 – 208/120 V Transformers
| ITEM # | SEVEN (7) 30 kVA – 225 kVA 480 V-208/120 V THREE-PHASE DRY TYPE TRANSFORMERS |
| Inspect, infrared, and clean exterior enclosures only |
BLDG #340 – 208/120 V Transformers
| ITEM # | THREE (3) 45 kVA – 112.5 kVA 480 V-208/120 V THREE-PHASE DRY TYPE TRANSFORMERS |
| Inspect, infrared, and clean exterior enclosures only |
BLDG #341 – 208/120 V Transformers
| ITEM # | TWO (2) 75 kVA – 150 kVA 480 V-208/120 V THREE-PHASE DRY TYPE TRANSFORMERS |
| Inspect, infrared, and clean exterior enclosures only |
BLDG #350- 208/120 liquid Filled Transformer
| ITEM #121. | ONE 500KVA EATON OILFILED THREE PHASE TRANSFORMER |
| Clean, inspect, and test as per appendix #7 |
| ITEM #122. | ONE 1200AMP EATON 3POLE BREAKER |
| Clean, inspect and test as per appendix #10 |
APPENDIX #1
SF6 CIRCUIT SWITCHER
A) VISUAL AND MECHANICAL INSPECTION
· Inspect for physical damage and compare nameplate data with plans and specifications.
· Perform mechanical operator tests in accordance with manufacturer's instructions.
· Check gas pressure indicator.
· Check pole opening indicator. Operate breaker several times to check mechanism operation.
B) ELECTRICAL TESTS
· Perform contact resistance test across each pole, closed and open.
· Perform insulation resistance tests, pole-to-pole, pole-to-ground, and across open poles at 2500V minimum.
· Circuit Switcher to be tripped by operation of each protective device, if possible.
· Perform timing tests, if possible.
APPENDIX #2
MEDIUM AND HIGH VOLTAGE SURGE PROTECTION DEVICES
A) VISUAL AND MECHANICAL INSPECTION
1. Inspect for physical damage.
1. Compare nameplate information with latest single line diagram and report discrepancies.
1. Inspect for proper mounting and adequate clearances.
1. Check tightness of connections.
1. Check ground lead on each device for individual attachment to ground bus or ground electrode.
B) ELECTRICAL TESTS
1. Perform an insulation power factor test.
1. Perform an insulation resistance test.
APPENDIX #3
TRANSFORMERS - LIQUID FILLED
A) VISUAL AND MECHANICAL INSPECTION
1. Inspect for physical damage. Make a close examination for all damage that may have occurred as the result of environment, or other problems, which could interfere with normal operation.
1. Verify proper manual operation such as fans, pumps, indicators, tap changer, and gas pressurization system.
1. Check all liquid in tanks and bushings for proper level and inspect for oil leaks.
1. Perform specific inspection and mechanical tests as recommended by manufacturer.
1. Perform tap changer inspection. Pump liquid from compartment, remove covers, clean all carbon, dirt, etc. from internal parts and walls. Thoroughly inspect all moving and stationary contacts, pins, supports, springs, holders, gaskets, wear indicators, etc. Return oil back into tap changer by filter press.
B) ELECTRICAL TESTS
1. Insulation resistance tests shall be performed winding-to-winding and winding-to-ground. Appropriate guard shall be utilized over all bushings.
1. Insulation power factor tests shall be made on all high and low voltage winding and bushings. Overall dielectric loss and power factor (CH, CL, CHL) shall be determined. Ungrounded specimen tests (UST) shall be made on any bushing equipped with power factor or capacitance taps.
1. A turn’s ratio test shall be performed between windings for all tap positions.
1. Perform winding resistance test on each winding in final tap position.
1. Perform a ground resistance test on each transformer main grounding system.
1. Insulating oil shall be sampled in accordance with ASTM D-923. Sample shall be laboratory tested for:
| a) | Dielectric breakdown voltage, Acid neutralization number, Specific gravity |
| b) | Interfacial tension, Color, Visual condition, PPM water |
| c) | Perform dissolved gas analysis (DGA) |
APPENDIX #4
CIRCUIT BREAKER - MEDIUM VOLTAGE - VACUUM
A) VISUAL AND MECHANICAL INSPECTION
1. Inspect anchorage, alignment, and grounding.
1. Perform all mechanical operational tests on both the circuit breaker and its operating mechanism.
1. Measure critical distances such as contact gap, as recommended by manufacturer.
B) ELECTRICAL TESTS
1. Perform a contact resistance test.
1. Trip circuit breaker by operation of each protective device.
1. Perform insulation resistance tests, pole-to-pole, pole-to-ground, and across open poles at 2500V minimum.
1. Perform vacuum bottle integrity test (overpotential) across each vacuum bottle with the breaker in the open position in strict accordance with manufacturer's instructions. DO NOT EXCEED MAXIMUM VOLTAGE STIPULATED FOR THIS TEST. Do not perform this test unless the contact displacement of each interrupter is within manufacturer's tolerance. Be aware that some DC high potential test sets are half-wave rectified and may produce peak voltages in excess of the breaker manufacturer's recommended maximum.
APPENDIX #5
PROTECTIVE RELAYS
A) VISUAL AND MECHANICAL INSPECTION
1. Relays shall be inspected for physical damage.
1. Inspect cover gasket, cover glass, and presence of foreign materials, moisture, and condition of spiral spring, disc clearance, contacts, and case short in contacts if present.
1. Check mechanically for freedom of movement, proper travel and alignment, and tightness of mounting hardware and tap plugs.
1. Perform all settings in accordance with owner/user's provided settings.
B) ELECTRICAL TESTS
1. Perform the following tests on the nominal settings specified by owner/user's electrical engineer:
| a) | Pickup parameters on each operating element. |
| b) | Timing test shall be performed at two (2) points on time dial curve. |
| c) | Pickup targets and seal in units. |
| d) | Special tests as required to check operation of restraint, direction, and other elements per manufacturer's instructions. |
APPENDIX #6
AIR SWITCHES - MEDIUM VOLTAGE - METAL ENCLOSED
A) VISUAL AND MECHANICAL INSPECTION
1. Inspect for physical and mechanical condition.
1. Check for proper anchorage and required area clearances.
1. Verify that fuse size and types correspond to drawings.
1. Check blade alignment and arc interrupter operation.
1. Check each fuse holder for adequate mechanical support for each fuse.
1. Test all electrical and mechanical interlock systems for proper operation and sequencing.
1. Clean entire switch using approved methods and materials.
1. Verify proper phase barrier materials and installation.
1. Lubricate as required.
B) ELECTRICAL TESTS
1. Perform insulation resistance tests on each pole, phase-to-phase and phase-to-ground for one (1) minute.
1. Perform contact resistance tests across each switch blade and fuse holder.
APPENDIX #7
TRANSFORMERS - LIQUID FILLED
A) VISUAL AND MECHANICAL INSPECTION
1. Inspect for physical damage. Make a close examination for all damage that may have occurred as the result of environment, or other problems, which could interfere with normal operation.
1. Compare equipment nameplate information with latest single-line diagram and report discrepancies.
1. Verify proper manual operation such as fans, pumps, indicators, tap changer, and gas pressurization system.
1. Check all liquid in tanks and bushings for proper level and inspect for oil leaks.
1. Inspect Grounding System. Check all connections and report any physical damage or deficiencies.
1. Verify and provide documentation of fuse sizes and types.
B) ELECTRICAL TESTS
1. Insulation resistance tests shall be performed winding-to-winding and winding-to-ground. Appropriate guard shall be utilized over all bushings.
1. Insulation power factor tests shall be made on all high and low voltage winding and bushings. Overall dielectric loss and power factor (CH, CL, CHL) shall be determined. Ungrounded specimen tests (UST) shall be made on any bushing equipped with power factor or capacitance taps.
1. A turn’s ratio test shall be performed between windings for the “as found” tap position.
1. Perform a ground resistance test on each transformer main grounding system.
1. Insulating oil shall be sampled in accordance with ASTM D-923. Sample shall be laboratory tested for:
1. Dielectric breakdown voltage / Acid neutralization number
1. Specific gravity / Interfacial tension / Color / Visual condition
1. Perform individual excitation current tests on each phase.
1. Perform winding resistance testing.
APPENDIX #8
CIRCUIT BREAKERS - LOW VOLTAGE - POWER
A) VISUAL AND MECHANICAL INSPECTION
1. Perform mechanical operational test.
1. Check cell fit and element alignment.
1. Check arc chutes for damage.
1. Clean entire circuit breaker using approved methods and materials.
1. Lubricate as required.
B) ELECTRICAL TESTS
1. Perform a contact resistance test.
1. Perform an insulation resistance test at 1000 volts DC from pole-to-pole and from each pole-to-ground with breaker closed and across open contacts of each phase.
1. Determine minimum pickup current by primary current injection.
1. Determine long time delay by primary injection.
1. Determine short time pickup and delay by primary current injection.
1. Determine ground fault pickup and delay by primary current injection.
1. Determine instantaneous pickup value by primary current injection.
1. Check charging mechanism.
APPENDIX #9
TRANSFORMERS - LIQUID FILLED – SINGLE PHASE
A) VISUAL AND MECHANICAL INSPECTION
1. Inspect for physical damage. Make a close examination for all damage that may have occurred as the result of environment, or other problems, which could interfere with normal operation.
1. Compare equipment nameplate information with latest single-line diagram and report discrepancies.
1. Verify proper manual operation such as fans, pumps, indicators, tap changer, and gas pressurization system.
1. Check all liquid in tanks and bushings for proper level and inspect for oil leaks.
B) ELECTRICAL TESTS
1. Insulation resistance tests shall be performed winding-to-winding and winding-to-ground. Appropriate guard shall be utilized over all bushings.
1. Insulation power factor tests shall be made on all high and low voltage winding and bushings. Overall dielectric loss and power factor (CH, CL, CHL) shall be determined. Ungrounded specimen tests (UST) shall be made on any bushing equipped with power factor or capacitance taps.
1. A turn’s ratio test shall be performed between windings for all tap positions.
1. Perform a ground resistance test on each transformer main grounding system.
1. Perform individual excitation current tests on each phase.
APPENDIX #10
CIRCUIT BREAKERS - LOW VOLTAGE - POWER
A) VISUAL AND MECHANICAL INSPECTION
1. Perform mechanical operational test.
1. Check cell fit and element alignment.
1. Check arc chutes for damage.
1. Clean entire circuit breaker using approved methods and materials.
1. Lubricate as required.
B) ELECTRICAL TESTS
1. Perform a contact resistance test.
1. Determine long time delay by secondary injection.
1. Determine short time pickup and delay by secondary current injection.
1. Determine ground fault pickup and delay by secondary current injection.
1. Check charging mechanism.
APPENDIX #11
PAD-MOUNT SWITCHES
A) VISUAL AND MECHANICAL INSPECTION
1. Inspect for physical and mechanical condition.
1. Check for proper anchorage and required area clearances.
1. Verify and provide documentation of fuse sizes and types.
1. Check blade alignment and arc interrupter operation.
1. Check each fuse holder for adequate mechanical support for each fuse.
1. Test all electrical and mechanical interlock systems for proper operation and sequencing.
1. Clean entire switch using approved methods and materials.
1. Verify proper phase barrier materials and installation.
1. Lubricate as required.
1. Perform infrared inspection
B.3 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
Triennial Electrical Inspection and Maintenance PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H261 - Equipment and Materials Testing - Electric Wire and Power Distribution Equipment
| GRAND TOTAL |
| __________________ |
SECTION C - CONTRACT CLAUSES
ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES Clauses that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The following clauses are incorporated into 52.212-4 as an addendum to this contract:
C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far https://www.va.gov/oal/library/vaar/
(End of Clause)
| FAR Number |
| Title |
| Date |
| 52.203-17 |
| CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS |
| NOV 2023 |
| 52.204-13 |