Drawings.pdf
PDF 3 MB Posted
- Attached to
- J041--Duct Cleaning Federal contract opportunity
- Solicitation number
- 36C25024Q0728
About this file
This document contains drawings and plans for a federal contract opportunity related to duct cleaning services for Building 31 at the VA Ann Arbor Healthcare System.
The key details are: The solicitation number is 36C25024Q0728, the opportunity is for duct cleaning services in accordance with the provided Statement of Work, questions are due by 12 PM EDT 7/1/2024, quotes are due by 12 PM EDT 7/8/2024, and the award will be made using FAR 13 Comparative Analysis procedures to the vendor that provides the best value to the Government. The contract is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25024Q0728 0002.docx | DOCX document | |
| HVAC info.pdf | ||
| 36C25024Q0728 0001.docx | DOCX document | |
| 36C25024Q0728.docx | DOCX document | |
| Wage Determination -- Service Contract Act WD no. 2015-4833.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
UP
UP
116 SF
ELEC
160 SF
DATA
103 SF
SURGICAL
RECOVERY
30 SF
MECH
29A
111 SF
SURGICAL
PACK PREP
348 SF
ELEC
359 SF
SMALL
ANIMAL
46 SF
H.A.C.
55 SF
FREEZER
21A
217 SF
STERILE
SURGERY
30B
128 SF
SURGICAL
PREP
88 SF
SURGICAL
PREP
30A
218 SF
ACUTE
SURGERY
121 SF
OFFICE
113 SF
OFFICE
172 SF
LOUNGE
34 339 SF
STORAGE
01A
615 SF
CLEAN SIDE
CAGE WASH
48 SF
ELEV
P-1104 SF
STAIR #3
S-03
76 SF
ELEV
S-1
76 SF
ELEV
S-2
329 SF
CORRIDOR
CB-1A
103 SF
PROCEDURE
ROOM
124 SF
SUPPLIES
139 SF
CLEAN
PROCEDURES
254 SF
WOMEN
LOCKERS
267 SF
MEN
LOCKERS
37 SF
PROCEDURE
214 SF
Room
26B
138 SF
Room
26A
139 SF
PROCEDURES
LAB
154 SF
SMALL
ANIMAL
172 SF
FEED AND
BEDDING
544 SF
CORRIDOR
CB-1
311 SF
CORRIDOR
CB-4
811 SF
CORRIDOR
CB-2
400 SF
CORRIDOR
CB-5
164 SF
STAIR #2
S-02
85 SF
TOILET
17C
61 SF
INFECTIOUS
SUITE
230 SF
LARGE
ANIMAL
WARD
114 SF
CUBICLE
ROOM
17A 17B
202 SF
Room
17A
MECH
937 SF
CORRIDOR
CB-3
142 SF
ISOTYPE
245 SF
SMALL
ANIMAL
WARD
105 SF
CUBICLE
ROOM
105 SF
CUBICLE
ROOM
139 SF
Room
15B
96 SF
Room
15A
169 SF
SMALL
ANIMAL
WARD
166 SF
SMALL
ANIMAL
WARD
168 SF
SMALL
ANIMAL
WARD
165 SF
SMALL
ANIMAL
WARD
315 SF
SMALL
ANIMAL
WARD
102 SF
STORAGE
139 SF
STAIR #1
S-01
551 SF
CAGE
WASHING
NOT FOR CONSTRUCTION
RDC/ JOHN POE ARCHITECTS
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
2/18/2020 1:30:31 PM
BIM Master Record Drawings
02.21.2020
BASEMENT FLOOR PLAN
31-A.100
506-17-601
Ann Arbor, Michigan (506)
VA Station No:
Weston Dick
Record Drawing 18007.00
Scale: 1/8" = 1'-0"
BASEMENT FLOOR PLAN
Revisions Date
Key Plan
UP
UP
UP
UP
UP
UP
UP
DN
80 SF
ELEC
96 SF
IT CLOSET
96 SF
OFFICE
96 SF
OFFICE
96 SF
OFFICE
96 SF
OFFICE
96 SF
OFFICE
96 SF
OFFICE
94 SF
OFFICE
133 SF
CORRIDOR
C1-4A
112 SF
LOUNGE
84 SF
BULK
STORAGE
101 SF
BULK
STORAGE
178 SF
CORRIDOR
C1-5
428 SF
ATRIUM
49 SF
ELEV
P-1
127 SF
MECH
131A
316 SF
STORAGE
104 SF
STAIR #3
S-03
76 SF
ELEV
S-1
76 SF
ELEV
S-2
288 SF
CORRIDOR
C1-1
147 SF
TOILET
136 SF
TOILET
48 SF
H.A.C.
724 SF
DOCK
173 SF
STAIR #1
S-01
207 SF
VESTIBULE
902 SF
C/L ROOM &
TABLE
892 SF
LAB
1154 SF
CORRIDOR
C1-2
891 SF
LAB
881 SF
LAB
110A 106A
164 SF
STAIR #2
S-02
457 SF
LAB
463 SF
LAB
98 SF
TISSUE
CULTURE
122 SF
CORRIDOR
C1-3
98 SF
TISSUE
CULTURE
215 SF
COLD ROOM
273 SF
CORE
EQUIPMENT
280 SF
GLASS
WASH
258 SF
Room
37 SF
MECH
105A
NOT FOR CONSTRUCTION
RDC/ JOHN POE ARCHITECTS
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
2/18/2020 1:30:31 PM
BIM Master Record Drawings
02.21.2020
FIRST FLOOR PLAN
31-A.101
506-17-601
Ann Arbor, Michigan (506)
VA Station No:
Weston Dick
Record Drawing 18007.00
Scale: 1/8" = 1'-0"
FIRST FLOOR PLAN
78 SF
ELEC
93 SF
DATA
94 SF
OFFICE
94 SF
OFFICE
94 SF
OFFICE
94 SF
OFFICE
94 SF
OFFICE
94 SF
OFFICE
92 SF
OFFICE
114 SF
OFFICE
157 SF
CORRIDOR
C2-4A
593 SF
LAB
104 SF
STAIR #3
S-03
76 SF
ELEV
S-1
76 SF
ELEV
S-2
97 SF
OFFICE
201A
104 SF
OFFICE
202A
417 SF
CORRIDOR
C2-1
688 SF
LAB
202173 SF
STAIR #1
S-01
213 SF
CORRIDOR
C2-2A
1040 SF
CORRIDOR
C2-2
894 SF
LAB
206A
890 SF
LAB
890 SF
LAB
879 SF
LAB
210A
164 SF
STAIR #2
S-02
458 SF
LAB
466 SF
LAB
452 SF
LAB
458 SF
LAB
129 SF
CORRIDOR
C2-3
425 SF
CORRIDOR
C2-4
90 SF
DARKROOM
70 SF
TISSUE
CULTURE
215 SF
COLD ROOM
273 SF
CORE
EQUIPMENT
285 SF
CORE
EQUIPMENT
269 SF
CONFERENCE
147 SF
WOMENS
TOILET
139 SF
MENS
TOILET
48 SF
H.A.C.
NOT FOR CONSTRUCTION
RDC/ JOHN POE ARCHITECTS
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
2/18/2020 1:30:32 PM
BIM Master Record Drawings
02.21.2020
SECOND FLOOR PLAN
31-A.102
506-17-601
Ann Arbor, Michigan (506)
VA Station No:
Weston Dick
Record Drawing 18007.00
Scale: 1/8" = 1'-0"
SECOND FLOOR PLAN
7510 SF
MECH
144 SF
STAIR #1
S-01
NOT FOR CONSTRUCTION
RDC/ JOHN POE ARCHITECTS
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
2/18/2020 1:30:33 PM
BIM Master Record Drawings
02.21.2020
PENTHOUSE FLOOR PLAN
31-A.103
506-17-601
Ann Arbor, Michigan (506)
VA Station No:
Weston Dick
Record Drawing 18007.00
Scale: 1/8" = 1'-0"
PENTHOUSE PLAN
8' - 1"
9' - 1" 9' - 1"
9' - 7"
9' - 1"
9' - 1"
9' - 7" 9' - 1"
9' - 1"
9' - 0" 9' - 1"
9' - 0"
9' - 0"
9' - 1"
8' - 1"
8' - 1"
8' - 1" 8' - 1"
8' - 1"
8' - 1"7' - 9"
8' - 1"
8' - 1" 8' - 1"
8' - 1"
9' - 0"
9' - 1"
9' - 0"9' - 0"9' - 1"9' - 0"
9' - 1"
9' - 1"
8' - 1"
8' - 1"
9' - 1"
9' - 1"
9' - 1"
9' - 1"
9' - 1"
9' - 1"
9' - 1" 9' - 0" 9' - 1" 9' - 1" 9' - 0" 9' - 0" 9' - 0"
8' - 1"
9' - 1"
9' - 1"
17C
17A 17B
17A
15A
15B
CB-5
13 12 10
CB-3
08 06 04
CB-1A
26B
CB-1
26A242322
28 29
30B
30A
31 32
34 01A
REFLECTED CEILING PLAN LEGEND
2' x 2' acoustical tile ceiling
Gypsum board / portland cement plaster ceiling / soffit - painted
2' x 4' acoustical tile ceiling
NOT FOR CONSTRUCTION
RDC/ JOHN POE ARCHITECTS
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
2/19/2020 9:04:23 AM
BIM Master Record Drawings
02.21.2020
RCP - BASEMENT
31-A.120
506-17-601
Ann Arbor, Michigan (506)
VA Station No:
Weston Dick
Record Drawing 18007.00
Scale: 1/8" = 1'-0"
BASEMENT REFLECTED CEILING PLAN
9' - 8" 8' - 4"
12' - 4"
7' - 4"
9' - 4"9' - 4"9' - 4"9' - 5"
9' - 5"9' - 4" 9' - 6"
9' - 1"
9' - 2"
8' - 11" 9' - 2" 9' - 2" 9' - 2"
8' - 1"
8' - 2"
8' - 2" 9' - 2"
9' - 4"9' - 8"9' - 8"9' - 8"9' - 8"9' - 8"9' - 8" 9' - 9"
7' - 9" 7' - 10"
8' - 4"
9' - 8"
12' - 5"
11' - 6"
9' - 8" 8' - 5" 9' - 8"
9' - 1" 9' - 1"
9' - 1"
7' - 0"
15' - 0"
15' - 0"
15' - 0"
15' - 0"
110A
109 106
106A
C1-2
C1-5
C1-4A
C1-1
104105107108
112111
118 119 120 121 122 123 124
C1-4A
REFLECTED CEILING PLAN LEGEND
2' x 2' acoustical tile ceiling
Gypsum board / portland cement plaster ceiling / soffit - painted
2' x 4' acoustical tile ceiling
NOT FOR CONSTRUCTION
RDC/ JOHN POE ARCHITECTS
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
2/19/2020 9:04:23 AM
BIM Master Record Drawings
02.21.2020
RCP - FIRST FLOOR
31-A.121
506-17-601
Ann Arbor, Michigan (506)
VA Station No:
Weston Dick
Record Drawing 18007.00
Scale: 1/8" = 1'-0"
FIRST FLOOR REFLECTED CEILING PLAN
9' - 4" 9' - 4" 9' - 4" 8' - 5"
8' - 4"
9' - 4" 9' - 5" 9' - 5" 9' - 5"
9' - 8"
8' - 4"
9' - 1" 9' - 4"
9' - 7"
9' - 3"
9' - 4"
8' - 4"8' - 1"
9' - 8"
9' - 8" 9' - 8"
9' - 8"
9' - 0"
8' - 4"8' - 11"
7' - 10"
8' - 11"8' - 11"8' - 11"8' - 11"8' - 11"
9' - 7"
9' - 1"
9' - 1"
9' - 1" 9' - 1" 9' - 1"
8' - 1"
8' - 2"
8' - 2"
8' - 1"
9' - 8"
REFLECTED CEILING PLAN LEGEND
2' x 2' acoustical tile ceiling
Gypsum board / portland cement plaster ceiling / soffit - painted
2' x 4' acoustical tile ceiling
NOT FOR CONSTRUCTION
RDC/ JOHN POE ARCHITECTS
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
2/19/2020 9:04:24 AM
BIM Master Record Drawings
02.21.2020
RCP - SECOND FLOOR
31-A.122
506-17-601
Ann Arbor, Michigan (506)
VA Station No:
Weston Dick
Record Drawing 18007.00
Scale: 1/8" = 1'-0"
SECOND FLOOR REFLECTED CEILING PLAN
| B 31- Combined |
| 31-A.100 - BASEMENT FLOOR PLAN |
| Sheets |
| 31-A.100 - BASEMENT FLOOR PLAN |
| 31-A.101 - FIRST FLOOR PLAN |
| 31-A.102 - SECOND FLOOR PLAN |
| 31-A.103 - PENTHOUSE FLOOR PLAN |
| 31-A.120 - RCP - BASEMENT |
| 31-A.121 - RCP - FIRST FLOOR |
| 31-A.122 - RCP - SECOND FLOOR |
| 31-A.200 - EAST & WEST ELEVATIONS |
| 31-A.201 - NORTH & SOUTH ELEVATIONS |
| 31-A.101 - FIRST FLOOR PLAN |
| Sheets |
| 31-A.100 - BASEMENT FLOOR PLAN |
| 31-A.101 - FIRST FLOOR PLAN |
| 31-A.102 - SECOND FLOOR PLAN |
| 31-A.103 - PENTHOUSE FLOOR PLAN |
| 31-A.120 - RCP - BASEMENT |
| 31-A.121 - RCP - FIRST FLOOR |
| 31-A.122 - RCP - SECOND FLOOR |
| 31-A.200 - EAST & WEST ELEVATIONS |
| 31-A.201 - NORTH & SOUTH ELEVATIONS |
| 31-A.102 - SECOND FLOOR PLAN |
| Sheets |
| 31-A.100 - BASEMENT FLOOR PLAN |
| 31-A.101 - FIRST FLOOR PLAN |
| 31-A.102 - SECOND FLOOR PLAN |
| 31-A.103 - PENTHOUSE FLOOR PLAN |
| 31-A.120 - RCP - BASEMENT |
| 31-A.121 - RCP - FIRST FLOOR |
| 31-A.122 - RCP - SECOND FLOOR |
| 31-A.200 - EAST & WEST ELEVATIONS |
| 31-A.201 - NORTH & SOUTH ELEVATIONS |
| 31-A.103 - PENTHOUSE FLOOR PLAN |
| Sheets |
| 31-A.100 - BASEMENT FLOOR PLAN |
| 31-A.101 - FIRST FLOOR PLAN |
| 31-A.102 - SECOND FLOOR PLAN |
| 31-A.103 - PENTHOUSE FLOOR PLAN |
| 31-A.120 - RCP - BASEMENT |
| 31-A.121 - RCP - FIRST FLOOR |
| 31-A.122 - RCP - SECOND FLOOR |
| 31-A.200 - EAST & WEST ELEVATIONS |
| 31-A.201 - NORTH & SOUTH ELEVATIONS |
| 31-A.120 - RCP - BASEMENT |
| Sheets |
| 31-A.120 - RCP - BASEMENT |
| 31-A.121 - RCP - FIRST FLOOR |
| 31-A.122 - RCP - SECOND FLOOR |
| 31-A.121 - RCP - FIRST FLOOR |
| Sheets |
| 31-A.120 - RCP - BASEMENT |
| 31-A.121 - RCP - FIRST FLOOR |
| 31-A.122 - RCP - SECOND FLOOR |
| 31-A.122 - RCP - SECOND FLOOR |
| Sheets |
| 31-A.120 - RCP - BASEMENT |
| 31-A.121 - RCP - FIRST FLOOR |
| 31-A.122 - RCP - SECOND FLOOR |
| HVAC 1st flr H2.1R1 |
| HVAC 2nd flr H2.2R1 |
| HVAC Bsmt H2.BR2 |
| HVAC Penthouse H4.1 |
| HVAC Penthouse H4.2R1 |
File details come from the government source that posted it. Updated .