B31 Secondary.pdf

PDF 1 MB Posted

Attached to
H959--5 Year Arc Flash Survey Federal contract opportunity
Solicitation number
36C25022Q1134
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

View the file

Other files for this federal contract opportunity

Other files attached to H959--5 Year Arc Flash Survey, newest first.
File Type Posted
Elect Single Line 1.pdf PDF
Elect Single Line 2.pdf PDF
36C25022Q1134 0002.docx DOCX document
B26 As-Built Drawings - Electrical (1-lines and Schedules).pdf PDF
36C25022Q1134 0001.docx DOCX document
Pages from B18 Machine Room As-builts.pdf PDF
B26 As-Built Drawings - Electrical.pdf PDF
36C25022Q1134.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCALE: NTS

BUILDING 31

METERING

SWBD

METERING

SWBD

MAIN SWBD "31MDP"

(480/277V-3PH-4W)

600/3

(400A)

600/3

(250A)

300/3

(300A)

600/3

(200A)

1200/3

(1200A)

200/3

1F

1G

1600/3

31-ACCU1

BMCP

31-SF4

15/3 15/3 150/3 40/3

ELEV.

GFI

GFI GFI GFIGFI GFI

225 KVA

480/277V

ISO. TRANS.

ISO

150A/3P

CT SCAN

80A/3P

MRI

SP1

E

80/3P (NEW)

150/3P (EXIST.)

SWBD "MS"

1600A/3P

600/3

(400A)

MRI

CHILLER

150A

M.B.

60/3P

SP1A

#3/0 GEC

GFI

13,417 SCA

EM SWBD

TAP

30/3

TVSS

SPARE

31-CCU1

200/3 125/3 100/3

ATS#2

EX

100/3

BP

150/3

(150A)

GFIGFI

BE

1E

225/3

3E

225/3

MCP

225/3

1L1

1L2

LL1

100/3 100/2

UPS

125/3 175/3 400/3

BW

BR

225/3

BX

200/3

RBA

RBB

200/3

R1A

R1B

300/3

GEN

100/2

400/3

AIR

COMP

40/340/3

ELEV

31MA2

100/3

31MV2

2@5HP

50/3

PNL

20/3

SPARE

200/3100/3

400/3

EBE

E1E

E2E

EPBP

LAB E-A

100/3

LAB E-B

125/3

EBN

60/3 100/3

ELEV

250/3

EPBA

EP1A

EMCP

100/3

EPB

100/3 100/3

EBW

E1A

E2W

(LS/CRITICAL)

(EQUIPMENT)

600A

200A 200A 200A

SPARE

515 KW/644 KVA

DIESEL GENERATOR

480Y/277V-3PH-4W

0.8PF

(99 KWD EXIST. LOAD)

( CLINICAL 33 KVAD NEW)

2E

208Y/120V-3PH-4W

(LS/CRITICAL)

208Y/120V-3PH-4W

MCP3

ATS#1

EX

(EQUIP)

T O

C

L I N

I C

A L

A

T S

E Q

TO CLINICAL

WIREWAY

N E N E

208Y/120V-3PH-4W

(NORMAL)

208/120V

750 KVA

400/3 400/3

1A

2W

S P

A R

E

600/3

(250A)

GFI

S P

A R

E

480Y/277V-3PH-4W

(NORMAL)

480Y/277V-3PH-4W

(NORMAL)

TO CLINICAL

31MDP2

TVSS

480Y/277V-3PH-4W

GFI

150/3 40/3 300/3

480Y/277V-3PH-4W

(NORMAL)

150/315/3

208Y/120V-3PH-4W

(NORMAL)

225/3 200/3225/3225/3225/3100/3 125/3 175/3 400/3100/3 100/2

LSI/1000A

515 KW/644 KVA

DIESEL GENERATOR

480Y/277V-3PH-4W

0.8PF

(99 KWD EXIST. LOAD)

(33 KVAD NEW)

TVSS

T2

208/120V

150 KVA

T1

208/120V

150 KVA

800/3

800/3

350/3 350/3

480Y/277V-3PH-4W

(CRITICAL)

225/3

480Y/277V-3PH-4W

(EQUIPMENT)

200/3

200/3100/3 100/3 100/3 60/3 100/3 100/3 100/3 100/3

208Y/120V-3PH-4W

(LS/CRITICAL)

175/3

300/3 40/340/3100/350/3

(EQUIPMENT)

208Y/120V-3PH-4W

480Y/277V-3PH-4W

480Y/277V-3PH-4W

(LIFE SAFETY)

175/3300/3

F

U T

C

R D

P

T

C

R D

P

500/3 300/3100/3

500/3

G

E Q

P

T

G

E Q

P

200/3

45/345/345/3

T

T

L S

T

L S

BLS3

MB

100A

208Y/120V-3PH-4W

(NORMAL)

LSIG LSIG LSIGLSIG LSIGLSIG

400/3 600/3 800/3 AT

1200AF

LSIG

100/3

200/3 200/3

60/360/3 400/3

LSIG

400/3

LSIG

400/3

P

D P

P

B C

T

P

D P

LSIG

400/3

LSIG

400/3

LSIG

400/3

LSIG

500/3

LSIG

500/3

SPARE

TVSS

30/3

TVSS

30/3

K

M

I L

M

I L

PBA

SPARE

M

I L

S

E T

S

O

F

M

I L

2WA

100/3

H2E

BX2

200/3

K

C M

I L

K

C M

I L

M

I L

4-500 KCMIL

4-500 KCMIL

4-500 KCMIL

400/3

EPBB

FUTURE

400A 400A

REFER TO PRIMARY SINGLE

LINE DIAGRAM

TYP.

TYP. TYP.

30/3

TVSS

ALL LIGHT LINEWEIGHTS INDICATE EXISTING EQUIPMENT TO REMAIN. LIGHT DASHED LINEWEIGHTS

INDICATES FUTURE EQUIPMENT. DARK DASHED LINEWEIGHTS INDICATES REMOVAL WORK. DARK

LINEWEIGHT INDICATES NEW WORK.

#4/0

TVSS

30/3

TVSS

30/3

4@5HP

200/3

200/3

250KW DIESEL

GENERATOR

480Y/277V

350 KCMIL

45/3

S P

A R

E

PBMCP

AMCP

EMPNL

EX/R

M

M

TO 31-ATSCR1

(SPD 111 KVAD NEW)

TO 31-ATSLS1

(LAB 53 KVAD NEW)

296 KVAD TOTAL (356 AMPS)

(URGENT

CARE)

(MRI)

MCP2

400/3

80A C.B.

(51.1 KVAD EXIST.)

100/3

90A C.B.

100A/3P

#1/0

(OLD EAMCP)

NEW

EAMCP

31-AC2 RF

2 X 5HP

31-AC2 SF

2 X 15HP

150A/3P

50A/3P

ELEV 1 ELEV 2

15 HP 15 HP

100A/3P

150/3

250/3

P4

99 9

14 14

SECONDARY SINGLE LINE DIAGRAM

PANEL "EM2" PANEL "EM1"

DIST. SWBD. "DP1"

PANEL "SP2"

PANEL "SMCP"

MAIN DIST. SWBD "31MDP"

PANEL "SP3"

DIST. PANEL "31DP1A"

PANEL "31CRDP" PANEL "31EQDP"

PANEL "31CRDP4"

PANEL "31EQDP4"

EM DIST. SWBD "31EMDP"

PANEL "31LSDP"

31TEQ4

31TLS3

31T1B

DIST. PANEL "31DP1B"

31T1A

31TCR4

N

G

BASEMENT

SECOND FLOOR

THIRD FLOOR/ATTIC

FIRST FLOOR

SPD ADDITION

PENTHOUSE

PIPE BASEMENT

4321 76

2500AT

3000A

100% RATED

N E

GEN START

(TO ATSCR2)

1000AT

1600A

N E

31-ATSLS2

100A/4P

GEN START

(TO GEN)

N E

31-ATSCR2

500A/4P

GEN START

(TO ATSLS2)

31-ATSEQ2

500A/4P

EMERGENCY EQUIPMENT

208Y/120V

-3PH-4W

112.5 KVA

480V

K=4

208Y/120V

-3PH-4W

30 KVA

480V

K=1

208Y/120V

-3PH-4W

225 KVA

480V

K=4

208Y/120V

-3PH-4W

225 KVA

480V

K=4

208Y/120V

-3PH-4W

112.5 KVA

480V

K=4

8 9 1411 12 13105 15 16 17

FUTURE

4 5 6 7 89

This Document was originally issued by

Gary S. Eodice on

February 17, 2015.

This document is not considered a sealed document.

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of o n e e i g h t h i n c o e f o t o n e q u a r t e r i n o t t h r e e e i g h t h s i n o t o n e h a l f i n o t t h r e e q u a r t e r s i n o t o n e i n o t o n e a d e h a l f i n c h e s o t t h r e e i n c h e o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

A R C H I T E C T S

J O H N P O E

116 EAST THIRD STREET

DAYTON, OHIO 45402-2130

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of

Construction and Facilities

Management

JPA Project No.

937 461 3290 PHONE

937 461 0260 FAX

jpa@johnpoe.com

HEAPY PROJECT No.: 2012-04025 FIRM LICENSE No.: 01528

A

M

SPD Addition to Building 31

2/17/2015

SECONDARY SINGLE LINE - BUILDING 31

E202

MSGMSG

12013.00

538-111

Chillicothe, Ohio

NOTES

1. REMOVE BUSSING, BREAKERS, PANEL COVER, ETC.. SPLICE FEEDERS

AND EXTEND TO NEW SOURCE AS INDICATED. MAINTAIN PANEL TUB AND

PROVIDE NEW SCREW COVER WITH LOADS/FEEDERS LABELED.

2. REMOVE AND RELOCATE DIESEL GENERATOR. REMOVE 600A

PANELBOARD INSIDE AND FEEDER BACK TO ALTERNATOR TERMINALS.

PROVIDE NEW 1000A LSI BREAKER IN NEMA 1 ENCLOSURE WITHIN

WEATHER PROOF HOUSING PROVIDE SHOP DRAWINGS SUBMITTAL ON

GENERATOR MODIFICATIONS FROM KOHLER DETAILING ALL NECESSARY

CHANGES/INSTALLATION.

3. NEW SCHNEIDER ELECTRIC EMERGENCY POWER

MONITOR/CONTROL/PLC/METER CABINET. PROVIDE ALL REQUIRED

COMPONENTS TO MATCH EXISTING SYSTEM FUNCTIONALITY.

4. PROVIDE RS485 MODBUS CABLE IN 0.75" C. TO EXISTING B31 EMCS

PANEL LOCATION AND TIE INTO SYSTEM. COORDINATE ALL

REQUIREMENTS WITH SCHNEIDER ELECTRIC.

5. PROVIDE NEW PT/CT'S FOR SCHNEIDER SYSTEM MONITORING.

6. 2-#12, IN 0.75"C. FOR GENERATOR START SIGNAL.

7. 5-#10 FOR VOLTAGE MONITORING (3 BLACK, 1 WHITE, 1GRD.) IN 0.75"C.

8. 7-#10 FOR CURRENT MONITORING (3 BLACK, 3 WHITE, 1GRD.) 4 SPARE (2

BLACK, 2 WHITE), IN 0.75"C.

9. 8-#14 IN 0.75"C. FOR ATS MONITOR/CONTROL VIA SCHNEIDER SYSTEM I/O

(ON EM, ON NORMAL, TEST, START TEST). RUN TO NEW EMCS PLC

CABINET.

10. INTERCEPT GENERATOR START CIRCUIT TO CLINICAL ADDITION AND

EXTEND TO NEW GENERATOR LOCATION.

11. INCLUDE ALL UPGRADES NECESSARY TO BUILDING 19 MASTER PLC

CONTROL PANEL/HMI.

12. PROVIDE ENCLOSED CIRCUIT BREAKER.

13. RUN 4-600 KCMIL, #1/0 G.E.C. IN 4"C.

14. REFER TO DISTRIBUTION SCHEDULE FOR SIZE.

15. RUN 4-#3/0, #6 GRD. IN 2"C. REMOVE AT COMPLETION OF PROJECT.

16. RUN 3-#6, #10 GRD. IN 1"C.

17. RUN 1"C. SPARE FOR FUTURE USE.

18. RUN 2 SETS OF (4-600 KCMIL, #3/0 G.E.C. IN 4"C.)

19. RUN 3-#10, #10 GRD. IN 0.75"C.

20. REMOVE BUS TAP AND BACKFEED BREAKER.

21. INTERCEPT CIRCUIT AND EXTEND TO NEW SOURCE.

22. PROVIDE PORTABLE 250KW-480V DIESEL GENERATOR THROUGHOUT

CONSTRUCTION UNTIL NEW 31EMDP IS CONSTRUCTED AND READY FOR

CUTOVERS. REFER TO SITE / BASEMENT PLAN.

23. PROVIDE TEMPORARY SERVICE DUCT BANK / FEEDER THROUGHOUT

CONSTRUCTION UNTIL NEW 31MDP IS CONSTRUCTED AND READY FOR

CUTOVER. REFER TO SITE PLAN / PRIMARY SINGLE LINE / BASEMENT

PLAN.

24. DISCONNECT AND REMOVE CHILLER FEEDER BACK TO SOURCE. DELETE

THIS WORK UNDER DEDUCT ALTERNATE NO. 1.

25. PROVIDE INTEGRAL POWER METER.

26. PROVIDE ADDITIONAL SET OF PT'S/CT'S AND TIE INTO RELOCATED

SCHNEIDER ELECTRICAL WIRELESS POWER METER.

27. PROVIDE 400A TEMPORARY FEEDER (TO KEEP MRI MAGNET ENERGIZED

AND URGENT CARE ROOFTOP UNIT/CHILLER OPERATIONAL). UTILIZE

SOURCE IN MAIN ELECTRIC ROOM OR PROVIDE ADDITIONAL

TEMPORARY GENERATOR OUTSIDE.

28. PROVIDE NEW LOAD BANK / PORTABLE GENERATOR CAM-LOCKS AND

CABLING TO GENERATOR BREAKER LUGS.

29. PROVIDE LOAD BANK DUMP / PORTABLE GENERATOR START CIRCUIT

CONTROL BOX IN GENERATOR START CIRCUIT CONTROL BOX IN

GENERATOR. CONNECT NORMAL SENSE LINE

30. RUN FEEDER TO ATTIC FOLLOWING THE SAME ROUTE AS MCP2 FEEDER.

31. REMOVE PORTION OF FEEDER TO DISCONNECT EXISTING "EAMCP"

FROM ELEVATOR PANEL.

32. INTERCEPT AND EXTEND TO NEW PANEL "EAMCP".

33. FEEDER ROUTE TO BE COORDINATED WITH COR.

34. PROVIDE NEW 150A/3P BREAKER.

Revisions Date

1 Bid Documents 02/17/2015

15 Record Drawings 07/02/2018

RECORD DRAWING NOTE:

ALL DEDUCT ALTERNATES

WERE ACCEPTED.

VHACLLSINCLJ

Line

VHACLLSINCLJ

Text Box To Clinical Secondary Single Line

METERING

SWBD

SCALE: NTS

CLINICAL

TVSS

480Y/277V-3PH-4W

BA

GA

GB

1A

1B

2A

2B

3A

3B

208Y/120V-3PH-4W

GLS

2LS

GCRA

1CRA

2CRA

2CRB

208Y/120V-3PH-4W

S P

A R

E

S P

A R

E

ALL LIGHT LINEWEIGHTS INDICATE EXISTING EQUIPMENT TO REMAIN. DASHED LINEWEIGHTS

INDICATES FUTURE EQUIPMENT. DARK LINEWEIGHT INDICATES NEW WORK.

TVSSTVSS

480Y/277V-3PH-4W

ELEV 2

TVSS

S P

A R

E

ELEVATOR

S P

A R

E

31-CCU6

3CRA

3CRB

(FUT.)

31-SF3

(FUT.)

31-RF3

(FUT.)

S P

A R

E

1EQPA

BEQA

31-P5 31-P6 HWP

(FUT.)

S P

A R

E

PBB

(40HP)

40HP 50HP 20HP

TVSS

#3/0 G.E.C.

#6 G.E.C.

#1/0 G.E.C.

E

M D

P

E

M D

P

MAIN DIST. SWBD "31MDP2"

DIST. SWBD "31DP2" DIST. SWBD "31CRDP1"

31TLS1

31TCR

31TDP2

PANEL "BEQPA"

31TEQ1

SECONDARY SINGLE LINE DIAGRAM

BASEMENT

4321 5

GROUND FLOOR

SECOND FLOOR

THIRD FLOOR

(FUTURE)

(FUTURE)

FIRST FLOOR

2 3 4 5 6 7

7 8 12

31-ATSCR1

200A/3P

EN

208Y/120V

-3PH-4W

112.5 KVA

480V

K=13

208Y/120V

-3PH-4W

30 KVA

480V

K=1

208Y/120V

-3PH-4W

225 KVA

480V

K=13

EXISTING TO 31MDP

N E

31-ATSEQ1

400A/4P

9 10 11

GEN START

(TO ATSCR1)

N E

31-ATLS1

100A/4P

GEN START

(TO B31ATS)

GEN START

(TO ATSLS)

SHELL

WIREWAY IN MAIN ELEC. ROOM

45A/3P

800AT

100A/3P

208Y/120V

-3PH-4W

15 KVA,

480V

K=1

1200A

175A/3P

#8 G.E.C.

1 2 3 4 5 6 7

FEEDER TO SPLICE

EXISTING EM

FEEDER TO SPLICE

This Document was originally issued by

Gary S. Eodice on

February 17, 2015.

This document is not considered a sealed document.

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h t h s i n o t o n e h a l f i n o t t h r e e q u a r t e r s i n o t o n e i n o t o n e a e h a l f i n c h e o t t h r e e i n c h e o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

A R C H I T E C T S

J O H N P O E

116 EAST THIRD STREET

DAYTON, OHIO 45402-2130

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of

Construction and Facilities

Management

JPA Project No.

937 461 3290 PHONE

937 461 0260 FAX

jpa@johnpoe.com

HEAPY PROJECT No.: 2012-04025 FIRM LICENSE No.: 01528

A

M

SPD Addition to Building 31

2/17/2015

SECONDARY SINGLE LINE - CLINICAL

E203

MSGMSG

12013.00

538-111

Chillicothe, Ohio

NOTES

1. EXISTING SCHNEIDER ELECTRIC CONTROL WIRING.

Revisions Date

1 Bid Documents 02/17/2015

15 Record Drawings 07/02/2018

RECORD DRAWING NOTE:

ALL DEDUCT ALTERNATES

WERE ACCEPTED.

SCALE: NTS

SPD (AND FUTURE) ADDITION

METERING

SWBD

1C

1D

480Y/277V-3PH-4W

S P

A R

E

ALL LIGHT LINEWEIGHTS INDICATE EXISTING EQUIPMENT TO REMAIN. DASHED LINEWEIGHTS

INDICATES FUTURE EQUIPMENT. DARK LINEWEIGHT INDICATES NEW WORK.

TVSS

GC

GD

2C

2D

3C

3D

(SPD)

1C

1D

480Y/277V-3PH-4W

TVSS

GF

GG

2C

2D

3C

3D

(LAB/PROSTHETICS)

GE

(SPD)

(MED. SUPPLIES

1E

(CLINICS)

2E

(MED/SURG)

3E

(3RD FLOOR?)

1E

(SURGERY)

2E

(MICU/ADMIN)

3E

(3RD FLOOR?)

(PHARM)

(LAB)

GI

(PROSTH)

GC

GD

(CANTEEN)

GLS2

1LS2

2LS2

3LS2

GLS3

1LS3

2LS3

3LS3

(SPD)

(CLINICS)

(MED/SURG)

(3RD FLOOR?)

(3RD FLOOR?)

(SURGERY)

(MICU/ADMIN)

(LAB)

1C

1D

480Y/277V-3PH-4W

TVSS

S P

A R

E

2C

2D

3C

3D

(CLINICS)

(CLINICS)

2E

(MED/SURG)

(3RD FLOOR?)

S P

A R

E

GEQ2

(SPD)

GEQP2

1C

1D

480Y/277V-3PH-4W

TVSS

S P

A R

E

2C

2D

3C

3D

(LAB)

(SURG/ENDO)

2E

(MED/SURG)

(3RD FLOOR?)

S P

A R

E

GEQ3

(LAB)

GEQP3

2EQP3

S F

M

E D

S

U R

R F

M

E D

S

U R

S F

M

I C

U

R F

M

I C

U

2EQP2

S F

M

E D

S

U R

R F

M

E D

S

U R

S F

M

I C

U

R F

M

I C

U

MB

300A

MB

400A

MB

300A

30/3 125/3 70/3 70/3 70/3 70/3

S P

A R

E

125/3

PBC

P1C

S F

C

L I N

I C

R F

C

L I N

I C

S F

C

L I N

I C

R F

C

L I N

I C

P2C

MB

150A

MB

150A

30/3 175/3 125/3 125/3 125/3 125/3

MB

300A

MB

300A

MB

300A

L S

D P

L S

D P

C

R D

P

M

D P

M

D P

C

R D

P

30/3 45/3 70/3 45/3 45/370/3

MB

100A

MB

150A

MB

100A

30/3 125/3 125/3 70/3 70/3125/3

MB

300A

1E

(PHARM)

MB

300A

MB

150A

MB

150A

1EQP3

S F

S

U R

G

R F

S

U R

G

S F

P

H A

R

R F

P

H A

R

MB

150A

TVSS

480Y/277V-3PH-4W

31-CCU7 31-CCU8 31-CCU9 31-CCU10

GFI

800/360/3 800/3 800/3 800/3

M

D P

GH

EXIST.

TVSS

TVSS

HAND./STORAGE)

NOTES

1. COORDINATE WIRE/CONDUIT SIZE WITH MANUFACTURER PRIOR TO ORDERING.

2. EQUIPMENT PROVIDED UNDER LAB PROJECT.

3. UNDER DEDUCT ALTERNATE NO. 1, DELETE CONNECTION TO CHILLER.

4. RUN 4-#1/0, #6 G.E.C. IN 2"C.

5. RUN 3-#4, #8 GRD. IN 1"C.

6. RUN 4-#1, #6 GRD. IN 1.25"C.

7. RUN 4-#2, #8 GRD. IN 1.25"C.

8. RUN 4-350 KCMIL, #1/0 G.E.C. IN 3"C.

9. RUN 4-350 KCMIL, #4 GRD. IN 3"C.

10. RUN 3-#1/0, #6 GRD. IN 1.5"C.

11. RUN 3-#6, #10 GRD. IN 1"C.

DIST. SWBD "31PDP1"

31TLS2

SECONDARY SINGLE LINE DIAGRAM

DIST. SWBD "31PDP2"

DIST. SWBD "31CRDP2" DIST. SWBD "31CRDP3"

31TG1

31T11

31T21

31T31

31TG2 31TG3

31TLS3

31T12

31T22

31T32

31TCR_

31TCR_

31TCR_

31TCR_

31TCR_

31TCR_

31TEQ2 31TEQ2

MAIN DIST. SWBD "31MDP1"

GROUND FLOOR

SECOND FLOOR

THIRD FLOOR

(FUTURE)

(FUTURE)

FIRST FLOOR

208Y/120V

-3PH-4W

30 KVA

480V

K=1

(FUTURE)

ROOF

(FUTURE)

1 2 3 4 5 6

1 2 3 4 5 6 1 2 3 4 5 6

208Y/120V

-3PH-4W

75 KVA

480V

K=4

208Y/120V

-3PH-4W

45 KVA

480V

K=4

208Y/120V

-3PH-4W

45 KVA

480V

K=4

208Y/120V

-3PH-4W

45 KVA

480V

K=4

208Y/120V

-3PH-4W

75 KVA

480V

K=4

208Y/120V

-3PH-4W

75 KVA

480V

K=4

208Y/120V

-3PH-4W

75 KVA

480V

K=4

208Y/120V

-3PH-4W

75 KVA

480V

K=4

208Y/120V

-3PH-4W

75 KVA

480V

K=4

208Y/120V

-3PH-4W

75 KVA

480V

K=4

208Y/120V

-3PH-4W

45 KVA

480V

K=4

208Y/120V

-3PH-4W

45 KVA

480V

K=4

208Y/120V

-3PH-4W

30 KVA

480V

K=4

208Y/120V

-3PH-4W

45 KVA

480V

K=4

208Y/120V

-3PH-4W

30 KVA

480V

K=4

208Y/120V

-3PH-4W

30 KVA

480V

K=1

208Y/120V

-3PH-4W

45 KVA

480V

K=1

208Y/120V

-3PH-4W

45 KVA

480V

K=1

1 5 6 7

2500AT

3000A

100% RATED

E

Q D

P

E

Q D

P

This Document was originally issued by

Gary S. Eodice on

February 17, 2015.

This document is not considered a sealed document.

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h t h s i n o t o n e h a l f i n o t t h r e e q u a r t e r s i n o t o n e i n o t o n e a e h a l f i n c h e o t t h r e e i n c h e o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

A R C H I T E C T S

J O H N P O E

116 EAST THIRD STREET

DAYTON, OHIO 45402-2130

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of

Construction and Facilities

Management

JPA Project No.

937 461 3290 PHONE

937 461 0260 FAX

jpa@johnpoe.com

HEAPY PROJECT No.: 2012-04025 FIRM LICENSE No.: 01528

A

M

SPD Addition to Building 31

2/17/2015

SECONDARY SINGLE LINE - SPD

E204

MSGMSG

12013.00

538-111

Chillicothe, Ohio

Revisions Date

1 Bid Documents 02/17/2015

15 Record Drawings 07/02/2018

RECORD DRAWING NOTE:

ALL DEDUCT ALTERNATES

WERE ACCEPTED.

NOTES

METERING

SWBD

SCALE: NTS

TVSS

480Y/277V-3PH-4W

BA

GA

GB

1A

1B

2A

2B

3A

3B

208Y/120V-3PH-4W

GLS

2LS

GCRA

1CRA

2CRA

2CRB

208Y/120V-3PH-4W

S P

A R

E

S P

A R

E

ALL LIGHT LINEWEIGHTS INDICATE EXISTING EQUIPMENT TO REMAIN. DASHED LINEWEIGHTS

INDICATES FUTURE EQUIPMENT. DARK LINEWEIGHT INDICATES NEW WORK.

TVSSTVSS

480Y/277V-3PH-4W

ELEV 2

TVSS

S P

A R

E

ELEVATOR

S P

A R

E

31-CCU6

3CRA

3CRB

(FUT.)

31-SF3

(FUT.)

31-RF3

(FUT.)

S P

A R

E

1EQPA

BEQA

31-P5 HWP

(FUT.)

S P

A R

E

PBB

(40HP)

40HP 50HP 20HP

TVSS

(FUTURE)

S P

A R

E

1 8-#14 IN 0.75"C. FOR ATS MONITOR/CONTROL VIA SCHNEIDER EMCS SYSTEM I/O (ON

EM SOURCE, ON NORMAL SOURCE, TEST, START TEST). RUN TO EXIST. B31 EMCS

PLC CABINET. FOLLOW NEW FEEDER PATH THROUGH CRAWLSPACE. COORDINATE

REQUIREMENTS WITH SCHNEIDER ELECTRIC. REFER TO FLOOR PLANS.

2 FUTURE ELEVATOR POWER MODULE SWITCH.

3 RUN 4-#1, #6 SBJ IN 1.5"C.

4 RUN 4-#2, #8 GRD. IN 1.25"C.

5 RUN 3-#4, #8 GRD. IN 1"C.

6 RUN 3-#3/0, #6 GRD. IN 2"C.

7 RUN 3-#10, #10 GRD. IN .75"C.

8 RUN 4-#4, #8 SBJ IN 1.25"C.

9 RUN 4-#350 KCMIL, #4 GRD. IN 3"C.

10 PROVIDE A 1.25"C. STUBBED AND CAPPED ABOVE FIRST FLOOR. UTILIZE 4" RMC

SLEEVE IN SLAB.

11 PROVIDE A 2"C. STUBBED AND CAPPED ABOVE FIRST FLOOR. UTILIZE 4" RMC SLEEVE

IN SLAB.

12 PROVIDE A 4"C. SLEEVE THROUGH FLOOR SLAB.

13 4-#4/0, #4 GRD. IN 3"C.

14 RUN START CIRCUIT FROM NEW ATS TO EXISTING B31 ATS IN 0.75"C. FOLLOW NEW

FEEDER PATH THROUGH CRAWLSPACE.

15 REFER TO DISTRIBUTION SCHEDULE FOR FEEDER SIZE.

16 4-#10, #10 GRD. IN 0.75"C.

17 UNDER DEDUCT ALTERNATE #2, DELETE THIS WORK.

18 CONDUIT SLEEVE REMAINS IN ALL DEDUCT ALTERNATES.

#3/0 G.E.C.

#6 G.E.C.

5 6

#1/0 G.E.C.

MAIN DIST. SWBD "31MDP2"

DIST. SWBD "31DP2" DIST. SWBD "31CRDP1"

31TLS

31TCR

31TDP2

SECONDARY SINGLE LINE DIAGRAM

PANEL "BEQPA"

31TEQ1

BASEMENT

4321 5

GROUND FLOOR

SECOND FLOOR

THIRD FLOOR

(FUTURE)

(FUTURE)

FIRST FLOOR

2 3 4 5 6 7

7 8 12

31-ATSCR1

200A/3P EN

208Y/120V

-3PH-4W

112.5 KVA

480V

K=13

208Y/120V

-3PH-4W

30 KVA

480V

K=1

208Y/120V

-3PH-4W

225 KVA

480V

K=13

RUN TO 31MDP

REFER TO SHEET E008

N E

31-ATSEQ1

400A/4P

9 10 11

GEN START

(TO ATSCR1)

N E

31-ATLS1

100A/4P

GEN START

(TO B31ATS)

GEN START

(TO ATSLS)

SHELL

NEW WIREWAY IN MAIN ELECTRIC ROOM

45A/3P

800AT

100A/3P

208Y/120V

-3PH-4W

15 KVA,

480V K=1

1200A

175A/3P

#8 G.E.C.

1 2 3 4 5 6 7

RUN TO EM FEEDER SPLICE

REFER TO SHEET E008

RUN TO EM FEEDER SPLICE

REFER TO SHEET E008

This Document was originally issued by Gary S. Eodice on

May 23, 2014.

This document is not considered a sealed document.

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch on fo ot on e-qu ar te r in fo ot th re e-ei gh th s in fo ot on e-ha lf in fo ot th re e-qu ar te rs in fo ot on e in fo ot on e an d on e-ha lf in es fo ot th re e in ch es fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

A R C H I T E C T SJ O H N P O E

116 EAST THIRD STREET

DAYTON, OHIO

45402-2130

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

JPA Project No.

937 461 3290 PHONE

937 461 0260 FAX

jpa@ johnpoe.com

Heapy Project No.: 2010-04026 Firm License No.: 01528

/1

/2

:3 :0

P

M

CLINICAL ADDITION TO BLDG 31

05/23/2014

SECONDARY SINGLE LINE DIAGRAM

E009

SCMSG

10017.00

538-108

Chillicothe, Ohio

Revision s

Date

BID DOCUMENTS 4/18/2014

1 AMENDMENT #3 08/14/14

2 BULLETIN #24 5/4/2018

3 RECORD DRAWINGS 01/22/2020

E202-Layout1
Sheets and Views
Layout1
E203-Layout1
Sheets and Views
Layout1
E204-Layout1
Sheets and Views
Layout1

File details come from the government source that posted it. Updated .