B31 Secondary.pdf
PDF 1 MB Posted
- Attached to
- H959--5 Year Arc Flash Survey Federal contract opportunity
- Solicitation number
- 36C25022Q1134
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Elect Single Line 1.pdf | ||
| Elect Single Line 2.pdf | ||
| 36C25022Q1134 0002.docx | DOCX document | |
| B26 As-Built Drawings - Electrical (1-lines and Schedules).pdf | ||
| 36C25022Q1134 0001.docx | DOCX document | |
| Pages from B18 Machine Room As-builts.pdf | ||
| B26 As-Built Drawings - Electrical.pdf | ||
| 36C25022Q1134.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE: NTS
BUILDING 31
METERING
SWBD
METERING
SWBD
MAIN SWBD "31MDP"
(480/277V-3PH-4W)
600/3
(400A)
600/3
(250A)
300/3
(300A)
600/3
(200A)
1200/3
(1200A)
200/3
1F
1G
1600/3
31-ACCU1
BMCP
31-SF4
15/3 15/3 150/3 40/3
ELEV.
GFI
GFI GFI GFIGFI GFI
225 KVA
480/277V
ISO. TRANS.
ISO
150A/3P
CT SCAN
80A/3P
MRI
SP1
E
80/3P (NEW)
150/3P (EXIST.)
SWBD "MS"
1600A/3P
600/3
(400A)
MRI
CHILLER
150A
M.B.
60/3P
SP1A
#3/0 GEC
GFI
13,417 SCA
EM SWBD
TAP
30/3
TVSS
SPARE
31-CCU1
200/3 125/3 100/3
ATS#2
EX
100/3
BP
150/3
(150A)
GFIGFI
BE
1E
225/3
3E
225/3
MCP
225/3
1L1
1L2
LL1
100/3 100/2
UPS
125/3 175/3 400/3
BW
BR
225/3
BX
200/3
RBA
RBB
200/3
R1A
R1B
300/3
GEN
100/2
400/3
AIR
COMP
40/340/3
ELEV
31MA2
100/3
31MV2
2@5HP
50/3
PNL
20/3
SPARE
200/3100/3
400/3
EBE
E1E
E2E
EPBP
LAB E-A
100/3
LAB E-B
125/3
EBN
60/3 100/3
ELEV
250/3
EPBA
EP1A
EMCP
100/3
EPB
100/3 100/3
EBW
E1A
E2W
(LS/CRITICAL)
(EQUIPMENT)
600A
200A 200A 200A
SPARE
515 KW/644 KVA
DIESEL GENERATOR
480Y/277V-3PH-4W
0.8PF
(99 KWD EXIST. LOAD)
( CLINICAL 33 KVAD NEW)
2E
208Y/120V-3PH-4W
(LS/CRITICAL)
208Y/120V-3PH-4W
MCP3
ATS#1
EX
(EQUIP)
T O
C
L I N
I C
A L
A
T S
E Q
TO CLINICAL
WIREWAY
N E N E
208Y/120V-3PH-4W
(NORMAL)
208/120V
750 KVA
400/3 400/3
1A
2W
S P
A R
E
600/3
(250A)
GFI
S P
A R
E
480Y/277V-3PH-4W
(NORMAL)
480Y/277V-3PH-4W
(NORMAL)
TO CLINICAL
31MDP2
TVSS
480Y/277V-3PH-4W
GFI
150/3 40/3 300/3
480Y/277V-3PH-4W
(NORMAL)
150/315/3
208Y/120V-3PH-4W
(NORMAL)
225/3 200/3225/3225/3225/3100/3 125/3 175/3 400/3100/3 100/2
LSI/1000A
515 KW/644 KVA
DIESEL GENERATOR
480Y/277V-3PH-4W
0.8PF
(99 KWD EXIST. LOAD)
(33 KVAD NEW)
TVSS
T2
208/120V
150 KVA
T1
208/120V
150 KVA
800/3
800/3
350/3 350/3
480Y/277V-3PH-4W
(CRITICAL)
225/3
480Y/277V-3PH-4W
(EQUIPMENT)
200/3
200/3100/3 100/3 100/3 60/3 100/3 100/3 100/3 100/3
208Y/120V-3PH-4W
(LS/CRITICAL)
175/3
300/3 40/340/3100/350/3
(EQUIPMENT)
208Y/120V-3PH-4W
480Y/277V-3PH-4W
480Y/277V-3PH-4W
(LIFE SAFETY)
175/3300/3
F
U T
C
R D
P
T
C
R D
P
500/3 300/3100/3
500/3
G
E Q
P
T
G
E Q
P
200/3
45/345/345/3
T
T
L S
T
L S
BLS3
MB
100A
208Y/120V-3PH-4W
(NORMAL)
LSIG LSIG LSIGLSIG LSIGLSIG
400/3 600/3 800/3 AT
1200AF
LSIG
100/3
200/3 200/3
60/360/3 400/3
LSIG
400/3
LSIG
400/3
P
D P
P
B C
T
P
D P
LSIG
400/3
LSIG
400/3
LSIG
400/3
LSIG
500/3
LSIG
500/3
SPARE
TVSS
30/3
TVSS
30/3
K
M
I L
M
I L
PBA
SPARE
M
I L
S
E T
S
O
F
M
I L
2WA
100/3
H2E
BX2
200/3
K
C M
I L
K
C M
I L
M
I L
4-500 KCMIL
4-500 KCMIL
4-500 KCMIL
400/3
EPBB
FUTURE
400A 400A
REFER TO PRIMARY SINGLE
LINE DIAGRAM
TYP.
TYP. TYP.
30/3
TVSS
ALL LIGHT LINEWEIGHTS INDICATE EXISTING EQUIPMENT TO REMAIN. LIGHT DASHED LINEWEIGHTS
INDICATES FUTURE EQUIPMENT. DARK DASHED LINEWEIGHTS INDICATES REMOVAL WORK. DARK
LINEWEIGHT INDICATES NEW WORK.
#4/0
TVSS
30/3
TVSS
30/3
4@5HP
200/3
200/3
250KW DIESEL
GENERATOR
480Y/277V
350 KCMIL
45/3
S P
A R
E
PBMCP
AMCP
EMPNL
EX/R
M
M
TO 31-ATSCR1
(SPD 111 KVAD NEW)
TO 31-ATSLS1
(LAB 53 KVAD NEW)
296 KVAD TOTAL (356 AMPS)
(URGENT
CARE)
(MRI)
MCP2
400/3
80A C.B.
(51.1 KVAD EXIST.)
100/3
90A C.B.
100A/3P
#1/0
(OLD EAMCP)
NEW
EAMCP
31-AC2 RF
2 X 5HP
31-AC2 SF
2 X 15HP
150A/3P
50A/3P
ELEV 1 ELEV 2
15 HP 15 HP
100A/3P
150/3
250/3
P4
99 9
14 14
SECONDARY SINGLE LINE DIAGRAM
PANEL "EM2" PANEL "EM1"
DIST. SWBD. "DP1"
PANEL "SP2"
PANEL "SMCP"
MAIN DIST. SWBD "31MDP"
PANEL "SP3"
DIST. PANEL "31DP1A"
PANEL "31CRDP" PANEL "31EQDP"
PANEL "31CRDP4"
PANEL "31EQDP4"
EM DIST. SWBD "31EMDP"
PANEL "31LSDP"
31TEQ4
31TLS3
31T1B
DIST. PANEL "31DP1B"
31T1A
31TCR4
N
G
BASEMENT
SECOND FLOOR
THIRD FLOOR/ATTIC
FIRST FLOOR
SPD ADDITION
PENTHOUSE
PIPE BASEMENT
4321 76
2500AT
3000A
100% RATED
N E
GEN START
(TO ATSCR2)
1000AT
1600A
N E
31-ATSLS2
100A/4P
GEN START
(TO GEN)
N E
31-ATSCR2
500A/4P
GEN START
(TO ATSLS2)
31-ATSEQ2
500A/4P
EMERGENCY EQUIPMENT
208Y/120V
-3PH-4W
112.5 KVA
480V
K=4
208Y/120V
-3PH-4W
30 KVA
480V
K=1
208Y/120V
-3PH-4W
225 KVA
480V
K=4
208Y/120V
-3PH-4W
225 KVA
480V
K=4
208Y/120V
-3PH-4W
112.5 KVA
480V
K=4
8 9 1411 12 13105 15 16 17
FUTURE
4 5 6 7 89
This Document was originally issued by
Gary S. Eodice on
February 17, 2015.
This document is not considered a sealed document.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of o n e e i g h t h i n c o e f o t o n e q u a r t e r i n o t t h r e e e i g h t h s i n o t o n e h a l f i n o t t h r e e q u a r t e r s i n o t o n e i n o t o n e a d e h a l f i n c h e s o t t h r e e i n c h e o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
A R C H I T E C T S
J O H N P O E
116 EAST THIRD STREET
DAYTON, OHIO 45402-2130
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of
Construction and Facilities
Management
JPA Project No.
937 461 3290 PHONE
937 461 0260 FAX
jpa@johnpoe.com
HEAPY PROJECT No.: 2012-04025 FIRM LICENSE No.: 01528
A
M
SPD Addition to Building 31
2/17/2015
SECONDARY SINGLE LINE - BUILDING 31
E202
MSGMSG
12013.00
538-111
Chillicothe, Ohio
NOTES
1. REMOVE BUSSING, BREAKERS, PANEL COVER, ETC.. SPLICE FEEDERS
AND EXTEND TO NEW SOURCE AS INDICATED. MAINTAIN PANEL TUB AND
PROVIDE NEW SCREW COVER WITH LOADS/FEEDERS LABELED.
2. REMOVE AND RELOCATE DIESEL GENERATOR. REMOVE 600A
PANELBOARD INSIDE AND FEEDER BACK TO ALTERNATOR TERMINALS.
PROVIDE NEW 1000A LSI BREAKER IN NEMA 1 ENCLOSURE WITHIN
WEATHER PROOF HOUSING PROVIDE SHOP DRAWINGS SUBMITTAL ON
GENERATOR MODIFICATIONS FROM KOHLER DETAILING ALL NECESSARY
CHANGES/INSTALLATION.
3. NEW SCHNEIDER ELECTRIC EMERGENCY POWER
MONITOR/CONTROL/PLC/METER CABINET. PROVIDE ALL REQUIRED
COMPONENTS TO MATCH EXISTING SYSTEM FUNCTIONALITY.
4. PROVIDE RS485 MODBUS CABLE IN 0.75" C. TO EXISTING B31 EMCS
PANEL LOCATION AND TIE INTO SYSTEM. COORDINATE ALL
REQUIREMENTS WITH SCHNEIDER ELECTRIC.
5. PROVIDE NEW PT/CT'S FOR SCHNEIDER SYSTEM MONITORING.
6. 2-#12, IN 0.75"C. FOR GENERATOR START SIGNAL.
7. 5-#10 FOR VOLTAGE MONITORING (3 BLACK, 1 WHITE, 1GRD.) IN 0.75"C.
8. 7-#10 FOR CURRENT MONITORING (3 BLACK, 3 WHITE, 1GRD.) 4 SPARE (2
BLACK, 2 WHITE), IN 0.75"C.
9. 8-#14 IN 0.75"C. FOR ATS MONITOR/CONTROL VIA SCHNEIDER SYSTEM I/O
(ON EM, ON NORMAL, TEST, START TEST). RUN TO NEW EMCS PLC
CABINET.
10. INTERCEPT GENERATOR START CIRCUIT TO CLINICAL ADDITION AND
EXTEND TO NEW GENERATOR LOCATION.
11. INCLUDE ALL UPGRADES NECESSARY TO BUILDING 19 MASTER PLC
CONTROL PANEL/HMI.
12. PROVIDE ENCLOSED CIRCUIT BREAKER.
13. RUN 4-600 KCMIL, #1/0 G.E.C. IN 4"C.
14. REFER TO DISTRIBUTION SCHEDULE FOR SIZE.
15. RUN 4-#3/0, #6 GRD. IN 2"C. REMOVE AT COMPLETION OF PROJECT.
16. RUN 3-#6, #10 GRD. IN 1"C.
17. RUN 1"C. SPARE FOR FUTURE USE.
18. RUN 2 SETS OF (4-600 KCMIL, #3/0 G.E.C. IN 4"C.)
19. RUN 3-#10, #10 GRD. IN 0.75"C.
20. REMOVE BUS TAP AND BACKFEED BREAKER.
21. INTERCEPT CIRCUIT AND EXTEND TO NEW SOURCE.
22. PROVIDE PORTABLE 250KW-480V DIESEL GENERATOR THROUGHOUT
CONSTRUCTION UNTIL NEW 31EMDP IS CONSTRUCTED AND READY FOR
CUTOVERS. REFER TO SITE / BASEMENT PLAN.
23. PROVIDE TEMPORARY SERVICE DUCT BANK / FEEDER THROUGHOUT
CONSTRUCTION UNTIL NEW 31MDP IS CONSTRUCTED AND READY FOR
CUTOVER. REFER TO SITE PLAN / PRIMARY SINGLE LINE / BASEMENT
PLAN.
24. DISCONNECT AND REMOVE CHILLER FEEDER BACK TO SOURCE. DELETE
THIS WORK UNDER DEDUCT ALTERNATE NO. 1.
25. PROVIDE INTEGRAL POWER METER.
26. PROVIDE ADDITIONAL SET OF PT'S/CT'S AND TIE INTO RELOCATED
SCHNEIDER ELECTRICAL WIRELESS POWER METER.
27. PROVIDE 400A TEMPORARY FEEDER (TO KEEP MRI MAGNET ENERGIZED
AND URGENT CARE ROOFTOP UNIT/CHILLER OPERATIONAL). UTILIZE
SOURCE IN MAIN ELECTRIC ROOM OR PROVIDE ADDITIONAL
TEMPORARY GENERATOR OUTSIDE.
28. PROVIDE NEW LOAD BANK / PORTABLE GENERATOR CAM-LOCKS AND
CABLING TO GENERATOR BREAKER LUGS.
29. PROVIDE LOAD BANK DUMP / PORTABLE GENERATOR START CIRCUIT
CONTROL BOX IN GENERATOR START CIRCUIT CONTROL BOX IN
GENERATOR. CONNECT NORMAL SENSE LINE
30. RUN FEEDER TO ATTIC FOLLOWING THE SAME ROUTE AS MCP2 FEEDER.
31. REMOVE PORTION OF FEEDER TO DISCONNECT EXISTING "EAMCP"
FROM ELEVATOR PANEL.
32. INTERCEPT AND EXTEND TO NEW PANEL "EAMCP".
33. FEEDER ROUTE TO BE COORDINATED WITH COR.
34. PROVIDE NEW 150A/3P BREAKER.
Revisions Date
1 Bid Documents 02/17/2015
15 Record Drawings 07/02/2018
RECORD DRAWING NOTE:
ALL DEDUCT ALTERNATES
WERE ACCEPTED.
VHACLLSINCLJ
Line
VHACLLSINCLJ
Text Box To Clinical Secondary Single Line
METERING
SWBD
SCALE: NTS
CLINICAL
TVSS
480Y/277V-3PH-4W
BA
GA
GB
1A
1B
2A
2B
3A
3B
208Y/120V-3PH-4W
GLS
2LS
GCRA
1CRA
2CRA
2CRB
208Y/120V-3PH-4W
S P
A R
E
S P
A R
E
ALL LIGHT LINEWEIGHTS INDICATE EXISTING EQUIPMENT TO REMAIN. DASHED LINEWEIGHTS
INDICATES FUTURE EQUIPMENT. DARK LINEWEIGHT INDICATES NEW WORK.
TVSSTVSS
480Y/277V-3PH-4W
ELEV 2
TVSS
S P
A R
E
ELEVATOR
S P
A R
E
31-CCU6
3CRA
3CRB
(FUT.)
31-SF3
(FUT.)
31-RF3
(FUT.)
S P
A R
E
1EQPA
BEQA
31-P5 31-P6 HWP
(FUT.)
S P
A R
E
PBB
(40HP)
40HP 50HP 20HP
TVSS
#3/0 G.E.C.
#6 G.E.C.
#1/0 G.E.C.
E
M D
P
E
M D
P
MAIN DIST. SWBD "31MDP2"
DIST. SWBD "31DP2" DIST. SWBD "31CRDP1"
31TLS1
31TCR
31TDP2
PANEL "BEQPA"
31TEQ1
SECONDARY SINGLE LINE DIAGRAM
BASEMENT
4321 5
GROUND FLOOR
SECOND FLOOR
THIRD FLOOR
(FUTURE)
(FUTURE)
FIRST FLOOR
2 3 4 5 6 7
7 8 12
31-ATSCR1
200A/3P
EN
208Y/120V
-3PH-4W
112.5 KVA
480V
K=13
208Y/120V
-3PH-4W
30 KVA
480V
K=1
208Y/120V
-3PH-4W
225 KVA
480V
K=13
EXISTING TO 31MDP
N E
31-ATSEQ1
400A/4P
9 10 11
GEN START
(TO ATSCR1)
N E
31-ATLS1
100A/4P
GEN START
(TO B31ATS)
GEN START
(TO ATSLS)
SHELL
WIREWAY IN MAIN ELEC. ROOM
45A/3P
800AT
100A/3P
208Y/120V
-3PH-4W
15 KVA,
480V
K=1
1200A
175A/3P
#8 G.E.C.
1 2 3 4 5 6 7
FEEDER TO SPLICE
EXISTING EM
FEEDER TO SPLICE
This Document was originally issued by
Gary S. Eodice on
February 17, 2015.
This document is not considered a sealed document.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h t h s i n o t o n e h a l f i n o t t h r e e q u a r t e r s i n o t o n e i n o t o n e a e h a l f i n c h e o t t h r e e i n c h e o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
A R C H I T E C T S
J O H N P O E
116 EAST THIRD STREET
DAYTON, OHIO 45402-2130
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of
Construction and Facilities
Management
JPA Project No.
937 461 3290 PHONE
937 461 0260 FAX
jpa@johnpoe.com
HEAPY PROJECT No.: 2012-04025 FIRM LICENSE No.: 01528
A
M
SPD Addition to Building 31
2/17/2015
SECONDARY SINGLE LINE - CLINICAL
E203
MSGMSG
12013.00
538-111
Chillicothe, Ohio
NOTES
1. EXISTING SCHNEIDER ELECTRIC CONTROL WIRING.
Revisions Date
1 Bid Documents 02/17/2015
15 Record Drawings 07/02/2018
RECORD DRAWING NOTE:
ALL DEDUCT ALTERNATES
WERE ACCEPTED.
SCALE: NTS
SPD (AND FUTURE) ADDITION
METERING
SWBD
1C
1D
480Y/277V-3PH-4W
S P
A R
E
ALL LIGHT LINEWEIGHTS INDICATE EXISTING EQUIPMENT TO REMAIN. DASHED LINEWEIGHTS
INDICATES FUTURE EQUIPMENT. DARK LINEWEIGHT INDICATES NEW WORK.
TVSS
GC
GD
2C
2D
3C
3D
(SPD)
1C
1D
480Y/277V-3PH-4W
TVSS
GF
GG
2C
2D
3C
3D
(LAB/PROSTHETICS)
GE
(SPD)
(MED. SUPPLIES
1E
(CLINICS)
2E
(MED/SURG)
3E
(3RD FLOOR?)
1E
(SURGERY)
2E
(MICU/ADMIN)
3E
(3RD FLOOR?)
(PHARM)
(LAB)
GI
(PROSTH)
GC
GD
(CANTEEN)
GLS2
1LS2
2LS2
3LS2
GLS3
1LS3
2LS3
3LS3
(SPD)
(CLINICS)
(MED/SURG)
(3RD FLOOR?)
(3RD FLOOR?)
(SURGERY)
(MICU/ADMIN)
(LAB)
1C
1D
480Y/277V-3PH-4W
TVSS
S P
A R
E
2C
2D
3C
3D
(CLINICS)
(CLINICS)
2E
(MED/SURG)
(3RD FLOOR?)
S P
A R
E
GEQ2
(SPD)
GEQP2
1C
1D
480Y/277V-3PH-4W
TVSS
S P
A R
E
2C
2D
3C
3D
(LAB)
(SURG/ENDO)
2E
(MED/SURG)
(3RD FLOOR?)
S P
A R
E
GEQ3
(LAB)
GEQP3
2EQP3
S F
M
E D
S
U R
R F
M
E D
S
U R
S F
M
I C
U
R F
M
I C
U
2EQP2
S F
M
E D
S
U R
R F
M
E D
S
U R
S F
M
I C
U
R F
M
I C
U
MB
300A
MB
400A
MB
300A
30/3 125/3 70/3 70/3 70/3 70/3
S P
A R
E
125/3
PBC
P1C
S F
C
L I N
I C
R F
C
L I N
I C
S F
C
L I N
I C
R F
C
L I N
I C
P2C
MB
150A
MB
150A
30/3 175/3 125/3 125/3 125/3 125/3
MB
300A
MB
300A
MB
300A
L S
D P
L S
D P
C
R D
P
M
D P
M
D P
C
R D
P
30/3 45/3 70/3 45/3 45/370/3
MB
100A
MB
150A
MB
100A
30/3 125/3 125/3 70/3 70/3125/3
MB
300A
1E
(PHARM)
MB
300A
MB
150A
MB
150A
1EQP3
S F
S
U R
G
R F
S
U R
G
S F
P
H A
R
R F
P
H A
R
MB
150A
TVSS
480Y/277V-3PH-4W
31-CCU7 31-CCU8 31-CCU9 31-CCU10
GFI
800/360/3 800/3 800/3 800/3
M
D P
GH
EXIST.
TVSS
TVSS
HAND./STORAGE)
NOTES
1. COORDINATE WIRE/CONDUIT SIZE WITH MANUFACTURER PRIOR TO ORDERING.
2. EQUIPMENT PROVIDED UNDER LAB PROJECT.
3. UNDER DEDUCT ALTERNATE NO. 1, DELETE CONNECTION TO CHILLER.
4. RUN 4-#1/0, #6 G.E.C. IN 2"C.
5. RUN 3-#4, #8 GRD. IN 1"C.
6. RUN 4-#1, #6 GRD. IN 1.25"C.
7. RUN 4-#2, #8 GRD. IN 1.25"C.
8. RUN 4-350 KCMIL, #1/0 G.E.C. IN 3"C.
9. RUN 4-350 KCMIL, #4 GRD. IN 3"C.
10. RUN 3-#1/0, #6 GRD. IN 1.5"C.
11. RUN 3-#6, #10 GRD. IN 1"C.
DIST. SWBD "31PDP1"
31TLS2
SECONDARY SINGLE LINE DIAGRAM
DIST. SWBD "31PDP2"
DIST. SWBD "31CRDP2" DIST. SWBD "31CRDP3"
31TG1
31T11
31T21
31T31
31TG2 31TG3
31TLS3
31T12
31T22
31T32
31TCR_
31TCR_
31TCR_
31TCR_
31TCR_
31TCR_
31TEQ2 31TEQ2
MAIN DIST. SWBD "31MDP1"
GROUND FLOOR
SECOND FLOOR
THIRD FLOOR
(FUTURE)
(FUTURE)
FIRST FLOOR
208Y/120V
-3PH-4W
30 KVA
480V
K=1
(FUTURE)
ROOF
(FUTURE)
1 2 3 4 5 6
1 2 3 4 5 6 1 2 3 4 5 6
208Y/120V
-3PH-4W
75 KVA
480V
K=4
208Y/120V
-3PH-4W
45 KVA
480V
K=4
208Y/120V
-3PH-4W
45 KVA
480V
K=4
208Y/120V
-3PH-4W
45 KVA
480V
K=4
208Y/120V
-3PH-4W
75 KVA
480V
K=4
208Y/120V
-3PH-4W
75 KVA
480V
K=4
208Y/120V
-3PH-4W
75 KVA
480V
K=4
208Y/120V
-3PH-4W
75 KVA
480V
K=4
208Y/120V
-3PH-4W
75 KVA
480V
K=4
208Y/120V
-3PH-4W
75 KVA
480V
K=4
208Y/120V
-3PH-4W
45 KVA
480V
K=4
208Y/120V
-3PH-4W
45 KVA
480V
K=4
208Y/120V
-3PH-4W
30 KVA
480V
K=4
208Y/120V
-3PH-4W
45 KVA
480V
K=4
208Y/120V
-3PH-4W
30 KVA
480V
K=4
208Y/120V
-3PH-4W
30 KVA
480V
K=1
208Y/120V
-3PH-4W
45 KVA
480V
K=1
208Y/120V
-3PH-4W
45 KVA
480V
K=1
1 5 6 7
2500AT
3000A
100% RATED
E
Q D
P
E
Q D
P
This Document was originally issued by
Gary S. Eodice on
February 17, 2015.
This document is not considered a sealed document.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h t h s i n o t o n e h a l f i n o t t h r e e q u a r t e r s i n o t o n e i n o t o n e a e h a l f i n c h e o t t h r e e i n c h e o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
A R C H I T E C T S
J O H N P O E
116 EAST THIRD STREET
DAYTON, OHIO 45402-2130
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of
Construction and Facilities
Management
JPA Project No.
937 461 3290 PHONE
937 461 0260 FAX
jpa@johnpoe.com
HEAPY PROJECT No.: 2012-04025 FIRM LICENSE No.: 01528
A
M
SPD Addition to Building 31
2/17/2015
SECONDARY SINGLE LINE - SPD
E204
MSGMSG
12013.00
538-111
Chillicothe, Ohio
Revisions Date
1 Bid Documents 02/17/2015
15 Record Drawings 07/02/2018
RECORD DRAWING NOTE:
ALL DEDUCT ALTERNATES
WERE ACCEPTED.
NOTES
METERING
SWBD
SCALE: NTS
TVSS
480Y/277V-3PH-4W
BA
GA
GB
1A
1B
2A
2B
3A
3B
208Y/120V-3PH-4W
GLS
2LS
GCRA
1CRA
2CRA
2CRB
208Y/120V-3PH-4W
S P
A R
E
S P
A R
E
ALL LIGHT LINEWEIGHTS INDICATE EXISTING EQUIPMENT TO REMAIN. DASHED LINEWEIGHTS
INDICATES FUTURE EQUIPMENT. DARK LINEWEIGHT INDICATES NEW WORK.
TVSSTVSS
480Y/277V-3PH-4W
ELEV 2
TVSS
S P
A R
E
ELEVATOR
S P
A R
E
31-CCU6
3CRA
3CRB
(FUT.)
31-SF3
(FUT.)
31-RF3
(FUT.)
S P
A R
E
1EQPA
BEQA
31-P5 HWP
(FUT.)
S P
A R
E
PBB
(40HP)
40HP 50HP 20HP
TVSS
(FUTURE)
S P
A R
E
1 8-#14 IN 0.75"C. FOR ATS MONITOR/CONTROL VIA SCHNEIDER EMCS SYSTEM I/O (ON
EM SOURCE, ON NORMAL SOURCE, TEST, START TEST). RUN TO EXIST. B31 EMCS
PLC CABINET. FOLLOW NEW FEEDER PATH THROUGH CRAWLSPACE. COORDINATE
REQUIREMENTS WITH SCHNEIDER ELECTRIC. REFER TO FLOOR PLANS.
2 FUTURE ELEVATOR POWER MODULE SWITCH.
3 RUN 4-#1, #6 SBJ IN 1.5"C.
4 RUN 4-#2, #8 GRD. IN 1.25"C.
5 RUN 3-#4, #8 GRD. IN 1"C.
6 RUN 3-#3/0, #6 GRD. IN 2"C.
7 RUN 3-#10, #10 GRD. IN .75"C.
8 RUN 4-#4, #8 SBJ IN 1.25"C.
9 RUN 4-#350 KCMIL, #4 GRD. IN 3"C.
10 PROVIDE A 1.25"C. STUBBED AND CAPPED ABOVE FIRST FLOOR. UTILIZE 4" RMC
SLEEVE IN SLAB.
11 PROVIDE A 2"C. STUBBED AND CAPPED ABOVE FIRST FLOOR. UTILIZE 4" RMC SLEEVE
IN SLAB.
12 PROVIDE A 4"C. SLEEVE THROUGH FLOOR SLAB.
13 4-#4/0, #4 GRD. IN 3"C.
14 RUN START CIRCUIT FROM NEW ATS TO EXISTING B31 ATS IN 0.75"C. FOLLOW NEW
FEEDER PATH THROUGH CRAWLSPACE.
15 REFER TO DISTRIBUTION SCHEDULE FOR FEEDER SIZE.
16 4-#10, #10 GRD. IN 0.75"C.
17 UNDER DEDUCT ALTERNATE #2, DELETE THIS WORK.
18 CONDUIT SLEEVE REMAINS IN ALL DEDUCT ALTERNATES.
#3/0 G.E.C.
#6 G.E.C.
5 6
#1/0 G.E.C.
MAIN DIST. SWBD "31MDP2"
DIST. SWBD "31DP2" DIST. SWBD "31CRDP1"
31TLS
31TCR
31TDP2
SECONDARY SINGLE LINE DIAGRAM
PANEL "BEQPA"
31TEQ1
BASEMENT
4321 5
GROUND FLOOR
SECOND FLOOR
THIRD FLOOR
(FUTURE)
(FUTURE)
FIRST FLOOR
2 3 4 5 6 7
7 8 12
31-ATSCR1
200A/3P EN
208Y/120V
-3PH-4W
112.5 KVA
480V
K=13
208Y/120V
-3PH-4W
30 KVA
480V
K=1
208Y/120V
-3PH-4W
225 KVA
480V
K=13
RUN TO 31MDP
REFER TO SHEET E008
N E
31-ATSEQ1
400A/4P
9 10 11
GEN START
(TO ATSCR1)
N E
31-ATLS1
100A/4P
GEN START
(TO B31ATS)
GEN START
(TO ATSLS)
SHELL
NEW WIREWAY IN MAIN ELECTRIC ROOM
45A/3P
800AT
100A/3P
208Y/120V
-3PH-4W
15 KVA,
480V K=1
1200A
175A/3P
#8 G.E.C.
1 2 3 4 5 6 7
RUN TO EM FEEDER SPLICE
REFER TO SHEET E008
RUN TO EM FEEDER SPLICE
REFER TO SHEET E008
This Document was originally issued by Gary S. Eodice on
May 23, 2014.
This document is not considered a sealed document.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of on e-ei gh th in ch on fo ot on e-qu ar te r in fo ot th re e-ei gh th s in fo ot on e-ha lf in fo ot th re e-qu ar te rs in fo ot on e in fo ot on e an d on e-ha lf in es fo ot th re e in ch es fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
A R C H I T E C T SJ O H N P O E
116 EAST THIRD STREET
DAYTON, OHIO
45402-2130
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
937 461 3290 PHONE
937 461 0260 FAX
jpa@ johnpoe.com
Heapy Project No.: 2010-04026 Firm License No.: 01528
/1
/2
:3 :0
P
M
CLINICAL ADDITION TO BLDG 31
05/23/2014
SECONDARY SINGLE LINE DIAGRAM
E009
SCMSG
10017.00
538-108
Chillicothe, Ohio
Revision s
Date
BID DOCUMENTS 4/18/2014
1 AMENDMENT #3 08/14/14
2 BULLETIN #24 5/4/2018
3 RECORD DRAWINGS 01/22/2020
| E202-Layout1 |
| Sheets and Views |
| Layout1 |
| E203-Layout1 |
| Sheets and Views |
| Layout1 |
| E204-Layout1 |
| Sheets and Views |
| Layout1 |
File details come from the government source that posted it. Updated .