Attachment III - Electric Drawings.pdf

PDF 18 MB Posted

Attached to
J061--539-22-204 - Electric Panel Study Commercial Services RFQ
Solicitation number
36C25022Q0250
Issued by

View the file

Other files

File Type Posted
36C25022Q0250 0003.pdf PDF
36C25022Q0250 0002.pdf PDF
36C25022Q0250 0001.docx DOCX document
Attachment II - SCA WD.pdf PDF
Attachment I - SOW.pdf PDF
36C25022Q0250.pdf PDF
Attachment IV - VHA Supplemental Contract Requirements for Combatting COVID-19.pdf PDF
36C25022Q0250.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EX.

TRAILER

(TYP.)

P E R G O L A

FUT. BLDG. 14

BLDG. 15

BLDG. 16

BLDG. 8

BLDG. 13

NOT

VA

PROPERTY

BUILDING 1

BUILDING 2

BUILDING 3

PARKING

GARAGE

This Document was originally issued by Gary S. Eodice on March 11, 2016.

This document is not considered a sealed document.

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch on e fo ot on e-qu ar te r e fo ot th re e-ei gh th s e fo ot on e-ha lf e fo ot th re e-qu ar te rs e fo ot on e e fo ot on e an d on e-ha lf in ch es on e fo ot th re e in ch es on e fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

Department of Veterans Affairs Medical Center

HEAPY ENGINEERING

MECHANICAL ELECTRICAL COMMISSIONING TECHNOLOGY

1400 WEST DOROTHY LANE

DAYTON, OH 45409

937.224.0861 P

937.224.5777 F

HEAPY PROJECT No.: 2014-04022 FIRM LICENSE No.: 01528

APP ARCHITECTURE

615 WOODSIDE DRIVE

ENGLEWOOD, OH 45322

937.836.8898 P

937.832.3696 F

/1

/2

:5 :1

P

M

CORRECT ELECTRICAL FCA

DEFICIENCIES

1/7/16

COVER

G001

SCMSG

539-15-104

Cincinnati, Ohio

CORRECT ELECTRICAL FCA DEFICIENCIES

3200 VINE STREET CINCINNATI, OHIO 45220

SCALE: NONE

LOCATION MAPSCALE: NONE

KEY PLAN

INDEX OF DRAWINGS

Sheet Number Description

G001 COVER

CU100 SITE PLAN - OVERALL UTILITIES

1E500 SITE PHOTOGRAPHS

1E501 SITE PHOTOGRAPHS

1E502 ELECTRICAL EQUIPMENT ELEVATIONS (REMOVALS)

1E503 ELECTRICAL EQUIPMENT ELEVATIONS (NEW) AND SCHEDULES

1E600 SINGLE LINE DIAGRAM

1E601 SINGLE LINE DIAGRAM

1E602 SINGLE LINE DIAGRAM

1E603 SINGLE LINE DIAGRAM

1E701 PANELBOARD SCHEDULES

1E702 PANELBOARD SCHEDULES

1E703 PANELBOARD SCHEDULES

1E704 PANELBOARD SCHEDULES

1E705 PANELBOARD SCHEDULES

1E706 PANELBOARD SCHEDULES

1E707 PANELBOARD SCHEDULES

1E708 PANELBOARD SCHEDULES

1E709 PANELBOARD SCHEDULES

1E710 PANELBOARD SCHEDULES

1E711 PANELBOARD SCHEDULES

1E712 PANELBOARD SCHEDULES

1E713 PANELBOARD SCHEDULES

1E714 PANELBOARD SCHEDULES

1E715 PANELBOARD SCHEDULES

1E716 PANELBOARD SCHEDULES

1EP099 SUB-BASEMENT PLAN

1EP100 BASEMENT PLAN - NEW WORK

1EP101 FIRST FLOOR PLAN - NEW WORK

1EP102 SECOND FLOOR PLAN - NEW WORK

1EP103 THIRD FLOOR PLAN - NEW WORK

1EP104 FOURTH FLOOR PLAN - NEW WORK

1EP105 FIFTH FLOOR PLAN - NEW WORK

1EP106 SIXTH FLOOR PLAN - NEW WORK

1EP107 SEVENTH FLOOR PLAN - NEW WORK

1EP108 EIGHTH FLOOR PLAN - NEW WORK

1EP109 NINTH FLOOR PLAN - NEW WORK

1EP110 TENTH AND ELEVENTH FLOOR PLANS - NEW WORK

1EP400 ENLARGED FLOOR PLANS - REMOVAL & NEW WORK

1EP401 ENLARGED FLOOR PLANS - REMOVAL & NEW WORK

2E600 SINGLE LINE DIAGRAM

13E600 SINGLE LINE DIAGRAM

14E600 SINGLE LINE DIAGRAM

15E600 SINGLE LINE DIAGRAM

15E701 PANELBOARD SCHEDULES

15ED100 BASEMENT FLOOR PLAN - REMOVALS

15EP100 BASEMENT FLOOR PLAN - NEW WORK

15EP101 FIRST FLOOR PLAN - NEW WORK

15EP102 SECOND FLOOR PLAN - NEW WORK

15EP103 THIRD FLOOR PLAN - NEW WORK

15EP104 FOURTH FLOOR PLAN - NEW WORK

16EP100 FLOOR PLANS - NEW WORK

PGEP100 ROOF PLAN - NEW WORK

E500 DETAILS

GENERAL CONSTRUCTION NOTES

*PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE CONTRACTING OFFICER'S

REPRESENTATIVE.

1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE, INTERNATIONAL BUILDING CODES,AND OTHER CODES AS IDENTIFIED IN VHA PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF

VETERAN AFFAIRS, TECHNICAL INFORMATION LIBRARY WEBSITE.

2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST ARCHITECTURAL BARRIERS

ACT ACCESSIBILITY STANDARD (ABAAS) AND DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE

DESIGN GUIDEPG-18-13 WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS

TECHNICAL INFORMATION LIBRARY WEBSITE.

3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS

PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED WITH THE CONTRACTING OFFICER'S

REPRESENTATIVE.

4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH ADJACENT EXISTING

SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT ARE DAMAGED DURING THE COURSE OF

DEMOLITION OR NEW WORK.

5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF NEW WORK,

CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO REMAIN OR PROVIDE NEW

CONSTRUCTION TO MATCH EXISTING ADJACENT SURFACES TO REMAIN.

6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO

ORDERING, FABRICATING OR INSTALLING NEW MATERIALS.

7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO BE INSTALLED AS

PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE SPECIAL PROVISIONS TO INSTALL

EQUIPMENT THAT IS TOO LARGE TO FIT THROUGH FINISHED OPENINGS.

8. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL SYSTEMS WHICH COMPLY

WITH STATED CODES AND REGULATIONS. WHERE THE OMISSION OF A PART OR ELEMENT OF A

SYSTEM WOULD RESULT IN THE NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM,

CONTRACTOR SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.

9. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED WALLS SHALL BE SMOKE/FIRESTOPPED AS REQUIRED BY THE RATING OF THE WALL. WHERE CONDUIT IS REMOVED

THROUGH RATED WALLS, SMOKE/FIRESTOP PENETRATION.

10. FIRESTOP ALL FLOOR PENETRATIONS AT THE END OF EACH WORKING SHIFT SO PENETRATION IS

NOT LEFT OPEN OVERNIGHT.

PHASING:

PANELBOARD REPLACEMENT:

1. THE CONTRACTOR SHALL SURVEY ALL EXISTING PANELBOARDS TO BE REPLACED FOR DIMENSIONS, LOADS, BREAKER/FEEDER SIZES, CONDUCTOR LOCATIONS, ETC. AND ENSURE NEW PANEL/LUGS/COVER FITS WELL. ANY TUBS WHICH ARE TOO SMALL FOR NEW INTERIORS SHALL BE INDICATED AT SHOP DRAWING REVIEW WITH TWO PROPOSED SOLUTIONS (i.e. REDUCING BREAKERS, REDUCING AMPACITY, CHANGING TO BRANCH MOUNTED MAIN, ETC.). REVISIONS FOR FIT SHALL NOT BE GROUNDS FOR ADDITIONAL COST TO THE GOVERNMENT.

2. ROUGH-IN ALL NEW ELECTRIC CLOSET EQUIPMENT (PRIMARY/SECONDARY FEEDERS, ENCLOSED CIRCUIT BREAKERS, DISTRIBUTION FEEDERS, ETC. THAT

CAN BE CONSTRUCTED WITHOUT INTERRUPTING POWER.

3. ONE SYSTEM (NORMAL/CRITICAL/LIFE SAFETY) RISER AT A TIME, DE-ENERGIZE EQUIPMENT, REMOVE BUSSING, BREAKERS, COVER AND INSTALL NEW BUSSING, BREAKERS AND CUSTOM COVER. RETERMINATE ALL FEEDERS AND BRANCH CIRCUITS. WORK SHALL BE COMPLETED SO EQUIPMENT IS DE-

ENERGIZED FOR NO LONGER THAN 4 HOURS.

4. PROVIDE UL FIELD INSPECTION SERVICE AND LABEL FOR ALL RETROFITTED PANELBOARDS.

5. INCLUDE 10 ADDITIONAL 208V-225A, 42 CKT-20A/1P PANELBOARD RETROFITS (LABOR AND MATERIAL, PER CROSS HATCHED PANELBOARD ON SINGLE LINE

DIAGRAM) IN BID. LOCATION TO BE DETERMINED DURING CONSTRUCTION.

SHARED NEUTRAL SEPARATION:

1. THE CONTRACTOR SHALL SURVEY ALL EXISTING SPLICED NEUTRAL BOXES, DE-ENERGIZE AND SEPARATE THEM ONE BY ONE.

2. WORK SHALL BE COMPLETED SO EQUIPMENT IS DE-ENERGIZED FOR NO LONGER THAN 2 HOURS.

3. INCLUDE 20 ADDITIONAL SHARED NEUTRAL BOX SEPARATIONS (LABOR AND MATERIAL, PER PLAN NOTES) IN BID. LOCATION TO BE DETERMINED DURING

CONSTRUCTION. CONTRACTOR SHALL INCLUDE LABOR TO TRACE OUT AS MANY AS POSSIBLE.

UNIT SUBSTATION REPLACEMENT:

1. THE CONTRACTOR SHALL SURVEY THE EXISTING UNIT SUBSTATIONS, CONDUIT DROP LOCATIONS, OVERHEAD CLEARANCES, RIGGING REQUIRED AND

DOWNSTREAM LOADS.

2. ROUGH-IN ALL NEW CONDUIT THAT CAN BE INSTALLED.

3. PROVIDE NEW BREAKER IN US-1P (BREIFLY DE-ENERGIZE FOR INSTALLATION AND CABLE TERMINATION), INSTALL TEMPORARY 300KVA TRANSFORMER, DISTRIBUTION SWITCHBOARD AND TEMPORARY FEEDERS TO SPLICE LOCATIONS IN SUB-BASEMENT.

4. ONE UNIT SUBSTATION/ONE FEEDER AT A TIME, DE-ENERGIZE FEEDER, INSTALL SPLICE BOX IN SUB-BASEMENT, MAKE SPLICE TO TEMPORARY FEEDER

AND RE-ENERGIZE FROM TEMPORARY SOURCE UNTIL ALL FEEDERS FROM ONE UNIT SUBSTATION ARE ON TEMPORARY POWER. ONE LOAD FROM UNIT SUBSTATION SHALL BE TEMPORARIED FROM OTHER UNIT SUBSTATION SPARE BREAKER TO PERMIT 300KVA TRANSFORMER TO CARRY LOAD.

5. WORK SHALL BE COMPLETED SO EACH FEEDER IS DE-ENERGIZED FOR NO LONGER THAN 3 HOURS. UNIT SUBSTATION PROVIDING TEMPORARY POWER SHALL BE DE-ENERGIZED FOR NO LONGER THAN 1 HOUR (DISCONNECT BUS TIE IN US-1D DURING THIS OUTAGE).

6. ONCE UNIT SUBSTATION IS NOT SUPPLYING POWER TO LOADS, DE-ENERIZE AT PS-1 AND REMOVE ENTIRE LINEUP INCLUDING BUS TIE.

7. CORE DRILL FLOOR FOR NEW OPENINGS, ROUGH-IN CONDUITS/CONDUCTORS TO SPLICE LOCATIONS, CONNECT METERING EQUIPMENT AND INSTALL NEW

UNIT SUBSTATION.

8. DE-ENERGIZE PS1, MAKE PRIMARY TERMINATIONS (AND TEST CABLE) AND ENERGIZE UNIT SUBSTATION. WORK SHALL BE COMPLETED SO PS1 IS DE-

ENERGIZED FOR NO LONGER THAN 3 HOURS.

9. ONE FEEDER AT A TIME, CUTOVER TO NEW UNIT SUBSTATION SOURCE. WORK SHALL BE COMPLETED SO EACH FEEDER IS DE-ENERGIZED FOR NO LONGER

THAN 2 HOURS.

10. BUS TIE SHALL BE INSTALLED DURING ONE OF THE REQUIRED OUTAGES. SPLICE EXISTING FEEDERS THAT ARE TO BE REPLACED UNDER A FUTURE PHASE.

ROUGH-IN ANY WORK THAT WILL EXPEDITE THE TERMINATIONS FOR THE FUTURE PHASE.

11. REMOVE TEMPORARY FEEDERS AND DISTRIBUTION EQUIPMENT AND PATCH FLOOR PENETRATIONS.

DISTRIBUTION REPLACEMENTS:

DS-1P AND DS-1X:

1. SET NEW PANEL ADJACENT TO EXISTING. ROUGH-IN CONDUITS TO SPLICE LOCATIONS OVERHEAD.

2. ONE SWITCHBOARD AT A TIME, DE-ENERGIZE DS-1P/X, SPLICE ALL FEEDERS AND EXTEND TO NEW SWITCHBOARD.

3. WORK SHALL BE COMPLETED SO FEEDERS ARE DE-ENERGIZED FOR NO LONGER THAN 4 HOURS.

DS-1A AND DS-1B:

1. SET NEW PANEL ACROSS FROM/ADJACENT TO EXISTING. ROUGH-IN CONDUITS TO SPLICE LOCATIONS OVERHEAD.

2. ONE SWITCHBOARD AT A TIME, DE-ENERGIZE DS-1A/B, SPLICE ALL FEEDERS AND EXTEND TO NEW SWITCHBOARD.

3. WORK SHALL BE COMPLETED SO FEEDERS ARE DE-ENERGIZED FOR NO LONGER THAN 8 HOURS.

EMERGENCY DISTRIBUTION:

1. INSTALL ATS-14, ATS-16 AND ATS-17 AND ROUGH-IN NEW NORMAL/LOAD CONDUITS. INSTALL CONTROL WIRING TO GPG.

2. REROUTE DATA CENTER PB FEEDER (LIKELY SERVING E4A FROM 1E7) TO PERMIT INSTALLATION OF NEW TGDE. ROUGH-IN NEW CONDUITS. WORK SHALL

BE COMPLETED SO FEEDER IS DE-ENERGIZED FOR NO LONGER THAN 2 HOURS.

3. INSTALL TGDE, GDE AND EMERGENCY FEEDERS TO NEW ATS'S AND MAKE TERMINATIONS.

4. START EMERGENCY GENERATORS AND HOLD EXISTING ATS'S IN THE EMRGENCY POSITION. DE-ENERGIZE US-1C THEN US-1D AND MAKE ATS NORMAL

FEEDER TERMINATIONS. WORK SHALL BE COMPLETED SO UNIT SUBSTATIONS ARE DE-ENERGIZED FOR NO LONGER THAN 2 HOURS EACH.

5. DE-ENERGIZE LSDP AND E4A AND MAKE FINAL LOAD SIDE SPLICES TO NEW ATS'S. PROVIDE TEMPORARY LOAD SIDE FEEDER FROM ATS-16 TO CDP TO

PERMIT REMOVAL OF EXISTING ATS-16. MAKE FINAL SPLICE TO TGDE AND ENERGIZE GDE. WORK SHALL BE COMPLETED SO EQUIPMENT IS DE-ENERGIZED

FOR NO LONGER THAN 4 HOURS.

6. INSTALL NEW CDP AND CUTOVER SOURCE/SPLICED FEEDERS. WORK SHALL BE COMPLETED SO EQUIPMENT IS DE-ENERGIZED FOR NO LONGER THAN 4

HOURS.

7. INSTALL NEW ATS-SURGERY AND ALL NEW FEEDERS UP TO SPLICE LOCATIONS.

8. MAKE CUTOVERS OUTSIDE OF SURGERY OPERATING HOURS. WORK SHALL BE COMPLETED SO DS-1A IS DE-ENERGIZED FOR NO LONGER THAN 2 HOURS.

9. INSTALL NEW ATS-1 AND ALL NEW FEEDERS UP TO SPLICE LOCATIONS.

10. MAKE CUTOVERS OUTSIDE OF SURGERY OPERATING HOURS. WORK SHALL BE COMPLETED SO US-1P IS DE-ENERGIZED FOR NO LONGER THAN 2 HOURS.

BUILDING 15:

1. INSTALL NEW 15MDP, ATS'S, PANELBOARDS, ETC. AND ROUGH-IN ALL FEEDERS (INCLUDING TO ESB).

2. TERMINATE EM FEEDER TO ESB. PANEL ESB SHALL BE DISCONNECTED FROM GPG FOR NO LONGER THAN 2 HOURS.

3. START EMERGENCY GENERATORS AND DISCONNECT 15MDP. CUTOVER ALL EMERGENCY LOADS TO NEW EM DISTRIBUTION AND ENERGIZE ON GENERATOR

POWER. WORK SHALL BE COMPLETED SO EM EQUIPMENT IS DE-ENERGIZED FOR NO LONGER THAN 4 HOURS. CUTOVER 15MDP SOURCE AND ALL FEEDERS TO EXISTING LOADS. WORK SHALL BE COMPLETED SO NORMAL EQUIPMENT IS DE-ENERGIZED FOR NO LONGER THAN 8 HOURS.

4. PROVIDE TEMPORARY LOAD CENTER ON 1ST FLOOR IN VIVARIUM AND RECEPTACLES ON TEMPORARY CABLING TO POWER CAGE EXHAUST SYSTEMS

DURING ANY OUTAGE TO THIS AREA OVER 2 HOURS.

GENERAL NOTES:

A. CONTRACTOR SHALL THOROUGHLY STUDY DESIGN DRAWINGS AND ALL EXISTING CONDITIONS PRIOR TO STARTING PROPOSED SCHEDULE.

B. SEQUENCE OF CONSTRUCTION INDICATED BELOW IS ONE POSSIBLE SOLUTION TO MINIMIZE DOWNTIME OF THE BUILDING ELECTRICAL SYSTEM. CONTRACTOR IS

REQUIRED TO SUBMIT A DETAILED SEQUENCE OF CONSTRUCTION NARRATIVE TO THE COR/ENGINEER AT THE BEGINNING OF THE PROJECT INDICATING CUTOVER DATES, POWER OUTAGES/DURATION AND PROJECT MILESTONES. DEVIATIONS FROM THE FOLLOWING PROPOSED SEQUENCE OF CONSTRUCTION WILL BE REVIEWED, BUT WILL

NOT BE GROUNDS FOR ADDITIONAL COST TO THE GOVERNMENT.

C. ALL CUTOVER WORK REQUIRING BUILDING ELECTRICAL SYSTEM OUTAGES AND/OR EMERGENCY SYSTEM DOWNTIME SHALL BE DONE OUTSIDE OF NORMAL WORKING HOURS (7AM-7PM MONDAY-FRIDAY). OUTAGES OF ALL TYPES SHALL BE AS MINIMAL AS POSSIBLE.

D. THE PHASE DESCRIPTIONS INDICATE A GENERAL FLOW OF WORK AND ARE NOT INTENDED TO CONVEY INSTRUCTIONS FOR EVERY ASPECT OF THE CONSTRUCTION

PROJECT.

E. NO LIVE WORK WILL BE PERMITTED WITHOUT WRITTEN CONSENT OF THE MEDICAL CENTER LEADERSHIP. REQUESTS MUST BE SUBMITTED WITH CONTRACTOR'S SAFETY

PLAN AND PROOF OF ARC FLASH LEVEL/PPE REQUIRED.

F. PROVIDE COORDINATION DRAWINGS FOR ALL NEW EQUIPMENT AND CONDUITS 2" AND LARGER WITH PATHWAYS VERIFIED IN THE FIELD AND SIGNED OFF BY THE

CONTRACTOR.

G. STATION CONSISTS OF A FULLY FUNCTIONAL HOSPITAL/HEALTHCARE FACILITY OCCUPIED 24/7 WITH INPATIENT/OUTPATIENT CARE, SURGERY, PRE/POST-OP, PSHYCIATRIC, PHARMACY, WAREHOUSE, NURSING, SUBSTANCE ABUSE, RETAIL, CANTEEN, INTENSIVE CARE, DATA CENTER, IMAGING, PBX, KITCHEN, ETC. INCLUDE LABOR AND MATERIAL TO ACCOMMODATE PPE/ACCESS REQUIRED FOR WORK IN THESE VARIOUS SPACES. EXTENSIVE COORDINATION MUST OCCUR TO MINIMIZE

DISRUPTION AS MUCH AS POSSIBLE.

H. 21 DAYS BEFORE ANY OUTAGE, CONTRACTOR SHALL SET UP A MEETING WITH COR AND DEPARTMENT MANAGERS TO REVIEW WHICH LOADS WILL BE TAKEN DOWN, WHICH LOADS WILL REMAIN ON AND OUTAGE START/END TIME. EACH DEPARTMENT MUST BE BREIFLY SURVEYED TO DETERMINE OVERALL IMPACT OF OUTAGE AND

EXPLAINED TO COR AND MANAGERS.

SEQUENCE OF CONSTRUCTION

Revisions Date

HVAC

HVAC

HVAC

HVAC

HVAC

MW

MW MW

MW MW

MW

E

T

T

S

D

D S

S

BP

BP

PE

E E

BPBP

EE

E

E

BP

E

BP

E

E

E

E

E

E

BP

E

E

BP

BP

BP

E

BP

BP

BP

BP

BP

BP

BP E

E

E

E

E E

BP

BP

BP

E

BP

BP

BP

BP

BP

BP

BP

E

BP

BP

GF

GF

GF

GF

GF

GF

GF

GFGF

GF

GF

S

S

S

S

S

S

S

S

S S

S

S S

S

SS

S

S

S S

S

S

S

S

SS

T

T

T

T

T

T

T

T

T

T

PIV

WV

W

WV

WV

WV

WV

W

PIV

PIV

WV

WV

WV

WVWV

WV

WV

WV

PIV

WV

WV

WV

WV

WV

WV

WV

WV

WV

WVWV

wsv

WV

WV

PIV

WV

WV

WV

WV

PIV

WV

WV

WV

WV

WV

wsv wsv wsvwsv

44150

46743

4662346445

46426

46015

45528 45526

45519

45111

44529

44436

44433

44360 44359

44296

44169

44155

44145

44051

43877

43870

43792

43787

43780

43776

43649

43543

43303

43067

42976

42816

42716

42715

42658

42484

42483

42121

42057

41834

41637

41612

41549

41243

41208

41206

41076

41075

41058 41023

15" CMP: 739.17

15" CMP: 740.87

46744

46741

46170

45527

45243

44568 44530

44440

44297

42979

42971

42943

42941

42669

42235

41927

8"

10"

10"

10"

10"

8"

6"

10"

8"

10"

30" 18"

16"

2"

4"

24"

24"

18" 10" 3

10"

8"

4"

8"

4"

6"

24"

8"

30"

4"

4"

14"

8"

6"

18"

6"

8"

8"

8"

4"

6" 2"

2" 6"

2"

2"2" 2"

2" 2"

2"

2"

2" 2"

2"

2"

2"

2"

2"

2"

6" 4"

2"

2"

2"

2"

2"

2"

2"

8"

2"

2"

2"

2"

14"

2" 2"

24"

2"

2"

2"

2" 2"

2" 2"

2"

6"

6"

2"

2"

2"

2"

2"

2"

2"

2"

2"

2"

2"

2"

2"

18"

2"

4"

6"

8"

8"

10" 12"

12"

8"

8"

6"

6"

8"

8"

8"

8"

8"

8"

8"

8"

8"

12"

8"

8"

8"

CONSTRUCTION

AREA

E

SHIELDS

ST

PUBLIC

R/W

V

IN

E S

T P

U B

L

IC

R /W

GOODMAN

DRPUBLICR/W

SKYWALK

TO

GARAGE

OXYGEN

TANKS

UNDERGROUND

STORMWATER

DETENTION

TBM #1 -

BOLT ON FIRE

HYDRANT

PAINTED BLACK

ELEVATION:

721.68

TBM #2 - BOLT ON

FIRE

HYDRANT PAINTED

BLACK

ELEVATION: 728.59

BUILDING 1

149,339 SQ.FT.

(BY EXTERIOR DIMENSIONS)

FFE = 726.97

(EXCEPT AS OTHERWISE NOTED)

B U

IL

D

IN

G

S Q

F T

F F E

.6

(L

O W E R

F F E

.7

(U

P P E R

EX.

TRAILER

(TYP.)

BUILDING #8

12,319 SQ. FT.

FFE = 729.70

BUILDING 3

4506 SQ. FT.

FFE = 742.52

(NORTH)

FFE 732.91

(SOUTH)

PARKING

GARAGE

EX. GARAGE

320 SQ.FT.

FFE =

725.33

BUILDING 15

S H E L

TE

R H O U S E

P E R G O

LA

STAIR

TOWER

SMOKING

SHELTER

CANOPY

SMOKE

STACK

EX.

TRAILERS

(3)

SQ.

FT.

FFE

727.57

SMOKING

SHELTER

713 71

3 735

5 7

NOT VA PROPERTY

"TPG"

150KW GEN.

"T13D"

"T13C"

"T13B"

"T13A"

"T5"

"PPSU"

"US3"

"US2"

2.8MW GEN.

This Document was originally issued by Gary S. Eodice on March 11, 2016.

This document is not considered a sealed document.

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in e fo ot on e-qu ar te r in fo ot th re e-ei gh th s fo ot on e-ha lf in fo ot th re e-qu ar te rs fo ot on e in fo ot on e an d on e-ha lf in es fo ot th re e in ch fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

HEAPY PROJECT No.: 2014-04022 FIRM LICENSE No.: 01528

/1

/2

:0

:4

A

M

CORRECT ELECTRICAL FCA

DEFICIENCIES

1/7/16

SITE PLAN - OVERALL UTILITIES

CU100

SCMSG

539-15-104

Cincinnati, Ohio

ALL

SCALE: 1" = 50'-0"

SITE PLAN

GENERAL NOTE

A. NO WORK ANTICIPATED. SHEET SHOWN FOR REFERENCE ONLY.

N

This Document was originally issued by Gary S. Eodice on March 11, 2016.

This document is not considered a sealed document.

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in fo ot on e-qu ar te r in fo ot th re e-ei gh th s fo ot on e-ha lf in fo ot th re e-qu ar fo ot on e in fo ot on e an d on e-ha lf in fo ot th re e in ch fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

HEAPY PROJECT No.: 2014-04022 FIRM LICENSE No.: 01528

/1

/2

:5

:5

A

M

CORRECT ELECTRICAL FCA

DEFICIENCIES

1/7/16

SITE PHOTOGRAPHS

1E500

SCMSG

539-15-104

Cincinnati, Ohio

SCALE: NONE

SITE PHOTOGRAPH

1 SCALE: NONE

SITE PHOTOGRAPH

2 SCALE: NONE

SITE PHOTOGRAPH

3 SCALE: NONE

SITE PHOTOGRAPH

4 SCALE: NONE

SITE PHOTOGRAPH

5 SCALE: NONE

SITE PHOTOGRAPH

SCALE: NONE

SITE PHOTOGRAPH

SCALE: NONE

SITE PHOTOGRAPH

SCALE: NONE

SITE PHOTOGRAPH

SCALE: NONE

SITE PHOTOGRAPH

SCALE: NONE

SITE PHOTOGRAPH

SCALE: NONE

SITE PHOTOGRAPH

SCALE: NONE

SITE PHOTOGRAPH

13 SCALE: NONE

SITE PHOTOGRAPH

14 SCALE: NONE

SITE PHOTOGRAPH

15 SCALE: NONE

SITE PHOTOGRAPH

16 SCALE: NONE

SITE PHOTOGRAPH

17 SCALE: NONE

SITE PHOTOGRAPH

SCALE: NONE

SITE PHOTOGRAPH

SCALE: NONE

SITE PHOTOGRAPH

SCALE: NONE

SITE PHOTOGRAPH

SCALE: NONE

SITE PHOTOGRAPH

SCALE: NONE

SITE PHOTOGRAPH

SCALE: NONE

SITE PHOTOGRAPH

Gary S. Eodice on March 11, 2016.

This document is not considered a sealed document.

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in fo ot on e-qu ar te r in fo ot th re e-ei gh th s fo ot on e-ha lf in fo ot th re e-qu ar fo ot on e in fo ot on e an d on e-ha lf in fo ot th re e in ch fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

HEAPY PROJECT No.: 2014-04022 FIRM LICENSE No.: 01528

/1

/2

:5

:5

A

M

CORRECT ELECTRICAL FCA

DEFICIENCIES

1/7/16

SITE PHOTOGRAPHS

1E501

SCMSG

539-15-104

Cincinnati, Ohio

SCALE: NONE

SITE PHOTOGRAPH

SCALE: NONE

SITE PHOTOGRAPH

SCALE: NONE

SITE PHOTOGRAPH

SCALE: NONE

SITE PHOTOGRAPH

SCALE: NONE

SITE PHOTOGRAPH

SCALE: NONE

SITE PHOTOGRAPH

SCALE: 12" = 1'-0"

SITE PHOTOGRAPH

SCALE: 12" = 1'-0"

SITE PHOTOGRAPH

SPC

PULL/MLO

SPC

M.S.

800A BPS

NEW MCC

400A

BUS BKR

400A

1A1L 100A

BC1L

100A

1C1L 100A

L2A/L3A 100A

BUS BKR

400A

BL1

100A

1C2L 100A

1C3L 100A

L2B/L3B 100A

L2C/L3C 100A

SIEMENS MCC

400A

ESWB-20

400A

ESWB-10

200A

ATS-SURG 55

200A

SPR

100A

2C1L 100A

ATS ELEV

P10 100A

S1CV PNL L3D

100A

SPR

30A

P-ELEV-18

60A

SPC

PPV-OPS

100A

PULL PULLTRACE

100A

BC1P

100A

1B1P 200A

1A1P 200A

M.S. 800A BPS

1C1P

200A (150AF)

1C2P

200A (150AF)

1C3P

200A (150AF)

DPF

400A

1C4P 100A

SPARE

100A (OFF)

RM

2DP

400A

3DP

200A

1C5P 1C6P 200A

SPC

S1CU R3D, R3E

200A

2C5P/2C6P 200A

BCP2/3

200A

3C5P/3C6P 200A

V A

ESWB-50

400A (250AF)

MCC/MCCD

400A 400AF

KWH

SPARE

200A

SPARE

200A

OFF

PET CT

200A

EDPEQ

600A

SPC

SPC

X-RAY

ESWB-40

600A

2ND-3RD

SPC

DS-1B

600A

SPR

600A

DPLF

800A

(IMAGING)

SPR

800A

ATS-1E2

600A

MCC

MCP

PNL

10A1 400A

DPD

800A

ATS-1E9

600A

KW VA

NP.

MB

PRI.

TERM

750 KVA

MINERAL OIL

FILLED TRANSFORMER

RACK

AHU 23

OFF

NORMAL

FEED TO

MCCE ATS

1-EF18

1-EF3

1-RF1

LUGS

1-EF17

AHU 22

MB MB

ATS-2

(100 A)

ATS-1

(400A)

AHU 25

SUPPLY

1-EF13

SPARE

1-EF19

RETURN

ACRCU-1

ACRCU-2

CHILLER

SPC

SPC

MAIN

LUGS

SPC

SPC

P3 CWP

EF14

AHU 32 (SF)

1-RF1

AIR COOLED

COND. UNIT

ACCU1

NORM FEED

TO MCCF

1-RF2 1-EF11 1-CU2

XFMR T10

TO E4A

AHU 24 (SF)

1-EF8

1-EF7

1-EF10

NUC.MED

HOOD C217

CB1

CHILLER OFF

CONTROL

AIR COMP.

HW PUMP P2

HW PUMP P1

ONLY

ONLY

MCCEMCCF

MCCG

SPC

RACK TROLLEY

CANTEEN

DIST. PNL

1KA

400A

CANTEEN

1KC/1KD

800A

CANTEEN

1 KE

800A

DPA

800A

DPC

800A

ATS

1E1

400A

TIE

BKR

BUS

MB

A VWH

PRI.

TERM

750 KVA

MINERAL OIL

FILLED TRANSFORMER

This Document was originally issued by Gary S. Eodice on March 11, 2016.

This document is not considered a sealed document.

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in fo ot on e-qu ar te r in fo ot th re e-ei gh th s fo ot on e-ha lf in fo ot th re e-qu ar fo ot on e in fo ot on e an d on e-ha lf in fo ot th re e in ch fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

HEAPY PROJECT No.: 2014-04022 FIRM LICENSE No.: 01528

/1

/2

:5

:5

A

M

CORRECT ELECTRICAL FCA

DEFICIENCIES

1/7/16

ELECTRICAL EQUIPMENT

ELEVATIONS (REMOVALS)

1E502

SCMSG

539-15-104

Cincinnati, Ohio

SCALE: 3/8" = 1'-0"

DS-1A, 1A1, 1A2 (REMOVALS)

SCALE: 3/8" = 1'-0"

DS-1B (REMOVALS)

SCALE: 3/8" = 1'-0"

DS-1P (REMOVALS)

SCALE: 3/8" = 1'-0"

DS-1X (REMOVALS)

SCALE: 3/8" = 1'-0"

US-1D (REMOVALS)

SCALE: 3/8" = 1'-0"

MCC-D

SCALE: 3/8" = 1'-0"

MCCE/F/G

SCALE: 3/8" = 1'-0"

US-1C (REMOVALS)

SPC

SPCSPD

36" 36"

SPC

MB

20SPD

36" 36"

MB

SPC

36"

10 11

SPACE

SPD

SPD

36"

SPC

3 6

SPC

36"

SPD

45"

PS

PS

SPACE

RBL CTS

34812

9 5 1

10 6

PREP

SPACE

PREP

SPACE

PREP

SPACE

SPACE

12,470V

750KVA XFMR

LIQUID TYPE

(LESS-FLAM.

SEED BASED)

208Y/120V-3PH-4W

AIR

TERMINAL

110" 60" 18"

BUS

TRANSITION

3 5 9 4

8 12

PREP

SPACE

PREP

SPACE

PREP

SPACE

SPACE

AIR

TERMINAL

110"60"18"

BUS

TRANSITION

12,470V

750KVA XFMR

LIQUID TYPE

(LESS-FLAM.

SEED BASED)

208Y/120V-3PH-4W

This Document was originally issued by Gary S. Eodice on March 11, 2016.

This document is not considered a sealed document.

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in fo ot on e-qu ar te r in fo ot th re e-ei gh th s fo ot on e-ha lf in fo ot th re e-qu ar fo ot on e in fo ot on e an d on e-ha lf in fo ot th re e in ch fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

HEAPY PROJECT No.: 2014-04022 FIRM LICENSE No.: 01528

/1

/2

:5

:0

A

M

CORRECT ELECTRICAL FCA

DEFICIENCIES

1/7/16

ELECTRICAL EQUIPMENT

ELEVATIONS (NEW) AND

SCHEDULES

1E503

SCMSG

539-15-104

Cincinnati, Ohio

0.00 kVA

TOTAL CONNECTED ESTIMATED DEMAND

NOTES:

12 Spare 0.00 kVA -- 3 100 A -- -- -- -- -- --

11 SPD 0.00 kVA 30 A 3 30 A TM

10 PBX LIEBERT 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25

9 CBT 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5

8 CDP3 (IMAGING) 0.00 kVA 300 A 3 300 A TM 2 SETS OF 4 250 3 2.5

7 CDPF (IMAGING) 0.00 kVA 200 A 3 200 A TM 4 350 4 3

6 PBX 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25

5 C5D RISER 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5

4 CBD RISER 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5

3 C5C RISER 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5

2 CBC RISER 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5

1 MAIN LUGS 0.00 kVA 0 A 3 0 A

CKT CIRCUIT DESCRIPTION

APPROX.

CONNECTED

LOAD

FRAME

SIZE POLES

TRIP

SETTING

BREAKER

TYPE

NUMBER OF

CONDUCTORS

WIRE

SIZE

GROUND

SIZE

CONDUIT

SIZE

SEE

NOTE

Feeder Size: REFER TO US-1D Spec. Ref. #: 26 24 13 Voltage: 120/208 Wye-3PH-4W Mains Rating: 600 A

Supply From: Enclosure: Mains Type:

Location: Mounting: A.I.C. Rating:

DISTRIBUTION PANEL: CDP

0.00 kVA

TOTAL CONNECTED ESTIMATED DEMAND

NOTES:

21 Spare 0.00 kVA -- 3 200 A -- -- -- -- -- --

20 BCIL 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25

19 1A1L 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25

18 MCC (EAST) 0.00 kVA 400 A 3 400 A TM 4 500 3 4

17 MCC (NORTH) 0.00 kVA 400 A 3 400 A TM 4 500 3 4

16 L2C / L3C 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25

15 L2B / L3B 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25

14 1C3L 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25

13 1C2L / 1C5L 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25

12 BL1 / BR1 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25

11 P-ELEV-16 0.00 kVA 60 A 3 60 A TM 3 1 8 1.5

10 Spare 0.00 kVA -- 3 100 A -- -- -- -- -- --

9 FLUORO (C3042) 0.00 kVA 100 A 3 100 A TM 4 350 350 4

8 L3D 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25

7 L2A / L3A 0.00 kVA 90 A 3 90 A TM 4 2 8 1.25

6 ATS-10 / ESWB-20 0.00 kVA 400 A 3 400 A TM 4 500 3 4

5 2CIL 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25

4 ATS-9 / ESWB-10 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5

3 ATS-SURGERY 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5

2 SPD 0.00 kVA 30 A 3 30 A -

1 MAIN BREAKER 0.00 kVA 600 A 3 600 A LSI

CKT CIRCUIT DESCRIPTION Load

FRAME

SIZE POLES

TRIP

SETTING

BREAKER

TYPE

NUMBER OF

CONDUCTORS

WIRE

SIZE

GROUND

SIZE

CONDUIT

SIZE

SEE

NOTE

Feeder Size: 2 SETS OF (4-350 KCMIL, #1 GRD IN 3"C) Spec. Ref. #: 26 24 13 Voltage: 480/277 Wye-3PH-4W Mains Rating: 800 A

Supply From: Enclosure: Mains Type:

Location: Mounting: A.I.C. Rating:

DISTRIBUTION PANEL: DS-1A

0.00 kVA

TOTAL CONNECTED ESTIMATED DEMAND

NOTES:

20 Spare 0.00 kVA -- 3 100 A -- -- -- -- -- --

19 Spare 0.00 kVA -- 3 100 A -- -- -- -- -- --

18 2C5P / 2C6P 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5

17 1C5P / 1C6P 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5

16 R3D / R3E 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5

15 3C5P / 3C6P 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5

14 DP3 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5

13 DPF 0.00 kVA 400 A 3 400 A TM 4 500 3 4

12 DP2 0.00 kVA 400 A 3 400 A TM 4 500 3 4

11 1C4P 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25

10 1C3P 0.00 kVA 150 A 3 150 A TM 4 1/0 6 2

9 1C2P / 1C2PA / 1C2PB 0.00 kVA 150 A 3 150 A TM 4 1/0 6 2

8 BC2P / BC3P 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2..5

7 1C1P / 1C1PA 0.00 kVA 150 A 3 150 A TM 4 1/0 6 2

6 BC1P 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25

5 EXIST LOAD 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25

4 1B1P 0.00 kVA 150 A 3 150 A TM 4 1/0 6 2

3 1A1P 0.00 kVA 150 A 3 150 A TM 4 1/0 6 2

2 SPD 0.00 kVA 30 A 3 30 A

1 MAIN BREAKER 0.00 kVA 600 A 3 600 A LSI

CKT CIRCUIT DESCRIPTION

APPROX.

CONNECTED

LOAD

FRAME

SIZE POLES

TRIP

SETTING

BREAKER

TYPE

NUMBER OF

CONDUCTORS

WIRE

SIZE

GROUND

SIZE

CONDUIT

SIZE

SEE

NOTE

Feeder Size: 2 SETS OF (4-350 KCMIL, #1 GRD IN 3"C) Spec. Ref. #: 26 24 13 Voltage: 120/208 Wye-3PH-4W Mains Rating: 800 A

Supply From: Enclosure: Mains Type:

Location: Mounting: A.I.C. Rating:

DISTRIBUTION PANEL: DS-1B

0.00 kVA

TOTAL CONNECTED ESTIMATED DEMAND

NOTES:

5 Spare 0.00 kVA -- 3 200 A -- -- -- -- -- --

4 MCC-D 0.00 kVA 400 A 3 400 A LSI 4 500 3 4

3 ATS-12 / ELEV 15/16 0.00 kVA 250 A 3 250 A TM 3 250 4 2.5

2 SPD 0.00 kVA 30 A 3 30 A -

1 MAIN LUGS 0.00 kVA 400 A 3 400 A -

CKT CIRCUIT DESCRIPTION

APPROX.

CONNECTED

LOAD

FRAME

SIZE POLES

TRIP

SETTING

BREAKER

TYPE

NUMBER OF

CONDUCTORS

WIRE

SIZE

GROUND

SIZE

CONDUIT

SIZE

SEE

NOTE

Feeder Size: 2 SETS OF (4-350 KCMIL, #1 GRD IN 3"C) Spec. Ref. #: 26 24 13 Voltage: 480/277 Wye-3PH-4W Mains Rating: 800 A

Supply From: Enclosure: Mains Type:

Location: Mounting: A.I.C. Rating:

DISTRIBUTION PANEL: DS-1P

0.00 kVA

TOTAL CONNECTED ESTIMATED DEMAND

NOTES:

6 Spare 0.00 kVA -- 3 100 A -- -- -- -- -- --

5 EDPEQ (IMAGING) 0.00 kVA 600 A 3 600 A LSI 2 SETS OF 4 350 1 3

4 ATS-11 / ESWB-40 0.00 kVA 600 A 3 600 A LSI 2 SETS OF 4 350 1 3

3 PET / CT 0.00 kVA 125 A 3 125 A TM 3 1/0 6 1.5

2 SPD 0.00 kVA 30 A 3 30 A -

1 MAIN LUGS 0.00 kVA -- 3 0 A -- -- -- -- -- --

CKT CIRCUIT DESCRIPTION

APPROX.

CONNECTED

LOAD

FRAME

SIZE POLES

TRIP

SETTING

BREAKER

TYPE

NUMBER OF

CONDUCTORS

WIRE

SIZE

GROUND

SIZE

CONDUIT

SIZE

SEE

NOTE

Feeder Size: 2 SETS OF (4-500 KCMIL, #1/0 GRD IN 4"C) Spec. Ref. #: 26 24 13 Voltage: 480/277 Wye-3PH-4W Mains Rating: 800 A

Supply From: Enclosure: Mains Type:

Location: Mounting: A.I.C. Rating:

DISTRIBUTION PANEL: DS-1X

0.00 kVA

TOTAL CONNECTED ESTIMATED DEMAND

NOTES:

7 METERING 0.00 kVA -- 1 0 A -- -- -- -- -- --

6 Spare 0.00 kVA -- 3 0 A -- -- -- -- -- --

5 ATS-14 / LSDP 0.00 kVA 400 A 3 400 A TM

4 ATS-16 / CDP 0.00 kVA 600 A 3 600 A TM

3 ATS-17 / E4A 0.00 kVA 200 A 3 200 A TM

2 SPD 0.00 kVA 30 A 3 30 A TM -- -- -- --

1 MAIN BREAKER 0.00 kVA 1000 A 3 1000 A LSI -- -- -- --

CKT CIRCUIT DESCRIPTION

APPROX.

CONNECTED

LOAD

FRAME

SIZE POLES

TRIP

SETTING

BREAKER

TYPE

NUMBER OF

CONDUCTORS

WIRE

SIZE

GROUND

SIZE

CONDUIT

SIZE

SEE

NOTE

Feeder Size: 3 SETS OF (4-400 KCMIL, #3/0 G.E.C. IN 4"C) Spec. Ref. #: 26 24 13 Voltage: 120/208 Wye-3PH-4W Mains Rating: 1200 A

Supply From: Enclosure: Mains Type:

Location: Mounting: A.I.C. Rating:

DISTRIBUTION PANEL: GDE

0.00 kVA

TOTAL CONNECTED ESTIMATED DEMAND

NOTES: 1. PROVIDE 100% RATED BREAKER WITH KIRK KEY INTERLOCK TO TIE BREAKER.

2. PROVIDE BACNET OUTPUT ON METER AND TIE INTO JCI SYSTEM.

3. PROVIDE KIRK KEY INTERLOCK WITH MAIN BREAKER.

12 TIE BREAKER 0.00 kVA 2000 A 3 2000 A LSI 3

11 Spare 0.00 kVA 800 A 3 400 A LSI - - - - -

10 ATS-14 / LSDP 0.00 kVA 800 A 3 400 A LSI 4 500 3 4

9 1KE 0.00 kVA 800 A 3 400 A LSI 2 SETS OF 4 4/0 2 2.5

8 1KC / 1KD 0.00 kVA 800 A 3 400 A LSI 2 SETS OF 4 4/0 2 2.5

7 1KA / 1KB 0.00 kVA 800 A 3 400 A LSI 4 500 3 4

6 Spare 0.00 kVA 800 A 3 800 A LSI - - - - -

5 DPC 0.00 kVA 800 A 3 800 A LSI 2 SETS OF 4 500 1/0 4

4 DPA 0.00 kVA 800 A 3 800 A LSI 2 SETS OF 4 500 1/0 4

3 METERING 0.00 kVA 0 A 3 0 A - 2

2 SPD 0.00 kVA 60 A 3 60 A LSI

1 MAIN BREAKER 0.00 kVA 2000 A 3 2000 A LSI 1

CKT CIRCUIT DESCRIPTION

APPROX.

CONNECTED

LOAD

FRAME

SIZE POLES

TRIP

SETTING

BREAKER

TYPE

NUMBER OF

CONDUCTORS

WIRE

SIZE

GROUND

SIZE

CONDUIT

SIZE

SEE

NOTE

Feeder Size: 3-#2 MV-90 15KV EPR, 1-#2 600V GRD IN 4"C Spec. Ref. #: 26 23 00 Voltage: 120/208 Wye-3PH-4W Mains Rating: 2000 A

Supply From: Enclosure: Mains Type:

Location: Mounting: A.I.C. Rating:

DISTRIBUTION PANEL: US-1C

0.00 kVA

TOTAL CONNECTED ESTIMATED DEMAND

NOTES: 1. PROVIDE 100% RATED BREAKER WITH KIRK KEY INTERLOCK TO TIE BREAKER.

2. PROVIDE BACNET OUTPUT ON METER AND TIE INTO JCI SYSTEM.

3. PROVIDE KIRK KEY INTERLOCK WITH MAIN BREAKER.

12 DPLF (IMAGING) 0.00 kVA 800 A 3 800 A LSI 2 SETS OF 4 750 3/0 4

11 ATS-16 / CDP 0.00 kVA 800 A 3 600 A LSI 2 SETS OF 4 350 1 3

10 MCP / 10A1 0.00 kVA 800 A 3 400 A LSI 4 500 3 4

9 Spare 0.00 kVA 800 A 3 400 A LSI - - - - -

8 Spare 0.00 kVA 800 A 3 800 A LSI - - - - -

7 ATS-14 / E4A 0.00 kVA 800 A 3 200 A LSI 4 4/0 4 2.5

6 DS-1B 0.00 kVA 800 A 3 600 A LSI 2 SETS OF 4 350 1 3

5 DPD 0.00 kVA 800 A 3 800 A LSI 2 SETS OF 4 500 1/0 4

4 BUS TIE 0.00 kVA 0 A 3 0 A - 3

3 METERING 0.00 kVA 0 A 3 0 A - 2

2 SPD 0.00 kVA 60 A 3 60 A LSI

1 MAIN BREAKER 0.00 kVA 2000 A 3 2000 A LSI 1

CKT CIRCUIT DESCRIPTION

APPROX.

CONNECTED

LOAD

FRAME

SIZE POLES

TRIP

SETTING

BREAKER

TYPE

NUMBER OF

CONDUCTORS

WIRE

SIZE

GROUND

SIZE

CONDUIT

SIZE

SEE

NOTE

Feeder Size: 3-#2 MV-90 15KV EPR, 1-#2 600V GRD IN 4"C Spec. Ref. #: 26 23 00 Voltage: 120/208 Wye-3PH-4W Mains Rating: 2000 A

Supply From: Enclosure: Mains Type:

Location: Mounting: A.I.C. Rating:

DISTRIBUTION PANEL: US-1D

S E E U S - 1 D

S E E U S - 1 D

S E E U S - 1 C

B U S W A Y

SCALE: 3/8" = 1'-0"

DS-1A (NEW)

2 SCALE: 3/8" = 1'-0"

DS-1B (NEW)

SCALE: 3/8" = 1'-0"

CDP (NEW)

SCALE: 3/8" = 1'-0"

DS-1P (NEW)

4 SCALE: 3/8" = 1'-0"

DS-1X (NEW)

SCALE: 3/8" = 1'-0"

GDE (NEW)

6 SCALE: 3/8" = 1'-0"

US-1C (NEW)

7 SCALE: 3/8" = 1'-0"

US-1D (NEW)

1 BULLETIN 2 02-17-2017

K K K

EXIST. MEDIUM VOLTAGE SWITCHGEAR "MVSG"

600A, 12,470V-3PH-3W

EXIST. UNIT SUBSTATION "US-1A"

5000A, 208Y/120V-3PH-4W

NORMAL BRANCH

SPD

METERING

SWBD

EXIST. UNIT SUBSTATION "US-1B"

5000A, 208Y/120V-3PH-4W

NORMAL BRANCH

SPD

METERING

SWBD

EXIST. MV SWITCHGEAR "PS1"

12,470V

NORMAL BRANCH

50E 100E 50E 100E

UNIT SUBSTATION "US-1C"- DEMO

3000A, 208Y/120V-3PH-4W

NORMAL POWER BRANCH

EXIST. DISTRIBUTION PANEL "PP-1"

400A, 208Y/120V-3PH-4W

NORMAL POWER BRANCH (B013A)

EXIST. DISTRIBUTION PANEL "DPB"

800A, 208Y/120V-3PH-4W

NORMAL POWER BRANCH

EXIST. DISTRIBUTION PANEL "DPA"

800A, 208Y/120V-3PH-4W

NORMAL POWER BRANCH

EXIST. DISTRIBUTION PANEL "DPC"

800A, 208Y/120V-3PH-4W

NORMAL POWER BRANCH

EXIST. DISTRIBUTION PANEL "DPE"

800A, 208Y/120V-3PH-4W

NORMAL POWER BRANCH

EXIST. DISTR. PANEL "DPP"

800A, 208Y/120V-3PH-4W

NORMAL POWER BRANCH

800/3

S P

A R

E

LOW

VOLTAGE

A/H 30 A H

U

BB1 BB2

3000A

12,470V

750KVA

LF OIL

208Y/120V

3PH-4W

FE

E

D E

R A

FE

E

D E

R B

FE

E

D E

R C

FUTURE

3200A

A

B

SELECTOR

SWITCH

3,200A

A

B

SELECTOR

SWITCH

1B1 1B2

1A3 1A2 1A1

A

B

SELECTOR

SWITCH

1KC 1KD 1KE

VM

2B1 2B2 2B3

3E1

MH#1 MH#17

250E

250E

CGAE ROCHELLE #43

12,470 3PH, 3W

ALTERNATE 9295

CGAE ROCHELLE #44

12,470 3PH, 3W

ALTERNATE 9371

N.C. N.O.

3-2/0-1/0-15KV PLC CKT

450 KVAR

CAPACITOR

BANK

RM B13A

EXIST. PRIMARY SWITCHGEAR "PPSU"

100E 100E 100E

12,470 KV, SITE

12E 20E

"T-5"

150 KVA

208Y/120V

3PH, 4W

BLDG 5

"TPG"

300 KVA

208Y/120V

3PH, 4W

25E 30E

"T-13A"

750 KVA

480Y/277V

3PH, 4W

BLDG 13

"T-13B"

500 KVA

480Y/277V

3PH, 4W

BLDG 13

225 KVA

DRY TYPE

"US-3"

208Y/120V

3PH, 4W

BLDG 3

30E

3B1 3B2

4B1 4B2 4B3

5B1 5B2

6B1 6B2

7B1 7B2

8B1 8B2 8B3

9B1

5A2 5A1

S P

A R

E

4E2 4E1

3E2

2E3 2E2 2E1

MCC5

S P

A R

E

S P

A R

E

S P

A R

E

2A12A22A3

3A23A1

B1

S P

A R

E

S P

A R

E

9A1

4A2 4A1

BA1BA2

6A2 6A1

7A2 7A1

8A2 8A1

BE1BE2BE3

1E11E2 1C2 1C1

BC1BC2

2C12C22C3

3C13C2

5C2 5C1

4C2 4C1

6C2 6C1

7C2 7C1

9C1

8C2 8C1

S P

A R

E

S P

A R

E

S P

A R

E

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

2 3 4 6 7 8 9 1 2 3 4 5 6 7 8 9

MSP-1

BASEMENT

SEVENTH FLOOR

EIGHTH FLOOR

NINTH FLOOR

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

FIFTH FLOOR

SIXTH FLOOR

FOURTH FLOOR

TENTH FLOOR

SPARE SPARESPARESPARESPARESPARE SPARE SPARE

SPACE

S P

A R

E

C H

IL

LE

R B

LD

G

A H

U

750 KVA

12470 TO

208/120

CAST RESIN

E X

IS

T.

P N

LS

4000A BUS DUCT

750 KVA

12470 TO

208/120

CAST RESIN

EXIST. DISTR. PANEL "DPK"

800A, 208Y/120V-3PH-4W

NORMAL POWER BRANCH

AHU13

S P

A R

E

S P

A R

E

S P

A R

E

S P

A R

E

2A4

5C3

6C3

MCC-5A

4E3

2E4

U

U

ATS

C-G&E

METERING

SWBD

SITE / BLDG 2, 3, 5, 8, 13, PG

3000A BUS DUCT

ELEVENTH FLOOR

SUB BASEMENT

M A

T C

H L

IN

E

50A

TO BLDG.15

MDP

1-

K

C M

IL

2-

K

C M

IL

2-

K

C M

IL

2-

K

C M

IL

1-#4/0

1-#4/0

2-

K

C M

IL

2-

K

C M

IL

1-

K

C M

IL

1- #4

/0

1-

K

C M

IL

1-

K

C M

IL

1-

K

C M

IL

R-1

1- #4

/0

5E1

1-350 KCMIL

1- #2

1- #6

1-#4/0

1-

K

C M

IL

1-

K

C M

IL

1-

K

C M

IL

1-

K

C M

IL

1-

K

C M

IL

1-

K

C M

IL

1-

K

C M

IL

1-

K

C M

IL

1-

K

C M

IL

1-

K

C M

IL

S P

A R

E

S P

A R

E

1-

K

C M

IL

1-

K

C M

IL

1- #4

/0

1-

K

C M

IL

50A

2- #3

/0

2-

K

C M

IL

2-

K

C M

IL

2-

K

C M

IL

2-500 KCMIL

2-500 KCMIL

1-#4/0

1-#4/0

1-#4/0

AT

AT

AT

AT

1- #2

1-500 KCMIL

C O

M P

A C

T O

R

C O

M P

A C

T O

R

P N

E U

M

TU

P

C O

M P

R E

S S

O R

1-

K

C M

IL

2- #4

/0

2- #4

/0

NEW UNIT SUBSTATION "US-1C"

2000A, 208Y/120V-3PH-4W

NORMAL POWER BRANCH

LSI

2000A

100% RATED

12,470V TO 208Y

750KVA

2-

K

C M

IL

2-

K

C M

IL

1-#2

1-500 KCMIL

1-#2

1-#2

1- #2

80A

"T-13D"

1000 KVA

480Y/277V

3PH, 4W

1-#4/0

1-#4/0

TO

U

S

80E

UNIT SUB

US2

1000 KVA

480Y/277V

3PH, 4W

BLDG 13

MH3

125A

"T-13C"

2000 KVA

480Y/277V

3PH, 4W

BLDG 13

SPD

SWBD

METERING

EX

EX

EX

EX EX EX

1KA

1KB

NEW 2000A

208Y/120V-3PH-4W

BUS DUCT

EX EX

1 1 1 1 1 1M

300/3 200/3 300/3 600/3 200/3 200/3 200/3 200/3

300/3 300/3 300/3 300/3 300/3 300/3 200/3 200/3

60/3 125/3 150/3 150/3

1600/3

800/3

400/3 600/3 800/3

800/3 800/3 800/3

800/3

3200A 800/3 800/3 800/3 800/3 400/3 800/3 600/3 400/3 800/3 800/3 800/3 800/3 800/3 800/3 3000/3 400/3 200/3 800/3 400/3

100/3 60/3 200/3 200/3 60/3 60/3

300/3 300/3 300/3 300/3 300/3 300/3 200/3 200/3 300/3 300/3 300/3 300/3 300/3 200/3 200/3 300/3

(2CA)

EX

EX

TO ATS

(1E5, 1E6, 1E7)

TO

ATS

(1E3, 1E4, 1E8)

EX

1211109765432

SPARE SPARE

TO

ATS

(14)

400 AF

(225 AT)

PANEL

S

PANEL

LITE

4- #4

/0

4-#2 TAP CONDUCTORS

1KB SUB-FEED FROM 1KA

S LITE PANEL

P2

400/3

IN ROOM SB0028 (PIPE SHOP)

This Document was originally issued by Gary S. Eodice on March 11, 2016.

This document is not considered a sealed document.

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in fo ot on e-qu ar te r in fo ot th re e-ei gh th s fo ot on e-ha lf in fo ot th re e-qu ar fo ot on e in fo ot on e an d on e-ha lf in fo ot th re e in ch fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

HEAPY PROJECT No.: 2014-04022 FIRM LICENSE No.: 01528

/1

/2

:5

:0

A

M

CORRECT ELECTRICAL FCA

DEFICIENCIES

1/7/16

SINGLE LINE DIAGRAM

1E600

SCMSG

539-15-104

Cincinnati, Ohio

SCALE: 6" = 1'-0"

SINGLE LINE DIAGRAM

NOTES

1. RUN CT LEADS TO JCI METER CABINET. PROVIDE ALL SHORTING BLOCKS,

PROGRAMMING/TESTING AND HARDWARE REQUIRED.

2. SPLICE FEEDER IN SUB-BASEMENT AND EXTEND TO NEW SOURCE.

3. VERIFY IF PANEL / LOAD EXISTS AND REPLACE IF ANTIQUATED. INCLUDE PANEL

REPLACEMENT IN BID. LOCATE ON AS-BUILTS.

4. TRACE LOAD AND LOCATE ON AS-BUILTS.

5. PROVIDE BACNET OUTPUT ON METER AND TIE INTO JCI SYSTEM.

6. ALL FAULT CURRENT VALVES ARE SHOWN FROM 2009 STUDY FURNISHED BY VA.

SHORT CIRCUIT STUDY SHALLY BE COMPLETED PRIOR TO SUBMITTING SHOP

DRAWINGS. ADD 1,000 SCA TO ALL SHOWN AVAILABLE FAULT CURRENT AMPS

AND BRACE PANELS ACCORDINGLY (TO ACCOMMODATE FUTURE INCREASE IN

SYSTEM SHORT-CIRCUIT AVAILABILITY).

CROSS HATCHED PANEL INDICATES TO REMOVE ANTIQUATED PANELBOARD INTERIOR

(COVER,BUSSING, BREAKERS, ETC.) AND REPLACE WITH NEW. PROVIDE NEW

NAMEPLATE. CLEAN AND REMOVE ANY RUST/CORROSION FROM PANEL TUB. RE-

TERMINATE ALL EXISTING BRANCH CIRCUITS AND FEEDERS TO REMAIN TO NEW

INTERIOR. EXISTING CIRCUIT NUMBERS SHALL MATCH NEW. INTERCEPT AND EXTEND

CONDUCTORS AS REQUIRED TO MAKE CONNECTION TO NEW BREAKERS/LUGS. PRIOR

TO SUBMITTING SHOP DRAWINGS AND AGAIN BEFORE ORDERING NEW PANEL INTERIOR

AND CUSTOM COVER, REMOVE EVERY EXISTING PANELBOARD COVER, FIELD MEASURE

EXACT TUB/FEEDER DIMENSIONS, AND VERIFY BREAKERS. RE-INSTALL COVER WHEN

FINISHED MEASURING. PROVIDE CUSTOM INTERIOR AND COVER TO FIT TUB. NO

ALLOWANCES WILL BE MADE FOR FAILURE TO DO SO. REFER TO SEQUENCE OF

CONSTRUCTION NOTES FOR MAXIMUM OUTAGE DURATION. CONTRACTOR SHALL

PROVIDE TEMPORARY POWER TO THIS PANELBOARD UPON FAILURE TO COMPLY WITH

MAXIMUM OUTAGE DURATION DUE TO INADEQUATE PREPARATION/SITE INVESTIGATION.

DIMENSIONS LISTED ARE APPROXIMATE.

EX EXISTING NEWER PANEL TO REMAIN.

SYMBOLS

GENERAL NOTES

A. REFER TO SEQUENCE OF CONSTRUCTION NOTES FOR PHASING / TEMPORARY

REQUIREMENTS.

B. FAULT CURRENT VALUES SHOWN FROM VA PROVIDED SHORT CIRCUIT STUDY.

VERIFY ALL PRIOR TO ORDERING.

C. REMOVE EXISTING AND PROVIDE NEW PHENOLIC NAMEPLATES (PER

SPECIFICATIONS) FOR ALL EQUIPMENT SHOWN ON THIS SINGLE LINE DIAGRAM.

D. LIGHT LINEWEIGHT INDICATES EXISTING EQUIPMENT.

DARK LINEWEIGHT INDICATES NEW EQUIPMENT.

DARK DASHED LINEWEIGHT INDICATES EQUIPMENT TO BE REMOVED.

FAULT CURRENT SCHEDULE

REF.

POINT DESCRIPTION

AVAILABLE

SHORT

CIRCUIT AMPS

1 MVSG 4,800

2 PS1 4,800

3 US-1A 32,500

4 US-1B 31,400

5 DPB 16,600

6 DPE 18,300

7 DPP 13,600

8 DPK 8,900

9 US-1C 32,100

10 US-1D 32,300

11 DPA 18,500

12 DPC 18,500

13 1KA 11,500

14 1KC/D 13,900

15 1KE 13,900

16 DPD 18,600

17 DS-1B 19,500

18 US-1X 15,200

19 US-1P 22,700

20 X-RAY 12,300

21 DS-1X 14,200

22 DS-1A 13,300

23 DS-1P 20,700

24 PP1 20,400

25 1E7 27,600

26 1E3 27,200

27 BB1 16,700

28 1B1 15,500

29 2B1 10,800

30 3B1 10,100

31 5B1 8,900

32 7B1 7,900

33 8B1 6,400

34 R1 6,400

35 BE1 17,000

36 1E1 15,800

37 2E1 14,100

38 3E1 11,200

39 4E1 10,700

40 B1 10,800

41 BA1 17,200

42 1A1 16,000

43 2A1 15,000

44 3A1 14,100

45 4A1 11,300

46 5A1 10,800

47 6A2 9,100

48 7A1 8,700

49 8A1 8,200

50 9A1 7,900

51 BC1 16,600

52 1C1 15,500

53 2C1 12,900

54 3C1 12,200

55 4C1 11,000

56 5C1 10,500

57 6C1 9,100

58 7C1 8,700

59 8C1 8,400

60 9C1 7,800

61 VM 5,600

62 BD1 17,200

63 1D1 16,100

64 2D1 15,000

65 2DX 15,000

66 3D1 13,300

67 4D1 12,600

68 5D1 10,500

69 6D1 10,100

70 7D1 8,800

71 8D1 9,300

72 9D1 8,900

73 1B1P 8,000

74 BC1P 8,000

75 1C1P 8,000

76 1C2P 8,000

77 1C3P 10,000

78 1C4P 4,800

79 BC2P 6,900

80 DP2 16,400

81 DP3 12,600

82 1C5P 8,100

83 R3D 10,600

84 2C5P 7,200

85 2C1L 6,900

86 L3D 7,800

87 1C3L 8,800

88 1C2L 8,800

89 BL1 7,100

90 L2B 8,800

91 L2C 6,200

92 1A1L 8,800

93 BC1L 10,100

94 GDE 3,600

95 CDP 25,100

96 LSDP 21,000

97 LSAB 13,400

98 LSA1 11,600

99 LSA2 10,900

100 LSA3 9,900

101 LSA5 9,600

102 CBC 13,700

103 C1C 12,200

104 C2C 11,000

105 C3C 10,000

106 C4C 9,200

107 C5C 8,300

108 CBD 12,200

109 C1D 11,000

110 C2D 10,000

111 C3D 9,200

112 C5D 7,900

113 ESWB 4,000

114 C3C 11,500

115 C3D 11,500

116 CR3E 1,300

117 ESWB-10 11,700

118 LS2C 7,100

119 LS2A 7,100

120 LS2B 7,100

121 S3B 500

122 ESWB-20 12,000

123 NOT USED 9,100

124 BEC1 11,900

1 BULLETIN 3 REV 2 01-17-2018

K KK

UNIT SUBSTATION "US-1D" - DEMO

3000A, 208Y/120V-3PH-4W

NORMAL POWER BRANCH

EXIST. DISTRIBUTION PANEL "DPD"

800A, 208Y/120V-3PH-4W

NORMAL POWER BRANCH

DIST. PANEL "DS-1B"- DEMO

1000A, 208Y/120V-3PH-4W

NORMAL POWER BRANCH

3000A

12,470V 208Y

750KVA

600A

200/3 (150A)

600A

1D3 1D2 1D1

5D2 5D1

2D12D2

3D13D2

4D1

BD1BD2

6D2 6D1

8D2 8D1

1 2 3 4 5 6 7 8 9

7D27D1

9D1

2DX

S P

A R

E

L5D

1C4P1C3P1C2P1C2PA1C2PB1C1P1C1PA

BC1P

1B1P1A1P

200/3 (200A)

200/3 (150A)

EXIST. DISTRIBUTION PANEL "US-1P"

2500A, 480Y/277V-3PH-4W (RM A23)

NORMAL POWER BRANCH

PP1

LP-B

480V TO 208Y 5KVA

2500A

DIST. PANEL "DS-1P"-DEMO

800A, 480Y/277V-3PH-4W

MCP2

MCC-D MCC-G

MCC-B

MCC-C

CH-1

EXIST. DISTRIBUTION PANEL "US-1X"

2500A, 480Y/277V-3PH-4W (RM A23)

NORMAL POWER BRANCH

4P1

1200A

750 KVA

12,470V TO

277/480V-3PH-4W

CH-2

MCC-2

X-RAY

DIST. PANEL "DS-1X"-DEMO

600A, 480Y/277V-3PH-4W (RM C8)

BL1

L2C

M C

C N

O R

T H

W A

LL

A H

U 5)

1A1L

BC1L

L2A

L3A L3C

L2B

L3B

BASEMENT

SEVENTH FLOOR

EIGHTH FLOOR

NINTH FLOOR

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

FIFTH FLOOR

SIXTH FLOOR

FOURTH FLOOR

TENTH FLOOR

SPARESPARESPARE

10A1MCP

BC2P

BC3P

3C5P3C6P R3D (A395) R3E

2500A BUS DUCT

TBR1

BR1

L3D

ELEVENTH FLOOR

SUB BASEMENT

M A

T C

H L

IN

E

M A

T C

H L

IN

E

NEW UNIT SUBSTATION "US-1D"

3000A, 208Y/120V-3PH-4W

NORMAL POWER BRANCH

LSI

2000A

100% RATED

12,470V, 750KVA

LF OIL

208Y/120V

3PH-4W

SPARESPARE

SWBD

METERING

TO DPLF

(IMAGING)

2-

K

C M

IL

2-

K

C M

IL

1-

K

C M

IL

1-

K

C M

IL

1-

K

C M

IL

1-

K

C M

IL

1-

K

C M

IL

1- #4

/0

1- #1

/0

6D3

NEW DIST. PANEL "DS-1P"

800A, 480Y/277V-3PH-4W

1-250 KCMIL

PET

CT

TO EDPEQ (IMAGING)

NEW DIST. PANEL "DS-1X"

800A, 480Y/277V-3PH-4W (RM C8)

2-

K

C M

IL

1000 KVA

12,470V TO

277/480V-3PH-4W

MCCD

(A23)

1- #4

/0

1- #6

1- #1

TLPB

2-

K

C M

IL

1-

K

C M

IL

2-

K

C M

IL

2-

K

C M

IL

2-

K

C M

IL

NEW DISTRIBUTION PANEL "DS-1B"

800A, 208Y/120V-3PH-4W

NORMAL POWER BRANCH

1- #4

/0

1- #4

/0

1- #4

/0

1- #1

/0

1- #2

1- #4

/0

2C6P

1C6P

2C5P

1C5P

SWBD

METERING

TO

A

T S

E S

W B

-F -3

IM

A G

IN

G

1-

K

C M

IL

2-

K

C M

IL

2-

K

C M

IL

2-

K

C M

IL

C3042

FLUOR

OPS

SPARE

P-ELEV-18

2C1L

1- #2

1-#2 1- #2

1- #2

1- #2

1- #2

1-

1-

1- #2

1- #2

1- #2

1- #8

15 KVA

M C

C A

H U

E

A S

T W

A

LL

R

M

C 8)

1-250 KCMIL

1-#2

SPD

NEW 2000A BUS DUCT

2-350 KCMIL

S P

A R

E

400A400A

DIST. PANEL "DS-1A"- DEMO

800A, 480Y/277V-3PH-4W (RM C8)

DIST. PANEL "DS-1A1" - DEMO

800A, 480Y/277V-3PH-4W (RM C8)

DIST. PANEL "DS-1A2" - DEMO

800A, 480Y/277V-3PH-4W (RM C8)

NEW DIST. PNL "DS-1A"

800A, 480Y/277V-3PH-4W (RM C8)

Ex

ExEx

Ex

Ex

ExEx

EXIST. DIST. PANEL "DPF"

400A, 480Y/277V-3PH-4W

1F2

MAMMO

C1041F1

2F12F2

ExEx

Ex Ex Ex

DP3

208Y/120V-3PH-4W

R3B

R3C

100 100 100

R3A R3E

R4A

DP2

208Y/120V-3PH-4W

R2B

100 100 300

R2A R2C (C309) R2E

100 100

R2FR2D

TO DPF

(IMAGING)

Ex Ex

1-#2

1-

0K C

M

IL

1- #1

1C3L1C2L1C5L

Ex

TR

A

C E

L O

A D

1-#6 1-#6

(C109)

Ex

Ex

1- #4

/0

1-

K

C M

IL

1- #2

1- #1

/0

1- #1

/0

200/3 (150A)

(A23)

Ex

Ex

Ex Ex

2 2

1 1 1 1 1 1

Ex

Ex Ex

Ex Ex

Ex

Ex

Ex

ExEx

Ex Ex

SPD

M

SPD

SPD

ExEx

100/3 (100A)

100/3 (100A)

200/3 (150A)

200/3 (200A)

100/3 (100A)

100/3 400/3 (400A)

400/3 (400A)

200/3 (200A)

200/3 (200A)

200/3 (200A)

200/3 (200A)

200/3 (200A)

100/3 (100A)

100/3 (100A)

400/3 (400A)

200/3200/3400/3300/3300/3300/3300/3300/3

225/3 150/3 35/3 150/3

800/3 600/3 800/3 800/3 800/3 400/3 600/3 600/3 800/3

600/3 400/3 600/3 400/3 800/3 600/3 600/3 300/3

400/3250/3

(125A)

(600A)

200 200

100/3 (100A)

100/3 (90A)

100/3 (100A)

100/3 (100A)

100/3 (100A)

100/3 (60A)

100/3 (100A)

100/3 (100A)

100/3 (100A)

100/3 (100A)

100/3 (100A)

400/3 (400A)

400/3 (400A)

100/3 (100A)

200/3 (200A)

200/3 (200A)

Ex

Ex Ex

Ex Ex

TO

"US-1A"

TO ATS

(1E3, 1E4, 1E8)

TO

ATS

(9, 10, 11, 12, SURG SUITE)

TO

ATS

(1E5, 1E6, 1E7)

TO

"US-1B"

TO ATS

(1E2, 1E9, 16, 17)

TYP.

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1819 20

SPARE SPARE

19.5KAIC

2-350 KCMIL

1-#4/0

TO

"US-1C"

2 4 5 7 8 9 10 11 1231 6

36,411AIC

TEMP. DIST. PANEL

1200A, 208Y/120V-3PH-4W

2 3 4 5 6 7

1200A/3P

600/3

480V

300KVA

208Y/120V

TEMP. XFMR

7 7

3 4 21 5

S P

A R

E

20.7KAIC

1 3 4 5 6 2

14.2KAIC

4 5 6 7 8 9 10 3

SPD

21 11 12 13 14 15 16 17 18 19 20

13.3KAIC

7 7

SPARE

0A

TO ATS SURG.

TO NEW ATS-1 (MCC-E/F)

7#1 /0

2-350 KCMIL

0A

0A

0A

0A

0A

5A

64 65

73 75

0A

MULTI-STACK

0A

EX. QUANTITY 2

PULL BOX

1C1L

2-350KCMIL

2-

K

C M

IL

This Document was originally issued by Gary S. Eodice on March 11, 2016.

This document is not considered a sealed document.

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in fo ot on e-qu ar te r in fo ot th re e-ei gh th s fo ot on e-ha lf in fo ot th re e-qu ar fo ot on e in fo ot on e an d on e-ha lf in fo ot th re e in ch fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

XX

HEAPY PROJECT No.: 2014-04022 FIRM LICENSE No.: 01528

/1

/2

:5

:0

A

M

CORRECT ELECTRICAL FCA

DEFICIENCIES

1/7/16

SINGLE LINE DIAGRAM

1E601

SCMSG

539-15-104

Cincinnati, Ohio

SCALE: NONE

SINGLE-LINE DIAGRAM

CROSS HATCHED PANEL INDICATES TO REMOVE ANTIQUATED PANELBOARD INTERIOR

(COVER,BUSSING, BREAKERS, ETC.) AND REPLACE WITH NEW. PROVIDE NEW

NAMEPLATE. CLEAN AND REMOVE ANY RUST/CORROSION FROM PANEL TUB. RE-

TERMINATE ALL EXISTING BRANCH CIRCUITS AND FEEDERS TO REMAIN TO NEW

INTERIOR. EXISTING CIRCUIT NUMBERS SHALL MATCH NEW. INTERCEPT AND EXTEND

CONDUCTORS AS REQUIRED TO MAKE CONNECTION TO NEW BREAKERS/LUGS. PRIOR

TO SUBMITTING SHOP DRAWINGS AND AGAIN BEFORE ORDERING NEW PANEL INTERIOR

AND CUSTOM COVER, REMOVE EVERY EXISTING PANELBOARD COVER, FIELD MEASURE

EXACT TUB/FEEDER DIMENSIONS, AND VERIFY BREAKERS. RE-INSTALL COVER WHEN

FINISHED MEASURING. PROVIDE CUSTOM INTERIOR AND COVER TO FIT TUB. NO

ALLOWANCES WILL BE MADE FOR FAILURE TO DO SO. REFER TO SEQUENCE OF

CONSTRUCTION NOTES FOR MAXIMUM OUTAGE DURATION. CONTRACTOR SHALL

PROVIDE TEMPORARY POWER TO THIS PANELBOARD UPON FAILURE TO COMPLY WITH

MAXIMUM OUTAGE DURATION DUE TO INADEQUATE PREPARATION/SITE INVESTIGATION.

DIMENSIONS LISTED ARE APPROXIMATE.

EX EXISTING NEWER PANEL TO REMAIN.

SYMBOLS

NOTES

1. RUN CT LEADS TO JCI METER CABINET. PROVIDE ALL SHORTING BLOCKS,

PROGRAMMING/TESTING AND HARDWARE REQUIRED.

2. SPLICE FEEDER IN SUB-BASEMENT AND EXTEND TO NEW SOURCE.

3. VERIFY IF PANEL / LOAD EXISTS AND REPLACE IF ANTIQUATED. INCLUDE PANEL

REPLACEMENT IN BID. LOCATE ON AS-BUILTS.

4. TRACE LOAD AND LOCATE ON AS-BUILTS.

5. PROVIDE BACNET OUTPUT ON METER AND TIE INTO JCI SYSTEM.

6. REMOVE TEMPORARY FEEDER IN A23, INTERCEPT AND EXTEND TO NEW BREAKER

IN US-1X. REFER TO 1EP104 FOR FEEDER SIZE.

7. SPLICE FEEDER IN ELECTRIC ROOM.

8. SPLICE FEEDER IN EXISTING / MODIFIED PULLBOX.

9. RUN 2 SETS OF (3-350KCMIL, #1 GRD. IN 3"C.).

10. UTILIZE NEW GDE DRY TYPE TRANSFORMER (BEFORE PERMANENT INSTALLATION)

AS TEMPORARY TO PERMIT REPLACEMENT OF US-1C/D. REMOVE AT COMPLETION

OF REPLACEMENT.

11. PROVIDE NEW 480V-600A/3P BREAKER IN GE UNIT SUBSTATION.

12. RUN 3 SETS OF (4-600KCMIL, #3/0 GEC. IN 4"C.).

13. RUN TEMPORARY FEEDERS FROM A23 ELECTRIC ROOM TO NEW SPLICE BOX IN

SUB-BASEMENT FOR TEMPORARY POWER TO US-1C/D LOADS. SIZE BREAKERS FOR

EXISTING FEEDER ACTUAL LOADS (PEAK TOTAL LOAD ON US-1C/D IS 300KVA EACH).

ONE FEEDER IN US-1C SHALL BE TEMPORARIED FROM US-1D SPARE BREAKER AND

VICE-VERSA TO PERMIT 300KVA DRY TYPE TO CARRY THE LOAD.

14. DELETE THIS WORK UNDER BID ITEM # 3.

15. DELETE THIS WORK UNDER BID ITEM # 4.

GENERAL NOTES

A. REFER TO SEQUENCE OF CONSTRUCTION NOTES FOR PHASING / TEMPORARY

REQUIREMENTS.

B. FAULT CURRENT VALUES SHOWN FROM VA PROVIDED SHORT CIRCUIT STUDY.

VERIFY ALL PRIOR TO ORDERING.

C. REMOVE EXISTING AND PROVIDE NEW PHENOLIC NAMEPLATES (PER

SPECIFICATIONS) FOR ALL EQUIPMENT SHOWN ON THIS SINGLE LINE DIAGRAM.

D. REFER TO 1E600 FOR FAULT CURRENT SCHEDULE.

E. LIGHT LINEWEIGHT INDICATES EXISTING EQUIPMENT.

DARK LINEWEIGHT INDICATES NEW EQUIPMENT.

DARK DASHED LINEWEIGHT INDICATES EQUIPMENT TO BE REMOVED.

1 BULLETIN 3 REV 2 01-17-2018

EN

EN

EN

G G

EN EN EN

EN

EN

EN

ENEN

EN EN EN

EN

EN

E N

E N

EN

E N

ENEN

EXIST. DISTRIBUTION PANEL "ESB"

2000A, 208Y/120V-3PH-4W

EMERGENCY POWER BRANCH

800A

ATS

"1E7" 800A

EQUIPMENT

BRANCH

300A 200A 200A 400A

PSBE

PNL

E4A

PNL

MCP-E

PNL

P1

PNL

P2

4TH FLR

UPS

600A

ATS

"1E6" 600A

EQUIPMENT

BRANCH

ATS

"1E4" 400A

EQUIPMENT

BRANCH

PPNL

EL2

ELEVATORS

1 # 2

ATS

"1E3" 600A

CRITICAL

BRANCH

EXIST. DIST. SWBD "IE3"

600A, 208Y/120V-3PH-4W, 65 KAIC

C3E

C4E

C2E

C1E

C3B

C4B

C2B

C1B

200A 200A 200A 200A

C6B2

C7B

150A 200A

CBB

C5B

MEDICAL

AIR

CBE EG

C3K1

C6B

C8B

C9B

C1E

ATS

"1E8" 200A

400A

TO ATS

"1E15"

BLDG 15

200A (100A)

JOCKEY

PUMP

2000A

NEW DIST. PANEL "CDP"

600A, 208Y/120V-3PH-4W (RM. A23)

CRITICAL POWER BRANCH

100/3

CBC

300/3200/3200/3200/3

C4C

C1C

C2C

C3C

C8C

C7C

C6C

C5C

C9C

CBD

200/3

C4D

C1D

C2D

C3D

C8D

C7D

C6D

C5D

C9D

PBX

200/3

DIST. PNL "LSDP"

400A, 208Y/120V-3PH-4W (RM. A23)

LIFE SAFETY BRANCH

LSAB

LSA4

LSA1

LSA2

LSA3

LSA8

LSA7

LSA6

LSA5

LSA10

LSA1A

LSA9

EX. DIST. SWBD "IE7"

800A, 208Y/120V-3PH-4W, 65 KAIC

XXXA

GENERATOR PARALLELING SWITCHGEAR

5000A, 208Y/120V-3PH-4W

2500/3 2000/3

CONNECTION

TO LOAD

BANK / TRAILER

GENSET

SPARE

TGEN #1

750 KVA

480/208Y/120V, 3P,4W

1000/3 2500/3 400/3 1600/3 2500/3

1500KW

GENSET

480Y/277V

3PH, 4W

RM. B13

ATS-14

"1E1"

400A LIFE

SAFETY

BRANCH

RM. A23

800A 200A

480V

300KVA

208Y/120V

ATS-16

"1E2" 600A

CRITICAL

BRANCH

ATS-17

"1E9" 225A

EQUIPMENT

BRANCH

RM. A23

250A

1500KW

GENSET

480Y/277V

3PH, 4W

RM. B13

NONCNCNONCNCNO

BASEMENT

DIST. SWBD "GDE" - DEMO

1000A, 208Y/120V-3PH-4W, RM A23

EXIST. DIST. SWBD "ESWB"

1600A, 480Y/277V-3PH-4W

ATS-12

250A

ATS-11

600A

EQUIP.

BRANCH

600A

EX. DIST. SWBD "ESWB-40"

600A, 480Y/277V-3PH-4W, 35 KAIC

200A 400A 200A 150A125A 200A

X2A

X3A

OR

C1F

ER

ELEV

C1FA

ATS-10

400A

CRITICAL

BRANCH

400A

EX. DIST. SWBD "ESWB-20"

400A, 480Y/277V-3PH-4W, 35 KAIC

250A 100A 50A 200A60A 200A

C1A

CR2A CR2A1C2B

C3B

C2C C2A

C3A

ATS-9

200A

LIFE SAFETY

BRANCH

200A

EX. DIST. SWBD "ESWB-10"

200A, 480Y/277V-3PH-4W, 35 KAIC

50A 100A 100A20A 100A

LS2A

LS3A

LS2B

LS3B

S3B

SICU

XFMR

LS2C

LS3C

300A

ATS-SURG SUITE

200A

LIFE SAFETY

BRANCH

200A250A

ATS-2

MCC-F

ATS-1

MCC-E

SEVENTH FLOOR

EIGHTH FLOOR

NINTH FLOOR

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

FIFTH FLOOR

SIXTH FLOOR

FOURTH FLOOR

TENTH FLOOR

400A

ELEVENTH FLOOR

PPNL

EL3

ELEVATORS

5 & 6

400A

PPNL

EL1

ELEVATORS

3 & 4

ATS

"1E5" 400A

EQUIPMENT

BRANCH

400A

SUB BASEMENT

C5C2

15 KVA

E4A

(4TH P.H.)EP4AEP4B

TB

9KVA

CR3A

CR2B

T2 T1

40A

3CEC1

C3E

TA

30KVA

3CEC2

40A

BEC1

ELEV.

ELEV

"E-16"

ELEV.

ELEV

"E-15"

LSA10A

M A

T C

H L

IN

E

1-500

1-500 KCMIL

25 HP

FIRE PUMP

ATS

ELEV.

P-17

2-

K

C M

IL

2-

K

C M

IL

1-

K

C M

IL

2-

K

C M

IL

2-

K

C M

IL

1-

K

C M

IL

1- #4

/0

1- #4

/0

1-#4/0

1-

K

C M

IL

EQUIPMENT

2-500 KCMIL

1- #4

/0

3-

K

C M

IL

2-

K

C M

IL

2-

K

C M

IL

2-

K

C M

IL

1-

K

C M

IL

1-

K

C M

IL

2-

K

C M

IL

1-#2

C2E1

1- #4

/0

1- #4

/0

1- #4

/0

1-

K

C M

IL

2-

K

C M

IL

CRITICAL POWER BRANCH

1- #2

1- #3

/0

1- #4

/0

1-

K

C M

IL

2-

K

C M

IL

1- #4

/0

480V

300KVA

208Y/120V K = 4

TO

C

D P

(I

M A

G

IN

G

NEW DIST. SWBD "GDE"

1000A, 208Y/120V-3PH-4W, RM A23

DIST. PANEL "CDP" - DEMO

600A, 208Y/120V-3PH-4W (RM. A23)

CRITICAL POWER BRANCH

(280AT) (560AT) (140AT)

1-500KCMIL

1-500KCMIL

2-350KCMIL

2-350KCMIL

1- #4

/0 1-

#4 /0

PBX

LIEBERT

CBT

TO

L

D P

F

IM

A

G

IN

G

1- #4

/0

1- #4

/0

1- #4

/0

1- #4

/0

1- #4

/0

1- #4

/0

1- #2

1- #4

/0

C6C1 C6D1

1-#21-#2

CR3E CR3C

1-#4

1-#6

30 KVA

C3C C3D

1- #4

/0

1-

K

C M

IL

1- #2

1- #2

1- #8

1- #2

1-

K

C M

IL

2-

K

C M

IL

1-

K

C M

IL

1- #4

/0

1- #4

/0

1-

K

C M

IL

1-

K

C M

IL

1-

K

C M

IL

MCC-E

1-

K

C M

IL

1-350 KCMIL

MCC-F

1- #2

1-250 KCMIL

1-#2

EQUIP. BRANCH CRITICAL LIFE SAFETY

1- #1

/0

1- #4

/0

1-

K

C M

IL

1- #3

/0

1- #2

1- #4

/0

1- #4

/0

50A

1CEC4

(C176)

50A

2CEC1

1- #6

1- #6

1- #6

1- #4

S3A

15 KVA

1-#10

1-#81-#8

T2CEC1

CR3D

1-#4 1-#4

30 KVA

TC

R

3D

CR3B

15 KVA

1-#10

1-#8

1-#4 1-#6

CR2C2 TCR2C1

30 KVA

1-#4 1-#8 1-#1 1-#4

45 KVA

CSB

2-

K

C M

IL

TO PANEL

M / O

BLDG 15

Ex

Ex Ex

Ex

Ex Ex

NEW

400A/4P

ATS-14

NEW

600A/4P

ATS-16

CRITICAL

NEW

225A/4P

ATS-17

C5B1

Ex

Ex

Ex Ex

Ex

Ex

Ex

Ex

Ex

Ex

Ex

Ex Ex

200/3

TO

C

D P

F

IM

A

G

IN

G

70A

45KVA

CR3FCR3G

1- #2

/0 1-

#4

400A

TO ATS ESWB-F-3

(IMAGING)

IN C008

(BLDG 1)

C1F2

Ex

1-#6

C2F

C2F1

Ex

Ex

BCEC1

XFMR

BC

30KVA

1- #6

1-#6

1CEC3

1EC3 1EC1 1EC2 1EB1

1CEC4

(C109)

1-#4

Ex Ex

Ex

Ex

Ex Ex Ex

SDP

1-#6

1-#6

ExEx

Ex Ex Ex Ex

200A

600A

200/3 200/3 200/3 30/3 200/3

TO

"US-1A"

TO

"DS-1A", "DS-1P",

"DS-1X"

TO

"US-1B"

TO

"US-1D"

Ex

Ex

Ex Ex Ex

Ex

TO BLDG

15 / 16

ATS

30KVA

E3C

Ex

ExEx

CR2C1

TO

"DS-1A"

TO

"US-1C"

1345 6

SPARE

SPD

SWBD

METERING

1-

K

C M

IL

2-

K

C M

IL

2 3 4 5 6 7 8 9 10 111 12

SPARE

1-

K

C M

IL

1-

K

C M

IL

14…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .