Attachment III - Electric Drawings.pdf
PDF 18 MB Posted
- Solicitation number
- 36C25022Q0250
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25022Q0250 0003.pdf | ||
| 36C25022Q0250 0002.pdf | ||
| 36C25022Q0250 0001.docx | DOCX document | |
| Attachment II - SCA WD.pdf | ||
| Attachment I - SOW.pdf | ||
| 36C25022Q0250.pdf | ||
| Attachment IV - VHA Supplemental Contract Requirements for Combatting COVID-19.pdf | ||
| 36C25022Q0250.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EX.
TRAILER
(TYP.)
P E R G O L A
FUT. BLDG. 14
BLDG. 15
BLDG. 16
BLDG. 8
BLDG. 13
NOT
VA
PROPERTY
BUILDING 1
BUILDING 2
BUILDING 3
PARKING
GARAGE
This Document was originally issued by Gary S. Eodice on March 11, 2016.
This document is not considered a sealed document.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of on e-ei gh th in ch on e fo ot on e-qu ar te r e fo ot th re e-ei gh th s e fo ot on e-ha lf e fo ot th re e-qu ar te rs e fo ot on e e fo ot on e an d on e-ha lf in ch es on e fo ot th re e in ch es on e fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
XX
Department of Veterans Affairs Medical Center
HEAPY ENGINEERING
MECHANICAL ELECTRICAL COMMISSIONING TECHNOLOGY
1400 WEST DOROTHY LANE
DAYTON, OH 45409
937.224.0861 P
937.224.5777 F
HEAPY PROJECT No.: 2014-04022 FIRM LICENSE No.: 01528
APP ARCHITECTURE
615 WOODSIDE DRIVE
ENGLEWOOD, OH 45322
937.836.8898 P
937.832.3696 F
/1
/2
:5 :1
P
M
CORRECT ELECTRICAL FCA
DEFICIENCIES
1/7/16
COVER
G001
SCMSG
539-15-104
Cincinnati, Ohio
CORRECT ELECTRICAL FCA DEFICIENCIES
3200 VINE STREET CINCINNATI, OHIO 45220
SCALE: NONE
LOCATION MAPSCALE: NONE
KEY PLAN
INDEX OF DRAWINGS
Sheet Number Description
G001 COVER
CU100 SITE PLAN - OVERALL UTILITIES
1E500 SITE PHOTOGRAPHS
1E501 SITE PHOTOGRAPHS
1E502 ELECTRICAL EQUIPMENT ELEVATIONS (REMOVALS)
1E503 ELECTRICAL EQUIPMENT ELEVATIONS (NEW) AND SCHEDULES
1E600 SINGLE LINE DIAGRAM
1E601 SINGLE LINE DIAGRAM
1E602 SINGLE LINE DIAGRAM
1E603 SINGLE LINE DIAGRAM
1E701 PANELBOARD SCHEDULES
1E702 PANELBOARD SCHEDULES
1E703 PANELBOARD SCHEDULES
1E704 PANELBOARD SCHEDULES
1E705 PANELBOARD SCHEDULES
1E706 PANELBOARD SCHEDULES
1E707 PANELBOARD SCHEDULES
1E708 PANELBOARD SCHEDULES
1E709 PANELBOARD SCHEDULES
1E710 PANELBOARD SCHEDULES
1E711 PANELBOARD SCHEDULES
1E712 PANELBOARD SCHEDULES
1E713 PANELBOARD SCHEDULES
1E714 PANELBOARD SCHEDULES
1E715 PANELBOARD SCHEDULES
1E716 PANELBOARD SCHEDULES
1EP099 SUB-BASEMENT PLAN
1EP100 BASEMENT PLAN - NEW WORK
1EP101 FIRST FLOOR PLAN - NEW WORK
1EP102 SECOND FLOOR PLAN - NEW WORK
1EP103 THIRD FLOOR PLAN - NEW WORK
1EP104 FOURTH FLOOR PLAN - NEW WORK
1EP105 FIFTH FLOOR PLAN - NEW WORK
1EP106 SIXTH FLOOR PLAN - NEW WORK
1EP107 SEVENTH FLOOR PLAN - NEW WORK
1EP108 EIGHTH FLOOR PLAN - NEW WORK
1EP109 NINTH FLOOR PLAN - NEW WORK
1EP110 TENTH AND ELEVENTH FLOOR PLANS - NEW WORK
1EP400 ENLARGED FLOOR PLANS - REMOVAL & NEW WORK
1EP401 ENLARGED FLOOR PLANS - REMOVAL & NEW WORK
2E600 SINGLE LINE DIAGRAM
13E600 SINGLE LINE DIAGRAM
14E600 SINGLE LINE DIAGRAM
15E600 SINGLE LINE DIAGRAM
15E701 PANELBOARD SCHEDULES
15ED100 BASEMENT FLOOR PLAN - REMOVALS
15EP100 BASEMENT FLOOR PLAN - NEW WORK
15EP101 FIRST FLOOR PLAN - NEW WORK
15EP102 SECOND FLOOR PLAN - NEW WORK
15EP103 THIRD FLOOR PLAN - NEW WORK
15EP104 FOURTH FLOOR PLAN - NEW WORK
16EP100 FLOOR PLANS - NEW WORK
PGEP100 ROOF PLAN - NEW WORK
E500 DETAILS
GENERAL CONSTRUCTION NOTES
*PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE CONTRACTING OFFICER'S
REPRESENTATIVE.
1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE, INTERNATIONAL BUILDING CODES,AND OTHER CODES AS IDENTIFIED IN VHA PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF
VETERAN AFFAIRS, TECHNICAL INFORMATION LIBRARY WEBSITE.
2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST ARCHITECTURAL BARRIERS
ACT ACCESSIBILITY STANDARD (ABAAS) AND DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE
DESIGN GUIDEPG-18-13 WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS
TECHNICAL INFORMATION LIBRARY WEBSITE.
3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS
PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE.
4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH ADJACENT EXISTING
SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT ARE DAMAGED DURING THE COURSE OF
DEMOLITION OR NEW WORK.
5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF NEW WORK,
CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO REMAIN OR PROVIDE NEW
CONSTRUCTION TO MATCH EXISTING ADJACENT SURFACES TO REMAIN.
6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO
ORDERING, FABRICATING OR INSTALLING NEW MATERIALS.
7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO BE INSTALLED AS
PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE SPECIAL PROVISIONS TO INSTALL
EQUIPMENT THAT IS TOO LARGE TO FIT THROUGH FINISHED OPENINGS.
8. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL SYSTEMS WHICH COMPLY
WITH STATED CODES AND REGULATIONS. WHERE THE OMISSION OF A PART OR ELEMENT OF A
SYSTEM WOULD RESULT IN THE NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM,
CONTRACTOR SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.
9. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED WALLS SHALL BE SMOKE/FIRESTOPPED AS REQUIRED BY THE RATING OF THE WALL. WHERE CONDUIT IS REMOVED
THROUGH RATED WALLS, SMOKE/FIRESTOP PENETRATION.
10. FIRESTOP ALL FLOOR PENETRATIONS AT THE END OF EACH WORKING SHIFT SO PENETRATION IS
NOT LEFT OPEN OVERNIGHT.
PHASING:
PANELBOARD REPLACEMENT:
1. THE CONTRACTOR SHALL SURVEY ALL EXISTING PANELBOARDS TO BE REPLACED FOR DIMENSIONS, LOADS, BREAKER/FEEDER SIZES, CONDUCTOR LOCATIONS, ETC. AND ENSURE NEW PANEL/LUGS/COVER FITS WELL. ANY TUBS WHICH ARE TOO SMALL FOR NEW INTERIORS SHALL BE INDICATED AT SHOP DRAWING REVIEW WITH TWO PROPOSED SOLUTIONS (i.e. REDUCING BREAKERS, REDUCING AMPACITY, CHANGING TO BRANCH MOUNTED MAIN, ETC.). REVISIONS FOR FIT SHALL NOT BE GROUNDS FOR ADDITIONAL COST TO THE GOVERNMENT.
2. ROUGH-IN ALL NEW ELECTRIC CLOSET EQUIPMENT (PRIMARY/SECONDARY FEEDERS, ENCLOSED CIRCUIT BREAKERS, DISTRIBUTION FEEDERS, ETC. THAT
CAN BE CONSTRUCTED WITHOUT INTERRUPTING POWER.
3. ONE SYSTEM (NORMAL/CRITICAL/LIFE SAFETY) RISER AT A TIME, DE-ENERGIZE EQUIPMENT, REMOVE BUSSING, BREAKERS, COVER AND INSTALL NEW BUSSING, BREAKERS AND CUSTOM COVER. RETERMINATE ALL FEEDERS AND BRANCH CIRCUITS. WORK SHALL BE COMPLETED SO EQUIPMENT IS DE-
ENERGIZED FOR NO LONGER THAN 4 HOURS.
4. PROVIDE UL FIELD INSPECTION SERVICE AND LABEL FOR ALL RETROFITTED PANELBOARDS.
5. INCLUDE 10 ADDITIONAL 208V-225A, 42 CKT-20A/1P PANELBOARD RETROFITS (LABOR AND MATERIAL, PER CROSS HATCHED PANELBOARD ON SINGLE LINE
DIAGRAM) IN BID. LOCATION TO BE DETERMINED DURING CONSTRUCTION.
SHARED NEUTRAL SEPARATION:
1. THE CONTRACTOR SHALL SURVEY ALL EXISTING SPLICED NEUTRAL BOXES, DE-ENERGIZE AND SEPARATE THEM ONE BY ONE.
2. WORK SHALL BE COMPLETED SO EQUIPMENT IS DE-ENERGIZED FOR NO LONGER THAN 2 HOURS.
3. INCLUDE 20 ADDITIONAL SHARED NEUTRAL BOX SEPARATIONS (LABOR AND MATERIAL, PER PLAN NOTES) IN BID. LOCATION TO BE DETERMINED DURING
CONSTRUCTION. CONTRACTOR SHALL INCLUDE LABOR TO TRACE OUT AS MANY AS POSSIBLE.
UNIT SUBSTATION REPLACEMENT:
1. THE CONTRACTOR SHALL SURVEY THE EXISTING UNIT SUBSTATIONS, CONDUIT DROP LOCATIONS, OVERHEAD CLEARANCES, RIGGING REQUIRED AND
DOWNSTREAM LOADS.
2. ROUGH-IN ALL NEW CONDUIT THAT CAN BE INSTALLED.
3. PROVIDE NEW BREAKER IN US-1P (BREIFLY DE-ENERGIZE FOR INSTALLATION AND CABLE TERMINATION), INSTALL TEMPORARY 300KVA TRANSFORMER, DISTRIBUTION SWITCHBOARD AND TEMPORARY FEEDERS TO SPLICE LOCATIONS IN SUB-BASEMENT.
4. ONE UNIT SUBSTATION/ONE FEEDER AT A TIME, DE-ENERGIZE FEEDER, INSTALL SPLICE BOX IN SUB-BASEMENT, MAKE SPLICE TO TEMPORARY FEEDER
AND RE-ENERGIZE FROM TEMPORARY SOURCE UNTIL ALL FEEDERS FROM ONE UNIT SUBSTATION ARE ON TEMPORARY POWER. ONE LOAD FROM UNIT SUBSTATION SHALL BE TEMPORARIED FROM OTHER UNIT SUBSTATION SPARE BREAKER TO PERMIT 300KVA TRANSFORMER TO CARRY LOAD.
5. WORK SHALL BE COMPLETED SO EACH FEEDER IS DE-ENERGIZED FOR NO LONGER THAN 3 HOURS. UNIT SUBSTATION PROVIDING TEMPORARY POWER SHALL BE DE-ENERGIZED FOR NO LONGER THAN 1 HOUR (DISCONNECT BUS TIE IN US-1D DURING THIS OUTAGE).
6. ONCE UNIT SUBSTATION IS NOT SUPPLYING POWER TO LOADS, DE-ENERIZE AT PS-1 AND REMOVE ENTIRE LINEUP INCLUDING BUS TIE.
7. CORE DRILL FLOOR FOR NEW OPENINGS, ROUGH-IN CONDUITS/CONDUCTORS TO SPLICE LOCATIONS, CONNECT METERING EQUIPMENT AND INSTALL NEW
UNIT SUBSTATION.
8. DE-ENERGIZE PS1, MAKE PRIMARY TERMINATIONS (AND TEST CABLE) AND ENERGIZE UNIT SUBSTATION. WORK SHALL BE COMPLETED SO PS1 IS DE-
ENERGIZED FOR NO LONGER THAN 3 HOURS.
9. ONE FEEDER AT A TIME, CUTOVER TO NEW UNIT SUBSTATION SOURCE. WORK SHALL BE COMPLETED SO EACH FEEDER IS DE-ENERGIZED FOR NO LONGER
THAN 2 HOURS.
10. BUS TIE SHALL BE INSTALLED DURING ONE OF THE REQUIRED OUTAGES. SPLICE EXISTING FEEDERS THAT ARE TO BE REPLACED UNDER A FUTURE PHASE.
ROUGH-IN ANY WORK THAT WILL EXPEDITE THE TERMINATIONS FOR THE FUTURE PHASE.
11. REMOVE TEMPORARY FEEDERS AND DISTRIBUTION EQUIPMENT AND PATCH FLOOR PENETRATIONS.
DISTRIBUTION REPLACEMENTS:
DS-1P AND DS-1X:
1. SET NEW PANEL ADJACENT TO EXISTING. ROUGH-IN CONDUITS TO SPLICE LOCATIONS OVERHEAD.
2. ONE SWITCHBOARD AT A TIME, DE-ENERGIZE DS-1P/X, SPLICE ALL FEEDERS AND EXTEND TO NEW SWITCHBOARD.
3. WORK SHALL BE COMPLETED SO FEEDERS ARE DE-ENERGIZED FOR NO LONGER THAN 4 HOURS.
DS-1A AND DS-1B:
1. SET NEW PANEL ACROSS FROM/ADJACENT TO EXISTING. ROUGH-IN CONDUITS TO SPLICE LOCATIONS OVERHEAD.
2. ONE SWITCHBOARD AT A TIME, DE-ENERGIZE DS-1A/B, SPLICE ALL FEEDERS AND EXTEND TO NEW SWITCHBOARD.
3. WORK SHALL BE COMPLETED SO FEEDERS ARE DE-ENERGIZED FOR NO LONGER THAN 8 HOURS.
EMERGENCY DISTRIBUTION:
1. INSTALL ATS-14, ATS-16 AND ATS-17 AND ROUGH-IN NEW NORMAL/LOAD CONDUITS. INSTALL CONTROL WIRING TO GPG.
2. REROUTE DATA CENTER PB FEEDER (LIKELY SERVING E4A FROM 1E7) TO PERMIT INSTALLATION OF NEW TGDE. ROUGH-IN NEW CONDUITS. WORK SHALL
BE COMPLETED SO FEEDER IS DE-ENERGIZED FOR NO LONGER THAN 2 HOURS.
3. INSTALL TGDE, GDE AND EMERGENCY FEEDERS TO NEW ATS'S AND MAKE TERMINATIONS.
4. START EMERGENCY GENERATORS AND HOLD EXISTING ATS'S IN THE EMRGENCY POSITION. DE-ENERGIZE US-1C THEN US-1D AND MAKE ATS NORMAL
FEEDER TERMINATIONS. WORK SHALL BE COMPLETED SO UNIT SUBSTATIONS ARE DE-ENERGIZED FOR NO LONGER THAN 2 HOURS EACH.
5. DE-ENERGIZE LSDP AND E4A AND MAKE FINAL LOAD SIDE SPLICES TO NEW ATS'S. PROVIDE TEMPORARY LOAD SIDE FEEDER FROM ATS-16 TO CDP TO
PERMIT REMOVAL OF EXISTING ATS-16. MAKE FINAL SPLICE TO TGDE AND ENERGIZE GDE. WORK SHALL BE COMPLETED SO EQUIPMENT IS DE-ENERGIZED
FOR NO LONGER THAN 4 HOURS.
6. INSTALL NEW CDP AND CUTOVER SOURCE/SPLICED FEEDERS. WORK SHALL BE COMPLETED SO EQUIPMENT IS DE-ENERGIZED FOR NO LONGER THAN 4
HOURS.
7. INSTALL NEW ATS-SURGERY AND ALL NEW FEEDERS UP TO SPLICE LOCATIONS.
8. MAKE CUTOVERS OUTSIDE OF SURGERY OPERATING HOURS. WORK SHALL BE COMPLETED SO DS-1A IS DE-ENERGIZED FOR NO LONGER THAN 2 HOURS.
9. INSTALL NEW ATS-1 AND ALL NEW FEEDERS UP TO SPLICE LOCATIONS.
10. MAKE CUTOVERS OUTSIDE OF SURGERY OPERATING HOURS. WORK SHALL BE COMPLETED SO US-1P IS DE-ENERGIZED FOR NO LONGER THAN 2 HOURS.
BUILDING 15:
1. INSTALL NEW 15MDP, ATS'S, PANELBOARDS, ETC. AND ROUGH-IN ALL FEEDERS (INCLUDING TO ESB).
2. TERMINATE EM FEEDER TO ESB. PANEL ESB SHALL BE DISCONNECTED FROM GPG FOR NO LONGER THAN 2 HOURS.
3. START EMERGENCY GENERATORS AND DISCONNECT 15MDP. CUTOVER ALL EMERGENCY LOADS TO NEW EM DISTRIBUTION AND ENERGIZE ON GENERATOR
POWER. WORK SHALL BE COMPLETED SO EM EQUIPMENT IS DE-ENERGIZED FOR NO LONGER THAN 4 HOURS. CUTOVER 15MDP SOURCE AND ALL FEEDERS TO EXISTING LOADS. WORK SHALL BE COMPLETED SO NORMAL EQUIPMENT IS DE-ENERGIZED FOR NO LONGER THAN 8 HOURS.
4. PROVIDE TEMPORARY LOAD CENTER ON 1ST FLOOR IN VIVARIUM AND RECEPTACLES ON TEMPORARY CABLING TO POWER CAGE EXHAUST SYSTEMS
DURING ANY OUTAGE TO THIS AREA OVER 2 HOURS.
GENERAL NOTES:
A. CONTRACTOR SHALL THOROUGHLY STUDY DESIGN DRAWINGS AND ALL EXISTING CONDITIONS PRIOR TO STARTING PROPOSED SCHEDULE.
B. SEQUENCE OF CONSTRUCTION INDICATED BELOW IS ONE POSSIBLE SOLUTION TO MINIMIZE DOWNTIME OF THE BUILDING ELECTRICAL SYSTEM. CONTRACTOR IS
REQUIRED TO SUBMIT A DETAILED SEQUENCE OF CONSTRUCTION NARRATIVE TO THE COR/ENGINEER AT THE BEGINNING OF THE PROJECT INDICATING CUTOVER DATES, POWER OUTAGES/DURATION AND PROJECT MILESTONES. DEVIATIONS FROM THE FOLLOWING PROPOSED SEQUENCE OF CONSTRUCTION WILL BE REVIEWED, BUT WILL
NOT BE GROUNDS FOR ADDITIONAL COST TO THE GOVERNMENT.
C. ALL CUTOVER WORK REQUIRING BUILDING ELECTRICAL SYSTEM OUTAGES AND/OR EMERGENCY SYSTEM DOWNTIME SHALL BE DONE OUTSIDE OF NORMAL WORKING HOURS (7AM-7PM MONDAY-FRIDAY). OUTAGES OF ALL TYPES SHALL BE AS MINIMAL AS POSSIBLE.
D. THE PHASE DESCRIPTIONS INDICATE A GENERAL FLOW OF WORK AND ARE NOT INTENDED TO CONVEY INSTRUCTIONS FOR EVERY ASPECT OF THE CONSTRUCTION
PROJECT.
E. NO LIVE WORK WILL BE PERMITTED WITHOUT WRITTEN CONSENT OF THE MEDICAL CENTER LEADERSHIP. REQUESTS MUST BE SUBMITTED WITH CONTRACTOR'S SAFETY
PLAN AND PROOF OF ARC FLASH LEVEL/PPE REQUIRED.
F. PROVIDE COORDINATION DRAWINGS FOR ALL NEW EQUIPMENT AND CONDUITS 2" AND LARGER WITH PATHWAYS VERIFIED IN THE FIELD AND SIGNED OFF BY THE
CONTRACTOR.
G. STATION CONSISTS OF A FULLY FUNCTIONAL HOSPITAL/HEALTHCARE FACILITY OCCUPIED 24/7 WITH INPATIENT/OUTPATIENT CARE, SURGERY, PRE/POST-OP, PSHYCIATRIC, PHARMACY, WAREHOUSE, NURSING, SUBSTANCE ABUSE, RETAIL, CANTEEN, INTENSIVE CARE, DATA CENTER, IMAGING, PBX, KITCHEN, ETC. INCLUDE LABOR AND MATERIAL TO ACCOMMODATE PPE/ACCESS REQUIRED FOR WORK IN THESE VARIOUS SPACES. EXTENSIVE COORDINATION MUST OCCUR TO MINIMIZE
DISRUPTION AS MUCH AS POSSIBLE.
H. 21 DAYS BEFORE ANY OUTAGE, CONTRACTOR SHALL SET UP A MEETING WITH COR AND DEPARTMENT MANAGERS TO REVIEW WHICH LOADS WILL BE TAKEN DOWN, WHICH LOADS WILL REMAIN ON AND OUTAGE START/END TIME. EACH DEPARTMENT MUST BE BREIFLY SURVEYED TO DETERMINE OVERALL IMPACT OF OUTAGE AND
EXPLAINED TO COR AND MANAGERS.
SEQUENCE OF CONSTRUCTION
Revisions Date
HVAC
HVAC
HVAC
HVAC
HVAC
MW
MW MW
MW MW
MW
E
T
T
S
D
D S
S
BP
BP
PE
E E
BPBP
EE
E
E
BP
E
BP
E
E
E
E
E
E
BP
E
E
BP
BP
BP
E
BP
BP
BP
BP
BP
BP
BP E
E
E
E
E E
BP
BP
BP
E
BP
BP
BP
BP
BP
BP
BP
E
BP
BP
GF
GF
GF
GF
GF
GF
GF
GFGF
GF
GF
S
S
S
S
S
S
S
S
S S
S
S S
S
SS
S
S
S S
S
S
S
S
SS
T
T
T
T
T
T
T
T
T
T
PIV
WV
W
WV
WV
WV
WV
W
PIV
PIV
WV
WV
WV
WVWV
WV
WV
WV
PIV
WV
WV
WV
WV
WV
WV
WV
WV
WV
WVWV
wsv
WV
WV
PIV
WV
WV
WV
WV
PIV
WV
WV
WV
WV
WV
wsv wsv wsvwsv
44150
46743
4662346445
46426
46015
45528 45526
45519
45111
44529
44436
44433
44360 44359
44296
44169
44155
44145
44051
43877
43870
43792
43787
43780
43776
43649
43543
43303
43067
42976
42816
42716
42715
42658
42484
42483
42121
42057
41834
41637
41612
41549
41243
41208
41206
41076
41075
41058 41023
15" CMP: 739.17
15" CMP: 740.87
46744
46741
46170
45527
45243
44568 44530
44440
44297
42979
42971
42943
42941
42669
42235
41927
8"
10"
10"
10"
10"
8"
6"
10"
8"
10"
30" 18"
16"
2"
4"
24"
24"
18" 10" 3
10"
8"
4"
8"
4"
6"
24"
8"
30"
4"
4"
14"
8"
6"
18"
6"
8"
8"
8"
4"
6" 2"
2" 6"
2"
2"2" 2"
2" 2"
2"
2"
2" 2"
2"
2"
2"
2"
2"
2"
6" 4"
2"
2"
2"
2"
2"
2"
2"
8"
2"
2"
2"
2"
14"
2" 2"
24"
2"
2"
2"
2" 2"
2" 2"
2"
6"
6"
2"
2"
2"
2"
2"
2"
2"
2"
2"
2"
2"
2"
2"
18"
2"
4"
6"
8"
8"
10" 12"
12"
8"
8"
6"
6"
8"
8"
8"
8"
8"
8"
8"
8"
8"
12"
8"
8"
8"
CONSTRUCTION
AREA
E
SHIELDS
ST
PUBLIC
R/W
V
IN
E S
T P
U B
L
IC
R /W
GOODMAN
DRPUBLICR/W
SKYWALK
TO
GARAGE
OXYGEN
TANKS
UNDERGROUND
STORMWATER
DETENTION
TBM #1 -
BOLT ON FIRE
HYDRANT
PAINTED BLACK
ELEVATION:
721.68
TBM #2 - BOLT ON
FIRE
HYDRANT PAINTED
BLACK
ELEVATION: 728.59
BUILDING 1
149,339 SQ.FT.
(BY EXTERIOR DIMENSIONS)
FFE = 726.97
(EXCEPT AS OTHERWISE NOTED)
B U
IL
D
IN
G
S Q
F T
F F E
.6
(L
O W E R
F F E
.7
(U
P P E R
EX.
TRAILER
(TYP.)
BUILDING #8
12,319 SQ. FT.
FFE = 729.70
BUILDING 3
4506 SQ. FT.
FFE = 742.52
(NORTH)
FFE 732.91
(SOUTH)
PARKING
GARAGE
EX. GARAGE
320 SQ.FT.
FFE =
725.33
BUILDING 15
S H E L
TE
R H O U S E
P E R G O
LA
STAIR
TOWER
SMOKING
SHELTER
CANOPY
SMOKE
STACK
EX.
TRAILERS
(3)
SQ.
FT.
FFE
727.57
SMOKING
SHELTER
713 71
3 735
5 7
NOT VA PROPERTY
"TPG"
150KW GEN.
"T13D"
"T13C"
"T13B"
"T13A"
"T5"
"PPSU"
"US3"
"US2"
2.8MW GEN.
This Document was originally issued by Gary S. Eodice on March 11, 2016.
This document is not considered a sealed document.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of on e-ei gh th in e fo ot on e-qu ar te r in fo ot th re e-ei gh th s fo ot on e-ha lf in fo ot th re e-qu ar te rs fo ot on e in fo ot on e an d on e-ha lf in es fo ot th re e in ch fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
XX
HEAPY PROJECT No.: 2014-04022 FIRM LICENSE No.: 01528
/1
/2
:0
:4
A
M
CORRECT ELECTRICAL FCA
DEFICIENCIES
1/7/16
SITE PLAN - OVERALL UTILITIES
CU100
SCMSG
539-15-104
Cincinnati, Ohio
ALL
SCALE: 1" = 50'-0"
SITE PLAN
GENERAL NOTE
A. NO WORK ANTICIPATED. SHEET SHOWN FOR REFERENCE ONLY.
N
This Document was originally issued by Gary S. Eodice on March 11, 2016.
This document is not considered a sealed document.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of on e-ei gh th in fo ot on e-qu ar te r in fo ot th re e-ei gh th s fo ot on e-ha lf in fo ot th re e-qu ar fo ot on e in fo ot on e an d on e-ha lf in fo ot th re e in ch fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
XX
HEAPY PROJECT No.: 2014-04022 FIRM LICENSE No.: 01528
/1
/2
:5
:5
A
M
CORRECT ELECTRICAL FCA
DEFICIENCIES
1/7/16
SITE PHOTOGRAPHS
1E500
SCMSG
539-15-104
Cincinnati, Ohio
SCALE: NONE
SITE PHOTOGRAPH
1 SCALE: NONE
SITE PHOTOGRAPH
2 SCALE: NONE
SITE PHOTOGRAPH
3 SCALE: NONE
SITE PHOTOGRAPH
4 SCALE: NONE
SITE PHOTOGRAPH
5 SCALE: NONE
SITE PHOTOGRAPH
SCALE: NONE
SITE PHOTOGRAPH
SCALE: NONE
SITE PHOTOGRAPH
SCALE: NONE
SITE PHOTOGRAPH
SCALE: NONE
SITE PHOTOGRAPH
SCALE: NONE
SITE PHOTOGRAPH
SCALE: NONE
SITE PHOTOGRAPH
SCALE: NONE
SITE PHOTOGRAPH
13 SCALE: NONE
SITE PHOTOGRAPH
14 SCALE: NONE
SITE PHOTOGRAPH
15 SCALE: NONE
SITE PHOTOGRAPH
16 SCALE: NONE
SITE PHOTOGRAPH
17 SCALE: NONE
SITE PHOTOGRAPH
SCALE: NONE
SITE PHOTOGRAPH
SCALE: NONE
SITE PHOTOGRAPH
SCALE: NONE
SITE PHOTOGRAPH
SCALE: NONE
SITE PHOTOGRAPH
SCALE: NONE
SITE PHOTOGRAPH
SCALE: NONE
SITE PHOTOGRAPH
Gary S. Eodice on March 11, 2016.
This document is not considered a sealed document.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of on e-ei gh th in fo ot on e-qu ar te r in fo ot th re e-ei gh th s fo ot on e-ha lf in fo ot th re e-qu ar fo ot on e in fo ot on e an d on e-ha lf in fo ot th re e in ch fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
XX
HEAPY PROJECT No.: 2014-04022 FIRM LICENSE No.: 01528
/1
/2
:5
:5
A
M
CORRECT ELECTRICAL FCA
DEFICIENCIES
1/7/16
SITE PHOTOGRAPHS
1E501
SCMSG
539-15-104
Cincinnati, Ohio
SCALE: NONE
SITE PHOTOGRAPH
SCALE: NONE
SITE PHOTOGRAPH
SCALE: NONE
SITE PHOTOGRAPH
SCALE: NONE
SITE PHOTOGRAPH
SCALE: NONE
SITE PHOTOGRAPH
SCALE: NONE
SITE PHOTOGRAPH
SCALE: 12" = 1'-0"
SITE PHOTOGRAPH
SCALE: 12" = 1'-0"
SITE PHOTOGRAPH
SPC
PULL/MLO
SPC
M.S.
800A BPS
NEW MCC
400A
BUS BKR
400A
1A1L 100A
BC1L
100A
1C1L 100A
L2A/L3A 100A
BUS BKR
400A
BL1
100A
1C2L 100A
1C3L 100A
L2B/L3B 100A
L2C/L3C 100A
SIEMENS MCC
400A
ESWB-20
400A
ESWB-10
200A
ATS-SURG 55
200A
SPR
100A
2C1L 100A
ATS ELEV
P10 100A
S1CV PNL L3D
100A
SPR
30A
P-ELEV-18
60A
SPC
PPV-OPS
100A
PULL PULLTRACE
100A
BC1P
100A
1B1P 200A
1A1P 200A
M.S. 800A BPS
1C1P
200A (150AF)
1C2P
200A (150AF)
1C3P
200A (150AF)
DPF
400A
1C4P 100A
SPARE
100A (OFF)
RM
2DP
400A
3DP
200A
1C5P 1C6P 200A
SPC
S1CU R3D, R3E
200A
2C5P/2C6P 200A
BCP2/3
200A
3C5P/3C6P 200A
V A
ESWB-50
400A (250AF)
MCC/MCCD
400A 400AF
KWH
SPARE
200A
SPARE
200A
OFF
PET CT
200A
EDPEQ
600A
SPC
SPC
X-RAY
ESWB-40
600A
2ND-3RD
SPC
DS-1B
600A
SPR
600A
DPLF
800A
(IMAGING)
SPR
800A
ATS-1E2
600A
MCC
MCP
PNL
10A1 400A
DPD
800A
ATS-1E9
600A
KW VA
NP.
MB
PRI.
TERM
750 KVA
MINERAL OIL
FILLED TRANSFORMER
RACK
AHU 23
OFF
NORMAL
FEED TO
MCCE ATS
1-EF18
1-EF3
1-RF1
LUGS
1-EF17
AHU 22
MB MB
ATS-2
(100 A)
ATS-1
(400A)
AHU 25
SUPPLY
1-EF13
SPARE
1-EF19
RETURN
ACRCU-1
ACRCU-2
CHILLER
SPC
SPC
MAIN
LUGS
SPC
SPC
P3 CWP
EF14
AHU 32 (SF)
1-RF1
AIR COOLED
COND. UNIT
ACCU1
NORM FEED
TO MCCF
1-RF2 1-EF11 1-CU2
XFMR T10
TO E4A
AHU 24 (SF)
1-EF8
1-EF7
1-EF10
NUC.MED
HOOD C217
CB1
CHILLER OFF
CONTROL
AIR COMP.
HW PUMP P2
HW PUMP P1
ONLY
ONLY
MCCEMCCF
MCCG
SPC
RACK TROLLEY
CANTEEN
DIST. PNL
1KA
400A
CANTEEN
1KC/1KD
800A
CANTEEN
1 KE
800A
DPA
800A
DPC
800A
ATS
1E1
400A
TIE
BKR
BUS
MB
A VWH
PRI.
TERM
750 KVA
MINERAL OIL
FILLED TRANSFORMER
This Document was originally issued by Gary S. Eodice on March 11, 2016.
This document is not considered a sealed document.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of on e-ei gh th in fo ot on e-qu ar te r in fo ot th re e-ei gh th s fo ot on e-ha lf in fo ot th re e-qu ar fo ot on e in fo ot on e an d on e-ha lf in fo ot th re e in ch fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
XX
HEAPY PROJECT No.: 2014-04022 FIRM LICENSE No.: 01528
/1
/2
:5
:5
A
M
CORRECT ELECTRICAL FCA
DEFICIENCIES
1/7/16
ELECTRICAL EQUIPMENT
ELEVATIONS (REMOVALS)
1E502
SCMSG
539-15-104
Cincinnati, Ohio
SCALE: 3/8" = 1'-0"
DS-1A, 1A1, 1A2 (REMOVALS)
SCALE: 3/8" = 1'-0"
DS-1B (REMOVALS)
SCALE: 3/8" = 1'-0"
DS-1P (REMOVALS)
SCALE: 3/8" = 1'-0"
DS-1X (REMOVALS)
SCALE: 3/8" = 1'-0"
US-1D (REMOVALS)
SCALE: 3/8" = 1'-0"
MCC-D
SCALE: 3/8" = 1'-0"
MCCE/F/G
SCALE: 3/8" = 1'-0"
US-1C (REMOVALS)
SPC
SPCSPD
36" 36"
SPC
MB
20SPD
36" 36"
MB
SPC
36"
10 11
SPACE
SPD
SPD
36"
SPC
3 6
SPC
36"
SPD
45"
PS
PS
SPACE
RBL CTS
34812
9 5 1
10 6
PREP
SPACE
PREP
SPACE
PREP
SPACE
SPACE
12,470V
750KVA XFMR
LIQUID TYPE
(LESS-FLAM.
SEED BASED)
208Y/120V-3PH-4W
AIR
TERMINAL
110" 60" 18"
BUS
TRANSITION
3 5 9 4
8 12
PREP
SPACE
PREP
SPACE
PREP
SPACE
SPACE
AIR
TERMINAL
110"60"18"
BUS
TRANSITION
12,470V
750KVA XFMR
LIQUID TYPE
(LESS-FLAM.
SEED BASED)
208Y/120V-3PH-4W
This Document was originally issued by Gary S. Eodice on March 11, 2016.
This document is not considered a sealed document.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of on e-ei gh th in fo ot on e-qu ar te r in fo ot th re e-ei gh th s fo ot on e-ha lf in fo ot th re e-qu ar fo ot on e in fo ot on e an d on e-ha lf in fo ot th re e in ch fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
XX
HEAPY PROJECT No.: 2014-04022 FIRM LICENSE No.: 01528
/1
/2
:5
:0
A
M
CORRECT ELECTRICAL FCA
DEFICIENCIES
1/7/16
ELECTRICAL EQUIPMENT
ELEVATIONS (NEW) AND
SCHEDULES
1E503
SCMSG
539-15-104
Cincinnati, Ohio
0.00 kVA
TOTAL CONNECTED ESTIMATED DEMAND
NOTES:
12 Spare 0.00 kVA -- 3 100 A -- -- -- -- -- --
11 SPD 0.00 kVA 30 A 3 30 A TM
10 PBX LIEBERT 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25
9 CBT 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5
8 CDP3 (IMAGING) 0.00 kVA 300 A 3 300 A TM 2 SETS OF 4 250 3 2.5
7 CDPF (IMAGING) 0.00 kVA 200 A 3 200 A TM 4 350 4 3
6 PBX 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25
5 C5D RISER 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5
4 CBD RISER 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5
3 C5C RISER 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5
2 CBC RISER 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5
1 MAIN LUGS 0.00 kVA 0 A 3 0 A
CKT CIRCUIT DESCRIPTION
APPROX.
CONNECTED
LOAD
FRAME
SIZE POLES
TRIP
SETTING
BREAKER
TYPE
NUMBER OF
CONDUCTORS
WIRE
SIZE
GROUND
SIZE
CONDUIT
SIZE
SEE
NOTE
Feeder Size: REFER TO US-1D Spec. Ref. #: 26 24 13 Voltage: 120/208 Wye-3PH-4W Mains Rating: 600 A
Supply From: Enclosure: Mains Type:
Location: Mounting: A.I.C. Rating:
DISTRIBUTION PANEL: CDP
0.00 kVA
TOTAL CONNECTED ESTIMATED DEMAND
NOTES:
21 Spare 0.00 kVA -- 3 200 A -- -- -- -- -- --
20 BCIL 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25
19 1A1L 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25
18 MCC (EAST) 0.00 kVA 400 A 3 400 A TM 4 500 3 4
17 MCC (NORTH) 0.00 kVA 400 A 3 400 A TM 4 500 3 4
16 L2C / L3C 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25
15 L2B / L3B 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25
14 1C3L 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25
13 1C2L / 1C5L 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25
12 BL1 / BR1 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25
11 P-ELEV-16 0.00 kVA 60 A 3 60 A TM 3 1 8 1.5
10 Spare 0.00 kVA -- 3 100 A -- -- -- -- -- --
9 FLUORO (C3042) 0.00 kVA 100 A 3 100 A TM 4 350 350 4
8 L3D 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25
7 L2A / L3A 0.00 kVA 90 A 3 90 A TM 4 2 8 1.25
6 ATS-10 / ESWB-20 0.00 kVA 400 A 3 400 A TM 4 500 3 4
5 2CIL 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25
4 ATS-9 / ESWB-10 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5
3 ATS-SURGERY 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5
2 SPD 0.00 kVA 30 A 3 30 A -
1 MAIN BREAKER 0.00 kVA 600 A 3 600 A LSI
CKT CIRCUIT DESCRIPTION Load
FRAME
SIZE POLES
TRIP
SETTING
BREAKER
TYPE
NUMBER OF
CONDUCTORS
WIRE
SIZE
GROUND
SIZE
CONDUIT
SIZE
SEE
NOTE
Feeder Size: 2 SETS OF (4-350 KCMIL, #1 GRD IN 3"C) Spec. Ref. #: 26 24 13 Voltage: 480/277 Wye-3PH-4W Mains Rating: 800 A
Supply From: Enclosure: Mains Type:
Location: Mounting: A.I.C. Rating:
DISTRIBUTION PANEL: DS-1A
0.00 kVA
TOTAL CONNECTED ESTIMATED DEMAND
NOTES:
20 Spare 0.00 kVA -- 3 100 A -- -- -- -- -- --
19 Spare 0.00 kVA -- 3 100 A -- -- -- -- -- --
18 2C5P / 2C6P 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5
17 1C5P / 1C6P 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5
16 R3D / R3E 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5
15 3C5P / 3C6P 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5
14 DP3 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2.5
13 DPF 0.00 kVA 400 A 3 400 A TM 4 500 3 4
12 DP2 0.00 kVA 400 A 3 400 A TM 4 500 3 4
11 1C4P 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25
10 1C3P 0.00 kVA 150 A 3 150 A TM 4 1/0 6 2
9 1C2P / 1C2PA / 1C2PB 0.00 kVA 150 A 3 150 A TM 4 1/0 6 2
8 BC2P / BC3P 0.00 kVA 200 A 3 200 A TM 4 4/0 4 2..5
7 1C1P / 1C1PA 0.00 kVA 150 A 3 150 A TM 4 1/0 6 2
6 BC1P 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25
5 EXIST LOAD 0.00 kVA 100 A 3 100 A TM 4 2 8 1.25
4 1B1P 0.00 kVA 150 A 3 150 A TM 4 1/0 6 2
3 1A1P 0.00 kVA 150 A 3 150 A TM 4 1/0 6 2
2 SPD 0.00 kVA 30 A 3 30 A
1 MAIN BREAKER 0.00 kVA 600 A 3 600 A LSI
CKT CIRCUIT DESCRIPTION
APPROX.
CONNECTED
LOAD
FRAME
SIZE POLES
TRIP
SETTING
BREAKER
TYPE
NUMBER OF
CONDUCTORS
WIRE
SIZE
GROUND
SIZE
CONDUIT
SIZE
SEE
NOTE
Feeder Size: 2 SETS OF (4-350 KCMIL, #1 GRD IN 3"C) Spec. Ref. #: 26 24 13 Voltage: 120/208 Wye-3PH-4W Mains Rating: 800 A
Supply From: Enclosure: Mains Type:
Location: Mounting: A.I.C. Rating:
DISTRIBUTION PANEL: DS-1B
0.00 kVA
TOTAL CONNECTED ESTIMATED DEMAND
NOTES:
5 Spare 0.00 kVA -- 3 200 A -- -- -- -- -- --
4 MCC-D 0.00 kVA 400 A 3 400 A LSI 4 500 3 4
3 ATS-12 / ELEV 15/16 0.00 kVA 250 A 3 250 A TM 3 250 4 2.5
2 SPD 0.00 kVA 30 A 3 30 A -
1 MAIN LUGS 0.00 kVA 400 A 3 400 A -
CKT CIRCUIT DESCRIPTION
APPROX.
CONNECTED
LOAD
FRAME
SIZE POLES
TRIP
SETTING
BREAKER
TYPE
NUMBER OF
CONDUCTORS
WIRE
SIZE
GROUND
SIZE
CONDUIT
SIZE
SEE
NOTE
Feeder Size: 2 SETS OF (4-350 KCMIL, #1 GRD IN 3"C) Spec. Ref. #: 26 24 13 Voltage: 480/277 Wye-3PH-4W Mains Rating: 800 A
Supply From: Enclosure: Mains Type:
Location: Mounting: A.I.C. Rating:
DISTRIBUTION PANEL: DS-1P
0.00 kVA
TOTAL CONNECTED ESTIMATED DEMAND
NOTES:
6 Spare 0.00 kVA -- 3 100 A -- -- -- -- -- --
5 EDPEQ (IMAGING) 0.00 kVA 600 A 3 600 A LSI 2 SETS OF 4 350 1 3
4 ATS-11 / ESWB-40 0.00 kVA 600 A 3 600 A LSI 2 SETS OF 4 350 1 3
3 PET / CT 0.00 kVA 125 A 3 125 A TM 3 1/0 6 1.5
2 SPD 0.00 kVA 30 A 3 30 A -
1 MAIN LUGS 0.00 kVA -- 3 0 A -- -- -- -- -- --
CKT CIRCUIT DESCRIPTION
APPROX.
CONNECTED
LOAD
FRAME
SIZE POLES
TRIP
SETTING
BREAKER
TYPE
NUMBER OF
CONDUCTORS
WIRE
SIZE
GROUND
SIZE
CONDUIT
SIZE
SEE
NOTE
Feeder Size: 2 SETS OF (4-500 KCMIL, #1/0 GRD IN 4"C) Spec. Ref. #: 26 24 13 Voltage: 480/277 Wye-3PH-4W Mains Rating: 800 A
Supply From: Enclosure: Mains Type:
Location: Mounting: A.I.C. Rating:
DISTRIBUTION PANEL: DS-1X
0.00 kVA
TOTAL CONNECTED ESTIMATED DEMAND
NOTES:
7 METERING 0.00 kVA -- 1 0 A -- -- -- -- -- --
6 Spare 0.00 kVA -- 3 0 A -- -- -- -- -- --
5 ATS-14 / LSDP 0.00 kVA 400 A 3 400 A TM
4 ATS-16 / CDP 0.00 kVA 600 A 3 600 A TM
3 ATS-17 / E4A 0.00 kVA 200 A 3 200 A TM
2 SPD 0.00 kVA 30 A 3 30 A TM -- -- -- --
1 MAIN BREAKER 0.00 kVA 1000 A 3 1000 A LSI -- -- -- --
CKT CIRCUIT DESCRIPTION
APPROX.
CONNECTED
LOAD
FRAME
SIZE POLES
TRIP
SETTING
BREAKER
TYPE
NUMBER OF
CONDUCTORS
WIRE
SIZE
GROUND
SIZE
CONDUIT
SIZE
SEE
NOTE
Feeder Size: 3 SETS OF (4-400 KCMIL, #3/0 G.E.C. IN 4"C) Spec. Ref. #: 26 24 13 Voltage: 120/208 Wye-3PH-4W Mains Rating: 1200 A
Supply From: Enclosure: Mains Type:
Location: Mounting: A.I.C. Rating:
DISTRIBUTION PANEL: GDE
0.00 kVA
TOTAL CONNECTED ESTIMATED DEMAND
NOTES: 1. PROVIDE 100% RATED BREAKER WITH KIRK KEY INTERLOCK TO TIE BREAKER.
2. PROVIDE BACNET OUTPUT ON METER AND TIE INTO JCI SYSTEM.
3. PROVIDE KIRK KEY INTERLOCK WITH MAIN BREAKER.
12 TIE BREAKER 0.00 kVA 2000 A 3 2000 A LSI 3
11 Spare 0.00 kVA 800 A 3 400 A LSI - - - - -
10 ATS-14 / LSDP 0.00 kVA 800 A 3 400 A LSI 4 500 3 4
9 1KE 0.00 kVA 800 A 3 400 A LSI 2 SETS OF 4 4/0 2 2.5
8 1KC / 1KD 0.00 kVA 800 A 3 400 A LSI 2 SETS OF 4 4/0 2 2.5
7 1KA / 1KB 0.00 kVA 800 A 3 400 A LSI 4 500 3 4
6 Spare 0.00 kVA 800 A 3 800 A LSI - - - - -
5 DPC 0.00 kVA 800 A 3 800 A LSI 2 SETS OF 4 500 1/0 4
4 DPA 0.00 kVA 800 A 3 800 A LSI 2 SETS OF 4 500 1/0 4
3 METERING 0.00 kVA 0 A 3 0 A - 2
2 SPD 0.00 kVA 60 A 3 60 A LSI
1 MAIN BREAKER 0.00 kVA 2000 A 3 2000 A LSI 1
CKT CIRCUIT DESCRIPTION
APPROX.
CONNECTED
LOAD
FRAME
SIZE POLES
TRIP
SETTING
BREAKER
TYPE
NUMBER OF
CONDUCTORS
WIRE
SIZE
GROUND
SIZE
CONDUIT
SIZE
SEE
NOTE
Feeder Size: 3-#2 MV-90 15KV EPR, 1-#2 600V GRD IN 4"C Spec. Ref. #: 26 23 00 Voltage: 120/208 Wye-3PH-4W Mains Rating: 2000 A
Supply From: Enclosure: Mains Type:
Location: Mounting: A.I.C. Rating:
DISTRIBUTION PANEL: US-1C
0.00 kVA
TOTAL CONNECTED ESTIMATED DEMAND
NOTES: 1. PROVIDE 100% RATED BREAKER WITH KIRK KEY INTERLOCK TO TIE BREAKER.
2. PROVIDE BACNET OUTPUT ON METER AND TIE INTO JCI SYSTEM.
3. PROVIDE KIRK KEY INTERLOCK WITH MAIN BREAKER.
12 DPLF (IMAGING) 0.00 kVA 800 A 3 800 A LSI 2 SETS OF 4 750 3/0 4
11 ATS-16 / CDP 0.00 kVA 800 A 3 600 A LSI 2 SETS OF 4 350 1 3
10 MCP / 10A1 0.00 kVA 800 A 3 400 A LSI 4 500 3 4
9 Spare 0.00 kVA 800 A 3 400 A LSI - - - - -
8 Spare 0.00 kVA 800 A 3 800 A LSI - - - - -
7 ATS-14 / E4A 0.00 kVA 800 A 3 200 A LSI 4 4/0 4 2.5
6 DS-1B 0.00 kVA 800 A 3 600 A LSI 2 SETS OF 4 350 1 3
5 DPD 0.00 kVA 800 A 3 800 A LSI 2 SETS OF 4 500 1/0 4
4 BUS TIE 0.00 kVA 0 A 3 0 A - 3
3 METERING 0.00 kVA 0 A 3 0 A - 2
2 SPD 0.00 kVA 60 A 3 60 A LSI
1 MAIN BREAKER 0.00 kVA 2000 A 3 2000 A LSI 1
CKT CIRCUIT DESCRIPTION
APPROX.
CONNECTED
LOAD
FRAME
SIZE POLES
TRIP
SETTING
BREAKER
TYPE
NUMBER OF
CONDUCTORS
WIRE
SIZE
GROUND
SIZE
CONDUIT
SIZE
SEE
NOTE
Feeder Size: 3-#2 MV-90 15KV EPR, 1-#2 600V GRD IN 4"C Spec. Ref. #: 26 23 00 Voltage: 120/208 Wye-3PH-4W Mains Rating: 2000 A
Supply From: Enclosure: Mains Type:
Location: Mounting: A.I.C. Rating:
DISTRIBUTION PANEL: US-1D
S E E U S - 1 D
S E E U S - 1 D
S E E U S - 1 C
B U S W A Y
SCALE: 3/8" = 1'-0"
DS-1A (NEW)
2 SCALE: 3/8" = 1'-0"
DS-1B (NEW)
SCALE: 3/8" = 1'-0"
CDP (NEW)
SCALE: 3/8" = 1'-0"
DS-1P (NEW)
4 SCALE: 3/8" = 1'-0"
DS-1X (NEW)
SCALE: 3/8" = 1'-0"
GDE (NEW)
6 SCALE: 3/8" = 1'-0"
US-1C (NEW)
7 SCALE: 3/8" = 1'-0"
US-1D (NEW)
1 BULLETIN 2 02-17-2017
K K K
EXIST. MEDIUM VOLTAGE SWITCHGEAR "MVSG"
600A, 12,470V-3PH-3W
EXIST. UNIT SUBSTATION "US-1A"
5000A, 208Y/120V-3PH-4W
NORMAL BRANCH
SPD
METERING
SWBD
EXIST. UNIT SUBSTATION "US-1B"
5000A, 208Y/120V-3PH-4W
NORMAL BRANCH
SPD
METERING
SWBD
EXIST. MV SWITCHGEAR "PS1"
12,470V
NORMAL BRANCH
50E 100E 50E 100E
UNIT SUBSTATION "US-1C"- DEMO
3000A, 208Y/120V-3PH-4W
NORMAL POWER BRANCH
EXIST. DISTRIBUTION PANEL "PP-1"
400A, 208Y/120V-3PH-4W
NORMAL POWER BRANCH (B013A)
EXIST. DISTRIBUTION PANEL "DPB"
800A, 208Y/120V-3PH-4W
NORMAL POWER BRANCH
EXIST. DISTRIBUTION PANEL "DPA"
800A, 208Y/120V-3PH-4W
NORMAL POWER BRANCH
EXIST. DISTRIBUTION PANEL "DPC"
800A, 208Y/120V-3PH-4W
NORMAL POWER BRANCH
EXIST. DISTRIBUTION PANEL "DPE"
800A, 208Y/120V-3PH-4W
NORMAL POWER BRANCH
EXIST. DISTR. PANEL "DPP"
800A, 208Y/120V-3PH-4W
NORMAL POWER BRANCH
800/3
S P
A R
E
LOW
VOLTAGE
A/H 30 A H
U
BB1 BB2
3000A
12,470V
750KVA
LF OIL
208Y/120V
3PH-4W
FE
E
D E
R A
FE
E
D E
R B
FE
E
D E
R C
FUTURE
3200A
A
B
SELECTOR
SWITCH
3,200A
A
B
SELECTOR
SWITCH
1B1 1B2
1A3 1A2 1A1
A
B
SELECTOR
SWITCH
1KC 1KD 1KE
VM
2B1 2B2 2B3
3E1
MH#1 MH#17
250E
250E
CGAE ROCHELLE #43
12,470 3PH, 3W
ALTERNATE 9295
CGAE ROCHELLE #44
12,470 3PH, 3W
ALTERNATE 9371
N.C. N.O.
3-2/0-1/0-15KV PLC CKT
450 KVAR
CAPACITOR
BANK
RM B13A
EXIST. PRIMARY SWITCHGEAR "PPSU"
100E 100E 100E
12,470 KV, SITE
12E 20E
"T-5"
150 KVA
208Y/120V
3PH, 4W
BLDG 5
"TPG"
300 KVA
208Y/120V
3PH, 4W
25E 30E
"T-13A"
750 KVA
480Y/277V
3PH, 4W
BLDG 13
"T-13B"
500 KVA
480Y/277V
3PH, 4W
BLDG 13
225 KVA
DRY TYPE
"US-3"
208Y/120V
3PH, 4W
BLDG 3
30E
3B1 3B2
4B1 4B2 4B3
5B1 5B2
6B1 6B2
7B1 7B2
8B1 8B2 8B3
9B1
5A2 5A1
S P
A R
E
4E2 4E1
3E2
2E3 2E2 2E1
MCC5
S P
A R
E
S P
A R
E
S P
A R
E
2A12A22A3
3A23A1
B1
S P
A R
E
S P
A R
E
9A1
4A2 4A1
BA1BA2
6A2 6A1
7A2 7A1
8A2 8A1
BE1BE2BE3
1E11E2 1C2 1C1
BC1BC2
2C12C22C3
3C13C2
5C2 5C1
4C2 4C1
6C2 6C1
7C2 7C1
9C1
8C2 8C1
S P
A R
E
S P
A R
E
S P
A R
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
2 3 4 6 7 8 9 1 2 3 4 5 6 7 8 9
MSP-1
BASEMENT
SEVENTH FLOOR
EIGHTH FLOOR
NINTH FLOOR
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FIFTH FLOOR
SIXTH FLOOR
FOURTH FLOOR
TENTH FLOOR
SPARE SPARESPARESPARESPARESPARE SPARE SPARE
SPACE
S P
A R
E
C H
IL
LE
R B
LD
G
A H
U
750 KVA
12470 TO
208/120
CAST RESIN
E X
IS
T.
P N
LS
4000A BUS DUCT
750 KVA
12470 TO
208/120
CAST RESIN
EXIST. DISTR. PANEL "DPK"
800A, 208Y/120V-3PH-4W
NORMAL POWER BRANCH
AHU13
S P
A R
E
S P
A R
E
S P
A R
E
S P
A R
E
2A4
5C3
6C3
MCC-5A
4E3
2E4
U
U
ATS
C-G&E
METERING
SWBD
SITE / BLDG 2, 3, 5, 8, 13, PG
3000A BUS DUCT
ELEVENTH FLOOR
SUB BASEMENT
M A
T C
H L
IN
E
50A
TO BLDG.15
MDP
1-
K
C M
IL
2-
K
C M
IL
2-
K
C M
IL
2-
K
C M
IL
1-#4/0
1-#4/0
2-
K
C M
IL
2-
K
C M
IL
1-
K
C M
IL
1- #4
/0
1-
K
C M
IL
1-
K
C M
IL
1-
K
C M
IL
R-1
1- #4
/0
5E1
1-350 KCMIL
1- #2
1- #6
1-#4/0
1-
K
C M
IL
1-
K
C M
IL
1-
K
C M
IL
1-
K
C M
IL
1-
K
C M
IL
1-
K
C M
IL
1-
K
C M
IL
1-
K
C M
IL
1-
K
C M
IL
1-
K
C M
IL
S P
A R
E
S P
A R
E
1-
K
C M
IL
1-
K
C M
IL
1- #4
/0
1-
K
C M
IL
50A
2- #3
/0
2-
K
C M
IL
2-
K
C M
IL
2-
K
C M
IL
2-500 KCMIL
2-500 KCMIL
1-#4/0
1-#4/0
1-#4/0
AT
AT
AT
AT
1- #2
1-500 KCMIL
C O
M P
A C
T O
R
C O
M P
A C
T O
R
P N
E U
M
TU
P
C O
M P
R E
S S
O R
1-
K
C M
IL
2- #4
/0
2- #4
/0
NEW UNIT SUBSTATION "US-1C"
2000A, 208Y/120V-3PH-4W
NORMAL POWER BRANCH
LSI
2000A
100% RATED
12,470V TO 208Y
750KVA
2-
K
C M
IL
2-
K
C M
IL
1-#2
1-500 KCMIL
1-#2
1-#2
1- #2
80A
"T-13D"
1000 KVA
480Y/277V
3PH, 4W
1-#4/0
1-#4/0
TO
U
S
80E
UNIT SUB
US2
1000 KVA
480Y/277V
3PH, 4W
BLDG 13
MH3
125A
"T-13C"
2000 KVA
480Y/277V
3PH, 4W
BLDG 13
SPD
SWBD
METERING
EX
EX
EX
EX EX EX
1KA
1KB
NEW 2000A
208Y/120V-3PH-4W
BUS DUCT
EX EX
1 1 1 1 1 1M
300/3 200/3 300/3 600/3 200/3 200/3 200/3 200/3
300/3 300/3 300/3 300/3 300/3 300/3 200/3 200/3
60/3 125/3 150/3 150/3
1600/3
800/3
400/3 600/3 800/3
800/3 800/3 800/3
800/3
3200A 800/3 800/3 800/3 800/3 400/3 800/3 600/3 400/3 800/3 800/3 800/3 800/3 800/3 800/3 3000/3 400/3 200/3 800/3 400/3
100/3 60/3 200/3 200/3 60/3 60/3
300/3 300/3 300/3 300/3 300/3 300/3 200/3 200/3 300/3 300/3 300/3 300/3 300/3 200/3 200/3 300/3
(2CA)
EX
EX
TO ATS
(1E5, 1E6, 1E7)
TO
ATS
(1E3, 1E4, 1E8)
EX
1211109765432
SPARE SPARE
TO
ATS
(14)
400 AF
(225 AT)
PANEL
S
PANEL
LITE
4- #4
/0
4-#2 TAP CONDUCTORS
1KB SUB-FEED FROM 1KA
S LITE PANEL
P2
400/3
IN ROOM SB0028 (PIPE SHOP)
This Document was originally issued by Gary S. Eodice on March 11, 2016.
This document is not considered a sealed document.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of on e-ei gh th in fo ot on e-qu ar te r in fo ot th re e-ei gh th s fo ot on e-ha lf in fo ot th re e-qu ar fo ot on e in fo ot on e an d on e-ha lf in fo ot th re e in ch fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
XX
HEAPY PROJECT No.: 2014-04022 FIRM LICENSE No.: 01528
/1
/2
:5
:0
A
M
CORRECT ELECTRICAL FCA
DEFICIENCIES
1/7/16
SINGLE LINE DIAGRAM
1E600
SCMSG
539-15-104
Cincinnati, Ohio
SCALE: 6" = 1'-0"
SINGLE LINE DIAGRAM
NOTES
1. RUN CT LEADS TO JCI METER CABINET. PROVIDE ALL SHORTING BLOCKS,
PROGRAMMING/TESTING AND HARDWARE REQUIRED.
2. SPLICE FEEDER IN SUB-BASEMENT AND EXTEND TO NEW SOURCE.
3. VERIFY IF PANEL / LOAD EXISTS AND REPLACE IF ANTIQUATED. INCLUDE PANEL
REPLACEMENT IN BID. LOCATE ON AS-BUILTS.
4. TRACE LOAD AND LOCATE ON AS-BUILTS.
5. PROVIDE BACNET OUTPUT ON METER AND TIE INTO JCI SYSTEM.
6. ALL FAULT CURRENT VALVES ARE SHOWN FROM 2009 STUDY FURNISHED BY VA.
SHORT CIRCUIT STUDY SHALLY BE COMPLETED PRIOR TO SUBMITTING SHOP
DRAWINGS. ADD 1,000 SCA TO ALL SHOWN AVAILABLE FAULT CURRENT AMPS
AND BRACE PANELS ACCORDINGLY (TO ACCOMMODATE FUTURE INCREASE IN
SYSTEM SHORT-CIRCUIT AVAILABILITY).
CROSS HATCHED PANEL INDICATES TO REMOVE ANTIQUATED PANELBOARD INTERIOR
(COVER,BUSSING, BREAKERS, ETC.) AND REPLACE WITH NEW. PROVIDE NEW
NAMEPLATE. CLEAN AND REMOVE ANY RUST/CORROSION FROM PANEL TUB. RE-
TERMINATE ALL EXISTING BRANCH CIRCUITS AND FEEDERS TO REMAIN TO NEW
INTERIOR. EXISTING CIRCUIT NUMBERS SHALL MATCH NEW. INTERCEPT AND EXTEND
CONDUCTORS AS REQUIRED TO MAKE CONNECTION TO NEW BREAKERS/LUGS. PRIOR
TO SUBMITTING SHOP DRAWINGS AND AGAIN BEFORE ORDERING NEW PANEL INTERIOR
AND CUSTOM COVER, REMOVE EVERY EXISTING PANELBOARD COVER, FIELD MEASURE
EXACT TUB/FEEDER DIMENSIONS, AND VERIFY BREAKERS. RE-INSTALL COVER WHEN
FINISHED MEASURING. PROVIDE CUSTOM INTERIOR AND COVER TO FIT TUB. NO
ALLOWANCES WILL BE MADE FOR FAILURE TO DO SO. REFER TO SEQUENCE OF
CONSTRUCTION NOTES FOR MAXIMUM OUTAGE DURATION. CONTRACTOR SHALL
PROVIDE TEMPORARY POWER TO THIS PANELBOARD UPON FAILURE TO COMPLY WITH
MAXIMUM OUTAGE DURATION DUE TO INADEQUATE PREPARATION/SITE INVESTIGATION.
DIMENSIONS LISTED ARE APPROXIMATE.
EX EXISTING NEWER PANEL TO REMAIN.
SYMBOLS
GENERAL NOTES
A. REFER TO SEQUENCE OF CONSTRUCTION NOTES FOR PHASING / TEMPORARY
REQUIREMENTS.
B. FAULT CURRENT VALUES SHOWN FROM VA PROVIDED SHORT CIRCUIT STUDY.
VERIFY ALL PRIOR TO ORDERING.
C. REMOVE EXISTING AND PROVIDE NEW PHENOLIC NAMEPLATES (PER
SPECIFICATIONS) FOR ALL EQUIPMENT SHOWN ON THIS SINGLE LINE DIAGRAM.
D. LIGHT LINEWEIGHT INDICATES EXISTING EQUIPMENT.
DARK LINEWEIGHT INDICATES NEW EQUIPMENT.
DARK DASHED LINEWEIGHT INDICATES EQUIPMENT TO BE REMOVED.
FAULT CURRENT SCHEDULE
REF.
POINT DESCRIPTION
AVAILABLE
SHORT
CIRCUIT AMPS
1 MVSG 4,800
2 PS1 4,800
3 US-1A 32,500
4 US-1B 31,400
5 DPB 16,600
6 DPE 18,300
7 DPP 13,600
8 DPK 8,900
9 US-1C 32,100
10 US-1D 32,300
11 DPA 18,500
12 DPC 18,500
13 1KA 11,500
14 1KC/D 13,900
15 1KE 13,900
16 DPD 18,600
17 DS-1B 19,500
18 US-1X 15,200
19 US-1P 22,700
20 X-RAY 12,300
21 DS-1X 14,200
22 DS-1A 13,300
23 DS-1P 20,700
24 PP1 20,400
25 1E7 27,600
26 1E3 27,200
27 BB1 16,700
28 1B1 15,500
29 2B1 10,800
30 3B1 10,100
31 5B1 8,900
32 7B1 7,900
33 8B1 6,400
34 R1 6,400
35 BE1 17,000
36 1E1 15,800
37 2E1 14,100
38 3E1 11,200
39 4E1 10,700
40 B1 10,800
41 BA1 17,200
42 1A1 16,000
43 2A1 15,000
44 3A1 14,100
45 4A1 11,300
46 5A1 10,800
47 6A2 9,100
48 7A1 8,700
49 8A1 8,200
50 9A1 7,900
51 BC1 16,600
52 1C1 15,500
53 2C1 12,900
54 3C1 12,200
55 4C1 11,000
56 5C1 10,500
57 6C1 9,100
58 7C1 8,700
59 8C1 8,400
60 9C1 7,800
61 VM 5,600
62 BD1 17,200
63 1D1 16,100
64 2D1 15,000
65 2DX 15,000
66 3D1 13,300
67 4D1 12,600
68 5D1 10,500
69 6D1 10,100
70 7D1 8,800
71 8D1 9,300
72 9D1 8,900
73 1B1P 8,000
74 BC1P 8,000
75 1C1P 8,000
76 1C2P 8,000
77 1C3P 10,000
78 1C4P 4,800
79 BC2P 6,900
80 DP2 16,400
81 DP3 12,600
82 1C5P 8,100
83 R3D 10,600
84 2C5P 7,200
85 2C1L 6,900
86 L3D 7,800
87 1C3L 8,800
88 1C2L 8,800
89 BL1 7,100
90 L2B 8,800
91 L2C 6,200
92 1A1L 8,800
93 BC1L 10,100
94 GDE 3,600
95 CDP 25,100
96 LSDP 21,000
97 LSAB 13,400
98 LSA1 11,600
99 LSA2 10,900
100 LSA3 9,900
101 LSA5 9,600
102 CBC 13,700
103 C1C 12,200
104 C2C 11,000
105 C3C 10,000
106 C4C 9,200
107 C5C 8,300
108 CBD 12,200
109 C1D 11,000
110 C2D 10,000
111 C3D 9,200
112 C5D 7,900
113 ESWB 4,000
114 C3C 11,500
115 C3D 11,500
116 CR3E 1,300
117 ESWB-10 11,700
118 LS2C 7,100
119 LS2A 7,100
120 LS2B 7,100
121 S3B 500
122 ESWB-20 12,000
123 NOT USED 9,100
124 BEC1 11,900
1 BULLETIN 3 REV 2 01-17-2018
K KK
UNIT SUBSTATION "US-1D" - DEMO
3000A, 208Y/120V-3PH-4W
NORMAL POWER BRANCH
EXIST. DISTRIBUTION PANEL "DPD"
800A, 208Y/120V-3PH-4W
NORMAL POWER BRANCH
DIST. PANEL "DS-1B"- DEMO
1000A, 208Y/120V-3PH-4W
NORMAL POWER BRANCH
3000A
12,470V 208Y
750KVA
600A
200/3 (150A)
600A
1D3 1D2 1D1
5D2 5D1
2D12D2
3D13D2
4D1
BD1BD2
6D2 6D1
8D2 8D1
1 2 3 4 5 6 7 8 9
7D27D1
9D1
2DX
S P
A R
E
L5D
1C4P1C3P1C2P1C2PA1C2PB1C1P1C1PA
BC1P
1B1P1A1P
200/3 (200A)
200/3 (150A)
EXIST. DISTRIBUTION PANEL "US-1P"
2500A, 480Y/277V-3PH-4W (RM A23)
NORMAL POWER BRANCH
PP1
LP-B
480V TO 208Y 5KVA
2500A
DIST. PANEL "DS-1P"-DEMO
800A, 480Y/277V-3PH-4W
MCP2
MCC-D MCC-G
MCC-B
MCC-C
CH-1
EXIST. DISTRIBUTION PANEL "US-1X"
2500A, 480Y/277V-3PH-4W (RM A23)
NORMAL POWER BRANCH
4P1
1200A
750 KVA
12,470V TO
277/480V-3PH-4W
CH-2
MCC-2
X-RAY
DIST. PANEL "DS-1X"-DEMO
600A, 480Y/277V-3PH-4W (RM C8)
BL1
L2C
M C
C N
O R
T H
W A
LL
A H
U 5)
1A1L
BC1L
L2A
L3A L3C
L2B
L3B
BASEMENT
SEVENTH FLOOR
EIGHTH FLOOR
NINTH FLOOR
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FIFTH FLOOR
SIXTH FLOOR
FOURTH FLOOR
TENTH FLOOR
SPARESPARESPARE
10A1MCP
BC2P
BC3P
3C5P3C6P R3D (A395) R3E
2500A BUS DUCT
TBR1
BR1
L3D
ELEVENTH FLOOR
SUB BASEMENT
M A
T C
H L
IN
E
M A
T C
H L
IN
E
NEW UNIT SUBSTATION "US-1D"
3000A, 208Y/120V-3PH-4W
NORMAL POWER BRANCH
LSI
2000A
100% RATED
12,470V, 750KVA
LF OIL
208Y/120V
3PH-4W
SPARESPARE
SWBD
METERING
TO DPLF
(IMAGING)
2-
K
C M
IL
2-
K
C M
IL
1-
K
C M
IL
1-
K
C M
IL
1-
K
C M
IL
1-
K
C M
IL
1-
K
C M
IL
1- #4
/0
1- #1
/0
6D3
NEW DIST. PANEL "DS-1P"
800A, 480Y/277V-3PH-4W
1-250 KCMIL
PET
CT
TO EDPEQ (IMAGING)
NEW DIST. PANEL "DS-1X"
800A, 480Y/277V-3PH-4W (RM C8)
2-
K
C M
IL
1000 KVA
12,470V TO
277/480V-3PH-4W
MCCD
(A23)
1- #4
/0
1- #6
1- #1
TLPB
2-
K
C M
IL
1-
K
C M
IL
2-
K
C M
IL
2-
K
C M
IL
2-
K
C M
IL
NEW DISTRIBUTION PANEL "DS-1B"
800A, 208Y/120V-3PH-4W
NORMAL POWER BRANCH
1- #4
/0
1- #4
/0
1- #4
/0
1- #1
/0
1- #2
1- #4
/0
2C6P
1C6P
2C5P
1C5P
SWBD
METERING
TO
A
T S
E S
W B
-F -3
IM
A G
IN
G
1-
K
C M
IL
2-
K
C M
IL
2-
K
C M
IL
2-
K
C M
IL
C3042
FLUOR
OPS
SPARE
P-ELEV-18
2C1L
1- #2
1-#2 1- #2
1- #2
1- #2
1- #2
1-
1-
1- #2
1- #2
1- #2
1- #8
15 KVA
M C
C A
H U
E
A S
T W
A
LL
R
M
C 8)
1-250 KCMIL
1-#2
SPD
NEW 2000A BUS DUCT
2-350 KCMIL
S P
A R
E
400A400A
DIST. PANEL "DS-1A"- DEMO
800A, 480Y/277V-3PH-4W (RM C8)
DIST. PANEL "DS-1A1" - DEMO
800A, 480Y/277V-3PH-4W (RM C8)
DIST. PANEL "DS-1A2" - DEMO
800A, 480Y/277V-3PH-4W (RM C8)
NEW DIST. PNL "DS-1A"
800A, 480Y/277V-3PH-4W (RM C8)
Ex
ExEx
Ex
Ex
ExEx
EXIST. DIST. PANEL "DPF"
400A, 480Y/277V-3PH-4W
1F2
MAMMO
C1041F1
2F12F2
ExEx
Ex Ex Ex
DP3
208Y/120V-3PH-4W
R3B
R3C
100 100 100
R3A R3E
R4A
DP2
208Y/120V-3PH-4W
R2B
100 100 300
R2A R2C (C309) R2E
100 100
R2FR2D
TO DPF
(IMAGING)
Ex Ex
1-#2
1-
0K C
M
IL
1- #1
1C3L1C2L1C5L
Ex
TR
A
C E
L O
A D
1-#6 1-#6
(C109)
Ex
Ex
1- #4
/0
1-
K
C M
IL
1- #2
1- #1
/0
1- #1
/0
200/3 (150A)
(A23)
Ex
Ex
Ex Ex
2 2
1 1 1 1 1 1
Ex
Ex Ex
Ex Ex
Ex
Ex
Ex
ExEx
Ex Ex
SPD
M
SPD
SPD
ExEx
100/3 (100A)
100/3 (100A)
200/3 (150A)
200/3 (200A)
100/3 (100A)
100/3 400/3 (400A)
400/3 (400A)
200/3 (200A)
200/3 (200A)
200/3 (200A)
200/3 (200A)
200/3 (200A)
100/3 (100A)
100/3 (100A)
400/3 (400A)
200/3200/3400/3300/3300/3300/3300/3300/3
225/3 150/3 35/3 150/3
800/3 600/3 800/3 800/3 800/3 400/3 600/3 600/3 800/3
600/3 400/3 600/3 400/3 800/3 600/3 600/3 300/3
400/3250/3
(125A)
(600A)
200 200
100/3 (100A)
100/3 (90A)
100/3 (100A)
100/3 (100A)
100/3 (100A)
100/3 (60A)
100/3 (100A)
100/3 (100A)
100/3 (100A)
100/3 (100A)
100/3 (100A)
400/3 (400A)
400/3 (400A)
100/3 (100A)
200/3 (200A)
200/3 (200A)
Ex
Ex Ex
Ex Ex
TO
"US-1A"
TO ATS
(1E3, 1E4, 1E8)
TO
ATS
(9, 10, 11, 12, SURG SUITE)
TO
ATS
(1E5, 1E6, 1E7)
TO
"US-1B"
TO ATS
(1E2, 1E9, 16, 17)
TYP.
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1819 20
SPARE SPARE
19.5KAIC
2-350 KCMIL
1-#4/0
TO
"US-1C"
2 4 5 7 8 9 10 11 1231 6
36,411AIC
TEMP. DIST. PANEL
1200A, 208Y/120V-3PH-4W
2 3 4 5 6 7
1200A/3P
600/3
480V
300KVA
208Y/120V
TEMP. XFMR
7 7
3 4 21 5
S P
A R
E
20.7KAIC
1 3 4 5 6 2
14.2KAIC
4 5 6 7 8 9 10 3
SPD
21 11 12 13 14 15 16 17 18 19 20
13.3KAIC
7 7
SPARE
0A
TO ATS SURG.
TO NEW ATS-1 (MCC-E/F)
7#1 /0
2-350 KCMIL
0A
0A
0A
0A
0A
5A
64 65
73 75
0A
MULTI-STACK
0A
EX. QUANTITY 2
PULL BOX
1C1L
2-350KCMIL
2-
K
C M
IL
This Document was originally issued by Gary S. Eodice on March 11, 2016.
This document is not considered a sealed document.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of on e-ei gh th in fo ot on e-qu ar te r in fo ot th re e-ei gh th s fo ot on e-ha lf in fo ot th re e-qu ar fo ot on e in fo ot on e an d on e-ha lf in fo ot th re e in ch fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
XX
HEAPY PROJECT No.: 2014-04022 FIRM LICENSE No.: 01528
/1
/2
:5
:0
A
M
CORRECT ELECTRICAL FCA
DEFICIENCIES
1/7/16
SINGLE LINE DIAGRAM
1E601
SCMSG
539-15-104
Cincinnati, Ohio
SCALE: NONE
SINGLE-LINE DIAGRAM
CROSS HATCHED PANEL INDICATES TO REMOVE ANTIQUATED PANELBOARD INTERIOR
(COVER,BUSSING, BREAKERS, ETC.) AND REPLACE WITH NEW. PROVIDE NEW
NAMEPLATE. CLEAN AND REMOVE ANY RUST/CORROSION FROM PANEL TUB. RE-
TERMINATE ALL EXISTING BRANCH CIRCUITS AND FEEDERS TO REMAIN TO NEW
INTERIOR. EXISTING CIRCUIT NUMBERS SHALL MATCH NEW. INTERCEPT AND EXTEND
CONDUCTORS AS REQUIRED TO MAKE CONNECTION TO NEW BREAKERS/LUGS. PRIOR
TO SUBMITTING SHOP DRAWINGS AND AGAIN BEFORE ORDERING NEW PANEL INTERIOR
AND CUSTOM COVER, REMOVE EVERY EXISTING PANELBOARD COVER, FIELD MEASURE
EXACT TUB/FEEDER DIMENSIONS, AND VERIFY BREAKERS. RE-INSTALL COVER WHEN
FINISHED MEASURING. PROVIDE CUSTOM INTERIOR AND COVER TO FIT TUB. NO
ALLOWANCES WILL BE MADE FOR FAILURE TO DO SO. REFER TO SEQUENCE OF
CONSTRUCTION NOTES FOR MAXIMUM OUTAGE DURATION. CONTRACTOR SHALL
PROVIDE TEMPORARY POWER TO THIS PANELBOARD UPON FAILURE TO COMPLY WITH
MAXIMUM OUTAGE DURATION DUE TO INADEQUATE PREPARATION/SITE INVESTIGATION.
DIMENSIONS LISTED ARE APPROXIMATE.
EX EXISTING NEWER PANEL TO REMAIN.
SYMBOLS
NOTES
1. RUN CT LEADS TO JCI METER CABINET. PROVIDE ALL SHORTING BLOCKS,
PROGRAMMING/TESTING AND HARDWARE REQUIRED.
2. SPLICE FEEDER IN SUB-BASEMENT AND EXTEND TO NEW SOURCE.
3. VERIFY IF PANEL / LOAD EXISTS AND REPLACE IF ANTIQUATED. INCLUDE PANEL
REPLACEMENT IN BID. LOCATE ON AS-BUILTS.
4. TRACE LOAD AND LOCATE ON AS-BUILTS.
5. PROVIDE BACNET OUTPUT ON METER AND TIE INTO JCI SYSTEM.
6. REMOVE TEMPORARY FEEDER IN A23, INTERCEPT AND EXTEND TO NEW BREAKER
IN US-1X. REFER TO 1EP104 FOR FEEDER SIZE.
7. SPLICE FEEDER IN ELECTRIC ROOM.
8. SPLICE FEEDER IN EXISTING / MODIFIED PULLBOX.
9. RUN 2 SETS OF (3-350KCMIL, #1 GRD. IN 3"C.).
10. UTILIZE NEW GDE DRY TYPE TRANSFORMER (BEFORE PERMANENT INSTALLATION)
AS TEMPORARY TO PERMIT REPLACEMENT OF US-1C/D. REMOVE AT COMPLETION
OF REPLACEMENT.
11. PROVIDE NEW 480V-600A/3P BREAKER IN GE UNIT SUBSTATION.
12. RUN 3 SETS OF (4-600KCMIL, #3/0 GEC. IN 4"C.).
13. RUN TEMPORARY FEEDERS FROM A23 ELECTRIC ROOM TO NEW SPLICE BOX IN
SUB-BASEMENT FOR TEMPORARY POWER TO US-1C/D LOADS. SIZE BREAKERS FOR
EXISTING FEEDER ACTUAL LOADS (PEAK TOTAL LOAD ON US-1C/D IS 300KVA EACH).
ONE FEEDER IN US-1C SHALL BE TEMPORARIED FROM US-1D SPARE BREAKER AND
VICE-VERSA TO PERMIT 300KVA DRY TYPE TO CARRY THE LOAD.
14. DELETE THIS WORK UNDER BID ITEM # 3.
15. DELETE THIS WORK UNDER BID ITEM # 4.
GENERAL NOTES
A. REFER TO SEQUENCE OF CONSTRUCTION NOTES FOR PHASING / TEMPORARY
REQUIREMENTS.
B. FAULT CURRENT VALUES SHOWN FROM VA PROVIDED SHORT CIRCUIT STUDY.
VERIFY ALL PRIOR TO ORDERING.
C. REMOVE EXISTING AND PROVIDE NEW PHENOLIC NAMEPLATES (PER
SPECIFICATIONS) FOR ALL EQUIPMENT SHOWN ON THIS SINGLE LINE DIAGRAM.
D. REFER TO 1E600 FOR FAULT CURRENT SCHEDULE.
E. LIGHT LINEWEIGHT INDICATES EXISTING EQUIPMENT.
DARK LINEWEIGHT INDICATES NEW EQUIPMENT.
DARK DASHED LINEWEIGHT INDICATES EQUIPMENT TO BE REMOVED.
1 BULLETIN 3 REV 2 01-17-2018
EN
EN
EN
G G
EN EN EN
EN
EN
EN
ENEN
EN EN EN
EN
EN
E N
E N
EN
E N
ENEN
EXIST. DISTRIBUTION PANEL "ESB"
2000A, 208Y/120V-3PH-4W
EMERGENCY POWER BRANCH
800A
ATS
"1E7" 800A
EQUIPMENT
BRANCH
300A 200A 200A 400A
PSBE
PNL
E4A
PNL
MCP-E
PNL
P1
PNL
P2
4TH FLR
UPS
600A
ATS
"1E6" 600A
EQUIPMENT
BRANCH
ATS
"1E4" 400A
EQUIPMENT
BRANCH
PPNL
EL2
ELEVATORS
1 # 2
ATS
"1E3" 600A
CRITICAL
BRANCH
EXIST. DIST. SWBD "IE3"
600A, 208Y/120V-3PH-4W, 65 KAIC
C3E
C4E
C2E
C1E
C3B
C4B
C2B
C1B
200A 200A 200A 200A
C6B2
C7B
150A 200A
CBB
C5B
MEDICAL
AIR
CBE EG
C3K1
C6B
C8B
C9B
C1E
ATS
"1E8" 200A
400A
TO ATS
"1E15"
BLDG 15
200A (100A)
JOCKEY
PUMP
2000A
NEW DIST. PANEL "CDP"
600A, 208Y/120V-3PH-4W (RM. A23)
CRITICAL POWER BRANCH
100/3
CBC
300/3200/3200/3200/3
C4C
C1C
C2C
C3C
C8C
C7C
C6C
C5C
C9C
CBD
200/3
C4D
C1D
C2D
C3D
C8D
C7D
C6D
C5D
C9D
PBX
200/3
DIST. PNL "LSDP"
400A, 208Y/120V-3PH-4W (RM. A23)
LIFE SAFETY BRANCH
LSAB
LSA4
LSA1
LSA2
LSA3
LSA8
LSA7
LSA6
LSA5
LSA10
LSA1A
LSA9
EX. DIST. SWBD "IE7"
800A, 208Y/120V-3PH-4W, 65 KAIC
XXXA
GENERATOR PARALLELING SWITCHGEAR
5000A, 208Y/120V-3PH-4W
2500/3 2000/3
CONNECTION
TO LOAD
BANK / TRAILER
GENSET
SPARE
TGEN #1
750 KVA
480/208Y/120V, 3P,4W
1000/3 2500/3 400/3 1600/3 2500/3
1500KW
GENSET
480Y/277V
3PH, 4W
RM. B13
ATS-14
"1E1"
400A LIFE
SAFETY
BRANCH
RM. A23
800A 200A
480V
300KVA
208Y/120V
ATS-16
"1E2" 600A
CRITICAL
BRANCH
ATS-17
"1E9" 225A
EQUIPMENT
BRANCH
RM. A23
250A
1500KW
GENSET
480Y/277V
3PH, 4W
RM. B13
NONCNCNONCNCNO
BASEMENT
DIST. SWBD "GDE" - DEMO
1000A, 208Y/120V-3PH-4W, RM A23
EXIST. DIST. SWBD "ESWB"
1600A, 480Y/277V-3PH-4W
ATS-12
250A
ATS-11
600A
EQUIP.
BRANCH
600A
EX. DIST. SWBD "ESWB-40"
600A, 480Y/277V-3PH-4W, 35 KAIC
200A 400A 200A 150A125A 200A
X2A
X3A
OR
C1F
ER
ELEV
C1FA
ATS-10
400A
CRITICAL
BRANCH
400A
EX. DIST. SWBD "ESWB-20"
400A, 480Y/277V-3PH-4W, 35 KAIC
250A 100A 50A 200A60A 200A
C1A
CR2A CR2A1C2B
C3B
C2C C2A
C3A
ATS-9
200A
LIFE SAFETY
BRANCH
200A
EX. DIST. SWBD "ESWB-10"
200A, 480Y/277V-3PH-4W, 35 KAIC
50A 100A 100A20A 100A
LS2A
LS3A
LS2B
LS3B
S3B
SICU
XFMR
LS2C
LS3C
300A
ATS-SURG SUITE
200A
LIFE SAFETY
BRANCH
200A250A
ATS-2
MCC-F
ATS-1
MCC-E
SEVENTH FLOOR
EIGHTH FLOOR
NINTH FLOOR
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FIFTH FLOOR
SIXTH FLOOR
FOURTH FLOOR
TENTH FLOOR
400A
ELEVENTH FLOOR
PPNL
EL3
ELEVATORS
5 & 6
400A
PPNL
EL1
ELEVATORS
3 & 4
ATS
"1E5" 400A
EQUIPMENT
BRANCH
400A
SUB BASEMENT
C5C2
15 KVA
E4A
(4TH P.H.)EP4AEP4B
TB
9KVA
CR3A
CR2B
T2 T1
40A
3CEC1
C3E
TA
30KVA
3CEC2
40A
BEC1
ELEV.
ELEV
"E-16"
ELEV.
ELEV
"E-15"
LSA10A
M A
T C
H L
IN
E
1-500
1-500 KCMIL
25 HP
FIRE PUMP
ATS
ELEV.
P-17
2-
K
C M
IL
2-
K
C M
IL
1-
K
C M
IL
2-
K
C M
IL
2-
K
C M
IL
1-
K
C M
IL
1- #4
/0
1- #4
/0
1-#4/0
1-
K
C M
IL
EQUIPMENT
2-500 KCMIL
1- #4
/0
3-
K
C M
IL
2-
K
C M
IL
2-
K
C M
IL
2-
K
C M
IL
1-
K
C M
IL
1-
K
C M
IL
2-
K
C M
IL
1-#2
C2E1
1- #4
/0
1- #4
/0
1- #4
/0
1-
K
C M
IL
2-
K
C M
IL
CRITICAL POWER BRANCH
1- #2
1- #3
/0
1- #4
/0
1-
K
C M
IL
2-
K
C M
IL
1- #4
/0
480V
300KVA
208Y/120V K = 4
TO
C
D P
(I
M A
G
IN
G
NEW DIST. SWBD "GDE"
1000A, 208Y/120V-3PH-4W, RM A23
DIST. PANEL "CDP" - DEMO
600A, 208Y/120V-3PH-4W (RM. A23)
CRITICAL POWER BRANCH
(280AT) (560AT) (140AT)
1-500KCMIL
1-500KCMIL
2-350KCMIL
2-350KCMIL
1- #4
/0 1-
#4 /0
PBX
LIEBERT
CBT
TO
L
D P
F
IM
A
G
IN
G
1- #4
/0
1- #4
/0
1- #4
/0
1- #4
/0
1- #4
/0
1- #4
/0
1- #2
1- #4
/0
C6C1 C6D1
1-#21-#2
CR3E CR3C
1-#4
1-#6
30 KVA
C3C C3D
1- #4
/0
1-
K
C M
IL
1- #2
1- #2
1- #8
1- #2
1-
K
C M
IL
2-
K
C M
IL
1-
K
C M
IL
1- #4
/0
1- #4
/0
1-
K
C M
IL
1-
K
C M
IL
1-
K
C M
IL
MCC-E
1-
K
C M
IL
1-350 KCMIL
MCC-F
1- #2
1-250 KCMIL
1-#2
EQUIP. BRANCH CRITICAL LIFE SAFETY
1- #1
/0
1- #4
/0
1-
K
C M
IL
1- #3
/0
1- #2
1- #4
/0
1- #4
/0
50A
1CEC4
(C176)
50A
2CEC1
1- #6
1- #6
1- #6
1- #4
S3A
15 KVA
1-#10
1-#81-#8
T2CEC1
CR3D
1-#4 1-#4
30 KVA
TC
R
3D
CR3B
15 KVA
1-#10
1-#8
1-#4 1-#6
CR2C2 TCR2C1
30 KVA
1-#4 1-#8 1-#1 1-#4
45 KVA
CSB
2-
K
C M
IL
TO PANEL
M / O
BLDG 15
Ex
Ex Ex
Ex
Ex Ex
NEW
400A/4P
ATS-14
NEW
600A/4P
ATS-16
CRITICAL
NEW
225A/4P
ATS-17
C5B1
Ex
Ex
Ex Ex
Ex
Ex
Ex
Ex
Ex
Ex
Ex
Ex Ex
200/3
TO
C
D P
F
IM
A
G
IN
G
70A
45KVA
CR3FCR3G
1- #2
/0 1-
#4
400A
TO ATS ESWB-F-3
(IMAGING)
IN C008
(BLDG 1)
C1F2
Ex
1-#6
C2F
C2F1
Ex
Ex
BCEC1
XFMR
BC
30KVA
1- #6
1-#6
1CEC3
1EC3 1EC1 1EC2 1EB1
1CEC4
(C109)
1-#4
Ex Ex
Ex
Ex
Ex Ex Ex
SDP
1-#6
1-#6
ExEx
Ex Ex Ex Ex
200A
600A
200/3 200/3 200/3 30/3 200/3
TO
"US-1A"
TO
"DS-1A", "DS-1P",
"DS-1X"
TO
"US-1B"
TO
"US-1D"
Ex
Ex
Ex Ex Ex
Ex
TO BLDG
15 / 16
ATS
30KVA
E3C
Ex
ExEx
CR2C1
TO
"DS-1A"
TO
"US-1C"
1345 6
SPARE
SPD
SWBD
METERING
1-
K
C M
IL
2-
K
C M
IL
2 3 4 5 6 7 8 9 10 111 12
SPARE
1-
K
C M
IL
1-
K
C M
IL
14…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .